  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 1

    REPUBLIC OF GHANA

    COMPOSITE BUDGET

    FOR 2017-2019

    PROGRAMME BASED BUDGET ESTIMATES

    FOR 2017

    ASSIN NORTH MUNICIPAL ASSEMBLY

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 2

    Table of Contents

    PART A: STRATEGIC OVERVIEW

    …………………………………………………………….3Error! Bookmark not defined.

    1. GSGDA II POLICY OBJECTIVES ............................................................................................. 3

    2. GOAL………………………………………………………………………….…………………...6

    3. CORE FUNCTIONS ...................................................................................................................... 3

    4. POLICY OUTCOME INDICATORS AND TARGETS ............................................................. 8

    SUMMARY OF KEY ACHIEVEMENTS IN 2016 ................................................................. 9-10

    P A R T B : B U D G ET P RO G RAM M E S UM M ARY .......................................................... 11-

    PROGRAMME 1: MANAGEMENT AND ADMINISTRATION .............................................. 12-20

    PROGRAMME 2: SOCIAL SERVICES DELIVERY ................................................................ 21-31

    PROGRAMME3 : INFRASTRUCTURE DELIVERY AND MANAGEMENT ....................... 32-38

    PROGRAMME 4: ECONOMIC DEVELOPMENT .................................................................... 39-43

    PROGRAMME 5: ENVIRONMENTAL AND SANITATION MANAGEMENT ................... 44-49

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 3

    1. BRIEF INTRODUCTION

    NAME, LOCATION AND SIZE

    The Assin North Municipal Assembly (A.N.M.A.) is among the twenty (20) MMDA’s in the

    Central Region of Ghana out of which Assin South District Assembly was carved in August

    2004. Assin North Municipal is situated in the Northern corner of the Central Region within

    Longitudes 1 0 05’ East and 1

    0 25’ West and latitudes 6

    0 05’ North and 6

    04

    ’ South. The

    Municipality shares common boundaries with Adansi East (in the Ashanti Region) on the North,

    Upper Denkyira on the North-West, Twifo Heman Lower Denkyira on the West, Assin South

    District Assembly on the south, Asikuma Odoben-Brakwa on the South-East and Birim North (in

    the Eastern Region) on the East. The Municipality covers a total land area of about 1,188 sq.km

    and comprises about 500 settlements including Assin Fosu, the Municipal Capital.

    ESTABLISHMENT

    The Municipality was established by LI 1859 in 2004.

    POLITICAL STRUCTURE OF THE ASSEMBLY

    The structure of the Assembly consists of the following; Assembly members of fifty (50) made

    up of thirty- three (33) elected members, fourteen (14) appointees, two (2) Honourable members

    of parliament and one Honourable Municipal Chief Executive.

    POLITICAL SUB STRUCTURE

    This structure consists of seven (7) Zonal Councils, namely; Assin Fosu, Assin Akonfudi,

    Assin Bediadua, Assin Akropong, Assin Praso and Assin Awisem.

    POPULATION STRUCTURE

    The 2010 Population and Housing Census put the population at 161,341 and with an annual

    growth rate of 2.9 percent, the estimated population for 2016 is now about 191,530. (51%

    Female and 49% Male)

    MUNICIPAL ECONOMY

    The main economic activities in the Municipality include Agriculture (farming), Trading mainly

    Wholesale/Retail Trade, Agro - processing and Service. Agriculture and its related activities are

    the leading economic ventures and employs about 63.2% of the working population in the

    Municipality. Commerce 24.8%, Services 9.6% and Industry 2.4%.

    ROADS

    In all, the Municipal has a total of 239.5 kilometers of feeder roads, which link the rural

    communities to the Municipal capital. There is also the Kumasi - Cape Coast - Takoradi first

    class road that passes through Assin Fosu, the Municipal capital.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 4

    EDUCATION

    In the 2015/2016 academic year, the Municipal had 110 Pre-schools, 111 Primary Schools, 77

    Junior High Schools, 4 Senior High Schools and 1 College of Education. The teacher - pupil

    ratio of public pre-school, Primary, Junior High School, Senior High Schools and Teacher

    Training College shows that pre-school and primary are above the national ratios of 1:54. Female

    enrolment from Pre-school to S.H.S is also slightly higher than that of males as shown in the

    table below indicating that some inroads are being made in the Girl-child education policy.

    Level Total

    Enrolment

    Enrolment

    No. of Teachers Males % Females %

    Pre-School 8107 4248 52 3859 48 178

    Primary 20461 10799 53 9974 47 597

    J.H.S 8202 4528 55 3607 45 467

    S.H.S 3115 1667 54 1448 46 220

    HEALTH

    The Municipal has only one hospital, St Francis Xavier Catholic Hospital at Assin Foso. The

    hospital caters for all referral cases in the Municipal. The health needs of the people are

    provided by various health institutions. There is a polyclinic in Assin Fosu complemented by

    various health centers and CHPS compounds. In terms of Out Patient Department (OPD) Cases,

    Malaria ranks first followed by Upper Respiratory Tract Infection and Diarrheal Diseases.

    ENVIRONMENT

    53.1% of the people use public dumps with 11.1 dumping indiscriminately while 3.6% of

    households use house to house collection. There is also poor settlement planning in the

    municipality which is manifested by haphazard arrangement of buildings in various locations.

    TOURISM POTENTIAL

    The potentials for tourism include; The mass grave of colonial masters during war with the

    Ashanti’s and the spot where King Osei Tutu was shot dead at Assin Praso, flagstone with

    footprints and designs at Assin Fosu, the sacred Rock formation at Endwa

    KEY ISSUES/CHALLENGES

    A summary of the key development problems identified under each of the thematic areas arising

    out of the situational analysis is provided below;

    Low income levels,

    Low agricultural productivity,

    Inadequate credit facilities,

    Inadequate employment opportunities,

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 5

    Poor housing conditions,

    Poor conditions of roads,

    Inadequate social protection programmes for the poor,

    Inadequate potable water supply,

    Inadequate health personnel and equipment,

    Dilapidated educational infrastructure,

    Lack of job openings for the physically challenged, and

    Low involvement of women in decision making.

    2. ASSIN NORTH MUNICIPAL ASSEMBLY BROAD OBJECTIVES IN LINE WITH THE GSGDA II POLICY OBJECTIVES

    The GSGDA II Policy Objectives that are relevant to the Assin North Municipal

    Assembly are as follows;

    Improve fiscal revenue mobilization and public expenditure management,

    Create and sustain an efficient and effective transport system that meets user needs.

    Develop social, community and recreational facilities.

    Promote proactive planning for disaster prevention and mitigation.

    Accelerate the provision of adequate, safe and affordable water.

    Accelerate the provision of improved environmental sanitation facilities.

    Improve efficiency and competitiveness of SMSEs.

    Diversify and expand the tourism industry for economic development.

    Increase inclusive and equitable access to and participation in education at all levels.

    Ensure effective implementation of the decentralization policy and programmes.

    Promote and improve the efficiency and effectiveness of service delivery performance in the Assembly.

    Bridge the equity gaps in geographical access to health services.

    3. VISION STATEMENT

    The vision of Assin North Municipal Assembly is to elevate Assin North to an International

    Standard Municipality where its residents will enjoy the full benefit of modernization on a

    peaceful, reliable and sustainable basis.

    MISSION STATEMENT

    The Assin North Municipal Assembly exists to create an enabling environment for the

    sustainable improvement of the quality of life of the people in the municipality through the

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 6

    provision of basic services in a co-ordinated system of decentralized administration and good

    governance.

    GOAL

    The goal of the Assin North Municipal Assembly is to promote a well-managed workforce

    capable and committed to delivering high quality services for accelerated development of the

    municipal area.

    4. CORE FUNCTIONS

    The core functions of the Assin North Municipal Assembly are as follows as specified in ACT

    462 sub Section (I) and LI 1859 Section 1 1. To ensure public safety and security 2. To ensure entire development of the district 3. To ensure the mobilization of revenue in support of central government efforts. 4. To provide basic infrastructure and. 5. To prepare developmental plan and budget for approval and implementation.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 7

    5. ALL BUDGET PROGRAMMES AND SUB-PROGRAMMES UNDERTAKEN

    The following are the Budget Programmes and their Budget Sub - Programmes that would be undertaken in the 2017

    Fiscal

    Year;

    A. Management and Administration 1. General Administration, 2. Finance, Revenue and Internal Audit, 3. Human Resource and 4. Planning, Budgeting, Monitoring and Evaluation.

    B. Social Services Delivery 1. Education, Youth & Sports and Library Services,

    2. Public Health Services Management,

    3. Environmental Health and Sanitation Management,

    4. Birth and Death Registration Services and

    5. Social Welfare and Community Services.

    C. Infrastructure Delivery and Management 1. Urban/Feeder Roads and Transportation Services, 2. Spatial Planning 3. Public Works, Rural Housing and Water Management

    D. Economic Development 1. Agricultural Service and Management and 2. Trade, Tourism and Industrial Development

    E. Environmental Management 1. Disaster Prevention And Management and 2. Natural Resource Conservation

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 8

    1. POLICY OUTCOME INDICATORS AND TARGETS

    OUTCOME INDICATOR DESCRIPTION UNIT OF MEASUREMENT BASELINE LATEST STATUS TARGET

    YEAR VALUE YEAR VALUE YEAR VALUE

    Improved revenue generation (IGF) and expenditure

    management

    Revenue collectors deployed 2015 20 2016 20 2017 20

    Income levels increased in terms of IGF 2015 10% 2016 15% 2017 20%

    Expenditure levels minimized 2015 15% 2016 20% 2017 25%

    Improved recreational facilities Recreational facilities 2015 1 2016 3 2017 1

    Improved electrification Communities connected to National Grid 2015 2 2016 2 2017 5

    Enhanced community appreciation and involvement

    on disaster management/ relief strategies

    Community members benefiting/trained on disaster

    management/ relief strategies 2015 10 2016 20 2017 50

    Improved water supply in the municipality Communities captured under the IDA/CWSA/

    GOG water project. 2015 3 2016 5 2017 7

    Improved environmental and sanitation management Status / Number of environmental facilities 2015 450 2016 450 2017 450

    Enhanced competitiveness of SMEs Competitive/ noncompetitive SMEs in the

    municipality 2015 2 2016 5 2017 10

    Enhanced tourism awareness/ publicity strategies Tourist arrivals 2015 100 2016 120 2017 150 Tourist facilities 2015 1 2016 1 2017 3

    Revenue levels for tourism 2015 10% 2016 15% 2017 20%

    Reduction in the incidence of HIV/AIDS HIV/ AIDS cases in the municipality reduced 2015 20% 2016 20% 2017 25%

    Increased school enrolment at basic and secondary

    levels

    Enrolment levels at the basic and secondary levels

    2015 50% 2016 60% 2017 70%

    Improved social protection throughout the

    municipality

    Socio - economic status of social protection

    beneficiaries in the various communities 2015 40% 2016 50% 2017 65%

    Enhanced decentralisation in the Municipality

    Functionality of decentralized departments and sub

    structures in the Municipality 2015 12 2016 13 2017 13

    Trainings organized for Assembly members 2015 1 2016 2 2017 2

    Improved performance and service delivery in the

    Assembly

    Community perception/ feedback on social

    accountability interventions 2015 40% 2016 50% 2017 70%

    Improved security in the Municipality

    Security posts 2015 10% 2016 15% 2017 25%

    Crime cases 2015 40% 2016 50% 2017 50%

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 9

    2. SUMMARY OF KEY ACHIEVEMENTS IN 2016

    PERFORMANCE FOR 2016

    MANAGEMENT AND ADMINISTRATION

    During the 2016 fiscal year, human resource activities were carried out such as

    staff capacity building, training workshops both national and local and also capacity

    programmes for the various Urban/Town/Area Councils.

    GENERAL ADMINISTRATION

    Most of the General Administrative expenditure were paid for, that enhanced the

    smooth running of the office.

    FINANCE AND REVENUE MOBILIZATION

    With specific strategies put in place, the ANMA was able to mobilize an amount

    of GH¢ 291,773.64 out of the total budget of GH¢ 622,204.00 as at June, 2016 for

    Internally Generated Revenue, (IGF).

    IDA, DACF, UDG and DDF were also encouraging. However, strict measures were put

    in place to avoid leakages in revenue (IGF) mobilization.

