*PT PETROKIMIA GRESIK(PKG)GRESIK, EAST JAVA

Wuhuan Eng. Co., LtdREVAMP OF PHOSPHORIC ACID PLANT PROJECTProject No.12057

No: 12057-PC70-1312057

Concealment RecordWBS No.

Unit name: SA - Unit

Subcontractor: PT Marga Bangun PersadaProject manager Didik Ariyanto

Concealed ProjectT-1303 Wall elv. -0.150 up to 4.000Construction Drawing No.12057-03000-ST40-02

Concealed project contents and schematicsA. Carry out the work of closing the Foundation T-1303 Wall elv. -0.150 up to 4.0001. The steel bars have been installed in accordance to construction drawing in good condition

2. The steel bars : (8,D10, D13 & D193. The method is using wire rope

4. Before installation formwork, the steel bars have been ascertained in good condition and clean through the check list together

Inspection result

OwnerContractorSubcontractor

Professional Engineer:

Date:Professional Engineer:Date:Quality Inspector

Technical Responsible Person Group leader Date: