    THE TERM, ENGINEER CONSTRUCTION MACHINERY COVERS A

    VERY WIDE RANGE OF MACHINES. EARTH MOVING MACHINES AND

    CRANES ARE GROUPED UNDER THE TERM, C VEHICLES. OTHERS

    SUCH AS PAVEMENT LAYERS AND FINISHERS, COMPRESSORS, ROAD

    ROLLERS, PUMPS AND CONCRETING MACHINES HAVE NO GROUP NAME.

    MANUFACTURERS ARE CONTINUOUSLY IMPROVING THEIR

    DESIGNS WITH THE RESULT THAT THE SPECIFICATIONS ARE

    CONTINUALLY CHANGING. SELECTION OF RIGHT MACHINE FOR THE

    RIGHT JOB WITH ITS OPTIMAL UTILIZATION BY TAKING CARE OF

    TRAINED OPERATORS ITS PROPER SERVICES AND MAINTENANCE WILL

    ALWAYS ADD POSITIVELY TOWARDS THE PROGRESS OF ENGINEER

    WORKS.

    INTRODUCTION

  • 7/25/2019 construction machinery guide and planning

    3/106

    PART I CONSTRUCTION MACHINERY CLASSIFICATION

    AND ITS CHARACTERISTICS.

    PART II CONSTRUCTION MACHINERY SERVICE AND

    ITS MAINTENANCE.

    PART III CONSTRUCTION PLANNING AND MANAGEMENT

    SCOPE

  • 7/25/2019 construction machinery guide and planning

    4/106

    ONSTRU TION MA HINERY LASSIFI ATION

    AND ITS HARA TERISTI S

  • 7/25/2019 construction machinery guide and planning

    5/106

    CLASSIFICATION

    EARTH MOVING AND EXCAVATING MACHINES

    DOZERS ALL TYPES

    EXCAVATORS

    DRAGLINES

    FRONT END LOADERS

    MOTOR GRADERS

    SCRAPPER

  • 7/25/2019 construction machinery guide and planning

    6/106

    ROLLER PLAIN STEEL WHEEL

    ROLLER PLAIN VIBRATORY

    ROLLER TANDEM

    ROLLER SHEEP FOOT VIBRATORY

    ROLLER SHEEP FOOT TOWED

    ROLLER PNEUMATIC TYRE

    ROLLER WALK BEHIND

    ROAD ROLLERS

  • 7/25/2019 construction machinery guide and planning

    7/106

    ASPHALT MIXING AND WEIGHING PLANT

    ASPHALT PAVER

    BITUMEN HEATER AND SPREADER

    ASPHALT RECYCLING PLANT !HOT AND COLD"

    ASPHALT LAYERS AND RELATED E#UIPMENT

    CONCRETE BATCHING PLANT

    CONCRETE MIXERS

    CONCRETE TRANSIT MIXERS

    CONCRETE SHOTCRETING MACHINES

    CONCRETE VIBRATORS

    CONCRETE PUMPS

    CONCRETE PREPARATION AND LAYING MACHINES

  • 7/25/2019 construction machinery guide and planning

    8/106

    DUMP TRUCKS

    CRANES

    AIR COMPRESSORS

    DRILL MACHINES

    CRUSHING PLANTS

    WATER PUMPS

    TRACTORS

    MISCELLANEOUS

  • 7/25/2019 construction machinery guide and planning

    9/106

    CHARACTERISTICS

    AND

    EMPLOYMENT OF MACHINES

  • 7/25/2019 construction machinery guide and planning

    10/106

    DOZER

  • 7/25/2019 construction machinery guide and planning

    11/106

    STRIPPING

    FOR REMOVING TOP SOIL USE DOZERS WHERE HAULS ARE

    SHORT. FOR LONG NARROW LANES $ FT TO %& FT WIDE, ANGLE DOZER

    ALONG THE LANE LEAVING SPOIL AT THE EDGES OF THE

    LANE.

    FOR WIDER LANES BULLDOZE ACROSS THE LANE

    DOZERS

    DOZERS ARE AVAILABLE IN DIFFERENT SIZES I.E SIZEI, SIZEII AND

    SIZEIV BOTH TRACKED AND WHEEL.

    USES OF DOZERS

  • 7/25/2019 construction machinery guide and planning

    12/106

    ANGLE DOZER IS THE MOST USEFUL TYPE OF DOZER FOR

    THIS JOB AS IT CAN EXERT GREATER PRESSURE IN CUTTING

    STOUT ROOTS BY ANGLING THE BLADE.

    WHEN LIGHT SHRUBS AND TREES UPTO & INCH DIAMETER, KEEP

    THE EDGE OF THE BLADE A FEW INCHES BELOW GROUND LEVEL.

    TRAVEL AT TRACTOR SPEED IN HIGHEST POSSIBLE GEAR.

    WHEN TREES ' INCH TO %& INCH DIAMETER, PUSH WITH THE

    BLADE HELD HIGH APPLYING STEERING CLUTCHES TO SWAY THE

    TREE TILL IT BEGINS TO FALL.

    CLEARING VEGETATION

  • 7/25/2019 construction machinery guide and planning

    13/106

    BACK UP AND LOWER THE BLADE UNDER THE ROOTS. CLEAR

    THE TREE WITH A PUSHING LIFTING ACTION OF THE BLADE.

    UNDER AVERAGE CONDITIONS TIME TAKEN TO FELL A TREE IS

    % TO ( MINUTES. TREES %& TO () INCH DIAMETER, CUT THE ROOTS ON THE SIDE

    OPPOSITE TO THE RE#UIRED DIRECTION OF FALL, PILING

    SPOIL NEAR BY. NORMAL DEPTH OF CUT IS & FEET TO &.*

    FEET.

    CUT THE ROOTS ON THE LEFT AND RIGHT HAND SIDES OF THE

    TREE PUSHING THE SPOIL INTO THE FIRST CUT. DOZE

    SURPLUS SPOIL BACK TO FORM A RAMP OVER THE FIRST CUT.

    CLEARING VEGETATION

  • 7/25/2019 construction machinery guide and planning

    14/106

    CLIMB THE RAMP WITH BLADE HIGH SWAYING THE TREE BY

    USE OF STEERING CLUTCHES UNTIL THE TREE BEGINS TO

    FALL. BACK OUT #UICKLY TO AVOID ROOTS COMING UP UNDER

    THE TRACTOR AND DAMAGING OR OVER TURNS IT.

    WHEN THE TREE HAS FALLEN, FILL THE HOLES AS NECESSARY

    AND CLEAR THE TREE BY A LIFTING AND PUSHING ACTION OF

    THE BLADE UNDER THE EXPOSED ROOTS.

