concealment record t-1301
DESCRIPTION
jiosTRANSCRIPT
*PT PETROKIMIA GRESIK(PKG)GRESIK, EAST JAVA
Wuhuan Eng. Co., LtdREVAMP OF PHOSPHORIC ACID PLANT PROJECTProject No.12057
No: 12057-PC70-1312057
Concealment RecordWBS No.
Unit name: SA - Unit
Subcontractor: PT Marga Bangun PersadaProject manager Didik Ariyanto
Concealed ProjectT-1303 Wall elv. -0.150 up to 4.000Construction Drawing No.12057-03000-ST40-02
Concealed project contents and schematicsA. Carry out the work of closing the Foundation T-1303 Wall elv. -0.150 up to 4.0001. The steel bars have been installed in accordance to construction drawing in good condition
2. The steel bars : (8,D10, D13 & D193. The method is using wire rope
4. Before installation formwork, the steel bars have been ascertained in good condition and clean through the check list together
Inspection result
OwnerContractorSubcontractor
Professional Engineer:
Date:Professional Engineer:Date:Quality Inspector
Technical Responsible Person Group leader Date: