confidence · 2019-06-13 · tpf group is one of the world’s fastest growing engineering,...

20
Geotechnical Engineering Highway & Bridge Design Foundaon Consultancy Engineering Survey Geophysical & ND Tesng Commitment Competence Confidence

Upload: others

Post on 01-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

Geotechnical Engineering Highway & Bridge Design Foundation Consultancy Engineering Survey Geophysical & ND Testing

Commitment

Competence

Confidence

Page 2: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

ABOUT US

MISSION

SUCCESS

CETEST TEAM

Strive to be known for reliability and performance, providing exceptional value to clients, and working to contin-uously improve skill-sets to provide innovative solutions.

That’s what CETEST stands for. And that is what makes the company a trusted name.

CETEST knows that successful projects are the result of mobilizing a variety of resources, quickly and efficiently, for the completion of the job. All company employees, vendors, subcontractors and equipment are the critical resourc-es that effect the quality and cost-ef-fectiveness of a project. The firm's seasoned workforce gives CETEST an edge in keeping projects on time and within budget.

And success evolves from a singular focus on ‘Quality’.

CETEST has a strong & dedicated team of more than 280 people from various professional fields like Civil, Structural, Geotechnical and Foundation Engi-neering; Piling, Highway Engineering, Bridge Design, Geology, Survey Engi-neering, Environmental, Social, Economics, Traffic Surveying, Manage-ment & Finance, etc.

C.E. Testing Company (P) Ltd. (CETEST) is a professionally managed, multidisciplinary consulting engineering firm in the domain of Geo-technical Engineering, Surveying, and Highway & Bridge Design. It was founded in 1985 as a Soil Testing firm. Even though it had a humble beginning, the company has grown steadily over the years and has successfully rendered customized professional services in various fields. CETEST initially focused on Geotechnical Engineering and consistently maintained its leadership position in that sector. In a span of 30 years, the company has made its presence felt in the entire country. With a steady growth in Geotechnical Consultancy in the last decade, the firm has established itself in Engineering Survey, Highway & Bridge Engineering. For more information, please visit www.ce-testindia.com.

CETEST is also a member of the TPF group, a multinational, multi-disciplinary Consultancy Organization, headquartered in Brussels (Belgium). TPF is active in the fields of Airports, Buildings, Hospitals, Bridges, flyovers, Roads, Viaducts, Motorways, Express-ways, Tunnels, Energy audits, Industrial Plants, Water and waste water Plants, Utilities. TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the world and a turnover of more than 254 million Euros. For more information, please visit www.tpf.eu

Page 3: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

In last 33 years, CETEST has completed more than 4,000 projects in vari-ous industries in different parts of India. Today, the company is a leading

name in Geotechnical & Geological Sub-surface Investigation, Field & Laboratory Testing and Analysis and Foundation Consultancy. CETEST is proud to have one of the

best equipped soil & rock testing laboratories in India and a fleet of more than 60 Boring/-Drilling Rigs.

In Highway design, CETEST has commendable achievements in providing consultancy services (DPR/Feasibili-ty/Detailed Design) for more than 100 projects, comprising more than 10,000 Km of roads & highways (Na-tional Highways, State Highways, Other Roads etc.) in various parts of India, including foreign aided (WB, ADB, JICA, etc) projects. CETEST is one of the very few consulting companies which can provide in-house services of Engineering Survey, Geotechnical & Design to its clients.

CETEST has completed more than 50 projects in Bridge Design in the last 10 years for National Highway, State Highway and Other Roads etc in the different states of India. We have the experience of design completion of more than 550 Major & Minor Bridges of different types. With in-house Geo technical, Engineering Survey & Design Teams, CETEST is a one-stop quality solution for Bridge Engineering.

CETEST offers services for various Geophysical Tests like Seismic Refraction, Cross Hole, Down Hole, ERT, Dipole–Dipole Sounding, Ground Utility, Vertical Electrical Sounding, Underground Water Survey, Pile Integri-ty Test, Dynamic Test and various Non-Destructive Tests.

With the use of state-of-art equipments like DGPS, LiDAR, Total Station, Auto Level, Echo Sounder, GPR etc. in last 10 years, CETEST has completed more than 3,000 jobs for various engineering surveys like Topographi-cal, Hydro graphical & Route Surveying.

GEOTECHNICALENGINEERING

HIGHWAY ENGINEERING

BRIDGE DESIGN

GEOPHYSICAL & NON DESTRUCTIVE TESTING

ENGINEERING SURVEY

Page 4: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

SERVICES

Page 5: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

GEOTECHNICAL ENGINEERING

Different types of Boring & DrillingTrial pits with large undisturbed sampling, bulk samplingStandard Penetration Test & Dynamic Cone Penetration TestStatic Cone Penetration Test and Vane Shear TestPermeability Test (Pumping-out & Pumping-in tests)Plate Load Test & Pile Load TestElectrical Resistivity and Seismic Refraction testBlock Vibration Test, Cyclic Plate Load Test and Cross Hole TestDetermination of California Bearing Ratio

Strength Tests like - Triaxial Shear Test (Unconsolidated Undrained, Consolidated Undrained with pore pressure measurement, Consolidated Drained), Unconfined Compression Test, Direct Shear Test, Vane Shear Test.Proctor Density Test (Standard & Modified)Consolidation TestsGeneral Tests for determination of Index Properties of SoilTests for determination of Consistency Limits of soilMeasurement of Swelling Pressure & Swelling IndexPermeability Test (Falling head & Constant head method)Determination of California Bearing RatioDetermination of Crushing Strength and Co-efficient of softening of RocksPoint Load Test for determination of Tensile Strength of RocksChemical Test of Soil & Water Samples for determining pH value and concentration of ions

Calculation of Bearing capacity of soil and settlement of foundationDesign of foundation for different sub-soil conditionsSlope-stability analysis for Embankments, Dams, Retaining -walls etc.Evaluation of Soil-reports prepared by other parties

Field Exploration & Testing

Laboratory Testing

Foundation Consultancy

Page 6: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

LIST OF MAJOR GEOTECHNICAL INVESTIGATION WORKS

4268 HPCL Rajasthan Refinery Ltd.Tel Bhavan, Sahkar Marg, Lal Kothi Vistar, Jyoti Nagar, Jaipur - 302005.

Geotechnical Investigation work (Part-I) for HPCL Rajasthan Refinery Project of HRRL (Ref-J4268)

102.37

4282 Bhaba Atomic Reserch CentreMysore.

Geotechnical Investigation work for Building No. 31 & 32 at BARCK site, Mysore. 95.99

4184 THDC India LimitedGanga Bhawan, By-Pass RoadPragatipuram, Rishikesh.

Detailed Geotechnical Investigation in the last of Khurja STPP, UP. 66.81

4153 HTG Engineering Pvt. Ltd.2x800 MW Godda Ultra Super Critical Thermal Power ProjectVill. : Motia, Dist. Godda, Jharkhand

Geotechnical Investigation work for 2x800 MW Godda Ultra Super Critical Thermal Power Project at Vill. : Motia, Dist. Godda, Jharkhand

137.23

4148 Reliance Infrastructure LimitedD Block, Ground Floor, 6th WingDhirubhai Ambani Knowledge CityKoparthairane, Navi Mumbai - 400710.

Geotechnical Investigation work for proposed six laning of Bihar - Jharkhand Border (Chordaha) to Gorhar Section of NH-2 from Km 249.525 to Km 320.810

97.41

China Alluminum International Engineering (India) Pvt. Ltd.D-403, Block-DC, Sector-ISalt Lake City, Kolkata - 700 064.

4117 Geotechnical Investigation Study at Balco, Korba, Chattisgarh. 108.47

Bharat Heavy Electricals LimitedPower Sector - Southern RegionPeriyar EVR Building, 690, Anna Salai, Nandanam, Chennai - 600 035.

4115 Detailed Geotechnical Investigation & Topographical Survey for 2 x 660 MW Undangudi Supercritical Thermal Power Project at Kallamoli, Thiruchendur Taluk, Tuticorin District, Tamil Nadu.

93.56

4050 Geoconsult-RITES (JV)Plot 473, Industrial Estate, Udyog Vihar, Phase-V, Gurgaon - 122 016.

Instrumentation, monitoring and design of remedial works as per requirement for vulnerable locations for two monsoon seasons in Lumding-Silchar BG Rail Line.

172.24

4024 Engineers India LimitedEngineers India Bhawan1, Bhikaji Cama Place, New Delhi.

Topographic Survey and Geotechnical Investigation for Dhobi - Durgapur Pipeline Project of M/s. GAIL India Limited.

102.53

3931 TATA Projects LimitedMithona Towers-1, 1-7-80 to 87 Prenderghast Road, Scunderbad-3, Telangana.

Geotechnical Investigation work at 1x800 MW Telangana Super Thermal Power Plant Phase-II at Ramagundam in Telangana for NTPC.

70.82

3860 Wanda Commercial Properties (Hong Kong) Co. Ltd., China.

Topographical Survey and Geotechnical Investigation Study Services of India Project (Smart City1st Phase), Sonepath, Haryana.

384.57

3684 Shandong Teijun Electric Power Engineering Co. Ltd.B2, Plot 13, Road #1North Khulshi Hills R/A, Chittagong, Bangladesh.

Geotechnical Investigation & Topographical Survey work for 2 x 660 MW Coal Based Supercritical Power Plant at Chittong, Bangladesh.

382.44

3262 Bharat Heavy Electricals LimitedPower Sector, Eastern Region, Plot No.9/1, Block-D, Sector-II, Salt Lake City, Kolkata - 700 091.

Topographical Survey and Geo-Technical Investigation work for 3x660 MW North Karanpura Super Thermal Power Project, Jharkhand

120.64

2878 NTPC Limited 3rd & 4th floor, Labhandl, GE RoadRaipur, Chattisgarh.

Detailed Geotechnical Investigation work for Barheti STPP 105.57

3104 McNally Bharat Engineering Co. Ltd.Ecospace Campus, 2B 11F/12New Town, Rajarhat, North 24 Pgs.

Soil Investigation work for BOP Package of 2x600 MW Singareni Thermal Power Plant at Jaipur, Dist. Adilabad, Andhra Pradesh.

74.17

2574 SEPCOIII Electric PowerConstruction Corporation SEPCOIIISite Office Village Gurha, KolayatBikaner, Rajasthan.

Soil Investigation work for IL&FS Power Plant at Cuddalore Dist., Tamil Nadu. 187.77

Job No. Name of Client Description of the Project Fees Rs. (Lakhs)Steel, Aluminium, Cement, Power Plants & Refinery

Page 7: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

LIST OF MAJOR GEOTECHNICAL INVESTIGATION WORKS

3620 Toshiba JSW Power Systems Pvt. Ltd.9th Floor, Building No.10, Tower-BPhase-II, DLF Cyber City, Gurgaon - 122 022.

Topographical & Contour Survey and Geotechnical Investigation work for Harduaganj Thermal Power Plant Project (1x660 MW) at District Aligarh, Uttar Pradesh.

58.72

2395 Bharat Aluminium Co. ltd.Smelter Project, Aluminium Bhawan Balco, Korba - 795684, Chattisgarh.

Soil Investigation work for proposed BALCO Expansion project at Korba, Chattisgarh.

97.34

2389 Sepco Electric Power Construction CorporationSEPCO Site Office, Janjgir - Champa,Dist. Chattisgarh

Geophysical Test (Dipole-Dipole) works and Detailed Soil Investigation work for the WPCL 3600MW Coal Based Power Project at Nariyara Village, Akaltara Tehsil, Janjgir - Champa District, Chattisgarh.

117.38

2291 Shandong TIEJUN Electric Power Engineering Co. Ltd.

Detailed Geotechnical Investigation Work for Haryana 2x660 MW Thermal Power Project.

114.87

2183 Vedanta Alumina Limited232, Solitaire Corporate Park,Andheri-Ghatkopar Link Road,Chakala, Andheri (E), Mumbai - 400 093.

Soil Investigation work for the proposed Smelter Project site at Jharsuguda, Orissa.

105.64

TATA Steel Limited2654 Geotechnical Investigation work for Khondbond Iron Ore Mines, Khondbond, Orissa.

101.96

Geoconsult India Pvt. Ltd.Plot No.473 Industrial EstateUdyag Vihar, Phase-V, Gurgaon - 122 016.

3682 Geotechnical Investigation and construction of supervision of Single Line BG Tunnel No.12 at Km 8,656/106.63 to 19.39/117.371 in between Tuplul - Imphal in connection with construction of New BG Line from Jiribam - Imphal of N F Rly.

368.78

3681 Geoconsult India Pvt. Ltd.Plot No.473 Industrial EstateUdyag Vihar, Phase-V, Gurgaon - 122 016.

Detailed Design and construction supervision of 5 nos. of Tunnels from Tunnel 1 to 5 with total length of 2.668 Km (approx.) in connection with the construction of New BG Railway Line Project from Bairabi to Sairang in Manipur.

326.96

3474 Geoconsult India Pvt. Ltd.Plot No.473 Industrial EstateUdyag Vihar, Phase-V, Gurgaon - 122 016

Geological, Geophysical and Geotechnical Investigations as well as Environmental Studies for NFR T-1 to T-9 Projects.

167.40

2672 RITES LIMITEDRITES Bhawan, No.1, Sector-29Gurgaon - 122 001.

Geotechnical Investigation including drilling of 150 mm / NX vertical bore holes, laboratory testing of soil, rock & water samples and submission of reports for the proposed new BG Rail line from Jiribam to Imphal - Package-III (km 64.00 - km 98.00).

120.35

2671 RITES LIMITEDRITES Bhawan, No.1, Sector-29Gurgaon - 122 001.

Geotechnical Investigation including drilling of 150 mm / NX vertical bore holes, laboratory testing of soil, rock & water samples and submission of reports for the proposed new BG Rail line from Jiribam to Imphal - Package-II (km 40.00 - km 64.00).

121.05

2528 RITES LIMITEDRITES Bhawan, No.1, Sector-29Gurgaon - 122 001.

Drilling work, Laboratory testing, Report submission etc. in connection with Geotechnical Investigation work for construction of new BG line from Jiribam to Imphal, Package-I.

110.35

3300 North East Frontier RailwayAgartala

Design of Embankment, Cutting Profile & Slope Stability analysis of new & existing cut slopes/ embankments etc. for Railway Formation from Km 10.0 to 114.00 Km in connection with new BG Railway line of Agartala - Sabroom Project.

94.87

4148 Reliance Infrastructure LimitedD Block, Ground Floor, 6th WingDhirubhai Ambani Knowledge CityKoparthairane, Navi Mumbai - 400710.

Geotechnical Investigation work for proposed six laning of Bihar - Jharkhand Border (Chordaha) to Gorhar Section of NH-2 from Km 249.525 to Km 320.810 in the state of Jharkhand.

97.41

3932 SMEC India Pvt. Ltd.387, Udyog Bihar, Phase-IIGurgaon - 122016.

Consultancy Services for Preparation of Feasibility Study and DPR for Two Bridges over River Brahmaputra connecting Panbazar to North Guwahati and Palashbari to Saulkuchi - Geotchnical Investigation & Topographical Survey.

250.83

Job No. Name of Client Description of the Project Fees Rs. (Lakhs)Steel, Aluminium, Cement, Power Plants & Refinery

Tunnel projects

Rail, Road & Bridge projects

Page 8: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

SERVICES

Page 9: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

HIGHWAY ENGINEERING

Detailed Topographical Survey including DGPS and LiDAR Survey.

Geometric Design including fixing of most suitable alignment.

Traffic Studies and analysis.

Testing of construction materials including fixing of most appropriate quarries.

Identification of borrow areas and testing of soil samples from these borrow areas.

Pavement composition assessment and determination of existing subgrade

characteristics by conducting trial pits.

Design of all types of CD structures.

Geotechnical Investigation of bridges and high embankments.

Environmental Impact Assessment.

Social and Resettlement Studies.

Detailed estimation of quantities and costs.

Economic / Financial analysis.

Preparation of Technical Specifications.

Preparation of bidding documents and assistance in the bidding process.

Proof checking of Detailed Project Report.

Construction and As-built drawing preparation

Land Acquisition 3(a), 3(A), 3(D) etc.

Page 10: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

LIST OF MAJOR ROAD &HIGHWAY DESIGN PROJECTS

Job No. Name of Client Description of the Project Fees Rs. (Lakhs)4262 PWD, NH, Nagaland

Chief Engineer, PWD NH Nagaland, Kohima.

Consultancy service for carrying out Feasibility study and preparation of Detailed Project Report for "Tizit to Tuli via Naginirnora (Package I - VI)" and "Jalukie to Athibung" in the State of Nagaland. 111 Km, 2 Lane, Trans Nagaland Expressway, Hilly Terrain

532.00

4146 NHIDCL3rd Floor, PTI Building, 4, Parliament Street, New Delhi – 110001.

Consultancy Services for Preparation of DPR of development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1) Package-1A. 248 Km, 2/4 Lane, NH/EC

949.35

4098 NHIDCL3rd Floor, PTI Building, 4, Parliament Street, New Delhi – 110001.

Consultancy services for Feasibility Study, Preparation of Detailed Project Report and Providing Pre-construction Services for Up gradation of New National Highways in the State of Assam (Pkg.III). 440 Km, 2 Lane, NH

1139.83

4151 The Executive EngineerNH Division, JainagarMadhubani, Bihar

Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of Dharbhanga - Kusheshwar Asthan - Khagaria in Bihar on EPC Mode. 135 Km, 2 Lane, NH

319.90

4047 NHIDCL3rd Floor, PTI Building, 4, Parliament Street, New Delhi – 110001.

Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of (i) 2 laning with paved shoulder of Churachandpur -Tuivai road section on NH-102B in the State of Manipur, (ii) 2 laning with paved shoulder of Imphal-Jiribam section of NH-37 (NH-53) in the State of Manipur and (iii) 2 laning with paved shoulder from Tamenglong in Manipur to Peren in Nagaland via Longdi Pabram. 482 Km - 2/4 Lane - National Highway - Hilly Terrain

1341.80

NHIDCL3rd Floor, PTI Building, 4, Parliament Street, New Delhi – 110001.

