    ORGANIZATION STRUCTURE

    BREAK EVEN POINT

    PROJECT STAGES

    PRE TENDER STAGE

    BIDDING THEORY

    THE DECISION TO TENDER

    PRICING PROCEDURE

    COST RESOURCES

    EFFICIENCY

    6- CONSTRUCTION RATES

    METHOD OF CONSTRUCTION STATEMENT

    TENDER ANALYSIS

    (FINANCE)

    CASH FLOW

    3

    3

  • Index

    ( PRE CONTRACT STAGE

    PRECONTRACT MEETING

    CONTRACT SIGNATURE

    PROJECT ORGANIZATION CHART

    SITE LAYOUT PLAN

    SHOP , AS BUILT DRAWINGS

    SUBMITTALS

    SUPPLIERSPURCHASE ORDERS

    SUBCONTRACTORS

    PROJECT TIME SCHEDULING

    ( - CONSTRUCTION STAGE)(SITE MOBILIZATION)

    MANAGEMENT PROJECT COMMUNICATIONS

    CO ORDINATION , FOLLOW UP

    CONTROL

    CRASHING

    MATERIALS

    PROCUREMENT

    STORES

    PAYMENTS

    INCENTIVES

    EQUIPMENTTS

    DOCUMENTATION

    CLAIMS

    SAFTY ARRANGEMENTS

    4

    4

  • Part 1-Construction Management

    5

    5

  • Part 1-Construction Management

    6

    6

  • Part 1-Construction Management

    TIME , COST , QNALITY

    PLANING ORGANIZING

    CONTROALDIRECTING

    STAFFING

    7

    7

  • Part 1-Construction Management

    GOALSPOLICY

    PROCEDURESSCHEDULES

    RESOURCESDECISIONS

    8

    8

  • Part 1-Construction Management

    C..P.M

    BAR CHARTS

    9

    9

  • Part 1-Construction Management

    10

    10

  • Part 1-Construction Management

    11

    11

  • Part 1-Construction Management

    12

    12

  • Part 1-Construction Management

    METHOD STATEMENT

    13

    13

  • Part 1-Construction Management

    14

    14

  • Part 1-Construction Management

    15

    15

  • TIME , COST , QUALITY

    16

    16

  • 17

    17

  • Part 1-Construction Management

    18

    18

  • Part 1-Construction Management

    19

    19

  • JOP DESCRIPITION

    UNIT RATE CONTRACT

    CONTENGENCY

    20

    20

  • COST PLUS

    LUM SUMP

    CLAIM

    21

    21

  • PARTIAL LUM SUMP

    22

    22

  • Part 1-Construction Management

    23

    23

  • Part 1-Construction Management

    24

    24

  • 25

    25

  • (

    )

    CM

    -

    /slx.

    62

    62

  • BIG PEOPLE DISCUSS IDEAS

    27

    27

  • 28

    28

  • RECORDS

    RECORDS

    RECORDS

    UPDATING

    INQUIRIESQUOTATIONS

    TENDER ANALSIS

    COST , TIME , QUALITY

    29

    29

  • METHOD STATEMENT

    SHOP DRAWINGS

    CLAIMS

    VARIATION ORDERS

    30

    30

  • FLOW CHART

    RECORD

    31

    31

  • FLOW CHART

    32

    32

  • Flow C

    harts of VB

    Program

    s

    Equipm

    ents Filing System

    Change Password

    Add

    Edit

    Delete

    Project

    Add

    Edit

    Delete

    Code

    Master

    Search Equipments

    Utility

    Add

    View

    Edit

    Delete

    Equipment

    by Project

    by Code

    by Serial No.

    Specified Code

    Company Equipm

    ents

    by Project

    Spfd. Code

    Project Equipments

    License

    Display

    by Project

    by Code

    by Serial No.

    Specified Code

    Company Equipm

    ents

    by Project

    Spfd. Code

    Project Equipments

    Detailed

    by Project

    by Code

    by Serial No.

    Specified Code

    Company Equipm

    ents

    by Project

    Spfd. Code

    Project Equipments

    BriefLicense

    ReportsExit

    EFS

    3 3

    3 3

  • 34

    34

  • 3 5

    3 5

  • Flow C

    harts of VB

    Program

    s

    Em

    ployees Managem

    ent System

    Change P

    assword

    Add

    Edit

    Delete

    Project

    Master

    Spfd. D

    esignation

    Spfd. D

    esig. of a Proj.

    Delete

    Search

    Utility

    Add

    View

    Edit

    Delete

    Em

    ployee

    by Project

    by Designation

    by Serial N

    o.

    by License

    by Nationality

    Spfd. D

    esignation

    Com

    pany Em

    ployees

    by Designation

    by License

    by Nationality

    Spfd. D

    esignation

    Project E

    mployees

    Display

    by Project

    by Designation

    by Serial N

    o.

    by License

    by Nationality

    Spfd. D

    esignation

    Com

    pany Em

    ployees

    by Designation

    by License

    by Nationality

    Spfd. D

    esignation

    Project E

    mployees

    Brief

    by Project

    by Designation

    by Serial N

    o.

    by License

    by Nationality

    Spfd. D

    esignation

    Com

    pany Em

    ployees

    by Designation

    by License

    by Nationality

    Spfd. D

    esignation

    Project E

    mployees

    Detailed

    Reports

    Exit

    EM

    S

    3 6

    3 6

  • 37

    37

  • 3 8

    3 8

  • 100

    20

    25

    15

    25

    15

    200

    39

    39

  • Part 1-Construction Management

    COST CONTROL

    40

    40

  • Part 1-Construction Management

    BREAK EVEN POINT

    PROJECT OVERHEADOFFICE OVERHEAD

    DIRECT COST

    MARK UP

    FIXED COST

    x

    x

    41

    41

  • Part 1-Construction Management

    x

    42

    42

  • Part 1-Construction Management

    43

    43

  • Part 1-Construction Management

    TRIAL PITS

    44

    44

  • Part 1-Construction Management

    45

    45

  • Part 1-Construction Management

    PRE TENDER STAGE

    PRE CONTRACT STAGE

    CONSTRUCTION STAGE

    PRE TENDER STAGE :

    METHOD STATEMENT

    DIRECT COST

    PROJECT OVERHEAD

    OFFICE OVERHEAD

    46

    46

  • Part 1-Construction Management

    PRE CONTRACT STAGE

    ORGANIZATION CHART

    SITE LAYOUT PLAN

    METHOD STATAMENT

    SUBMITTALS & APPROVALS

    SHOP DRAWINGS

    CASH FLOW

    CONSTRUCTION STAGE

    SITE MOBILIZATION

    47

    47

  • Part 1-Construction Management

    QUALITY TIME COST

    UPDATING

    COST CONTROL

    SNAG LIST

    PREQUALIFICATION

    48

    48

  • Flow C

    harts of VB

    Program

    s

    Projects Data File

    Ch

    an

    ge P

    assw

    ord

    Utility

    Add

    Vie

    w

    Ed

    it

    Dele

    te

    Pro

    jects

    by C

    on

    tract D

    ate

    by P

    roje

    ct Valu

    e

    by D

    ura

    tion

    by C

    onsu

    ltant

    by C

    lient

    Wh

    ole

    Pro

    jects

    by C

    on

    tract D

    ate

    by P

    roje

    ct Valu

    e

    by D

    ura

    tion

    by C

    onsu

    ltant

    by C

    lient

    Sp

    ecifie

    d Y

    ear

    Disp

    lay

    Ara

    bic

    Eng

    lish

    by C

    on

    tract D

    ate

    by P

    roje

    ct Valu

    e

    by D

    ura

    tion

    by C

    onsu

    ltant

    by C

    lient

    Wh

    ole

    Pro

    jects

    by C

    on

    tract D

    ate

    by P

    roje

    ct Valu

    e

    by D

    ura

    tion

    by C

    onsu

    ltant

    by C

    lient

    Sp

    ecifie

    d Y

    ear

    Brie

    f

    by C

    on

    tract D

    ate

    by P

    roje

    ct Valu

    e

    by D

    ura

    tion

    by C

    onsu

    ltant

    by C

    lient

    Wh

    ole

    Pro

    jects

    by C

    on

    tract D

    ate

    by P

    roje

    ct Valu

    e

    by D

    ura

    tion

    by C

    onsu

    ltant

    by C

    lient

    Sp

    ecifie

    d Y

    ear

    Deta

    iled

    Re

    po

    rtsE

    xit

    PD

    F

    4 9

    4 9

  • 50

    50

  • 5 1

    5 1

  • Part 1-Construction Management

    FLOW CHART

    52

    52

  • Part 1-Construction Management

    53

    53

  • Part 1-Construction Management

    54

    54

  • Part 1-Construction Management

    55

    55

  • Part 1-Construction Management

    56

    56

  • Part 1-Construction Management

    -

    -

    57

    57

  • Part 1-Construction Management

    x

    x

    x

    58

    58

  • Part 1-Construction Management

    xx

    59

    59

  • Part 1-Construction Management

    60

    60

  • ////

    / :

    00.09200.00700.0072/ 00.000,400.000,400.005,42

    00.000,061,100.000,008,200.000,051,3

    : %06%06%06

    00.47100.02400.024 =2/ 00.100.200.2

    %05%05%052/ 00.7800.01200.0122/

    00.7800.01200.0122/

    00.61100.08200.0822/

    %06%06%06 00.47100.02400.0242/

    00.100.200.2 00.47100.01200.0122/

    %66%66%66 00.300.400.4

    04.19100.26400.2642/ 02.47500.848,100.848,12/

    00.100.200.22/ 00.300.800.8 04.19100.13200.1322/

    %05%05%052/ 07.5900.13200.1322/

    07.5900.13200.1322/

    09.03900.907,200.907,2

    : 00.050,100.050,100.050,1/ 2

    00.004,100.004,100.004,1/ 2 06.931,132.95941.970,1 2 06.935,232.953,241.974,2/ 2

    06.981,232.900,241.921,2/ 2 03.594,09158.839,12417.811,744/

    03.549,02258.834,59417.816,025 06.098,14458.834,59417.816,025 66.970,68437.289,44585.086,275

    38.930,34237.289,44585.086,2752/ 00.016,493,100.001,310,400.001,310,4

    07.464,554,251.166,116,600.001,361,7

    : 00.007,200.007,200.007,2/ 2

    00.009,43200.000,76500.000,765/

    00.002,300.002,300.002,3/ 2 00.004,87200.000,27600.000,276/

    00.005,300.005,300.005,3/ 2 00.000,90600.000,53700.000,537/

    00.057,300.057,300.057,3/ 2 00.057,71700.052,66800.052,668/

    00.005,300.005,300.005,3/ 2 00.059,43300.005,80800.005,808/

    00.00500.00500.005/ 2 00.058,7400.005,51100.005,511/

    %05%05%05 00.00500.00500.005/ 2

    00.000,9200.000,0700.000,07/

    00.053,786,300.000,336,0100.000,336,01

    %71.05%28.06%44.84) 81(

    00.000,000,200.000,005,300.000,000,4/

    -ecirP\gnireenignE liviC\mamI lA demahoM\gnireenignE\:D

    16

    16

  • Part 2-Pre Tender Stage

    62

    62

  • Part 2-Pre Tender Stage

    BIDDING THEORY

    63

    63

  • Part 2-Pre Tender Stage

    MARGINAL ADJUSTMENT

    64

    64

  • Part 2-Pre Tender Stage

    THE DECISION TO TENDER

    RESOURCES

    65

    65

  • Part 2-Pre Tender Stage

    C OST PLUSLUMPSUM

    MEASURED

    RETENSION

    66

    66

  • Part 2-Pre Tender Stage

    PRICING PROCEDURE

    67

    67

  • egatS redneT erP-2 traP

    : :

    : :

