construction contract_existing and proposed accounting standards
DESCRIPTION
The slides contained information gathered from accounting standards applicable to construction contract as well as some examples on disclosures by Malaysian companies. The slides were co-prepared by fellow classmates, whose name appears in the 1st slide.TRANSCRIPT
![Page 1: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/1.jpg)
Norlayalina
Adi Iskandar
Ruzzana
Construction Contract
![Page 2: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/2.jpg)
Norlayalina
Adi Iskandar
Ruzzana
Construction Contract
![Page 3: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/3.jpg)
CONSTRUCTION CONTRACT
A contract negotiated between parties of which, generally the owner (or developer) and the
contractor of an asset (or group of interrelated assets).
![Page 4: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/4.jpg)
MFRS111
• Definition:
“Contract specifically negotiated for the construction of an asset or a combination of assets that are closely interrelated or interdependent in terms of their design, technology and function or their ultimate purpose or use”
![Page 5: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/5.jpg)
MFRS111
• Recognizing revenue under construction contract
• Derived from the initial amount of revenue agreed in the contract and variations in contract work, claims and incentive payments to the extent it is probable that they will result in revenue and they are capable of being reliably measured
![Page 6: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/6.jpg)
MFRS111
• Issue – progress of a long-term project• To determine the right timing to recognize
revenue
‘when the outcome of a contract can be estimated reliably, revenue shall be recognized by reference to the stage of completion’
![Page 7: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/7.jpg)
Long-Term ConstructionAccounting Methods
1) Terms of contract must be certain, enforceable.2) Certainty of performance by both parties3) Estimates of completion can be made reliably
1) To be used only when the percentage method is inapplicable [uncertain]2) For short-term contracts
Percentage-of-CompletionMethod
Completed ContractMethod
Revenue Recognition Before Delivery
![Page 8: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/8.jpg)
MFRS111
• Method:1) Percentage of completion
- contract revenue is matched with the contract costs incurred in reaching stage of completion- contract revenue recognized as revenue in profit or loss in accounting period which work is performed- stage of completion determined by reference to the contract costs that reflect to the work performed incurred to date
![Page 9: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/9.jpg)
PERCENTAGE OF COMPLETION
• Basis for revenue recognition in long-term construction contracts – span over than one accounting period
• Accountant need a basis to apportion the total contract revenue between the multiple accounting periods
![Page 10: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/10.jpg)
PERCENTAGE OF COMPLETION
• Formula:(i) Revenue recognized
(ii) Percentage of work complete
Percentage of Work Completed in the Period
Total Contract Value
Expenditures Incurred from Inception to Date
Total Estimated Costs for the Contract
![Page 11: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/11.jpg)
Costs incurred to date = Percent completeMost recent estimated total costs
1
Estimated total revenue x Percent complete = Revenue to be recognized to date
2
Total revenue to be recognized to date less Revenue recognized in PRIOR periods = Current period revenue
3
Current Period Revenue less current costs = Gross profit4
Percentage-of-Completion: Steps
![Page 12: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/12.jpg)
Costs incurred to date = Percent completeMost recent estimated total costs
1
Estimated total revenue x Percent complete = Revenue to be recognized to date
2
Total revenue to be recognized to date less Revenue recognized in PRIOR periods = Current period revenue
3
Current Period Revenue less current costs = Gross profit4
Percentage-of-Completion: Steps
![Page 13: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/13.jpg)
PERCENTAGE OF COMPLETION
• The seller can recognize some gain or loss related to a project in every accounting period in which the project continues to be active
• Works best when it is reasonably possible to estimate the remaining costs to complete a project
• It should not be used if when there are significant uncertainties about the percentage of completion or the remaining costs to be incurred
![Page 14: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/14.jpg)
PERCENTAGE OF COMPLETION
• Measurement:1) Cost-to-cost method. This is a comparison of the contract cost incurred to date to the total expected contract cost. The cost of items already purchased for a contract but which have not yet been installed should not be included in the determination of the percentage of completion of a project, unless they were specifically produced for the contract. Also, allocate the cost of equipment over the contract period, rather than up-front, unless title to the equipment is being transferred to the customer.
![Page 15: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/15.jpg)
PERCENTAGE OF COMPLETION
2) Efforts-expended method. This is the proportion of effort expended to date in comparison to the total effort expected to be expended for the contract. For example, the percentage of completion might be based on direct labor hours, or machine hours, or material quantities
![Page 16: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/16.jpg)
PERCENTAGE OF COMPLETION
3) Units-of-delivery method. This is the percentage of units delivered to the buyer to the total number of units to be delivered under the terms of a contract. It should only be used when the contractor produces a number of units to the specifications of a buyer. The recognition is based on: – For revenue, the contract price of units delivered– For expenses, the costs reasonably allocable to the
units delivered
![Page 17: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/17.jpg)
PERCENTAGE OF COMPLETION
• The same measurement should be used for similar types of contracts – improve consistency of the method
• Commonly used – at least some indication of economic activity that spills over into the income statement prior to project completion
![Page 18: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/18.jpg)
2) Completed contract- revenue and expenses are not recognized until contract is completed and the title is transfer to the client
![Page 19: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/19.jpg)
COMPLETED CONTRACT
• Prior to completion, this method does not yield any useful information for the reader of a company’s financial statements.
• However, the delay in income recognition allows a business to defer the recognition of related income taxes.
• since revenue and expense recognition only occurs at the end of a project, the timing of revenue recognition can be both delayed and highly irregular.
![Page 20: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/20.jpg)
COMPLETED CONTRACT
• used under the following circumstances: When it is not possible to derive dependable
estimates about the percentage of completion of a project; or
When there are inherent hazards that may interfere with completion of a project; or
When contracts are of such a short-term nature that the results reported under the completed contract method and the percentage of completion method would not vary materially.
![Page 21: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/21.jpg)
COMPLETED CONTRACT
• If there is an expectation of a loss on a contract, record it at once even under the completed contract method; do not wait under the end of the contract period to do so.
![Page 22: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/22.jpg)
Overview on New Proposed Standard
IFRS 15 “Revenue from Contracts with Customers”The new standard in detail by Standard Setters and technical accountants
• The long awaited revenue recognition standard recently issued will have a major impact for all firms and their advisers.
• ‘Walk through’ of the new revenue standard from experts involved in its construction.
• The 5 steps for recognizing revenue from contracts with customers and identify which contracts are within the scope of the new standard.
• Factors to consider when applying the new revenue standard retrospectively and how the standard will affect client’s figures (including reported profit/loss).
• How ‘variable consideration’ should be recognized.• How to account for revenue from licenses, how credit risk affects
collectability and how this impacts on revenue recognition.
![Page 23: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/23.jpg)
Revenue Recognition – New
1. Identify contracts with customer2. Identify the separate performance
obligations within the contract3. Determination of price4. Allocation of price to separate performance
obligation5. Recognize revenue upon satisfaction of
performance obligation
![Page 24: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/24.jpg)
1. Identify contract
• Various forms -> written, oral or implied• All of these conditions must exist:
a. Commercial substanceb. Parties agreed to the provisions
and committed in satisfying their obligations
c. Enforceable rightsd. Terms & payment methods
![Page 25: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/25.jpg)
• Segmented or combinedTo identify combined – entered
simultaneously, negotiated together, activities are consequent or concurrent.
To identify separated – goods purchased separately, if bought together -> no discounts.
Change orders? Separate or combined?
1. Identify contract
![Page 26: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/26.jpg)
2. Separate Performance Obligation
• If contract is more > 1 goods/services, then each is a separate performance obligations subject to:-
Another entity may provides similar separately;
Goods can be sold off separately, distinct function and margin
![Page 27: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/27.jpg)
• Eg. Say, Construction > 3 years, can the design service be treated as a separate performance obligation?
