Project : “Hotel Crown Plaza” (Expansion) Conceptual Plan & Environmental Management Plan Promoter : J.R. Recreation Clubs and Resorts Limited EIA Coordinator Authorized Signatory CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION & PROJECT SUMMARY: The proposed project involves expansion of the existing Hotel Crown Plaza situated at Plot no. SP1, RIICO Industrial Area, Sitapura, Jaipur (Raj). The total plot area of the project is 15,580 sq. m. Gross built up area envisaged for the project is 40,671.59 sq. m. (Existing: 34,781.41 sq. m.; Proposed: 5,890.18 sq. m.). The project was accorded with Environmental Clearance for the existing phase by Ministry of Environment & Forests vide letter dated 30.07.2008 (No. 21-29/2008-IA.III). The existing project comprises of 200 guest rooms along with other facilities like coffee shop, Bar & Restaurant, banquet hall, etc. The proposed expansion will come within the existing premises on the fifth floor and will comprise of 18 additional rooms. Thus, the total number of rooms will be 218. Table: Salient features of the project Items Details Project address Plot no. SP1, RIICO Industrial Area, Sitapura, Tonk Road, Jaipur (Raj) Type of project Hotel project (Expansion) Screening category 'B-2' under item 8(a) of Schedule – Gazette Notification dated Sep 14 th , 2006 and subsequent amendments thereoff. Total Plot area 15,580 sq. m. Gross Built up area 40,671.59 sq. m. (Existing: 34,781.41 sq. m.; Proposed: 5,890.18 sq. m.) Green Area 16.03% (2498 sq.m) Parking facilities Required Parking : 278 ECU Proposed Parking : 301 ECU Power requirement & source Connected load : 3428 KW Maximum demand : 2073 KW Source : JVVNL Power backup DG sets of cumulative capacity 3000 kVA (1500 kVA -2 nos.) Water requirement & source Total Water requirement: 350 KLD Fresh Water: 189 KLD Recycled Water: 161 KLD Source: RIICO Water Supply, ground water Sewage treatment & disposal Sewage treatment facility: STP of 200 KLD capacity Sewage discharge: Nil

Upload: lamque

Post on 22-May-2018

219 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLANenvironment.rajasthan.gov.in/content/dam/environment/E… ·  · 2018-03-10Project : “Hotel Crown Plaza” (Expansion) Conceptual

Project : “Hotel Crown Plaza” (Expansion) Conceptual Plan &

Environmental Management Plan Promoter : J.R. Recreation Clubs and Resorts Limited

EIA Coordinator Authorized Signatory

CONCEPTUAL PLAN &

ENVIRONMENTAL MANAGEMENT PLAN

INTRODUCTION & PROJECT SUMMARY:

The proposed project involves expansion of the existing Hotel Crown Plaza situated at Plot no.

SP1, RIICO Industrial Area, Sitapura, Jaipur (Raj).

The total plot area of the project is 15,580 sq. m. Gross built up area envisaged for the project is

40,671.59 sq. m. (Existing: 34,781.41 sq. m.; Proposed: 5,890.18 sq. m.).

The project was accorded with Environmental Clearance for the existing phase by Ministry of

Environment & Forests vide letter dated 30.07.2008 (No. 21-29/2008-IA.III). The existing project

comprises of 200 guest rooms along with other facilities like coffee shop, Bar & Restaurant,

banquet hall, etc. The proposed expansion will come within the existing premises on the fifth floor

and will comprise of 18 additional rooms. Thus, the total number of rooms will be 218.

Table: Salient features of the project

Items Details

Project address Plot no. SP1, RIICO Industrial Area, Sitapura, Tonk Road, Jaipur (Raj)

Type of project Hotel project (Expansion)

Screening category 'B-2' under item 8(a) of Schedule – Gazette Notification dated Sep 14th, 2006 and

subsequent amendments thereoff.

Total Plot area 15,580 sq. m.

Gross Built up area 40,671.59 sq. m.

(Existing: 34,781.41 sq. m.; Proposed: 5,890.18 sq. m.)

Green Area 16.03% (2498 sq.m)

Parking facilities Required Parking : 278 ECU

Proposed Parking : 301 ECU

Power requirement

& source

Connected load : 3428 KW

Maximum demand : 2073 KW

Source : JVVNL

Power backup DG sets of cumulative capacity 3000 kVA (1500 kVA -2 nos.)

