CONDUIT BLVD ATLANTIC AVE TO SUTTER AVE Presented to Brooklyn CB 5 Transportation Committee
June 6, 2016
1
![Page 2: CONDUIT BLVD](https://reader031.vdocuments.site/reader031/viewer/2022022417/5899966c1a28abe2458b687b/html5/thumbnails/2.jpg)
nycdotfeedbackportals.nyc/conduit-boulevard
PROJECT AREA
2
N
Subway
(A)
Subway (A/C)
Brooklyn-Queens
Boundary Line
City Line
Park
School
School School
![Page 3: CONDUIT BLVD](https://reader031.vdocuments.site/reader031/viewer/2022022417/5899966c1a28abe2458b687b/html5/thumbnails/3.jpg)
nycdotfeedbackportals.nyc/conduit-boulevard
CRASH HISTORY
3
−Atlantic Ave, Liberty Ave, and Pitkin
Ave are Vision Zero Priority Corridors
−S Conduit Blvd at Liberty Ave and
Euclid Ave is a Vision Zero Priority
Intersection
−Between 2010 and 2014, there were
ten pedestrian KSI, including two
fatalities
City Line
Park
J Z
A C
A
Vision Zero Corridor
Vision Zero Intersection
Pedestrian Fatality (2008-2015) N
![Page 4: CONDUIT BLVD](https://reader031.vdocuments.site/reader031/viewer/2022022417/5899966c1a28abe2458b687b/html5/thumbnails/4.jpg)
nycdotfeedbackportals.nyc/conduit-boulevard
DOT OUTREACH
4
Online feedback map has
gathered over 80 comments
DOT Ambassadors spent two
days on-site and spoke to
over 160 community members
![Page 5: CONDUIT BLVD](https://reader031.vdocuments.site/reader031/viewer/2022022417/5899966c1a28abe2458b687b/html5/thumbnails/5.jpg)
nycdotfeedbackportals.nyc/conduit-boulevard 5
EXISTING
CONDITIONS
B
Separated corridor with three moving lanes in each direction leads to highway
like environment
ATLANTIC AVE LOOKING EAST TOWARD S CONDUIT BLVD
N CONDUIT BLVD AND 75th ST LOOKING NORTH
Speed limit is set to 15 MPH above the city-wide limit and vehicles frequently
exceed 40 MPH
At this location, 29% of vehicles were recorded
as 40+ MPH
A
A
B
![Page 6: CONDUIT BLVD](https://reader031.vdocuments.site/reader031/viewer/2022022417/5899966c1a28abe2458b687b/html5/thumbnails/6.jpg)
nycdotfeedbackportals.nyc/conduit-boulevard 6
EXISTING
CONDITIONS
A
Discontinuous sidewalk leading to City Line Park
Skewed intersections create long crosswalks
S CONDUIT BLVD AND LIBERTY AVE LOOKING NORTH
S CONDUIT BLVD AND GLENMORE AVE LOOKING WEST
A
B
![Page 7: CONDUIT BLVD](https://reader031.vdocuments.site/reader031/viewer/2022022417/5899966c1a28abe2458b687b/html5/thumbnails/7.jpg)
nycdotfeedbackportals.nyc/conduit-boulevard 7
EXISTING
CONDITIONS
Long distances between crosswalks and signalized
intersections
Frequent midblock crossing
S CONDUIT BLVD AND GRANT AVE
S CONDUIT BLVD AND PINE ST
A
B
![Page 8: CONDUIT BLVD](https://reader031.vdocuments.site/reader031/viewer/2022022417/5899966c1a28abe2458b687b/html5/thumbnails/8.jpg)
nycdotfeedbackportals.nyc/conduit-boulevard
PROPOSAL KEY
8
N
1
2
3 4
5
6
Proposed Corridor Improvements: - Reduce speed limit to 30 MPH
(Planned for June) - Upgrade all crosswalks to high visibility
Location Specific Changes: 1) Atlantic Ave 2) Liberty Ave 3) Pine St & Crescent St 4) Glenmore Ave & Hemlock St 5) Pitkin Ave 6) Grant Ave
![Page 9: CONDUIT BLVD](https://reader031.vdocuments.site/reader031/viewer/2022022417/5899966c1a28abe2458b687b/html5/thumbnails/9.jpg)
nycdotfeedbackportals.nyc/conduit-boulevard
1) ATLANTIC AVE
9
1. Reduce eastbound Atlantic Ave from 3 to 2 lanes 2. Reduce S Conduit Ave from 3 to 2 lanes
- Parking lane possible if demand exists
1
2
![Page 10: CONDUIT BLVD](https://reader031.vdocuments.site/reader031/viewer/2022022417/5899966c1a28abe2458b687b/html5/thumbnails/10.jpg)
nycdotfeedbackportals.nyc/conduit-boulevard
2) LIBERTY AVE
10
1. Build new sidewalk 2. Remove left turn bay, but allow
left turn; build median extension 3. Build sidewalk extension
1
2
3
![Page 11: CONDUIT BLVD](https://reader031.vdocuments.site/reader031/viewer/2022022417/5899966c1a28abe2458b687b/html5/thumbnails/11.jpg)
nycdotfeedbackportals.nyc/conduit-boulevard 11
1. Install new pedestrian activated signal and crosswalks
2. Build sidewalk across median 3. Install new crosswalks 4. Build median extension
1
2
3
3) PINE ST &
CRESCENT ST
4
3
![Page 12: CONDUIT BLVD](https://reader031.vdocuments.site/reader031/viewer/2022022417/5899966c1a28abe2458b687b/html5/thumbnails/12.jpg)
nycdotfeedbackportals.nyc/conduit-boulevard 12
1. Remove left turn bay and ban turn - 30 vehicles during PM peak
2. Install new crosswalks 3. Build median extension 4. Build sidewalk extension
1
2 3
4) GLENMORE AVE &
HEMLOCK ST
4
2
![Page 13: CONDUIT BLVD](https://reader031.vdocuments.site/reader031/viewer/2022022417/5899966c1a28abe2458b687b/html5/thumbnails/13.jpg)
nycdotfeedbackportals.nyc/conduit-boulevard 13
1. Remove left turn bay and ban turn - 40 vehicles during PM peak
2. Install new crosswalk 3. Install westbound left turn bay
1
2
5) PITKIN AVE
6) GRANT AVE
1. Install new signal, ped ramps, sidewalk and crosswalks
1
3
![Page 14: CONDUIT BLVD](https://reader031.vdocuments.site/reader031/viewer/2022022417/5899966c1a28abe2458b687b/html5/thumbnails/14.jpg)
nycdotfeedbackportals.nyc/conduit-boulevard 14
5) PITKIN AVE DIVERSION
1. Install signs to direct drivers to diversion
1
![Page 15: CONDUIT BLVD](https://reader031.vdocuments.site/reader031/viewer/2022022417/5899966c1a28abe2458b687b/html5/thumbnails/15.jpg)
nycdotfeedbackportals.nyc/conduit-boulevard 15
SUMMARY AND BENEFITS
SUMMARY • Lower speed limit to 30 MPH
• Remove one through travel lane on EB Atlantic Ave between S Conduit Blvd and Euclid Ave and on
S Conduit between Atlantic Ave and Liberty Ave
• Build new concrete sidewalk along west side of S Conduit Blvd north of Liberty Ave
• Build sidewalk extensions on SE corner of N Conduit Blvd at Liberty Ave and SE corner of S
Conduit Blvd at Hemlock St
• Build concrete neckdowns on NE corner of S Conduit Blvd at Liberty Ave and SW corner of N
Conduit Blvd at Glenmore Ave
• Ban LT from S Conduit Blvd to EB Glenmore Ave and EB Pitkin Ave
• Install new signalized crossings on S Conduit Blvd at Pine St and Grant Ave
• Build new concrete pedestrian ramps and sidewalk S Conduit Blvd at Grant Ave
BENEFITS • Reduce vehicle speeds and calm traffic along corridor
• Increase pedestrian connectivity and accessibility
• Safer, shorter pedestrian crossings
![Page 16: CONDUIT BLVD](https://reader031.vdocuments.site/reader031/viewer/2022022417/5899966c1a28abe2458b687b/html5/thumbnails/16.jpg)
nycdotfeedbackportals.nyc/conduit-boulevard
Questions?
THANK YOU!
16