1 Cities Support Programme Quarter 1 ( April June) 2015 Consolidated Narrative Report 1 Purpose This report presents the outputs and progress on the Cities Support Programme for the period April 2015 to June 2015, Quarter 1 of the 2015/16 financial year. The main report reflects the progress through the component lens and programme management with the Annexure A reflecting the detailed city level project reports. 2 Core City Governance The priority projects that we were implemented during the reporting quarter included preparation for the investor conference (CG7), finalisation of the 2015 BEPP process (CG6) and initiation of work on longer term planning alignment (CG6), ongoing support to catalytic projects (CG10), and ongoing development of the CIDMS toolkit (CG20). Under the leadership and governance subcomponent, the PARI project (Leadership Development and Change management CG2) has gained momentum. The inception report has been tabled and discussed. It is likely to be a fascinating project which introduces some groundWbreaking frames and insights for city level research and analysis. Cities selected for this research are eThekwini and Nelson Mandela Bay. Procurement of the service provider for the Executive Leadership Courses (CG1) was initiated and will be finalised in the next quarter. The theme for the next course to be held in October/ November 2015 is on City Economic Development Strtaegies and Activities. Work has commenced on the Citizen Engagement (CG3) project in Cape Town and Nelson Mandela Bay with Draft city level inception notes and pilot reports being produced. The Integrity project (CG5) is also at an inception level in the selected cities. The concept note for the Investor conference (CG7) scheduled for the end of August 2015 has been finalised and engagements with partners and participants has started. The Spatial Planning Sub;component focuses on Built Environment Performance Plans (BEPPs) (CG6) as an instrument and process to try and get better alignment in metros between planning, budgeting, implementation, urban management, reporting and evaluation. The focus of the sub component has been on the peparation of the 2015/16 BEPPs. 7 out of 8 metros submitted their Council approved BEPPs to National Treasury on the 29 th May 20165 as per the DoRA and ICDG Grant conditions. The BEPP process and the focus on spatial transformation was presented to the TCF and Budget Council as per of the memo submission on

Upload: others

Post on 26-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 1!

Cities!Support'Programme!Quarter'1'(April#–!June)!2015!!Consolidated+Narrative(Report!

1 Purpose)This!report!presents!the!outputs!and!progress!on!the!Cities!Support!Programme!for!the! period! April! 2015! to! June! 2015,! Quarter! 1! of! the! 2015/16! financial! year.! The!main! report! reflects! the! progress! through! the! component! lens! and! programme!management!with!the!Annexure!A!reflecting!the!detailed!city!level!project!reports.!!

2 Core)City)Governance)The! priority! projects! that! we! were! implemented! during! the! reporting! quarter!included!preparation!for!the!investor!conference!(CG7),!finalisation!of!the!2015!BEPP!process! (CG6)! and! initiation! of! work! on! longer! term! planning! alignment! (CG6),!ongoing! support! to! catalytic! projects! (CG10),! and! ongoing! development! of! the!CIDMS!toolkit!(CG20).!!!Under!the!leadership)and)governance)subcomponent,!the!PARI!project!(Leadership!Development! and! Change! management! –! CG2)! has! gained! momentum.! The!inception!report!has!been!tabled!and!discussed.!It!is!likely!to!be!a!fascinating!project!which! introduces! some!groundWbreaking! frames!and! insights! for! city! level! research!and! analysis.! Cities! selected! for! this! research! are! eThekwini! and! Nelson!Mandela!Bay.! ! Procurement! of! the! service! provider! for! the! Executive! Leadership! Courses!(CG1)!was!initiated!and!will!be!finalised!in!the!next!quarter.!The!theme!for!the!next!course! to! be! held! in! October/! November! 2015! is! on! City! Economic! Development!Strtaegies! and!Activities.! !Work!has! commenced!on! the!Citizen! Engagement! (CG3)!project!in!Cape!Town!and!Nelson!Mandela!Bay!!!with!Draft!city!level!inception!notes!and!pilot!reports!being!produced.!The!Integrity!project!(CG5)!is!also!at!an!inception!level! in! the! selected! cities.! The! concept! note! for! the! Investor! conference! (CG7)!scheduled! for! the! end! of! August! 2015! has! been! finalised! and! engagements! with!partners!and!participants!has!started.!!The! Spatial) Planning) Sub;component! focuses! on! Built! Environment! Performance!Plans!(BEPPs)!!(CG6)!as!an!instrument!and!process!to!try!and!get!better!alignment!in!metros! between! planning,! budgeting,! implementation,! urban! management,!reporting! and! evaluation.! The! focus! of! the! sub! component! has! been! on! the!peparation! of! the! 2015/16! BEPPs.! 7! out! of! 8! metros! submitted! their! Council!approved!BEPPs! to!National!Treasury!on! the!29th!May!20165!as!per! the!DoRA!and!ICDG!Grant! conditions.! The! BEPP! process! and! the! focus! on! spatial! transformation!was! presented! to! the! TCF! and! Budget! Council! as! per! of! the!memo! submission! on!

Page 2: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 2!

Cities!and!their!contribution!to!Economic!Growth.!In!the!next!quarter!the!2015!BEPP!review!will!be! finalised!and! the!guidelines! for! the!2016!BEPP!will!be!completed.!A!process! was! undertaken! with! the! cities! to! identify! 1! integration! zone! for! CoGTA/!IUDF!support.!!These!submissions!have!been!provided!to!CoGTA.!Preparations!were!undertaken! for! the! establishment! of! the! Planning! Task! Team!meeting! as! per! the!resolution!of!the!November!2014!CBF.!The!first!task!team!meeting!was!scheduled!for!1!July!2015.!On!the!Fiscal! Impacts!for!Spatial!Form!(CG9)!project!a!service!provider!has! been! procured! to! support! cities! to! test! the! Fiscal! Impacts!Model! from! July! to!August!2015.!!

The!main!focus!of!the!Infrastructure)Finance)sub)component)has!been)Land!!)Development!transaction!support!(CG10).!!Ongoing!support!to!catalytic!projects!has!been!provided!to!all!cities!and!a!Technical!Assistance!Strategy!has!been!developed.!The! procurement! of! a! specialist! to! provide! technical! assistance! on! infrastructure!finance! was! initiated.! The! first! output! for! this! will! be! a! concept! paper! on!infrastructure!finance.!!!In! the! Infrastructure)Delivery) sub) component! progress!has! continued!with!CIDMS!development! (CG20.! A! number! of! modules! of! the! IDMS! has! been! developed! and!consulted! with! stakeholders.! The! rollout! of! the! PPF! (CG15)! continues! to! be! a!challenge.!Although!the!Policy!Framework!has!been!developed! it!has!not!yet!been!approved!and!institutionalised!in!the!operations!of!the!PPF.!Cities!have!also!not!been!happy!with!the!quality!of!the!work!of!the!service!providers!working!on!the!project!concept!studies.!It!is!proposed!that!changes!to!the!current!governance!structure!will!assist!to!institutionalise!the!policy!framework!and!provide!the!link!to!other!proceses!and! initaitives! of! the! CSP! supporting! catalytic! project! development! and!implementation.!The!implementation!of!the!Social!and!Environmental!Managament!project! (CG19)! has! not! moved! and! following! the! CBF! discussions! on! regulatory!constraints! to!accelerate! infrastructure!delivery!by!metros!a! revised!and!expanded!scope!for!the!project!is!required.!!

3 )Human)Settlements)(HS))!The!Human!Settlements!Component! intends! to!contribute! to!a!more! inclusive!and!diverse!city!in!terms!of!the!following!subWcomponents:W!(a) Planning!support!to!create!an!enabling!environment!through!property!markets!&!

land;!(b) Upgrading!support!to!provide!cities!with!implementation!support!for!upgrading!

of!informal!settlements;!(c) Finance.support!to!improve!the!performance!of!fiscal!instruments.!!!A!key!focus!for!the!quarter! in!the!Planning) sub) component!was!responding!to!the!Department!of!Human!Settlements!(DHS)!to!provide!input!on!the!identification!and!selection!of!Catalytic/!Mega!Projects!in!metros,!and!contributing!to!the!preparation!of! a! Memo! for! the! bilateral! meeting! between! the! Minister! of! Finance! and! the!

Page 3: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 3!

Minister! of! Human! Settlements.! ! National! Treasury! (NT)! is! beginning! to! have!coherence! on! the! sector! by! getting! the! different! divisions! within! NT! to! work!together,! especially! Public! Finance! and! IGR,! as! input! into! the! DHS! Green/White!Paper!process.!!!!Through!the!RAS!agreement!with!the!World!Bank!a!service!provider!has!been!appointed!to!undertake!the!Property!Market!Reviews!(HS3)!project!and!it!is!anticipated!that!city!level!workshops!will!commence!in!the!next!quarter.!!

