Notice of San Luis & Delta-Mendota Water Authority Board of Directors Regular Meeting Thursday, February 6, 2020, 9:30 a.m. SLDMWA Boardroom 842 6 th Street, Los Banos AGENDA Note: Any member of the public may address the Board concerning any item on the agenda before or during its consideration of that matter. For each item, public comment is limited to no more than three minutes per person. For good cause, the Chair of the Board may waive this limitation. Note Further: The order of agenda items is subject to change. 1. Pledge of Allegiance 2. Call to Order/Roll Call 3. Board to Consider Corrections or Additions to the Agenda of Items, as authorized by Government Code Section 54950 et seq. 4. Opportunity for Public Comment Any member of the public may address the Board concerning any matter not on the agenda, but within the Boards jurisdiction. Public comment is limited to no more than three minutes per person. For good cause, the Chair of the Board may waive this limitation. Consent Calendar Note: All matters listed on the Consent Calendar are considered to be routine and non-controversial and will be acted upon by a single action of the Board of Directors, unless a Board Member requests separate consideration of the item. If such a request is made, the item may be heard as an action item at this meeting. 5. Board of Directors to Consider Approval of January 9, 2020 Meeting Minutes, January 9, 2020 Workshop Minutes, and January 17, 2020 Special Telephonic Meeting Minutes 6. Board of Directors to Consider Acceptance of Financial & Expenditures Reports 7. Board of Directors to Consider the Finance and Administration Committee Recommendation to Accept the Treasurer’s Report for the Quarter Ending 12/31/19 8. Board of Directors to Consider Acceptance of Staff Reports: a. Self-Funding b. Operations & Maintenance c. Science Program d. Activity Agreements Action Items 9. Board of Directors to Consider Resolution and Finance & Administration Committee Recommendation Regarding Guidance Providing for the Prioritization of Use of OM&R Revenues, Arroyave/Doug Brown 10. Board of Directors to Consider Finance & Administration and Water Resources Committees Recommendations to the Board of Directors Regarding Proposed FY21 Activity Budget, Barajas

Upload: others

Post on 08-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Notice of San Luis & Delta-Mendota Water Authority Board of Directors Regular Meeting

Thursday, February 6, 2020, 9:30 a.m.

SLDMWA Boardroom

842 6th Street, Los Banos

AGENDA

Note: Any member of the public may address the Board concerning any item on the agenda before or during its consideration of that matter. For each item, public comment is limited to no more than three minutes per person. For good cause, the Chair of the Board may waive this limitation. Note Further: The order of agenda items is subject to change.

1. Pledge of Allegiance

2. Call to Order/Roll Call

3. Board to Consider Corrections or Additions to the Agenda of Items, as authorized by Government Code

Section 54950 et seq.

4. Opportunity for Public Comment – Any member of the public may address the Board concerning any matter not on the agenda, but within the Board’s jurisdiction. Public comment is limited to no more than three minutes per person. For good cause, the Chair of the Board may waive this limitation.

Consent Calendar

Note: All matters listed on the Consent Calendar are considered to be routine and non-controversial and will be acted upon by a single action of the Board of Directors, unless a Board Member requests separate consideration of the item. If such a request is made, the item may be heard as an action item at this meeting. 5. Board of Directors to Consider Approval of January 9, 2020 Meeting Minutes, January 9, 2020

Workshop Minutes, and January 17, 2020 Special Telephonic Meeting Minutes

6. Board of Directors to Consider Acceptance of Financial & Expenditures Reports 7. Board of Directors to Consider the Finance and Administration Committee Recommendation to

Accept the Treasurer’s Report for the Quarter Ending 12/31/19 8. Board of Directors to Consider Acceptance of Staff Reports:

a. Self-Funding

b. Operations & Maintenance

c. Science Program

d. Activity Agreements

Action Items

9. Board of Directors to Consider Resolution and Finance & Administration Committee Recommendation

Regarding Guidance Providing for the Prioritization of Use of OM&R Revenues, Arroyave/Doug Brown

10. Board of Directors to Consider Finance & Administration and Water Resources Committees Recommendations to the Board of Directors Regarding Proposed FY21 Activity Budget, Barajas

11. Board of Directors to Consider Finance & Administration Committee Recommendation to the Board of Directors Regarding FY21 O&M Water Rates, Arroyave

12. Board of Directors to Consider Resolution and Finance & Administration Committee Recommendation

to Amend Resolution 2017-415 to Update Signatures for Central Valley Community Bank, Machado

13. Board of Directors to Consider Authorizing Execution of Third Amendment to Central Delta-Mendota

Region Sustainable Groundwater Management Act Services Activity Agreement, Petersen

14. Board of Directors to Consider Central Delta-Mendota Region SGMA Management Committee and Northern Delta-Mendota Region SGMA Management Committee Recommendations Regarding $265,000 Increase to FY20 Activity Agreement Budgets, Petersen

15. Board of Directors to Consider Finance & Administration Committee Recommendation Regarding Executive Compensation for Various Positions, Barajas/Gilmore

Report Items

16. Report on State and Federal Affairs, Petersen/Dennis Cardoza

17. Update on California Storage Projects, Barajas 18. Update on Infrastructure Projects, Mizuno/Arroyave 19. Update on Water Transfers/Exchanges/Release Program, Mizuno/Arroyave 20. Executive Director’s Report, Barajas

(May include reports on activities related to 1) CVP/SWP water operations; 2) regulation of the CVP/SWP; 3) existing or possible new State and Federal policies; 4) Water Authority activities)

21. Committee Reports:

a. Water Resources Committee Activities, Birmingham

b. Finance & Administration Committee Activities, Gilmore

c. O & M Technical Committee Activities, White 22. Reports on Activities of the following Agencies that are Outside of the Authority:

a. State and Federal Contractors Water Agency

b. Family Farm Alliance

c. Farm Water Coalition

d. Association of California Water Agencies

e. San Joaquin Valley Water Infrastructure Authority

23. Report on Water Operations and Forecasts

24. Board Member Reports

25. CLOSED SESSION

CONFERENCE WITH LEGAL COUNSEL – ANTICIPATED LITIGATION Initiation of Litigation Pursuant to paragraph (4) of Subdivision (d) of Government Code Section

54956.9 – 4 potential cases

CONFERENCE WITH LEGAL COUNSEL – ANTICIPATED LITIGATION Significant Exposure to Litigation Pursuant to Paragraph (2) or (3) of Subdivision (d) of Government Code

Section 54956.9 – 3 potential cases

CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION Existing Litigation Pursuant to paragraph (1) of Subdivision (d) of Section 54956.9

A. Natural Resources Defense Council et al. v. Bernhardt et al., U.S. District Court, E.D. Cal., Case No. 1:05-cv-01207, LJO-

BAM (Old FWS – OCAP BO/Contracts) B. Modesto Irrigation District, et al. v. State Water Resources Control Board & Woods Irrigation Company, Sacramento County

Superior Court Case No. 34-2011-80000803 (Complaint for Declaratory Relief re Woods Irrigation Company) C. SWRCB Water Rights Complaints: Modesto Irrigation District, State Water Contractors, San Luis & Delta- Mendota Water

Authority, Interested Persons in SWRCB CDO Enforcement Proceedings and/or Petitions for Reconsideration: Pak & Young;

Mussi et al; George Speckman Testamentary Trust (Water Rights Complaints) D. Pacific Coast Federation of Fishermen’s Associations, California Sportfishing Protection Alliance, Friends of the River, San

Francisco Crab Boat Owners Association, Inc., The Institute for Fisheries Resources, and Felix Smith v. Donald R. Glaser and San Luis & Delta-Mendota Water Authority, U.S. District Court, E.D. Cal., Case No. 2:11-CV-02980-KJM-CKD, Appeal No. 17-17130 (“PCFFA v Glaser” or “GBP Citizens Suit”)

E. San Luis & Delta-Mendota Water Authority and Westlands Water District v. Delta Stewardship Council, et al., Sacramento County Superior Court Case No. 34-2013-80001500 (Delta Plan Litigation). Appeals in Delta Plan Litigation: State Water Contractors, et al. v. Delta Stewardship Council, et al. (Sacramento County Superior Court JCCP No. 4758) (Third District Court of Appeal Case No. C082944); California Water Impact Network, et al. v. Delta Stewardship Council, et al. (Sacramento County Superior Court JCCP No. 4758) (Third District Court of Appeal Case No. C082994); Central Delta Water Agency, et al. v. Delta Stewardship Council, et al. (Sacramento County Superior Court JCCP No. 4758) (Third District Court of Appeal Case No. C082994); North Coast Rivers Alliance, et al. v. Delta Stewardship Council, et al. (Sacramento County Superior Court JCCP No. 4758) (Third District Court of Appeal Case No.C082994); San Luis & Delta-Mendota Water Agency, et al. v. Delta Stewardship Council, et al. (Sacramento County Superior Court JCCP No. 4758) (Third District Court of Appeal Case No. C082994); Save the California Delta Alliance v. Delta Stewardship Council, et al. (Sacramento County Superior Court JCCP No. 4758) (Third District Court of Appeal Case No. C082994)

F. California Sportfishing Protection Alliance, et al. vs. California State Water Resources Control Board, et al., Alameda County Superior Court Case No. RG15780498 (State WQCP/TUCP)

G. City of Fresno, et al. v. United States, U.S. Court of Federal Claims, Case No. 16-1276L (Friant Takings Suit) H. Monterey Coastkeeper, et al. v. Central Valley Regional Water Quality Control Board, et al., Sacramento County

Superior Court Case No. 34-2018-80002853; Environmental Law Foundation v. State Water Resources Control Board, Sacramento County Superior Court Case No. 34-2018-80002851; Protectores del Agua Subterranea v. State Water Resources Control Board, Sacramento Superior Court Case No. 34-2018-80002852 (“Waste Discharge Requirement Cases”)

I. North Coast Rivers Alliance v. Delta Stewardship Council, Sacramento County Superior Court, Case No. 34-2018-80002898; Central Delta Water Agency v. Delta Stewardship Council, Sacramento County Superior Court, Case No. 34-2018-80002900; Friends of the River v. Delta Stewardship Council, Sacramento County Superior Court, Case No. 34-2018-80002901; California Water Impact Network v. Delta Stewardship Council, Sacramento County Superior Court, Case No. 34-2018-80002904 (“Delta Plan Amendment Cases”)

J. North Coast Rivers Alliance, et al. v. San Luis & Delta-Mendota Water Authority, et al., Merced County Superior Court, Case No. 19CV-04989 (GBP Long-Term Storm Water Management Plan)

K. Pacific Coast Federation of Fishermen’s Associations, et al. v. Wilbur Ross, et al., U.S. District Court, N.D. Cal., Case No. 3:19-cv-07897 (ROC on LTO BiOps)

26. Return to Open Session

27. Report from Closed Session, if any Required by Government Code Section 54957.1

28. Reports Pursuant to Government Code Section 54954.2(a)(3) 29. ADJOURNMENT

Persons with a disability may request disability-related modification or accommodation by contacting Cheri Worthy or Felicia Luna at the San Luis & Delta-Mendota Water Authority Office, 842 6th Street, P O Box 2157, Los Banos, California, telephone: 209/826- 9696 at least 3 for regular or 1 for special day(s) before the meeting date.

DRAFT

1

SAN LUIS & DELTA-MENDOTA WATER AUTHORITY BOARD OF DIRECTORS SPECIAL MEETING

MINUTES FOR January 9, 2020

The Board of Directors of the San Luis & Delta-Mendota Water Authority convened at

approximately 9:30 a.m. at Hotel Mission De Oro, 13070 State Hwy 33, in Santa Nella, California for

a special meeting, with Chair Cannon Michael presiding.

Directors and Alternate Directors in Attendance

Division 1 Bobby Pierce, Director Anthea Hansen, Director Rick Gilmore, Director ~ Vince Lucchesi, Alternate

Division 2 William Bourdeau, Director John Bennett, Director Bill Diedrich, Director

Division 3 Jeff Bryant, Alternate for Dan McCurdy

Chris White, Director ~ Jarrett Martin, Alternate

Cannon Michael, Director

Ellen Wehr, Alternate for Ric Ortega

Division 4 John Varela, Director ~ Garth Hall, Alternate

Gary Kremen, Director

Jeff Cattaneo, Director

Sara Singleton, Alternate for Joseph Tonascia

Division 5

Bill Pucheu, Director

Tom Birmingham, Director

Steve Stadler, Director

Authority Representatives Present

Federico Barajas, Executive Director

Pablo Arroyave, Chief Operating Officer

Frances Mizuno, Assistant Executive Director

Rebecca Akroyd, General Counsel

Scott Petersen, Water Policy Director

Joyce Machado, Director of Finance

Lauren Neves, Accountant III

Darlene Neves, Accountant II

Stephanie Harris, HR Coordinator

Cheri Worthy, Executive Secretary

DRAFT

2

Others in Attendance

Tom Boardman, Westlands Water District

Dennis Cardoza (via teleconference)

Mike Wade, California Farm Water Coalition

Russ Freeman, Westlands Water District

Kristi Robinson, Water Wise

John Wiersma, Henry Miller Reclamation District

Joe McGahan, Summers Engineering (via Teleconference)

Brian Nash, Richardson & Company, LLP (via Teleconference)

Don Willard, Friant Water Authority

Eric Ruckdaschel, San Luis Canal Company

Adam Scheuber, Del Puerto Water District

Diane Rathmann, Legal Counsel

Kevin Assemi, Maricopa Orchards

Michael Peters, Kaweah Pump, Inc.

1. Pledge of Allegiance

In absence of a flag, the Board took a moment to consider the United States.

2. Call to Order/Roll Call

Roll was called.

3. Board to Consider Corrections or Additions to the Agenda of Items, as authorized

by Government Code Section 54950 et seq.

General Counsel Rebecca Akroyd informed the Board that Agenda Item 9 would be

removed from the Agenda.

4. Opportunity for Public Comment

No public comment.

CONSENT ITEMS

5. Agenda Items 5-7: Board to Consider: a) Approval of December 12, 2019, Meeting

Minutes, b) Acceptance of the Financial & Expenditures Reports, c) Staff Reports.

On a motion of Director John Varela, seconded by Director Tom Birmingham, the Board

approved the December 12, 2019 Meeting Minutes, Financial Expenditures Reports, and Staff

Reports. The vote on the motion was as follows:

AYES: Pierce, Hansen, Gilmore, Bourdeau, Bennett, Diedrich, Bryant,

DRAFT

3

White, Michael, Wehr, Varela, Kremen, Cattaneo, Singleton, Pucheu, Birmingham, Stadler

NAYS: None

ABSTENTIONS: None

ACTION ITEMS

6. Agenda Item 8: Board of Directors to Consider Finance & Administration Committee

Recommendation Regarding Approval of the FY21 and Preliminary FY22 O&M Budget

including Salary Adjustments.

Assistant Executive Director Frances Mizuno gave a brief overview of the changes made to

the FY2021 O&M Budget presented in November. Mizuno explained that these changes included:

1) the addition of a special projects administration position, 2) a proposed salary increase of 2.3%

for all employees and a 5% increase for the Executive Director and General Counsel, 3) and a

$500,000 placeholder in the budget to address DMC subsidence.

With Assistant Executive Director Frances Mizuno out of the room, Executive Director

Federico Barajas discussed bringing Mizuno back to fill the Special Projects Administrator position

part-time after retirement, to work on special projects including WIFIA, SLTP, LVE, and water

transfers.

On a motion of Director Rick Gilmore, seconded by Director Bill Pucheu, the Board approved

the FY21 and Preliminary FY22 Budget including salary adjustments. The vote on the motion was as

follows:

AYES: Pierce, Hansen, Gilmore, Bourdeau, Bennett, Diedrich, Bryant, White, Michael, Wehr, Varela, Kremen, Cattaneo, Singleton, Pucheu, Birmingham, Stadler

NAYS: None

ABSTENTIONS: None

7. Agenda Item 10: Board of Directors to Consider Finance & Administration Committee

Recommendation Regarding FY18 and FY19 Audited Financial Statements.

Outside Auditor Brian Nash reviewed the FY18 and FY19 Audited Financial Statements by

phone. During his presentation, Nash reviewed the financial statement, explained changes, and

reviewed various footnotes.

Director Birmingham raised a concern that the audit was in draft, and not final form, and

that the management representation letter had not yet been signed; other Directors agreed with

this concern. Yet other Directors indicated their comfort with accepting the draft audit,

DRAFT

4

consistent with past practice.

Director Rick Gilmore made a motion to defer action on the audit until finalization,

seconded by Director Kremen. After additional discussion and clarification that no changes were

expected, Director Gilmore withdrew his motion.

Director Rick Gilmore made a motion, seconded by Director Anthea Hansen, to accept the

FY18 and FY19 Audited Financial Statements as presented. The motion failed. The vote on the

motion was as follows:

AYES: Hansen, Gilmore, Diedrich, White, Wehr, Stadler

NAYS: Pierce, Bourdeau, Bennett, Bryant, Michael, Varela, Kremen, Cattaneo, Singleton, Birmingham

ABSTENTIONS: None

Next, on a motion of Director Rick Gilmore, seconded by Director Tom Birmingham, the

Board approved deferring acceptance of the audit until after the audit was finalized and reviewed

by the Finance & Administration Committee. During the discussion, Nash, staff, and the

Directors all complemented and thanked the finance department staff for their work in

completing the audits. The vote on the motion was as follows:

AYES: Pierce, Hansen, Gilmore, Bourdeau, Bennett, Diedrich, Bryant, White, Michael, Wehr, Kremen, Varela, Cattaneo, Singleton, Birmingham, Stadler

NAYS: None

ABSTENTIONS: None

REPORT ITEM

8. Agenda Item 11: Report on State and Federal Affairs.

Water Policy Director Scott Petersen reported that a number of draft Reclamation

Directives and Standards have been released for comment, including: Implementation of Historic

Preservation Responsibilities for Operation, Maintenance and Replacement of Project Works.

Petersen reported that there will be a hearing on January 9, 2020 in the House

Transportation and Infrastructure Committee on the Water Resources Development Act, it’s

anticipated that the House will limit their bill to Army Corp of Engineers only, and the Senate is

likely to include Reclamation policy that the Senate Energy and Natural Resources Committee

reaches agreement on.

Petersen reported that Authority staff are organizing a tour with State Water Resources

DRAFT

5

Control Board members Sean McGuire and Laurel Firestone, with a focus on Authority

infrastructure, broader CVP issues, the irrigated lands program, and SGMA, and it has been

scheduled for January 16, 2020.