4046 Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of 2 laning of (i) Maram-Peren-Dimapur section on NH 129A (Manipur & Nagaland), (ii) Pallel-Chandel Section of NH-102C & (iii) Sangshak-Nampisha on NH 102A on Engineering, Procurement and Construction mode in the state of Manipur. 312 Km, 2 Lane, NH

811.15

The Executive EngineerPWDNH Division, Muzaffarpur, Bihar

4150 Consultancy Services for Preparation of Improvement of Two Lane with Paved Shoulder of In Principle of NH (i) Manjhi (NH-31) - Emka (NH-531) - Maharajganj - Afradmore (NH-227A) - Barauli (NH-27 New) (ii) Mairwa (NH-2227A) - Nautan - Kuchaikot on NH-28/NH-27, (iii) Mirganj (NH-85/NH-531 New) Bhagaipatti - Somour Road upto UP Border in Bihar. 162 Km, 2 Lane

445.06

4044 R&B, TelanganaGovt. of Telengana, NH Cirlcle, Karimnagar Circle

Consultancy Services for preparation of Detailed Project Report for the 'In Principle' approved NH stretch of "Medak-Siddipet-Elkathurthy" for a length of 133 Km in the State of Telangana. 133 Km, 2 Lane, NH

292.88

4040 NHAIG-5 & 6, Sector-10 Dwarka, New Delhi - 110 075.

Consultancy Services for preparation of DPR for development of Econimic Corridor, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharat Pariyojana (Lot-3/West Bengal/Package-1). 373 Km, 4 Lane, NH/EC

601.93

3935 PWD,NH Works, Assam Assam, Chandmari Guwahati-3.

Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Two Laning with paved shoulders from Sibsagar on NH-2 connecting Simuluguri and terminating at its junction with new NH No.702 at Sonari in the State of Assam. 50 Km, 2 Lane, NH

139.17

3908 MoRT&H Jeevan Tara Building Patel Chowk, Sansad Marg New Delhi - 110 001.

Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for Two Laning with paved shoulders of Foothill road from Amguei NH-61 to Niuland via Longehem - Changpang - Governor's Camp under SARDP-NE Phase B in the State of Nagaland. 189 Km, 2 Lane, Trans Nagaland Expressway, Hilly Terrain

468.45

3907 RCD, NH Division, Gulzarbagh Patna, Bihar

Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of (1) Stretch from Siwan on NH-531 Maharajganj - Janta Bazar - Junction with NH-331 near Baniapur & (2) Sitalpur (Patna) (on NH-31) Amnour - Taraiya - Mashrakh - Siwan (on NH-531) in Bihar on EPC Mode. 98 Km, 2 Lane, NH

341.61

Page 11: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

LIST OF MAJOR ROAD &HIGHWAY DESIGN PROJECTS

3885 PWD, NH Division, W.B.Khadya Bhavan, Block-A 1st Floor, 11A Mirza Galib Street, Kolkata - 700 087.

Consultancy Services for preparation of Project Report for 4-Laning of NH-117 from Joka to Namkhana including realignment for bye-passing Diamond Harbour Town in the district of South 24 Pgs., West Bengal. 90 Km, 4 Lane, NH

192.19

3882 RCD, NH Division, BiharGulzarbagh Patna.

Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of (1) Buxar - Chausa - Ramgarh- Mohania (2) Chausa - Rajpur - Kochas - Karahgar - Sasaram in Bihar on EPC Mode. 137 Km, 2 Lane, NH

237.31

3854 PWD, NH Division, West Bengal N. H. Cirlcle No.III Matigara, Siliguri - 734010.

Consultancy Services for preparation of DPR for improvement NH-10 with a minimum of 2-Lane configaration including protecting measure of land-slide and road sinking zone starting from Ch.0.00 km (Sevoke) to Ch.52.0 km (Rangpoo) in the District of Darjeeling, West Bengal. 50 Km, 2 Lane, NH, Hilly Terrain

149.56

3826 PWD, NH Division, West Bengal N. H. Cirlcle No.III Matigara, Siliguri - 734010.

Consultancy Services for preparation of DPR for 2-Lane with paved shoulder from Chalsa (Km 105) to Telipara (Km 150) Section of NH-31C in the District of Jalpiguri, West Bengal. 40 Km, 2 Lane, NH

119.81

3617 Roads and Buildings (R&B)

Govt. of Telangana Errumanzil Hyderabad.

Consultancy Services For Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan Schedules for Widening to Two/Four Lane With Paved Shoulders from Km 0.000 T0 Km 140.500 & HLB at Km 11.040 of NH-161 on Sangareddy - Nanded - Akola Road in the State of Telangana on EPC Mode. 136 Km, 4 Lane, NH

121.51

3580 PWD (R&B), Tripura

P. N. Complex, Agartala, Tripura - 799006

Consultancy Services for preparation of Feasibility Study and and Detailed Project Report for Improvement and widening to two lane with 1.50 mtr. paved shoulder of newly declared NH-208 (tentative length 157.70 Km) and NH-108A (tentative length of 22.90 Km) respectively for execution of EPC mode in the State of Tripura under NH(O). NH108A 21.412 Km, & NH208 106.219 Km, 2-Lane

171.02

3499 Ministry of Road Transport & Highways New Delhi - 110001.

Consultancy Services for preparation of Detailed Project Report for 2-Laning of Pfutsero - Zhamai State Road in Nagaland under SARDP Phase-B on EPC Mode. 16 Km, 2 Lane, SH, Hilly Terrain

127.06

3454 R&B, Telangana, Govt. of Telengana Errumanzil Hyderabad.

Preparation of detailed project report for Widening single lane roads (including detailed survey, geometric design, crust design, preparation of plan and profile drawings and detailed cost estimates for the roads in Telangana State (Pkg. No. II). 578 km, 2 Lane & 58 km, 4 Lane

259.03

3028 BSRDC Ltd.RCD Central Mechanical Workshop Campus, Sheikhpura, Patna - 800014

Consultancy Services for Feasibility and Preparation of Detailed Project Report of State Highway SH102 (Bihia – Piro – Bihita) in Bihar 54 km, 2 Lane, SH