The! Informal) Settlement) Upgrading) Sub;Component! of! the! Human! Settlements!Component! focuses! on! providing! cities! with! implementation! support! for! the!upgrading!of!informal!settlements.and!addressing!city!level!constraints!to!drastically!scalingWup!upgrading,!including!the!support!for!selfWbuild!housing.!Procurement!for!a!project! manager! to! coWordinate! the! projects! in! this! sub! component! has! been!initiated.!

The! Finance) Sub;Component! of! the! Human! Settlements! Component! focuses! on!improving! the! performance! of! fiscal! instruments! such! as! grants! and! subsidies! and!piloting! demand! side! subsidy! instruments;! exploring! rental! housing! options;! and!incentivising! the! private! sector! to! increase! participation! in! affordable! housing! in!betterWlocated! areas.! ! Through! the! RAS! agreement! a! World! Bank! mission! was!undertaken! on! the! Pilot! on! Demand! Side! Instruments! (HS9).! At! the! national! level!meetings! were! held! with! Banks,! DHS,! NHFC,! NT,! FFC! and! developers.! 4! City! level!meetings! held.! The! 3! pilot!metros! for! this! project! are!Manguang,! Cape! Town! and!Ekurhuleni.!!.

4 Public)Transport))The!majority! of! work! in! the! component! has! been! directed! at! finalising! the! Fiscal!Architecture! grant! reform! related! process.! Key! to! its! success! will! be! creation! of!systems! and! processes! at! NDOT! as! well! as! NT! to! ensure! that! the! grant! is!administered! appropriately! especially! given! the! proposal! for! a! performance! based!window.!In!the!next!quarter,!noting!the!current!weakenesses!in!the!system!it!will!be!key! that! an! agreement! is! reached!with! NDOT! to! provide! the! department! support!around!administering!the!new!grant!regime.!!

!!!The!leadership)and)planning)sub;component!has!4!projects:!

• PT1!W!Diagnostic!on!Transport!and!Land!Use!Management!• PT2!W!Development!of!Transport!Devolution!Strategy!&!Programme!

(Provincial)!• PT3!W!National!Capacity!Building!Strategy!• PT7!W!Development!of!Transport!Devolution!Strategy!&!Programme!

(Metrorail)!The!PT1!project!has!been!completed;!PT2!and!PT4!are!currently!in!implementation!and!the!final!project!PT7!has!begun!at!a!city!level!in!eThekwini!but!not!yet!as!national!level!project.!!!!!With! regard! to! the! PT2:. Development. of. Transport. Devolution. Strategy. &.Programme. (Provincial)! project! the! policy! and! political! environment! has! not!

Page 4: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 4!

fundamentally! changed!on! the!devolution! front.!At!a!national! level,!NDOT!has!not!shown! significant! appetite! for! devolving! the! provincial! road! function! to! cities.!Neither!has!any!city! shown! intent! to! for! the! function! to!be!devolved! to! it,!outside!Cape!Town.!In!practice,!the!lack!of!a!devolved!function!is!presenting!difficult!choices!to!stakeholders.!This!was!best!illustrated!by!riots!in!Mamelodi,!after!the!withdrawal!of! the! services! of! Putco.! Before! this,! as! in! previous! years,! the! South! African! Bus!Owners!Association!(SABOA)!presented!to!the!NDOT!Minister!the!challenge!of!rising!costs! in! the! industry! (fuel,! labour,!maintenance)!which!has! increased!at!around!10!per! cent,! whilst! the! increase! in! supplementary! grant! allocations! averaged! 5.6! per!cent.!NDOT! sought! new! funding! from!NT,! not! likely! to! be! granted! because! of! the!reality!of!a!shrinking!national!fiscal!envelope!across!all!sectors!including!transport.1!!!The!most! useful! possible! solution! is! in! fact!making! a! clear! case! for! devolution! to!better! align! transportation! functions! at! a! provincial! and! city! level! and! therefore!extract!greater!value!for!money!between!various!public!transport!grants.!This!is!why!this! project! is! so! useful.! A! service! provider! has! been! procured! to! support! the!implementation!of!this!project.!!In!initiating!this!project!PT3.@.National.Capacity.Building.Strategy.a!meeting!between!the!CSP!team!and!the!NDOT!happened!where!the!Results!Framework!was!presented.!Follow! through!meetings!were! scheduled! and! have! happened.2!Although! relations!with! the! NDOT! have! improved,! the! Department! has! not! indicated! the! dedicated!support! it! requires!via! the!CSP.! ! Through! the!PTNG! review!process! (PT10),!NT!and!CSP! have! offered! support! to! the! NDOT! to! improve! its! performance! management!system,!which!is!clearly!inadequate.!!!The!following!projects!are!being!implemented!in!the!Capacity)and)Support)sub)component.))

In! the!PT4. @.Review.of.City. IPTs.and. IPTNs.project! the! intent!of! this! line!of!work! is!twoWfold:!one,!to!create!a!platform!for!knowledge!dissemination!emerging!from!the!various!PT4!city!IPTN!reviews!and!secondly,!to!provide!transversal!support!to!cities!on! a! number! of! areas! including! service! planning! and! ITS! support.! Currently! both!work! streams! are! in! procurement! (PT4! –! Service! planning;! and! PT4! ITS).! ! It! is!anticipated!that!this!project!will!be!a!good!area!for!peer!learning!and!the!generation!of! knowledge!and!a! joint! collaboration!with! the! SACN! is!being! considered.!Project!PT5@.Study.on.MBT.Industry.Innovation.and.Integration.has!also!been!submitted!for!procurement!

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!1!This!they!did!in!a!meeting!with!NT!public!finance!division!on!20!May.!!2!This!includes!triWlaterals!with!cities!as!well!as!meetings!of!the!Dept.!and!CSP!on!the!projects!and!programs!of!the!CSP.!!

Page 5: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 5!

The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@.Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is!being!implemented!through!the!World!Bank!and!a!mission!is!planned!planned!for!July!2015.!!!.The!PT10.@.Review.of.the.Fiscal.Architecture.of.Public.Transport.Financing!is!at!the!institutionalisation!phase!of!the!project!cycle!and!two!events!have!been!undertaken!suporting!this!process.!!A!report!on!“Fiscal!architecture!for!public!transport!and!the!Public!Transport!Network!Grant”!has!been!produced.!To!obtain!a!unified!NT!position!on!the!paper,!a!session!held!on!June!10th;!and!a!second!meeting!with!NDOT!on!June!19th.!Two!more!interactions!are!intended!with!cities!(13!July)!and!NDOT!on!20th!July.!As!a!natural!follow!up!to!the!project,!and!given!the!response!from!stakeholders,!it!will!have!another!phase,!dealing!with!broader!question!of!public!financing!for!public!transport!as!a!whole!(and!not!limited!simply!to!the!PTNG).!!It!is!expected!project!closure!will!happen!in!this!coming!quarter.!

5 Economic)Development)Support)

On!the!City)Economic)Development)Services)sub)component)the!preparations!and!the! launch! of! the! release! of! the! SNDB! ED1! report! on! 12th! June! dominated! the!activities! and! outputs! for! this! sub! component.! Extensive! steering! committee!meetings!and!workshops!with!cities!were!held!in!the!lead!up!to!the!SNDB!launch.!A!procurement!requirement!for!phase!11!of!the!project!has!been!submitted.!!

On!the!Asset!management!and!service!delivery!support!project!a!draft!report!report!on! water! and! sanitation! has! been! produced.! ! Procurement! is! underway! for!continued!support!on!water!and!sanitation!and!the!other!area!of!energy.!

The!Analysis)of)City)Economies)sub!component!has!not!commenced!primarily!due!to!limitations! imposed!by! the!already!existing!workload.! !The!projects! that!are!under!this! sub! compenent! are! ED5! City! value! chains,! ED7! City! spatial! economies,! ED8!informal!economic!activities.!!

The!City) Economic) Strategies) sub) component)has!been!dominated!by! the! tour!of!cities!to!prepare!for!the!ELC! in!October/!November.! ! !While!one!day!was!spent!on!most!of!the!cities,!three!days!were!spent!in!Mangaung!in!order!to!start!the!process!of! developing! an! economic! development! strategy! for! that! city! and! a! quick! scan!report!has!been!produced.!Through!the!ED9!Implementing!city!economic!strategies!support!is!being!provided!to!City!of!Johannesburg!on!Key!business!process!mapping!and!investment!promotion!for!economic!precincts.!

No! work! has! been! undertaken! on! the! National) Economic) Policies) and) Practices)subcomponent! during! the! last! quarter! however! the! procurement! of! a! service!provider! for! the! ED2!National! policies! on! spatial! targeting! is! planned! for! the! next!quarter.!An!inception!report!on!the!potential!of! impact!bonds!was!produced!under!the!ED6!Stimulating!youth!employment! in!cities!project! for! the!sub) component) of)Maximising)job)creation.!!!

Page 6: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 6!

6 Programme)Management)

Strategic)Support)Strategic! support! has! been! providing! inputs! to! a! number! of! more! general!programme!management!areas!especially!the!stakeholder!engagement!strategy!and!associated! progression! model! and! assistance! with! the! editing! of! the! framework!document.!!!Progress!was!made! in! a!number!of! areas!during! this! quarter.! The!development!of!trackers!and!formats!continued.!Some!useful!comments!were!made!on!the!project!management!tracker!relating!to!the!need!for!more!of!a!project!management!focus!(as!opposed!to! just!a!monitoring!focus).!These!comments!have!been!noted!and!an!integrated!more!project!management!system!will!be!developed!in!the!next!quarter.!!!Responding! to! the! request! for! coaching! support! to! the! core! team,! a! Terms! of!Reference!was!prepared!and!it!is!anticipated!that!a!service!provider!will!be!on!board!in!the!next!quarter!to!provide!support!to!the!team.!!!Progress! continued! on! the! reporting! reforms! project! with! a! number! of! key!engagements!being!held!with!the!cities!and!sector!departments.!This!will!continue!in!the!next!quarter!which!should!see!the!conclusion!of! this!phase!of! the!project.!The!project!on!Built!Environment!indicators!was!closed!during!this!quarter!and!combined!with!the!reporting!reforms!project.!!The! first! of! the! city! strategic! reviews!–! Ekurhuleni! –!was!undertaken.! This! process!proved!to!be!useful! in!clarifying!what!will!be!offered!by!the!CSP! in!this!metro.!The!process!also!triggered!a!useful!clarification!to!the!CSP!Theory!of!Change!at!the!city!level!–!and!this!was!institutionalised!in!an!updated!diagram.!!!Lastly,!a!relationship!has!been!established!with!DPME’s!National!Evaluation!Plan!and!a!request!to!have!the!CSP!evaluated!was!submitted.!!.

StakeholderEngagement))During! the! reporting! period! support! was! provided! to! the! Economic! Development!component! lead! to! successfully! deliver! the! SNDB! launch! event! and! the! joint!roundtable!event!with!CDE.! !2!component! level!programme!planning! interventions!(ED!and!HS)!were! completed!and!a! joint! initial! first!meeting!with!Governance!was!held.!!!!A!first!successful!joint!SACN/CSP!team!planning!session!was!also!held!in!this!quarter.!!Also!CSP!participation!in!the!SA!Urban!portal!plan!with!GIZ/!SACN/CoGTA!has!been!consolidated! through! the! approval! of! TORs! for! the! functioning! of! this! committee.!JICA! support! for! CSP!has!been! secured! from! the! Japanese! government! –! although!the!programmatic!detail!has!to!be!defined.!!!

Page 7: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 7!

Further!extensive!preparatory!work!including!the!process!for!the!finalisation!of!roles!and!responsibilities!was!undertaken!on!the!CBF!planned!for!the!8!July!2015.!

Operations)The!systems! for! the!various!projects!within!operations!have!been!established.! !On!internal! reporting! there! has! been!progress! regarding! the! timeliness! and!quality! of!the!monthly!reports.!!The!reporting!formats!have!been!reviewed!and!have!become!much!more!user!friendly.!The!area!for!improvement!in!the!next!quarter!is!to!ensure!that! the! finalisation! of! the! consolidated! reports! is! in! accordance! with! the!timeframes.!!The!contract!and!financial!management!system!has!been!integrated!and!is!currently!populated!with! this! quarter! data.! ! The! data! for! the! last! financial! year!will! also! be!included! and! this! system! will! also! be! integrated! with! the! project! sheets! and! the!project!tracker.! !There!has!been!improvement! in!the!turnaround!time!of!the!home!week! minutes! however! this! needs! to! further! improve! to! meet! the! performance!standards!agreed.!!!!Procurement!remains!a!significant!risk!to!the!programme.!!The!turnaround!times!are!impacting!on!individual!projects!and!the!programme.!!The!number!and!timing!of!ToR!being!generated!is!not!aligned!to!the!project!sheets!and!is!impacting!on!the!cashflow!projections.!.

.

.

.

.

.

.

.

.

.

.

.

.

.

Page 8: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 8!

Annexure)A);)City)level)reporting)

1 )Buffalo)City)Metro)

1.1 Achieved)over)the)last)quarter)The.City.has.gone. through.a. very. turbulent.political.period. in. the. recent.past.. This.threatened. the. survival. of. the. City. Manager,. which. directly. threatened. the.sustainability. of. the. programme. in. the. institution.. During. this. time. a. lot. of.administrative. problems. ensued.. Among. others. were. the. political. threats. towards.the.critical.officials.in.the.administration..The.CSP.has.thus.focussed.in.assisting.the.teams. to.see.hope.beyond. the.potential.unforeseen.circumstances.and. to.keep. the.boat. floating. until. the. political. challenges. are. resolved.. The. Executive.Mayor. was.then.removed.and.a.new.EM.instated.within.the.past.month..There.was.no.clarity.as.to.the.outcome.of.this.to.the.administration..The.Department.of.CoGTA.has.invoked.Section.154.of. the.Municipal. Systems.Act,. by.way.of. intervening. in. the. institution..The.intervention.drew.both.national.and.provincial.DCoG..CSP.drove.the.drafting.of.the.content.of.the.action.plan.even.though.the.final.product.couldn’t.be.controlled..A.lot.of.correspondence.has.been.compiled.and.keeping.the.internal.Treasury.aware.of.the.emerging.issues.has.been.the.major.activity.in.the.past.month..The.City.Manager.is.currently.kept.in.his.position.with.a.lot.of.internal.instability.in.the.institution..!

1.2 Breakdown)of)projects)!Code) Project) Outputs)delivered) Process)undertaken))BCM! General!city!

strategic!support!to!BCM!

W!Mega!projects!fineWtuned!and!workWshopped!internally!for!submission!to!DHS!W!DCoG!process!of!supporting!integration!zones!supported!through!the!delivery!of!a!BEPP!and!the!catalytic!projects!!WAssist!the!City!to!line!up!a!single!agenda!for!different!stakeholders.!

W!Meetings,!desk!top!work,!consistent!engagements!through!phone!calls,!emails!etc.!

CG2WBCM1! BCM!Strengthening!Strategic!Leadership!for!Urban!Transformation!

W!Letters!and!memo!to!inform!the!National!Treasury!on!the!challenges!and!proposing!solutions.!W!Action!plan/Support!package!drafted!as!part!of!the!DCoG!intervention!team.!Assisting!the!administrative!ship!to!keep!afloat.!

W!Sessions!with!key!people.!W!Raising!issues!with!decisions!makers!W!Desk!top!work!and!consultations!with!city!officials!!

CG10WBCM15!

Land!Development!Transaction!Support!for!BCMM!(catalytic!projects)!

W!Sleeper!Site!drafted!as!a!high!priority!project!on!Action!Plan!–!Mayors’!speech!!!W!Buy!–in!solicited!on!profiling!all!catalytic!projects!as!political!priority!

W!Strategic!discussions!W!Contributing!to!the!drafting!of!the!EM’s!Speech!

PT4WBCM14! BCM!Review!of!IPT/IPTN!

!W!Supporting!BCMM!in!the!rethink!of!IRPTN!with!PRASA.!!W!Briefing!GIZ!and!CSP!on!approach!to!

W!Supporting!BCMM!in!finding!its!own!solutions!to!its!local!

Page 9: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 9!

BCMM.!W!Few!engagements!to!determine!if!the!City!has!capacity!to!engage!with!national!reforms!and!support.!No!capacity!is!yet!identified.!

challenges.!

CG10WBCM15!

Land!Development!Transaction!Support!for!BCMM!(catalytic!projects)!

W!Support!the!city!in!the!pursuit!of!aligning!its!activities!with!the!findings!of!the!ULI!panel!W!Support!city!with!specific!items!on!the!budget!to!pursue!the!pedestrinisation!of!the!oxford!street.!W!Support!city!in!reviving!its!commitments!to!the!MBSA!partnership!agreement!