9. Agenda Item 12: Update on California Storage Projects.

Executive Director Federico Barajas gave a brief update on the B.F. Sisk Raise Project,

reporting that modeling is underway. Barajas reported that there will be a meeting with MBK to

look at actual outputs from the modeling scenarios. Barajas reported that a meeting is scheduled

with DWR (SWP Operations Office) to discuss the project and the different operational

scenarios.

Assistant Executive Director Frances Mizuno reported that current activity related to the

Los Vaqueros Reservoir Expansion Project is with the various workshops regarding the terms of

the JPA. Mizuno reported that the goal is to have the JPA package ready by July 2020 to allow the

Boards of the Local Agency Participants to consider joining the JPA, and to have the of formation

of the JPA by the end of the year.

10. Agenda Item 13: Update on Infrastructure Projects.

Assistant Executive Director Frances Mizuno reported that there will be a San Luis

Transmission Project Workshop in February regarding changes to rates related to Project Use

Energy with San Luis Transmission Project. Mizuno reported that the project will proceed with

Duke Energy only, because American Transmission Company has decided not to pursue the San

Luis Transmission Project.

11. Agenda Item 14: Update on Water Transfers/Exchanges/Release Program.

Assistant Executive Director Frances Mizuno reported that staff has started the

coordination process to prepare for possible water transfers needed in 2020.

12. Agenda Item 15: Water Operations and Forecasts.

Westlands Water District’s Tom Boardman reported that the current storm was helping

to sustain Jones pumping at 4200 cfs and Banks at 2000 cfs. The total allowable pumping began

to be restricted by the OMR limit as mandated by the salmon BiOp. Boardman warned that Jones

may have to reduce its pumping in the near future as the CVP is exported slightly more than its

60% of allowable pumping per the amended COA.

All CVP reservoirs are at near their seasonal maximum levels due to flood control, so

DRAFT

6

needed precipitation from future storms should come as either rain in the San Joaquin basin

and/or as snow fall above the rim reservoirs.

Referencing two charts showing projected CVP San Luis refill, Boardman stated that CVP

San Luis storage has refilled to 450 TAF and is not expected to refill without above normal

hydrology.

Boardman concluded his report with a brief review to the allocation table shown in his

written report to the Board.

13. Agenda Item 16: Update on Drainage Activity

Joe McGahan reported that conference calls were held with USBR and Contra Costa

Interests (CCI) on the Use Agreement and Draft Environmental Assessments December 17-23,

2019. McGahan reported that comment letters were received by USBR on the draft EA for the

Use Agreement on December 23, 2019 from Contra Costa Water District, Contra Costa County,

The Bay Institute, Volker Law Offices for Winneman Wintu Tribe et al, and the Planning and

Conservation League et al. McGahan reported that the US Fish & Wildlife Service issued a letter

of concurrence on December 16, 2019, and NMFS issued a letter of concurrence December 27, 2019,

and the USBR responded to comments and issued FONSI December 31, 3019.

McGahan reported that the USBR and the Authority signed a new Use Agreement on

December 31, 2019 which included: 1) term reduced from 10 years to 6 months to allow further

discussions with CCI, 2) a more detailed monitoring program, 3) a better defined process for

determining when there would be storm discharges, 4) a commitment to make good faith efforts

to achieve a 2 ppb monthly mean selenium goal in Mud Slough and San Joaquin River, and 5) a

commitment to manage salinity in a manner similar to the way it has been managed during the

2010 Use Agreement. That is to discharge salt loads similar to the loads in the last years of the

2009 UA and well below the SJR TMML.

14. Agenda Item 17: Executive Director’s Report.

Executive Director Federico Barajas reported that comments on Reclamation’s rescheduling

guidelines are due tomorrow, January 10, 2020.

Barajas also reported that Authority staff will be attending the Water User’s Conference.

15. Agenda Item 18: Committee Reports.

No reports.

DRAFT

7

16. Agenda Item 19: Reports on Activities of the Following Agencies that are Outside the

Authority.

a. State and Federal Contractors Water Agency (SFCWA)

No update.

b. Family Farm Alliance (FFA)

Report provided in the packet.

c. Farm Water Coalition.

Mike Wade provided a brief update regarding efforts to prepare an Authority

communications plan. Wade also discussed participation in the ACWA VA

workgroup and FWC’s role with the San Joaquin Valley blueprint effort.

d. Association of California Water Agencies.

Director Bill Diedrich reported that there will be an ACWA Workshop at the end

of the month.

e. San Joaquin Valley Water Infrastructure Authority. (SJVWIA)

No update.

17. Agenda Item 20: Board Member Reports.

No reports.

18. Public Comment:

No public comment.

19. Agenda Items 21-23: Closed Session Report.

Chair Cannon Michael adjourned the open session to address the items listed on the Closed

Session Agenda at approximately 11:45 a.m. Upon return to open session at approximately 12:05

p.m., General Counsel Rebecca Akroyd stated that no reportable actions were taken.

20. Agenda Item 24: Reports Pursuant to Government Code Section 54954.2

No reports given.

21. Agenda Item 25: Adjournment.

The meeting was adjourned at approximately 12:05 p.m.

DRAFT

1

SAN LUIS & DELTA-MENDOTA WATER AUTHORITY

SPECIAL JOINT WORKSHOP OF THE BOARD OF DIRECTORS, WATER RESOURCES COMMITTEE, AND FINANCE & ADMINISTRATION COMMITTEE

MINUTES FOR January 9, 2020

The Board of Directors of the San Luis & Delta-Mendota Water Authority convened at

approximately 12:25 p.m. at Hotel Mission De Oro, 12070 State Hwy 33, in Santa Nella, California

for a Special Budget Workshop, with Chair Cannon Michael presiding.

Directors and Alternate Directors in Attendance

Ex-Officio

Cannon Michael

Division 1 Bobby Pierce, Director Anthea Hansen, Director Rick Gilmore, Director ~ Vince Lucchesi, Alternate

Division 2

William Bourdeau, Director

John Bennett, Director

Bill Diedrich, Director Division 3

Jeff Bryant, Alternate for Dan McCurdy

Cannon Michael, Chair/Director

Chris White, Director ~ Jarrett Martin, Alternate

Ellen Wehr, Alternate for Ric Ortega

Division 4 John Varela, Director ~ Garth Hall, Alternate

Gary Kremen, Director

Jeff Cattaneo, Director

Sara Singleton, Alternate for Joseph Tonascia

Division 5

Bill Pucheu, Director

Tom Birmingham, Director

Steve Stadler, Director

Water Resources Committee Members Present

Ex-Officio

Cannon Michael

Division 1

Anthea Hansen, Alternate

Division 2

DRAFT

2

Bill Diedrich, Member ~ William Bourdeau, Alternate

Division 3

Chris White, Member

Division 4

Jeff Cattaneo, Alternate for Cindy Kao

Division 5

Tom Birmingham, Member ~ Steve Stadler, Alternate

Finance & Administration Committee Members Present

Ex-Officio

Cannon Michael

Division 1

Rick Gilmore, Member ~ Anthea Hansen, Alternate

Division 2

Bobbie Ormonde, Member

Division 3

Chris White, Member ~ Jarrett Martin, Alternate

Division 4

Sara Singleton, Member

Division 5

Bill Pucheu, Member ~ Steve Stadler, Alternate

Authority Representatives Present

Federico Barajas, Executive Director

Frances Mizuno, Assistant Executive Director

Pablo Arroyave, Chief Operating Officer

Rebecca Akroyd, General Counsel

Scott Petersen, Water Policy Director

Joyce Machado, Director of Finance

Lauren Neves, Accountant III

Darlene Neves, Accountant II

Stephanie Harris, HR Coordinator

Cheri Worthy, Executive Secretary

Others in Attendance

Russ Freeman, Westlands Water District

Don Willard, Friant Water Authority

John Wiersma, Henry Miller Reclamation Distrit

DRAFT

3

Minnie Moreno, Del Puerto Water District

Adam Scheuber, Del Puerto Water District

Mike Wade, California Farm Water Coalition

Kyle Perez, Del Puerto Water District

1. Call to Order/Roll Call

Roll was called.

2. Opportunity for Public Comment

No public comments.

3. Review of FY21 Activity Budget and Related FY20 Objectives

Executive Director Federico Barajas reviewed the proposed FY21 Activity budget, with

reference to related FY20 objectives. Barajas discussed comparisons between FY20 and FY21

budgets, with a particular focus on the proposed Leg/Ops budget. Finance Director Joyce

Machado provided additional details and reviewed the preliminary budget book included in the

packet, and staff answered questions posed by Board and Committee members.

4. Review Preliminary WY20 O&M Rates

Assistant Executive Director Frances Mizuno reviewed preliminary WY20 O&M Rates,

including a related review of the Unit Rewind Cost and Cash Flow Plan. Mizuno requested

guidance regarding assumed allocation percentages on which to base proposed WY20 O&M

Rates, and the Board discussed analysis of both 25% and 40% ag allocations.

5. Closed Session Report

Chair Cannon Michael adjourned the open session to address the items listed on the

Closed Session Agenda at approximately 1:45 p.m. Upon return to open session at approximately

2:20 p.m., General Counsel Rebecca Akroyd stated that no reportable actions were taken.

6. Reports Pursuant to Government Code Section 54954.2 (a)(3)

No reports given.

7. Adjournment

The meeting was adjourned at approximately 2:20 p.m.

DRAFT

1

SAN LUIS & DELTA-MENDOTA WATER AUTHORITY BOARD OF DIRECTORS SPECIAL TELEPHONIC MEETING

MINUTES FOR JANUARY 17, 2020

The Board of Directors of the San Luis & Delta-Mendota Water Authority convened at

approximately 9:00 a.m. for a Special Telephonic meeting, with Chair Cannon Michael

presiding.

Directors and Alternate Directors in Attendance

Division 1 Dave Weisenberger, Alternate for Jim McLeod Bobby Pierce, Director Anthea Hansen, Director Rick Gilmore, Director

Division 2 John Bennett, Director Lon Martin, Alternate for Bill Diedrich

Division 3 Chris White, Director ~ Jarrett Martin, Alternate

Cannon Michael, Chair/Director

Ellen Wehr, Alternate for Ric Ortega

Division 4 Garth Hall, Alternate for John Varela

Gary Kremen, Director – Richard Santos, Alternate

Jeff Cattaneo, Director

Sara Singleton, Alternate for Joseph Tonascia

Division 5

Bill Pucheu, Director

Jose Gutierrez, Alternate for Tom Birmingham

Authority Representatives Present

Federico Barajas, Executive Director

Frances Mizuno, Assistant Executive Director

Pablo Arroyave, Chief Operating Officer

Rebecca Akroyd, General Counsel

Scott Petersen, Water Policy Director

Joyce Machado, Director of Finance

Lauren Neves, Accountant III

Felicia Luna, Office Assistant

Others in Attendance

Brian Nash, Richardson & Company, LLP

1. Call to Order/Roll Call

Meeting and roll was called.

DRAFT

2

2. Board to Consider Corrections to the Agenda of Items, as authorized by

Government Code Section 54950 et seq.

No corrections were made.

3. Board of Directors to Consider Acceptance of FY18 and FY19 Audited Financial

Statements.

Executive Director Federico Barajas introduced outside auditor Brian Nash, who was

available to answer any questions. Barajas explained that the draft FY18 and FY19 Audited Financial

Statements previously presented to the Board had been finalized. Barajas and others also

acknowledged the hard work of staff members Joyce Machado, Lauren Neves, and others, in finishing

these audits in a timely fashion.

On a motion of Director Rick Gilmore, seconded by Director Gary Kremen, the Board

accepted the FY18 and FY19 Audited Financial Statements. The roll call vote on the motion was as

follows:

AYES: Weisenberger, Pierce, Hansen, Gilmore, Bennett, Martin, White, Michael, Wehr, Hall, Kremen, Cattaneo, Singleton, Pucheu, Gutierrez

NAYS: None ABSTENTIONS: None

4. Closed Session Report.

No Closed Session was taken.

5. Agenda Item 9: Adjournment.

The meeting was adjourned at approximately 9:10 a.m.

February 6, 2020

To: Pablo Arroyave, Chief Operating Officer

From: Paul Stearns, O&M Manager

Subject: O&M Report for January 2020

Operations Department The C.W. “Bill” Jones Pumping Plant (JPP) pumped at five units for nearly the entire month of January. Pumping was reduced to four units on January 6th for approximately 17 hours to allow for the exciter brushes on Jones Unit 4 to be changed. Pumping is scheduled to be reduced to three units on February 1st due to the D-1641 Delta outflow criteria. The average daily pumping rate for the JPP as of January 29th was 4,160 cfs. As of January 29th, the total pumping at the JPP was 239,289 acre-feet. The O’Neill Pump/Generating Plant (OPP) pumped 187,181 acre-feet and no water was generated. The Delta-Mendota Canal/California Aqueduct Intertie Plant (DCI) pumped 26,386 acre-feet during full pumping at the JPP to help manage water levels due to subsidence related flow restrictions in several areas of the upper DMC. The Federal share in San Luis Reservoir on January 29th was 564,469 acre-feet as compared to 803,850 acre-feet on January 29th, 2019. As of January 29th, releases from Friant Dam for the month of December ranged from 400 to 427 cfs and flows entering the Mendota Pool ranged from 167 to 185 cfs. Flows of 167 to 187 cfs were released passed Mendota Dam for the San Joaquin River Restoration Program (SJRRP). During the month of January, Canal Operations staff members performed open channel and closed-pipe flow measurements, routine patrols, bi-weekly meter readings, well soundings, and meter maintenance. Staff attended the Cal Poly Irrigation and Training Research Center’s (ITRC) Flow Measurement Workshop. Control Operations staff performed the following switching/clearance placements for the month of January:

• JPP Unit 4; Exciter brush replacement and cleaning

Civil Maintenance Department The Civil Maintenance crews worked on the following projects for the month of January:

• Clean DMC Parallel Drain (Bell & Stuhr Roads) • Assist with O’Neill Unit 4 penstock and main unit rehabilitations • Replaced hydraulic ram on 10-yd dump truck • Chemical and mechanical weed control • Grading of San Luis Drain (SLD) and DMC intake channel operating roads • Remove vegetation from O’Neill Forebay toe-drain ditches • Forklift operation recertification • Prepare DMC turnout 25.63-R for reactivation • Erect carport for spray truck • Continued fabricating and installing guard rails on top of DMC meter wells per Cal-

OSHA requirements • Continued installing stairs and handrails to DMC turnout gates and meters • Maintenance and repairs to float lines, signs, fences, and gates • Garbage collection on DMC, SLD, and Wasteways

Plant Maintenance Department Electrical/C&I/SCADA Staff:

• Continued with lower DMC Programmable Logic Controller (PLC) upgrade replacement

• Continued Tracy 13.8kV switchgear relay testing and setting verifications • Replaced exciter brushes on JPP Unit 4 and cleaned exciter of brush dust • Replaced DMC Check 13 gate motors • Repaired control cable at DMC Check 5 that was cut by vandals • Removed electrical conduit and evaporation lines from JPP80-ton air

conditioning unit in preparation of new air wash system installation • Assist contractor with HVAC replacement at the Tracy Administration Office • Replaced O’Neill 65-ton crane trolley contactor

Mechanical Staff: • O’Neill Unit 4 main unit and penstock rehabilitation: Coating contractor completed

work and demobilized. Main unit partial assembly for motor-to-pump (bottom) bearing alignment check. Reinstalled flow meters in penstock. Flow meter technician (Accusonic) scheduled to be on-site February 5th for sensor alignment checks. Estimated completion is February 28, 2020.

• JPP Unit 2 rewind: Contractor NEC performed the final stacking of laminations and final core press, performed successful stator core loop test, painted the stator core slots, installed surge ring and RTD’s, and began installation of the stator coils. Authority crews continued to provide crane support. Estimated return to service is June 7, 2020.

• Began installation of new JPP air wash system (swamp cooler) for humidity control • Assist with JPP Unit 4 exciter cleaning and brush replacement • Assist with DMC Check 13 gate motor replacement • Repaired JPP 100-ton gantry crane south rail • Replaced DMC Check 1, gate #3 gear box • Mechanical tests and inspections of DMC Checks 1-10 • Repair leak in potable water line at WAPA Tracy facility

Engineering and Planning Department On January 14, 2020, Reclamation and the Authority executed a new 35-year O&M Transfer Agreement. In addition, on January 24, 2020, Reclamation issued a 3-year delegation of authority to the Authority to issue limited use authorization to third parties for activities on Reclamation lands.

The Engineering & Planning Department staff worked on the following projects this month: Rehabilitate OPP unit 4 penstock and pump assembly projects, JPP unit 2 rewind project, JPP slip ring and commutator repairs (developing a carbon dust collection system), JPP air wash system replacement, TFCF primary louver guide repairs, JPP gantry crane rail repairs, DCI & OPP cathodic protection surveys, DCI U4 switchgear replacement, DCI electrical PMs, TFF electrical PMs, and DMC subsidence mitigation project. Planning support was provided for civil, mechanical & electrical maintenance activities.

Land Management Activity Summary:

A total of three (3) access permits were issued this month. Access permit P2002023 (Installation of new flow meters at MP99.82) issued to Firebaugh Canal Water District, was amended to reflect a new expiration date. Emergency permit P2002024 was issued to Firebaugh Canal Water District to repair the pipeline crossing located at DMC MP99.82. The last access permit, P2002025 was issued to Del Puerto Water District in order to remove the existing pump and motor located DMC MP25.63R.

Provided additional information to engineering firm Wood Rodgers regarding DMC area adjacent to the Crows Landing Business Park. Reviewed and approved stair design for FCWD meter site at MP109.45R. Provided support to TFCF with 350T crane rental. Inspected pipeline installation over NWW at Brazo road that was approved through a Reclamation license.

Safety Department JHA support, two accident investigations, WAPA-Merced County Haz-Mat inspection at O’Neill Plant, asbestos removal work on O’Neill Unit 4 rotor, support on carbon brush problem at JPP, Control and Excitation replacement project at JPP, JPIA site visit at Tracy, support O’Neill Unit 4 overhaul, forklift recertification training, FY21 equipment purchasing.

HR Department General Administrative Activities:

• Recruitment: o Heavy equipment operator: skills test/interviews held; position remains

open until filled. Next review period to be determined. o Preparation for recruitment of FY 2021 approved positions as well as

those vacated due to pending retirements. • Employee handbook rollout: scheduling employee meetings to review recent

changes/collect signed receipts in progress • Preparing for annual quarterly safety meeting – Attendance recognition, safety

jacket winners • JPIA:

o Property Claims Management: report filing, coordinating adjuster o ACA IRS (“healthcare W-2’s”) Reporting – review data, provide

updates/required documents to the JPIA by January 31, 2020.