Water requirement

& source

Total Water requirement: 350 KLD

Fresh Water: 189 KLD

Recycled Water: 161 KLD

Source: RIICO Water Supply, ground water

Sewage treatment

& disposal

Sewage treatment facility: STP of 200 KLD capacity

Sewage discharge: Nil

Page 2: CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLANenvironment.rajasthan.gov.in/content/dam/environment/E… ·  · 2018-03-10Project : “Hotel Crown Plaza” (Expansion) Conceptual

Project : “Hotel Crown Plaza” (Expansion) Conceptual Plan &

Environmental Management Plan Promoter : J.R. Recreation Clubs and Resorts Limited

EIA Coordinator Authorized Signatory

REGULATORY COMPLIANCE:

• Environmental Clearance for the existing project was granted by Ministry of Environment &

Forests vide letter dated 30.07.2008 (No. 21-29/2008-IA.III)

• NOC from CGWA has been obtained vide letter no. 21-4(243)/WR/CGWA / 2008-1913 dated

20.01.2009

• Consent to Establish has been granted by Rajasthan State Pollution Control Board (valid upto

30.11.2015) for the existing project.

LOCATION OF THE PROJECT & INFRASTRUCTURE FACILITIES:

The proposed project is coming up at Plot no. SP1, RIICO Industrial Area, Sitapura, Tonk Road, Jaipur

(Raj).

Page 3: CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLANenvironment.rajasthan.gov.in/content/dam/environment/E… ·  · 2018-03-10Project : “Hotel Crown Plaza” (Expansion) Conceptual

Project : “Hotel Crown Plaza” (Expansion) Conceptual Plan &

Environmental Management Plan Promoter : J.R. Recreation Clubs and Resorts Limited

EIA Coordinator Authorized Signatory

PROJECT DETAILS:

The proposed project involves expansion of existing Hotel project. The project will constitute of

218 guest rooms (Existing: 200 nos.; Proposed: 18 nos.), along with facilities like swimming pool,

meeting rooms (4 nos.), restaurant (2 nos: capacity 215 pax), Bar (55 seats), banquet hall , etc.

BUILT UP AREA DETAILS:

Floor Gross BUA (sq. m.) BUA (sq. m.) FAR

Basement-1 7316.033 7316.033 1153.62

Basement-2 7129.863 7027.793 2760.831

Ground Floor 6310.016 6074.496 4935.62

Mezzanine 4160.467 4160.467 827.924

1st floor 4366.55 4366.55 3463.63

2nd floor 4153.955 4153.955 3251.31

3rd floor 4085.961 4085.961 3184.614

4th floor 3148.743 3148.743 2641.78

GRAND TOTAL 40671.588 say

40671.59 sq. m.

40333.998 22219.27

PARKING REQUIREMENT:

Basis of parking: 1 ECU /100 sq. m. FAR area + 25% visitors parking

A. Total ECU required : 278

B. Total ECU provided : 301

Details of parking are given as:

S.

No.

Details Cars Two wheelers Total

ECU

Basis of

ECS

Area

Required

Area Provided

1. Open area 7 48 (16 ECU) 23 23 sq. m. 529 sq. m. 550 sq. m.

2. Basement-1 41 174 (58 ECU) 99 32 sq. m. 3168 sq. m. 4266.96 sq. m.

3. Basement-2 118 183 (61 ECU) 179 32 sq. m. 5728 sq. m. 6162.41 sq. m.

Total 166 405 (135 ECU) 301 9425 sq. m. 10979.37 sq. m.

Page 4: CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLANenvironment.rajasthan.gov.in/content/dam/environment/E… ·  · 2018-03-10Project : “Hotel Crown Plaza” (Expansion) Conceptual

Project : “Hotel Crown Plaza” (Expansion) Conceptual Plan &

Environmental Management Plan Promoter : J.R. Recreation Clubs and Resorts Limited

EIA Coordinator Authorized Signatory

POWER REQUIREMENT:

Power requirement for the proposed project is summarized as under:

S. No. Description

1. Source of supply 33 kV supply will be from nearest JVVNL GSS

2. Electrical Load Connected load : 3428 KW

Maximum demand : 2073 KW

3. Transformer Number 2 nos.

Capacity 1,250 kVA, 33 /0.433 kV each

4. DG Sets Number 2

Cumulative Capacity 1500 kVA each

Fuel Used HSD (sulphur content: 0.05%)

Fuel Consumption 603.4 l/hr / DG

5. Boilers Number 2 (1 w + 1 s)

Capacity 850 kg/hr each

Fuel consumption

6. Hot water

generators

Number 2 (1 w + 1 s)

Capacity 4 lac kcal/hr each

Fuel consumption

CRITERIA OF WATER DEMAND:

The daily water requirement for the proposed development will be 350 KLD (fresh water: 189 KLD

and the recycled/reused water demand: 161 KLD).

Criteria of water demand are given as under:

Water demand calculation:

S.

No.

Particulars Population Fresh water demand Treated water

demand

Total water

demand

1. Guest rooms 426 @220 LPCD: 96 KLD @21 LPCD: 9 KLD 105 KLD

2. Rest., Bar, Coffee

shops, F&B

270 @50 LPCD: 14 KLD @9 LPCD: 2 KLD 16 KLD

3. Meeting hall/ Banquet 1200 @9 LPCD: 11 KLD @6 LPCD: 7 KLD 18 KLD

4. Staff 400 @26 LPCD: 10 KLD @9 LPCD: 4 KLD 14 KLD

5. Laundry 12 KLD -- 12 KLD

6. Kitchen 16 KLD -- 16 KLD

7. Making up of

swimming pool, others

LS 30 KLD -- 30 KLD

8. Make up for cooling

towers

126 KLD 126 KLD

9. Landscaping 13 KLD 13 KLD

Total -- 189 KLD 161 KLD 350 KLD

Page 5: CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLANenvironment.rajasthan.gov.in/content/dam/environment/E… ·  · 2018-03-10Project : “Hotel Crown Plaza” (Expansion) Conceptual

Project : “Hotel Crown Plaza” (Expansion) Conceptual Plan &

Environmental Management Plan Promoter : J.R. Recreation Clubs and Resorts Limited

EIA Coordinator Authorized Signatory

WATER BALANCE

181 KLD

Waste water

S

T

P

Capacity

200 KLD

Sludge &

evaporation

losses

(20 KLD)

Daily water demand: 189 KLD + 161 KLD = 350 KLD

32

Guest Rooms

(96 KLD)

91

Flushing

22 KLD

Landscaping

13 KLD

10

Laundry, Kitchen ( 28 KLD)25

Staff , Rest. Bar, F&B, meeting/

Banquet hall (35 KLD)

Top up water

(30 KLD)

Make up for cooling towers

(126 KLD)

22

Fresh water

189 KLD

STP Treated

water

161 KLD

RII

CO

su

pp

ly

10

KL

D

Gro

un

d w

ater

17

9 K

LD

Page 6: CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLANenvironment.rajasthan.gov.in/content/dam/environment/E… ·  · 2018-03-10Project : “Hotel Crown Plaza” (Expansion) Conceptual

Project : “Hotel Crown Plaza” (Expansion) Conceptual Plan &

Environmental Management Plan Promoter : J.R. Recreation Clubs and Resorts Limited

EIA Coordinator Authorized Signatory

IDENTIFICATION, PREDICTION AND EVALUATION OF IMPACTS

Environmental impact can be defined as any alteration of environmental conditions, adverse or

beneficial, caused or induced by the action or set of actions under consideration.

Various operations involved in the project have been studied in details to identify, predict and

evaluate impacts on various environmental components. The identified impacts were quantified

using mathematical models to a possible extent so as to estimate the future environmental scenario.

AIR ENVIRONMENT

Air pollution has long been recognized as a brain storming issue worldwide. The onset of

technological and scientific innovations in various fields and diverse activities of human race for

its elegance have put extra load on the atmosphere by way of releasing air pollutants like

particulate matter (PM10, PM2.5), sulphur dioxide (SO2), oxides of nitrogen (NOX), carbon

monoxide (CO), unburned hydrocarbon (HC) and other organic as well as inorganic pollutants

including trace metals responsible for causing health consequences. Entry of pollutants into the

atmosphere occurs in the form of gases or particles. Continuous mixing, transformation and trans-

boundary transportation of air pollutants make air quality of a locality unpredictable. The growth

of population, industry and number of vehicles and make the problem of air pollution still worse.