    PLANNING, BUDGET, MONITORING AND EVALUATION

    A comprehensive Municipal Composite Budget was prepared and approved for

    onward transmission to MOFEP in Accra as a result of adequate resources provided by

    management to the Budget Committee.

    The MTDP was also successfully prepared and a draft copy was submitted to NDPC in

    Accra for consideration.

    INFRASTRUCTURE DELIVERY AND MANAGEMENT

    Most of the physical projects initiated by the Municipal Works Department were

    implemented/executed. Mobilization was paid for work to begin. And as at June 2016 all

    projects under various funding sources were at about 60% completion or work done.

    These physical projects include renovation of staff bungalows, construction of

    Urban/Town roads, construction of various classroom blocks, provision of school

    furniture and others.

    SOCIAL SERVICES DELIVERY

    Water facilities, CHPS compound, classroom blocks, sports and culture and

    monitoring of BECE/WASCE were captured in the budget and paid for. However, with

    the water facilities, health facilities and classroom blocks, about 60% of work have been

    done and paid for under various funding sources.

    ENVIRONMENTAL MANAGEMENT

    Environmental and sanitation activities were captured in the budget and

    implemented during the year. There were flooding in some communities and the ANMA

    provided NADMO with the needed resources to cater for the affected communities.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 10

    ECONOMIC DEVELOPMENT: - TRADE TOURISM

    Capacity building programmes were organised for various SMSEs, BAC client

    and some traders to boost their competitiveness.

    Assin Praso - Emancipation Day celebration was also fully catered for and that

    brought about a good patronage this year.

    CONCLUSION

    It is the view of ANMA that Government funds and other Donor funds would

    continue to flow regularly in terms of releases for the development agenda of ANMA to

    be achieved.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 11

    B : BU D GET PR OGR A MME S U MMA R Y

    PROGRAMME 1: MANAGEMENT AND ADMINISTRATION

    1. BUDGET PROGRAMME OBJECTIVES - To implement policies / Strategies for efficient and effective service delivery. - To co-ordinate resource mobilization improve financial management, timely

    reporting, information gathering and management mechanism of ANMA to enhance

    policy formulation, analysis and timely decision making.

    - To ensure the effective and efficient implementation of the decentralization policy and programme

    2. BUDGET PROGRAMME DESCRIPTION The management and administration programmes would provide administrative and

    logistical support for efficient and effective operations of the ANMA. This will ensure

    efficient management of the resource of the Assembly (ANMA) as well as promoting

    cordial relationship with key stakeholders. And some of the sub - programmes under this

    budget programme are;

    - General Administration,

    - Finance, Revenue and Audit,

    - Human Resource and

    - Planning, Budgeting, Monitoring and Evaluation.

    Under this sub - programme a total staff strength of One Hundred and Twenty - Nine

    (129) will be involved.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 12

    BUDGET SUB - PROGRAMME SUMMARY

    PR O GR A MME 1: MANAGEMENT AND ADMINISTRATION

    S UB - PRO GR A MME 1 .1 GENERAL ADMINISTRATION

    1. BUDGET SUB - PROGRAMME OBJECTIVE To provide administrative support to the various division/units and to ensure effective

    implementation of administrative procedures and controls within ANMA.

    2. BUDGET SUB - PROGRAMME DESCRIPTION

    To provide logistical services such as transport, estate, cleaning, security and maintenance.

    Frequent/regular supervision and monitoring of staff.

    Efficient and effective management of transport facilities.

    The main key stakeholders of this sub - programme are Honourable Assembly members, ANMA Clients/public, staff of ANMA and Local Government

    Secretariat.

    The funding for this sub - programme would be done through GF, DACF and DDF.

    Staff strength for this sub - programme is thirty - two (32).

    The challenges include inadequate staffing, funds and logistic of the Assembly

    ANMA.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 13

    BUDGET SUB - PROGRAMME RESULTS STATEMENT

    The table indicates the main outputs, its indicators and projections by which the ANMA

    measures the performance of this sub - programme. The past data indicates actual performance

    whilst the projections are the ANMA’s estimate of future performance

    KEY PERFOMANCE INFORMATION FOR BUDGET PROGRAMMES

    (MANAGEMENT AND ADMINISTRATION)

    MAIN OUTPUTS OUTPUT

    INDICATOR

    PAST YEARS PROJECTIONS

    2015 2016

    BUDGET

    YEAR

    2017

    INDICATIV

    E YEAR

    2018

    INDICATIVE

    YEAR

    2019

    3 No. Administrative,

    Quarterly and Annual

    Progress Reports.