Meeting!engagements!

.

1.3 Planned)for)the)next)quarter)!Code) Project) Outputs)planned) Process)planned))CG2WBCM1!

BCM!Strengthening!Strategic!Leadership!for!Urban!Transformation!

!W!Resource!person!to!mentor!City!Manager!and!bridge!gap!between!administration!and!political!council!

Procure!the!Strategic!Advisor!!

CG10WBCM15!

Land!Development!Transaction!Support!for!BCMM!(catalytic!projects)!

W!Budget!prioritisation!of!Sleeper!Site!!W!Acquiring!resource/!Urban!Management!Specialist!to!support!the!implementation!of!Sleeper!Site!!W!Strengthen!the!partnership!between!MBSA!and!City!through!assisting!City!to!implement!the!partnership!agreement.!!W!Support!the!City!in!engaging!on!financing!arrangements!for!the!sewer!tunnel!!W!Strengthen!the!BEPP!

Strategic!sessions,!meetings,!phone!calls!and!emails!

PT4WBCM14!

BCM!Review!of!IPT/IPTN!

W!Meeting!still!planned!to!confirm!PRASA’s!commitment!and!their!MTEF!plan.!This!will!focus!on!rail!and!its!feeder!routes!until!such!time!that!the!city!has!the!capacity!to!engage!on!larger!public!transport!planning,!implementation!and!management.!

W!Meeting!engagements!!

.

.

.

Page 10: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 10!

1.4 Risks)and)mitigations)Risk) Mitigation)Political!instability!might!threaten!the!planned!activities!with!most!politicians!around!the!ExW!Mayor!having!some!clouds!around!them!!

Planned!political!engagement!by!the!Minister!of!Finance!to!assist!but!caution!Council!against!wrong!decisions.!

!

1.5 Issues)for)Escalation)Structure) Issue)Programme!Management! None!for!now!IGR!Branch! !City!Budget!Forum! !

2 City)of)Cape)Town)

2.1 Achieved)over)the)last)quarter)!Code) Project) Outputs)delivered) Process)undertaken))CG7WCPT1! Building!Coalitions!

for!change!None! None!

CG10WCPT7!

Catalytic!project!support!

Draft!LVC!options!report!ToR!for!APS!project!support!

Internal!discussions!

PT7WCPT12b!

Review!of!PT!financing!

None! None!

CG2WCPT3a!

Strengthening!policy!delivery!

Final!draft!of!SPU!transversal!management!report!

Review!and!comments!on!WB!report!!!Scoping!exercise!with!city!coWordinator!City!level!engagements!!

HS3WCPT9! Human!Settlements!Review!

None! None!

CR4WCPT13!

Fiscal!implications!of!energy!substitution!

None! None!

CG3WCPT4! Citizen!engagement!

Finalisation!of!pilot! EMT!discussion!and!identification!of!next!steps!

HS10WCPT10!

Accelerating!land!availability!

Draft!scoping!of!projects!in!pipeline!

TOD!Gamechanger!working!group!meetings!

Page 11: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 11!

with!province!ED9WCPT15!

Strategic!economic!initiatives!

Finalisation!of!report! None!

CG6WCPT5! Strengthening!policy!delivery!

None! None!

HS13WCPT11!

Upgrading!support! None! None!

CG9WCPT6! Econ!and!fiscal!implications!of!LU!

None! None!

PT4WCPT12a!

IPTN!review! Concept!note! TOD!strategy!development!support!workshop!

.

2.2 Planned)for)the)next)quarter)!Code) Project) Outputs)planned) Process)planned))CG7WCPT1! Building!Coalitions!

for!change!None! None!

CG10WCPT7!

Catalytic!project!support!

APS!review!Finalisation!of!LVC!options!report!

Selection!of!LVC!option!for!piloting!

PT7WCPT12b!

Review!of!PT!financing!

None! None!

CG2WCPT3a!

Strengthening!policy!delivery!

Finalisation!of!transversal!management!report!

Identification!of!next!steps!

HS3WCPT9! Human!Settlements!Review!

None! Inception!meeting!

CR4WCPT13!

Fiscal!implications!of!energy!substitution!

None! None!

CG3WCPT4! Citizen!engagement!

Final!practice!note! Next!steps!agreed!

HS10WCPT10!

Accelerating!land!availability!

Finalisation!of!pipeline!

Identification!of!support!options!

ED9WCPT15!

Strategic!economic!initiatives!

None! None!

CG6WCPT5! Strengthening!policy!delivery!

None! None!

HS13WCPT11!

Upgrading!support! None! Scoping!of!support!

CG9WCPT6! Econ!and!fiscal!implications!of!LU!

Pilot!of!fiscal!impacts!model!

Inception!meeting!

PT4W IPTN!review! TOD!working!group! !

Page 12: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 12!

CPT12a! report!.

2.3 Risks)and)mitigations)Risk) Mitigation)Capacity!constraints! New!city!coordinator!Introduction!of!new!city!coordinator! Transition!management!arrangements!!

2.4 Issues)for)Escalation)!Structure) Issue)Programme!Management! None!IGR!Branch! None!City!Budget!Forum! None!!

3 City)of)Johannesburg)

3.1 Achieved)over)the)last)quarter)There!are!3!key!support!projects!currently!being!implemented!in!the!COJ!

• PT4WCOJ10!(Joburg!Review!of!IPT/IPTN);!!• PT6WCOJ12!(COJ!TIF!Dunkeld/Rosebank!TOD);!and!!• ED9WCOJ4! (Economic! Development! Strategy)! which! is! in! its! second! phase,!

with!phase!1!having!been!completed!in!2014.!!!In! addition! to! the! support! projects,! the! COJ! had! a! good! Budget! and! Benchmark!session!on!8!May!2015;!submitted!its!2015/16!–!2017/18!BEPP;!and!has!worked!with!the! CSP! and! DBSA! on! the! 5! projects! submitted! to! the! Cities! Project! Preparation!Facility!(PPF).!!!The!COJ!showed!a!keen!interest!in!the!CIDMS!in!relation!to!planning!for!2015/16!implementation!of!their!budget!and!plans.!The!COJ!Human!Settlements!and!Development!Planning!departments!coWoperated!well! in!the! input!required!for!DHS!Catalytic/Mega!Projects!during!June!2015.!!!!!! !

Page 13: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 13!

Code) Project) Outputs)delivered) Process)undertaken))! General!city!

strategic!support!to!COJ!!

1. COJ!Economic!Development!participated!in!SNDB!Panel!re!city!focus!on!SMMEs!as!good!practice.!!!

!2. !NDPG!project!in!

Jabulani!Precinct!proceeding!after!some!delays.!!

!!

3. LeanWin!submitted!on!13!April,!and!discussed!with!Programme!Management!Support!(Jeremy!Timm)!on!11!May.!

!4. COJ!HS!and!

Development!Planning!departments!provided!input!on!HS!catalytic/mega!projects.!!!

!5. COJ!Benchmarking!

on!8!May!2015!!

6. 5!Reports!for!projects!received!from!Cities!PPF!in!June!2015.!!!

!7. Louis!Botha!

Corridor!(IZ)!to!receive!assistance!from!COGTA!!

!!8. CIDMS!

presentation!to!COJ!!

!

1. Preparation!for!SNDB!launch!on!12!June!2015.!

!2. COJ!and!NDPG!

resolved!issues!causing!delays,!and!have!also!prepared!for!year!ahead.!!!

!3. Discussion!at!Home!

Week!led!to!submission!of!LeanWIn.!!Will!proceed!after!EKU!LeanWIn!sometime!in!August!or!September!2015.!!!

!4. Process!started!in!late!

May!2015!and!concluded!on!11!June!2015.!!!

!5. Part!of!LGBAS!

process.!!!!6. Facilitated!

engagement!between!DBSA!Cities!PPF!and!COJ!on!the!5!projects!submitted!in!February!2015.!!!

!7. CoJ!identified!Louis!

Botha!Corridor!(IZ)!for!assistance!to!be!received!from!COGTA!!

!8. COJ!requested!

information!on!CIDMS!to!see!the!extent!to!which!it!could!assist!in!planning!for!better!implementation!for!the!2015/16!Budget.!!!!!

Page 14: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 14!

Code) Project) Outputs)delivered) Process)undertaken))PT6WCOJ12!

COJ!TIF!Dunkeld/Rosebank!TOD!

Market!analysis!done!and!presented!on!26!May!2015.!!!

