construction costing

Upload: meteora135

Post on 30-May-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/14/2019 Construction Costing

    1/33

    Construction contracts

  • 8/14/2019 Construction Costing

    2/33

    Name Rollnumber

    Topic

    Srinivas K 49 Introduction & definition.

    Shruti N 44 Procurement of contract.

    Virupaksha 56 Contract analysis.

    Zakir 58 Cost estimation.

    Sharada 40 Types of payments.

    Sangameshwar 36 Types of costs.

    Saroj 38 Collection of costs.

    Shilpa S 42 Indian example.

    Soumya B 47 International example.

  • 8/14/2019 Construction Costing

    3/33

    Construction contract

    A construction contract is a contract

    specifically negotiated for the

    construction of an asset or a combinationof assets that are closely interrelated or

    interdependent in terms of their design,

    technology and function or their ultimatepurpose or use.

  • 8/14/2019 Construction Costing

    4/33

    Construction contract is a

    formal agreement for construction,

    alteration, or repair of

    buildings or structures (bridges,dams, facilities, roads, tanks, etc.). A

    construction contract is distinct from a

    contract to assemble, fabricate,or manufacture.

  • 8/14/2019 Construction Costing

    5/33

    Contract costing

    Contract costing is defined as the form of

    specific order costing which is

    undertaken for customers specialrequirements and each order is of long

    duration, the work is usually

    constructional and in general the methodis similar to job costing

  • 8/14/2019 Construction Costing

    6/33

    Procurement methods of contract

    Traditional

    Design and Build

  • 8/14/2019 Construction Costing

    7/33

    Two Stage Tendering

    Management Contracting

  • 8/14/2019 Construction Costing

    8/33

    Construction Management

    Framework Agreements

  • 8/14/2019 Construction Costing

    9/33

  • 8/14/2019 Construction Costing

    10/33

    Factors

    Plan:Plan is developed to describe activities

    associated with the project .The resource

    required to achieve the best possible

    outcomes for it &must be agreed on by allkey characters.

    Scope < Time < Cost < Quality < Human

    resource < Communication < Risk