    No. of

    Administrative,

    Quarterly and

    Annual Progress

    Reports produced.

    18 18 18 18 18

    Staff trained annually. Number of staff

    trained. 7 7 7 7 7

    1 No. staff meeting

    organised monthly.

    No. of Staff

    meetings

    organised.

    12 12 12 12 12

    1 No. staff retreat

    organised annually.

    No. of Staff

    retreats organised. 1 1 1 1 1

    3 No. General

    Assembly Meetings

    organised annually.

    No. of Assembly

    meetings

    organized.

    3 3 3 3 3

    4 No. meetings

    organised annually per

    Sub-Committee.

    No. of Sub-

    Committee

    meetings

    organized.

    28 28 28 28 28

    Training programmes

    organised for 47

    Assembly Members.

    No. of Assembly

    Members trained. 47 47 47 47 47

    4 No. Monitoring and

    Evaluation Activities

    carried out.

    No. of

    Monitoring and

    Evaluation

    Activities carried

    out.

    4 4 4 4 4

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 14

    1. BUDGET SUB - PROGRAMME OPERATIONS AND PROJECTS The table lists the main Operations and Projects to be undertaken by the Sub -

    Programme.

    OPERATIONS PROJECTS

    General Assembly and Sub - Committee

    meeting organized

    Administrative reports writing organized

    Organized Management Meeting

    Organized Staff Retreat

    Conduct Monitoring and Evaluation

    Provide stationery consumables and logistic

    Procure 5 no. Computers

    Casual Workers’ wages allowances paid

    Administrative expenditure provided

    Running cost of Official Vehicles provided

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 15

    BUDGET SUB - PROGRAMME SUMMARY

    PR O GR A MME 1: MANAGEMENT AND ADMINISTRATION

    S UB - PRO GR A MME 1 .2 : FINANCE, REVENUE MOBILIZATION AND

    INTERNAL AUDIT

    1. BUDGET SUB - PROGRAMME OBJECTIVE - To improve revenue mobilization and ensure efficient/effective implementation of

    fiscal discipline and internal control procedures/mechanism.

    2. BUDGET SUB - PROGRAMME DESCRIPTION

    To implement strategic RIAP to boost revenue mobilization in the Municipality.

    To implement effective and efficient method of revenue mobilization.

    Implementation of internal audit control procedures/processes.

    The Finance Unit, Revenue, Audit and Budget Units would spear head this sup - programme as key stakeholders and the beneficiaries are staff of ANMA and the

    general public/client that ANMA serves in the Municipality.

    Funding for this budget sub-programme would be IGF and DACF.

    Staff of ANMA to be involved are Twenty-five (25). And the challenges are inadequate Economic Data, Funds and Logistics.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 16

    3. BUDGET SUB - PROGRAMME RESULTS STATEMENT The table indicates the main outputs, its indicators and projections by which the ANMA

    measures the performance of this sub-programme. The past data indicates actual

    performance whilst the projections are the ANMA’s estimate of future performance.

    MAIN OUTPUTS OUTPUT

    INDICATOR

    PAST YEARS PROJECTIONS

    2015 2016

    BUDGET

    YEAR

    2017

    INDICATIV

    E YEAR

    2018

    INDICATIVE

    YEAR

    2019

    Revenue Improvement

    Action Plan, (RIAP)

    prepared.

    Revenue

    Improvement

    Action Plan,

    (RIAP) prepared

    1 1 1 1 1

    Economic Data

    collected from all 7

    Zonal Councils annual.

    Number of Zonal

    Councils covered

    in Economic

    Data collection

    annual.

    7 7 7 7 7

    4 No. Monitoring and

    Evaluation of

    IGF Collection

    annually.

    No. of

    Monitoring and

    Evaluation

    carried out on

    IGF collection.

    4 4 4 4 4

    4. BUDGET SUB - PROGRAMME OPERATIONS AND PROJECTS

    The table lists the main Operations and Projects to be undertaken by the Sub -

    Programme.