Project!meetings!were!held!on!26!May!and!17!and!26!June!2015.!!!!!!!

COJ!W!PT4WCOJ10!

Joburg!Review!of!IPT/IPTN!

Meeting!on!19!June!between!COJ!and!DOT!

Worked!with!Jan!Hattingh!and!Michael!Kihato!to!facilitate!agreement!between!the!2!parties.!

.

3.2 Planned)for)the)next)quarter)!Code) Project) Outputs)planned) Process)planned))ED9WCOJ4! Economic!

Development!Strategy!!

Progress!Report!by!End!of!August!2015!

Work!with!the!World!Bank!PSP!to!check!on!progress.!

PT6WCOJ12!

COJ!TIF!Dunkeld/Rosebank!TOD!

Financial!and!Regulatory!analysis!planned!for!July!–!August!2015!

Part!of!the!project!reference!group.!!!

CG6! BEPP!–!City!level!support!

Meeting!with!DHS!and!Eskom!!Alignment!of!planning!for!provincial!infrastructure!!!

Follow!up!on!range!of!issues!raised!during!BEPP!Review!and!Benchmarking!

.

3.3 Risks)and)mitigations)Risk) Mitigation)Staff!in!the!COJ!Development!Planning!Unit!are!highly!stressed!due!to!a!lack!of!staff!and!thus!missing!out!on!opportunities!for!support!presented!to!the!COJ.!

Check!with!CSP!the!possibility!of!assisting!COJ!Planning!with!“interim!capacity”!for!project!management!of!Capital!Investment!Projects!and!provide!response!to!COJ!by!end!of!July!2015.!!

!

3.4 Issues)for)Escalation)!Structure) Issue)Programme!Management! !IGR!Branch! !City!Budget!Forum! !

Page 15: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 15!

4 Ekurhuleni)Metro);)EMM)

4.1 Achieved)over)the)last)quarter)Substantial!progress!on!engagements!with!the!metro!which!is!being!driven!once!again!by!the!coordinator.!The!strategic!review!has!been!concluded!and!the!approach!and!document!is!being!finalised.!This!has!yet!to!be!agreed!with!council!but!it!has!generated!much!interest!and!specific!focus!on!areas!requiring!support!for!the!first!time.!!!Code) Project) Outputs)delivered) Process)undertaken))PM!8! Strategic!review! Draft!issues!

presentation!Discussions!with!selected!individuals!at!metro;!presentation!of!issues!at!HW!

CG10WEKU3b!

Improve!prioritisation!of!catalytic!projects!

Inception!visit!to!metro!by!WB!team!

City!has!decided!to!focus!on!specific!projects!and!will!follow!up!with!WB!to!deliver!TA!

.

4.2 Planned)for)the)next)quarter)!Code) Project) Outputs)planned) Process)planned))PM8! Strategic!review! Final!document!and!

presentation!delivered!

Review!to!be!submitted!urgently;!then!presentation!to!CM!and!team.!Agreed!and!implemented!!

Review!of!project!sheets!

CSIP! Revise!the!project!sheets!based!on!review!and!focus!agreed!with!metros!Implement!TA!by!triggering!TORs!for!activities!

Revise!and!update!project!sheets!by!end!July;!secure!approval!for!projects!by!council;!implement!project!support.!

CG2EKU2! Strengthen!strategic!leadership!decisionWmaking!to!improve!project!prioritisation!and!implementation!

Revised!project!sheet! Scoping!exercise!with!city!coWordinator!

.

4.3 Risks)and)mitigations)Risk) Mitigation)! !!

Page 16: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 16!

4.4 Issues)for)Escalation)Highlight.issues.for.escalation.for.the.various.structures.as.listed.below...!Structure) Issue)Programme!Management! Review!has!been!conducted!experimentally.!We!

should!consider!how!to!write!this!up!and!what!this!means!for!others.!!

IGR!Branch! !City!Budget!Forum! !

5 City)of)Tshwane))

5.1 Achieved)over)the)last)quarter)The! City! got! a! serious! wakeup! call! at! the! Budget! and! Benchmarking! exercise!engagement!where!the!top!management!was!given!marching!orders!about!their!lack!of!integration!and!a!weak!budget!that!wasn’t!linked!to!the!plan!but!political!wish!list.!There!have!been!some! internal!movements! in! the!system!where!various!units!sort!NT!support!in!the!alignment!of!their!work!within.!There!is!a!lot!of!hope!for!the!city!to!reunite!for!its!citizens!once!again.!

5.2 Breakdown)of)projects)!Code) Project) Outputs)delivered) Process)

undertaken))CG10WTSH8! Land!

Development!Transaction!Support!for!Tshwane!(catalytic!projects)!

W!Engaging!with!City!on!prioritisation!of!their!catalytic!projects!and!the!link!between!the!various!support!resources!and!how!they!better!position!themselves!to!tap!into!the!different!support!programmes.!W!Engage!City!on!their!misaligned!catalytic!projects!W!Engaged!city!in!their!PPF!misaligned!list!

W!Meetings,!desk!top!work,!consistent!engagements!through!phone!calls,!emails!etc.!

HS10WTSH15!

Development!of!mixed!use!catalytic!programmes!within!the!integration!zones!

W!Engaging!the!City!on!West!Capital!with!a!hope!that!it!could!form!part!of!the!WB!Mission.!

W!Meetings!!

PT4WTSH1! Review!of!Tshwane!IPTN!W!Implementing!Light!Rail!

W!Working!with!Tshwane!in!establishing!the!relevance!of!LRT!in!the!midst!of!TRT!and!BRT!under!implementation.!!!W!Reviewing!the!report!in!view!of!the!role!LRT!can!play!in!transforming!and!linking!spaces.!

W!Support!the!city!to!find!its!alternative!financing!options!

CGW6! BEPPS!2015/16!W!National!process!support;!CityWlevel!

W!Support!the!refining!of!the!BEPP!2015!in!preparation!for!the!final!submission;!W!Engage!the!leadership!to!strengthen!the!alignment!between!IDP,!BEPP!and!budgets;!

W !

Page 17: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 17!

support;!Planning!Reform!

W!Support!focus!of!the!ICDG!by!way!of!preventing!diversion!from!spatial!transformative!objectives.!W!Support!in!the!preparation!for!the!triWmetro!engagements!with!the!province!on!alignment!issues!within!province! !W!Support!the!alignment!of!BEPP!and!budget!in!preparation!for!the!benchmarking!exercise!!

.

5.3 Planned)for)the)next)quarter)!Code) Project) Outputs)planned) Process)planned))HS10WTSH15!

Development!of!mixed!use!catalytic!programmes!within!the!integration!zones!

W Asset!Management!improvement!to!ascertain!infrastructure!requirements!

W West!Capital!packaging!W Inner!City!ToD!support!W LRT!review!support!W Support!city!to!achieve!

horizontal!integration!and!in!strengthening!a!single!narrative.!

Panels,!individual!discussions!etc.!!

.

5.4 Risks)and)mitigations)Risk) Mitigation)Political!non!decisiveness!about!real!integration!

Further!high!level!engagements!!

5.5 Issues)for)Escalation)!Structure) Issue)Programme!Management! Potential!high!level!engagements!on!spatial!transformation!IGR!Branch! !City!Budget!Forum! !

6 eThekwini)Metro)

6.1 Achieved)over)the)last)quarter)The!City!has!gone!miles!towards!achieving!spatial!integration!within!the!institution.!!A!formal!Integration!Forum!has!been!established!and!all!the!catalytic!projects!have!also!found!a!home!where!a!team!of!project!managers!are!working!around!them!by!further!unpacking!them.!The!City!has!now!seen!the!opportunities!presented!by!the!

Page 18: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 18!

CSP! fully! and! is! exploiting! them.!City! has! submitted!projects! for! the!RAS,! PPF,! are!part! of! the! Task! Team! for! financing! infrastructure! whilst! also! on! the! forefront!preparing! for! the! investor! conference.! A! lot! of! progress!was! achieved! in! the! past!quarter!with!the!significant!one!being!the!population!of!the!new!Strategy!Office!that!will!deal!with!spatial!transformation!and!economic!growth!agenda!issues.!The!BEPP!team! sits! within! this! unit.! Further! work! is! being! done! in! pulling! the! various!work!streams!towards!supporting!the!catalytic!projects!and!all!the!strategic!projects!in!the!city.!!

6.2 Breakdown)of)projects)!Code) Project) Outputs)delivered) Process)undertaken))ETK! General!city!

strategic!support!to!eThekwini!