    CLEARING VEGETATION

  • 7/25/2019 construction machinery guide and planning

    15/106

    SIDE HILL CUTTING

    PUSH LOADING SCRAPPERS

    CAMBERING

    DITCHING

    BATTERING AND SLOPING

    BACK FILLING

    SPREADING AND ROUGH GRADING

    USES OF DOZERS !C+-.."

  • 7/25/2019 construction machinery guide and planning

    16/106

    WORK DOWN HILL WHENEVER PRACTICABLE

    WHEN BULLDOZING, KEEP THE LENGTH OF HAUL WITHIN THE

    ECONOMIC LIMITS/

    o TRACKED DOZER/ MAXIMUM ()) FT, BETTER &)) FT

    o WHEEL DOZER / MAXIMUM ')) FT

    PUSH A FULL LOAD AND USE THE HIGHEST POSSIBLE GEAR.

    ALWAYS AIM AT ARRIVING AT THE DUMPING AREA WITH AS FULL A

    LOAD AS POSSIBLE IN FRONT OF THE BLADE.

    SLOT DOZING, WHEN BULLDOZING TO MOVE LARGE #UANTITIES

    OF MATERIAL, REDUCES SPILLAGE AT THE SIDES OF THE BLADE.

    BULLDOZE SIDE BY SIDE, WHEN CLEARING A LARGE AREA.

    SPILLAGE FROM INSIDE EDGES OF BLADES IS REDUCED.

    EMPLOY WELL TRAINED OPERATORS OR DAMAGE TO TRACTORS

    WILL RESULT.

    AIDS TO EFFICIENT OUT PUT

  • 7/25/2019 construction machinery guide and planning

    17/106

    KOMATSU

    CATERPILLAR

    TEREX

    MAIN MANUFACTURERS OF DOZERS

  • 7/25/2019 construction machinery guide and planning

    18/106

  • 7/25/2019 construction machinery guide and planning

    19/106

  • 7/25/2019 construction machinery guide and planning

    20/106

  • 7/25/2019 construction machinery guide and planning

    21/106

  • 7/25/2019 construction machinery guide and planning

    22/106

  • 7/25/2019 construction machinery guide and planning

    23/106

    EXCAVATOR

  • 7/25/2019 construction machinery guide and planning

    24/106

    THE BASE MACHINE CAN BE RIGGED WITH DIFFERENT FRONT END

    E#UIPMENTS FOR EXCAVATING/

    FACE SHOVEL

    BACK ACTOR

    DRAGLINE

    CRAB OR CLAM SHELL

    IT CAN ALSO BE RIGGED AS A CRANE OR A PILE DRIVER/

    CRAWLER MOUNTED

    TRUCK MOUNTED

    WHEEL MOUNTED

    EXCAVATORS

  • 7/25/2019 construction machinery guide and planning

    25/106

    CYCLE OF OPERATION IS VERY SHORT, HENCE SECONDS

    SAVED IN EACH CYCLE HAVE GREAT EFFECT ON OUT PUT.

    RESTRICT SWING OF EXCAVATORS TO 0) DEGREES MAXIMUM.

    PROVIDE SUFFICIENT HAULAGE TRUCKS FOR REMOVAL OF

    SPOIL.

    ARRANGE FOR RAPID POSITIONING OF TRUCKS BOTH AT

    LOADING AND DISCHARGING SITES. USE SPORTING LOGS FOR

    VEHICLES WHICH HAVE TO BACK INTO POSITION.

    OPERATOR SHOULD MAKE FULL USE OF ANY WAITING TIME.

    AIDS TO EFFICIENT USE OF EXCAVATORS

  • 7/25/2019 construction machinery guide and planning

    26/106

    KEEP HAUL ROADS IN GOOD CONDITION WITH ADE#UATE

    PASSING PLACES.

    ENSURE EXCAVATOR IS STANDING ON A LEVEL SIDE. USE

    SLEEPER MATS IF NECESSARY.

    KEEP BUCKET TEETH SHARP.

    KEEP CLUTCHES CORRECTLY ADJUSTED AS PER MACHINE

    HAND BOOK.

    AIDS TO EFFICIENT USE OF EXCAVATORS

  • 7/25/2019 construction machinery guide and planning

    27/106

    POSITION HAULAGE VEHICLES SO THAT BUCKET SWINGS

    OVER BACK AND NOT OVER CAB.

    DRIVER OF HAULAGE VEHICLE MUST DISMOUNT DURING

    LOADING.

    EXCAVATOR BUCKET MUST BE BROUGHT DOWN CLOSE TO

    VEHICLE BEFORE DISCHARGING.

    LOAD A CUSHION OF EARTH ON BED OF VEHICLE BEFORE

    LOADING A BOULDER IF ANY.

    SAFETY PRECAUTIONS

  • 7/25/2019 construction machinery guide and planning

    28/106

    PRIMARY ROLE OF DRAGLINE IS BULK EXCAVATION BELOW TRACK

    LEVEL IN SOFT SOILS OR LOOSE MATERIALS INCLUDING SHALE

    AND SHATTERED ROCKS. THE MOST SUITABLE ROLLERS ARE

    THOSE RE#UIRING LIGHT CUT OVER WIDE RADIUS 1.2. BATTERING

    BANKS, CUTTING BACK LONG SLOPES AND CLEARING OUT

    STREAMS AND CANALS.

    DRAGLINES

  • 7/25/2019 construction machinery guide and planning

    29/106

    OUTPUT DEPENDS ON/

    ANGLE OF SWING FROM DIG TO DISCHARGE. KEEP THIS AS

    SMALL AS POSSIBLE.

    DUMPING ON TO SPOIL HEAPS INSTEAD OF INTO TRANSPORT.

    TIME IT TAKES TO FILL THE BUCKET

    SHARPNESS OF TEETH

    SKILL OF THE OPERATOR.

