connection checklist - electranet · 2019. 1. 22. · contact us to have a confidential discussion...

4
CONNECTION CHECKLIST A Guide to preparing your Application to Connect July 2018

Upload: others

Post on 08-Mar-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CONNECTION CHECKLIST - ElectraNet · 2019. 1. 22. · Contact Us To have a confidential discussion about your project, the transmission connection process or how to complete or submit

CONNECTION CHECKLISTA Guide to preparing your Application to ConnectJuly 2018

Page 2: CONNECTION CHECKLIST - ElectraNet · 2019. 1. 22. · Contact Us To have a confidential discussion about your project, the transmission connection process or how to complete or submit

Page 2 l Connection Checklist

Connection Checklist

Item Required information or things to consider

1Completed Application to Connect form ElectraNet website

https://www.electranet.com.au/wp-content/uploads/2018/07/180702_AEMC-Rule-Change-Application-to-Connect-Form_V1-DRAFT.pdf

2Registration with AEMO as an Intending Participant (if not already a Registered Participant)

https://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Participant-information/New-participants/Intending-Participants

3 Detailed Design for those Identified User Shared Assets that will not be provided by ElectraNet (and any other associated requirements as outlined in Chapter 5 of the NER)

4 Project Location Maps (ideally Google Earth files showing project location, boundaries, collector substation site etc)

5 Single Line Diagrams

6 Half hourly generation and/or load profile (Storage projects may require load from the network and this should be considered)

7Plant dynamic models and associated model documentation

https://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Network-connections/Modelling-requirements

8

Releasable User Guides, Data Sheets and any other reference documents

https://www.aemo.com.au/-/media/Files/Electricity/NEM/Network_Connections/Transmission-and-Distribution/Template-for-preparation-of-a-Releasable-User-Guide.docx

https://www.aemo.com.au/-/media/Files/Electricity/NEM/Network_Connections/Transmission-and-Distribution/Guideline-and-Template-for-preparation-of-a-Releasable-User-Guide.pdf

9 Voltage and/or Power Factor Control Strategy

The purpose of this guide is to assist a connecting party in collecting the relevant information required to prepare an NER compliant application to connect. The below table summarises the typical information which will be needed either with the completed application to connect form or throughout the application to connect phase of the project.

There may be information required in addition to that shown in the list below. We will help you in understanding any additional requirements as and when the need arises.

Page 3: CONNECTION CHECKLIST - ElectraNet · 2019. 1. 22. · Contact Us To have a confidential discussion about your project, the transmission connection process or how to complete or submit

Page 3 l Connection Checklist

Item Required information or things to consider

10

Proposed Generator or Customer Performance Standards

https://www.aemo.com.au/-/media/Files/Electricity/NEM/Network_Connections/AEMO-Template-Generator-Performance-Standards.docx

https://www.aemo.com.au/-/media/Files/Electricity/NEM/Network_Connections/Transmission-and-Distribution/Customer_Performance_Standards_Template.doc

https://www.aemo.com.au/-/media/Files/Electricity/NEM/Network_Connections/Transmission-and-Distribution/guidelines_for_assessment_of_generator_proposed_performance_standards.pdf

11 PSS/E Study Cases in support of the proposed Performance Standards

12 PSCAD Models and any other relevant studies for the generator

13 Powerfactory model (if available)

14

If you have undertaken any of the following studies, please provide relevant results (note these are not required at the time you make your application to connect, however will need to be considered through the application to connect stage. If these studies have not been performed, we would be happy to discuss whether ElectraNet could undertake any of these on your behalf as part of our services)

• Geotechnical• Environmental and Ecological• Aboriginal Cultural Heritage• Noise• EMF• Site Surveys (including boundary surveys for switching station, substation, access roads

and project boundaries; contours; etc)• Any other relevant studies?

15

Other Items for consideration as part of the Application to Connect process (if applicable):

• ESCOSA Licensing Requirements https://www.escosa.sa.gov.au/industry/electricity/licensing

• OTR Generator Development Approval Procedure https://www.sa.gov.au/__data/assets/pdf_file/0003/311448/Generator-development-approval-procedure-V1.1.pdf

• System Strength Impact Assessments https://www.aemo.com.au/Stakeholder-Consultation/Consultations/Power-System-Model-Guidelines-and-System-Strength-Impact-Assessment-Guidelines

• Any other information applicable to your application to connect

Page 4: CONNECTION CHECKLIST - ElectraNet · 2019. 1. 22. · Contact Us To have a confidential discussion about your project, the transmission connection process or how to complete or submit

Contact UsTo have a confidential discussion about your project, the transmission connection process or how to complete or submit any of the associated forms, please contact our Business Development team.

Phone +61 8 8404 7966 Email [email protected]

JUNE 2018