Rapid industrialization and vehicular traffic especially in the urban areas of India is a great threat

to air quality.

AMBIENT AIR QUALITY DATA:

Details of monitoring report are given as under:

Ambient air monitoring report

Instrument used: Respirable Dust Sampler (SLE-RDS 103 & SLE-GA 133) & Fine Particle Sampler APM 550)

Sampling date 08.08.2015-22.08.2015, Duration: 24 hrs.

Parameter Results Units NAAQS 2009

Particulate Matter (PM10) 68.9 µg/m3 100.0

Particulate Matter (PM2.5) 40.5 µg/m3 60.0

Sulphur dioxide (as SO2) 9.7 µg/m3 80.0

Nitrogen Dioxide (as NO2) 14.0 µg/m3 80.0

Carbon Monoxide (as CO) 330 µg/m3 2000

* Monitoring reports enclosed as Annexure VII

Page 7: CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLANenvironment.rajasthan.gov.in/content/dam/environment/E… ·  · 2018-03-10Project : “Hotel Crown Plaza” (Expansion) Conceptual

Project : “Hotel Crown Plaza” (Expansion) Conceptual Plan &

Environmental Management Plan Promoter : J.R. Recreation Clubs and Resorts Limited

EIA Coordinator Authorized Signatory

Instrument Sensitivity:

Instrument Range and Sensitivity

Respirable Dust Sampler

(RDS)

(PM-10)

0.40 – 1.5 m3/min

±0.02 m3/min

(Other gases)

0 – 3 LPM

± 0.2 LPM

Fine Particulate Sampler (PM – 2.5) : ±0.03 DGM m3

CONSTRUCTION PHASE:

SOURCES OF POLLUTION:

1. Vehicular Exhaust:

The major source of pollution in construction phase will be vehicles carrying construction

material. Pollution load from the same is calculated as :

Pollution Load = No. of trucks × Emission Factors × Deterioration Factor

Due to movement of average 05 trucks short term pollution load is given in table:

Parameter Emission Factor

(g /km)*

Deterioration Factor

(g /km)*

Pollution Load

(g/km)

CO 4.5 1.33 29.92

NOx 1.21 1 6.05

SPM 0.8 1.595 6.38

SO2 0.15 1 0.75

HC 1.21 1 6.05

* Source : CPCB Publication, 1998

MITIGATION MEASURES:

S. No. Guidance on Practices to reduce emission

1. Water Application Water will be applied by variety of methods, for instance trucks, hoses,

sprinklers, etc to mitigate dust generation from the construction site.

2. Design • Travelled distances will be minimized for delivery of materials

• Green building materials viz. fly ash bricks, RMC’s, etc. will be used

to the best possible extent.

3. Vehicles &

Equipments

• Engines & exhaust systems will be properly maintained.

• Low sulphur diesel (HSD) will be used.

• Idling time will be eliminated/ reduced to the minimum

Page 8: CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLANenvironment.rajasthan.gov.in/content/dam/environment/E… ·  · 2018-03-10Project : “Hotel Crown Plaza” (Expansion) Conceptual

Project : “Hotel Crown Plaza” (Expansion) Conceptual Plan &

Environmental Management Plan Promoter : J.R. Recreation Clubs and Resorts Limited

EIA Coordinator Authorized Signatory

4. Material Handling

& Transfer

systems

• Material drop will be minimized at the transfer point and enclosure

• Foam suppression systems will be utilized.

• PM emissions from spills will be prevented.

• Material handling operations will be minimized.

5. Road Surfaces • On-site vehicle restrictions will be established.

• Unpaved roads will be properly maintained.

POST CONSTRUCTION PHASE:

The emission sources are mainly due to the vehicular emissions, diesel generator set of cumulative

capacity 3000 kVA (1500 kVA- 2 nos.), Boilers (2 nos. of capacity 850 kg/hr each), & Hot water

generators (2 nos. of capacity 4 lac kcal/hr each). The DG sets are housed in an acoustic enclosure

for maximum noise attenuation.

However, the maximum concentrations due to DG sets emission rate are given as under*:

Parameters Emission rate

PM 75 mg/Nm3

NOx 710 ppmv (as NO2), dry basis in ppmv

CO 150 mg/Nm3

HC NA

NMHC 100 mg/Nm3 (as C)

*CPCB Emission standards for DG sets of ratings more than 800 KW (1000 kVA) as notified by the E (P) third Amendment Rules,

2002 vide GSR 489 (E) dated 9th July, 2002 at S. No. 96, under E (P) Act, 1986.

SOURCES OF POLLUTION:

A. DG sets:

Calculation of stack height of D.G. sets

DG Set of capacity 1500 kVA- 2 nos.:

The stack height of DG set is calculated as under:

H = 0.2 (√capacity of the DG set in kVA)

= 0.2 x (√3000)

= 0.2 x 54.77= 10.95 m say 11 m

However, a safe stack height of 30 m above the roof of DG house will be provided.

Page 9: CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLANenvironment.rajasthan.gov.in/content/dam/environment/E… ·  · 2018-03-10Project : “Hotel Crown Plaza” (Expansion) Conceptual

Project : “Hotel Crown Plaza” (Expansion) Conceptual Plan &

Environmental Management Plan Promoter : J.R. Recreation Clubs and Resorts Limited

EIA Coordinator Authorized Signatory

B. Vehicular exhausts:

Parameter Emission rate per ECU (g/sec/m)

NOx 1.17 x 10-6

CO 1.46 x10-5

MANAGEMENT PLAN

SOURCES MANAGEMENT

• Exhaust from D.G. sets

boilers, hot water

generators

• D.G. sets have been provided with effective stack height as per the

norms of CPCB.

• Low-sulphur-content fuel (HSD - Sulphur content 0.05%) will be used.

• Vehicular exhausts

especially congestions

during peak traffic

hours.

• Sufficient width of driveways to ensure smooth traffic movements.

• Provisions of fully internalized parking including the parking facilities

for the visitors.

• Guided traffic ways within the project site.

• Speed humps will be installed for speed restrictions inside the project

area.

WATER ENVIRONMENT:-

GROUND WATER ANALYSIS REPORT

Date of sampling: 12.10.2015 Location: Project site

Parameter Results Complete Test as Per IS :10500-1991

Desirable Limit Permissible Limit

Odour Agreeable Agreeable --

pH value (at 210C) 7.45 6.5 - 8.5 No Relaxation

Colour, Hazen units <1 <5 <5

Turbidity (NTU) <1 NTU 01 NTU 05 NTU

Total Dissolved solids, 784 mg/l 500 mg/l 2000 mg/l

Total Hardness as CaCO3 112 mg/l 200 mg/l 600 mg/l

Calcium( as Ca), mg/l 30.40 mg/l 75 mg/l 200 mg/l

Magnesium (as Mg), mg/l 8.75 mg/l 30 mg/l 100 mg/l

Total Alkalinity (as CaCO3), mg/l 496 mg/l 200 mg/l 600 mg/l

Nitrate (as NO3), mg/l 8.28 mg/l 45.0 mg/l No relaxation

Chloride (as Cl) 243.98 mg/l 250.0 mg/l 1000 mg/l

Page 10: CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLANenvironment.rajasthan.gov.in/content/dam/environment/E… ·  · 2018-03-10Project : “Hotel Crown Plaza” (Expansion) Conceptual

Project : “Hotel Crown Plaza” (Expansion) Conceptual Plan &

Environmental Management Plan Promoter : J.R. Recreation Clubs and Resorts Limited

EIA Coordinator Authorized Signatory

Sulphate (as SO4) 43.04 mg/l 200 mg/l 400 mg/l

Iron (as Fe) 0.03 mg/l 0.3 mg/l No relaxation

Fluoride (as F) 1.07 mg/l 1.0 mg/l 1.5 mg/l

Free residual chlorine <0.1 mg/l <0.2 mg/l 1.0 mg/l

*Monitoring report enclosed as Annexure V

CONSTRUCTION PHASE:

WATER CONSERVATION TECHNIQUES:

Best construction practices will be adopted to reduce the water demand for construction activities:

• Use of polymer dispersion and air entraining agents to reduce the construction water demand.