    AIDS TO EFFICIENT USE

  • 7/25/2019 construction machinery guide and planning

    30/106

    WH EXCAVATOR

  • 7/25/2019 construction machinery guide and planning

    31/106

    EXCAVATION

  • 7/25/2019 construction machinery guide and planning

    32/106

    EXCAVATION

  • 7/25/2019 construction machinery guide and planning

    33/106

    EXCAVATION

  • 7/25/2019 construction machinery guide and planning

    34/106

    exx

  • 7/25/2019 construction machinery guide and planning

    35/106

  • 7/25/2019 construction machinery guide and planning

    36/106

    DRAGLINE

  • 7/25/2019 construction machinery guide and planning

    37/106

    DRAGLINE

    DRAGLINE

  • 7/25/2019 construction machinery guide and planning

    38/106

    DRAGLINE

    DRAGLINE

  • 7/25/2019 construction machinery guide and planning

    39/106

    DRAGLINE

  • 7/25/2019 construction machinery guide and planning

    40/106

    FE LOADER

    FE LOADER

  • 7/25/2019 construction machinery guide and planning

    41/106

    FE LOADER

    EMPLOYMENT

    THE PRIMARY ROLE OF LOADER IS LOADING/

    LOOSE MATERIAL FROM STOCK PILES AND SPOIL HEAPS

    INTO HAULAGE VEHICLES.

    AGGREGATE INTO CONCRETE MIXING AND BATCHING PLANT.

    STONE IN TO CRUSHING PLANT.

  • 7/25/2019 construction machinery guide and planning

    42/106

    OUTPUT DEPENDS ON/

    REDUCING TO A MINIMUM THE TIME TAKEN TO TRAVEL

    BETWEEN LOADING AND DISCHARGING POINT AND BACK.

    FOR EFFICIENT OUT PUT/

    HAUL DISTANCE SHOULD NOT EXCEED &) YARDS.

    AVOID TURNS

    FOR FRONT LOADING AND FRONT TIPPING MACHINES, USE

    THE MOBILITY OF THE HAULAGE VEHICLE TO REDUCE THE

    LENGTH OF HAUL OF THE LOADER.

    FOR FRONT LOADING AND REAR TIPPING MACHINES,

    POSITION THE HAULAGE VEHICLE IMMEDIATELY BEHIND THE

    LOADER AND AS CLOSE AS PRACTICABLE.

    AIDS TO EFFICIENT USE

  • 7/25/2019 construction machinery guide and planning

    43/106

    FOR MACHINES LOADING FROM STOCKPILES INTO STATIC

    PLANT, PLACE THE STOCK PILE CLOSE TO THE PLANT AND IN A

    POSITION WHICH REDUCES MANEUVERING OF THE LOADER TO

    A MINIMUM.

    KEEP THE SHOVEL CLEAN.

    KEEP THE TYRE PRESSURE CORRECT AND #UAL.

    CHOOSE GOOD OPERATOR HAVING MATCHING APTITUDE.

    AIDS TO EFFICIENT USE

  • 7/25/2019 construction machinery guide and planning

    44/106

    FE LOADER

  • 7/25/2019 construction machinery guide and planning

    45/106

    FE LOADER

  • 7/25/2019 construction machinery guide and planning

    46/106

    FE LOADER

  • 7/25/2019 construction machinery guide and planning

    47/106

    MOTOR GRADER

  • 7/25/2019 construction machinery guide and planning

    48/106

    EMPLOYMENT

    STRIPPING

    SLOPING AND BANK CUTTING

    CAMBERING AND LEVELING NEW WORK

    SPREADING

    MAINTENANCE OF EXISTING WORK RESHAPING

    DITCHING

    CLEARING EXISTING DITCHES

    MIXING AGGREGATES OR AGGREGATE BITUMEN

    MATERIALS

    CLEARING SNOW

    MOTOR GRADER

    MOTOR GRADERS ARE AVAILABLE WHICH MAY BE $3', IN WHICH CASE

    THE FRONT WHEEL CAN BE TILTED, OR '3' WITH NONE OF THE WHEELSTILTING. THEY CAN WORK IN REVERSE AS WELL.

  • 7/25/2019 construction machinery guide and planning

    49/106

    WORK IN PASSES NOT LESS THAN %))) FT

    PLAN THE METHOD OF WORK CAREFULLY TO REDUCE THE

    NUMBER OF PASSES.

    DIVIDE THE WORK INTO SECTIONS SO THAT EACH PASS IS AS

    LONG AS THE NEEDS OF SUPERVISION WILL ALLOW.

    WORK AT AS HIGH SPEED AS POSSIBLE

    FOR MAXIMUM TRACTION, INFLATE TYRES E#UALLY AND TO

    CORRECT PRESSURE. ON SOFT GROUND REDUCE TRYE

    PRESSURE TO INCREASE TRACTION.

    GREATER EFFICIENCY CAN BE ACHIEVED IF GRADERS WORK IN

    TEAMS.

    AIDS TO EFFICIENT USE

  • 7/25/2019 construction machinery guide and planning

    50/106

    SET THE BLADE TO SUIT THE SOIL. ON LOOSE GRANULAR

    SOILS, SET THE FACE OF BLADE ALMOST VERTICAL, CAUSING

    THE SOIL TO BOIL UP AND ROLL FORWARD SO EASING THE

    LOAD. ON COHESIVE SOILS SET THE BLADE TO ACUTE ANGLE

    TO SLICE OFF THE SOIL WITH A PLANE LIKE ACTION.

    WHILE WORKING ON MAINTENANCE OF EARTH AND GRAVEL

    ROADS, BEGIN AT THE FIRST SIGNS OF RUTTING. MAINTENANCE

    IS OFTEN BEST DONE AFTER RAIN WHEN THE SOIL HAS CEASED

    TO BE MUDDY BUT IS STILL DAMP.

    AIDS TO EFFICIENT USE

  • 7/25/2019 construction machinery guide and planning

    51/106

    MOTOR GRADER

  • 7/25/2019 construction machinery guide and planning

    52/106

    MOTOR GRADER

  • 7/25/2019 construction machinery guide and planning

    53/106

  • 7/25/2019 construction machinery guide and planning

    54/106

  • 7/25/2019 construction machinery guide and planning

    55/106

    SINGLE DRUM ROLLER

  • 7/25/2019 construction machinery guide and planning

    56/106

    SINGLE DRUM ROLLER

    ROLLER PLAIN STEEL WHEEL

  • 7/25/2019 construction machinery guide and planning

    57/106

    THE BEST WEIGHT OF ROLLER TO BE USED FOR ANY TASK WILL

    DEPEND ON/

    THE NATURE OF WORK.

    THE NATURE OF THE MATERIAL.

    THE THICKNESS OF EACH LAYER TO BE COMPACTED.

    THE COARSER THE MATERIAL AND THE THICKER THE LAYER,THE HEAVIER THE ROLLER.

    TOO HEAVY A ROLLER, MAY HAVE TOO GREAT A CRUSHING

    EFFECT, MAY CAUSE MATERIAL TO GIVE WAY, OR MAY

    S#UEEZE IT OUT IN THE FORM OF A WAVE IN FRONT OF THE

    ROLLER.

    ROLLER PLAIN STEEL WHEEL

    SMOOTH STEEL WHEEL ROLLERS ARE USED WHEN CRUSHING ACTION

    IS RE#UIRED, AND FOR THE INITIAL AND FINAL ROLLING OF WATER

    BOUND MACADAM, TAR MACADAM AND BITUMINOUS MATERIAL.

    WEIGHT

    ROLLER PLAIN STEEL WHEEL

  • 7/25/2019 construction machinery guide and planning

    58/106

    MAKE FIRST PASSES ALONG THE SIDES OF THE TASK AND

    SUBSE#UENT PASSES GRADUALLY WORKING TOWARDS THE

    CENTRE.

    EACH PASS SHOULD OVERLAP THE PREVIOUS ONE BY ABOUT

    %& INCHES.

    ROLL SLOWLY, STEADILY AND UNINTERRUPTEDLY THROUGH

    OUT EACH PASS.

    AVOID OVER ROLLING, THE NUMBER OF PASSES TO ACHIEVE

    COMPACTION SHOULD BE SPECIFIED.

    FURTHER ROLLING DOES NO GOOD AND IS LIKELY TO CAUSE

    DAMAGE.

    OPERATION

    ROLLER PLAIN VIBRATORY

  • 7/25/2019 construction machinery guide and planning

    59/106

    IN THIS TECHNI#UE THE VIBRATING ROLLER IS IN CLOSE CONTACT WITH

    ANY LAYER OF MATERIAL AND EXERTS TWO ACTIONS/

    THE REDUCTION OF THE INTERNAL FRICTION OF THE

    MATERIAL

    THE TAMPING EFFECT

    THE PROCESS OF THE REDUCTION OF THE INTERNAL FRICTION OCCURS

    LIKE/ AS THE VIBRO COMPACTOR PASSES OVER THE MATERIAL, IT

    BEGINS TO VIBRATE INTENTLY. THE PARTICLES DETACH THEM SELVES

    ONE FROM OTHER, THUS ACHIEVING REDUCTION OF THE INTERNAL

    FRICTION. IN THIS PARTICULAR PHASE THE PARTICLES MOVE ON TOP OF

    EACH OTHER AND READJUST THEMSELVES WITHIN THE VOIDS, UNTIL ALL

    THE VOIDS HAVE BEEN FILLED. IT HAS BEEN OBSERVED THAT VIBRATION

    IS ABSOLUTELY NECESSARY FOR COMPACTION OF NATURAL SOIL,

    GRANULAR MATERIALS, CRUSHED ROCK AND BITUMINOUS MIXERS.

    VIBRO COMPACTION

  • 7/25/2019 construction machinery guide and planning

    60/106

    PASSES USUALLY '$ PASSES ARE ADE#UATE. COMPACTORS

    ACHIEVE THEIR MAXIMUM EFFORT IN THE FIRST FEW PASSES.

    THEREAFTER THE DENSITY INCREASES VERY SLOWLY. IT MAY

    EVEN DECREASE DUE TO CHANGES IN THE SOIL

    CHARACTERISTICS CAUSED BY OVERSTRESSING. IT IS POINTLESS

    TO GO ON TRYING WITH MORE PASSES IF SPECIFIED COMPACTION

    IS NOT BEING OBTAINED.

    LAYER THICKNESS GENERALLY, THINNER THE LAYER THE

    COMPACTION IS EASIER AND FAST AS MOISTURE CONTROL ISEASIER. %& INCH LOOSE SOIL IS IDEAL, %4 INCH THE MAXIMUM AND

    &' INCH AS AN EXCEPTION. IT IS WISE TO RUN TEST STRIPS TO

    DECIDE THE LAYER THICKNESS AND NUMBER OF PASSES

    RE#UIRED.

    AIDS TO EFFICIENT USE OUTPUT

  • 7/25/2019 construction machinery guide and planning

    61/106

    SPEED

    o THE MAXIMUM EFFECT OF VIBRATOR IS BETWEEN %%5&

    MPH AND &%5& MPH. EFFICIENCY FALLS OFF VERY

    #UICKLY ABOVE &%5& MPH.

    o IF THE ROLLER BEGINS TO BOUNCE, STOP ROLLING.

    BOUNCING INDICATES THAT THE MAXIMUM DENSITY

    HAS BEEN ACHIEVED.

    TO GET A SMOOTH SURFACE, & TO ( PASSES OF STATIC

    ROLLING !WITHOUT VIBRATION" SHOULD BE MADE

    INCASE OF SHARP AND ABRASIVE ROCK, IT IS BETTER TO ROLL

    IT TWICE WITH SMOOTH STEEL WHEEL ROLLER BEFORE

    BRINGING ON THE VIBRO COMPACTOR. THIS IS RE#UIRED

    ONLY TO SAVE THE RUBBER TYRES.

    AIDS TO EFFICIENT USE OUTPUT

  • 7/25/2019 construction machinery guide and planning

    62/106

    DO NOT ROLL VERY CLOSE TO THE RETAINING WALLS AND

    OTHER MASONRY STRUCTURES. THEY ARE LIABLE TO BE

    DAMAGED.

    STRICTLY FOLLOW THE MANUFACTURERS GUIDE REGARDING

    NUMBER OF VIBRATION PER MINUTE, THEY VARY WITH EACH

    MAKE.

    MAKE SURE THE OPERATORS ARE WELL TRAINED OTHERWISE

    THEY WILL DAMAGE THE EXPENSIVE MACHINE.

    PRECAUTIONS

    ROLLER SHEEP FOOT

  • 7/25/2019 construction machinery guide and planning

    63/106

    COMPACTION EFFECT OF SHEEP FOOT ROLLERS ON EACH

    LAYER OF SOIL IS FROM THE BOTTOM UPWARDS AND IS

    AFFECTED BY THE PRESSURE EXERTED BY THE FEET.

    IN GENERAL SHEEP FOOT ROLLERS ARE MOST USEFUL FOR

    COMPACTING COHESIVE SOILS OF LOW MOISTURE CONTENT.

    THEY ARE INEFFECTIVE FOR CLEAN SANDS, GRAVEL AND

    CRUSHED ROCK WITHOUT CLAY OR OTHER BINDER.

    THE MAXIMUM DEPTH OF LAYER WHICH CAN BE COMPACTED IS

    & INCHES GREATER THAN THE LENGTH OF FEET. TO

    COMPACT A LAYER OF THIS DEPTH &' TO (& PASSES ARE

    NECESSARY.

    SPEED OF TRAVEL TO ACHIEVE THE BEST RESULT IS &%5& TO

    (%5& MPH.