79.30

3084 Hyderabad Growth Corridor Ltd 2nd Floor, HMDA Complex, Tarnaka, Secunderabad-500007

Preparation of Detailed Project Report for Improvement of 71.5 km Radial Road No. 14,17,26,31 & 32 in Hyderabad being taken up with the loan assistance of JICA. 67 km, 4 Lane, Urban Road

78.62

2764 State Highways Authority of Jharkhand (SHAJ) Road Construction Department, Room No.420, 4th floor, Project Building, Dhurwa, Ranchi-834004, Jharkhand

Consultancy Services for Feasibility study and Preparation of Detailed Project Report for Improvement and Up-gradation to 2-lane/2-lane with paved shoulders configuration of various State Highways in Jharkhand for Package No. SHAJ/DPR/2011/06 for Dumka - Hansdiha upto Bihar Border (SH-17) Road. Length: 7.00 Km – 4 Lane, 44.211 km, 2 Lane – State Highway

61.54

2341Consultancy Services for Preparation of Detailed Project Report for 4-Laning of Budhist Circuit Gaya-Hisua-Rajgir-Biharsharif (NH-82) 93 km, 4 Lane, NH

92.78BSRDC Ltd.RCD Central Mechanical Workshop Campus, Sheikhpura, Patna - 800 014

2302 BSRDC Ltd.RCD Central Mechanical Workshop Campus, Sheikhpura, Patna - 800 014

Consultancy Services for Preparation of Detailed Project Report for 6 nos. Bihar State Highways Project Phase-II (Package-I, North Bihar) 422 Km, 2 Lane, SH

349.10

Job No. Name of Client Description of the Project Fees Rs. (Lakhs)

Page 12: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

SERVICES

Page 13: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

BRIDGE DESIGN

Detailed Topographical and Hydrological Survey.

Detailed hydraulic analysis including estimation of flood discharge,

fixing of bridge length and ascertaining span arrangement.

Detailed Geotechnical Investigations.

Analysis of all load types including dead, superimposed dead, moving,

seismic, wind, water current, etc.

Analysis and design of all types of superstructure including RCC Slab,

RCC T-Beam, PSC, Composite etc. (specialization in composite integral bridges).

Analysis and design of all types of substructure and foundation (open/pile/well).

Testing of construction materials including fixing of quarries.

Estimation of quantities and costs.

Preparation of Technical Specifications.

Assistance in bidding process.

Repairing and Rehabilitation work for bridges.

Page 14: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

LIST OF BRIDGE DESIGN PROJECTS & PREPARATION OF DPR

Job No. Name of Client Description of the Project Fees Rs. (Lakhs)

4289 West Bengal HIDCO LimitedHidco Bhaban, Premises No.35-1111, Biswa Bangla Sarani, 3rd Rotary, New Town, Kolkata – 700156.

Consultancy Work for Improvement of Traffic Management System and Pedestrian Safety by constructing Vehicular Underpass and Pedestrian Subways in various inter-sections of Biswa Bangla Sarani, a Major Arterial Road of Newtown, Kolkata connecting Airport and Salt Lake. 4 No’s Underpass

67.33

3549 Roads and Buildings (R&B) Govt. of Telangana Errumanzil Hyderabad.

Consultancy Services for preparation of detailed project report for construction of bridges (construction of HLB across river Krishna connecting Somasila in Mahaboobnagar district & Siddeswaram in Kurnool district) in Telangana State (Package III). 2 Lane, Bridge length 1.8Km

112.29

4213 Bihar Rajya Pul Nirman Nigam Limited Saran Division, Chapra, Bihar.

Preparation of Detailed Project Report for Flyover from Gopalganj more to Tarwara more in the town of Siwan District Siwan, Bihar along with Feasibility Study & PPR. 2-Lane, Flyover length 2.3Km

124.57

3853 Northern Frontier RailwayMaligaon, Guwahati.

Preparation of GAD, details design & drawings of Girder including foundations, sub structure, bed blocks, inspection platform, bearing etc. in between (a) NBQ to KYO station via GLPT and (b) DGU to Hojai in connection with NBQ to KYO via GLPT and Digru to Hojai Doubling works in N F Rly. 50 nos. Railway Bridges

124.87

3335 East Central RailwayMahendrughatPatna –800004

Design & Drawing of minor bridges, super passages, minor bridges, RUBs, ROBs andOther Structure for Tori-Shivpur Section under CE/Con/Central construction organization, East Central Railway, Mahendrughat, Patna. Minor Bridge = 41 nos.,Syphon = 3 Nos., Major Bridge = 2 nos., ROB = 11 nos., RUB = 9 nos.

151.26

3286 Eastern Railway (Construction Department) 14, Strand Road 4th Floor, Kolkata - 700 001

Design & Drawing including soil investigation in connection of new new road over bridges in place of existing old ROB's between Pirpainti to Bhagalpur in connection with doubling of Pirpainti to Bhagalpur under Dy. CE/Con/JMP of Eastern Railway Total No. of ROBs = 7

24.26

4219 National Engineering OfficeP.O. Box 1657, P.C. 112 Sultanate of Oman

Consultancy Services for the design of Dualization of Wadi Sa's - Hafeet Road and Ibri Southern Bypass Dual Carriageway of Ministry of Transport & Communications Sulnate of Oman. 129 Km, 2 Lane Bridge / VUP = 23 Nos., Total length = 800m

140.00

3535 Greater Hyderabad Municipal Corporation. 6th Floor, C C Complex, Tank Bund Road, Hyderabad.

Consultancy Services for preparation of a feasibility report and PPR/DPR with bidding document for Comprehensive Development of NFCL Junction to Sangeeth Junction Corridor in Greater Hyderabad Municipal Corporation (GHMC) Limits, Telangana State. (Pkg6)Road= 7.7 Km, 4/6-Lane, 8 Nos. Flyover, Underpass = 4 nos.VUP = 4 nos.