2. Separate Performance Obligation
Design services are distinct and can be sold separately, hence -> satisfy the criteria, treated as separate Performance Obligation
What about buying of materials or equipment?
Buying of materials/equipment – no real Performance Obligation, thus to combined with other performance obligation
![Page 28: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/28.jpg)
• Site preparation?• Actual construction? Construction
Management?• Highly specialized interior build-out?
2. Separate Performance Obligation
o One PO – can be contracted separately, distinct profit margin, high risk
o Treated as one PO as very interrelated although maybe subcontracted. Difficult to separate risk between the two.
o Regarded as separate, contracted separately distinct profit margin
High Level Judgment & Very Subjective
![Page 29: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/29.jpg)
3. Price determination
• Some are clearly stated, if for a fixed amount• Some long term contract -> price may varies
due to performance incentives, liquidated damage, change orders
• TO also consider -> collectability, non cash consideration, PV
• What if the contract price is uncertain?
Defer revenue until can estimate reasonably
![Page 30: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/30.jpg)
4. Price Allocation
• Must reflect risk involved• Price and allocation -> updated
throughout, instead of single gross margin on the project
![Page 31: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/31.jpg)
5. Recognition – Performance Obligation
• Amount of revenue = amount of price allocated
• Cost -> charged to each PO as incurred• Change of control – contract complete.• Transfer of legal title? Contract complete?
![Page 32: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/32.jpg)
5. Recognition – Performance Obligation
• Continuous transfer• Output method – units delivered/produced,
milestone, engineering survey relative to total goods/service
• Input method – effort expended relative to total effort to be expended
Preferable
![Page 33: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/33.jpg)
• What if price changes after a performance obligation was recognised?
• What if the developer and contractor is the same party? How about the transfer of control?
5. Recognition – Performance Obligation
o The portion of price change attributable to the PO can be recognized.
o Transfer of control may not be seen as taken place. Recognised only once the contract is completed
![Page 34: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/34.jpg)
COMPLIANCE TO MFRS 111 BY MALAYSIAN COMPANIES
![Page 35: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/35.jpg)
Annual Report 2012
HIGH
LIGH
TS
![Page 36: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/36.jpg)
Annual Report 2012
HIGH
LIGH
TS
![Page 37: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/37.jpg)
Annual Report 2013HIG
HLIGHTS
![Page 38: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/38.jpg)
Annual Report 2012
HIGHLIG
HTS
![Page 39: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/39.jpg)
![Page 40: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/40.jpg)
![Page 41: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/41.jpg)
![Page 42: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/42.jpg)
![Page 43: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/43.jpg)
![Page 44: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/44.jpg)
![Page 45: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/45.jpg)
![Page 46: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/46.jpg)
![Page 47: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/47.jpg)
![Page 48: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/48.jpg)
![Page 49: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/49.jpg)
INCONSISTENCIES IN DISCLOSURE
• Variation and claim • Determining stage of
completion for long term contract
• Disclosure of significant judgment
![Page 50: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/50.jpg)
![Page 51: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/51.jpg)
ISSUE
• Halliburton-reported practice booking cost overruns on construction project
• Raytheon - reported provide insufficient write off for unexpected losses and booking revenues from inactive long term contracts
![Page 52: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/52.jpg)
FASB initiative to improve reporting by
• Eliminating inconsistencies of financial reporting disclosure from long term contract.
• Provide guidance-not provide only basic disclosures
• Standardization-opt for different progress measurement method
• selecting input method rather than output method
![Page 53: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/53.jpg)
Reporting issues in construction contract
• percentage of completion method over completed contract method (whenever possible)
• input method or output method• Disclosure of revenue recognition policies• Consideration to measure performance
![Page 54: Construction contract_Existing and Proposed Accounting Standards](https://reader033.vdocuments.site/reader033/viewer/2022061121/546ea50eaf79597b298b57fc/html5/thumbnails/54.jpg)
Cost determination
• Input measures-based on effort and resources applies
• Output measures-based on number of unit completed ;– Units of production method– Units of delivery method