    WHEN SUCCESSIVE LAYERS ARE TO BE COMPACTED ON TOP OF

    EACH OTHER, LEAVE THE TOP & TO * INCHES OF EACH LAYER TO

    BE COMPACTED WITH THE NEXT LAYER ABOVE IN ORDER TO

    PROVIDE A KEY.

    PNEUMATIC TYRE ROLLERS

  • 7/25/2019 construction machinery guide and planning

    64/106

    PNEUMATIC ROLLER IS MAINLY USED ON BITUMINOUS SURFACES.

    COMPACTION OF BITUMINOUS SURFACE INCLUDES THREE TYPES OF

    ROLLING/

    BREAK DOWN ROLLINGAT &$) OF 6 %*OTEMPERATURE. THIS IS

    DONE BY STEEL THREE WHEEL ROLLER. IT IS A UNIVERSAL

    PRACTICE TO START ROLLING AT THE OUT SIDE EDGES OF A

    NEWLY LAID MAT AND ROLLS INWARD TOWARDS THE CENTRE

    OR CROWN. INCASE OF SUPER ELEVATED CURVES, ROLLING ISSTARTED AT THE LOW SIDE AND CARRIED TO THE HIGH SIDE IN

    THE SAME MANNER.

    PNEUMATIC TYRE ROLLING AT %$) OF 6 %*+7 IMMEDIATELY

    FOLLOWING THE INITIAL ROLLING OPERATION, THE SURFACEOF THE MAT SHOULD BE CHECKED WITH A STRAIGHT EDGE

    AND LEVELS ARE CORRECTED IF NECESSARY. AFTER

    NECESSARY ADJUSTMENT OF SURFACE, THE PNEUMATIC TYRE

    ROLLING IS UNDER TAKEN FOLLOWING THE SAME PATTERN E.Y

    FROM OUTSIDE EDGE TOWARDS THE CENTRE OR CROWN.

    PNEUMATIC TYRE ROLLERS

  • 7/25/2019 construction machinery guide and planning

    65/106

    FINISH ROLLING AT %() OF 6 %*O .AT THE CONCLUSION OF THE

    PNEUMATIC TYRE ROLLING OPERATION, THE SURFACE OF THEBITUMINOUS MAT, ALTHOUGH ALMOST TOTALLY DENSIFIED AND

    COMPACTED TO THE SPECIFICATIONS MAY PRESENT AN

    UNFINISHED APPEARANCE. THE APPLICATION OF A TANDEM STEEL

    WHEEL FINISHING ROLLER WILL ELIMINATE ANY MARKS LEFT BY

    THE PNEUMATIC TYRE ROLLING AND PROMOTE A SMOOTH UNIFORM

    SURFACE TEXTURE.

    THE SIZE AND WEIGHT OF THE THREE ROLLERS MOSTLY USED IN

    BITUMINOUS WORK IS/

    THREE WHEEL BREAK DOWN ROLLER VARY IN WEIGHT FROM

    %) TO &) TON.

    SELF PROPELLED PNEUMATIC TYRE ROLLERS HAVE WIDER

    RANGE OF WEIGHT FROM * TO (* TONS OR MORE.

    THE TANDEM AXLE ROLLERS VARY FROM 4 TO %& TONS.

    PNEUMATIC TYRE ROLLERS

  • 7/25/2019 construction machinery guide and planning

    66/106

    NUMBER OF PASSESHAS TO BE DETERMINED BY ACTUAL TRIALS.

    GENERALLY THE PASSES OF THREE OF ROLLERS ARE/

    THREE WHEEL STEEL ROLLER !%& TON" & TO ' PASSES

    PNEUMATIC TYPE ROLLERS %4 TO &) TON %8 TO &* PASSES

    TANDEM SMOOTH WHEEL !TWO WHEEL" $ TO 4 TONS WITH '

    TO %) PASSES.

    PNEUMATIC TYRE ROLLERS

  • 7/25/2019 construction machinery guide and planning

    67/106

    PNEUMATIC TYRED ROLLER

    SINGLE DRUM

  • 7/25/2019 construction machinery guide and planning

    68/106

    ROLLER

    ROLLER PLAIN 3

  • 7/25/2019 construction machinery guide and planning

    69/106

    WHEEL

  • 7/25/2019 construction machinery guide and planning

    70/106

    SINGLE DRUM

    ROLLER PLAIN 3

  • 7/25/2019 construction machinery guide and planning

    71/106

    WHEEL

    ROLLER SHEEP FOOT

  • 7/25/2019 construction machinery guide and planning

    72/106

  • 7/25/2019 construction machinery guide and planning

    73/106

    ROLLER SHEEPFOOT

    VIBRATORY

  • 7/25/2019 construction machinery guide and planning

    74/106

    THESE PLANTS MAY BE EITHER BATCH MIXING OR CONTINUOUS

    MIXING PLANTS. THE FORMER DELIVER A SERIES OF BATCHES

    PROPORTIONED BY WEIGHT, THE LATTER A CONTINUOUS SUPPLY

    PROPORTIONED BY VOLUME.

    ASPHALT MIXING PLANT

    BATCH MIXING PLANT

  • 7/25/2019 construction machinery guide and planning

    75/106

    THERE ARE THREE TYPES OF BATCH MIXING PLANTS/

    SMALL MOBILE MACHINES PERMANENTLY MOUNTED AS A

    SINGLE UNIT ON PNEUMATIC TYRED ROAD WHEELS READY FOR

    TOWING FROM SITE TO SITE.

    TRANSPORTABLE PLANTS DESIGNED FOR RAPID ERECTION AND

    DISMANTLING. EACH PART CAN EITHER BE TOWED ON ITS OWN

    WHEELS OR LIFTED ONTO A TRUCK.

    LARGE STATIC INSTALLATIONS ASSEMBLED AND ERECTED ON

    THE SITE.

    BATCH MIXING PLANT

    BATCH MIXING PLANT

  • 7/25/2019 construction machinery guide and planning

    76/106

    COMPOSITION OF TYPICAL BATCHING PLANT CONSISTS OF/

    o AN AGGREGATES FEEDER

    o A ROTATING CYLINDRICAL AGGREGATE DRIER AND

    HEATER.

    o AGGREGATE SCREENS AND BINS FOR THE HOT

    AGGREGATE.

    o STORAGE AND HEATING TANK FOR THE TAR OR

    BITUMEN.

    o WEIGH BUCKETS

    o A MECHANICAL MIXER

    o FILLER E#UIPMENT AND DUST COLLECTORS CAN BE

    ADDED TO IF DESIRED

    BATCH MIXING PLANT

    BATCH MIXING PLANT

  • 7/25/2019 construction machinery guide and planning

    77/106

    CARE MUST BE TAKEN WHEN ERECTING THE PLANT TO ENSURE

    TRUE LEVELS SO THAT THE COMPONENTS ARE TRULY ALIGNED

    AND ELEVATORS VERTICAL.

