Project:
Owner:
Construction Manager:
C O N S T R U C T I O N C H A N G E A U T H O R I Z AT I O N
T S O I K O B U S & A S S O C I A T E S
A R C H I T E C T S
Construction ChangeAuthorization No.:
Date of Issuance:
Project No.:
No Change in Cost or Time
The Work shall be carried out in accordance with the described supplemental instructions issued in accordance with the ContractDocuments without change in Contract Sum or Contract Time. Prior to proceeding in accordance with these instructions, indicateyour acceptance of these instructions for minor change to the Work as consistent with the Contract Documents and return a copyto the Architect within 10 working days.
Estimate of Change in Cost/Time, Proceed with Work
In order to expedite the Work and avoid or minimize delays in the Work which may affect Contract Sum or Contract Time, theContract Documents are hereby amended as described above. Proceed with this Work promptly. Submit final costs for Workinvolved and change in Contract Time (if any), for inclusion in a subsequent Change Order.
Estimate of Change in Cost/Time, Do Not Proceed with Work
Please submit a proposal showing itemized cost breakdown of labor and material for the proposed change, showing either creditor extra cost to the Contract time, prior to proceeding with this work. Do not proceed with this work unless authorized by theOwner in writing.
Description:
Attachments:
Issued Confirmed Authorized
By: By: By:Architect Contractor Owner
Date: Date: Date:
1 of 2
Tel.Fax.
Tel.Fax.
Tel.Fax.
Tel.Fax.
Tel.Fax.
Job Number
Drawn by
Checked
Date
Scale
Drawing No.
Drawing Title
Stamp
O n e B r a t t l e S q u a r e P . O . B o x 9 1 1 4C a m b r i d g e , M A 0 2 2 3 8 - 9 1 1 4
T e l : 6 1 7 4 7 5 4 0 0 0 F a x : 6 1 7 4 7 5 4 4 4 5w w w . t k a - a r c h i t e c t s . c o m
Revisions
No. Description Date
Siegel AssociatesStructural860 Walnut STNewton, MA 02459
617.244.1612000.000.0000
Coneco EngineersCivil4 First StreetBridgewater, MA 02324
508.697.3191508.697.5996
Sun EngineeringHVAC Design491 Maple ST, Suite 209Danvers, MA 01923
978.777.7765978.777.7768
Thompson Engineering CompanyElectrical Engineer10 City SquareBoston MA, 02129
617.227.6818617.886.9090
VAV International Inc.Plumbing and FireProtection 400 Cummings Park STE 4700
Woburn, MA 018017814.935.7228781.935.1822
JEN
C-3
GRADING & DRAINAGE
SMO
04/29/2016
Lincoln Instituteof Land Policy
CONSTRUCTION DOCUMENTS
35016
Thorp House, 115 Brattle Street,Cambridge, MA
AS NOTED
2 CONSTRUCTION MODIFICATION 09/21/16
Tel.Fax.
Tel.Fax.
Tel.Fax.
Tel.Fax.
Tel.Fax.
Job Number
Drawn by
Checked
Date
Scale
Drawing No.
Drawing Title
Stamp
O n e B r a t t l e S q u a r e P . O . B o x 9 1 1 4C a m b r i d g e , M A 0 2 2 3 8 - 9 1 1 4
T e l : 6 1 7 4 7 5 4 0 0 0 F a x : 6 1 7 4 7 5 4 4 4 5w w w . t k a - a r c h i t e c t s . c o m
Revisions
No. Description Date
Siegel AssociatesStructural860 Walnut STNewton, MA 02459
617.244.1612000.000.0000
Coneco EngineersCivil4 First StreetBridgewater, MA 02324
508.697.3191508.697.5996
Sun EngineeringHVAC Design491 Maple ST, Suite 209Danvers, MA 01923
978.777.7765978.777.7768
Thompson Engineering CompanyElectrical Engineer10 City SquareBoston MA, 02129
617.227.6818617.886.9090
VAV International Inc.Plumbing and FireProtection 400 Cummings Park STE 4700
Woburn, MA 018017814.935.7228781.935.1822
JEN
C-4
CONSTRUCTION DETAILS
SMO
04/29/2016
Lincoln Instituteof Land Policy
CONSTRUCTION DOCUMENTS
35016
Thorp House, 115 Brattle Street,Cambridge, MA
1"=20'
UTILITY CROSSING DETAIL6" WATER CONNECTION DETAIL
2" WATER CONNECTION DETAIL
GATE VALVE
CONCRETE THRUST BLOCK
UTILITY TRENCH
CULTEC RECHARGER 330 XL
FOUNDATION CORING DETAIL
DOWNSPOUT TO INFILTRATION TRENCH DETAIL
TYPICAL PAVEMENT SECTION
WATER METER DETAIL
95% COMPACTED FILL
FINISHED
GRADE
RECHARGER
330 XL HD
HEAVY DUTY
CHAMBER
HVLV FC-24 FEED CONNECTOR
WHERE SPECIFIED
4 OZ. NON-WOVEN FILTER FABRIC
AROUND STONE. TOP AND SIDES
MANDATORY.
CULTEC NO. 20L POLYETHYLENE LINER TO
BE PLACED BENEATH
HVLV FC-24 FEED CONNECTORS
WHEN UTILIZING
INTERNAL MANIFOLD
1-2 INCH DIA
WASHED
CRUSHED
STONE
1 - 2 INCH DIA. WASHED,
CRUSHED STONE
CULTEC RECHARGER
330XL HD HEAVY DUTY
CHAMBER
4 OZ. NON-WOVEN
FILTER FABRIC
AROUND STONE
95% COMPACTED FILL
CULTEC NO. 20L POLYETHYLENE
LINER TO SPAN THE ENTIRE WIDTH
OF THE SYSTEM BELOW THE HVLV FC-24
FEED CONNECTORS AND
SIDE PORTALS
SIDE PORTAL TO BE CUT IN
FIELD TO ALLOW HVLV FC-24
FEED CONNECTOR AS
NEEDED
INPSECTION PORT RISER (TYP) 8" - 10" SCH
40 PVC IN PAVEMENT PLACE CURB BOX
OVER PORT IN GRASS COVER WITH
SPRINKLER STYLE PVC ROAD BOX
NOTES:
1. PREVENTATIVE MEASURES WILL BE KEPT IN PLACE TO PREVENT SEDIMENT ENTERING
THE INFILTRATION SYSTEMS AND WILL BE REMOVED ONCE PAVEMENT AND VEGETATION IS
ESTABLISHED ON THE SITE IN THE AREAS THAT CONTRIBUTE TO THE SYSTEMS.
2. NO DEWATERING DURING CONSTRUCTION WILL BE ALLOWED TO BE DIRECTED INTO THE
INFILTRATION SYSTEM. A DEWATERING BASIN WILL BE UTILIZED.
3. CONSTRUCTION TRAFFIC SHALL BE HELD TO A MINIMUM IN THE AREAS OF THE
INFILTRATION SYSTEM TO PREVENT THE OVER COMPACTION OF THE SOILS.
DOWNSPOUT CONNECTION & OVERFLOW DETAIL
POROUS PAVEMENT
1 CONSTRUCTION MODIFICATION 07/22/16
AREA DRAIN
2 CONSTRUCTION MODIFICATION 09/21/16