39.92

3534 Greater Hyderabad Municipal Corporation. 6th Floor, C C Complex, Tank Bund Road,Hyderabad.

Consultancy Services for preparation of a feasibility report and PPR/DPR with bidding document for Comprehensive Development of Aramgarh to Muslimjung Bridge Corridor as Conflict Corridor in Greater Hyderabad Municipal Corporation (GHMC) Limits, Telangana State. (Pkg-5)Length of 6-lane flyover / Structure = 3788mTotal Structure Length = 4148m (Flyover + Ramp)

29.96

3155 Greater Hyderabad Municipal Corporation, 6th floor, CC Complex, Tank Bund Road, Hyderabad–500 029

Consultancy Services for Detailed project reports for the proposed construction of flyover @ Amberpet –X – Road, Hyderabad. Flyover length 1.465Km

60.30

4030 PWD, Govt. of West Bengal AndWest Bengal Highway Development Corporation Limited 4th & 5th Floor, HRBC Bhawan, Munsi Premchand Sarani, Kolkata – 700021

Consultancy Services for Preparation of Detailed Project Report for Upgradation ofChampadanga - Pursurah - Arambagh Road (State Highway 2) Stretches (0.00 Kmp to 20.00 Kmp) into 4 (four) Lane under PWD, Government of West Bengal. • Road 19.6 Km, 4 Lane, Bridge with Grade Separator = 1075m

48.99

3492 PWD, Arunachal PradeshYachuli Civil Circle Camp - Naharlagun.

Construction of Bailey Bridge over River Kamala (100m Span) at Arunachal Pradesh. 15.16

Page 15: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

LIST OF BRIDGE DESIGN PROJECTS & PREPARATION OF DPR

Job No. Name of Client Description of the Project Fees Rs. (Lakhs)

4029 West Bengal Highway Development Corporation Limited 4th & 5th Floor, HRBC Bhawan, Munsi Premchand Sarani, Kolkata – 700021

Consultancy Services for preparation of Detailed Project Report for Strengthening and Widening to Standard 4/2 Lane of Arterial Road from Pragati Maidan Fire Station to Bantala (0 Km to 5 Km) and SH-3A from Bantala to Ghoshpur near Ghatakpukur (5.0 Km to 29.00 Km) in the District of North 24 Parganas / South 24 Parganas in West Bengal to be executed in EPC Mode. Road 29Km, 4 Lane, SH, 4-Lane Flyover = 1017m & 1020m

64.98

3425 East Central Railway Mahendrughat Patna – 800004

Conducting Final Location Survey, Geotechnical Investigation, Design/Drawing of Structure between Biratoli & Tori for rail flyover at Tori and Biratoli to Mahuamilan for avoiding line in connection with Tori - Shivpuri New B.G. Line Project in Lathehar District. of Jharkhand State. FLS = 20 Km, ROR = 01 no.

116.27

3362 Ministry of Road Transport &

Highways Jeevan Tara Building 1, Parliament Street New Delhi - 110001.

Consultancy Services for carrying out feasibility study, Detailed Survey/Investigation, Alignment Option, Preparation of GAD and Engineering Report for Construction of proposed ROBs & their approaches in replacement of Existing Level Crossings as finalised RFP in the State of Odisha (Pkg. No.11) 4 Nos. ROB = 2,180m

70.00

3363 Ministry of Road Transport &

Highways 17, Aniket Housing Co-operative Colony, IAS Colony, Kidwaipuri, Patna-800001

Consultancy Services for carrying out feasibility study, Detailed Survey/ Investigation, Alignment Option, Preparation of General Arrangement Drawing and Engineering Report for Construction of Proposed ROBs & their approaches in replacement of Existing Level Crossings (Package 05: Bihar) 13 Nos. ROB = 1658m

115.50

3409 Bridge and Roof Co.(I) Ltd.

Kankaria Centre 2/1, Russel Street, Kolkata - 700071.

Surveying, Soil Investigation, Preparation of DPR including Design calculation and Drawings for 11 nos. Bailey Bridgs to be installed in Rayagada District, Odisha.

17.60

3231 East Central RailwayMahendrughat, Patna – 800004

Conducting Final Location Survey, Soil Investigation work, Design & Drawing of bridges/ROBs/RUBs/ Other Structure and submission of Detailed Project Report in connection with Manpur Bye Pass Fly over line including surface connection of Dn line. FLS = 20 Km, Minor Bridge = 60 nos., ROR = 1 no., Major Bridge = 1 no.

43.93

3082 Jharkhand Accelerated Road Development Co. Ltd. 443/A, Road No.5, Ashok Nagar, Ranchi-834002.

Consultancy Services for Feasibility and Preparation of Detailed Project Report (DPR) for Improvement and Upgradations of Vikas (Junction of Ranchi Ring Road & NH-33) Booty more - Kantatoli - Namkum Bridge (ROB) - Rampur (Junction of Ranchi Ring Road & NH-33) in the State of Jharkhand, Road 25.35Km, 4 Lane NH, 1 No. ROB cum Flyover = 601m

31.92

3195 PWD - NH Division Gulzarbagh, Patna.

Construction of 5 x 24m (eff. Span) High Level RCC Bridge across river Noon at Km 45 of NH-103.

17.63

3175 Bridge and Roof Co.(I) Ltd.Kankaria Centre 2/1, Russel Street Kolkata - 700071.

Surveying, Soil Investigation, Prearation of all necessary Engineering Documents (DPR) including Design Calculation and Drawings as well as providing Consultancy Services during different stages of execution of all related civil work pertaining to Construction of Foundation with suitable Approach Road for connectivity with existing Main Road at each end of 23 nos. Bailey Bridges at different locations of Odisha.

27.70

2934 IL & FS Infrastructure Development Corporation Ltd Constantia 3rd Floor, 11, Dr. U.N. Brahmachari Street, Kolkata - 700 017

Preparation of Detailed Project Reports including approval for 35 nos. Bridges having length more than 15 Mtr. under PMGSY Scheme in the District of PaschimMedinipur, North 24 Pgs., Hooghly, Howrah and PurbaMedinipur in West Bengal.

50.00

2869 PWD (R&B) Agartala, Tripura Preparation of Detailed Project Report (DPR) as per latest guidelines etc. for RuralRoad Projects (including bridges, cross drainage structures) under PMGSY in formerly West and South Tripura (Batch No. I to IV & VI to VII)

150.00

2699 PWD (R&B) Division No.III, Agartala.

Consultancy service for preliminary and detailed Engineering including preparation of Detailed Project Report for Construction of 13 Nos. of permanent bridges at different locations on the State Road Network.

48.50

2380 Aalo Civil Circle PWD, AP-791101

Preparation of DPR for the bridges on the river Siyom at Paya and Bene. 42.50

Page 16: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

Topographical Survey, Profiling, Contouring, Levelling, Curve setting with

DGPS, GPS, Total Station and LiDAR

Cadastral Survey

Hydrographic Survey through Total Station, Current Meter, Echo-sounder etc.

Astronomical Survey, Route surveying (Transmission Line, Pipe Line & Roads).

Conducting fully computerized Highway, Land & Hydraulic Survey.

Preparation of Digital Survey Maps and drawing, Contour Maps, Digital

Terrain models and Survey database.

Survey of Rivers including collection of Hydraulic Data, Fixing Bridge Sites,

Estimation of Flow And Flood Discharge etc.

ENGINEERINGSURVEYING

Page 17: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

LIST OF SOME IMPORTANT SURVEYENGINEERING PROJECTS

Job No. Name of Client Description of the Project Fees Rs. (Lakhs)

3713 Northeast Frontier Railway Maligaon, Guwahati.

Final location survey and land survey including preparation of detailed plan and section with land plan and detailed estimate between New Bangaigaon to Kamakhya via Goalpara (176.0 KM) in connection with doubling of existing BG Line from NBQ to KYQ via GLPL. Length = 186 Km

594.03

3764 Adani Power (Jharkhand) Limited Adani House, NR Mithakhali Six RoadsNavrangpura, Ahmedabad.

Carrying out route survey for railway siding from proposed Godda Railway Station to2x800 MW Godda Thermal Power Project Site at Village Motia, Dist. Godda, Jharkhand. Length = 15 Km

15.00

3192 Rites Limited, Metro Railway Service Building, 56, C. R. Avenue, Kolkata-700012

Preliminary Engineering Survey for diversion of Railway lines, Sidings in connection with preparation of Detailed Project Report for JRDA, Dhanbad, Jharkhand.

35.97

3238 Drinking Water & Sanitation, Govt. of Tripura Dharmanagar Sub-Division Dharmanagar, North Tripura

Urban Water Supply Scheme at Dharmanagar/ Remodeling of existing pipeline Distribution Network within Dharmanagar Nagar Panchayet/ Survey work for Topographical and contour survey. Length = 130 Km

8.76

2385 Power Grid Corporation of India Ltd Design Consultant: Consulting Engineering Services, 57, Nehru Place (5th Floor), New Delhi.

Survey work for Transmission Line in the North East. Length = 372 Km 119.30

2374 Oil And Natural Gas Corporation Ltd. Pipeline Installation & Maintenance Group Engineering Services Agartala - 799 014, Tripura

Detail Route and Cadastral Survey for laying Gas pipelines from proposed Kunjaban Manifold to ADB GGS (approx. 18 km) and from proposed Sundalbari Manifoldto proposed Sonamura GGS (approx. 12 km). Length = 30 Km

16.53

4099 Bharat Heavy Electricals Limited Western Region, Shreemohini Complex, 345, Kingsway, Nagpur.

Topographical Survey, Bathymatric Survey and Geotechnical Investigation, at 3x800 MW PVUNL, Patratu STTP, Jharkhand.

187.16

4096 Vedanta Limited Bhurkamunda, P.O. Kalimandir Dist. Jharsuguda(Odisha)-768202.

Topographical Survey & Soil Investigation work for Ash Pond at Siriyapalli, Jharsuguda, Odisha.

41.47

3743 Jindal Steel & Power Limited13 K M Stone, G E Road, NH-6 Mandir Hasaud, Raipur - 492 101 Chattisgarh.

Detailed Survey for (CCPC) Cross Country Pipe Conveyor at JSPL, Raipur. 10.83

3690 CSIR - NGRI Post Bag # 724, Uppal Road Hyderabad - 500 007.

Topographical Survey work in the States of West Bengal & Jharkhand. 31.58

3548 Imphal International AirportImphal.

Topographical/Contour Survey for Entire Land of Imphal Airport including Newly Acquired Land.

6.30

3427 Talwandi Sabo Power LimitedBanwala, Mansa - Talwandi Sabo Road Mansa - 151302, Punjab, India

Topographical and contour survey Work for 3X660 MW power plant site at Bannawala village, Mansa District, Punjab, and its adjoining area of up to 500 meters from the plot boundar Surveyed Area 4398 Acre

18.17

3208 CSIR- NGRI Post Bag # 724, Uppal Road Hyderabad - 500 007.

Carrying out Topographical Survey in Jharsuguda, Odisha. Surveyed Area 10.15 Sqkm. 30.11

3025 Larsen & Toubro Ltd. NH-8, Chhani, Vadodara - 391740

Topographical Survey and Allied Works for 2X660 Mw, Coal Based TPP, Unit 5&6, Near Chhabra, Dist: Baran, Rajasthan Surveyed Area 1200 Hectare

22.70

3319 Detailed Engineering Survey & Soil Investigation for new-Docklines between Korukkupet Terminal to Fore Shore Terminal, Chennai, Tamilnadu.

11.46Indian Oil Corporation Ltd. Indian Oil Bhawan, 139, Nungambakkam High Road, Chennai 600 034.

Highways, Railways, Drinking Water Pipeline, Gas Pipeline & Transmission Line

Plants, Refinery & Airport

Page 18: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

SERVICESQUALITY CERTIFICATION/ACCREDITATION

Taking its vision one step forward is CETEST’s Soil/Rock Testing Laboratory, one of the most reputed NABL Accredited Testing and Calibration Laboratories in India, which is famous for its high accuracy in testing capabilities.

The NABL Accreditation as per ISO/IEC 17025:2005 was awarded to CETEST in 2017 in Mechanical Discipline for 27 nos. different rock and soil testing Parameters.