    IT IS ADVISABLE TO SITE THE PLANT CLOSE TO CRUSHERS IF

    ITS OUTPUT IS %) TON PER HOUR OR MORE.

    VERY SMALL PLANTS OF LOWER CAPACITY ARE USUALLY SITED

    NEAR THE JOB, AGGREGATE BEING BROUGHT FROM THE

    #UARRY STOCK PILE.

    BATCH MIXING PLANT

    CONTINUOUS MIXING PLANT

  • 7/25/2019 construction machinery guide and planning

    78/106

    THESE PLANTS USUALLY CONSIST OF A SERIES OF COMPONENT, SOME

    OF WHICH ARE INDEPENDENTLY MOUNTED FOR MOVEMENT, OTHERS

    HAVE TO BE DISMANTLED AND REERECTED ON A CHANGE OF SITE.

    THEIR OUT PUT IS HIGH AND THEY NEED AN ADE#UATE SCALE OF

    #UARRY MACHINERY, TRANSPORT FOR THE MIX AND SPREADING AND

    FINISHING MACHINERY.

    CONTINUOUS MIXING PLANT

    ASPHALT

    PLANT

  • 7/25/2019 construction machinery guide and planning

    79/106

    PLANT

    ASPHALT

    PLANT

  • 7/25/2019 construction machinery guide and planning

    80/106

    PLANT

    ASPHALT

    PLANT

  • 7/25/2019 construction machinery guide and planning

    81/106

    PLANT

    CONCRETE WEIGH BATCHING PLANT

  • 7/25/2019 construction machinery guide and planning

    82/106

    WEIGH BATCHING IS PREFERRED TO BATCHING BY VOLUME ON

    ACCOUNT OF ITS GREATER ACCURACY. WHEN DECIDING THE

    WEIGHT OF SAND AND AGGREGATE ALLOW FOR THEIR MOISTURECONTENT. WATER CAN BE MEASURED BY WEIGHT OR BY VOLUME9

    MOST MIXERS HAVE EITHER GAUGED WATER TANKS OR METERING

    DEVICES. WEIGH BATCHERS ARE OF THREE TYPES:-

    SMALL. USED WITH SMALL TRANSPORTABLE MIXER UPTO %)

    CUBIC FEET CAPACITY. TRANSPORTABLE AND FED BY HAND.

    MEDIUM. USED WITH MIXERS OF FROM %' TO &4 CUFT. CAN

    BE RAPIDLY SET UP AND FED BY HAND.

    LARGE STATIC PLANTS. USED FOR SUPPLYING MIX TO

    TRANSPORT VEHICLES OR TO LARGE STATIC MIXERS OF %

    CUYD OR LARGER. TAKES DAYS TO ERECT, FED BY

    ELEVATOR OR DRAGLINE.

    EMPLOYMENT OF WEIGH BATCHING PLANT

  • 7/25/2019 construction machinery guide and planning

    83/106

    CENTRAL BATCHING IS MORE ECONOMICAL AND SAVES

    LABOR BUT RE#UIRES AN ADE#UATE DISTRIBUTION

    SYSTEM.

    SITE BATCHING, EXCEPT FOR SMALL MIXERS IS LIKELY TO

    BE UNECONOMIC.

    THE USE OF OVERHEAD HOPPER TYPE OF WEIGH BATCHER

    WHICH INVOLVES MECHANICAL LOADING IS USUALLY

    ECONOMICAL FOR MIXERS OF %' CUFT AND LARGER.

    EMPLOYMENT OF WEIGH BATCHING PLANT.

    CARE OF WEIGHING DEVICES

  • 7/25/2019 construction machinery guide and planning

    84/106

    CHECK THE CALIBRATION OF THE DEVICE WHEN NEW AND

    PERIODICALLY THERE AFTER.

    KEEP THE DEVICE CLEAN AND IN REALLY GOOD CONDITION BY

    FRE#UENT SERVICING.

    ALWAYS LOCK THE DEVICE IN PLACE DURING MOVEMENT

    CARE OF WEIGHING DEVICES

    CONC BATCHING PLANT

  • 7/25/2019 construction machinery guide and planning

    85/106

    CONC BATCHING PLANT

    CONC BATCHING PLANT

  • 7/25/2019 construction machinery guide and planning

    86/106

    CONC BATCHING PLANT

  • 7/25/2019 construction machinery guide and planning

    87/106

    ONSTRU TIO

    N

    MA HINERY

    SERVI E AND

    MAINTENAN E

  • 7/25/2019 construction machinery guide and planning

    88/106

    SERVICING.

    THIS COVERS ALL FUNCTIONS CARRIED OUT TO KEEP THE

    PARTICULAR E#UIPMENT IN AN EFFICIENT CONDITION. THESE

    FUNCTIONS ARE DETAILED IN THE MAINTENANCE MANUALS OF THE

    E#UIPMENT. THE INSTRUCTIONS GIVEN IN THESE MANUALS SHOULD

    BE FOLLOWED VERY STRICTLY.

    MAINTENANCE.

    THIS INCLUDES SERVICING, INSPECTION, TESTING, ADJUSTMENTS,

    REPAIR AND OVERHAUL OF THE E#UIPMENT.

    SERVICE SYSTEM

  • 7/25/2019 construction machinery guide and planning

    89/106

    THE SYSTEM APPLIES TO ALL E#UIPMENT, MACHINERY, AND PLANT

    SERVICE ON AN HOURS RUN BASIS. THE SYSTEM INCLUDES/

    A PLANT SERVICING SCHEDULE FOR EACH PARTICULAR

    MACHINE WHICH DETAILS THE SERVICING TASKS TO BE

    CARRIED OUT AND THE LUBRICANTS TO BE USED. THIS

    SCHEDULE IS LAID DOWN IN USER:S HANDBOOK OR

    MAKER:S MAINTENANCE MANUAL

    A PLANT DOCUMENTATION SYSTEM

    SERVICE SYSTEM

    SERVICE SYSTEM

  • 7/25/2019 construction machinery guide and planning

    90/106

    ON RECEIPT OF THE MACHINE.

    AFTER THE RUNNING FOR A PERIOD OF $) HOURS OR AS

    DESCRIBED IN RELEVANT MAINTENANCE MANUAL.