• Admixtures will be used to reduce water demand during construction.

• Discouraging the washing of vehicles and equipment on the construction site. Workers will

not allow to wash their personal vehicles on site. Vehicles and equipment that regularly leave

the construction site should be washed offsite.

MANAGEMENT PLAN:

SOURCES MANAGEMENT

• Un-captured run-off

from the site may

contaminate ground

water aquifers.

• The rain-water entering into the pit will be screened for the removal of

heavy silt and other materials.

• Provisions will be made to ensure the construction vehicles stick to the

access track to prevent mud & dirt being deposited on roads.

• Up slope water will be diverted with turf and due care will be taken not

to mix mortar in locations that will drain into storm water system.

• Unsanitary conditions

during rainy season.

• The civil contractor will be made responsible for site sanitation and will

be bound by the management to adhere to healthy level of sanitation.

• There will be no stagnant water at site, as the runoff from the relevant

areas will be systematically drained into the storm water line. There

will be provision of cleaning the storm water line periodically.

Page 11: CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLANenvironment.rajasthan.gov.in/content/dam/environment/E… ·  · 2018-03-10Project : “Hotel Crown Plaza” (Expansion) Conceptual

Project : “Hotel Crown Plaza” (Expansion) Conceptual Plan &

Environmental Management Plan Promoter : J.R. Recreation Clubs and Resorts Limited

EIA Coordinator Authorized Signatory

POST CONSTRUCTION PHASE:

Daily water demand will be 350 KLD (fresh: 189 KLD + recycled: 161 KLD). The fresh water

demand will be met from RIICO supply/ ground water.

A. WATER CONSERVATION TECHNIQUES:

Following water conservation techniques have been proposed for the project:

• Dual plumbing system will be adopted to utilize the treated waste water for flushing (22

KLD), make up for cooling towers (126 KLD), landscaping (13 KLD). This will help in

reducing the fresh water demand.

• Dual flushing fixtures will be used to allow different volumes of water for solid and

liquid flushing which will help in conserving the water demand for flushing significantly.

• Water meters will be installed for the following:

o Potable water consumption

o Landscape water consumption

o Hot water consumption through solar systems, at building level

o Treated waste water consumption

• Landscape design & management of irrigation systems:

o Native & xeriscaping plant species: Choose native plant species that need less

water.

o Creating Hydrozones: Grouping of plant according to their water needs to provide

adequate water to all plants without over or under-watering.

o Maintain Healthy Soil: Healthy soils are the basis for a water-smart landscape; they

effectively cycle nutrients, minimize runoff, retain water, and absorb excess nutrients,

sediments, and pollutants.

o Mulching: Incorporate mulch around shrubs and garden plants to help reduce

evaporation, inhibit weed growth, moderate soil temperature, and prevent erosion.

Adding organic matter and aerating soil can improve its ability to hold water.

o Avoid watering during the heat of the day. Water early in the morning to reduce the

evaporation rate

o Drought tolerant species will be selected.

o Turfs will be avoided to the extent possible.

Page 12: CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLANenvironment.rajasthan.gov.in/content/dam/environment/E… ·  · 2018-03-10Project : “Hotel Crown Plaza” (Expansion) Conceptual

Project : “Hotel Crown Plaza” (Expansion) Conceptual Plan &

Environmental Management Plan Promoter : J.R. Recreation Clubs and Resorts Limited

EIA Coordinator Authorized Signatory

o Central shut off valve will be provided

o Sprinkler landscaping system will be used to conserve water

B. WASTE WATER GENERATION AND TREATMENT:

Approximate 181 KLD waste water will be generated which will be treated in STP of

capacity 200 KLD, based on FAB technology. Physico chemical characteristics of influent

and effluent are given as:

Parameters Influent Treated effluent

pH 7.5 - 8.5 7 - 8

Suspended solids 200- 225 mg/l <5 mg/l

BOD 200 - 250 mg/l <10 mg/l

COD 350 - 400 mg/l <60 mg/l

Oil & Grease 20-25 mg/l <1 mg/l

STORM WATER MANAGEMENT:

Construction phase

Contaminant Sources Impact Mitigation

Sediment &

Floatables

Streets, lawns, driveways,

roads, construction

activities,

During construction, sediment fencing or other erosion

control devices will be used to mitigate the short-term

adverse impacts of sedimentation.