    1

    2

    3

    4

    5

    6

    7

    8

    9

    11

    11

    21

    31

    41

    51

    61

    71

    81

    91

    12

    86

    86

  • Part 2-Pre Tender Stage

    INITIAL PRE TENDER MEETING

    PRE TENDER CHECK LIST

    69

    69

  • Part 2-Pre Tender Stage

    COST RESOURCES

    70

    70

  • 2 / 14102/30/32

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    :

    10.005,8

    3.3820.38

    6.553.891

    7.710.101

    0.0522.453

    3.5150.58

    1.818,10.521,2

    7.147,17.32

    5.868,510.925

    7.682

    0.000,87.662

    0.386.55

    7.6817.71

    0.1010.052

    3.3332.984

    0.081.117,1

    0.000,27.147,1

    7.320.370,51

    4.2054.88

    3

    0.005,7

    0.0520.38

    6.550.571

    7.710.101

    0.0525.213

    2.3640.57

    2.406,10.578,1

    7.147,17.32

    5.772,419.574

    4.094

    0.000,73.332

    0.386.55

    3.3617.71

    0.1010.052

    7.1922.734

    0.072.794,1

    0.057,17.147,1

    7.320.284,31

    4.9446.29

    50.005,6

    7.6120.38

    6.557.151

    7.710.101

    0.0528.072

    1.1140.56

    3.093,10.526,1

    7.147,17.32

    6.686,219.224

    2.596

    0.000,6

    0.0020.38

    6.550.041

    7.710.101

    0.0520.052

    1.5830.06

    3.382,10.005,1

    7.147,17.32

    1.198,114.693

    2.897

    0.005,53.381

    0.386.55

    3.8217.71

    0.1010.052

    2.9220.953

    0.554.671,1

    0.573,17.147,1

    7.326.590,11

    9.9637.101

    8

    0.000,5

    7.6610.38

    6.557.611

    7.710.101

    0.0523.802

    0.3330.05

    4.960,10.052,1

    7.147,17.32

    1.003,013.343

    0.6019

    0.005,40.051

    0.386.55

    0.5017.71

    0.1010.052

    5.7819.603

    0.545.269

    0.521,17.147,1

    7.326.405,9

    8.6132.111

    010.000,4

    3.3310.38

    6.553.39

    7.710.101

    0.0527.661

    0.7620.04

    6.5587.666

    7.147,17.32

    9.163,87.872

    0.90111

    0.005,37.611

    0.386.55

    7.187.71

    0.1010.052

    8.5417.242

    0.536.847

    3.3857.147,1

    7.328.906,7

    7.3524.711

    :

    1

    0.005,37.611

    0.086.55

    7.187.71

    0.1010.511

    8.5411.351

    0.536.847

    0.0010.57

    7.322.232,5

    4.4715.94

    20.002,3

    7.6010.18

    6.557.47

    7.710.101

    0.6113.331

    6.0410.23

    4.4860.001

    0.577.32

    1.538,42.161

    1.153

    0.000,3

    0.0010.28

    6.550.07

    7.710.101

    0.7110.521

    3.2310.03

    7.1460.001

    0.577.32

    0.175,44.251

    4.254

    0.008,2

    3.390.38

    6.553.56

    7.710.101

    0.8117.611

    0.4210.82

    9.8950.001

    0.577.32

    8.603,46.341

    8.355

    0.005,2

    3.380.38

    6.553.85

    7.710.101

    0.8112.401

    5.1110.52

    7.4350.001

    0.577.32

    7.709,33.031

    3.656

    0.003,27.67

    0.386.55

    7.357.71

    0.1010.811

    8.591.301

    0.329.194

    0.0010.57

    7.326.146,3

    4.1213.85

    70.002,2

    3.370.38

    6.553.15

    7.710.101

    0.8117.19

    0.990.22

    6.0740.001

    0.577.32

    5.805,30.711

    5.958

    0.000,2

    7.660.38

    6.557.64

    7.710.101

    0.8113.38

    6.090.02

    8.7240.001

    0.577.32

    4.242,31.801

    1.269

    0.008,10.06

    0.386.55

    0.247.71

    0.1010.811

    0.573.28

    0.810.583

    0.0010.57

    7.323.679,2

    2.993.56

    010.006,1

    3.350.38

    6.553.73

    7.710.101

    0.8117.66

    0.470.61

    2.2430.001

    0.577.32

    2.017,23.09

    4.9611

    0.005,1

    0.050.38

    6.550.53

    7.710.101

    0.8115.26

    8.960.51

    8.0230.001

    0.577.32

    1.775,29.58

    8.1721

    0.004,17.64

    0.386.55

    7.237.71

    0.1010.811

    3.856.56

    0.414.992

    0.0010.57

    7.321.444,2

    5.186.47

    310.003,1

    3.340.38

    6.553.03

    7.710.101

    0.8112.45

    5.160.31

    1.8720.001

    0.577.32

    0.113,20.77

    8.7741

    0.002,10.04

    0.386.55

    0.827.71

    0.1010.811

    0.053.75

    0.217.652

    0.0010.57

    7.320.871,2

    6.275.18

    510.001,1

    7.630.38

    6.557.52

    7.710.101

    0.8118.54

    1.350.11

    3.5320.001

    0.577.32

    9.440,22.86

    9.5861

    0.000,13.33

    0.386.55

    3.327.71

    0.1010.811

    7.140.94

    0.019.312

    0.0010.57

    7.328.119,1

    7.362.19

    710.009

    0.030.38

    6.550.12

    7.710.101

    0.8115.73

    8.440.9

    5.2910.001

    0.577.32

    8.877,13.95

    6.7981

    0.0583.82

    0.386.55

    8.917.71

    0.1010.811

    4.537.24

    5.88.181

    0.0010.57

    7.323.217,1

    1.754.101

    910.008

    7.620.38

    6.557.81

    7.710.101

    0.8113.33

    6.040.8

    1.1710.001

    0.577.32

    7.546,19.45

    7.50102

    0.0570.52

    0.386.55

    5.717.71

    0.1010.811

    3.135.83

    5.74.061

    0.0010.57

    7.322.975,1

    6.256.011

    120.007

    3.320.38

    6.553.61

    7.710.101

    0.8112.92

    5.630.7

    7.9410.001

    0.577.32

    7.215,14.05

    1.611

    P -ecir

    17

    17

  • 2 / 24102/30/32

    :

    1 :

    .

    2 :

    =

    / 30

    .

    3

    :

    =

    (3

    * 30

    /

    3

    )

    / 24

    .

    4 :

    = (

    15

    .

    +

    100

    .

    + 1000

    .

    + 200

    .

    + 20

    .

    ) /

    24

    .

    5 :

    =

    2%

    *

    14

    / 12

    .

    6 :

    = (

    375

    .

    +

    50

    .

    )

    / 24

    .

    7 :

    = 71

    .

    /

    + 20

    .

    /

    +

    10

    .

    / .

    8

    :

    :

    -

    : (

    60

    % * 1500

    .

    +

    20

    % * 2600

    .

    +

    20

    % * 3200

    .

    ) /

    24

    .

    -

    :

    (50

    % * 2600

    .

    +

    20

    % * 1500

    .

    +

    20

    % * 3200

    .

    ) /

    24

    .

    9 :

    =

    05.

    /12

    .

    10

    :

    =

    05.

    * (

    +

    +

    )

    /12

    .

    11

    :

    = 00.1

    *

    (

    .

    12

    :

    = (

    6

    + 4

    +

    +

    2

    + 12

    /

    + 52

    = 77

    *

    / 12

    .

    13

    :

    :

    3

    / 12

    &

    100

    .

    /

    .

    14

    :

    (

    )=

    = 19.

    * 55000

    .

    /

    5

    / 12

    &

    =

    75

    .

    .

    15

    :

    =

    (90

    .

    + 30

    .

    +

    10

    .

    + 3

    *

    4 .

    ) /

    6

    .

    En

    gM.

    A.mI l

    am

    .

    P -ecir

    27

    27

  • Part 2-Pre Tender Stage

    MEANS

    COST CONTROL

    JOP EFFICINECY

    OPERATOR EFFICIENCY

    MECHANICAL EFFICIENCY

    OVERALL EFFICIENCY

    73

    73

  • Part 2-Pre Tender Stage

    MATERIALS

    RECORD

    CODE

    CEMENT

    74

    74

  • Part 2-Pre Tender Stage

    INQUIRY

    QUOTATION

    COMPARISON LIST

    75

    75

  • Part 2-Pre Tender Stage

    RISK

    76

    76

  • Part 2-Pre Tender Stage

    77

    77

  • Part 2-Pre Tender Stage

    SITE VISIT REPORT

    78

    78

  • egatS redneT erP-2 traP

    1

    2

    ) ( 3

    4

    5

    1) STIP LAIRT( 6

    ) ( 7

    8

    ) ( 9

    11

    11

    21

    31

    ) ( 41

    51 ) 111 (

    61

    ) ( ) ( 71

    81

    91

    12

    12 : (

    )

    22

    32

    97

    97

  • Part 2-Pre Tender Stage

    EFFICIENCY

    JOB EFFICIENCY

    80

    80

  • egatS redneT erP-2 traP

    %17 %67 %18 %48

    %56 %17 %57 %87

    %16 %56 %96 %27

    %25 %75 %16 %36

    : ) (

    %

    %23 8221

    %86 12272

    %111 14

    :

    7226

    %61

    %1121 1121

    %11211 1823

    %8 9223

    %5 4122

    %82 11

    %2 721

    %86 12272

    18

    18

  • Part 2-Pre Tender Stage

    EQUIPMENTS EFFICIENCIES

    JOB EFFICIENCY

    JOB EFFICIENCY

    MECHANICAL EFFICIENCY

    82

    82

  • Part 2-Pre Tender Stage

    JOB EFFICIENCY

    MACHINE AVAILABILITY

    83

    83

  • Part 2-Pre Tender Stage

    CONSTRUCTION RATES

    84

    84

  • Part 2-Pre Tender Stage

    WEIGHT FACTOR

    FLOW CHART

    85

    85

  • Part 2-Pre Tender Stage

    DURATION

    86

    86

  • egatS redneT erP-2 traP

    :

    4 1 3 3

    3 2 1 3 3

    3

    3

    5221 1

    5721

    3

    3

    721 -521 1

    3

    3

    -5221 1

    5421

    3

    2+ 3+ 3

    6 4 1

    3

    2+ 3+ 3

    3 2 1

    3

    3

    152 1

    113

    3

    3

    53 52 1

    3

    3

    11 8 1

    3

    3

    115 1

    :

    +

    321 -5221 1

    +

    221 1

    5221

    1

    78

    78

  • egatS redneT erP-2 traP

    2

    522 -2 1 + 3

    521 -1 1 + 3

    521 -5221 1 + 3

    (

    ) 2 -521 1 + 3

    521 1 + 3

    3

    2+ 6+

    2+ 3+ 8+

    + 1+ +

    +

    14 1

    3

    + 2+ 3+

    2+

    + 1+

    ) + + (

    1 111

    151

    :

    2

    111 1 2 2

    2

    16 15 1 2 2

    2

    16 1 3 2

    2

    ) enarbmeM(

    17 1 2 2

    21 5 2 2

    3 111 1

    2

    88

    88

  • egatS redneT erP-2 traP

    3

    :

    62152 3

    522+

    3

    5223 1

    62152

    3 522+

    3

    521 1

    52

    6 21 2

    522+

    3

    52 1

    121214 2

    522+

    3

    81 61 1

    121214 2

    522+

    3

    8 1

    :

    15 1 2 2

    17 1 2 2

    1 2 2 121

    151

    151 1 3+ 2 2

    2 2

    3+ 2

    3 1521

    44 14 1

    111 1 2 2

    4 2

    5+ 2

    1521

    3

    23 1

    3

    98

    98

  • egatS redneT erP-2 traP

    4

    2

    1521 3+2

    3

    83 1

    2 2+

    3 1521

    12 1

    :

    1 1521+ 2 - 15

    16

    1 1521+ 2 -151

    161

    3

    3 51 -21 1 1521+ 2

    :

    / (

    ) 1 2 2

    /121

    111

    2 2+ 1

    3 1521

    5 1

    1521 521+ .