    AT SPECIFIC INTERVALS. THESE ARE NORMALLY AS UNDER/

    %) HOURS OR DAILY

    $) HOURS OR WEEKLY

    %&) HOURS OR FORTNIGHTLY

    &') HOURS OR MONTHLY

    SERVICE SYSTEM

    SERVICE SYSTEM

  • 7/25/2019 construction machinery guide and planning

    91/106

    CLEANLINESS, EXTERNAL AND INTERNAL.

    LUBRICATION.

    DRAINING AND REFILLING.

    TOPPING UP

    CHECKING

    SERVICE SYSTEM

    SERVICE SYSTEM

  • 7/25/2019 construction machinery guide and planning

    92/106

    EXTERNAL CLEANLINESS. THIS IS IMPORTANT TO/

    PERMIT ACCESS TO LUBRICATION POINTS.

    REDUCE WEAR ON EXTERNAL MOVING PARTS.

    AVOID DANGER TO OPERATIONS CAUSED BY SLIPPERY

    MIXTURES OF OIL AND DIRT ON THE MACHINE.

    HELP TO MAINTAIN THE OPERATOR:S PRIDE IN HIS MACHINE.

    CRAWLER TRACKS IN PARTICULAR MUST BE CLEANED AFTER

    EVERY SHIFT. THEY ARE VERY SUSCEPTIBLE TO WEAR, WHICH

    IS GREATLY INCREASED BY ACCUMULATIONS OF MUD. IN

    COLD CLIMATES CAKED MUD WILL FREEZE AND CLOG

    TRACKS OVERNIGHT.

  • 7/25/2019 construction machinery guide and planning

    93/106

    INTERNAL CLEANLINESS

    LUBRICATION

    REFUELLING

    CHECKING

    SERVICE SYSTEM

  • 7/25/2019 construction machinery guide and planning

    94/106

    ONSTRU TION

    PLANNING AND

    MANAGEMENT

    PLANNING

  • 7/25/2019 construction machinery guide and planning

    95/106

    IT IS DEVISING OF A WORKABLE SCHEME OF OPERATIONS WHICH IS

    DESIGNED TO ACCOMPLISH AN ESTABLISHED OBJECTIVE WHEN PUT INTO

    ACTION. IT DETERMINES THE FOLLOWING/

    WHAT IS TO BE DONE !OBJECT"

    WHERE IT IS TO BE DONE !VENUE"

    WHO IS RESPONSIBLE FOR DOING IT !RESPONSIBILITY"

    WHEN IT IS TO BE DONE !TIME"

    HOW IT IS TO BE DONE !METHODOLOGY"

    PLANNING

    STRATEGIC PLANNING

  • 7/25/2019 construction machinery guide and planning

    96/106

    STRATEGIC PLANNING

    DETERMINING OVERALL POLICIES AND OBJECTIVES.

    DECIDING ON ANY CHANGES IN THESE POLICIES AND OBJECTIVES.

    DECIDING ON THE RESOURCES TO BE DEVOTED TO ATTAINING THESE

    OBJECTIVES.

    MANAGEMENT.

    IT IS THE JUDICIOUS ALLOCATION AND EFFICIENT USAGE OF

    RESOURCES TO ACHIEVE A DESIRED END. RESOURCES ARE MONEY,

    PERSONS, E#UIPMENT, MATERIALS AND TIME.

  • 7/25/2019 construction machinery guide and planning

    97/106

    MANAGER

    HE WHO EMPLOYS HIS RESOURCES IN ACCORDANCE WITH THEIR

    CAPABILITIES TO ACCOMPLISH SOME PURPOSE. HIS FUNCTION IS TO

    PLAN, SCHEDULE, CONTROL AND COORDINATE THE WORK AND

    ENSURES THAT THE TASK IS COMPLETED WITHIN THE TIME AND

    COST RE#UIREMENTS. TO PERFORM THESE FUNCTIONS HE MUST

    HAVE THE AUTHORITY AND POWER TO TAKE DECISIONS.

    MANAGEMENT CONTROL

  • 7/25/2019 construction machinery guide and planning

    98/106

    .OPERATIONALCONTROL DETERMINING THE SPECIFIC MANPOWER, E#UIPMENT, MATERIAL

    AND INFORMATION NECESSARY TO ACCOMPLISH THE

    SUBDIVISION OF THE PLAN.

    ASSIGNING THE RESOURCES SO THAT THE PLAN CAN BE

    CARRIED OUT IN THE MOST EFFICIENT MANNER.

    COMPARING ACTUAL RESULTS WITH PLAN AND TAKING

    CORRECTIVE ACTION WHERE APPROPRIATE.

    DIVIDING THE STRATEGIC PLANS INTO LOGICAL

    SUBDIVISIONS.

    PROVIDING FUNDS TO CARRY OUT THE SUBDIVISIONS OF THE

    PLAN.

    ASSIGNING THE RESPONSIBILITIES FOR CARRYING OUT EACH

    OF THE SUBDIVISIONS OF THE PLAN TO INDIVIDUALS.

    FOLLOWING UP TO SEE THAT THE ASSIGNMENTS ARE BEING

    SATISFACTORILY CARRIED OUT.

    MANAGEMENT BY OBJECTIVES

  • 7/25/2019 construction machinery guide and planning

    99/106

    MANAGEMENT BY OBJECTIVES

    REVIEWING CRITICALLY AND RESTATING THE ORGANIZATION:S

    STRATEGIC AND THE SUPPORTING TACTICAL PLANS.

    CLARIFYING WITH EACH MANAGER THE KEY RESULTS AND

    PERFORMANCE STANDARDS HE MUST ACHIEVE, IN LINE WITH

    UNIT;S AND ORGANIZATION:S OBJECTIVES, AND GAINING HIS

    CONTRIBUTION AND COMMITMENT TO THESE.

    AGREEING WITH EACH MANAGER A JOB IMPROVEMENT PLAN

    WHICH MAKES A MEASURABLE AND REALISTIC IMPROVEMENT

    TO THE UNIT;S AND ORGANIZATION:S PLANS FOR BETTER

    PERFORMANCE.

    MANAGEMENT BY OBJECTIVES

  • 7/25/2019 construction machinery guide and planning

    100/106

    MANAGEMENT BY OBJECTIVES

    USING SYSTEMATIC PERFORMANCE REVIEW TO MEASURE AND

    DISCUSS PROGRESS TOWARDS RESULTS AND POTENTIAL

    REVIEW TO IDENTIFY MEN WITH POTENTIAL FOR

    ADVANCEMENT.

