Page 1: Computer Asset Management System Project Feasibility CS 410, Fall 2005 Semester October 20, 2005

Computer Asset

Management System

Project FeasibilityCS 410, Fall 2005 Semester

October 20, 2005

ToldeamG

CS 410

Page 2: Computer Asset Management System Project Feasibility CS 410, Fall 2005 Semester October 20, 2005

2

ToldeamG

CS 410

Agenda

• Speakers

• Problem Statement

• Proposed Solution

• What We Are Not Doing

• Hardware Components

• Software Components

• Market Analysis

• Schedule

• Cost

• Risks & Issues

• Conclusion

Page 3: Computer Asset Management System Project Feasibility CS 410, Fall 2005 Semester October 20, 2005

3

ToldeamG

CS 410

Speakers

• Gold Team:– Keith Mulkey – Project Overview

– Joe Kane – Hardware

– Sergei Yemelianoff – Software

– John Gedville – Market Analysis

– Keith Mulkey – Wrap up

Page 4: Computer Asset Management System Project Feasibility CS 410, Fall 2005 Semester October 20, 2005

4

ToldeamG

CS 410

Problem Statement

Network Administrators and Corporate Asset managers in large organizations spend numerous hours each year tracking and locating computer hardware assets.

Page 5: Computer Asset Management System Project Feasibility CS 410, Fall 2005 Semester October 20, 2005

5

ToldeamG

CS 410

Proposed Solution

A turn-key computer asset management and inventory system based on RFID (Radio Frequency Identification) tag technologies integrated with a specialized database management system.

Page 6: Computer Asset Management System Project Feasibility CS 410, Fall 2005 Semester October 20, 2005

6

ToldeamG

CS 410

What We Are Not Doing

We are not re-inventing the RFID based inventory management systems already available and used by the Department of Defense and corporate giants such as Wal Mart.

Page 7: Computer Asset Management System Project Feasibility CS 410, Fall 2005 Semester October 20, 2005

7

ToldeamG

CS 410

Hardware Components

• RFID Tags– Passive or Active – Four frequency ranges– Re-writeable or write once

• RFID Scanner– Types of readers: Fixed and Mobile– PC card and compact flash– Wireless LAN with 802.11G or other

wireless technology

Page 8: Computer Asset Management System Project Feasibility CS 410, Fall 2005 Semester October 20, 2005

8

ToldeamG

CS 410Hardware Components of the

Computer Asset Manager System

RFID Tag PDA

Computer

RFID Scanner

Page 9: Computer Asset Management System Project Feasibility CS 410, Fall 2005 Semester October 20, 2005

9

ToldeamG

CS 410

Software Components

• RFID Application Program Interface– Every manufacturer provides its own API– Communicates with a PC via TCP/IP socket

or COM port

• Client – Server paradigm– Connect PDA to remote server PC– Server PC communicates with a database

engine

Page 10: Computer Asset Management System Project Feasibility CS 410, Fall 2005 Semester October 20, 2005

10

ToldeamG

CS 410

Software Components

• Database Engine– Independent database server– Software provides initial script of DB

creation

• Development Platform & SDKs– J2SE & J2ME– JAVA APIs: java.com.*, java.net.*,

sun.jdbc.*

Page 11: Computer Asset Management System Project Feasibility CS 410, Fall 2005 Semester October 20, 2005

11

ToldeamG

CS 410

Market Analysis

• Straw poll survey indicates 72% of those surveyed indicated an interest in such a product

• Very large potential market: computer repair facilities such as the Geek Squad®– Nearly 7,000 agents– Plans to open 20-50 stand-alone stores by

the end of 2006

Page 12: Computer Asset Management System Project Feasibility CS 410, Fall 2005 Semester October 20, 2005

12

ToldeamG

CS 410

ScheduleID Task Name Start Finish

Nov 2005Oct 2005 Dec 2005

11/2710/9 12/411/1310/16 11/2010/2310/2 11/610/30 12/11

1 10/20/200510/20/2005Presentation II (Feasibility

6 11/17/200511/17/2005Presentation III

8 11/29/200511/29/2005Preliminary Web Page Due

9 12/13/200512/13/2005Presentation IV

10 12/13/200512/13/2005Final Web Page Due

11 12/13/200512/13/2005SBIR Proposal Due

2 11/11/200510/24/2005Requirements Analysis

23 4/5/20064/5/2006Project Completion

Jan 2006 Feb 2006

12/18 12/25 1/1 1/8 1/15 1/22 1/29

Mar 2006

2/5 2/12 2/19 2/26 3/5 3/12 3/19 3/26

Apr 2006

4/2 4/9

May 2006

4/16 4/23 4/30 5/7

22 4/5/20063/31/2006Acceptance Test

19 3/31/20063/20/2006Integration Test

11/11/200511/7/2005RFID Hardware Selection3

4 11/28/200511/14/2005Client Side Software Design

5 12/12/200511/21/2005Server Side Software Design

14 2/13/20061/23/2006Client Side Software Develop

16 3/20/20062/13/2006Server Side Software Develop

12 1/23/20061/9/2006Simulation Software Develop

13 1/23/20061/16/2006Simulation Software Functional Test

15 2/13/20061/30/2006Client Side Software Functional Test

17 3/20/20062/20/2006Server Side Functional Test

18 3/20/20062/20/2006Integration Test Plan & Procedures

21 3/31/20063/6/2006Acceptance Test Plan & Procedures

20 3/31/20062/20/2006User Documentation

7 12/13/200510/24/2005Web Page Development

Page 13: Computer Asset Management System Project Feasibility CS 410, Fall 2005 Semester October 20, 2005

13

ToldeamG

CS 410

Estimated Development CostLabor: Rate Hours Cost

Joe 19.00$ 440 8,360$

John 19.00$ 440 8,360$

Keith 40.00$ 440 17,600$

Sergei 19.00$ 440 8,360$

Hardware: Price Quantity Cost

RFID tags 2.00$ 4 8$

RFID scanner 400.00$ 1 400$

PDA 200.00$ 1 200$

Software Price Quantity Cost

RFID SDK -$ 1 -$

Java DE -$ 1 -$

Total Labor 42,680.00$

Total Hardware 608.00$

Total Software -$ Total Cost 43,288.00$

Page 14: Computer Asset Management System Project Feasibility CS 410, Fall 2005 Semester October 20, 2005

14

ToldeamG

CS 410

Risks & Issues

Risks:

• Most obvious risk is questionable market

• Meeting development schedule given other demands on team members’ time

Issues

• Management challenge with respect to diverse schedules of team members

Page 15: Computer Asset Management System Project Feasibility CS 410, Fall 2005 Semester October 20, 2005

15

ToldeamG

CS 410

Conclusion

• Market is questionable mainly due to already existing products.

• Overall however:– This system would be of great benefit to

organizations that track a great many computer assets.

– Project is technically feasible– Costs are within the budget of our group– Development schedule is achievable in CS410/411– Our team has the expertise to complete the project.– The potential benefits outweigh the risks