    3 51 -21 1

    521+ 1 2

    3 1

    51

    12

    1521 521+ 1

    3 1

    - 12

    52

    5221 + . 11

    3 13 1

    4

    09

    09

  • egatS redneT erP-2 traP

    5

    :

    :

    111 1 2 2

    151 1 3+ 2 2 :

    13 1 1521 +3+2 2 3

    1 521+1 2 6 -52

    13

    12 1 1+ 1 2

    ) : (

    5 2

    8+ +

    3

    18 1

    :

    ) + ( 2

    18 1

    3 :

    2+

    2 8+3

    3 18 1

    :

    12 1 + 2

    6 4(

    ) : 13 1 + .

    :

    13 1 4+ 2 .

    . :

    1521 2+

    3

    1 -12

    52

    12 1 + . :

    ( .

    . 3+ . 5

    ) 2+

    1 2+ . -11

    51

    :

    3 1 3 521 3

    5

    19

    19

  • egatS redneT erP-2 traP

    6

    2 21212 521+

    3 12 1

    2x5252

    31313 2

    521+

    3 12 1

    2 21212 521+

    3 22 1

    2 1521 521+

    15 14 1

    12 1 521 + 2 41414

    .

    4 3+

    14 13 1

    :

    2 2 2+

    3 21 -11 1

    2 2 1521 +

    12 1

    2 2 521+

    3 12 51 1

    2

    2

    2

    5+ +

    3

    21 -11 1

    :

    2

    3 3 521

    1

    1

    5226- 15

    522 -2

    2

    3 1 3 521

    16

    3

    - 1 + 3

    54 1 + 2

    2

    3 1 2

    111

    3

    53 13 1 + 2

    6

    29

    29

  • egatS redneT erP-2 traP

    7

    53 1 2

    181 1 + 2

    16 1 + 2 3

    :

    2

    3 3 521

    1

    1

    5226-15

    5222

    2

    3 1 3 521

    16

    3

    - 1 + 3

    54 1 + 2

    2

    3 1 2

    111

    3

    53 13 1 + 2

    53 1 2

    181 1 + 2

    16 1 + 2 3

    16 1 + 2 3

    :

    + 2

    3 3 1521

    1

    1

    15 14

    522 2

    921

    17 1 + 2

    53 1 2

    3

    11 1 + 2

    181 1 + 2

    16 1 + 2 3

    7

    39

    39

  • egatS redneT erP-2 traP

    8

    :

    522 11

    .

    3

    3 1521

    1

    1111118

    522 2

    .

    3 2

    1

    1

    116

    3

    111 1 .

    56 1 + .

    :

    :

    1521

    "57 9 1 2+ .

    "1 8 1 2+ .

    % 12-% 11

    :

    5 1 2+ . 521

    4 1 2+ . 2

    3 1 2+ . 522

    9 1 2+ . 2

    7 1 2+ . 3

    6 1 + . 4

    % 11

    :

    2 1 2+

    522 1 2+

    2 1 2+

    521 1 2+

    2 1 2+

    2 1 2+

    8

    49

    49

  • egatS redneT erP-2 traP

    9

    5222 1 2+

    2 1 2+

    + +

    2721 1 2+

    + +

    + 7521 1 2+

    51 1 2+

    :

    9 1 2+ . "57

    8 1 2+ . "1

    7 1 2+ . "2"521

    5 1 2+ . " 3

    4 1 2+ . " 4

    % 12-%11

    :

    9 1 2+ . 2

    7 1 2+ . 3

    6 1 2+ . 4

    5 1 2+ . 5

    % 11

    9

    59

    59

  • egatS redneT erP-2 traP

    11

    :

    61

    18 1 + .

    61

    14 1 + .

    5222

    15 1 + .

    22 52

    52 1 + .

    12 1 .

    11 1 .

    11

    69

    69

  • Flow C

    harts of VB

    Program

    s

    Construction R

    ates Filing System

    Change P

    assword

    Add

    Edit

    Delete

    Code

    Master

    Search

    Utility

    Add

    View

    Edit

    Delete

    Construction R

    ate

    All C

    odes

    Specified C

    ode

    Display

    All C

    odes

    Specified C

    ode

    Brief

    All C

    odes

    Specified C

    ode

    Detailed

    Reports

    Exit

    CR

    FS

    9 7

    9 7

  • 98

    98

  • 9 9

    9 9

  • Part 2-Pre Tender Stage

    METHOD OF CONSTRUCTION STATEMENT

    METHOD STATEMENT

    100

    100

  • Part 2-Pre Tender Stage

    NEW CONSTRUCTION TECHNIQUES

    METHOD STATEMENT

    RESOURCES

    DURATIONS

    101

    101

  • Part 2-Pre Tender Stage

    102

    102

  • 1/1

    PR

    OJE

    CT

    NO

    . 2-5

    -58

    NO

    .D

    ES

    CR

    IPT

    ION

    CO

    NT

    .U

    NIT

    WG

    HT

    CH

    EC

    KD

    UR

    ./

    Q

    TY

    F

    AC

    TR

    DA

    Y

    Site m

    obilization1.00

    LUM

    S0.000

    320.000

    Ext.w

    orks with culvert,channel,pitching

    1LU

    MS

    15.599

    6015.599

    Excavation of stores foundations

    2,880M

    36.035

    30

    6.035E

    xc.of explosion walls foundations,s/s

    421M

    30.882

    15

    0.882M

    3 R.C

    onc.Found. :stores,walls,s/s

    990M

    320.745

    75

    20.745M

    3 R.C

    onc.Walls :stores,w

    alls,s/s594

    M3

    15.213

    9015.213

    Cross beam

    s for stores160

    M3

    4.098

    45

    4.098

    S/S

    Concrete skeleton

    75M

    31.921

    30

    1.921C

    oncrete Works for A

    ir Conditions room

    s88

    M3

    2.254

    212.254

    Fixing of Roofs for stores , pathw

    ays2,560

    M2

    5.364

    455.364

    Air C

    onditions works , D

    ucts for Stores

    4LU

    MS

    9.313

    309.313

    Fixing of False Ceiling for stores

    1,920M

    23.129

    45

    3.129E

    lectrical works for S

    tores , F.A.S

    ystem4

    LUM

    S3.492

    45

    3.492G

    enerators , S/S

    electrical works

    1LU

    MS

    6.251

    526.251

    Steel D

    oors 4

    NO

    S0.931

    30

    0.931S

    tores concrete paths4

    LUM

    S1.630

    30

    1.630Filling round stores

    4LU

    MS

    2.095

    902.095

    Painting W

    orks1,500

    M2

    1.048

    451.048

    10

    0.0

    00

    10

    0.0

    00

    0.0

    00

    15

    .71

    71

    1.7

    37

    6.1

    80

    0.3

    46

    170

    .70

    20

    .34

    6

    7.8

    00

    17

    .98

    39

    .18

    01

    3.3

    69

    5.0

    71

    6.4

    37

    6.1

    79

    160

    .69

    90

    .69

    80

    .69

    8

    140

    .46

    60

    .46

    6

    151

    .63

    0

    121

    .15

    22

    .34

    0

    133

    .57

    22

    .67

    9

    4.6

    56

    112

    .08

    61

    .04

    3

    91

    .78

    83

    .57

    6

    104

    .65

    7

    70

    .96

    10

    .96

    1

    82

    .25

    4

    5.0

    71

    61

    .36

    62

    .73

    2

    5.0

    71

    30

    .88

    2

    44

    .14

    98

    .29

    8

    26

    .03

    5

    8.2

    98

    55

    .07

    1

    6/1

    40

    4

    17.800

    7.799

    *0.000

    4/1

    40

    45

    /14

    04

    2/1

    40

    43

    /14

    04

    7/1

    40

    4

    HO

    OK

    MIS

    SIL

    E S

    TO

    RE

    S T

    IME

    SC

    HE

    DU

    E

    8/1403

    9/1

    40

    31

    0/1

    40

    31

    1/1

    40

    31

    2/1

    40

    31

    /14

    04

    8/1

    40

    4

    CM

    -

    -

    /Schedule

    Eng.M

    .Al Im

    am

    103

    103

  • :2

    - 5

    - 58

    :

    /

    /

    1

    900.00

    330.00

    Eexcavation of channel by excavatorExcavator+driver+2 labrs

    200.004.50

    Excavation then slopes+pitching,culvert parallel

    875.00

    2Pitching of sides , bottom

    of channel3 Bricky+6 labrs

    75.0011.67

    Stones collected from m

    ountains110.00

    3Base, sides, top of r.concrete culvert w

    . 25m.l.

    2 Steel Fixers+3 labrs12.00

    9.17R

    ate for fixing rnft only,prepairing during shutter110.00

    3Base, sides, top of r.concrete culvert w

    . 25m.l.

    2 Carpenter+ 3 labrs

    5.0022.00

    With Plain concrte footing w

    ith 10 cm th.

    2

    2880.00

    360.00

    Buldozer cut through the rocky mountain

    Buldozer+driver+2labrs150.00

    19.20D

    uration include opening water w

    ays to valley3

    421.00

    330.00

    Buldozer cut through the rocky mountain

    Buldozer+driver+2labrs100.00

    4.214

    3

    990.00

    375.00

    Durat.for fixing rnft, preparing rnft before

    2 *(Steel fixer+2 labrs) works in a store

    20.0049.50

    2teams w

    orks together first base to start walls quickly

    2 loaders available all the project duration

    2 *(carpenter+1.5 labrs) works in a store

    50.000.00

    Batch plant+c.pump+4 trucks+5 labrs for pouring,

    Concreting

    5 labrs+4 trucks+concrete pump

    247.500.00

    Group for concreting all activities+cleaning purpose

    5

    3

    421.00

    390.00

    Durat.for fixing rnft, preparing rnft during shutter

    4 *(Steel fixer+2 labrs) works seperete

    24.0017.54

    After found.,each steel fixer have one store

    Shutter

    4 *(carpenter+1.5 labrs) works separete

    10.0042.10

    After found.,each carpenter have one store

    C

    oncreting5 labrs+4 trucks+concrete pum

    p 35.08

    12.00Pouring each w

    all on 3 slips, after a working day

    6C

    ross beams for stores

    160.00

    345.00

    Rnft

    2*(steel fixer+2 labrs) works seperate

    12.0013.33

    Crane available the w

    hole duration of activityShutter

    2 *(carpenter+1.5 labrs) works separete

    4.0040.00

    Concreting

    5 labrs+4 trucks+concrete pump

    40.004.00

    7S/S C

    oncrete skeleton75.00

    330.00

    Rnft

    2*(steel fixer+2 labrs) works seperate

    12.006.25

    Shutter2 *(carpenter+1.5 labrs) w

    orks separete4.00

    18.75Footings+sem

    elles+columns+roof+parapet

    Concreting

    5 labrs+4 trucks+concrete pump

    15.005.00

    Each activity poured separete 8

    Concrete W

    orks for Air Conditions room

    s88.00

    321.00

    Rnft

    3*(steel fixer+2 labrs) works seperate

    18.004.89

    Shutter3 *(carpenter+1.5 labrs) w

    orks separete6.00

    14.67C

    oncreting5 labrs+4 trucks+concrete pum

    p 22.00

    4.009

    Fixing of Roofs for stores , pathw

    ays2560.00

    245.00

    2 Labrs for drilling,2 with technician for erection

    2(Technicians+4 labrs)65.00

    39.38C

    rane available the whole duration of activity

    10Air C

    onditions works , D

    ucts for Stores4.00

    30.00

    Subcontractor agreed on the durationSubcontractor

    30.0011

    Fixing of False Ceiling for stores

    1920.00

    245.00

    Subcontractor agreed on the durationSubcontractor

    45.0012

    Electrical works for Stores , F.A.System

    4.00

    45.00Explosion proof conduits, w

    ires , fixtures2*(Electrician+3labrs) , A Store/10 days

    40.00

    Smoke detectors w

    ith F.A.system included

    13G

    enerators , S/S electrical works

    1.00

    52.00Subcontractor agreed on the duration

    Subcontractor

    50.00C

    rane available the whole duration of activity

    14Steel D

    oors 4.00

    30.00

    Each team 2 stores , each store a w

    eek2 * (2 Technicians + 3 Labrs)

    28.00C

    rane available the whole duration of activity

    15Stores C

    oncrete paths4.00

    30.00

    Each team 2 stores , each store a w

    eek1* (2 C

    arpenters+ concrete crew)

    28.00Path devided pcs to avoid close store entrance

    16Filling round stores

    4.00

    90.00Loader bring Soil , Labrs do levels, com

    paction1*(Loader+4 labrs)

    80.00Each store 15-20 days

    17Painting W

    orks1500.00

    245.00

    2 * (Painter+ labr)100.00

    25.60W

    alls fair face, 2 coats paint with som

    e putty for repair

    104

    104

  • Part 2-Pre Tender Stage

    COST ESTIMATING

    PRECAT

    CONCRETE

    PROJECT OVERHEAD

    OFFICE OVERHEAD

    105

    105

  • Part 2-Pre Tender Stage

    INQUIRIES

    QUOTATIONS

    106

    106

  • -ecirP

    cibarA/

    701

    701

  • Part 2-Pre Tender Stage

    PROJECT OVERHEAD

    108

    108

  • Part 2-Pre Tender Stage

    OFFICE OVERHEAD

    109

    109

  • Part 2-Pre Tender Stage

    DIRECT COST

    110

    110

  • Part 2-Pre Tender Stage

    111

    111

  • Part 2-Pre Tender Stage

    CREW

    x x

    112

    112

  • Part 2-Pre Tender Stage

    113

    113

  • Part 2-Pre Tender Stage

    x

    x

    x

    x

    x

    x

    xx

    114

    114

  • 1/1

    PR

    OJE

    CT

    NO

    . 2-5

    -58

    NO

    .D

    ES

    CR

    IPT

    ION

    CO

    NT

    .U

    NIT

    WG

    HT

    CH

    EC

    KD

    UR

    ./

    Q

    TY

    F

    AC

    TR

    DA

    Y

    Site m

    obilization1.00

    LUM

    S0.000

    320.000

    Ext.w

    orks with culvert,channel,pitching

    1LU

    MS

    15.599

    6015.599

    Excavation of stores foundations

    2,880M

    36.035

    30

    6.035E

    xc.of explosion walls foundations,s/s

    421M

    30.882

    15

    0.882M

    3 R.C

    onc.Found. :stores,walls,s/s

    990M

    320.745

    75

    20.745M

    3 R.C

    onc.Walls :stores,w

    alls,s/s594

    M3

    15.213

    9015.213

    Cross beam

    s for stores160

    M3

    4.098

    45

    4.098

    S/S

    Concrete skeleton

    75M

    31.921

    30

    1.921C

    oncrete Works for A

    ir Conditions room

    s88

    M3

    2.254

    212.254

    Fixing of Roofs for stores , pathw

    ays2,560

    M2

    5.364

    455.364

    Air C

    onditions works , D

    ucts for Stores

    4LU

    MS

    9.313

    309.313

    Fixing of False Ceiling for stores

    1,920M

    23.129

    45

    3.129E

    lectrical works for S

    tores , F.A.S

    ystem4

    LUM

    S3.492

    45

    3.492G

    enerators , S/S

    electrical works

    1LU

    MS

    6.251

    526.251

    Steel D

    oors 4

    NO

    S0.931

    30

    0.931S

    tores concrete paths4

    LUM

    S1.630

    30

    1.630Filling round stores

    4LU

    MS

    2.095

    902.095

    Painting W

    orks1,500

    M2

    1.048

    451.048

    10

    0.0

    00

    10

    0.0

    00

    0.0

    00

    15

    .71

    71

    1.7

    37

    6.1

    80

    0.3

    46

    170

    .70

    20

    .34

    6

    7.8

    00

    17

    .98

    39

    .18

    01

    3.3

    69

    5.0

    71

    6.4

    37

    6.1

    79

    160

    .69

    90

    .69

    80

    .69

    8

    140

    .46

    60

    .46

    6

    151

    .63

    0

    121

    .15

    22

    .34

    0

    133

    .57

    22

    .67

    9

    4.6

    56

    112

    .08

    61

    .04

    3

    91

    .78

    83

    .57

    6

    104

    .65

    7

    70

    .96

    10

    .96

    1

    82

    .25

    4

    5.0

    71

    61

    .36

    62

    .73

    2

    5.0

    71

    30

    .88

    2

    44

    .14

    98

    .29

    8

    26

    .03

    5

    8.2

    98

    55

    .07

    1

    6/1

    40

    4

    17.800

    7.799

    *0.000

    4/1

    40

    45

    /14

    04

    2/1

    40

    43

    /14

    04

    7/1

    40

    4

    HO

    OK

    MIS

    SIL

    E S

    TO

    RE

    S T

    IME

    SC

    HE

    DU

    E

    8/1403

    9/1

    40

    31

    0/1

    40

    31

    1/1

    40

    31

    2/1

    40

    31

    /14

    04

    8/1

    40

    4

    CM

    -

    -

    /Schedule

    Eng.M

    .Al Im

    am

    115

    115

  • 1 / 123/03/2014

    NO

    TE

    S :

    1- DU

    RA

    TION

    S TA

    KE

    N FR

    OM

    PR

    OJE

    CT S

    CH

    ED

    ULE

    , TO H

    AV

    E A

    CTU

    AL W

    OR

    KD

    AYS

    : CA

    NC

    EL FR

    IDA

    YS &

    HO

    LIDA

    YS .

    2- LAB

    OR

    SA

    LAR

    IES

    TAK

    EN

    FRO

    M LA

    BR

    CO

    ST .

    3- CH

    EC

    K FO

    RM

    ULA

    S C

    AR

    EFU

    LLY , DR

    IVE

    RS

    OF E

    QU

    IP. C

    ON

    SID

    ER

    ED

    WITH

    TEC

    HN

    ICIA

    NS

    NO

    .

    AC

    T.

    CO

    DE

    AC

    TIV

    ITY

    DE

    SC

    RIP

    TIO

    N Q

    TY

    U

    NIT

    SC

    HE

    D.

    DU

    R. /

    DA

    Y

    SC

    HE

    D.

    DU

    R. /

    MN

    TH

    AC

    TU

    AL

    WO

    RK

    .

    DA

    YS

    RE

    QU

    IR.

    OU

    TP

    . /

    DA

    Y

    TE

    AM

    OU

    TP

    . /

    DA

    Y

    NO

    OF

    TE

    AM

    S

    MO

    DIF

    .

    NO

    . OF

    TE

    AM

    S

    TE

    CH

    .

    NO

    /

    TE

    AM

    LA

    BR

    NO

    /

    TE

    AM

    BA

    SIC

    SA

    LA

    R /

    TE

    CH

    NIC

    .

    GR

    OS

    S

    SA

    LA

    RY

    /

    TE

    CH

    NIC

    .

    BA

    SIC

    SA

    LA

    RY

    /

    LA

    BR

    GR

    OS

    S

    SA

    LA

    RY

    /

    LA

    BR

    WO

    RK

    MS

    H.

    DIR

    EC

    T C

    OS

    T

    / AC

    TIV

    ITY

    EQ

    UIP

    ME

    NT

    S

    EQ

    UIP

    .

    NO

    EQ

    UIP

    ME

    NT

    PR

    ICE

    EQ

    UIP

    ME

    NT

    S

    DE

    PR

    EC

    IAT

    . /

    AC

    TIV

    ITY

    DU

    R.

    TO

    TA

    L D

    IRE

    CT

    CO

    ST

    / AC

    TIV

    ITY

    1E

    xternal works w

    .culvert , pitching1

    LUM

    S60.00

    2.0052.00

    0.0250.00

    1.001.00

    8.0014.00

    1,500.002,400.00

    850.001,500.00

    80,400.00E

    XC

    AV

    ATO

    R1.00

    450,000.0017,812.50

    98,212.50

    2E

    xc.of stores foundations2,880

    M3

    30.001.00

    26.00110.77

    120.000.92

    1.001.00

    2.001,800.00

    2,800.00850.00

    1,500.005,800.00

    DO

    ZER

    1.00500,000.00

    9,895.8315,695.83

    3E

    xc.of explos.walls foundations,s/s

    421M

    315.00

    0.5013.00

    32.38100.00

    0.321.00

    1.002.00

    1,800.002,800.00

    850.001,500.00

    2,900.00D

    OZE

    R1.00

    500,000.004,947.92

    7,847.924

    M3 R

    .Conc.Found.of stores,w

    alls,s/s990

    M3

    75.002.50

    65.0015.23

    8.001.90

    2.002.00

    3.501,500.00

    2,400.00850.00

    1,500.0050,250.00

    0.00

    50,250.005

    M3 R

    .Conc.W

    alls of stores,walls,s/s

    594M

    390.00

    3.0078.00

    7.622.00

    3.814.00

    2.003.50

    1,500.002,400.00

    850.001,500.00

    120,600.00

    0.00120,600.00

    6C

    ross beams for stores

    160M

    345.00

    1.5039.00

    4.102.10

    1.952.00

    2.003.50

    1,500.002,400.00

    850.001,500.00

    30,150.00C

    RA

    NE

    INC

    LUD

    ED

    0.0030,150.00

    7S

    /S C

    oncrete skeleton75

    M3

    30.001.00

    26.002.88

    2.101.37

    2.002.00

    3.501,500.00

    2,400.00850.00

    1,500.0020,100.00

    0.00

    0.000.00

    20,100.008

    R.C

    oncr.for Air C

    onditions rooms

    88M

    322.00

    0.7319.07

    4.622.00

    2.313.00

    2.004.00

    1,500.002,400.00

    850.001,500.00

    23,760.000.00

    0.0023,760.00

    9Fixing of R

    oofs for stores , pathways

    2,560M

    245.00

    1.5039.00

    65.6435.00

    1.882.00

    1.004.00

    1,600.002,550.00

    850.001,500.00

    25,650.00C

    RA

    NE

    INC

    LUD

    ED

    0.000.00

    25,650.0010

    Air C

    ondit.works , D

    ucts for Stores

    4LU

    MS

    30.001.00

    26.00S

    UB

    CO

    NTR

    AC

    TOR

    664,000.000.00

    0.00664,000.00

    11Fixing of False C

    eiling for stores1,920

    M2

    45.001.50

    39.00S

    UB

    CO

    NTR

    AC

    TOR

    217,730.000.00

    0.00217,730.00

    12E

    lectrical works for S

    tores 4

    LUM

    S45.00

    1.5039.00

    2.002.00

    1.003.00

    1,800.002,800.00

    850.001,500.00

    21,900.00

    0.0021,900.00

    13G

    enerators , S/S

    electrical works

    1LU

    MS

    52.001.73

    45.07S

    UB

    CO

    NTR

    AC

    TOR

    435,000.00C

    RA

    NE

    INC

    LUD

    ED

    0.000.00

    435,000.0014

    Steel D

    oors 4

    NO

    S30.00

    1.0026.00

    0.150.20

    0.771.00

    2.003.00

    1,800.002,800.00

    850.001,500.00

    10,100.00C

    RA

    NE

    INC

    LUD

    ED

    0.00

    10,100.0015

    Stores concrete paths

    4LU

    MS

    30.001.00

    26.000.15

    0.250.62

    1.002.00

    1,500.002,400.00

    850.001,500.00

    4,800.00

    0.00

    4,800.0016

    Filling round stores4

    LUM

    S90.00

    3.0078.00

    0.100.10

    0.511.00

    1.004.00

    1,500.002,400.00

    850.001,500.00

    25,200.00TR

    UC

    K1.00

    170,000.0010,093.75

    35,293.7517

    Painting w

    orks1,500

    M2

    45.001.50

    39.0038.46

    25.001.54

    2.001.00

    1.001,600.00

    2,550.00850.00

    1,500.0012,150.00

    0.00

    12,150.00E

    xcavation Activities

    75.002.50

    65.000.00

    0.00R

    OLLE

    R1.00

    35,000.001,731.77

    1,731.77300.00

    10.00260.00

    0.000.00

    BA

    R B

    EN

    DE

    R1.00

    25,000.004,947.92

    4,947.92300.00

    10.00260.00

    0.000.00

    BA

    R C

    UTTE

    R1.00

    25,000.004,947.92

    4,947.92C

    oncrete Equipm

    ents,Concrete Team

    300.0010.00

    260.000.00

    1.001.00

    1.002.00

    5.001,600.00

    2,550.00950.00

    1,650.00133,500.00

    CO

    NC

    RE

    TE P

    UM

    P1.00

    1,200,000.00237,500.00

    371,000.00300.00

    10.00260.00

    0.001.00

    1.001.00

    2.001,500.00

    2,400.00

    48,000.00

    BA

    TCH

    PLA

    NT

    1.001,400,000.00

    277,083.33325,083.33

    300.0010.00

    260.000.00

    1.001.00

    1.004.00

    1,500.002,400.00

    96,000.00TR

    UC

    K M

    IXE

    R4.00

    350,000.00277,083.33

    373,083.33360.00

    12.00312.00

    0.001.00

    1.001.00

    1.00

    1,600.002,550.00

    30,600.00LO

    AD

    ER

    1.00370,000.00

    87,875.00118,475.00

    240.008.00

    208.000.00

    1.001.00

    1.001.00

    1,800.002,800.00

    22,400.00C

    RA

    NE

    1.00420,000.00

    66,500.0088,900.00

    Steel D

    oors 30.00

    1.0026.00

    0.001.00

    0.000.00

    WE

    LDIN

    G M

    AC

    HIN

    E1.00

    40,000.00791.67

    791.671.00

    0.030.87

    0.001.00

    0.000.00

    0.000.00

    0.00

    2,0

    80,9

    90.0

    01,0

    01,2

    10.9

    4

    3,0

    82,2

    00.9

    4

    Act.

    Co

    de

    CR

    EW

    Act.

    Co

    de

    CR

    EW

    110

    SU

    BC

    ON

    TRA

    CTO

    R

    21 * [B

    ULD

    OZE

    R+D

    RIV

    ER

    +2LAB

    RS

    ]11

    SU

    BC

    ON

    TRA

    CTO

    R3

    1 * [BU

    LDO

    ZER

    +DR

    IVE

    R+2LA

    BR

    S]

    122 * [E

    LEC

    TRIC

    IAN

    +3LAB

    RS

    ]4

    2 * [(CA

    RP

    EN

    TER

    +1.5LAB

    R),(S

    TEE

    L FIXER

    +2LAB

    RS

    )] 13

    SU

    BC

    ON

    TRA

    CTO

    R5

    4 * [(CA

    RP

    EN

    TER

    +1.5LAB

    R),(S

    TEE

    L FIXER

    +2LAB

    RS

    )] 14

    1 * [2TEC

    HN

    ICIA

    NS

    +3LAB

    RS

    ]6

    2 * [(CA

    RP

    EN

    TER

    +1.5LAB

    R),(S

    TEE

    L FIXER

    +2LAB

    RS

    )] 15

    1 * [2CA

    RP

    EN

    TER

    +CO

    NC

    RE

    TE C

    RE

    W (IN

    CLU

    DE

    D)]

    72 * [(C

    AR

    PE

    NTE

    R+1.5LA

    BR

    ),(STE

    EL FIXE

    R+2LA

    BR

    S)]

    161 * [LO

    AD

    ER

    +TRU

    CK

    +4LAB

    RS

    ]8

    3 * [(CA

    RP

    EN

    TER

    +2 LAB

    R),(S

    TEE

    L FIXER

    +2LAB

    RS

    )] 17

    2 * [PA

    INTE

    R+LA

    BR

    ]9

    2 * [TEC

    HN

    ICIA

    N+4 LA

    BR

    S]

    1 * [ (EX

    CA

    VA

    TOR

    +DR

    IVE

    R+2 LA

    BR

    S),(2 C

    AR

    PE

    NTE

    R +3

    LAB

    RS

    ),(2 STE

    EL IX

    ER

    S+3LA

    BR

    S) , (3 B

    RIC

    KY + 6 LA

    BR

    S)]

    TE

    ND

    ER

    DIR

    EC

    T L

    AB

    R , E

    QU

    IPM

    EN

    T C

    OS

    T

    TO

    TA

    L

    TE

    ND

    ER

    :HO

    OK

    MIS

    SIL

    E S

    TO

    RE

    S

    CL

    OS

    ING

    DA

    TE

    :

    PR

    OJE

    CT

    TIM

    E : 1

    2 M

    ON

    TH

    S

    DA

    TE

    : 1/5

    /1403

    Handling E

    quipments

    Reinforceds C

    oncrete Activities

    Concrete E

    quipments

    Price-Tender D

    irect Labr, Equip C

    ost-Hook

    Eng.M

    .Al Im

    am

    116

    116

  • Part 2-Pre Tender Stage

    x254

    x402.5

    x254

    520

    254

    x

    117

    117

  • Part 2-Pre Tender Stage

    118

    118

  • Part 2-Pre Tender Stage

    252.8

    405.65

    254.86

    532.1

    25

    2.85.654.8632.11.7247.2

    2.81.4

    5.652.83

    10.03

    544.4

    1.720.86

    1.42.8310.0344.40.8659.61

    2.81.4

    5.652.83

    119

    119

  • Part 2-Pre Tender Stage

    4.862.43

    525.58

    1.720.86

    1.42.832.4325.580.8633.15

    TRUSS

    com.dokawww.

    www.peri.de/english/frm_haupt.htm

    R.M.D

    www.rmdformwork.com

    4.

    CLIMBING SHUTTER

    120

    120

  • Part 2-Pre Tender Stage

    121

    121

  • Part 2-Pre Tender Stage

    JOB EFFICIENCY

    122

    122

  • Part 2-Pre Tender Stage

    BASIC

    DBASE III+VISUAL BASIC

    EXCLLOUTUS

    COPY

    123

    123

  • Part 2-Pre Tender Stage

    FLOW CHART

    124

    124

  • Flow C

    harts of VB

    Program

    s

    Tenders E

    stimate System

    Ch

    ang

    e Passw

    ord

    Ad

    d, Ed

    it, De

    lete T

    end

    er

    Co

    py Te

    nder

    Ten

    ders

    Add

    Ed

    it

    Co

    py

    Dele

    te

    Print all A

    cty

    Activity

    Add

    Ed

    itD

    elete

    Sub

    Activity

    Activity, S

    ub

    Activity

    Add

    Ed

    it

    Dele

    te

    Print

    Mate

    rials

    Add

    Ed

    it

    Dele

    te

    Print

    La

    bors

    Add

    Ed

    it

    Dele

    te

    Print

    Equ

    ipmen

    ts

    Re

    sources

    Sp

    fd. T

    end

    erS

    pfd. A

    cty of aT

    end

    er

    Ch

    ang

    e %

    O.h

    ds +

    Pro

    fit

    Ma

    ster D

    ata

    Utility

    Add

    View

    Ed

    it

    Dele

    te

    Activity

    All T

    end

    ers by A

    ctivity No.

    Te

    nder b

    y Activity N

    o.

    Activity o

    f a T

    end

    er

    Spe

    cified

    Disp

    lay

    All T

    end

    ers by A

    ctivity No.

    Te

    nder b

    y Activity N

    o.

    Tn

    d. b

    y Acty, S

    . Acty

    Acty o

    f Sp

    fd. T

    nd., S

    . Acty

    Spe

    cified

    Brief

    All T

    end

    ers by A

    ctivity No.

    Te

    nder b

    y Activity N

    o.

    Acty o

    f Sp

    fd. T

    nd., S

    . Acty

    Spe

    cified

    Deta

    il

    Re

    ports

    Exit

    TE

    S

    1 2 5

    1 2 5

  • 126

    126

  • Part 2-Pre Tender Stage

    INDIRECT COST

    PROJECT OVERHEAD

    OFFICE OVERHEAD

    PROJECT OVERHEAD

    127

    127

  • Part 2-Pre Tender Stage

    TOWER OR MOBILE CRANE

    128

    128

  • Part 2-Pre Tender Stage

    - -

    OFFIVE OVERHEAD

    129

    129

  • Part 2-Pre Tender Stage

    OFICE OVERHAD

    130

    130

  • 1 / 123/03/2014

    TE

    ND

    ER

    NO

    : T4

    76

    EN

    G.M

    .AL

    IMA

    M

    CL

    OS

    ING

    DA

    TE

    : 9/9

    /19

    99

    PR

    OJ

    EC

    T D

    UR

    A. : 3

    0 M

    ON

    TH

    1) E

    QU

    IPM

    EN

    TS

    IND

    . CO

    ST

    LIS

    T

    EQ

    UIP

    ME

    NT

    EQ

    UP

    S.

    EQ

    UIP

    .W

    OR

    K.

    PR

    ICE

    MA

    NT

    .+S

    P.

    TO

    TA

    LE

    QU

    IPS

    .AT

    TO

    TA

    L

    NO

    TE

    S

    NO

    .P

    RIC

    EL

    IFE

    /YE

    AR

    / MN

    TH

    PA

    R./M

    NT

    CO

    ST

    /MN

    TS

    ITE

    /MN

    TH

    CO

    ST

    /PR

    OJ

    .

    GE

    NE

    RA

    TOR

    3.006,000.0

    5.00300.0

    270.0570.0

    28.015,960.0

    ITEM

    S N

    OT N

    EE

    DE

    D O

    MITTE

    DD

    OZE

    R1.00

    285,000.08.00

    2,968.82,671.9

    5,640.67.0

    39,484.4C

    OM

    PA

    RE

    EQ

    UIP

    .WITH

    DIR

    EC

    T CO

    ST

    LOA

    DE

    R0.0

    EQ

    UIP

    . AT D

    IR_C

    OS

    .WK

    3D

    UM

    PE

    R0.0

    RO

    LLER

    CO

    MP

    AC

    TOR

    0.0P

    LATE

    CO

    MP

    AC

    TOR

    3.007,000.0

    5.00350.0

    315.0665.0

    18.011,970.0

    (30-6 STA

    RT-6B

    EFO

    RE

    EN

    D=18)

    TOW

    ER

    CR

    AN

    EM

    OB

    ILE C

    RA

    NE

    FOR

    KLIFT

    3.0065,000.0

    8.002,031.3

    1,828.13,859.4

    18.069,468.8

    0.0W

    ATE

    R TR

    UC

    K2.00

    120,000.08.00

    2,500.02,250.0

    4,750.026.0

    123,500.0D

    UM

    P TR

    UC

    K0.0

    SIX W

    HE

    EL

    0.0TR

    AILE

    R1.00

    200,000.08.00

    2,083.31,875.0

    3,958.318.0

    71,250.0LO

    W B

    ED

    0.00.00.0

    LON

    G P

    ICK

    UP

    [DYN

    A]

    2.0065,000.0

    5.002,166.7

    1,950.04,116.7

    26.0107,033.3

    PIC

    KU

    P0.0

    JEE

    P/FO

    RE

    ME

    N(H

    ALF

    ON

    LY)6.00

    45,000.05.00

    4,500.04,050.0

    8,550.026.0

    222,300.0

    0.0G

    .M.C

    0.0P

    RIV

    ATE

    CA

    RS

    0.0B

    US

    0.00.0

    WE

    LDIN

    G M

    AC

    HIN

    E3.00

    10,000.05.00

    500.0450.0

    950.024.0

    22,800.0LA

    THE

    0.0LA

    DD

    ER

    S(11*2000=22000)

    11.00

    22,000.01.5 TO

    N R

    ICH

    AR

    DS

    (4S

    ITES

    *4*1300=20800)16.00

    20,800.0

    RO

    LLER

    S (4S

    ITES

    *2KM

    *30P

    CS

    *120=28800240.00

    28,800.0

    0.00.0

    TRA

    NS

    P.TO

    BE

    AD

    DE

    D H

    ER

    E IF ITS

    0.0

    OM

    ITTED

    IN TH

    E E

    MP

    LOE

    ES

    TOTA

    L 7

    55

    ,36

    6.4

    6

    SO

    UT

    H T

    AIF

    PA

    RT

    II IND

    IRE

    CT

    CO

    ST

    LIS

    TS

    TO

    TA

    L E

    QU

    IPM

    EN

    T IN

    DIR

    EC

    T C

    OS

    T / P

    RO

    JE

    CT

    Indirect Cost-T476

    131

    131

  • 1 / 123/03/2014

    EM

    PL

    OY

    EE

    EM

    PL

    .B

    AS

    .SA

    L.

    AC

    T. S

    AL

    .E

    MP

    .AT

    E

    MP

    . SA

    L.

    NO

    TE

    S

    NO

    ./ M

    ON

    TH

    / MO

    NT

    HS

    ITE

    /MN

    T/ P

    RO

    J.

    PR

    OJE

    CT M

    AN

    AG

    ER

    1.007,000.00

    13,160.0031.00

    407,960.00 1-TH

    E A

    CTU

    AL S

    ALA

    RY / E

    MP

    LOYE

    E TA

    KE

    N FR

    OM

    SITE

    EN

    GIN

    EE

    R3.00

    5,500.0010,790.00

    26.00841,620.00

    EM

    PLO

    YEE

    S TO

    TAL C

    OS

    T [LAB

    R C

    OS

    T 1.XLS].

    TEC

    HN

    ICA

    L OFFIC

    E E

    NG

    .1.00

    5,000.0010,000.00

    30.00300,000.00

    2-TRA

    NS

    PO

    R.TO

    BE

    OM

    ITTED

    FRO

    M TH

    E A

    CTU

    AL

    QU

    ALITY C

    ON

    TRO

    L EN

    G.

    SA

    LAR

    Y IF ITS C

    ON

    SID

    ER

    . IN E

    QU

    IP.LIS

    T [LIST N

    O.1].

    OFFIC

    E E

    NG

    INE

    ER

    3-HO

    US

    ING

    TO B

    E O

    MITTE

    D FR

    OM

    EM

    PLO

    YEE

    S

    DR

    AFTS

    MA

    NTO

    TAL C

    OS

    T IF CO

    NS

    IDE

    R.IN

    SITE

    MO

    BILIZA

    T.LIST

    SE

    CR

    ETA

    RY

    1.002,500.00

    3,730.0028.00

    104,440.00[LIS

    T NO

    3].A

    DM

    INS

    TRA

    TOR

    -SA

    UD

    I3.00

    2,000.002,500.00

    26.00195,000.00

    FOR

    EM

    AN

    6.002,500.00

    3,730.0026.00

    581,880.00FO

    RE

    MA

    N3.00

    2,500.003,730.00

    12.00134,280.00

    SITE

    SU

    RV

    EYO

    RLA

    BO

    RA

    T.TEC

    HN

    ICIA

    NA

    CO

    UN

    TAN

    T2.00

    2,000.003,100.00

    28.00173,600.00

    STO

    RE

    KE

    EP

    ER

    3.002,000.00

    3,100.0028.00

    260,400.00A

    SS

    IST. S

    TOR

    EK

    EE

    PE

    R3.00

    1,000.001,700.00

    28.00142,800.00

    PU

    RC

    HA

    SE

    R M

    AN

    1.002,000.00

    3,100.0028.00

    86,800.00D

    OZE

    R D

    RIV

    ER

    1.001,500.00

    2,400.007.00

    16,800.00JE

    EP

    DR

    IVE

    RS

    0.00D

    YNA

    DR

    IVE

    RS

    2.001,400.00

    2,250.0026.00

    117,000.00B

    US

    DR

    IVE

    RS

    0.00TR

    AILE

    R D

    RIV

    ER

    S1.00

    1,500.002,400.00

    18.0043,200.00

    WA

    TER

    TRU

    CK

    DR

    IVE

    RS

    2.001,400.00

    2,250.0026.00

    117,000.00E

    QU

    IP.M

    EC

    HC

    AN

    ICS

    3.001,500.00

    2,400.0026.00

    187,200.00A

    SS

    IST.E

    QU

    IP.M

    EC

    HA

    N.

    3.00800.00

    1,450.0026.00

    113,100.00E

    QU

    IP.E

    LEC

    TRA

    TION

    S1.00

    1,500.002,400.00

    26.0062,400.00

    AS

    S.E

    QU

    IP.E

    LEC

    TRA

    T.0.00

    WE

    LDE

    R3.00

    1,200.001,970.00

    18.00106,380.00

    PU

    NC

    HE

    R TE

    CH

    NIC

    IAN

    0.00TIM

    EK

    EE

    PE

    R0.00

    GU

    AR

    DB

    OY

    3.00800.00

    28.000.00

    TEA

    BO

    Y4.00

    800.0028.00

    0.00C

    AN

    TEE

    N E

    MP

    LOYE

    E0.00

    EN

    GIN

    EE

    RS

    BO

    NU

    S0.00

    FOR

    ME

    N B

    ON

    US

    0.003

    ,99

    1,8

    60

    .00

    WO

    RK

    MS

    HIP

    DIR

    .CO

    ST

    0.0

    0%

    IDL

    E L

    AB

    RS

    (5-1

    0%

    )0

    .05

    30

    0,0

    00

    .00

    IDLE

    LAB

    RS

    5%-10%

    OF W

    OR

    KM

    EN

    .DIR

    EC

    T CO

    ST

    4,2

    91

    ,86

    0.0

    0

    30

    0,0

    00

    0

    TO

    TA

    L O

    F S

    TA

    FF

    IND

    IRE

    CT

    CO

    ST 2

    ) ST

    AF

    F IN

    D. C

    OS

    T L

    IST

    Indirect Cost-T476

    132

    132

  • 1 / 123/03/2014

    3) S

    ITE

    MO

    BIL

    IZA

    TIO

    N L

    IST

    DE

    SC

    RIP

    ITIO

    NR

    EN

    T P

    R.

    DU

    RA

    T.

    CO

    ST

    NO

    TE

    S

    / YE

    AR

    / YE

    AR

    A-R

    EN

    TING

    SE

    RV

    ICE

    AR

    EA

    : LAB

    R C

    AM

    P / S

    TOR

    ES

    / W

    OR

    KS

    HO

    PS

    .30,000

    2.5075,000.0

    3 SITE

    S*10000=30000

    B-O

    FF

    ICE

    S :

    1-C

    OM

    PA

    NY O

    FFICE

    INS

    IDE

    TAIF

    15,0002.50

    37,500.02-C

    ON

    SU

    LTAN

    T & G

    UE

    STS

    OFFIC

    E IN

    SID

    E C

    ITY.

    3-STA

    FF SITE

    OFFIC

    ES

    .36,000

    2.5090,000.0

    3 OFFIC

    ES

    *12000=360004-C

    ON

    SU

    LTAN

    T SITE

    OFFIC

    E.

    0.0D

    EP

    RE

    CIA

    T.FOR

    ON

    E O

    R M

    OR

    E P

    RO

    J.IF ITS P

    RE

    FAB.

    6-DIFFE

    R. R

    EQ

    .OFFIC

    ES

    : MA

    TER

    IAL S

    AM

    PLE

    S,FIR

    ST A

    IDC

    -HO

    US

    ING

    :0.0

    HO

    US

    ING

    CO

    ST TO B

    E A

    DD

    ED H

    ER

    E IF ITS

    OM

    ITTED

    1-EN

    GIN

    EE

    RS

    0.0

    IN TH

    E A

    CTU

    AL S

    ALA

    RY / M

    ON

    TH [LIS

    T NO

    .2].2-FO

    RE

    ME

    N &

    AC

    OU

    NTA

    NTS

    AN

    D A

    DM

    INS

    T. STA

    FF0.0

    3-SITE

    STA

    FF HO

    US

    ING

    INC

    LUD

    ING

    TOILE

    TS.

    36,0002.50

    90,000.03 B

    IG H

    OU

    SE

    S*12000=36000

    D-F

    UR

    NIT

    UR

    E :

    0.01-FU

    RN

    ITUR

    E FO

    R C

    OM

    PA

    NY O

    FFICE

    & S

    ITE O

    FFICE

    S.

    80,000.04 O

    FFICE

    S* 20000=80000

    2-FUR

    NITU

    RE

    FOR

    CO

    NS

    ULTA

    NT O

    FFICE

    & S

    ITE O

    FFICE

    .0.0

    FUR

    NITU

    RE

    INC

    LUD

    ES

    : RE

    FRIG

    ER

    ATO

    RS

    , A.C

    UN

    ITS3-FU

    RN

    ITUR

    E FO

    R E

    NG

    INE

    ER

    S H

    OU

    SIN

    G.

    0.0W

    AS

    HIN

    G M

    AC

    HIN

    ES

    , KITC

    HE

    N TO

    OLS

    , GA

    S S

    TOV

    ES

    4-FUR

    NITU

    RE

    FOR

    AD

    MIN

    STR

    ATIO

    N S

    TAFF

    0.0C

    UP

    BO

    AR

    DS

    , BE

    DS

    , BE

    D S

    HEE

    TS , M

    ATR

    ES

    SE

    S ,

    5-FUR

    NITU

    RE

    FOR

    SITE

    STA

    FF(4 HO

    US

    ES

    *20000=80000).80,000.0

    PILLO

    WS

    , PILLO

    WS

    CO

    VE

    RS

    . E

    -ST

    OR

    ES

    :0.0

    1-US

    UA

    L STO

    RE

    FOR

    MA

    TER

    IAL (3*10000=30000).

    30,000.02-O

    PE

    N S

    TO

    RE

    S F

    OR

    TIM

    BE

    R , S

    TE

    EL R

    NF

    T , S

    AN

    ITA

    RY

    PIP

    ES

    0.0

    F-W

    OR

    KS

    HO

    PS

    :0.0

    1-ME

    CH

    AN

    IC W

    OR

    KS

    HO

    PS

    (7000*3=21000) , ELE

    CTR

    ICITY

    21,000.0 , P

    UN

    CH

    ER

    , LATH

    E , IR

    ON

    - WO

    OD

    -STE

    EL R

    NFT

    MA

    NG

    OR

    Y-TOO

    LS FO

    R TH

    ES

    E W

    OR

    KS

    HO

    PS

    .0.0

    2-SH

    ED

    S FO

    R E

    QU

    IPM

    EN

    TS [TR

    AN

    SIT M

    IXER

    S &

    CA

    RS

    .... ].0.0

    G-D

    IFF

    ER

    EN

    T S

    ITE

    MO

    BIL

    IZA

    TIO

    N :

    0.01-FE

    NC

    E R

    OU

    ND

    SITE

    & C

    OS

    T OF R

    EM

    OV

    AL (5000*3=15000)

    15,000.02-R

    OA

    DS

    LEV

    ELLIN

    G IN

    SID

    E S

    ITE IN

    CLU

    D.R

    OA

    D A

    CC

    ES

    S TO

    SITE

    .0.0

    3-CO

    ST O

    F EQ

    UIP

    ME

    NTS

    ER

    EC

    TION

    &R

    EM

    OV

    AL A

    S :BA

    TCH

    PLA

    NT

    0.0TO

    WE

    R C

    RA

    NE

    , GE

    NE

    RA

    TOR

    FOU

    ND

    ATIO

    N0.0

    4-CO

    ST O

    F MA

    TER

    IAL + E

    RE

    CTIO

    N + R

    EM

    OV

    AL O

    F :WA

    TER

    TAN

    KS

    0.0W

    ATE

    R &

    ELE

    CTR

    ICITY N

    ETW

    OR

    KS

    , TELE

    PH

    ON

    E LIN

    ES

    - IF AN

    Y.0.0

    5-SIG

    NS

    FOR

    PR

    OJE

    CT (3*2000=6000)

    6,000.06-C

    AR

    PA

    RK

    S S

    HE

    DS

    FOR

    OFFIC

    ES

    INC

    LUD

    ING

    CO

    NS

    ULTA

    NTS

    &

    0.0T

    OT

    AL

    OF

    SIT

    E M

    OB

    ILIZ

    AT

    ION

    524,5

    00.0

    Indirect Cost-T476

    133

    133

  • 1 / 123/03/2014

    DE

    SC

    RIP

    ITIO

    N C

    OS

    T

    / MN

    T

    DU

    R. /

    MN

    T

    TO

    TA

    L

    CO

    ST

    NO

    TE

    S

    A-P

    RE

    TE

    ND

    ER

    & P

    RE

    CO

    NT

    RA

    CT

    ST

    AG

    E :

    0.001-TE

    ND

    ER

    ING

    :EN

    GIN

    EE

    RS

    , PH

    OTO

    CO

    PIE

    S , FA

    XS , D

    .H.L. ,

    2,500.00

    1.00

    2,500.00TE

    ND

    ER

    PR

    ICE

    =2500O

    UT S

    IDE

    EN

    GIN

    EE

    RS

    .10,000.00

    1.00

    10,000.00

    SA

    LAR

    Y OF O

    NE

    EN

    GIN

    EE

    R FO

    R S

    TUD

    Y2-P

    RO

    JEC

    T MA

    NA

    GE

    R W

    ITH S

    OM

    E S

    TAFF TO

    PR

    EP

    AR

    E

    0.00W

    OR

    K S

    TAR

    T , PR

    OJE

    CT S

    UP

    PLIE

    RS

    0.000.00

    B-C

    ON

    TR

    AC

    T S

    TA

    GE

    ( TE

    CH

    N. O

    FF

    ICE

    SID

    E ) :

    0.001-P

    RO

    GR

    AM

    MIN

    G &

    UP

    DA

    TING

    AN

    D C

    OM

    PU

    TER

    CO

    ST.

    0.002-S

    HO

    P D

    RA

    WIN

    G.

    0.00S

    OM

    E O

    F THE

    STA

    FF MA

    Y SP

    EN

    D A

    PE

    RIO

    D3-A

    S B

    UILT D

    RA

    WIN

    G.

    20,000.00

    1.00

    20,000.00A

    T SITE

    , AD

    D TH

    ER

    E E

    XPE

    NS

    ES

    :SA

    LAR

    IES

    ,5-D

    EFE

    CTS

    LIAB

    ILTY CO

    ST

    0.00C

    AR

    S H

    OU

    SE

    S.

    4-MA

    INTE

    NA

    NC

    E [3-5%

    OF D

    IRE

    CT C

    OS

    T , SO

    ME

    PR

    OJE

    CTS

    0.00TO

    BE

    STU

    DIE

    D C

    AR

    EFU

    LLY] .0.00

    IF LAB

    .IS N

    OT A

    VA

    ILAB

    LE A

    T SITE

    .0.00

    C-L

    AB

    OR

    AT

    OR

    Y T

    ES

    TS

    :0.00

    1-DE

    SIG

    N O

    F CO

    NC

    RE

    TE M

    IX6,000.00

    1.00

    6,000.00

    2-DE

    PR

    EA

    SIO

    N O

    F LAB

    .EQ

    UIP

    ME

    NTS

    / project.0.00

    3-ER

    EC

    TION

    OF LA

    BO

    RA

    TOR

    Y RO

    OM

    , ITS E

    QU

    IPM

    EN

    TS.

    4-CU

    BE

    S &

    OTH

    ER

    MA

    TER

    IAL [B

    RIC

    KS

    ,TILES

    ,...] TES

    T CO

    ST

    2,000.00

    2.50

    5,000.000.00

    D-P

    RIM

    AR

    Y R

    EQ

    UIR

    ED

    WO

    RK

    S :

    0.001-D

    ES

    IGN

    THE

    PR

    OJE

    CT O

    R A

    PA

    RT.

    0.00TO

    BE

    OM

    ITTED

    IF CO

    NS

    IDE

    R.IN

    EQ

    UIP

    ME

    NT

    2-PE

    RM

    ITS FR

    OM

    GO

    VE

    RN

    ME

    NT A

    UTH

    OR

    ITIES

    .10,000.00

    1.00

    10,000.00

    LIST [LIS

    T 1] .0.000.00

    E-T

    OO

    LS

    :0.00

    TOO

    LS FO

    R D

    IFFER

    EN

    T TEC

    HN

    ICIA

    NS

    , WO

    RK

    SH

    OP

    S A

    S :

    1,000.00

    24.00

    24,000.001000/M

    ON

    TH=1000 FO

    R 3 S

    ITES

    DR

    ILLS , D

    RILL B

    ITS , D

    ISK

    GR

    IND

    ER

    , OXYG

    EN

    CYLID

    ER

    S,

    0.00G

    LOV

    ES

    , ME

    TER

    TAP

    ES

    , AN

    GLE

    S, W

    ATE

    R LE

    VE

    LS.

    0.000.00

    F-C

    ON

    TR

    AC

    T S

    TA

    GE

    : 0.00

    1-WA

    TER

    FOR

    PR

    OJE

    CT W

    OR

    K &

    OFFIC

    ES

    AN

    D H

    OU

    SIN

    G.

    1,500.00

    26.00

    39,000.003S

    ITES

    *500RIA

    L/MO

    NTH

    =15002-TE

    LEP

    HO

    NE

    & FA

    X & TE

    LEX IN

    VO

    ICE

    S.

    1,000.00

    30.00

    30,000.001 M

    AIN

    OFFIC

    E=1000/M

    ON

    TH3-E

    LEC

    TRIC

    ITY INV

    OIC

    ES

    .1,800.00

    28.00

    50,400.00

    3SITE

    S*(300/S

    TAFF+300O

    FFICE

    )/MO

    NTH

    =18004-M

    AIN

    TEN

    AN

    CE

    FOR

    OFFIC

    ES

    , WO

    RK

    SH

    OP

    S , LA

    BR

    CA

    MP

    .300.00

    26.00

    7,800.00

    5-OFFIC

    E C

    OS

    T: STA

    TION

    AR

    Y , CA

    LCU

    LATO

    RS

    , PH

    OTO

    CO

    PY

    600.00

    26.00

    15,600.00FILE

    S , N

    EW

    S P

    AP

    ER

    S , TR

    AC

    ING

    & D

    RA

    FT PA

    PE

    R.

    0.006-B

    UFFE

    T CO

    ST : TE

    A , C

    OFFE

    E , S

    UG

    ER

    , CLE

    AN

    ING

    CO

    ST.

    600.00

    26.00

    15,600.007-M

    AN

    AG

    ER

    S V

    ISITS

    TO S

    ITE [H

    OTE

    LS , FO

    OD

    , TICK

    ETS

    ] .500.00

    26.00

    13,000.00

    8-TRA

    VE

    LLING

    EXP

    EN

    SE

    S FO

    R S

    TAFF TO

    SITE

    .500.00

    26.00

    13,000.00

    9-SE

    RV

    ICE

    S C

    OS

    T TO S

    UB

    CO

    NTR

    AC

    TOR

    S &

    SU

    PP

    LIER

    S .

    0.0010-M

    ISC

    ELLA

    NE

    OU

    S C

    OS

    TS.

    0.000.000.00

    TRA

    VE

    LLING

    , AC

    CO

    MO

    DA

    TION

    FOR

    SE

    CE

    CO

    EN

    GIN

    EE

    RS

    50,000.00

    1.00

    50,000.00TIC

    KE

    TS=24000 , H

    OTE

    LS=14000 ,

    0.00S

    HO

    PP

    ING

    =12000,TOTA

    L=500000.000.00

    TO

    TA

    L O

    F S

    ITE

    EX

    PE

    NS

    ES

    31

    1,9

    00

    .00

    4) S

    ITE

    EX

    PE

    NS

    ES

    LIS

    T

    Indirect Cost-T476

    134

    134

  • 1 / 1 23/03/2014

    DESCRIPITIONPROJECT

    OVERHEDNOTES

    A-RISK FOR :

    1-UNEXPECTED INCREASE OF MATEIALS / EQUIPMENTS PRICE.2-UNEXPECTED INCREASE OF STAFF SALARIES.3-UNEXPECTED INCREASE FOR FOREIGN COINS. 100,000.004-UNSURE PRICE OF ANY OF SUBCONTRACTORS.

    B-COST OF INSURANCE. 120,000.00

    C-COST OF BID BOND.

    TOTAL OF RISK & INSURANCE & BID BOND 220,000.00

    DESCRIPITION OFF. OVER. NOTES

    A-FINANCE FOR : COST TO OBTAIN REQ.CAPITAL [BANK1-EQUIPMENTS. 2,500,000.00 INTERREST] TILL MONEY RETURNS TO2-SITE MOBILIZATION BANK , ITEMS NOT NEEDED TO BE3-SALARIES TILL THE 1-ST BILL. OMITTED].4-ANY OTHER REQUIRED MATERIALS.

    B-MAIN OFFICE COST : 250,000.00 1-PROJECT VALUE / PROJECTS EXPECTED DURING PROJ.DURAT. 2-PERCENT.FROM THE HISTORICAL DATA OF THE COMPANY. 3-PERCENTAGE FIXED BY MANAGERS.

    HEAD OFFICE COST = FINANCE + MAIN OFFICE COST 2,750,000.00

    DESCRIPITION OFF. OVER. NOTES

    C-PROJECT PROFIT : 4,598,665.37

    1-PERCENTAGE OF THE PROJECT DIRECT COST. 2-FIXED AMOUNT DECIDED BY MANAGERS

    PROFIT PROFIT 4,598,665.37

    INDIRECT COST :

    1-EQUIPMENTS IND. COST 755,366.46 2-STAFF IND. COST 4,291,860.003-SITE MOBILIZATION IND. COST 524,500.004-SITE EXPENSES 311,900.00 5-RISK & INSURANCE & BID BOND 220,000.00 PROJECT OVERHEAD 6,103,626.46

    6-OFFICE OVERHEAD 2,750,000.007-PROJECT PROFIT 4,598,665.37INDIRECT COST 13,452,291.83

    6) HEAD OFFICE IND. COST LIST

    5) RISK & INSURANCE & BID BOND

    7) PROJECT PROFIT

    Indirect Cost-T476

    135

    135

  • Part 2-Pre Tender Stage

    DISTRIBUTION OF MARK UP

    DIRECT COSTNDIRECT COST

    136

    136

  • Part 2-Pre Tender Stage

    137

    137

  • 1/1

    PR

    OJ

    EC

    T N

    AM

    E :A

    BO

    U R

    AK

    A , B

    AN

    I SA

    AD

    [2 N

    D S

    TA

    GE

    ]

    CL

    OS

    ING

    DA

    TE

    : 9 - 9

    -1999

    PR

    OJ

    EC

    T D

    UR

    AT

    ION

    : 30 M

    ON

    TH

    DIR

    EC

    T C

    OS

    T A

    NA

    LY

    SIS

    / QU

    AN

    TIT

    YD

    IR. C

    OS

    T%

    OV

    R.

    MA

    TE

    RIA

    LIN

    ST

    AL

    L

    WO

    RK

    M.

    EQ

    UIP

    M.

    WO

    RK

    M.

    EQ

    UIP

    M.

    / QT

    YP

    RO

    F.