Trainings/ Conferences:

• Laures and Stephanie attended the 2020 Annual Legal Update Luncheon sponsored by Central Valley HR Management Association on January 15, 2020.

• Laures is scheduled to attend 2-day training at the JPIA for the PDP at the end of January.

• Scheduling continues for Sexual Harassment Training for all staff. Government Reporting:

• Continuing to coordinate with consultant on finalizing GreatPlains reporting mechanisms to move these reports from an Access database to the GP HR module.

o Affirmative Action Plan: transferring data from Littler to Biddle Consultants; preparing 2019 AAP reports

• Continuing research and evaluation of website accessibility for ADA compliance Annual Postings:

• OSHA 300 Logs/Employer Postings – all sites were posted on January 23rd to comply with the OSHA deadline of February 1st.

Ongoing:

• FMLA notices/follow ups • COBRA notices/follow ups • Monthly Safety Scratcher distribution • Health benefits eligibility/employee assistance • Maintain OSHA logs for 2020 calendar year • Wellness program

EXTRAORDINARY O&M & CAPITAL PROJECTS

DELTA-MENDOTA CANAL (DMC)

DMC O&M Road Maintenance Program – Phase 8 & 9 (MP 39.21 to 62.09) (1900478) Status: Project complete.

DMC O&M Road Repair – (MP 102.04 to 110.85) (1900469) Status: Project complete.

DMC Subsidence Mitigation Status: Reclamation staff is 90% complete with the development of the sole source

procurement documents for the manufacturing of additional pumps, motors and valves for the Intertie Pumping Plant. The addition of these two pumps will help mitigate the lost capacity associated with the subsidence that has occurred on the upper DMC. The schedule is to award the supply contract in February and the delivery of the manufactured components is expected 36 weeks after the NTP. During the 36-week manufacturing period, Reclamation will develop contract documents, solicit contractors and award a contract for the installation of the manufactured components. Installation of the pumps, motors and valves is planned for November, 2020. Reclamation is continuing their work on finalizing the HEC-RAS model.

C.W. “BILL” JONES PUMPING PLANT (JPP)

JPP Excitation Cabinet & Control Panel Refurbishment (1800333) FY2018 Project Status: USBR Denver Office engineering staff continues to work on the design of the static

system.

JPP Unit No. 2 Rewind Status: JPP Unit No. 2 rewind work is ongoing and on schedule. NEC returned to work on

January 6th after holiday break. NEC is installing stator coils during this rebuild phase of the project. The coil installation is detailed procedure and requires constant quality control and then testing to ensure no coil was damaged during installation. The ring buses and RTDs are also getting installed simultaneously.

JPP Arc Flash Hazard Breaker Research Status: Investigated the circuit breaker mechanism at the MCCs. We have shown vendor AIES

the mechanism and have requested sample breakers for fit test.

JPP/OPP/DCI Fire Protection Systems Assessment Status: Seeking engineering support from Reclamation TSC – Denver Office.

O’NEILL PUMPING/GENERATING PLANT (OPP)

Design New Access Opening near Pump Bowl (1800332) FY2018 Project Status: Fairbanks Morse engineering is coming for a site visit on February 6th to gather

information to develop a cost estimate for the design and fabrication of the new access opening.

EXTRAORDINARY O&M & CAPITAL PROJECTS

Rehabilitate Pump Assemblies Unit No. 4 (1900462) Status: The project has entered into assembly phase. The OPP crew put together the impeller

assembly and installed it. The suction piece was leveled and pump bowl was mounted on top of it. Shaft sleeves were sent out to vendor for refurbishment. The crew moved the motor to its final place to begin the process of rotor shaft assembly. After the motor, rotor shaft, and thrust collar assembly are completed, the process to center the rotor shaft on top of pump bowl will begin. The estimated completion date for this project is February 28th, 2020.

Rehabilitate Penstock Interiors - Unit No. 4 (1800461) Status: All work on penstock and pump parts has been completed by F.D. Thomas. Final site

clean up to be completed by 1st week of February. Flowmeter installation in progress with the Accusonics representative scheduled to be onsite the first week of February to commission the flowmeter.

Main Transformers Condition Assessment Status: Reclamation staff finalizing the Condition Assessment report. Planned disposal of two

old type “U” bushings will be serviced by PARC Environmental.

LOS BANOS FIELD OFFICE (LBFO)

LBFO Parking Lot Seal Coat and Striping (1900480) Status: Project complete.

TRACY FACILITIES (TFO)

TFO Domestic Water Treatment Plant Replacement (2000158) Status: Preliminary research of project began.

NOTE: ALL FIGURES ARE IN ACRE FEETDecember-2019 December-2018

JONES PUMPING PLANT - PUMPED 219,481 240,151DCI PLANT - PUMPED 14,150 21,443DCI PLANT - RETURNED 0 0O'NEILL P/G PLANT - PUMPED 181,570 201,219O'NEILL P/G PLANT - GENERATED 0 0DMC DELIVERIES 3,562 4,134RIVER/WELL/RECYCLE WATER INTO DMC 2,439 4,506MENDOTA POOL DELIVERIES 25,151 19,705

SHASTA RESERVOIR STORAGE 3,329,900 2,267,900SAN LUIS RESERVOIR STORAGE 1,286,842 1,502,521* FEDERAL SHARE 398,444 634,540

December-2019 December-2018SAN LUIS UNIT DELIVERIES 481 495SAN LUIS UNIT WELL WATER 0 0SAN FELIPE UNIT DELIVERIES 4,990 7,112

Jones Pumping Plant monthly average = 3,570 cfs

OPERATIONS SUMMARYSan Luis & Delta-Mendota Water Authority

1 December 2019

Date: 1/14/20

District/Other

Total Available Water into

System (INCOMING) (Acre Feet)

AG/Refuge Deliveries

(Acre Feet)

M & I Deliveries

(Acre Feet)

Total Deliveries

(OUTGOING) (Acre Feet)

Total Pumped @ Jones Pumping Plant 219,481Total Pumped @ DCI (14,150)

Total Reversed @ DCI 0City of Tracy 0 311 311Byron Bethany I.D. 2 0 2West Side I.D. 0 0 0Banta Carbona I.D. 0 0 0West Stanislaus I.D. 0 0 0Patterson I.D. 0 0 0Del Puerto W.D. 106 0 106Central California I.D. - above check #13 8 0 8San Luis W.D.- above check #13 0 0 0Volta Wildlife Mgmt. Area (Fish & Game) 392 0 392Fish & Wildlife (Volta) Santa Fe - Kesterson 0 0 0Grasslands W.D. (Volta) 1,388 0 1,388

Total Pumped @ O'Neill PP (181,570)Total Generated @ O'Neill PP 0

Central California I.D. - below check #13 0 0 0Grasslands W.D. (76.05-L) 155 0 155Fish & Game Los Banos Refuge (76.05-L) 68 0 68Fish & Wildlife Kesterson (76.05-L) 104 0 104Freitas Unit (76.05-L) 94 0 94Salt Slough Unit (76.05-L) 109 0 109China Island (76.05-L) 113 0 113San Luis W.D. - below check #13 30 0 30Panoche W.D. 35 2 37Eagle Field W.D. 17 0 17Oro Loma W.D. 0 0 0Mercy Springs W.D. 0 0 0Firebaugh Canal W.D. (D.M.C.) 628 0 628

River and Groundwater well pump-in 1,293North Valley Regional Recycled Water Program 1,146

Change in Canal Storage 127Wasteway Flushing and Spill (45)

Total Available in Delta-Mendota Canal 26,282

TOTAL DELIVERY FROM DELTA-MENDOTA CANAL (3,562) 3,249 313 3,562Theoretical DMC Delivery to Mendota Pool 22,720

Total Estimated DMC Delivery to MP (determined at Check 20) 23,455Estimated (Loss) or Gain in DMC 735

Estimated % Loss or Gain in DMC 0.33%

San Luis & Delta-Mendota Water AuthorityMonthly Deliveries

December 2019

To: Adam Hoffman; Erma Leal; Gabe Mora; Katrina Buelna; Liz Kiteck; Mark Rhodes; Marta Rivas; Melody Hernandez; Sheryl Carter; Sonya Nechanicky; Stacey Smith; Tim Blair; Tom Boardman; Joyce Machado; Wes Harrison

From: Chauncey Lee, Water Operations Superintendent, 530-228-4504 (cell)

2 December 2019

District/Other

Total Available Water into

System (INCOMING) (Acre Feet)

AG/Refuge Deliveries

(Acre Feet)

M & I Deliveries

(Acre Feet)

Total Deliveries

(OUTGOING) (Acre Feet)

Estimated DMC Inflow to MP 23,455Mendota Pool Groundwater Well Pump-In 0

(+)SJRR Releases into Mendota Pool 9,495(+)Kings River Flood Releases into the Mendota Pool 0

Mendota Pool Delivery InformationExchange Contractors:Central California Irrigation District (CCID) 1,755 0 1,755Columbia Canal Company (CCC) 161 0 161Firebaugh Canal Water District (FCWD) 1,279 0 1,279San Luis Canal Company (SLCC) 3,364 0 3,364Refuge:Conveyance Losses 0 0 0Calif Dept of F/G-LB Unit (CCID) 556 0 556Calif Dept of F/G-LB Unit (SLCC) 0 0 0Calif Dept of F/G-Salt Slough Unit (CCID) 888 0 888Calif Dept of F/G-China Island Unit (CCID) 918 0 918US Fish & Wildlife-San Luis Refuge (SLCC) 0 0 0US Fish & Wildlife-Freitas (CCID) 770 0 770US Fish & Wildlife-Kesterson (CCID) 852 0 852Grasslands WD (CCID) 986 0 986Grasslands WD (SLCC) 1,198 0 1,198Grasslands (Private) 275 0 275San Luis WD Conveyance (CCID) 0 0 0Del Puerto WD Conveyance (CCID) 0 0 0San Joaquin River Restoration:SJRR 9,366 0 9,366Other: (see MP Operations Report) 2,783 0 2,783

Total Available Water in Mendota Pool 32,950TOTAL DELIVERY FROM MENDOTA POOL (25,151) 25,151 0 25,151

*Estimated (Loss) or Gain in Mendota Pool (7,799)*Estimated % Loss or Gain in Mendota Pool -23.67%

Total System Delivery (28,713)*Total Estimated System (Loss) or Gain (7,064)

*Total Estimated % System Loss or Gain -3.07%Special Notes:

December 2019

San Luis & Delta-Mendota Water AuthorityMonthly Deliveries

Date AVG DAILY CFS1 18262 34233 34164 34665 34616 34747 34998 35049 349010 349011 350012 348613 374014 406515 409716 410117 402718 399419 338020 402621 333022 379623 367024 415625 315626 343927 348128 347829 347630 347131 3738

3570

Jones Pumping Plant

# OF UNITS TIME ON/OFF

AVG CFS for the month

2 CONTINOUSLY2 to 4 0001

4 CONTINOUSLY4 CONTINOUSLY4 CONTINOUSLY4 CONTINOUSLY4 CONTINOUSLY4 CONTINOUSLY4 CONTINOUSLY4 CONTINOUSLY4 CONTINOUSLY4 CONTINOUSLY

4 to 5 12305 CONTINOUSLY5 CONTINOUSLY

Off @ 0922, On @ 1459

5 CONTINOUSLY5 CONTINOUSLY5 CONTINOUSLY

5 to 4,4 to 5 Off @ 0003, On @ 0305

December - 2019

4 CONTINOUSLY

5 to 4,4 to 5 Off @ 0301, On @ 05155 to 4,4 to 5 Off @ 1305, On @ 1605

5 CONTINOUSLY

5 to 4,4 to 5 Off @ 0939, On @14385 CONTINOUSLY

5 to 4,4 to 5

4 CONTINOUSLY4 to 5 1520

4 CONTINOUSLY4 CONTINOUSLY4 CONTINOUSLY

1 Dec 2019 WA Credits

Turnout Start Meter Reading

End Meter Reading Factor Adjust District Total Less 5% Month Year

3.32-R1 0 0 1 0 BBID 0 0 0 03.32-R2 0 0 1 0 BBID 0 0 0 03.32-R3 130 130 1 0 BBID 0 0 0 013.31-L 4,804 4,804 1 0 BBID 0 0 0 014.26-R 5,217 5,217 1 0 BBID 0 0 0 015.11-R 1,604 1,604 1 0 BBID 0 0 0 020.42-L 18,477,617 18,544,878 1 0 BCID 0 0 0 9,50020.42-L 18,477,617 18,544,878 1 0 USBR/FWA 0 0 0 021.12-L 990 990 1.01 0 DPWD 0 0 0 021.86-L 769 769 1 0 DPWD 0 0 0 024.38-L 1,763 1,763 1.04 0 DPWD 0 0 0 029.95-R 944 944 0.87 0 DPWD 0 0 0 030.43-L 7,422 7,422 1 0 DPWD 0 0 0 030.43-R 2,123 2,123 0.92 0 DPWD 0 0 0 030.95-L 1,915 1,916 1.03 (1) DPWD 0 0 0 0

31.31-L1 46,798 46,798 1 0 WSTAN 0 0 0 031.31-L2 46,798 46,798 1 0 DPWD 0 0 0 031.31-L3 46,798 46,798 1 0 PID 0 0 0 031.60-L 8,182 8,182 0.93 0 DPWD 0 0 0 032.35-L 1,793 1,793 0.86 0 DPWD 0 0 0 033.71-L 748 748 0.94 0 DPWD 0 0 0 036.80-L 1,843 1,843 1 0 DPWD 0 0 0 037.10-L 3,294 3,294 0.94 0 DPWD 0 0 0 037.32-L 2,653 2,653 0.91 0 DPWD 0 0 0 042.50-R 1,034 1,034 0.96 0 DPWD 0 0 0 042.53-L 4,798,009 4,854,337 1 0 PID 0 0 0 1,20042.53-L 4,798,009 4,854,337 1 0 DPWD 0 0 0 042.53-L 4,798,009 4,854,337 1 0 USBR/FWA 1,293 0 1,293 8,22943.22-L 55 55 1 0 DPWD 0 0 0 048.97-L 870 870 0.95 0 SLWD 0 0 0 050.46-L 4,108 4,108 1.07 0 DPWD 0 0 0 051.00-R 296 296 0.89 0 DPWD 0 0 0 051.66-L 337 337 0.98 0 DPWD 0 0 0 052.40-L 1,331 1,331 0.94 0 DPWD 0 0 0 058.28-L 1,177 1,177 1.02 0 SLWD 0 0 0 058.60-L 917 917 0.96 0 DPWD 0 0 0 058.73-R 306 306 1 0 DPWD 0 0 0 064.85-L 1,662 1,662 0.72 0 DPWD 0 0 0 0

UPPER DMC SUB TOTAL 1,293 18,929

From : Chauncey Lee, Water Operations Superintendent, 530-228-4504 (cell)

Date:1/14/20

CREDITS UNDER WARREN ACT CONTRACTS

To: Adam Hoffman; Adam Scheuber; Anthea Hansen; Kelley Geyer; Bobby Pierce; Brandon Kelley; Chris Eacock; David Weisenberger; Erma Leal; Frances Mizuno; Gabe Mora; Ian Uecker; Janet Gutierrez; Jarrett Martin; Jason Dean; Jeff Bryant; Juan Cadena; Katrina Buelna; Lon Martin; Lydia Sosa; Margaret Howe; Margie Lowe; Mark Rhodes; Marta Rivas; Melody Hernandez; Reza Shahcheraghi; Rick Gilmore; Sandra Reyes; Sheryl Carter; Siqing Liu; Stacey Smith; Wes Harrison

NON-PROJECT WATER CREDITS REPORT(ALL FIGURES IN ACRE FEET)

December 2019 WA Credits

2 Dec 2019 WA Credits

Turnout Start Meter Reading

End Meter Reading Factor Adjust District Total Less 5% Month Year

78.31-L 4,469 4,469 1.08 0 SLWD 0 0 0 079.12-R 1,805 1,805 0.91 0 SLWD 0 0 0 079.13-L 2,286 2,286 1 0 SLWD 0 0 0 079.13-R 4,415 4,415 1.08 0 SLWD 0 0 0 079.60-L 8,582 8,582 0.84 0 SLWD 0 0 0 080.03-L 060 060 0.94 0 SLWD 0 0 0 080.03-R 638 638 1.05 0 SLWD 0 0 0 098.60-R 10,791 10,792 1 (1) PANOCHE/MS 0 0 0 098.74-L 5,695 5,695 1.14 0 PANOCHE/MS 0 0 0 099.24-L 10,493 10,493 0.92 0 PANOCHE/MS 0 0 0 0

100.70-L 6,211 6,211 1 0 PANOCHE/MS 0 0 0 0102.04-R 1,000 1,000 1 0 WIDREN WD 0 0 0 0

LOWER DMC SUB TOTAL 0 0WARREN ACT CONTRACT CREDIT TOTAL 1,293 18,929

0 0 00 0 00 0 00 0 00 0 1,2000 0 00 0 00 0 00 0 00 0 0

Other Warren Act Conveyance Credit TotalsDel Puerto Water District: 0 0 0Banta Carbona Irrigation District: 0 0 9,500West Stanislaus Irrigation District: 0 0 0Byron Bethany Irrigation District: 0 0 0Patterson Irrigation District: 0 0 0San Joaquin River Restoration Pump Back BCID: 0 0 0San Joaquin River Restoration Pump Back PID: 1,293 1,293 8,229Notes: 3.32-R, 20.42-L, 31.31-L and 42.53-L are River water

TOTAL (MERCY SPRINGS WATER DISTRICT)TOTAL (WIDREN WATER DISTRICT)

TOTAL (FIREBAUGH WATER DISTRICT)

TOTAL (BANTA CARBONA IRRIGATION DISTRICT)TOTAL (DEL PUERTO WATER DISTRICT)

TOTAL (WEST STANISLAUS IRRIGATION DISTRICT)TOTAL (PATTERSON IRRIGATION DISTRICT)

TOTAL (SAN LUIS WATER DISTRICT)TOTAL (PANOCHE WATER DISTRICT)

TOTAL (BYRON BETHANY IRRIGATION DISTRICT)

NON-PROJECT WATER CREDITS REPORT(ALL FIGURES IN ACRE FEET)

December 2019 WA Credits

CREDITS UNDER WARREN ACT CONTRACTS

TOTAL GROSS PUMP-IN CREDIT

2019

Date:1/14/20

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTALFCWD 0 0 0 0 0 0 0 0 0 0 0 0 0CCID 0 0 0 0 0 0 0 0 0 0 0 0 0

FRESNO SLOUGH 69 222 219 224 181 282 278 76 27 0 24 0 1,602TPUD 0 0 24 0 0 15 25 25 0 0 0 0 89

JAMES I.D. 0 1,105 0 5,666 5,083 3,045 7,307 10,989 3,138 342 812 0 37,487MEYERS 777 1,280 812 1,073 889 897 543 218 70 46 25 0 6,630

M.L. DUDLEY & INDART 1 11 26 79 172 170 426 828 423 233 216 110 0 2,694MID VALLEY* (Kings River) 0 0 0 0 369 952 0 0 0 0 0 0 1,321

REC. DIST. 1606 0 0 0 62 0 0 0 0 0 0 0 0 62STATE FISH & WILDLIFE 1,498 804 549 400 682 512 1,535 1,752 3,068 3,857 1,877 1,774 18,308

TRACTION 743 356 494 425 609 581 996 1,111 1,080 1,294 692 947 9,328UNMETERED 55 10 50 50 150 190 200 140 550 150 50 50 1,645

Total 2,296 1,170 1,093 875 1,441 1,283 2,731 3,003 4,698 5,301 2,619 2,771 29,281COELHO FAMILY TRUST 2 33 79 348 699 629 1,128 1,340 608 438 426 121 12 5,861

TRANQUILITY I.D. 293 1,885 1,415 2,257 2,558 4,862 5,660 3,626 1,597 1,286 702 0 26,141WESTLANDS LATERAL-6 0 0 0 192 46 189 0 0 0 0 0 0 427WESTLANDS LATERAL-7 0 0 0 387 1,273 3,790 0 0 0 0 0 0 5,450

CARVALHO TRUST 9 9 36 94 102 144 95 32 29 32 22 0 604TOTAL 3,488 5,776 4,026 11,701 12,741 17,013 18,807 19,000 10,230 7,649 4,435 2,783 117,649

NUMBERS SHOWN IN BOLD WERE REVISED AFTER DISTRIBUTION OF REPORT1 aka COELHO-GARDNER-HANSEN 2 aka TERRA LINDA FARMS

Article 215 Water Kings River WaterJan-19 Jan-19Feb-19 Feb-19Mar-19 Meyers WD 812 AF Mar-19 TID 1073 AFApr-19 Apr-19 TID 1261 AFMay-19 May-19 JID 1298 AF, WWD 1319 AF, Meyers 259 AF

MVWD 369 AF, TID 2558 AF, CGH 25 AF, TL 38 AFJun-19 Jun-19 JID 3045 AF, WWD 979 AF, Meyers 886 AF

MVWD 952 AF, TID 3756 AF, CGH 319 AF, TL 799 AFJul-19 Jul-19

Aug-19 Aug-19Sep-19 Sep-19Oct-19 Oct-19Nov-19 Nov-19Dec-19 Dec-19

Duck Clubs (Percent Full)

Jan, 2019 May, 2019 Sept, 2019DMC Inflow 19,736 AF DMC Inflow 48,745 AF DMC Inflow 90,497 AF James Bypass Flows 0 AF James Bypass Flows 44,458 AF James Bypass Flows 0 AF

Feb, 2019 June, 2019 Oct, 2019DMC Inflow 28,126 AF DMC Inflow 24,595 A.F DMC Inflow 78,893 AFJames Bypass Flows 0 AF James Bypass Flows 89,240 AF James Bypass Flows 0 AF

Mar, 2019 July, 2019 Nov, 2019DMC Inflow 22,485 AF DMC Inflow 112,706 AF DMC Inflow 59,307 AF James Bypass Flows 179 AF James Bypass Flows 363 AF James Bypass Flows 0 AF

Apr, 2019 Aug, 2019 Dec, 2019DMC Inflow 51,491 AF DMC Inflow 123,237 AF DMC Inflow 23,455 AFJames Bypass Flows 438 AF James Bypass Flows 0 AF James Bypass Flows 0 AF

Prepared by: Chauncey Lee, Water Operations Superintendent, 530-228-4504 (cell)

MENDOTA POOL OPERATIONS

ALL FIGURES IN ACRE-FEET

To: Adam Hoffman; Bill Pipes; Cheryl Lassotovitch; Danny Wade; Donna Hanneman; Emily Thomas; Erma Leal; Steve Brueggemann; Gabe Mora; Hallie Rajkovich; Janet Gutierrez; Jason Dean; Jason Smith; Jeff Gallmann; Joy Kelley; Katarina Buelna; Linda Colella; Liz Kiteck; Margie Lowe; Mark Rhodes; Marta Rivas; Melody Hernandez; Rebecca Heilman; Rick Yribarren; Sonya Nechanicky; Stacey Smith; Steven Stadler; Ted Baker; Tom Boardman; Joyce Machado; Wes Harrison; William Halligan

1 ACRE0% 0% 100% 0% 100% 100%

BECK 120 PATOS COLE TRANQUILITY

Date: 1/14/20

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTALCOELHO FAMILY TRUST 1 0 48 0 0 0 146 1,292 625 0 651 120 0 2,882M.L. DUDLEY & INDART 2 0 72 0 0 0 36 495 105 0 0 0 0 708

FORDEL 0 0 37 274 322 190 489 430 156 180 0 0 2,078COELHO WEST 0 0 75 0 0 0 0 0 0 0 0 0 75

CASACA VINYARDS 30 1 81 0 0 0 0 0 0 0 0 0 112DPF 4 0 50 0 0 0 0 0 0 0 0 0 54

SOLO MIO 0 0 34 0 0 0 0 0 0 0 0 0 34BAKER FARMS 0 0 371 0 0 0 0 0 0 0 0 0 371FARMERS W.D. 0 0 844 0 0 0 0 0 0 0 0 0 844

MEYERS 0 0 0 0 32 0 0 75 157 52 41 0 357MEYERS BANKED 0 0 0 0 0 0 0 0 0 0 0 0 0

SILVER CREEK 0 0 31 0 0 0 0 0 0 0 0 0 31TRANQUILITY I.D. 0 0 6 0 0 0 0 2 0 0 0 0 8

FCWD 0 0 0 0 0 126 234 204 147 0 0 0 711YRIBARREN FARMS 0 0 0 0 0 0 0 0 0 0 0 0 0CARVALHO TRUST 0 234 164 95 150 227 44 0 0 34 0 0 948ETCHEGOINBERRY 0 0 0 0 0 0 0 0 0 0 0 0 0

FRESNO SLOUGH W.D. 71 0 0 0 0 30 0 0 0 0 0 0 101LSK-1 3 0 0 0 0 0 0 0 0 0 0 0 3

TOTAL 108 355 1,693 369 504 755 2,554 1,441 460 917 161 0 9,317NUMBERS SHOWN IN BOLD WERE REVISED AFTER DISTRIBUTION OF REPORT1 aka TERRA LINDA FARMS2 aka COELHO-GARDNER-HANSEN

Spill Back CreditJAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL

James ID (per C. Lee) 0 0 0 0 0 0 0 0 0 0 0 87 87James ID (per JID) 0 0 0 0 0 0 0 0 0 0 0 87 87

Variance 0 0 0 0 0 0 0 0 0 0 0 87 87

Prepared by: Chauncey Lee, Water Operations Superintendent, 530-228-4504 (cell)

MENDOTA POOL WELL PUMP IN2019

(ALL FIGURES IN ACRE-FEET)

Adam Hoffman; Anthony Coelho; Bill Pipes; Cheryl Lassotovitch; Chris White; Danny Wade; Darrell Vincent; Donald McCurdy; Erma Leal; Gabe Mora; Hilda Urbano; James Merrill; Janet Gutierrez; Jason Dean; Jeff Bryant; Jim Stillwell; Joyce Machado; Juan Pacheco; Katrina Buelna; Ken Carvalho; Margie Lowe; Mark Rhodes; Marta Rivas; Melody Hernandez; Rick Yirbarren; Rod Wade; Sophia Pulido; Stacey Smith; Steven Stadler; Wes Harrison; Will Halligan

REACH POOL INFLOW INTO CUSTOMERS AMOUNT IN AFTOTALS AQUEDUCT

R3A Parks & Rec. @ San Luis Reservoir 04990 Santa Clara Valley Water District 2675

Casa de Fruta (Santa Clara Valley Water District) 02315

R3 13 6613 0

101 13 013 San Luis Water District 35

R4 14 City of Dos Palos 6214 Pacheco Water District 2814 San Luis Water District 62

1002 14 Panoche Water District 4115 San Luis Water District 015 Panoche Water District 24815 Westlands Water District 561

R5 16 DFG @ Lat. 4L (Pilibos) 016 DFG @ Lat. 4L 016 DFG @ Lat. 6L 016 DFG @ Lat. 7L 0

3833 16 Westlands Water District 36517 Westlands Water District 54318 City of Coalinga 28818 Pleasant Valley Pumping Plant 120418 Westlands Water District 1433

R6 19 Alta Gas 019 City of Huron (P&R-Area 11) @ Lat. 22R 019 DWR Water Truck @ 22R/F&G @ Lat.22R 0

3818 19 Lemoore N.A.S. thru WWD 29L & 30L 7819 Kings County thru WWD 30L 019 Westlands Water District 374020 City of Huron @ Lat. 23R 4620 Kings County thru WWD 31L,32L,33L,34L,35L,36L 020 Westlands Water District 1119

1615 21 City of Avenal 14121 Kings County thru WWD 37L,38L 021 Westlands Water District 309

15359 0 <---TOTALS---> 15359TOTALS BY CUSTOMERS

Pacheco Water District 28San Luis Water District 97

Panoche Water District 289Westlands Water District 9274

AltaGas 0City of Huron @ LAT. 23R 46

City of Huron (P&R/Area 11 @ 22R) 0Lemoore N.A.S. thru WWD @ 29L & 30L 78

Kings County thru WWD Laterals in Pools 19 - 21 0City of Avenal 141

62City of Coalinga 288

66Pacheco Tunnel 4990

DFG @ Lateral 4L & 6L & 7L 0DWR Water Truck @ 22R/F&G @ Lat.22R 0

00

Pool 12 - Reach 2B Customers 15359VA Turnout Use AF = 0

DWR 3137(Rev.9/15) 15359

Total:

Parks & Recreation0 AF for DWR Water Truck at O'Neill, 0 AF for Cattle Program @ O'Neill Reservoir

City of Dos Palos

DFG @ O'Neill Forebay

DWR Water Truck at O'Neill 0 AF for Cattle Program @ O'Neill Forebay

TABLE 19: GOVERNOR EDMUND G. BROWN CALIFORNIA AQUEDUCTSAN LUIS FIELD DIVISION MONTHLY DELIVERIES

DFG @ O'Neill ForebayParks & Rec. @ O'Neill Forebay

San Benito Water District

DECEMBER 2019

Pool Lateral 7 (7L)

StartsPump

Unit-1 744 0.0 0.00% 0.3 99.96% 7

Unit-2 744 744.0 100.00% 0.0 0.00% 0

Unit-3 744 0.0 0.00% 300.5 59.61% 1

Unit-4 744 0.0 0.00% 1.0 99.87% 7

Unit-5 744 0.0 0.00% 0.0 100.00% 6

Unit-6 744 0.0 0.00% 156.1 79.02% 5

Total 4464 744.0 17% 457.9 72.74% 26

%Unscheduled Outages (2)

%Over-all

Availability %

Monthly Availability ReportCW "Bill" Jones Pumping Plant

December - 2019

Comments

(1) Planned maintenance (2) Emergency outages and maintenance performed with less than 24 hours advance notice

0.04%

0.00% 1) Motor Rewind, Rotor Rehab

40.39% 2) Slip Ring Repair

Unit #

0.13% 2) Unexplained Under Frequency Trip

0.00%

20.98% 2) Slip Ring Repair

10.26%Notes:

Max Hours

Scheduled Outages (1)

Pump Gen

Unit-1 744 0.0 0.00% 0.0 100.00% 2 0

Unit-2 744 0.0 0.00% 0.0 100.00% 1 0

Unit-3 744 0.0 0.00% 33.3 95.52% 3 0

Unit-4 744 744.0 100.00% 0.0 0.00% 0 0

Unit-5 744 0.0 0.00% 0.0 100.00% 2 0

Unit-6 744 0.0 0.00% 0.0 100.00% 1 0

Total 4464 744.0 17% 33.3 82.25% 9 0

0.00%

0.00%

Monthly Availability ReportO'Neill Pump/Generating Plant

Unit # Max

HoursScheduled

Outages (1)%

Unscheduled Outages (2)

%Over-all

Availability %Starts Comments

December - 2019

4.48% 2) Exciter Repair

0.00% 1) Penstock/Pump Rehab

0.00%

0.00%

0.75%Notes:(1) Planned maintenance (2) Emergency outages and maintenance performed with less than 24 hours advance notice

StartsPump

Unit-1 744 0.0 0.00% 0.0 100.00% 7

Unit-2 744 0.0 0.00% 0.0 100.00% 6

Unit-5 744 0.0 0.00% 0.0 100.00% 5

Unit-6 744 0.0 0.00% 0.0 100.00% 7

Total 2976 0.0 0% 0.0 100.00% 25

DCI Pumping PlantDecember - 2019

Unscheduled Outages (2)

(2) Emergency outages and maintenance performed with less than 24 hours advance notice

0.00%

0.00%

0.00%

%Over-all

Availability %Comments

Notes:(1) Planned maintenance

0.00%

0.00%

Monthly Availability Report

Unit # Max

HoursScheduled

Outages (1)%

MEMORANDUM

TO: SLDMWA Board of Directors, Alternates

FROM: Scott Petersen, Water Policy Director Joe McGahan, Regional Drainage/Westside Watershed Coalition Coordinator

DATE: February 6, 2020

RE: Activity Agreements – Staff Report for January 2020

This memorandum serves as the Staff Report for January 2020 regarding specified1 Water Authority activities not separately addressed on the Board meeting agenda. 1. Integrated Regional Water Management Activity Summary San Joaquin River Funding Area (SJRFA)

Following the completion of the Needs Assessment, the SJRFA DACIP will now focus on identifying projects within the Funding Area for additional DAC support through technical assistance and capacity building. The SJRFA DACIP stakeholder advisory committee is meeting in mid-February to discuss the next steps for this funding and potential project ideas from each IRWM region.

DWR is conducting an eligibility and completeness review for the submitted Proposition 1 Round 1 IRWM Implementation application. The participating local project sponsors provided updated Groundwater Management Compliance Self-Certification forms following a request from DWR to reflect each agency’s GSP status. It is anticipated that the SJRFA will receive a draft funding announcement in late March or early April.

Tulare-Kern Funding Area (TKFA)

The Tulare-Kern Funding Area is anticipating receiving draft funding award from DWR in early February. If any projects in the TKFA are awarded funding, SLDMWA staff will coordinate grant administration support as needed.

1 For the sake of completeness, this includes those Activity Agreements that have been approved by the Board of Directors, but not yet signed by all interested members and/or participants (i.e., the Los Vaqueros Expansion Project Activity Agreement, the Exchange Contractors 2019-2023 Transfer Program Activity Agreement, and the Westside-San Joaquin Integrated Regional Water Management Activity Agreement).

Memo to SLDMWA Board of Directors February 6, 2020 Page 2 of 4

General Westside IRWM In January, the Westside-San Joaquin IRWM Activity Agreement members had a call to discuss the Fiscal Year 2021 IRWM Activity Agreement budget, discuss recent updates on the development of the Region’s Stormwater Resource Plan, and discuss next steps within the San Joaquin River and Tulare Kern Funding Areas.

A technical advisory committee (TAC) meeting was held for the Stormwater Resource Plan in early January. Activity Agreement members and other stakeholders attended this meeting. Following this meeting, a call for projects was announced for stormwater-related projects in the Westside-San Joaquin IRWM region; this will conclude on February 20th. The next TAC meeting is scheduled for February 10th at the SLDMWA Los Banos office.

2. Sustainable Groundwater Management Activity Summary Northern and Central Delta-Mendota Regions The Northern & Central Delta-Mendota Region Groundwater Sustainability Plan (GSP) was successfully submitted to the Department of Water Resources’ SGMA Portal on January 23rd along with the five other GSPs in the Delta-Mendota Subbasin. The Northern and Central Region GSP’s associated reference, monitoring network, and historical data have also been uploaded to the SGMA Portal as required by DWR. The Groundwater Sustainability Agencies (GSAs) in the Northern & Central DM GSP Region had been coordinating the development for the past few years to reach the target submittal date of January 31st. Prior to this submittal, all GSAs in the Northern & Central DM GSP Region held public hearings to adopt the GSP. DWR is currently finalizing a completeness check of the submitted GSPs. Once this is complete, DWR will open a 60-day public comment period to the GSP. The GSAs will now transition their focus from GSP development to GSP implementation and on-going efforts to complete the first Annual Report, which is due by April 1st. Representatives from the Northern and Central Delta-Mendota Region Management Committees have been discussing the Northern & Central GSP Group’s approach for GSP implementation for the past several months. The Finance Working Group, comprised of members from the Northern and Central Management Committees, convened several times to discuss the received proposals for GSP implementation support. The Finance Working Group recommended the selection of a hybrid approach for implementation, which will provide the Northern & Central DM Region GSP Group with support from the Woodard & Curran consultant team as well as from EKI for additional program management support for the first six months of GSP implementation. The January Management Committees meeting was held on January 30th. During this meeting, the Management Committee representatives approved several action items that the SLDMWA Board will consider for final approval, including:

Memo to SLDMWA Board of Directors February 6, 2020 Page 3 of 4

- Recommendation to the SLDMWA Board of approval of the Fiscal Year 2021 SGMA Activity Agreement budgets

- Recommendation to the SLDMWA Board to authorize execution of consultant services agreements for GSP implementation and program management support within the Northern & Central Delta-Mendota Region

- Recommendation to the SLDMWA Board to increase the Fiscal Year 2020 budget and amend the GSP development contract to finalize the remaining tasks prior to the initiation of the implementation contracts

Representatives from the Northern & Central GSP Group agreed to pursue a single Annual Report for the Delta-Mendota Subbasin. The consultant teams will continue to coordinate with Northern & Central GSAs and other GSP Groups to compile the necessary data and develop the Annual Report for the Subbasin. General SGMA Activities All GSPs in the Delta-Mendota Subbasin were successfully submitted to DWR ahead of the January 31st deadline for the Subbasin. Prior to this submission, GSAs in the Subbasin held public hearings to adopt their respective GSP. The representatives and consultant teams for the various GSAs and GSPs in the Subbasin have been collaborating toward this target over the past few years. Subbasin-wide meetings were held in January for the Coordination Committee, DMS Working Group, and Technical Working Group. Now that the GSPs have been submitted, the focus in these meetings will shift to GSP implementation across the Subbasin. This month, DWR released draft funding announcements for recently submitted Proposition 68 grant applications. In this draft funding announcement, the Delta-Mendota Subbasin’s application received the full $500,000 that was requested in the application. There is currently a public comment period until February 10th. The GSP Groups in the Subbasin are initiating work for the projects outlined in the Proposition 68 application, which will focus on developing a Subbasin-wide well census and inventory, subsidence characterization and project feasibility determination, as well as funding for supplemental GSP development for each GSP Group. Additional Data Management System (DMS) Working Group calls were held this month to continue to refine the structure of the DMS and discuss the content of the Subbasin’s Annual Report. Staff finalized and distributed the 13th newsletter to all GSA representatives. This newsletter announced the successful submission of all six GSPs and provided additional summary of coordinated Delta-Mendota Subbasin SGMA activities as well as updates for each individual GSP group. 3. Drainage Activity Summary

Memo to SLDMWA Board of Directors February 6, 2020 Page 4 of 4

Grassland Basin Drainage Management Steering Committee Activity Summary A side-by–side comparison was prepared of the new 2020 4th Use Agreement compared to the previous 2009 Use Agreement. Participate with Water Authority counsel on the CEQA lawsuit against the Long-Term Storm Water Management Plan (LTSWMP). Prepare Revision 2 of draft GBD budget and present at GBD meeting in Los Banos. Prepare for and attend the GBD meeting in Los Banos. Prepare monitoring plan as required for the new WDRs and use Agreement for the LTSWP. Coordinate work related to the agreement with Newman Land Company for restoration of deliveries to their property. Review proposed letter from Regional Board on reporting requirements. Prepare documents for installation of monitoring wells adjacent to the SJRIP and Grassland Water District. Provide conference call report to SLDMWA board meeting. Attend meeting in Los Banos with State Board members to give drainage update. Ongoing monitoring for discharges from the Grassland Bypass Project and data entry continued. Work to administer the Prop 84 grant for the Long-Term Stormwater Plan and reuse area upgrades continued. Activities also included management of the Third Party Group for the Grassland Drainage Area Coalition to implement the Irrigated Lands Program. Support was provided to farmers for completing their paperwork requirements. Upcoming paperwork mailings were prepared.

San Joaquin Valley Drainage Authority Activity Summary Prepare outreach information for focused outreach meetings. Follow up conference call with consultants and respond to question regarding the surface water management plan. Follow up calls and emails were answered to assist farmers in completing their paperwork requirements. Assist with web portal updates for 2019 growing season paperwork. Prepare updates to membership list. Manage field monitoring. Compile nitrogen summary report mailers. Management continued for the Prop 84 Real Time Management Program Grant. This grant is part of compliance with the San Joaquin River Salt and Boron TMDL. Begin work on November 30 annual report. Make presentations at January 9 grower meeting in Newman and January 21 grower meeting in Westley. Prepare first draft of SJVDA budget and attend SJVDA meeting Los Banos. Prepare for and participate in quarterly meeting with the Regional Board.

MEMORANDUM

TO: SLDMWA Finance & Administration Committee Members, Board of Directors, Alternates

FROM: Pablo R. Arroyave, Chief Operating Officer

DATE: February 2, 2020

RE: Adoption of Resolution Providing for the Prioritization of Use for OM&R Revenues

BACKGROUND In order to finance the Jones Pumping Plant Unit Motor Rehabilitation Project, the Authority is currently pursuing an EPA Water Infrastructure Finance and Innovation Act Loan (WIFIA loan) of up to $19,300,000 and an additional repayment contract with Reclamation of up to $12,500,000. Given this project and other foreseeable future EO&M projects, it is advisable that the Authority establish a policy that identifies the priority of the use of OM&R revenues to meet repayment commitments. Establishment of such a policy will be an asset in the Authority’s securing of loan funds and will provide certainty regarding the repayment of future financing. In addition, the policy, enacted by adoption of the attached resolution, will provide additional transparency on priority of payment of other O&M costs and additional capital improvements.

ISSUE FOR DECISION Whether the Finance & Administration Committee should recommend adoption, and the Board should adopt the Resolution Providing for the Prioritization of Use for OM&R Revenues.

RECOMMENDATION

Staff’s recommendation is for the Finance & Administration Committee to recommend, and the Board adopt, the Resolution Providing for the Prioritization of Use for OM&R Revenues.

ANALYSIS By adopting the proposed resolution, the Board would establish guidance providing for the prioritization of use for OM&R Revenues. Section 3.2 of the proposed resolution prioritizes the use of OM&R Revenues in the OM&R Revenue Fund as follows:

Memo to SLDMWA Finance & Administration Committee, Board of Directors February 2, 2020 Page 2 of 2

1. Payments with respect to Operations and Maintenance Obligations (as defined in the resolution, e.g. Reclamation repayment contract, WIFIA loan, if received) are to be paid first.

2. Operation and Maintenance Costs are to be paid so long as the Authority determines that there are sufficient OM&R Revenues to pay the Operations and Maintenance Obligations in item 1.

3. If the Authority determines that there are sufficient OM&R Revenues to satisfy both 1 and 2 above, funds can be used for activities pursuant to Section 5 of the Transfer Agreement, including but not limited to capital improvements.

BUDGET IMPLICATIONS

Although there are budget implications associated with the need for the Jones Pumping Plant

Unit Motor Rehabilitation Project there are no budget implications associated with the proposed resolution.

1

SAN LUIS & DELTA-MENDOTA WATER AUTHORITY

RESOLUTION NO. 2020-___

RESOLUTION PROVIDING FOR THE PRIORITIZATION OF USE FOR OM&R

REVENUES

WHEREAS, the Board of Directors of the San Luis & Delta-Mendota Water Authority (the

“Board” and the “Authority,” respectively), pursuant to the Authority’s procedures and the California

Government Code, from time to time, may adopt policy for the administration of the Authority; and

WHEREAS, the Authority operates and maintains certain Delta Division and San Luis Unit

facilities of the Central Valley Project pursuant to the Transfer Agreement (as defined below); and

WHEREAS, the Authority receives certain revenues (as further defined below, the “OM&R

Revenues”) from Water Delivery Contractors and Parties Entitled to Utilize or Receive Other Water,

the Friant Water Authority, and the U.S. Bureau of Reclamation pursuant to the terms of the Transfer

Agreement and the Friant MOU (as all such terms are defined below); and

WHEREAS, the Board, by adoption of this Resolution, desires to adopt guidance providing

for the prioritization of use for such OM&R Revenues.

NOW, THEREFORE, BE IT RESOLVED, AS FOLLOWS, THAT:

Section 1. The facts stated in the recitals above are true and correct, and the Board so finds

and determines.

Section 2. Definitions. Unless the context otherwise requires, the terms defined in this

section shall for all purposes hereof and of any amendment hereof or supplement hereto and of any

opinion or report or other document mentioned herein or therein have the meanings defined herein.

Capitalized terms used herein and not defined herein shall have the definitions ascribed thereto in the

Transfer Agreement. Such definitions are equally applicable to both the singular and plural forms of

any of the terms defined herein:

(a) Authority. “Authority” means the San Luis & Delta-Mendota Water Authority, a joint

exercise of powers agency duly created and existing under and by virtue of the Amended and Restated

Joint Powers Agreement, dated as of January 1, 1992 among the parties listed.

(b) Authorized Officer. The term “Authorized Officer” means (i) the Executive Director

of the Authority or, if there is no officer designated as the Executive Director, the highest ranking

officer of the Authority (excluding members of the Board of Directors of the Authority), (ii) the Chief

2

Operating Officer of the Authority, or (iii) the Director of Finance of the Authority; and, in each case,

the written designee thereof.

(c) Fiscal Year. “Fiscal Year” means the period beginning on March 1 of each year and

ending on the last day of February of the succeeding year, or any other accounting period hereafter

selected and designated by the Board of the Authority as the Fiscal Year of the Authority.

(d) Friant MOU. “Friant MOU” means that certain “Memorandum of Understanding

Relating to Allocation, Collection and Payment of Operation, Maintenance & Replacement Costs for

Water Deliveries through Central Valley Project Facilities (MOU”) effective March 1, 1998 and

amended September 1, 2002, with Friant Water Authority (as assignee of the Friant Water Users

Authority effective June 30, 2004), as such Friant MOU may be supplemented or amended in

accordance with the terms thereof.

(e) OM&R Revenue Fund. “OM&R Revenue Fund” means the “Fund 01-Operations &

Maintenance of the DMC” maintained by the Authority.

(f) OM&R Revenues. “OM&R Revenues” means, with respect to any Fiscal Year or other

period, all amounts received by the Authority for OM&R under the Transfer Agreement, including but

not limited to Section 12 thereof, and all income from the investment of any OM&R Revenues in the

OM&R Revenue Fund.

(g) Operation and Maintenance Costs. “Operation and Maintenance Costs” means costs

associated with OM&R as defined in the Transfer Agreement.

(h) Operation and Maintenance Obligation. “Operation and Maintenance Obligation”

means any contractual obligation to repay amounts borrowed by the Authority for the payment of

Operation and Maintenance Costs, so long as in each case the payments thereunder are designated as

Operation and Maintenance Costs by the Board; including but not limited to the Reclamation

Repayment Contract.

(i) Reclamation. “Reclamation” means the United States of America, Department of the

Interior, Bureau of Reclamation, including any successor thereto or assignee thereof.

(j) Reclamation Repayment Contract. “Reclamation Repayment Contract” shall mean the

“Contract between the United States of America and San Luis & Delta-Mendota Water Authority for

the Repayment of Extraordinary Maintenance Costs for the C.W. “Bill” Jones Pumping Plant

constituting Contract No. 17-WC-20-5100, dated February 5, 2018, between Reclamation and the

Authority, as such Reclamation Repayment Contract may be supplemented or amended in accordance

with the terms thereof.

(k) Transfer Agreement. “Transfer Agreement” means the “Agreement between the

United States of America and San Luis & Delta-Mendota Water Authority to Transfer the Operation,

Maintenance and Replacement and Certain Financial and Administrative Activities Related to the San

Luis and Delta-Mendota Canals, C.W. “Bill” Jones Pumping Plant, Delta-Mendota Canal/ California

Aqueduct Intertie Pumping Plant, O’Neill Pumping/Generating Plant, San Luis Drain and Associated

3

Works,” effective January 14, 2020, between the United States of America and the Authority, as such

Transfer Agreement may be supplemented or amended in accordance with the terms thereof.

(l) WIFIA Loan. “WIFIA Loan” means a loan from the United States Environmental

Protection Agency to the Authority under the Water Infrastructure Finance and Innovation Act, as

amended.

Section 3. Prioritization of Use for OM&R Revenues.

Section 3.1. OM&R Revenue Fund.

The Authority hereby continues and agrees to maintain, so long as any Operation and

Maintenance Obligations remain unpaid, the OM&R Revenue Fund to be held by the Authority.

Amounts in the OM&R Revenue Fund shall be disbursed, allocated and applied solely to the uses and

purposes hereinafter described in this Resolution and as permitted under the Transfer Agreement, and

shall be accounted for separately and apart from all other accounts, funds, money or other resources of

the Authority.

All OM&R Revenues and all amounts on deposit in the OM&R Revenue Fund are hereby

allocated to the payment of the Operation and Maintenance Obligations, Operation and Maintenance

Costs and other costs as set forth in Section 3.2. The OM&R Revenues and all amounts on deposit in

the OM&R Revenue Fund shall not be used for any other purpose while any Operation and

Maintenance Obligations remain unpaid.

Section 3.2. Prioritization of Use for OM&R Revenues.

In order to carry out and effectuate the obligations of the Authority hereunder, the Authority

agrees and covenants that all OM&R Revenues received by it shall be deposited when and as received

in the OM&R Revenue Fund.

The Authority shall transfer or make payments from the OM&R Revenue Fund of the amounts

set forth below at the following times and in the following order of priority:

(a) Payments with respect to Operation and Maintenance Obligations at the times

and in the amounts required thereby;

(b) So long as the Authority reasonably determines that there will be sufficient

OM&R Revenues to make the transfers in (a) above for the remainder of the Fiscal Year, such amounts

at such times as the Authority shall require to provide for the payment of Operation and Maintenance

Costs; and

(c) So long as the Authority reasonably determines that there will be sufficient

OM&R Revenues to make the transfers in (a) and (b) above for the remainder of such Fiscal Year, for

any lawful purpose, including but not limited to Capital Improvements funded or financed by the

Authority pursuant to Section 5 of the Transfer Agreement.

Section 3.3. Additional Operation and Maintenance Obligations. The Authority may at

any time execute Operation and Maintenance Obligations payable from OM&R Revenues in

accordance with Section 3.2(a); provided:

4

(a) The OM&R Revenues for the most recent audited Fiscal Year preceding the

date of execution of such Operation and Maintenance Obligations, including adjustments to give effect

as of the first day of such Fiscal Year to increases or decreases in OM&R rates and charges approved

and in effect as of the date of calculation, as evidenced by a certificate of an Authorized Officer on file

with the Authority, shall have produced a sum equal to at least one hundred ten percent (110%) of the

payments under all Operation and Maintenance Obligations for such Fiscal Year plus Operation and

Maintenance Obligations executed since the end of such Fiscal Year assuming such Operation and

Maintenance Obligations had been executed at the beginning of such Fiscal Year; and

(b) The estimated OM&R Revenues for the then current Fiscal Year and for each

of the next two Fiscal Years thereafter, as evidenced by a certificate of an Authorized Officer of the

Authority on file with the Authority, including an allowance for estimated OM&R Revenues for each

of such Fiscal Years arising from any increase in OM&R Revenues which are economically feasible

and reasonably considered necessary based on projected operations for such period, as evidenced by a

certificate of an Authorized Officer on file with the Authority, shall produce a sum equal to at least

one hundred ten percent (110%) of the estimated payments under Operation and Maintenance

Obligations for each of such Fiscal Years.

Nothing herein shall prevent the Authority from incurring obligations payable from

OM&R Revenues, the OM&R Revenue Fund and amounts on deposit in the OM&R Revenue Fund on

a basis subordinate to Operation and Maintenance Obligations.

Notwithstanding the foregoing, the Authority may enter into a WIFIA Loan in an

amount not to exceed $19,300,000 and an additional repayment contract with Reclamation in an

amount not to exceed $12,500,000 to finance the cost of the Jones Pumping Plant Unit Motor

Rehabilitation Project without compliance with the provisions of Section 3.3(a) and (b).

Section 3.4. Setting of OM&R Rates and Charges.

(a) To the fullest extent permitted by law, the Authority will fix and prescribe rates,

fees and charges for OM&R costs at the commencement of each Fiscal Year in accordance with the

Transfer Agreement and the Friant MOU, which, together with other OM&R Revenues, are reasonably

expected to be at least sufficient to yield during each Fiscal Year OM&R Revenues an amount equal

to or greater than the sum of (i) 1.10 times payments due on Operation and Maintenance Obligations

and (ii) 1.00 times other Operation and Maintenance Costs. The Authority may make adjustments

from time to time in such rates, fees and charges for OM&R Costs and may make such classification

thereof as it deems necessary, but shall not reduce the rates, fees and charges for OM&R costs then in

effect unless the OM&R Revenues from such reduced rates, fees and charges are reasonably expected

to be sufficient to meet the requirements of this section.

(b) So long as the Authority has complied with its obligations set forth in

subsection (a) above, the failure of OM&R Revenues to meet the threshold in the prior subsection (a)

shall not constitute a default or an event of default hereunder.

Section 3.5. Compliance with Transfer Agreement. The Authority will comply with,

keep, observe and perform all material provisions of agreements, conditions, covenants and terms,

express or implied, required to be performed by it contained in the Transfer Agreement. The Authority

will not terminate the Transfer Agreement so long as any Operation and Maintenance Obligation

5

remains unpaid unless the obligation is transferred to Reclamation in accordance with the Transfer

Agreement.

Section 4. Miscellaneous.

Section 4.1. Benefits of this Resolution Limited to Certain Parties. Nothing contained

herein, expressed or implied, is intended to give any person other than the Authority or the parties to

an Operation and Maintenance Obligation any right, remedy or claim under or pursuant hereto, and

any agreement or covenant required herein to be performed by or on behalf of the Authority shall be

for the sole and exclusive benefit of such other parties. Notwithstanding the foregoing, parties to an

Operation and Maintenance Obligation may be designated by the Authority as a third-party beneficiary

hereunder to the extent set forth in such Operation and Maintenance Obligation.

Section 4.2. Successor is Deemed Included in all References to Predecessor. Whenever

the Authority is named or referred to herein, such reference shall be deemed to include the successor

to the powers, duties and functions that are presently vested in the Authority, and all agreements and

covenants required hereby to be performed by or on behalf of the Authority shall bind and inure to the

benefit of the successors thereof whether so expressed or not.

Section 4.3. Amendments. Except as may be otherwise provided in Operation and

Maintenance Obligations, the Authority may amend the provisions of this Resolution without the

approval of any other party.

Section 4.4. Partial Invalidity. If any one or more of the agreements or covenants or

portions thereof required hereby to be performed by or on the part of the Authority shall be contrary to

law, then such agreement or agreements, such covenant or covenants or such portions thereof shall be

null and void and shall be deemed separable from the remaining agreements and covenants or portions

thereof and shall in no way affect the validity hereof. The Authority hereby declares that it would have

adopted this Resolution, and each and every other article, section, paragraph, subdivision, sentence,

clause and phrase hereof irrespective of the fact that any one or more articles, sections, paragraphs,

subdivisions, sentences, clauses or phrases hereof or the application thereof to any person or

circumstance may be held to be unconstitutional, unenforceable or invalid.

Section 4.5. Investments. Any money held by the Authority in the OM&R Fund shall be

invested in lawful investments of Authority funds and in accordance with the Board-adopted Authority

investment policy.

Section 4.6. Repeal of Inconsistent Resolutions. Any resolution of the Authority and any

part of any resolution inconsistent herewith is hereby repealed to the extent of such inconsistency.

6

Section 4.7. Effective Date. This Resolution shall take effect immediately.

PASSED, APPROVED AND ADOPTED this 6th day of February, 2020, by the Board of

Directors of the San Luis & Delta-Mendota Water Authority.

AYES:

NOES:

ABSENT:

APPROVED:

________________________________________________

Cannon Michael, Chairman

SAN LUIS & DELTA-MENDOTA WATER AUTHORITY

Attest:

__________________________________________________

Federico Barajas, Secretary

7

*****

I hereby certify that the foregoing Resolution No. 2020-_ was duly and regularly adopted

by the Board of Directors of the San Luis & Delta-Mendota Water Authority at the meeting thereof

held on the 6th day of February, 2020.

Federico Barajas, Secretary

SAN LUIS & DELTA-MENDOTA WATER AUTHORITY

FY 20 TO FY 21 COMPARISON

MARCH 1, 2020 - FEBRUARY 28, 2021

BOD 2/6/2020

PROPOSED FINAL Recommended by WRC & FACA B C

D

(D = C - B)

Direct Expenses FY 2020 BudgetFY 2020

Projected Actual

FY 2021

Proposed Final

VARIANCE FY 2020

Compared to FY2021

Increase (Decrease)

Legal: 1 Linneman et al 34,000$ 68,000$ 33,500$ (34,500)$ 1

2 Kronick Moskovitz et al 762,300$ 762,300$ 1,100,000$ 337,700$ 2

3 Kronick Moskovitz et al (annual costs) 12,000$ 22,050$ 18,000$ (4,050)$ 3

4 Pioneer Law Group 40,000$ 90,000$ 216,000$ 126,000$ 4

5 Somach Simmons & Dunn 43,000$ 5,000$ 50,000$ 45,000$ 5

6 Additional O&M Legal Support 29,500$ 29,500$ 29,500$ -$ 6

7 Baker Manock & Jensen 84,000$ 23,992$ 53,280$ 29,288$ 7

8 Additional GBD Legal Support (NEPA, CWA, etc.) -$ 25,000$ 90,000$ 65,000$ 8

9 Technical Legal Support 150,000$ 150,000$ 150,000$ -$ 9

10 Legal Contingency 200,000$ 135,000$ 335,000$ 200,000$ 10

1,354,800$ 1,310,842$ 2,075,280$ 764,438$

Technical: 1 Direct Funding / Water Storage Studies 200,000$ 200,000$ 1,500,000$ 1,300,000$ 1

2 Science Program 500,000$ 500,000$ 2

3 Previous Technical Project Commitment 505,000$ 304,160$ 360,840$ 56,680$ 3

4 Science Studies / Efforts 200,000$ 95,000$ (95,000)$ 4

5 Coordinated Science / CAMT 105,000$ 50,000$ (50,000)$ 5

1,010,000$ 649,160$ 2,360,840$ 1,711,680$

1 Federal & State Representation 269,500$ 269,500$ 256,025$ (13,475)$ 1

2 Legislative Support 10,982$ 10,982$ 2

3 Public Information / Communication 120,000$ 120,000$ 121,550$ 1,550$ 3

389,500$ 389,500$ 388,557$ (943)$

Other Professional Services:1 SGMA Services 278,944$ 1,033,476$ 1,188,082$ 154,606$ 1

2 Integrated Regional Water Management 215,000$ 351,823$ 152,000$ (199,823)$ 2

493,944$ 1,385,299$ 1,340,082$ (45,217)$

Grassland Basin Drainage:1 GBD Specific 841,962$ 1,021,360$ 1,100,192$ 78,832$ 1

2 New UA Mud Slough Mitigation 719,000$ 135,000$ 100,000$ (35,000)$ 2

3 Use of Drain 240,000$ 100,000$ 110,000$ 10,000$ 3

4 Biological Monitoring 202,000$ 269,000$ 367,500$ 98,500$ 4

5 Groundwater WDR Specific 262,950$ 285,943$ 372,478$ 86,535$ 5

2,265,912$ 1,811,303$ 2,050,170$ 238,867$

OTHER:1 DHCCP Debt Service on Bond/Arbitrage/Trustee Admin 2,458,000$ 2,458,000$ 2,460,000$ 2,000$ 1

2 Strategic Planning 35,000$ 29,000$ -$ (29,000)$ 2

3 Executive Director 333,733$ 333,733$ 350,789$ 17,056$ 3

4 Executive Assistant 92,893$ 92,893$ 97,799$ 4,906$ 4

5 Special Projects Coordinator 155,727$ 155,727$ 5

6 General Counsel 272,657$ 272,657$ 294,932$ 22,275$ 6

7 Deputy General Counsel 100,840$ -$ -$ -$ 7

8 Water Policy Director 247,948$ 247,948$ 257,767$ 9,819$ 8

9 Science Manager/Special Projects Manager 250,000$ 250,000$ 9

10 In-House Staff 391,544$ 392,503$ 562,791$ 170,288$ 10

11 Law Clerk 40,000$ 40,000$ 11

12 Sacramento Administrative Office (SAO) 50,033$ 50,033$ 100,000$ 49,967$ 12

13 Dissolved Oxygen Aerator 25,000$ 25,000$ -$ (25,000)$ 13

14 Other Services & Expenses 58,926$ 54,703$ 54,785$ 82$ 14

15 License & Continuing Education 4,500$ 1,750$ 4,800$ 3,050$ 15

16 Organizational Membership 80,250$ 80,250$ 90,250$ 10,000$ 16

17 Conferences & Training 26,750$ 10,750$ 28,300$ 17,550$ 17

18 Travel/Mileage 86,500$ 71,750$ 106,125$ 34,375$ 18

19 Group Meetings 4,025$ 12,514$ 13,000$ 486$ 19

20 Telephone 6,950$ 11,910$ 11,090$ (820)$ 20

4,275,549$ 4,145,394$ 4,878,155$ 732,761$

9,789,705$ 9,691,498$ 13,093,084$ 3,401,586$ Total DMC O&M / EO&M / CIP Direct Exp., excludes DMC Legal / Admin 21,050,119$ 21,072,119$ 26,020,474$ 4,948,355$

30,839,824$ 30,763,617$ 39,113,558$ 8,349,941$

286,500$ 290,264$ -$ (290,264)$

31,126,324$ 31,053,881$ 39,113,558$ 8,059,677$ (A) (B) (C) (D)

(B) Total FY20 Projected Actual

(C) Total FY21 Proposed Final Budget

(D) Total reflects variance between FY21 Proposed Final Budget and FY20 Projected Actuals

Sub Total Other:Total Activities Budget Direct Exp., includes DMC Legal / Admin

Grand Total Direct Expenditures

Administrative Expenditures

Total Expenditures

(A) Total FY20 Budget

Sub Total Legal:

Sub Total Technical:

Legislative Advocacy/Public Information Representation:

Sub Total Legislative Advocacy/PIP

Sub Total Other Professional Services:

Sub Total GBD Specific:

Subject to rounding 1

SAN LUIS & DELTA-MENDOTA WATER AUTHORITY

FY 21 BUDGET EXPENDITURE SUMMARY

MARCH 1, 2020 - FEBRUARY 28, 2021

BOD 2/6/2020

PROPOSED FINAL Recommended by WRC & FAC

Direct Expenses

Total DMC O&M

(01)

General Fund

(03)

Leg/Op

(05)

Reallo Agreement

(06)

Contract Renewal

Coordinator (35)

Leg/Op #3

(09)

Yuba Co. Water

Trans.

(28) Sub

Fund of Leg/Op#3

GBD Dr #3A

(22)

SGMA Northern

Delta-Mendota

Region (64)

SGMA Central

Delta-Mendota

Region (65)

Integrated

Regional Water

Management (67)

Los Vaqueros

(68)

Exchange

Contractor 5

Year Transfer

(44)

Long-Term North

to South Water

Transfers

(56)

DHCCP

(16)

Legal:

1 Linneman et al 33,500$ 5,000$ 3,500$ 25,000$ 1

2 Kronick Moskovitz et al 1,100,000$ 50,000$ 1,000,000$ 50,000$ 2

3 Kronick Moskovitz et al (annual costs) 18,000$ 500$ 17,000$ 500$ 3

4 Pioneer Law Group 216,000$ 8,000$ 20,000$ 50,000$ 138,000$ 4

5 Somach Simmons & Dunn 50,000$ 40,000$ 10,000$ 5

6 Additional O&M Legal Support 29,500$ 29,500$ 6

7 Baker Manock & Jensen 53,280$ 23,040$ 23,040$ 7,200$ 7

8 Additional GBD Legal Support (NEPA, CWA, etc.) 90,000$ 90,000$ 8

9 Technical Legal Support 150,000$ 150,000$ 9

10 Legal Contingency 335,000$ 335,000$ 10

Sub Total 2,075,280$ 93,000$ -$ 1,565,500$ -$ 50,500$ -$ -$ 175,000$ 23,040$ 23,040$ 7,200$ -$ -$ 138,000$ -$ Technical:

1 Direct Funding / Water Storage Studies 1,500,000$ 1,500,000$ 1

2 Science Program 500,000$ 500,000$ 2

3 Previous Technical Project Commitment 360,840$ 360,840$ 3

Sub Total 2,360,840$ -$ -$ 2,360,840$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Legislative Advocacy/Public Information Representation:

1 Federal & State Representation 256,025$ 256,025$ 1

2 Legislative Support 10,982$ 10,982$ 2

3 Public Information / Communication 121,550$ 121,550$ 3

Sub Total 388,557$ -$ 121,550$ 267,007$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Other Professional Services:

1 SGMA Services 1,188,082$ 594,041$ 594,041$ 1

2 Integrated Regional Water Management 152,000$ 152,000$ 2

Sub Total 1,340,082$ -$ -$ -$ -$ -$ -$ -$ -$ 594,041$ 594,041$ 152,000$ -$ -$ -$ -$ Grassland Basin Drainage:

1 GBD Specific 1,100,192$ 1,100,192$ 1

2 New UA Mud Slough Mitigation 100,000$ 100,000$ 2

3 Use of Drain 110,000$ 110,000$ 3

4 Biological Monitoring 367,500$ 367,500$ 4

5 Groundwater WDR Specific 372,478$ 372,478$ 5

Sub Total 2,050,170$ -$ -$ -$ -$ -$ -$ -$ 2,050,170$ -$ -$ -$ -$ -$ -$ -$ OTHER:

1 DHCCP Debt Service on Bond/Arbitrage/Trustee Admin 2,460,000$ 2,460,000$ 1

2 Executive Director 350,789$ 87,697$ 175,395$ 87,697$ 2

3 Executive Assistant 97,799$ 48,899$ 24,450$ 24,450$ 3

4 Special Projects Coordinator 155,727$ 77,864$ 38,932$ 7,786$ 31,145$ 4

5 General Counsel 294,932$ 73,733$ 147,466$ 73,733$ 5

6 Water Policy Director 257,767$ 257,767$ 6

7 Science Manager/Special Projects Manager 250,000$ 250,000$ 7

8 In-House Staff 562,791$ 65,000$ 30,780$ 1,368$ 3,420$ 10,000$ 194,991$ 194,991$ 44,929$ 5,000$ 3,420$ 3,420$ 5,472$ 8

9 Law Clerk 40,000$ 40,000$ 9

10 Sacramento Administrative Office (SAO) 100,000$ 45,000$ 10,000$ 45,000$ 10

11 Other Services & Expenses 54,785$ 21,560$ 6,000$ 1,600$ 8,500$ 8,500$ 8,625$ 11

12 License & Continuing Education 4,800$ 1,750$ 2,550$ 250$ 250$ 12

13 Organizational Membership 90,250$ 90,250$ 13

14 Conferences & Training 28,300$ 4,625$ 8,675$ 5,000$ 5,000$ 5,000$ 14

15 Travel/Mileage 106,125$ 46,125$ 40,000$ 5,000$ 5,000$ 10,000$ 15

16 Group Meetings 13,000$ 6,000$ 5,000$ 500$ 500$ 1,000$ 16

17 Telephone 11,090$ 2,790$ 4,000$ 800$ 1,250$ 1,250$ 1,000$ 17

DMC/EO&M 26,020,474$ 26,020,474$

Sub Total 30,898,629$ 26,353,667$ 635,411$ 835,652$ -$ 1,368$ -$ 3,420$ 12,400$ 215,491$ 215,491$ 70,554$ 43,932$ 11,206$ 34,565$ 2,465,472$

Total Expenditures 39,113,558$ 26,446,667$ 756,961$ 5,028,999$ -$ 51,868$ -$ 3,420$ 2,237,570$ 832,572$ 832,572$ 229,754$ 43,932$ 11,206$ 172,565$ 2,465,472$

PROPOSED FINAL

Subject to rounding 2

SAN LUIS & DELTA-MENDOTA WATER AUTHORITY

MARCH 1, 2020 - FEBRUARY 28, 2021

FY 21 MEMBERSHIP ASSESSMENT

BOD 2/6/2020

PROPOSED FINAL Recommended by WRC & FAC03 05 06 35 09 28 22 64 65 67 68 44 56 16

DHCCP BOND Debt

Service/Other

Financing Participants

Only (2013A Issue)

Total Membership

Assessment

General

Fund

(03)

Leg/Op

(05)

Reallo

Agreement

(06)

Contract

Renewal

Coordinator

(35)

Leg/Op #3

(09)

Yuba Co. Water

Trans.

(28)

Sub Fund of

Leg/Op#3

GBD Dr #3A

(22)

SGMA

Northern Delta-

Mendota

Region (64)

SGMA Central

Delta-Mendota

Region (65)

Integrated

Regional Water

Management

(67)

Los Vaqueros *

(68)

Exchange

Contractor 5 Year

Transfer*

(44)

Long-Term North

to South Water

Transfers*

(56)

DHCCP

(16)

TOTAL ASSESSMENT 2,460,000$ 9,259,669$ 312,004$ 4,259,497$ 286$ (67,953)$ 663$ 5,579$ 1,421,339$ 1,420,724$ 1,288,708$ 318,343$ 43,932$ 11,518$ 237,283$ 7,746$

DIVISION 1

1. Banta-Carbona Irrigation District 57,694$ 2,146$ 34,348$ (693)$ 7$ 21,886$

2. Byron Bethany Irrigation District 36,105$ 37,020$ 2,208$ 35,359$ (714)$ 8$ 69$ -$ 89$

3. City of Tracy 35,801$ 2,146$ 34,348$ (693)$ -$ -$

4. Del Puerto Water District 639,202$ 15,115$ 241,599$ (4,872)$ 51$ 471$ 346,746$ 40,093$

5. Patterson Irrigation District 281,407$ 2,426$ 34,141$ (571)$ 6$ 223,519$ 21,886$

6. West Side Irrigation District 4,709$ 280$ 4,523$ (95)$ 1$ -$

7. West Stanislaus Irrigation District 371,569$ 5,380$ 86,108$ (1,740)$ 18$ 245,201$ 36,601$

Total Division 1 36,105$ 1,427,402$ 29,701$ 470,427$ (9,378)$ 92$ 540$ 815,466$ 120,467$ 89$

DIVISION 2 1. Panoche Water District 164,754$ 349,223$ 10,139$ 162,049$ (3,269)$ 34$ 316$ 179,547$ -$ 406$

2. San Luis Water District 219,228$ 453,181$ 13,498$ 215,678$ 14$ (4,349)$ 46$ 416$ 227,338$ -$ 540$

3. Westlands Water District 1,962,536$ 2,171,696$ 125,925$ 2,013,483$ 129$ (40,628)$ 429$ 3,922$ 63,389$ 5,048$

4. Charleston Drainage District 37,266$ 37,266$ -$

5. Panoche Drainage District 677,779$ 677,779$ -$

6. Pleasant Valley 24,927$ 500$ 24,427$

Total Division 2 2,346,517$ 3,714,071$ 150,062$ 2,391,209$ 143$ (48,246)$ 509$ 4,654$ 715,045$ 406,885$ 87,816$ 5,994$

DIVISION 3

1. Central California Irrigation District 604,060$ 57,380$ 509,791$ 36,601$ 288$

2. Firebaugh Canal Water District 294,068$ 9,175$ 81,504$ 203,344$ -$ 46$

3. Grassland Water District 56,882$ 5,754$ 51,129$ -$ -$

4. HMRD #2131 174,388$ 17,634$ 156,666$ -$ 88$

5. Columbia Canal Company (Friend Member) 63,035$ 6,376$ 56,628$ -$ 32$

6. Camp 13 Drainers 27,245$ -$ -$ 27,245$ -$ -$

Total Division 3 -$ 1,219,679$ 96,318$ 855,717$ 230,589$ 36,601$ 454$

DIVISION 4

1. San Benito County Water District 79,048$ 4,727$ 75,521$ (1,522)$ 13$ 119$ -$ 189$

2. Valley Water District 294,020$ 16,608$ 265,485$ 143$ (5,355)$ 13$ 117$ 16,344$ 666$

Total Division 4 373,068$ 21,335$ 341,006$ 143$ (6,877)$ 26$ 236$ 16,344$ 855$

DIVISION 5

1. Broadview Water District 45,352$ 48,826$ 2,923$ 46,624$ (939)$ 10$ 90$ -$ 117$

2. Eagle Field Water District 7,975$ 76,292$ 498$ 7,870$ (156)$ 2$ 15$ 68,044$ -$ 20$

3. Fresno Slough Water District -$ 76,148$ 529$ 7,710$ (136)$ 1$ 68,044$ -$ -$

4. James Irrigation District -$ 73,963$ 4,852$ 70,171$ (1,230)$ 13$ -$ 158$

5. Laguna Water District 1,402$ 1,499$ 93$ 1,429$ (27)$ 0$ -$ 3$

6. Mercy Springs Water District 4,981$ 73,260$ 311$ 4,984$ (102)$ 1$ 10$ 68,044$ -$ 12$

7. Oro Loma Water District 77,322$ 77,322$ -$

8. Pacheco Water District 17,667$ 202,354$ 1,089$ 17,432$ (353)$ 4$ 34$ 98,227$ 85,878$ -$ 44$

9. Reclamation District 1606 763$ 62$ 707$ (7)$ 0$ -$ 1$

10. Tranquillity Irrigation District 164,790$ 3,670$ 43,207$ (482)$ 5$ 102,046$ 16,344$ -$

11. Turner Island Water District 500$ 500$ -$

Total Division 5 77,377$ 795,717$ 14,526$ 200,135$ (3,433)$ 36$ 149$ 98,227$ 469,378$ 16,344$ 354$

OTHER

1. City of Patterson 188,097$ 188,097$

2. Northwestern Delta-Mendota (SS-MOA Participant) 387,010$ 387,010$

3. Oak Flat 30,152$ 30,152$

4. FT Land LLC 1,045$ 62$ 1,003$ (20)$

5. Central DM Region Multi-Agency GSA 335,122$ 335,122$

6. Widren Water District (SS-MOA Participant) 77,322$ 77,322$

7. IRWM - MOA Participant 40,771$ 40,771$

Total Other 1,059,519$ 62$ 1,003$ (20)$ 605,258$ 412,445$ 40,771$

Groundwater WDR Specific

1. Camp 13 Drainage District 22,158$ 22,158$

2. Charleston Drainage District 17,326$ 17,326$

3. Firebaugh Canal Water District 101,617$ 101,617$

4. Pacheco Water District 21,101$ 21,101$

5. Panoche Drainage District 176,395$ 176,395$

6. SJRIP 24,763$ 24,763$

7. Private Lands not in a district 14,118$ 14,118$

Total Groundwater WDR Specific 377,478$ 377,478$

Total 2,460,000$ 8,966,933$ 312,004$ 4,259,497$ 286$ (67,953)$ 663$ 5,579$ 1,421,339$ 1,420,724$ 1,288,708$ 318,343$ -$ -$ -$ 7,746$

* Total Unallocated Assessment; Allocations to be

determined at later date. 292,733$

Subject to rounding 3

Proposed

WY 2020 O & M Water Rates

Finance & Administration Committee

February 3, 2020

Board of Directors

February 6, 2020

San Luis & Delta-Mendota Water Authority Los Banos Administrative Office Los Banos Field Office

Tracy Field Office C.W. “Bill” Jones Pumping Plant O'Neill Pumping Plant

San Luis & Delta-Mendota Water Authority

Notes to Support the Proposed WY20 O&M Rates to FAC 2.3.20 / BOD 2.6.20

1 O&M Budget - Self Funded

WY20 - Fiscal Year 3/1/20-2/28/21

RO&M = $15,217,122

1 EO&M = $4,578,680

2 Delivery Assumptions

Ag - Contractor Estimates, 25%, with Contractor projections

M&I - Contractor Estimates, 50%, with Contractor projections

Refuge - 100% used BOR Refuge Estimate

Exchange/Water Rights - 100%

Estimated Rescheduled Water

Pump-Ins

Miscellaneous Transfers

Mendota Pool Pumpers

Volta Well Pumping

3 Intertie

Intertie anticipated to be used in WY20, estimated at 150,000 a/f per SLDMWA

Final cost allocation for Intertie O&M, Intertie PUE and DWR Conveyance

remains undetermined.

