construction costing
TRANSCRIPT
-
8/14/2019 Construction Costing
1/33
Construction contracts
-
8/14/2019 Construction Costing
2/33
Name Rollnumber
Topic
Srinivas K 49 Introduction & definition.
Shruti N 44 Procurement of contract.
Virupaksha 56 Contract analysis.
Zakir 58 Cost estimation.
Sharada 40 Types of payments.
Sangameshwar 36 Types of costs.
Saroj 38 Collection of costs.
Shilpa S 42 Indian example.
Soumya B 47 International example.
-
8/14/2019 Construction Costing
3/33
Construction contract
A construction contract is a contract
specifically negotiated for the
construction of an asset or a combinationof assets that are closely interrelated or
interdependent in terms of their design,
technology and function or their ultimatepurpose or use.
-
8/14/2019 Construction Costing
4/33
Construction contract is a
formal agreement for construction,
alteration, or repair of
buildings or structures (bridges,dams, facilities, roads, tanks, etc.). A
construction contract is distinct from a
contract to assemble, fabricate,or manufacture.
-
8/14/2019 Construction Costing
5/33
Contract costing
Contract costing is defined as the form of
specific order costing which is
undertaken for customers specialrequirements and each order is of long
duration, the work is usually
constructional and in general the methodis similar to job costing
-
8/14/2019 Construction Costing
6/33
Procurement methods of contract
Traditional
Design and Build
-
8/14/2019 Construction Costing
7/33
Two Stage Tendering
Management Contracting
-
8/14/2019 Construction Costing
8/33
Construction Management
Framework Agreements
-
8/14/2019 Construction Costing
9/33
-
8/14/2019 Construction Costing
10/33
Factors
Plan:Plan is developed to describe activities
associated with the project .The resource
required to achieve the best possible
outcomes for it &must be agreed on by allkey characters.
Scope < Time < Cost < Quality < Human
resource < Communication < Risk