constraints for implementation process in marriott germany

1
Constraints for implementation process in Marriott Germany USE BUSINESS MODEL 2 for the property creation 1. User: For creating the Buyer User IDs, make sure that no actual first and last name but the EID’s provided in the template should be used. (for all the properties) So we can use Eid in the first name and dot (.) in the last name. Generic email IDs instead of specific email ID’s are preferred. (Specifically Marriot Frankfurt properties) 2. SOTF: PSFT vendor Code and PSFT SITE ID (CUST_VENDOR_SITE_CODE) is mandatory, PSFT SITE ID is mentioned as LOCATION in the template provided by the properties. Make sure to upload the PSFT vendor Code and PSFT SITE ID on the Supplier/Site Cross Reference Screen.

Upload: ankita-tripathi

Post on 18-Nov-2015

5 views

Category:

Documents


0 download

DESCRIPTION

Constraints for Implementation Process in Marriott Germany

TRANSCRIPT

Constraints for implementation process in Marriott GermanyUSE BUSINESS MODEL 2 for the property creation1. User:For creating the Buyer User IDs, make sure that no actual first and last name but the EIDs provided in the template should be used. (for all the properties)So we can use Eid in the first name and dot (.) in the last name.Generic email IDs instead of specific email IDs are preferred. (Specifically Marriot Frankfurt properties)

2. SOTF:

PSFT vendor Code and PSFT SITE ID (CUST_VENDOR_SITE_CODE) is mandatory, PSFT SITE ID is mentioned as LOCATION in the template provided by the properties.

Make sure to upload the PSFT vendor Code and PSFT SITE ID on the Supplier/Site Cross Reference Screen.