    DEVELOPING MANAGEMENT TRAINING PLANS. TO HELP EACH

    MANAGER TO OVERCOME HIS WEAKNESSES, TO BUILD ON HIS

    STRENGTHS AND TO ACCEPT A RESPONSIBILITY FOR SELF

    DEVELOPMENT.

    STRENGTHENING A MANAGER;S MOTIVATION BY EFFECTIVE

    SELECTION, SALARY AND SUCCESSION PLANS.

  • 7/25/2019 construction machinery guide and planning

    101/106

    OBJECTIVES SETTING

    PLANNING

    AND

    CONTROL

    SETTING OF OBJECTIVES

    DATA COLLECTION AND EVALUATION

  • 7/25/2019 construction machinery guide and planning

    102/106

    INTERNAL AND EXTERNAL DATA IS COLLECTED AND SUBSE#UENTLY

    EVALUATED TO DEFINE THE OBJECTIVES. WHERE SOME FACTS ARE

    NOT AVAILABLE, TOP MANAGEMENT HAS TO USE ITS JUDGMENT AND

    BALANCE RISKS.

    INTERNAL DATA. DETAILED INFORMATION REGARDING STRENGTHS AND

    WEAKNESSES OF THE ORGANIZATION, ITS PERFORMANCE ANDEXPECTATIONS OF ITS WORKERS.

    EXTERNAL DATA. IT ENCOMPASSES FINANCES, PERSONNEL,

    MATERIALS, TECHNOLOGY, COMPETITION AND WORKING

    ENVIRONMENTS.

    EVALUATION. CRITICAL ANALYSIS OF THE DATA WOULD YIELD

  • 7/25/2019 construction machinery guide and planning

    103/106

    .CLARIFICATION OF OBJECTIVES. OBJECTIVE MUST BE SET IN

    CLEAR AND UNAMBIGUOUS TERMS TO AVOID WASTE OF EFFORT.

    .SUCCESSION OF SPECIFIC GOALS. INTEGRATED SHORT RUN

    OBJECTIVES MUST= BE SET ON THE WAY TO ACHIEVE A DISTANT GOAL.

    SHORT RUN OBJECTIVES CAN BE ACHIEVED #UICKLY, AS, BEST

    ATTENTION AND CONSISTENT EFFORT CAN BE DEVOTED TO THEM.

    SUCH SMALL SUCCESSES OR THE LARGER ONE WILL ENABLE A SETUP

    TO CONTINUE IN THE PURSUIT OF ITS GOALS WITH UNABATED VIGOR,

    ENERGY AND INTEREST.

    .DELEGATION BY OBJECTIVES. AFTER HAVING SPECIFIED THE

    OBJECTIVES, AUTHORITY NEEDS TO BE DELEGATED TO THE

    SUBORDINATES TO ACCOMPLISH THE ASSIGNED TASKS. THEY MUSTHAVE THE FULL POWER TO OPERATE AS THEY SEE FIT. ON THIS

    AUTHORITY THE SUBORDINATES WOULD CREATE AND MAINTAIN AN

    ENVIRONMENT FOR THE PERFORMANCE OF INDIVIDUAL WORKING IN A

    GROUP.

    PRERE#UISITES FOR SUCCESS OF THE SYSTEM

  • 7/25/2019 construction machinery guide and planning

    104/106

    FREEDOM TO ACT. SUBORDINATE CAN USE THEIR INITIATIVE PROVIDED

    CLEAR OBJECTIVES ARE SET ALONG WITH THE AUTHORITY TO ACHIEVE

    THEM. GIVEN THIS POWER, THEY WOULD BE ABLE TO READJUST,

    IMPROVE SCHEME OF THINGS AND WORKING CONDITIONS FOR

    ATTAINING THE GIVEN OBJECTIVE.

    VERIFIABLE RESULTS.

    REALISTIC APPRAISAL BECOMES POSSIBLEWHEN OBJECTIVES ARE SET #UANTITATIVELY OR #UALITATIVELY. WHEN

    AN OBJECTIVE IS #UALITATIVELY DEFINED, THE EMPHASIS IS ON HOW

    WELL RATHER THAN HOW MUCH.

    CLEAR COMMUNICATION. IT WOULD BE POSSIBLE ONLY WHEN

    OBJECTIVES ARE SPECIFIC, AGREED UPON AND AUTHORITY TO ACHIEVE

    THEM IS GIVEN.

    PRERE#UISITES FOR SUCCESS OF THE SYSTEM

  • 7/25/2019 construction machinery guide and planning

    105/106

    SHARED RESPONSIBILITY. COOPERATIVE DETERMINATION OF THE

    RESULTS TO BE ACHIEVED PROVIDES THE BASIS FOR A FEELING OFINCREASED RESPONSIBILITY TO ATTAIN ON THE PART OF BOTH

    SUPERIOR AND SUBORDINATE.

    PERSONAL ACCOUNTABILITY. APPRAISAL SHOULD BE FOLLOWED BY

    PERSONAL ACCOUNTABILITY. TO DO THIS, MAKING OF ASSIGNMENT BY

    RESULTS AND DELEGATION OF NECESSARY AUTHORITY ARE PRE

    RE#UISITES. PERSONAL ACCOUNTABILITY WOULD RESULT IN INCREASE

    IN EFFICIENCY AND ENTHUSIASM OF THE INDIVIDUALS.

    WORKING ENVIRONMENTS. ALL EMPLOYEES MUST BE E#UALLY

    MOTIVATED AND ONLY THEN THEY WILL DEVELOP SELF CONTROL AND

    SELF DISCIPLINE RESULTING IN MINIMIZING EXTERNAL PRESSURE AND

    CONSE#UENTLY CREATION OF HEALTHY AND CONGENIAL

    ENVIRONMENT FOR WORK.

    #

  • 7/25/2019 construction machinery guide and planning

    106/106

    IMPROVED MANAGEMENT ABILITY. AT EACH INTERVAL IN THE

    ROUTINE APPRAISAL PROGRAMME, THE RESULTS TO BE ACHIEVED

    RE#UIRE THE SUBORDINATE:S CONCENTRATION ON THE WEAKER

    AREAS OF HIS PERFORMANCE. NEW TARGETS ARE SELECTED AFTER

    NECESSARY CORRECTIONS ARE MADE. CONSE#UENTLY OVER A PERIOD

    OF TIME ATTENTION IS DIRECTED TO SPECIFIC ACTIVITIES WHICH ARE

    TO BE IMPROVED.

    PRERE#UISITES FOR SUCCESS OF THE SYSTEM