Oil & Grease Roads, driveways, parking

lots etc.

Oil & Grease trap will be provided to remove oil & grease,

suspended matter, and ensure the quality of water.

Storm water control and rain water harvesting will be done as per the standards laid down by

CGWA & BIS. Following measure will be adopted for the same:

Compost Blankets: A compost blanket is a layer of loosely applied composted material placed on

the soil in disturbed areas to reduce storm water runoff and erosion. This material fills in small rills

and voids to limit channelized flow, provides a more permeable surface to facilitate storm water

infiltration, and promotes re-vegetation.

Page 13: CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLANenvironment.rajasthan.gov.in/content/dam/environment/E… ·  · 2018-03-10Project : “Hotel Crown Plaza” (Expansion) Conceptual

Project : “Hotel Crown Plaza” (Expansion) Conceptual Plan &

Environmental Management Plan Promoter : J.R. Recreation Clubs and Resorts Limited

EIA Coordinator Authorized Signatory

Post Construction Phase:

a. Design:

For good design of rainwater harvesting, following points are to be kept under consideration:

• Ideal location with good ground slope.

• The location has adequate subsurface permeability of the aquifer to accommodate maximum

recharge of rainwater through injection well.

• Rate of filtration should exceed average rainfall intensity.

• Clogging of filtration media should be cleaned periodically.

• Ground water pollution does not take place.

b. Baseline:

The average annual rainfall (based on last 10 years rainfall data) is 597 mm.

Rain Fall Data (last 10 years):

S. No. Year Annual Average Rainfall No. of Rainy Days

1 2014 606 40

2 2013 757 35

3 2012 907 28

4 2011 646 38

5 2010 750 40

6 2009 377 28

7 2008 572 32

8 2007 553 34

9 2006 407 27

10 2005 392 19

Total 5967 321

Average 597 32

Source: Water Resource Department, Rajasthan

c. Calculation of No. of RWH Structures:

The rain water harvesting structures are calculated on the basis of peak intensity of rainfall

recorded as 40 mm/hr considering 15 minutes of peak rainfall. The same has been done to

avoid flooding of the area.

Page 14: CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLANenvironment.rajasthan.gov.in/content/dam/environment/E… ·  · 2018-03-10Project : “Hotel Crown Plaza” (Expansion) Conceptual

Project : “Hotel Crown Plaza” (Expansion) Conceptual Plan &

Environmental Management Plan Promoter : J.R. Recreation Clubs and Resorts Limited

EIA Coordinator Authorized Signatory

S.

No

Type of

Structure/ Surface

Area [A]

(sq. m.)

Run off

Coefficient

[C]

Intensity

of rainfall

(m/hour) [I]

Total discharge

[Q = CIA]

(m3/hr)

1. Roof Top 6310.02 0.9 0.04 227.16

2. Landscape 2498 0.3 0.04 29.98

3. Paved 6771.98 0.75 0.04 203.16

Grand Total (1-3) 15580 460.30

Total Rain Water Flow : 460.30 m3/hr

Considering 15 minutes of peak rainfall,

Runoff volume : 115.08 m3/hr

Volume of each pit : 27 m3 (3 m x 3 m x 3 m)

Total no. of rain water harvesting pits required : Total run-off volume/volume of each pit

: 115.08/27

: 4.26 say 5 nos.

Therefore, 5 Nos. rain Water Harvesting pit of size 3 m length x 3 m width x 3 m depth with

PVC slotted pipe upto minimum depth of 30 m.

d. Design of Rain Water Harvesting Structure:

The dimensional parameters of Desilting/Settlement chamber would be 3 m (length) x 3 m

(width) x 1.30 (depth). In Desilting chamber, 0.30 m depth below outflow is kept for silt

deposition. The filtration tank dimension would be 3 m (length) x 3 m (width) x 1 m (depth)

with 0.15 m dia recharge well of 30 m depth depending upon the formation for recharge in

aquifer through vadose zone. Each structure will be capable of handling rainwater volume @

27 m3/day.

Page 15: CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLANenvironment.rajasthan.gov.in/content/dam/environment/E… ·  · 2018-03-10Project : “Hotel Crown Plaza” (Expansion) Conceptual

Project : “Hotel Crown Plaza” (Expansion) Conceptual Plan &

Environmental Management Plan Promoter : J.R. Recreation Clubs and Resorts Limited

EIA Coordinator Authorized Signatory

e. Calculation of annual recharge:

S.

No

Type of

Structure/ Surface

Area [A]

(sq. m.)

Run off

Coefficient

[C]

Intensity

of rainfall [I]

(m/annum)

Total discharge

[Q= CIA]

(m3/ annum)

1. Roof Top 6310.02 0.9 0.597 3390.37

2. Landscape 2498 0.3 0.597 447.39

3. Paved 6771.98 0.75 0.597 3032.15

Grand Total (1-3) 15580 6869.91 say 6870

Total Annual Recharge to Ground Water Regime of the area through rainwater harvesting structure

would be 6870 m3/ annum.

Page 16: CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLANenvironment.rajasthan.gov.in/content/dam/environment/E… ·  · 2018-03-10Project : “Hotel Crown Plaza” (Expansion) Conceptual

Project : “Hotel Crown Plaza” (Expansion)

Promoter : J.R. Recreation Clubs and Resorts Limited

EIA Coordinator

SOIL ENVIRONMENT:

Location:

Parameters

Color

pH (1:10)

Conductivity (1:10)( µS/cm)

Moisture (%)

Chlorides as Cl (%)

Sulphate as SO4

Total Carbonates (%)

Total Organic Matter (%)

Nitrogen as N (%)

Phosphorous as P(%)

Potassium

*Monitoring report is enclosed as

WASTE MANAGEMENT

Construction Waste:

• About 350 MT of the construction waste will be generated. Details of the same is given as

under:

: “Hotel Crown Plaza” (Expansion)

Environmental Management PlanJ.R. Recreation Clubs and Resorts Limited

SOIL ANALYSIS

Location: Project Site; Date of sampling: 12.10.2015

Parameters Results

Color Light Brown

pH (1:10) 7.89

Conductivity (1:10)( µS/cm) 298

Moisture (%) 8.5

Chlorides as Cl (%) 0.038

Sulphate as SO4 0.021

Total Carbonates (%) 0.2

Total Organic Matter (%) 0.87

Nitrogen as N (%) 0.08

Phosphorous as P(%) <0.005

Potassium as K (%) 0.05

Monitoring report is enclosed as Annexure VII

WASTE MANAGEMENT:

MT of the construction waste will be generated. Details of the same is given as

Conceptual Plan &

Environmental Management Plan

Authorized Signatory

MT of the construction waste will be generated. Details of the same is given as

Page 17: CONCEPTUAL PLAN & ENVIRONMENTAL MANAGEMENT PLANenvironment.rajasthan.gov.in/content/dam/environment/E… ·  · 2018-03-10Project : “Hotel Crown Plaza” (Expansion) Conceptual

Project : “Hotel Crown Plaza” (Expansion) Conceptual Plan &

Environmental Management Plan Promoter : J.R. Recreation Clubs and Resorts Limited

EIA Coordinator Authorized Signatory

POST CONSTRUCTION PHASE:

The solid waste generated from the project considering full occupancy will be mainly domestic

waste and estimated quantity of the same will be approx 228 kg/day. The solid waste generated will

be first segregated as plastic, glass, paper, and other waste separately and disposed off as per MSW

Rules

ENERGY CONSERVATION CALCULATIONS:

• Total landscape and street light load will be met through solar powered fixtures.

• Total geyser load can be reduced by 10% by using solar power.

• Lift load can be reduced by 23% by use of VF drives.

• All capacitors will be provided with Harmonic Filters to avoid distortion in Voltage.

• Automatic Power Factor correction panel with capacitor will be used for Common Load &

Fixed Capacitor for Transformer to minimize the losses.

• Insulation of exposed walls and roof will be done to minimize heat gains inside the building.

This will help to reduce the air conditioning demand of the buildings.

• Emphasis will be given on low maintenance, low wattage and longer life in selection of chokes

and lamps for all common area and external light fixtures.

********