!W!General!City!support!including!the!water!and!sanitation!issues!on!bulk!and!water!use!licence.!!!W!Supported!City!to!get!a!fineWtuned!list!of!priority!projects!for!Human!Settlements!department’s!Mega!Projects.!!!W!Single!narrative!getting!clearer!and!further!engagements!internally.!

!W!Meetings,!desk!top!work,!consistent!engagements!through!phone!calls,!emails!etc.!

CG19WETK12!

Innovative!ways!of!financing!public!transport!infrastructure!and!operations!W!EThekwini!

W!Supporting!the!PT!component!in!rallying!City!around!the!appropriate!moderation!areas!on!their!current!and!future!BRT!and!IRPTNs!

W!Strategic!discussions!!

CG6WETK1!

eThekwini!Corporate!Spatial!Investment!Plan!

W!Strengthened!the!ICDG!forum!(now!an!integration!forum)!to!play!an!institutional!integration!role!that!has!ensured!that!the!city!is!congruent!between!the!plan!and!the!institutional!behaviour!towards!the!plan.!W!Supporting!the!City!in!the!packaging,!prioritisation!and!pipelining!of!the!catalytic!projects!linked!to!their!Corporate!Spatial!Investment!Framework.!!W!Assisting!City!to!contextualise!the!RAS,!PPF!support!within!their!investment!package!agenda.!!W!Supporting!the!City!on!the!horizontal!alignment!across!internal!units.!!!W!Engaging!on!the!Integration!Forum.!!!W!Briefing!City!on!the!upcoming!CSP!events!and!contextualising!them!within!their!broader!spatial!investment!agenda.!Support!the!Social!Sector!in!getting!

W!Engagements,!reviews!etc.!W!Sessions!with!key!people.!!W!Raising!issues!with!decisions!makers!!W!Desk!top!work!and!consultations!with!city!and!provincial!KZN!officials!

Page 19: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 19!

them!into!the!overall!City!BEPP!whilst!also!supporting!the!Health!sector!to!get!the!funding!it!requires.!!W!Engaged!with!Health!provincial!in!supporting!City!to!claim!the!debt!owed!to!them!by!city.!

PT4WETK2!

eThekwini!Review!of!IPT/IPTN!

W!Engaging!on!the!IRPTN!and!the!potential!support!that!the!City!can!get!in!moderating!their!system!plan!and!future!rollWout.!

W!Meeting!engagement!

CG18! Development!Charges!Capacity!Support!

W!Meeting!to!discuss!the!position!of!eThekwini!in!utilising!the!draft!policy!on!DC!to!frame!the!relationship!with!Tongaat!Hulett!Properties!on!current!developments.!W!Support!planning!and!preparation!of!the!human!settlements!learning!exchange!program!

W!Cheer!LGPU!in!finalising!the!policy!and!public!engagements!on!DCs!

.

6.3 Planned)for)the)next)quarter)!Code) Project) Outputs)planned) Process)planned))CG19WETK12!

Innovative!ways!of!financing!public!transport!infrastructure!and!operations!W!EThekwini!

W Follow!up!sessions!with!City!and!the!RAS!to!come!assist!with!doing!some!ground!work!on!the!numbers!

W Some!detail!work!on!the!sustainability!of!the!PT!work!

Panels,!individual!discussions!etc.!!

CG6WETK1! eThekwini!Corporate!Spatial!Investment!Plan!

W Further!planning!and!unpacking!of!catalytic!projects!

W Greater!drill!downs!on!the!ToD!projects!and!their!potential!pipeline!

W Support!the!City!in!their!internal!establishment!of!a!fund!to!package!more!catalytic!projects!

W Support!the!City!in!engaging!on!financing!arrangements!for!the!major!projects!

W Strengthen!the!BEPP!by!supporting!the!City!in!taking!it!out!to!strategic!partners!

W Support!city!in!preparation!for!the!Investor!Conference.!

Panels;!Strategic!sessions,!meetings,!phone!calls!and!emails!

.

Page 20: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 20!

6.4 Risks)and)mitigations)Risk) Mitigation)Political!non!decisiveness!about!Regional!Secretary!

Wait!and!see!

!

6.5 Issues)for)Escalation)Structure) Issue)Programme!Management! None!for!now!IGR!Branch! !City!Budget!Forum! !!

7 Mangaung))

7.1 Overview)Mangaung)As!from!the!previous!quarter,!the!key!issue!in!the!city!of!Mangaung!is!dealing!with!the!shortage!of!bulk!water!supply.!This!issue!is!one!of!its!priority!catalytic!projects,!presents!a!key!risk!to!the!development!of!the!city!and!its!ability!to!provide!services!to!its!residents.!The!CSP!is:!!

• Facilitating!the!process!of!ensuring!greater!efficiencies!are!built!into!the!current!system!through!better!demand!management!and!improvement!on!the!very!large!nonWwater!revenue!losses.!This!process!is!part!of!the!postW!!BEPP!follow!up!process,!and!is!being!done!together!with!the!national!Department!of!Water.!!

• Facilitating!at!an!intergovernmental!level,!resolution!of!the!challenge!of!current!inefficiencies!and!challenges!faced!by!the!current!bulk!water!supplier,!Bloemefontein!Water.!This!is!through!the!Water!and!Sanitation!Task!team.!

Assisting!in!preparing!its!catalytic!project,!the!Ghariep!pipeline,!for!financing)7.2 Achieved)over)the)last)quarter)Three!important!projects!were!initiated!and!progressed!in!the!quarter.!!Mangaung.Water.and.Sanitation:3..This!project,!the!foremost!catalytic!project!for!the!city!was!presented!at!the!benchmarking!hearings!in!NT!in!25!May.!NT!LGBA!provided!support!for!implementation!of!the!Gariep!pipeline,!subject!to!a!thorough!Feasibility!Study!and!financial!plan!being!produced;!and!secondly,!consent!and!approval!from!DWA.!The!project!is!currently!sitting!at!the!DBSA!IIPSA!facility!for!Project!Preparation!and!there!are!good!prospects!for!its!funding!for!project!preparation.!A!meeting!is!scheduled!with!DWA!on!10!July!to!ensure!that!their!departmental!requirements!are!met,!and!with!NT,!can!coordinate!processes.!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!3!A!project!sheet!for!this!project!inexplicably!was!not!created!during!handover.!This!anomaly!will!be!rectified.!!

Page 21: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 21!

!ED.3.@.Mangaung.Economic.Development.Strategy.Support.Developing.City.Economic.Strategies..A!successful!mission!was!held!by!the!WB!and!two!broad!lines!of!work!identified!for!the!city:!

1. In!the!short!term:!a. Present!to!mayoral!committee!and!sell!the!issue!of!the!need!for!a!reW

think!of!economic!development!strategies!in!the!city.!!!b. Develop!a!list!of!15!investors!and!appoint!a!specialist!by!July!2015!to!

assist!Mangaung!“fish!for!them”.!This!emerging!from!the!feedback!from!the!private!sector!that!“many”!investors!have!invested!elsewhere!because!the!unresponsiveness!of!the!city.!The!specialist!will!be!an!expert!in!tourism!and!investment!promotion.!The!specialist!will!also!assist!in!creating!a!clear!diagnosis!of!what!the!key!factors!hampering!investment!in!the!city!are,!based!on!issues!raised!in!this!initial!mission.!!

2. As!part!of!the!long!term!project,!get!a!process!of!Business!Process!ReWengineering!(BPR)!to!deal!with!issues!regarding!planning!and!building!permission!consents.!The!SNDB!results!will!be!key!here,!and!as!well,!harnessing!the!potential!of!the!yet!to!be!formed!development!tribunal.!!

A!mission!Aide!Memoire!is!yet!to!be!produced.!!!HS9.@.Pilot.Demand.Side.Subsidy.Instruments.A!successful!mission!with!the!World!Bank!was!done!where!the!city!and!stakeholders!in!the!housing!sector!were!consulted.!An!Aide!Memoire!is!yet!to!be!produced.!!!PT4.Man.6:.Mangaung.Review.of.IPTN.A!session!with!the!City!Manager!and!NDOT!was!held!to!raise!the!issue!of:!1)!the!city!may!“fall!of!the!table”!with!regard!to!the!PTNG;!and!2)!the!current!planned!PT!system!for!the!city!runs!the!real!risk!of!running!large!deficit.!It!also!lacks!in!innovation!in!meeting!the!PT!demand!in!a!small!city!such!as!Mangaung.!!A!follow!through!brainstorming!session!scheduled!for!21!July!to!identify!specific!areas!of!support.!Meanwhile,!the!support!capacity!is!in!procurement.!!!!Code) Project) Outputs)

delivered)Process)undertaken))

! Mangaung!Water!and!Sanitation!!