    OPERATIONS PROJECTS

    RIAP Preparation.

    Economic Data Collection.

    Installation of Accounting Software

    Organized Training for Revenue Collectors.

    Monitoring and Evaluation of

    IGF collected/mobilized. Purchase one Double cabin back

    Organized Training for finance office staff.

    Organized Training for Internal Auditors.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 17

    BUDGET SUB - PROGRAMME SUMMARY

    PR O GR A MME 1: MANAGEMENT AND ADMINISTRATION

    S UB - PRO GR A MME 1 .3 H U MA N RES OU R CE

    1. BUDGET SUB - PROGRAMME OBJECTIVE - Effective and efficient performance of the HR polices, programmes and

    guidelines and to disseminate the results/findings appropriately.

    - To manage HRM information and system. - To facilitate staff appraisal, promotion and interview. - To conduct training/seminars/conferences for staff of ANMA.

    2. BUDGET SUB - PROGRAMME DESCRIPTION - The ANMA Human Resource Management programme will focuses on formation

    and development of HRM polices, frameworks and standards for effective

    management of Human Resource in the Assembly. The components of the

    programme would include Human Resource auditing, performance appraisal

    management, service delivery improvement and Human Resource Management

    Information System.

    - Periodic assessment of staff for promotion for higher responsibilities. - These are intended to improve productivity at the local level as well as enhancing

    informed decision making in the management of human resources.

    - The main beneficiaries are ANMA staff and other Local Government Servants. The unit that will be involved is the Human Resource unit.

    Funding of the programme would be from IGF, DACF, and DDF etc.

    The total staff strength of ten (10) will carry out the implementation of this Sub-

    programme.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 18

    3. BUDGET SUB - PROGRAMME RESULTS STATEMENT The table indicates the main outputs, its indicators and projections by which the ANMA

    measures the performance of this sub-programme. The past data indicates actual

    performance whilst the projections are the ANMA’s estimate of future performance.

    MAIN OUTPUTS OUTPUT

    INDICATOR

    PAST YEARS PROJECTIONS

    2015 2016

    BUDGET

    YEAR

    2017

    INDICATIV

    E YEAR

    2018

    INDICATIVE

    YEAR

    2019

    1 No. Human Resource

    Report prepared

    annually

    No. of Human

    Resource Reports

    prepared annually.

    1 1 1 1 1

    Staff performance

    appraisal conducted for

    each staff half yearly

    No. of Staff

    performance

    Appraisal conducted

    annually.

    2 2 2 2 2

    1 No Human Resource

    Audit undertaken

    annually

    No. of HR Audit

    undertaken

    annually.

    1 1 1 1 1

    3 Conference /Seminars/

    Symposia organised

    annually

    No. of Conference/

    seminars/ symposia

    Organized.

    3 3 3 3 3

    4. BUDGET SUB - PROGRAMME OPERATIONS AND PROJECTS The table lists the main Operations and Projects to be undertaken by the Sub –

    Programme.

    OPERATIONS PROJECTS

    Prepare HR Reports

    Training of staff on Project Management, Monitoring and

    Evaluation, Contract Management, Client Relation/Service,

    Project Operation and Maintenance, etc.

    Organize Human Resource Audit Report

    Prepare Staff Performance Appraisal

    Organize Conference, seminars, symposia etc.

    Provide office consumables and stationery

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 19

    BUDGET SUB - PROGRAMME SUMMARY

    PR O GR A MME 1: MANAGEMENT AND ADMINISTRATION

    S UB - PROGRAMME 1.4 PLANNING, BUDGETING, MONITORING AND

    EVALUATION

    1. BUDGET SUB - PROGRAMME OBJECTIVE - To ensure efficient and effective planning of programmes/ activities for proper

    implementation.

    - To co-ordinate resource mobilization to ensure value for money. - To minimize waste of fiscal resources. - To ensure that budgetary allocation are adhered to. - To achieve high value for money for projects/programmes implementation through

    monitoring and evaluation activities.