4 Volta Wells

Volta Wells Program estimated at 2,400 a/f per GWD. Costs split between DPWD and SLWD.

5 PUE SLDMWA Meters

WY20 PUE estimates based on BOR PUE FYE 9/30/20

PUE Budget relating to WY20 - FY 3/1/20- 2/28/21 = $26,050,000

PUE Budget relating to WY19 - FY 3/1/19- 2/29/20 = $25,560,000

6 DWR San Luis Joint Use

WY20 SLJU estimates based on DWR SLJU Calendar Year Budget Estimates

SLJU Budget relating to WY20 - FY 3/1/20- 2/28/21 = $13,805,000

SLJU Budget relating to WY19 - FY 3/1/19- 2/29/20 = $13,350,000

Federal cost allocation for 2016-2020 = 39.90%

7 EO&M Funding

Funding Obligation:

1 EO&M Funding Obligation WY20 FY3/1/20 - 2/28/21 = $4,600,000, EO&M Budget = $4,578,680

EO&M Rewind Estimated Debt Service Funding Obligation WY20 FY3/1/20 - 2/28/21 = $400,000

8 Overall Increase in Estimated Recoverable Costs over Prior Year.

Total Estimated Recoverable Costs in Water Year 2020= 63,312,124$

Total Estimated Recoverable Costs in Water Year 2019= (63,538,785)$

(226,661)$

* See page 4 for detail

Decrease

1

FAC 2.3.20 / BOD 2.6.20

WY 2020 Rate WY 2019 Rate

3/1/20-2/28/21 3/1/19-2/29/20

Proposed Current

WY2020 WY2019 Variance

WATER SUPPLYIrrigation 25% 75% -50%

M&I 50% 100% -50%

Refuge 100% 100% 0%

Exchange/Water Rights 100% 100% 0%

RATES

Upper DMC $22.69 $17.56 $5.13

Upper DMC - Exhange/Wtr Rts $18.53 $15.18 $3.35

Lower DMC/Pool $27.45 $20.11 $7.34

Lower DMC/Pool - Exchange/Wtr Rts $23.29 $17.73 $5.56

San Felipe $27.57 $20.26 $7.31

SLC Above Dos Amigos $55.60 $29.76 $25.84

SLC Below Dos Amigos $71.99 $37.91 $34.08

Volta Wells $47.16 $31.93 $15.23

San Luis Drain $0.34 $0.17 $0.17

Proposed WY20 O&M Rates - @ 25% ALLOCATION

San Luis & Delta-Mendota Water Authority

2

WY20 O&M Rates 25percent alloc_FAC 2.3.20 Rate Comp 2.3.20 FAC 1/30/2020

SLDMWA SLDMWASLDMWA TOTAL

UPPER UPPER JPP PWR VOLTA LOWER RESERVES RESERVESRESERVES POWER

Upper DMC/ Intertie WELLS Lower DMC/ Unit 6 RewindUnit 2 RewindSan Luis Canal Dos Amigos Dos Amigos

JPP (Temporary Cost Pool) Mendota Pool BOR RepaymentSelf-Funded O&M O&M Power

All Users All Users All Users LowerDMC & All Users All Users All Users All SLJU Dos Amigos Dos Amigos

Excludes Exchange Cont. (Actual DPWD MP Users "Direct" "Storage" Users Users Users

and Water Rights Pumping Only) SLWD

$8,757,182 $3,734,666 $18,900,000 $113,179 $5,493,460 $2,634,775 $325,646 $4,600,000 $400,000 $11,605,000 $2,015,000 $4,605,000 $63,183,908

1,782,546 898,459 1,775,363 2,400 1,153,763 513,451 1,320,801 % of 10 Yr % of 10 Yr % of 10 Yr 413,983 403,983 403,983

Historical Use Historical UseHistorical Use

$4.91 $4.16 $10.65 $47.16 $4.76 $5.13 $0.25 $2.50 $0.22 $28.03 $4.99 $11.40

A Aa B C D E F G H I J K L

SLDMWA COMPONENT RATE PER ACRE FOOT - BY DELIVERY AREA / CONTRACTOR Direct Storage

Upper DMC $22.69 A+Aa+B+F+G+H+I O&M = $0.96 O&M = $.05 Irrigation 25%

Exchange/Wtr Rts (Upper) $18.53 A+B+F+G+H+I Excludes Intertie O&M DWR = $.32 O&M DWR = $.02 M&I 50%

Lower DMC/Pool $27.45 A+Aa+B+D+F+G+H+I Pwr = $3.85 Pwr = $.18 Refuge 100%

San Felipe $27.57 A+Aa+B+E+G+H+I Ex/Wtr Rts 100%

San Luis Canal Above Dos Amigos $55.60 A+Aa+B+E+G+H+I+J

San Luis Canal Below Dos Amigos $71.99 A+Aa+B+E+G+H+I+J+K+L O&M $0.96 $0.05

Exchange/Wtr Rts (Lower) $23.29 A+B+D+F+G+H+I Excludes Intertie DWR 0.32$ $0.02

Refuge (Lower ) $27.45 A+Aa+B+D+F+G+H+I PUE 3.85$ $0.18

Volta Wells $47.16 C $5.13 $0.25

San Luis Drain $0.34 $128,214

**COSTS TO BE ALLOCATED

included in $

O&M Budget per above $15,088,910 555,421.37$ 494,325.02$ 0.962750134

Required Reserve Funding $4,600,000 61,096.35$ 0.046257045

Estimated Rewind Reserve Funding - Debt Service $400,000

Estimated Rewind Reserve Funding - Unit 2 $0San Luis Drain $128,214 555,421.37$

Volta Well Project-

GWD - Monitoring $0

Intertie: DWR Wheeling $3,240,000

POWER

JPP $18,900,000

Interite $325,000

Volta Wells $0

O'Neill $2,220,000 $21,445,000 2,220,000.00$ 1,975,800.00$ 3.848078979

244,200.00$ 0.184887807

SAN LUIS JOINT USE 2,220,000.00$ O'Neill Split

DWR - San Luis Canal O&M $11,605,000 89%/11%

DWR - Dos Amigos O&M $2,015,000

DWR - O'Neill $185,000 185,000.00$ 164,650.00$ 0.320673248

20,350.00$ 0.015407317

POWER 185,000.00$

Dos Amigos $4,605,000

$63,312,124

SLDMWA - O&M RatesProposed - WY2020 SELF-FUNDING O&M WATER RATES - @ 25% ALLOCATION

Board of Directors 2.6.20

SLDMWA ANNUAL O&M and POWER SLJU

Finance & Administration Committee 2.3.20

O'Neill O&M

WATER SUPPLY ASSUMPTIONS

Note: Supply assumptions include

Contractor Estimates

COST POOLS O'NEILL P/G

3

PARTICIPANTS All Users

COSTS TO BE ALLOCATED**

ACRE FEET

RATE PER AF

DWR COSTS

WY20 O&M Rates 25percent alloc_FAC 2.3.20 Total 2.3.20 FAC1/30/2020

San Luis & Delta-Mendota Water Authority

Self-Funding O&M Budget Comparison WY20/WY192.3.20 FAC / 2.6.20 BOD

RO&M EO&M Self-Funding

Reserve Obligation Self-Funding PUE Self-Funding SLJU

Volta Wells Outside

Service (GWD)

Intertie DWR

Conveyance

Total, does not include

EO&M Budget

WY20 15,217,124$ 5,000,000$ 26,050,000$ 13,805,000$ -$ 3,240,000$ 63,312,124$

WY19 (13,086,535)$ (8,625,000)$ (25,560,000)$ (13,350,000)$ (17,250)$ (2,900,000)$ (63,538,785)$

Variance 2,130,589$ (3,625,000)$ 490,000$ 455,000$ (17,250)$ 340,000$ (226,661)$

* * * * * *

* Included in O&M Rate Calculation

Volta Wells (DPWD & SLWD only)

Intertie DWR Conveyance

4

O&M

Reserve Obligation

Project Use Energy (PUE)

San Luis Joint Use (SLJU)

2.3.20 FAC / 2.6.20 BOD

UPPER UPPER JPP PWR Volta Wells LOWER POWER

Upper DMC/ Intertie Lower DMC/ San Luis Canal Dos Amigos Dos Amigos

JPP (Temporary Cost Pool) Mendota Pool O&M O&M Power

All Users All Users All Users

BOR /

DPWD/SLWD LowerDMC & All SLJU Dos Amigos Dos Amigos

Excludes Exchange Cont. (Actual MP Users "Direct" "Storage" Users Users Users

and Water Rights Pumping Only)

1,782,546 898,459 1,775,363 2,400 1,153,763 513,451 1,320,801 413,983 403,983 403,983

2,326,761 1,444,000 2,324,415 2,025 1,169,749 1,187,931 1,315,399 1,007,972 997,972 997,972

.

(544,215) (545,541) (549,052) 375 (15,986) (674,480) 5,402 (593,989) (593,989) (593,989)

PARTICIPANTS All Users

WY20 ACRE FEET @ 25% allocation

WY19 ACRE FEET @ 75% allocation

SLDMWA - WY20 Proposed O&M Water Rates - @ 25% ALLOCATIONWY20/WY19 Deliveries Comparison

5

SLDMWA ANNUAL O&M and POWER SLJU

Variance

COST POOLS O'NEILL P/G DWR COSTS

O'Neill O&M

WY20 O&M Rates 25percent alloc_FAC 2.3.20Deliveries Comp 2.3.20 FAC1/30/2020

San Luis & Delta-Mendota Water Authority

Notes to Support the Proposed WY20 O&M Rates to FAC 2.3.20 / BOD 2.6.20

1 O&M Budget - Self Funded

WY20 - Fiscal Year 3/1/20-2/28/21

RO&M = $15,217,122

1 EO&M = $4,578,680

2 Delivery Assumptions

Ag - Contractor Estimates, 40%, with Contractor projections

M&I - Contractor Estimates, 65%, with Contractor projections

Refuge - 100% used BOR Refuge Estimate

Exchange/Water Rights - 100%

Estimated Rescheduled Water

Pump-Ins

Miscellaneous Transfers

Mendota Pool Pumpers

Volta Well Pumping

3 Intertie

Intertie anticipated to be used in WY20, estimated at 150,000 a/f per SLDMWA

Final cost allocation for Intertie O&M, Intertie PUE and DWR Conveyance

remains undetermined.

4 Volta Wells

Volta Wells Program estimated at 2,400 a/f per GWD. Costs split between DPWD and SLWD.

5 PUE SLDMWA Meters

WY20 PUE estimates based on BOR PUE FYE 9/30/20

PUE Budget relating to WY20 - FY 3/1/20- 2/28/21 = $26,050,000

PUE Budget relating to WY19 - FY 3/1/19- 2/29/20 = $25,560,000

6 DWR San Luis Joint Use

WY20 SLJU estimates based on DWR SLJU Calendar Year Budget Estimates

SLJU Budget relating to WY20 - FY 3/1/20- 2/28/21 = $13,805,000

SLJU Budget relating to WY19 - FY 3/1/19- 2/29/20 = $13,350,000

Federal cost allocation for 2016-2020 = 39.90%

7 EO&M Funding

Funding Obligation:

1 EO&M Funding Obligation WY20 FY3/1/20 - 2/28/21 = $4,600,000, EO&M Budget = $4,578,680

EO&M Rewind Estimated Debt Service Funding Obligation WY20 FY3/1/20 - 2/28/21 = $400,000

8 Overall Increase in Estimated Recoverable Costs over Prior Year.

Total Estimated Recoverable Costs in Water Year 2020= 63,312,124$

Total Estimated Recoverable Costs in Water Year 2019= (63,538,785)$

(226,661)$

* See page 4 for detail

Decrease

1

FAC 2.3.20 / BOD 2.6.20

WY 2020 Rate WY 2019 Rate

3/1/20-2/28/21 3/1/19-2/29/20

Proposed Current

WY2020 WY2019 Variance

WATER SUPPLYIrrigation 40% 75% -35%

M&I 65% 100% -35%

Refuge 100% 100% 0%

Exchange/Water Rights 100% 100% 0%

RATES

Upper DMC $19.51 $17.56 $1.95

Upper DMC - Exhange/Wtr Rts $16.26 $15.18 $1.08

Lower DMC/Pool $24.26 $20.11 $4.15

Lower DMC/Pool - Exchange/Wtr Rts $21.01 $17.73 $3.28

San Felipe $22.81 $20.26 $2.55

SLC Above Dos Amigos $41.79 $29.76 $12.03

SLC Below Dos Amigos $52.80 $37.91 $14.89

Volta Wells $47.16 $31.93 $15.23

San Luis Drain $0.22 $0.17 $0.05

Proposed WY20 O&M Rates - @ 40% ALLOCATION

San Luis & Delta-Mendota Water Authority

2

WY20 O&M Rates 40percent alloc_FAC 2.3.20 Rate Comp 2.3.20 FAC 1/30/2020

SLDMWA SLDMWASLDMWA TOTAL

UPPER UPPER JPP PWR VOLTA LOWER RESERVES RESERVESRESERVES POWER

Upper DMC/ Intertie WELLS Lower DMC/ Unit 6 RewindUnit 2 RewindSan Luis Canal Dos Amigos Dos Amigos

JPP (Temporary Cost Pool) Mendota Pool BOR RepaymentSelf-Funded O&M O&M Power

All Users All Users All Users LowerDMC & All Users All Users All Users All SLJU Dos Amigos Dos Amigos

Excludes Exchange Cont. (Actual DPWD MP Users "Direct" "Storage" Users Users Users

and Water Rights Pumping Only) SLWD

$8,757,182 $3,734,666 $18,900,000 $113,179 $5,493,460 $2,634,775 $325,646 $4,600,000 $400,000 $11,605,000 $2,015,000 $4,605,000 $63,183,908

2,034,156 1,150,069 2,029,973 2,400 1,156,050 742,238 1,345,424 % of 10 Yr % of 10 Yr % of 10 Yr 611,535 601,535 601,535

Historical Use Historical UseHistorical Use

$4.31 $3.25 $9.31 $47.16 $4.75 $3.55 $0.25 $2.20 $0.19 $18.98 $3.35 $7.66

A Aa B C D E F G H I J K L

SLDMWA COMPONENT RATE PER ACRE FOOT - BY DELIVERY AREA / CONTRACTOR Direct Storage

Upper DMC $19.51 A+Aa+B+F+G+H+I O&M = $0.67 O&M = $.05 Irrigation 40%

Exchange/Wtr Rts (Upper) $16.26 A+B+F+G+H+I Excludes Intertie O&M DWR = $.22 O&M DWR = $.02 M&I 65%

Lower DMC/Pool $24.26 A+Aa+B+D+F+G+H+I Pwr = $2.66 Pwr = $.18 Refuge 100%

San Felipe $22.81 A+Aa+B+E+G+H+I Ex/Wtr Rts 100%

San Luis Canal Above Dos Amigos $41.79 A+Aa+B+E+G+H+I+J

San Luis Canal Below Dos Amigos $52.80 A+Aa+B+E+G+H+I+J+K+L O&M $0.67 $0.05

Exchange/Wtr Rts (Lower) $21.01 A+B+D+F+G+H+I Excludes Intertie DWR 0.22$ $0.02

Refuge (Lower ) $24.26 A+Aa+B+D+F+G+H+I PUE 2.66$ $0.18

Volta Wells $47.16 C $3.55 $0.25

San Luis Drain $0.22 $128,214

**COSTS TO BE ALLOCATED

included in $

O&M Budget per above $15,088,910 555,421.37$ 494,325.02$ 0.665992605

Required Reserve Funding $4,600,000 61,096.35$ 0.045410481

Estimated Rewind Reserve Funding - Debt Service $400,000

Estimated Rewind Reserve Funding - Unit 2 $0San Luis Drain $128,214 555,421.37$

Volta Well Project-

GWD - Monitoring $0

Intertie: DWR Wheeling $3,240,000

POWER

JPP $18,900,000

Interite $325,000

Volta Wells $0

O'Neill $2,220,000 $21,445,000 2,220,000.00$ 1,975,800.00$ 2.661949402

244,200.00$ 0.181504121

SAN LUIS JOINT USE 2,220,000.00$ O'Neill Split

DWR - San Luis Canal O&M $11,605,000 89%/11%

DWR - Dos Amigos O&M $2,015,000

DWR - O'Neill $185,000 185,000.00$ 164,650.00$ 0.221829117

20,350.00$ 0.015125343

POWER 185,000.00$

Dos Amigos $4,605,000

$63,312,124

3

PARTICIPANTS All Users

COSTS TO BE ALLOCATED**

ACRE FEET

RATE PER AF

DWR COSTS

O'Neill O&M

WATER SUPPLY ASSUMPTIONS

Note: Supply assumptions include

Contractor Estimates

COST POOLS O'NEILL P/G

SLDMWA - O&M RatesProposed - WY2020 SELF-FUNDING O&M WATER RATES - @ 40% ALLOCATION

Board of Directors 2.6.20

SLDMWA ANNUAL O&M and POWER SLJU

Finance & Administration Committee 2.3.20

WY20 O&M Rates 40percent alloc_FAC 2.3.20 Total 2.3.20 FAC1/30/2020

San Luis & Delta-Mendota Water Authority

Self-Funding O&M Budget Comparison WY20/WY192.3.20 FAC / 2.6.20 BOD

RO&M EO&M Self-Funding

Reserve Obligation Self-Funding PUE Self-Funding SLJU

Volta Wells Outside

Service (GWD)

Intertie DWR

Conveyance

Total, does not include

EO&M Budget

WY20 15,217,124$ 5,000,000$ 26,050,000$ 13,805,000$ -$ 3,240,000$ 63,312,124$

WY19 (13,086,535)$ (8,625,000)$ (25,560,000)$ (13,350,000)$ (17,250)$ (2,900,000)$ (63,538,785)$

Variance 2,130,589$ (3,625,000)$ 490,000$ 455,000$ (17,250)$ 340,000$ (226,661)$

* * * * * *

* Included in O&M Rate Calculation

Volta Wells (DPWD & SLWD only)

Intertie DWR Conveyance

4

O&M

Reserve Obligation

Project Use Energy (PUE)

San Luis Joint Use (SLJU)

2.3.20 FAC / 2.6.20 BOD

UPPER UPPER JPP PWR Volta Wells LOWER POWER

Upper DMC/ Intertie Lower DMC/ San Luis Canal Dos Amigos Dos Amigos

JPP (Temporary Cost Pool) Mendota Pool O&M O&M Power

All Users All Users All Users

BOR /

DPWD/SLWD LowerDMC & All SLJU Dos Amigos Dos Amigos

Excludes Exchange Cont. (Actual MP Users "Direct" "Storage" Users Users Users

and Water Rights Pumping Only)

2,034,156 1,150,069 2,029,973 2,400 1,156,050 742,238 1,345,424 611,535 601,535 601,535

2,326,761 1,444,000 2,324,415 2,025 1,169,749 1,187,931 1,315,399 1,007,972 997,972 997,972

.

(292,605) (293,931) (294,442) 375 (13,699) (445,693) 30,025 (396,437) (396,437) (396,437)

5

SLDMWA ANNUAL O&M and POWER SLJU

Variance

COST POOLS O'NEILL P/G DWR COSTS

O'Neill O&M

PARTICIPANTS All Users

WY20 ACRE FEET @ 40% allocation

WY19 ACRE FEET @ 75% allocation

SLDMWA - WY20 Proposed O&M Water Rates - @ 40% ALLOCATIONWY20/WY19 Deliveries Comparison

WY20 O&M Rates 40percent alloc_FAC 2.3.20Deliveries Comp 2.3.20 FAC1/30/2020

MEMORANDUM

TO: Finance & Administration Committee and SLDMWA Board of Directors, Alternates

FROM: Joyce Machado, Director of Finance

DATE: February 3, 2020

RE: Resolution Amending Signature Requirements For Central Valley Community Bank

BACKGROUND The Board of Directors has previously authorized the establishment of commercial investment, checking and savings accounts at Central Valley Community Bank (CVCB) and through Resolutions 2009-293 and 2017-415, the Board identified the signatures by which checks could be written from the Authority’s general checking and payroll accounts. One of the authorized signatures is of the Assistant Executive Director. The current Assistant Executive Director is scheduled to retire at the end of March, and the position has been replaced by the Chief Operating Officer position.

ISSUE FOR DECISION Whether the Chief Operating Officer position should replace the Assistant Executive Director as an authorized signature for signing checks.

RECOMMENDATION

We recommend the Chief Operating Officer position be included along with the Chairman of the Board, Vice Chairman of the Board, Executive Director, Treasurer/Auditor, Director of Finance, and the Director of Human Resources as authorized signatures for the Authority’s general checking accounts with Central Valley Community Bank.

IMPLICATIONS If the Chief Operating Officer is not added as an additional authorized signatory, it may be difficult to obtain the required two signatures necessary to issue checks. When two signatures are not available, processing of payroll and payables are delayed.

SAN LUIS & DELTA-MENDOTA WATER AUTHORITY

RESOLUTION NO. 2020-___

RESOLUTION AMENDING SIGNATURE REQUIREMENTS FOR

CENTRAL VALLEY COMMUNITY BANK

WHEREAS, the Board of Directors of the San Luis & Delta-Mendota Water Authority

(the "Board" and the "Authority," respectively) previously authorized the establishment of

commercial investment, checking, and savings accounts at Central Valley Community Bank; and

WHEREAS, through Resolution 2017-415, the Board identified the signatures by which

checks could be written from the Authority’s general checking and payroll accounts; and

WHEREAS, the Board now seeks to update the signatures required to write checks from

a general checking and payroll accounts.

NOW, THEREFORE, BE IT RESOLVED, AS FOLLOWS, THAT:

Section 1. The facts stated in the recitals above are true and correct, and the Board so

finds and determines.

Section 2. Checks written on the Authority’s general checking account at Central Valley

Community Bank shall be issued on two (2) original signatures, being any two (2) of the

following: Chairman of the Board, Vice Chairman of the Board, Executive Director, Chief

Operating Officer, Treasurer/Auditor, Director of Finance, or Director of Human Resources.

Section 3. Checks written on the Authority’s payroll checking account at Central Valley

Community Bank shall be issued on two (2) signatures, being any two (2) of the following:

Chairman of the Board, Vice Chairman of the Board, Executive Director, Chief Operating

Officer, Treasurer/Auditor, Director of Finance, or Director of Human Resources; provided,

however, that each check shall have at least one (1) original signature. The second signature

may be either an original signature or countersigned with a facsimile stamped signature of the

Executive Director or the Chief Operating Officer.

Section 4. The Executive Director and the Treasurer/Auditor, or either of them, are each

further authorized and directed to take any and all such additional actions, including without

limitation, the execution of documents, as may be required or reasonably necessary to carry out

the intention of this Resolution and this Resolution is hereby ratified and confirmed as the duly

authorized action of the Authority.

PASSED, APPROVED AND ADOPTED this 6th day of February, 2020, by the Board

of Directors of the San Luis & Delta-Mendota Water Authority.

__________________________________________________

Cannon Michael, Chairman

SAN LUIS & DELTA-MENDOTA WATER AUTHORITY

Attest:

__________________________________________________

Federico Barajas, Secretary

* * * * * *

I hereby certify that the foregoing Resolution No. 2020-__ was duly and regularly

adopted by the Board of Directors of the San Luis & Delta-Mendota Water Authority at the

meeting thereof held on the 6th day of February, 2020.

_________________________________

Federico Barajas, Secretary

MEMORANDUM

TO: SLDMWA Board of Directors, Alternates

FROM: Seth Harris, Water Resource Coordinator

DATE: February 6, 2020

RE: Third Amendment to the Central Delta-Mendota Region Sustainable Groundwater Management Act (SGMA) Services Activity Agreement and Consent of SS-MOA Participants

BACKGROUND The San Luis & Delta-Mendota Water Authority is coordinating the development of six groundwater sustainability plans (GSPs) within the Delta-Mendota Subbasin. The Delta-Mendota Subbasin is categorized as a high-priority critically overdraft Subbasin, and was required to submit GSPs by January 31, 2020; the Subbasin’s six GSPs were successfully and timely submitted. SLDMWA also directly supports GSP development for the Northern & Central Delta-Mendota Region GSP. The governance of the GSAs within the Northern and Central Delta-Mendota Regions is established through the Northern and Central Delta-Mendota Region SGMA Services Activity Agreements and Consent of SGMA Services Memorandum of Agreement (SS-MOA) Participants. SLDMWA members and non-members that participate as groundwater sustainability agencies (GSAs) within the Northern and Central Delta-Mendota Regions have collaborated to develop these Activity Agreements; non-members have executed Memoranda of Agreement to participate in the Activity Agreements as SS-MOA participants. Three GSAs comprise the Central Delta-Mendota Region: Central Delta-Mendota GSA, Oro Loma Water District GSA, and Widren Water District GSA. The Central Delta-Mendota GSA is a recently formed joint powers authority (as of August 28, 2019) that consists of SLDMWA members and non-members. The agencies that comprise the Central Delta-Mendota GSA were formerly coordinating through a memorandum of agreement as the Central Delta-Mendota Region Multi-Agency GSA; the Central Delta-Mendota GSA replaced this multi-agency GSA. The objective of the participants under this Activity Agreement is to obtain coordinated access to the administrative and technical resources and services available through the Water Authority and to provide the mechanisms to share the benefits and expenses of obtaining such resources and services.

Memo to SLDMWA Board of Directors February 6, 2020 Page 2 of 2

The Third Amendment of the Central Delta-Mendota Region SGMA Services Activity Agreement and Consent of SS-MOA Participants allows the members of the Central Delta-Mendota GSA to delegate voting authority on the Central Delta-Mendota Region Management Committee.

RECOMMENDATION

Staff recommends the Board of Directors authorize execution of the Third Amendment to the Central Delta-Mendota Region SGMA Services Activity Agreement and Consent of SS-MOA Participants, contingent on ratification by the Central Delta-Mendota Region Management Committee.

ANALYSIS / DISCUSSION SLDMWA staff has supported representatives of the various Central Delta-Mendota Region GSAs since December 2015. SLDMWA has supported participating agencies and GSAs in the development of the Activity Agreements and subsequent amendments. The Central Delta-Mendota Region Activity Agreement was executed February 15, 2017, first amended November 17, 2017, and amended a second time effective November 1, 2018. The Third Amendment to the Central SGMA Services Activity Agreement includes proposed amendments to three sections within the Activity Agreement. These sections all pertain to delegating voting authority on the Central Delta-Mendota Region Management Committee. The Third Amendment was developed with input from staff and legal counsel from various agencies within the Central Delta-Mendota Region Management Committee as well as from SLDMWA. It is intended to streamline participation in the Activity Agreement for members of the Central Delta-Mendota JPA, which should also streamline administrative tasks and coordination for SLDMWA staff.

EXHIBITS

1. Third Amendment to Central Delta-Mendota Region Sustainable Groundwater Management Act Services Activity Agreement and Consent of SS-MOA Participants

MEMORANDUM

TO: SLDMWA Board of Directors, Alternates

FROM: Seth Harris, Water Resources Coordinator

DATE: February 6, 2020

RE: Board of Directors to Consider Central Delta-Mendota Region SGMA Management Committee and Northern Delta-Mendota Region SGMA Management Committee Recommendations Regarding $265,000 Increase to FY20 Activity Agreement Budgets

BACKGROUND

The San Luis & Delta-Mendota Water Authority is coordinating the development of six Groundwater Sustainability Plans (GSPs) for the participating GSP Groups within the Delta-Mendota Subbasin (Subbasin). SLDMWA also directly supports GSP development for the Northern & Central Delta-Mendota Region GSP (N-C DM Region), one of the six GSP Groups. The Delta-Mendota Subbasin is categorized as a high-priority critically overdraft subbasin, so it is required to submit GSPs by January 31, 2020 and begin implementation of these GSPs starting February 1, 2020. The six Delta-Mendota GSPs were successfully submitted on January 23, 2020. Woodard & Curran is the primary consultant leading the GSP development efforts in the N-C DM Region and supports the Coordination Committee, which consists of representatives from each GSP Group in the Subbasin. The consultant services agreement and task order outlining this support expires on January 31, 2020. In order for the GSAs in the Subbasin to continue to receive needed support through the Woodard & Curran team, it is necessary to increase the Fiscal Year 2020 contract budget and extend the timing of the GSP development contract. The Northern and Central Management Committees voted to recommend approval of this budget increase and authorization for the SLDMWA Board of Directors during the January 30th Joint Northern and Central Delta-Mendota Region Management Committees meeting.

ISSUE FOR DECISION

Whether the SLDMWA Board of Directors should approve an increase to the Fiscal Year 2020 SGMA Activity Agreements budget and authorize an amendment to the consultant services

agreement with Woodard & Curran for GSP development to complete coordination work and grant management.

RECOMMENDATION

The Northern and Central Delta-Mendota Region Management Committees recommend the proposed Fiscal Year 2020 budget increase and consultant services agreement amendment.

ANALYSIS / IMPLICATIONS

The proposed contract extension and budget increase will allow Woodard & Curran to continue services to complete coordination and grant management necessary to comply with SGMA regulations in the Delta-Mendota Subbasin.

The SLDMWA Board of Directors will consider approval of this budget increase and contract amendment during the February 6th Board meeting. This Board approval will be contingent upon the Coordination Committee’s approval of the Coordinated costs during the February 10th Coordination Committee meeting.

BUDGET

The proposed budget increase can be separated into three components: support for the Northern and Central Regions, support for the Coordination Committee, and items associated with the current grant agreement. The proposed increase for the Northern & Central Delta-Mendota Region is $12,758. Tasks covered under this item include uploading monitoring site and time series data to the SGMA monitoring module as well as general communication and coordination for the Northern and Central Regions. These tasks will conclude in February 2020. The proposed increase for the Coordination Committee activities is $13,744. Tasks included in this component are coordination for the Subbasin-level Annual Report, consistent with direction received by staff from the Committee to proceed with a coordinated Annual Report. These activities will continue through submittal of the Annual Report by April 1, 2020. This Coordinated activities budget also includes activities for general communication at the Subbasin level, which will conclude in February 2020. The proposed increase for activities related to the current grant agreement is $238,557. Activities within this component are fully reimbursable by Category 1 grant funding. This budget increase will allow the Woodard & Curran team to continue its coordination role as it pertains to grant management. This budget will also cover Woodard & Curran’s sub-consultants and their respective projects: Houston Engineering, Inc’s work related to the Coordinated Data Management System and Stantec’s work related to facilitation and outreach. Activities within this component will continue through the end of May 2020.

MEMORANDUM

TO: SLDMWA BOARD OF DIRECTORS

FROM: TOM BOARDMAN, WATER RESOURCES ENGINEER

SUBJECT FEBRUARY OPERATIONS UPDATE

DATE: JANAURY 30, 2020

Project Operations

Jones pumped at its seasonal capacity of about 4200 cfs during all of January amidst an Old and Middle river reverse flow restriction of -5000 cfs that went into effect on January 1 per the salmon BiOp. Jones pumping is scheduled to reduce by 35% by early February when delta outflow requirements increase, and exports are limited to 35% of delta inflow per D1641 standards. Under existing OMR restrictions, increased flows on the San Joaquin river will do the most to support capacity pumping during remainder of spring

Banks pumped at about 30% of its permitted capacity during January per its share of the total allowable export under the revised Coordinated Operation Agreement. SWP pumping may increase slightly in early February as part of keeping COA accounting balanced.

Accumulated precipitation for the Northern Sierra is slightly more than 50% of average for January. However, cold storms earlier in the month helped to somewhat sustain the accumulated snowpack amount of 80% of average.

Shasta storage has increased to more than 3.4 MAF; an increase of 100 TAF from last month and 300 TAF below the reservoir’s flood control curve. The current release of 5,000 cfs may decrease in February to conserve storage if dry weather persists.

Folsom storage has slipped to about 483 TAF; a reduction of 30 TAF from a month ago. Reservoir release has been relatively constant at about 2,000 cfs but may decrease to 1,750 in February to conserve storage.

CVP demands were about 96 TAF during January; about 25% above the 15-year average.

2019-20 San Luis Operations and Allocation Outlook

Since 2000, there has been only four years when CVP San Luis storage has been lower than the current storage of 565 TAF for this date. In addition to refill efforts being affected by export limits related to D1641 and the BiOps affecting, increased demands during February may also hinder refill as growers minimize the amount of water turned back to Reclamation. As shown on the attached San Luis storage projection graphs, the CVP share will fall short of filling with 90% and 50% exceedance conditions by 300 TAF and 170 TAF, respectively. Above normal hydrology with reduced demands will be needed to support enough Jones pumping to fill CVP San Luis during 2020.

2

The new BiOps for delta smelt and salmon are expected to be finalized within the next two weeks. The actions contained in the new BiOps should provide greater operational flexibility. Decisions by Project operators may, at times, lean more towards fish protection rather than water supply.

The following table contains projected allocations based on Reclamation’s most recent Project operations studies under the soon-to-be-finalized BiOps.

Hydrology  90% Exceedance  50% Exceedance 

Water Rights/Refuges  100%  100% 

Ag Service  20‐25%  55‐65% 

Urban  50%  80‐90% 

   

T. Boardman, WWD

1/29/2020

0

100

200

300

400

500

600

700

800

900

1000

1100

1200

1300

1400

1500

1600

1700

1800

1900

2000

2100

Jan Feb Mar Apr May Jun Jul Aug Sep

San Luis Storage

 (TA

F)

End of Month

2019‐2020 San Luis Storage Projection90% Exceedance Hydrology

Total SLR Storage

CVP SLR

Full CVP San Luis

Full  San Luis

Per DWR 1/17/20 Operations Studies 

T. Boardman, WWD

1/29/2020

0

100

200

300

400

500

600

700

800

900

1000

1100

1200

1300

1400

1500

1600

1700

1800

1900

2000

2100

Jan Feb Mar Apr May Jun Jul Aug Sep

San Luis Storage

 (TA

F)

End of Month

2019‐2020 San Luis Storage Projection50% Exceedance Hydrology

Total SLR Storage

CVP SLR

Full CVP San Luis

Full  San Luis

Per DWR 1/17/20 Operation Studies