concrete inspection

8
AF/QLY/FR/29 Issue no - 1.0 Vendor: SYNCHRON SYSTEMS Drawing no: J 060.200 Slno Parameters 1 Cabinet Quality/Finishing 2 Cabinet Paint 3 All Door Operation 4 Gasket On All doors 5 Door Lock Operation 6 Door Handles 7 8 Componenets/Channels 9 Cable Turfs / Finshing 10 Lugging / Ferruling 11 Wiring Quality 12 Door Wiring Finishing 13 Proper & Complete Labels 14 Terminal Drawings 15 Earthing Strip/Terminal 16 Mimic Quality/Pasting 17 Bus Bar Mounting 18 Proper PB/SS 19 20 Proper gauges, Hour meter Base Frame(Antivibration pads) Proper indication lamps operation

Upload: babu-rajamanickam

Post on 17-Dec-2015

18 views

Category:

Documents


0 download

DESCRIPTION

fgh

TRANSCRIPT

Sheet1AF/QLY/FR/29 INSPECTION REPORTSep-14Issue no - 1.0 Action taken by Synchron systemsVendor: SYNCHRON SYSTEMSDate:8/11/2014Date. 16.01.2014Drawing no: J 060.200Description : CONTROL PANEL JSP 40Rev: 0SL No: SlnoParametersSpecificationInstruments used & calibrated onObservationsJudgmentRemarksCorrection details (Kindly doubble click on Icons)1Cabinet Quality/FinishingCheck for proper fabrication finishingVisualFinishing found okAccepted2Cabinet PaintPaint Quality & Coating, should't have any scratch/rustVisualPowder coating done Accepted3All Door OperationProper operation/alignment of all doors/hingesVisualFound okAccepted4Gasket On All doorsProper mounting/pasting of gasketVisualFound okAccepted5Door Lock OperationDoor lock-quality, fittment and operationVisualUsed darshan make lockAccepted6Door HandlesDoor handles-quality, fittment and operationVisualNot providedRework7Base Frame(Antivibration pads)Base frame fittment and moutning holes as per drg.VisualPoor quality pads used/ height is more compare to sampelReworkPads not as per our sample8Componenets/ChannelsProper fittment of components/channelsVisualFound okAccepted9Cable Turfs / FinshingCable turf/channels mounting and finishing with labelsVisualTerminal nos to be inserted & Remote/engine connector/working lamp stickers to be providedRework10Lugging / FerrulingAll cable ends should have proper ferrules/luggingVisualFound okAccepted11Wiring QualityGood finishing, lugging and tighteningVisualFound okAccepted12Door Wiring FinishingDoor wiring finshing, binding and clampingVisualFound okAccepted13Proper & Complete LabelsLabels on - Components, Turfs, Terminals. Doors etc.VisualTerminal labeling not done on panelRework14Terminal DrawingsCorrect & Proper pasting of terminal drawingsVisualFound okAccepted15Earthing Strip/TerminalCheck for proper earthing strip/Terminal for each motorVisualFound okAccepted16Mimic Quality/PastingCorectness, quality, cleanliness and proper pastingVisualFound okAccepted17Bus Bar MountingProper insulation, fittment, finishingVisualNA18Proper PB/SSfittment, operational VisualRubber boot not provided for toggle switchRework19Proper indication lamps operationfittment, operationVisualFound okAccepted20Proper gauges, Hour meterfittment, operation range Pumping & engine hour meter fitted in opposite directionRework21Components mounting positions inside the panelQuality, fittment, finishingVisualFound okAccepted22Electrical material VarifiedAll component makes, models & ratingVisualRef BOMAcceptedComments : 1. Door cabels rubbing with channels , to be protected with PVC sleeve, 2. Key holder chain to be fitted, 3. Door not opening completely to be rectified , 4. unwanted holes to be closed with rubber gromites

FABRICATED BY : N/AFOR Ajax QUALITY Inspector By Name& Signature: N/A Date:Name& Signature: Ashok kumar.K/Tappan

Date: 08/11/2014

Sheet2

Sheet3