conceptual site modelpathway - 2014 historical aboveground storage tank, sump or pump house...

4

Upload: others

Post on 25-Jan-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Conceptual Site ModelPathway - 2014 Historical Aboveground Storage Tank, Sump or Pump House Environmental Resources Management Figure 6 LNAPL Cleanup Action Areas ... Existing Piping
Page 2: Conceptual Site ModelPathway - 2014 Historical Aboveground Storage Tank, Sump or Pump House Environmental Resources Management Figure 6 LNAPL Cleanup Action Areas ... Existing Piping

Conceptual Site Model

DRAFT

Page 3: Conceptual Site ModelPathway - 2014 Historical Aboveground Storage Tank, Sump or Pump House Environmental Resources Management Figure 6 LNAPL Cleanup Action Areas ... Existing Piping

Bioventing InfrastructureDRAFT

Page 4: Conceptual Site ModelPathway - 2014 Historical Aboveground Storage Tank, Sump or Pump House Environmental Resources Management Figure 6 LNAPL Cleanup Action Areas ... Existing Piping

@A

@A

@A

@A

@A

@A

@A

@A@A

@A

@A

@A@A

@A

@A

@A

@A

@A

@A

@A

@A

@A

@A

@A

@A

@A

@A

@A

@A

@A

BNSF Rail Line

N Market St N Market St

MW-6MW-8

MW-10

MW-11

MW-12 MW-13 MW-14

MW-15

MW-16

MW-21

MW-22

MW-24MW-25

MW-26

MW-27

MW-30

MW-29

MW-10.10

MW-20.30

MW-35.53

MW-43.67

MW-50.76MW-7

1.65

MW-90.12 MW-17

2.03 MW-180.31

MW-190.88

MW-207.79

MW-230.32

MW-280.82

Legend@A

Monitoring Well with Average 2016LNAPL Thickness (feet)

@AMonitoring Well with Uncertain Results(Submerged Screen or Dry Well)

@A Monitoring Well with No Measureable LNAPLDOT Proposed RailroadRealignment Option - 2014

Most Recent Approximate Extent ofLNAPL, December 20161 Foot LNAPL Thickness Based on AveragesOver Four Quarters 2016 DataDOT Proposed HighwayAlignment Option - 2014

DOT Proposed PedestrianPathway - 2014Historical Aboveground Storage Tank, Sump or Pump House

Environmental Resources Managementwww.erm.com

Figure 6LNAPL Cleanup Action Areas

BNSF Black TankSpokane, Washington

0 120 24060Feet

M:\Pr

ojects

\BNS

F\BNS

F_Bla

ckTa

nk\m

aps\G

WM

Repo

rt 8\Fi

gure

7 Avg

Only

LNAP

L 201

6.mxd

³

Draw

n By:

Melod

y Kien

eker

Da

te: 2/

14/20

17

Proje

ct: 01

9797

7

PRELIMINARY WORKING DRAFT

ERM