    NO

    .D

    ES

    CR

    IPIT

    ION

    QU

    AN

    TIT

    YU

    NIT

    DIR

    EC

    T C

    OS

    T A

    NA

    LY

    SIS

    / UN

    ITD

    IRE

    CT

    CO

    ST

    /

    UN

    IT

    TE

    ND

    ER

    PR

    ICE

    / QT

    YM

    AT

    ER

    .IN

    ST

    AL

    LA

    TIO

    N

    MA

    TE

    R.

    INS

    TA

    LL

    AT

    ION

    TE

    ND

    ER

    PR

    ICE

    / UN

    IT

    SO

    UT

    H T

    AIF

    II TE

    ND

    ER

    AN

    AL

    YS

    IS

    5.4.2S

    UP

    PLY

    & IN

    ST. O

    F FIBE

    RG

    LAS

    S M

    ETE

    R

    CA

    BIN

    ET (60A

    )1,115.00

    No.

    500.0020.00

    15.00535.00

    557,500.0022,300.00

    16,725.00596,525.00

    1.35674.00

    47.00803,915.00

    5.4.3S

    UP

    PLY

    & IN

    ST. O

    F 60A K

    WH

    ME

    TER

    1,115.00N

    o.280.00

    5.000.00

    285.00312,200.00

    5,575.000.00

    317,775.001.35

    378.007.00

    429,275.00

    5.4.4S

    UP

    P.&

    INS

    T. OF FIB

    ER

    GLA

    SS

    ME

    TER

    C

    AB

    INE

    T (100A)

    86.00N

    o.500.00

    20.0015.00

    535.0043,000.00

    1,720.001,290.00

    46,010.001.35

    674.0047.00

    62,006.00

    5.4.5S

    UP

    PLY

    & IN

    ST. O

    F 60A K

    WH

    ME

    TER

    86.00N

    o.290.00

    5.000.00

    295.0024,940.00

    430.000.00

    25,370.001.35

    391.007.00

    34,228.00

    5.4.6S

    UP

    P. &

    INS

    T. OF FIB

    ER

    GLA

    SS

    200A D

    IST.

    BO

    X.0.00

    No.

    953.4020.00

    15.00988.40

    0.000.00

    0.000.00

    1.351,286.00

    47.000.00

    937

    ,640

    .00

    30,0

    25

    .00

    18,0

    15

    .00

    985

    ,680

    .00

    1,3

    29

    ,424

    .00

    6.0

    0C

    IVIL

    WO

    RK

    S : H

    T/L

    T N

    ET

    WO

    RK

    S

    6.1LIN

    E R

    OU

    TE S

    UR

    VE

    Y: P

    RO

    FILE, S

    TAK

    ING

    ,VO

    LTAG

    E B

    68DR

    OP

    CA

    L. R.O

    .W

    AP

    PR

    VL

    1.00LS

    0.00227,994.00

    0.00227,994.00

    0.00227,994.00

    0.00227,994.00

    1.350.00

    307,547.00307,547.00

    6.2S

    AM

    E A

    S ITE

    M 6.1 B

    UT FO

    R LT

    1.00LS

    0.0075,998.00

    0.0075,998.00

    0.0075,998.00

    0.0075,998.00

    1.350.00

    102,516.00102,516.00

    6.3C

    OM

    PLE

    TE E

    NG

    G. &

    DE

    SIG

    N O

    F PO

    LES

    , SA

    G

    ETC

    .1.00

    LS0.00

    37,999.000.00

    37,999.000.00

    37,999.000.00

    37,999.001.35

    0.0051,258.00

    51,258.00

    6.4S

    AM

    E A

    S ITE

    M 6.3 B

    UT FO

    R LT N

    ETW

    OR

    KS

    1.00LS

    0.0037,999.00

    0.0037,999.00

    0.0037,999.00

    0.0037,999.00

    1.350.00

    51,258.0051,258.00

    6.5S

    UB

    SO

    IL INV

    ES

    TIGA

    TION

    & S

    PE

    CIA

    L FO

    UN

    DA

    TION

    1.00LS

    0.0030,000.00

    0.0030,000.00

    0.0030,000.00

    0.0030,000.00

    1.350.00

    40,468.0040,468.00

    0.0

    04

    09

    ,990

    .00

    0.0

    04

    09

    ,990

    .00

    553

    ,047

    .00

    TE

    ND

    ER

    VA

    LU

    E :

    PR

    OJ

    EC

    T O

    VE

    RH

    EA

    DS

    :1

    9,8

    74

    ,117

    .35

    3,1

    85

    ,258

    .94

    2,0

    86

    ,550

    .12

    25,1

    45

    ,926

    .41

    TO

    TA

    L O

    F P

    AR

    T II

    33,9

    22

    ,458

    .00

    ACT. W

    .OU

    T OVR

    HD

    S DIR

    ECT C

    OST

    1,329,531.441-EQ

    UIPM

    ENTS

    755,366.463

    1,5

    90

    ,424

    .23

    5,0

    15

    ,127

    .55

    3,2

    77

    ,475

    .48

    39,8

    83

    ,027

    .26

    TO

    TA

    L O

    F P

    AR

    T I,II

    53,3

    39

    ,371

    .60

    ACT. W

    .OVR

    HD

    S DIR

    ECT C

    OST

    38,553,495.822-SITE STAFF

    4,291,860.00/ Q

    TY

    / QT

    Y/ Q

    TY

    CO

    ST

    / QT

    Y

    PR

    OJ

    EC

    T D

    IRE

    CT

    CO

    ST

    3

    9,8

    83

    ,027

    .26

    3-SITE MO

    BILIZATION

    524,500.00

    PRO

    JECT O

    VERH

    EADS

    6,103,626.464-SITE EXPEN

    SES311,900.00

    PR

    OJ

    EC

    T R

    AT

    IOS

    :C

    HE

    CK

    :

    PR

    OJ

    EC

    T T

    OT

    AL

    CO

    ST

    4

    5,9

    86

    ,653

    .72

    5-INSU

    RAN

    CE , BID

    BON

    D , R

    ISK220,000.00

    % PR

    O. O

    VER. / D

    IREC

    T CO

    ST [5%-15%

    ] 15.30%

    ACT. W

    .OU

    T OVR

    HD

    S TEND

    ER PR

    ICE

    1,329,510.00

    OFFIC

    E OVER

    HEAD

    S + PRO

    FIT7,348,665.37

    PR

    OJ

    EC

    T O

    VE

    RH

    EA

    DS

    6

    ,103

    ,626

    .46

    % O

    FF. OVER

    . / DIR

    ECT C

    OST [2%

    -8%]

    6.90%AC

    T. W.O

    VRH

    DS TEN

    DER

    PRIC

    E52,009,861.60

    TE

    ND

    ER

    VA

    LU

    E

    53,3

    35

    ,319

    .09

    MA

    IN O

    FF

    ICE

    OV

    ER

    HE

    AD

    S , P

    RO

    FIT

    :%

    PRO

    FIT / DIR

    ECT C

    OST

    11.53%TEN

    DER

    PRIC

    E 53,339,371.60

    SU

    PP

    LY

    & E

    RC

    TIO

    N R

    AT

    IOS

    :6-FIN

    ANC

    E , MAIN

    OFFIC

    E CO

    ST2,750,000.00

    % O

    VERH

    S + PRO

    FIT / DIR

    ECT C

    OST

    33.73%D

    IFF

    ER

    EN

    CE

    VA

    LU

    E

    4,0

    52

    .51

    % AD

    DED

    TO AC

    TIVITIES W.O

    UT O

    VERD

    S1

    .000

    00

    00

    7-PRO

    JECT PR

    OFIT

    4,598,665.37%

    PRO

    J. OVER

    . / TEND

    ER VALU

    E 11.44%

    59.2

    3%

    9.4

    0%

    6.1

    4%

    25.2

    2%

    ACTIVITIES W

    .O O

    VERH

    DS TEN

    DER

    PRIC

    E 1,329,531.44

    MA

    IN O

    FF

    . OV

    ER

    EA

    HD

    S +

    PR

    OF

    IT

    7,3

    48

    ,665

    .37

    %

    OFFC

    . OVER

    . / TEND

    ER VALU

    E 5.16%

    Ma

    t./Te

    n.

    La

    br/T

    en

    .E

    qu

    p./T

    en

    .O

    vh

    s+

    Pro

    ./Te

    n.

    ACTIVITIES W

    .OVER

    DS TEN

    DER

    PRIC

    E 52,005,787.65

    TO

    TA

    L O

    F IN

    DIR

    EC

    T C

    OS

    T1

    3,4

    52

    ,291

    .83

    %

    PRO

    FIT / TEND

    ER VALU

    E8.62%

    100

    .0%

    % AD

    DED

    TO AC

    TIVITIS W.O

    VERD

    S1

    .348

    92

    53

    % O

    VERH

    DS + PR

    OFIT / TEN

    DER

    VALUE

    25.22%T

    ota

    l

    (

    2)

    TO

    TA

    L

    TO

    TA

    L

    Price-

    -

    2

    138

    138

  • 1/123/03/2014

    PR

    OJE

    CT

    NA

    ME

    : DE

    SIG

    N , S

    UP

    PL

    Y , IN

    ST

    AL

    AT

    ION

    OF

    DIS

    TR

    IB.N

    ET

    WO

    RK

    FO

    R W

    AD

    I AL

    - FA

    RA

    A (P

    HA

    SE

    -I)

    CL

    OS

    ING

    DA

    TE

    : 21/0

    5/2

    002

    PR

    OJE

    CT

    DU

    RA

    TIO

    N : 2

    4 M

    ON

    TH

    S

    DIR

    EC

    T C

    OS

    T A

    NA

    LY

    SIS

    / QU

    AN

    TIT

    YD

    IR. C

    OS

    T%

    OV

    R.

    WO

    RK

    M.

    EQ

    UIP

    M.

    WO

    RK

    M.

    EQ

    UIP

    M.

    / QT

    YP

    RO

    F.

    QU

    AN

    TIT

    Y

    DIR

    EC

    T C

    OS

    T A

    NA

    LY

    SIS

    / UN

    ITD

    IRE

    CT

    CO

    ST

    / UN

    IT

    TE

    ND

    ER

    PR

    ICE

    / UN

    IT

    MA

    TE

    RIA

    LIN

    ST

    AL

    L

    WA

    DI A

    L F

    AR

    AA

    (PH

    AS

    E 1

    ) TE

    ND

    ER

    AN

    AL

    YS

    IS

    UN

    ITT

    EN

    DE

    R P

    RIC

    E

    / QT

    YM

    AT

    ER

    .IN

    ST

    AL

    LA

    TIO

    N

    MA

    TE

    R.

    INS

    TA

    LL

    AT

    ION

    N

    O.

    DE

    SC

    RIP

    ITIO

    N

    7.7

    .8C

    IVIL

    WO

    RK

    S : H

    T/L

    T N

    ET

    WO

    RK

    S :

    7.7

    .8.1

    LIN

    E R

    OU

    TE

    SU

    RV

    EY

    :

    7.7.8.1.1S

    urvey , Draw

    ings, Staking of H

    T, RO

    W approvals etc.for H

    T1.00

    Lums.

    7,629.00128,673.00

    15,660.00151,962.00

    7,629.00128,673.00

    15,660.00151,962.00

    1.148500008,762.00

    165,766.00174,528.00

    7.7.8.1.2sam

    e as item no. 7.7.8.1.1 but for LT N

    etworks

    1.00Lum

    s.1,140.00

    19,227.002,340.00

    22,707.001,140.00

    19,227.002,340.00

    22,707.001.14850000

    1,309.0024,770.00

    26,079.007.7

    .8.2

    EN

    GIN

    EE

    RIN

    G &

    DE

    SIG

    N :

    7.7.8.2.1

    Com

    pl.Engineer.,D

    esign of poles and acc.for HT

    1.00Lum

    s.1,740.00

    1,740.000.00

    3,480.001,740.00

    1,740.000.00