As per the Mutual Recognition Agreement (MRA) signed by the members of International Laboratory Accreditation Cooperation (ILAC), test reports issued by the NABL accredited laboratories are recognized besides in India, in many foreign countries which include USA, Canada, Australia, Japan, UAE, UK, Switzerland, Germany, France, Netherlands and other European Countries.

As part of CETEST’s commitment to maintain the highest levels of Occupational Health and Safety management, it intends to maintain accreditation of its OHSAS Management System to OHSAS 18001:2007 and integrate occupational health and safety with Quality and Envi-ronment.

CETEST is determined to prevent injuries and ill-health, so far as is reasonably practicable, safe systems of work and a safe and healthy working environment throughout all of its busi-ness operations and activities.

CETST has the policy of Health & Safety in order to achieve and maintain the highest practical standard of accident prevention, continual improvement in OH&S management and perfor-mance, and the prevention of injury and ill health.

At the CETEST, Quality is a tangible commodity valued throughout the organization, and the evidence of the same is being seen in the customers’ satisfaction. In 2005, CETEST earned the International Standardization Organization’s certification (ISO 9001:2000), and renewed to (ISO 9001:2015) in 2017, demonstrating its dedication to continuous improvement and superior performance in all aspects of its business domain.

CETEST systematically monitors its Quality through customer feedback, individual self-assess-ment, regular management reviews, and an annual quality assessment. CETEST constantly hones its processes, maintaining its commitment to the ongoing improvement of CETEST’s engineering consultancy services. CETEST also has a defined list of Key Performance Indicators (KPI) and qual-ity targets that are constantly measured and analysed.

CETEST believes that it has an important duty to ensure good environmental performance in all its business operations and to provide the necessary organization, commitment and training to fulfil this obligation. The management firmly believes in, and is committed to monitoring and improving environmental performance, pollution prevention and environmental protection as per the imple-mentation of ISO 14001:2015.

CETEST has incorporated environmental responsibility into all business operations by planning environmental protection, reviewing and developing policy, by setting targets and reviewing and auditing performance. Utilizing the best available techniques not entailing excessive costs to comply the commitment to control and improve environmental performance with respect to the environment leads to the development of Environmental Objectives and Targets.

Page 19: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

RESOURCES, FINANCIALPERFORMANCE & CLIENTELE

Soil Equipments Persons for Business Contact Soil Boring Rig 22 Permeability Test 10 Dr. M. Nayak, Managing Director

P. +91 33 2428-6221/22, M. +91 9051366117 E. [email protected], [email protected]

Mr. Anirban Nayak, Joint Managing DirectorP. +91 33 2428-6221/22. M. +91 9836356311 E. [email protected], [email protected]

Mr. Suman Ray, Chief Executive OfficerP. +91 33 2428-6221/22 M. +91 8697738389 /9818683727 E. [email protected], [email protected]

Mrs. Aparajita Khatua, DirectorP. +91 33 2428-6221/22. M. +91 9433017508 E. [email protected], [email protected]

Mr. R. P. Dutta, Sr. Manager-Business DevelopmentP. +91 33 2428-6221/22 , M. +91 9433015599 E. [email protected], [email protected]

Boring cum Drilling 44 SCPT 3 Rock Drilling Rig 21 DCPT 8 Cross Hole Test 2 BVT 2 Pressure Meter Test 2 ERT 5

Seismic Refraction Test 2 PLT & CPLTNDT Equipments

78

Vane Shear Test 1 Survey Equipments & Design Software

Electronic Total Station 25 SAP / SAFE Hand GPS 20 HDM 4 DGPS 04 Bentley MX Road Auto Level 10 Autodesk civil 3D 2011 Echo Sounder 02 PLS CADD Current Meter 02 MIDAS Human Resource 289

Ph.D. 02 M. Tech./M.E. 07 B.E. / B. Tech 42 MBA/LLB/MCA/CA 08Diploma 88 I.T.I 62 B.Sc. /B. Com/ B.A 80

0

5

10

15

20

25

30

35

2013-2014 2014-2015 2015-2016 2016-2017 2017-2018

Revenue in Rs.Crore

MARKET SECTOR

In the last 33 years through the consultancyservice in Geotechnical Engineering, Highway& Bridge Design and Engineering Survey, CETEST has been able to join different marketsector or industries like

Transportation (Road , Bridge, Tunnel, Railways) Power Plants Petrochemicals & Refineries

MAJOR CLIENTELE

Geotechnical & Survey

• RITES • BHEL • NTPC• IOCL• EIL• NALCO• NBCC• RELIANCE• ADANI

Highway & Bridge

• MoRT&H• NHIDCL• NHAI • PWD, WB• BSRDC• MPRDC• HGCL• GHMC• EASTERN RAIL

• BRDGE & ROOF• N. F. RAILWAY• R&B, TELENGANA• RCD, BIHAR• PWD, NAGALAND• PWD, MANIPUR• PWD, AR.P• PWD, RAJASTHAN

• CSIR-NGRI• VEDANTA• HPCL• RAILWAYS• TATA• MECON• GAIL• GE POWER• MITSUBISHI

Page 20: Confidence · 2019-06-13 · TPF group is one of the World’s fastest growing engineering, architecture and management consultancy groups with more than 4200 employees around the

LABORATORY & GODOWNBrahmapur, Sardarpara,

Kolkata-700154, West BengalTel: +91 33 2410 5085/9813

Ramnagar Road No-1Agartala – 799002Tripura

101, Vidya Vatika, 1st FloorGandhi Nagar, Boring RoadPatna 800001, Bihar

Krishan Singh ColonyStation RoadRanchi – 834001,Jharkhand

Street No:1House No: 12-13-442Tarnaka, Hyderabad-500017

House No.2 (Ground Floor),Bye Lane - 1, Rajgarh,Guwahati - 781 003.

PROJECT OFFICES

C.E. Testing Company Pvt. Ltd.124-A, N.S.C. Bose Road, Kolkata 700 092, West Bengal, India

P. +91 33 2428-6221/6222/6223, F. +91 33 2428-6220 E. [email protected], W. www.cetestindia.com

CIN: U74920WB1988PTC045778

AGARTALA, TRIPURA

PATNA, BIHAR

RANCHI, JHARKHAND

HYDERABAD, TELENGANA

GUWAHATI, ASSAM