None!! Presentation!of!the!project!intent!and!preWfeasibility!at!the!NT!Benchmark!hearings!in!25!May!

ED.3.MAN.12.!

Mangaung.Economic.Development.Strategy.Support.Developing.City.Economic.Strategies!

None!! Successful!mission!was!held!by!the!WB!between!12W14!May.!!

HS9..!

Pilot.Demand.Side.Subsidy.Instruments!

None!! Successful!mission!held!in!28!and!29!April.!!

PT4.Man.6.. Mangaung.Review.of. None.!! Successful!joint!session!between!

Page 22: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 22!

. IPTN. NDOT/MM!facilitated!by!CSP!to!provide!guidance!on!how!to!1)!ensure!the!city!does!not!“fall!of!the!table)!with!regard!to!the!PTNG;!and!2)!support!to!create!an!appropriate!PT!system!for!the!city!and!ensure!that!it!does!not!run!the!large!deficits!in!other!cities!are!not!run!in!it.!!

.

7.3 Planned)for)the)next)quarter)!Code) Project) Outputs)planned) Process)planned))CG2MAN10! Leadership!session!

on!spatial!transformation!

! Scoping!exercise!with!city!coWordinator!

ED.3.MAN.12.! Mangaung.Economic.Development.Strategy.Support.Developing.City.Economic.Strategies!

Aide!memoire!and!Clear!SoW.!!!Appointment!of!specialist!and!embarking!on!short!term!support!work!as!identified.!

ReWengagement!with!the!city!and!private!sector!stakeholders!to!produce!a!clear!diagnostic!on!barriers!to!investment!in!the!city.!!

HS9..!

Pilot.Demand.Side.Subsidy.Instruments!

Aide!memoire!and!Clear!SoW.!!!

!

PT4.Man.6..!

Mangaung.Review.of.IPTN!

Concept!on!appropriate!PT!system!for!city.!!

Brainstorming!session!on!appropriate!public!transport!system!on!21!July!as!well!as!creating!process!map!on!how!to!ensure!the!city!is!appropriately!geared!up!t!receive!its!grant.!.!!!

. . ! !

.

7.4 Risks)and)mitigations)The!local!government!elections!pose!a!significant!risk!to!the!city,!especially!if!there!is!a!shakeWup!in!the!senior!city!leadership,!especially!the!city!manager.!This!issue!has!been!raised,!and!is!being!incorporated!in!the!process!of!preWelection!NT!positions.!!

In!public!transport,!the!city!has!very!weak!capacity!in!the!PT!department.!It!thus!runs!the!risk,!firstly!of!attempting!to!execute!a!complex!PT!system!that!is!does!not!have!the!ability!to!run,!and!will!run!it!considerable!operational!deficits.!Secondly,!because!of!this!weak!capacity,!it!runs!the!real!risk!of!losing!out!on!its!PTNG!grant!allocations!!given!poor!past!performance.!!

Risk) Mitigation)Local!government!elections!and!possible!change!of!senior!executive!leadership!!

A!CSP!discussion!is!underway!on!how!to!deal!with!this!issue.!!

City!losing!out!on!PTNG!grant!and!fiscal!risk!of!inappropriate!system!

The!city!has!agreed!to!support!for:!1)!creating!a!road!map!to!meet!the!grant!conditions!and!ensure!it!is!not!dropped!

Page 23: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 23!

as!a!grant!recipient!of!the!PTNG;!and!2)!CSP!assist!it!through!a!process!of!strategic!thinking!to!create!some!options!around!an!appropriate!PT!system.!!

!

7.5 Issues)for)Escalation)!Structure) Issue)Programme!Management! None.!!IGR!Branch! None!!City!Budget!Forum! None!!

Page 24: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 24!

8 NELSON)MANDELA)BAY)METROPOLITAN)MUNICIPALITY)

8.1 Achieved)over)the)last)quarter)

The!change!in!political!leadership!at!NMBM!completely!changed!the!environment!within!which!the!CSIP!is!being!implemented.!!While!the!new!political!leadership!(and!COGTA)!now!appear!to!have!been!convinced!of!the!value!of!the!SDR!and!its!implications,!the!interventions!from!COGTA,!DHS,!DWAS!and!other!departments!and!agencies!has!required!that!a!new!action!plan!be!developed,!based!on!the!5!pillars!of!the!Back!to!Basics!Programme,!and!overseen!by!a!new!intergovernmental!political!and!technical!committees.!!The!new!action!plan!does!rely!heavily!on!the!existing!CSIP!(there!is!no!rival!analytical!or!programmatic!basis,!and!it!has!been!put!forward!by!both!the!NT/CSP!and!the!city!administration).!!Also,!the!installation!of!the!new!political!leadership!definitely!does!open!new!scope!for!action,!because!of:!• a!new!determination!to!take!action!against!corruption;!• a!new!willingness!to!review!approaches!to!public!transport!and!housing!delivery;!• a!new!emphasis!on!a!strong!administrative!centre!and!coherent!sectoral!policies.!

These!new!approaches!were!all!required!by!the!SDR!and!none!of!them!were!likely!to!gain!much!traction!under!the!previous!administration.!!!

However!the!existing!CSIP!has!been!confused!and!diluted!by!(a)!the!standard!Back!to!Basics!template;!and!(b)!political!priorities!developed!during!a!strategic!planning!session!of!the!new!Mayoral!Committee!(some!of!which!are!unrealistic,!due!to!inexperience).!!Furthermore,!senior!management!attention!to!the!CSIP!has!drastically!diminished.!!The!overall!operating!environment!for!the!CSIP!has!become!vastly!more!complicated!than!previously.!

Considerable!work!was!done!on!a!new!action!plan,!incorporating!all!previous!SDR!work!though!under!the!Back!to!Basics!headings,!and!adding!in!many!other!proposals!from!COGTA,!other!departments!and!agencies,!and!the!new!Mayoral!Committee!(see!attached).!!Considerable!work!was!also!done!on!a!new!more!streamlined!approach!to!the!CSP!programme!at!NMBM,!again!incorporating!all!previous!work,!though!with!only!eight!projects!rather!than!fifteen.!!Both!of!these!documents!are!attached.!!!Code) Project) Outputs)delivered) Process)undertaken))CG4WNMB1!

Strategic)development*review!

• Approval!of!SDR!report!by!last!meeting!of!outgoing!Mayoral!Committee!in!May.!

• Ensured!new!political!leadership!appreciated!SDR!analysis!and!implications!

• Awaited!Council!approval!processes!

• Repeated!`situational!analysis’!briefings!of!new!political!leadership!based!on!SDR!conclusions!

• Intensive!engagement!with!COGTA!support!personnel!!!

Page 25: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 25!

Code) Project) Outputs)delivered) Process)undertaken))CG2WNMB2!

Organisational+change'management'support!

• None! • None!

CG5WNMB3!

Integrity!strategy!development!&!implementation!

• Menu!of!implementations!tools!prepared!and!submitted!to!NMBM!coWordinator!

• Revisited!implementation!framework!due!to!change!of!political!leadership.!!

• No!responses!received!to!menu!of!implementations!tools!until!5th!May!(and!this!was!anyway!not!substantive).!

• ReWassessed!framework!based!on!briefing!on!requirements!of!new!political!leadership!

CG3WNMB4!

Expanding)modalities*for*citizen'engagement!

• Implementation!framework!developed!for!consideration!

• ReWassessment!of!implementation!framework!due!to!change!of!political!leadership!

• Identified!emerging!CE!issues!by!analysing!metro!policy!documents!and!projects!

• Proposed!and!implementation!framework!and!received!feedback!from!NMBM!coWordinator!

CG4WNMB5!

Long%term%development*planning'support!

None! None!

CG11WNMB6!

Financial'planning'support!

• Some!progress!on!long!term!financial!sustainability!plan!!

• 2015/16!finalised!with!budget!surplus!

• Participated!in!NMBM!team!meetings!on!longWterm!financial!sustainability!plan!

• Repeated!briefings!of!new!political!leadership!on!NMBM!financial!status!and!trends!and!need!for!operating!surplus!

• Engagements!on!draft!MTREF!(supported!by!LGBA)!because!it!envisaged!substantial!deficits.!!

CG13WNMB7!

Revenue&strategy(&(management'support!

None! None!

Page 26: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 26!

Code) Project) Outputs)delivered) Process)undertaken))CG11WNMB8!

Infrastructure+financing'support!

• Some!progress!on!funding!plan!

• Increased!capex!allocation!to!Nooitgedagt!for!2015/16!

• Participated!in!NMBM!team!meetings!on!funding!plans!for!Nooitgedagt!and!Fishwater!Flats!

• Repeated!briefings!of!new!political!leadership!on!NMBM!on!strategic!priority!of!Nooitgedagt!

ED3WNMB9!

Economic'development(strategy(support!

None!planned!until!after!course!

None!

ED9WNMB10!

Economic'development*interventions)support!

None!planned!until!after!course!

None!

CG6WNMB11!

Spatial'development*framework)review!

None! None!

HS12WNMB12!

Review&of&land&use$management'options,(policy(&(practices!

None! None!

PT4WNMB13!

Review&of&integrated)public)transport(system!

• Repeated!briefings!of!new!political!leaderships!of!likely!unfeasibility!of!current!IPTS!plans!

• No!financial!plans!delivered!by!NMBM!as!promised!

• Reviewed!starter!services!plan!for!three!contract!areas!!

HS3WNMB14!

Human&settlements'support!

None! None!

CG10WNMB15!

Land%development*transaction)support'(catalytic(projects)!

• Refined!`long!list’!of!catalytic!projects!to!two!inner!city!urban!regeneration!projects!

• Funding!obtained!for!three!further!projects!on!previous!catalytic!project!list!

• PPF!facility!assessments!of!two!projects!

• Visit!by!Rob!McGaffen!to!review!proposed!catalytic!projects!!

• WB!team!(Valerie!Santos,!Gary!Goliath)!visit!to!plan!ULI!panel!engagement!!!

8.2 Planned)for)the)next)quarter)Code) Project) Outputs)planned) Process)planned))

Page 27: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 27!

Code) Project) Outputs)planned) Process)planned))CG4WNMB1!

Strategic)development*review!

• Formal!adoption!of!Council!report!on!SDR!

• Project!closure!report!!

• Await!Council!approval!• Further!briefings!of!new!political!leadership!if!required!

• Preparation!of!administrative!closure!report!

CG2WNMB2!

Organisational+change'management'support!

• Secure!contractor!and!initiate!project,!to!support!process!of!developing!new!city!strategy!and!key!policies!

• Finalisation!of!ToR!and!scoring!criteria!

• Procurement!through!DBSA!panel,!adjudicate!tenders,!brief!successful!tenderer!&!initiate!project!

CG5WNMB3!

Integrity)strategy)development*&*implementation!

• First!steps!in!implementation!of!Integrity!Management!Office!

• First!steps!in!implementation!of!Integrity!Pact.!

• First!steps!in!implementation!of!radical!procurement!transparency!

• ReWassign!Integrity!strategy!within!NMBM!

• Develop!stepWbyWstep!plans!to!implement!IMO,!Integrity!Pact!and!radical!procurement!transparency!

• Assist!with!implementation!

CG3WNMB4!

Expanding)modalities*for*citizen'engagement!

• Start!of!intensive!consultation!processes!for!new!city!strategy!and!associated!sectoral!strategies!

• Engagements!with!IDP!office!and!Speakers!Office!around!nature!and!form!of!the!consultation!processes!

• Development!of!detailed!plan!for!consultative!processes!

• Assist!with!implementation!of!plan!

CG4WNMB5!

Long%term%development*planning'support!

• Secure!contractor!and!initiate!project!

• Finalisation!of!ToR!and!scoring!criteria!

• Procurement!through!DBSA!panel,!adjudicate!tenders,!brief!successful!tenderer!&!initiate!project!

Page 28: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 28!

Code) Project) Outputs)planned) Process)planned))CG11WNMB6!

Financial'planning'support!

• Further!entrench!new!budget!process,!aligned!with!development!of!new!city!strategy,!IDP,!BEPP,!SDF,!etc!

• Engagements!with!new!political!leadership,!esp!MMC!

• Engagement!with!Budget!&!Finance!department,!esp!CFO!

CG13WNMB7!

Revenue&strategy(&(management'support!

• None!planned! ! • None!

CG11WNMB8!

Infrastructure+financing'support!

• Further!review!of!need!for!Fishwater!Flats!

• Funding!plan!for!Nooitgedagt!

• Further!review!of!need!for!Fishwater!Flats!

• Work!with!city!teams!to!produce!funding!plan!!

ED3WNMB9!

Economic'development*strategy(support!

• None!planned!until!after!the!course!

• None!

ED9WNMB10!

Economic'development*interventions)support!

• None!planned! • None!

CG6WNMB11!

Spatial'development*framework)review!

• Secure!contractor!and!initiate!project!

• Finalisation!of!ToR!and!scoring!criteria!

• Procurement!through!DBSA!panel,!adjudicate!tenders,!brief!successful!tenderer!&!initiate!project!

HS12WNMB12!

Review&of&land&use$management'options,(policy(&(practices!

• None!planned! • None!

PT4WNMB13!

Review&of&integrated)public)transport(system!

• Draft!new!approach!to!PT!services!in!NMBM!prepared!

• Analysis!of!financial!implications!of!starter!services!

• Further!visits!by!WB!expert!teams!

• Support!to!city!leadership!to!engage!with!taxi!industry!

Page 29: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 29!

Code) Project) Outputs)planned) Process)planned))HS3WNMB14!

Human&settlements'support!

• Secure!contractor!and!initiate!project!

• Finalisation!of!ToR!and!scoring!criteria!

• Procurement!through!DBSA!panel,!adjudicate!tenders,!brief!successful!tenderer!&!initiate!project!

CG10WNMB15!

Land%development!transaction)support'(catalytic(projects)!

• Logistics!and!approvals!in!place!for!ULI!panel!visit!in!late!October!

• Briefings!of!new!political!leadership!

• Preparations!for!visit!of!ULI!panel!

.

8.3 Risks)and)mitigations)Risk) Mitigation)• Existing!CSIP!gets!absorbed!within!and!diluted!by!a!larger!intervention,!made!up!of!numerous!politicallyWdriven!and!poorly!conceived!interventions!by!powerful!national!departments.!

• Use!the!credibility!gained!by!the!detailed!work!already!done!to!shape!the!overall!intervention!framework;!

• Engage!further!with!new!political!leadership!on!the!existing!CSIP!!

• Integrity!programme!not!gaining!traction!due!to!unavailability!of!NMBM!coWordinator!!

• ReWassign!NMBM!coWordination!role!• Exploit!opportunity!of!new!political!leadership!to!push!more!radical!integrity!reforms!!

• Citizen!engagement!programme!not!gaining!traction!due!to!generalised!suggestions!!

• Engage!HSRC!team!more!specifically!on!new!requirements;!otherwise!procure!other!capacity!

• HSRC!support!programmes!for!Integrity!Strategy!and!Citizen!Engagement!operating!on!tight!budgets!!

• Ensure!optimal!use!of!human!resources.!

• Increase!budgets!appropriately!

• NMBM!financial!sustainability!planning!failing!to!make!progress!

• Detailed!engagements!with!NMBM!team,!then!escalate!to!CFO!and!new!MMC!

• NMBM!infrastructure!finance!team!failing!to!make!progress!!

• Detailed!engagements!with!NMBM!team,!then!escalate!to!CFO!and!new!MMC!

• Procurement!delays!prevent!key!parts!of!new!action!plan!from!getting!started!!

• Manage!closely!

8.4 Issues)for)Escalation)Structure) Issue)Programme! • Approve!new!consolidated!CSP!support!programme!at!

Page 30: Consolidated CSP Quarter1 Narrative Report V3 20 July 2015 _Centre... · ! 5! The!Public!Transport!Finance)sub)component)has!two!projects.!The!first!PT.9.@. Innovative.ways.of.financing.public.transport.infrastructure.and.operations!is

! 30!

Management! NMBM!• Assist!in!managing!risk!of!procurement!delays!• Increase!HSRC!budget!for!Integrity!Strategy!and!Citizen!Engagement!appropriately!

• Inability!to!do!justice!to!both!the!component!and!the!city!IGR!Branch! !City!Budget!Forum! !

)

9 Approvals)!

) NAME) DESIGNATION) SIGNATURE) DATE)

Submitted!by:!Samantha!Naidu! Operations!

Manager!!!

21!July!2015!

Approved!by:! David!Savage! !Programme!Manager! !

6!August!2015!

Comments:! Further!detail!and!annexes!on!quarterly!operational!performance!(FM!and!SCM)!is!required!as!discussed!

Approved!by:! ))

!!! !!

Comments:! !!

!