consideration of test voltage results from cigre b1 test experience icc spring 2017 f11w nigel...
TRANSCRIPT
Field Test Experience
ICC SPRING 2017 F11W
Nigel Hampton, NEETRAC
Mark Fenger, Prysmian
1
Consideration of test
voltage results from
CIGRE B1.28
Field Test Experience
ICC SPRING 2017 F11W
ON-SITE PD ASSESSMENT OF
EXTRUDED HV & EHV CABLE SYSTEMS
CIGRE B1.28
2
M. Fenger, Convener (CA),
R. N. Hampton, Secretary (USA),
H. Blandine/Q. de clerk (BE), N. De Louredo* (BR), R. J.
Densley (CA), F. Cochet (CH), Xuyang (CN), R. Plath (DE) J.
Z. Hansen (DK), X. Balza (ES) B. Dhuiq (FR); M. Totsi/L.
Testa*/G.C. Montanari (IT), M. Nishiuchi* (JP), R. Colon*
(MX) E Pultrum (NL); A. Rakowska (PL)' M. L. Sjoberg (SE),
M. Mashikian/S. Ziegler (USA), A. Barclay (UK);
Field Test Experience
ICC SPRING 2017 F11W
Year20
0820
0720
0620
0520
0420
0320
0220
0120
0019
9919
9819
9719
9619
9519
9419
9319
9219
9119
90
80
70
60
50
40
30
20
10
0
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
EHV
Nu
mb
er
of
Te
sts
HVNO
YES
PD Test
Relative number of tests
green shows voltage only tests– from draft B1.28 brochure
3
Field Test Experience
ICC SPRING 2017 F11W
Overall Voltage Picture
4
2.9%Uo
97.1%>Uo
A subset of this 97%
>Uo has information
on:
• voltage level,
• test time,
• length and
• test outcome
Field Test Experience
ICC SPRING 2017 F11W
Disbursement of Tests by Voltage
5
Cumulative Distribution
Field Test Experience
ICC SPRING 2017 F11W
How often do things fail on voltage test
6
Failu
res o
n T
est [%
]
Field Test Experience
ICC SPRING 2017 F11W
How often do things show PD on test
– from draft B1.28 brochure
7
2.001.751.501.251.000.750.50
100
80
60
40
20
0
PD Inception Voltage (Uo)
Pe
rce
nt
1 1.4 1.7
41 1.4
54
1.7
19
Field Test Experience
ICC SPRING 2017 F11W
How long do we have to wait for PD on test
– from draft B1.28 brochure
8
6050403020100
100
80
60
40
20
0
PD Inception Time at 1.7Uo (Mins)
Pe
rce
nt