    2. BUDGET SUB - PROGRAMME DESCRIPTION

    This sub - programme intends to ensure that activities/programmes/projects to be

    implemented are captured in the MTDP, Composite Annual Action Plan, and Composite

    Budget/Programme Based Budget. The Municipal Plan Co - ordinating Unit in

    collaboration with the Municipal Budget Unit will ensure that all programmes/protects to

    be implemented emanate from the approved budget/annual action plan of the ANMA.

    This sub - programme would be funded through IGF, DACF and DDF. The

    beneficiaries of this sub-programme would be the staff of the ANMA, key stakeholders/

    Clients and Donor partners. The staff strength for this sub -programmes is twenty (20).

    The main challenges are logistics and inadequate fund.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 20

    3. BUDGET SUB - PROGRAMME RESULTS STATEMENT The table indicates the main outputs, its indicators and projections by which the ANMA

    measures the performance of this sub-programme. The past data indicates actual

    performance whilst the projections are the ANMA’s estimate of future performance.

    MAIN OUTPUTS OUTPUT

    INDICATOR

    PAST YEARS PROJECTIONS

    2015 2016

    BUDGET

    YEAR

    2017

    INDICATIVE

    YEAR

    2018

    INDICATIVE YEAR

    2019

    MTDP prepared. Availability of

    MTDP 1 - 1 - 1

    Composite Annual

    Action Plan

    prepared.

    Availability of

    Composite

    Annual Action

    Plan.

    1 1 1 1 1

    Budget (CB/PBB)

    prepared.

    Availability of

    Budget.

    1 1 1 1 1

    4 No. Monitoring

    and Evaluation

    Activities carried

    out.

    No. of

    Monitoring and

    Evaluation

    Activities carried

    out.

    4 4 4 4 4

    8 No. MPCU

    Meeting organised

    annually.

    No. of MPCU

    Meetings

    organized.

    8 8 8 8 8

    4. BUDGET SUB - PROGRAMME OPERATIONS AND PROJECTS The table lists the main Operations and Projects to be undertaken by the Sub –

    Programme.

    OPERATIONS PROJECTS

    Review of MTDP

    Facilitate Composite Annual Action Plan preparation

    Composite Budget/Programme Based Budget Preparation

    Budget Committee meeting

    Finance and Administration Sub-Committee meeting

    Approval of Composite Budget, Programme Based Budget and AAP

    Quarterly monitoring and evaluation of projects and programmes Purchase 2 no. pick up vehicles

    Facilitation of Project Appraisal

    Town Hall meetings to review ANMA’s performance, etc.

    Building capacity of Budget Committee Members, F&A Members,

    G/A Members Municipal Planning Co - ordinating Unit and

    Monitoring Team

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 21

    BUDGET PROGRAMME SUMMARY

    PROGRAMME 2: SOCIAL SERVICES DELIVERY

    1. BUDGET PROGRAMME OBJECTIVES - To enhance the growth and development of social service infrastructure. - To mobilize and co - ordinate resources for effective and efficient implementation of

    polices /strategies of social service delivery in the Municipality.

    - To enhance sustainable public heath serve and management, environmental health and sanitation services, Birth and Death registration service, social; Welfare and

    community services

    2. BUDGET PROGRAMME DESCRIPTION The social services delivery programme would provide resources/logistics to

    support the development and growth of social services delivery in the municipality in the

    areas of education, public health, environmental health and sanitation, birth and death

    registration, social welfare and community development.

    This will ensure equitable distribution of resources among the beneficially communities

    in the seven (7) Urban/Town/Area Councils.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 22

    BUDGET SUB - PROGRAMME SUMMARY

    PR O GR A MME 2 : SOCIAL SERVICES DELIVERY

    S UB - PROGRAMME 2.1: EDUCATION, YOUTH, SPORTS AND LIBRARY

    SERVICES

    1. BUDGET SUB - PROGRAMME OBJECTIVE - To enhance the growth and development of educational infrastructure. - To ensure access to education at basic and secondary level. - To enhance performance in the educational sector, (all levels of education Basic and

    Senior High).

    2. BUDGET SUB - PROGRAMME DESCRIPTION To ensure access to basic and secondary education to school going children and

    also enhance performance through the provision of educational infrastructure,

    textbooks and bursaries. This sub - programme would be carried out by Ghana

    Education Service in collaboration with the Central Administration of ANMA. In all,

    thirty - five (35) staff would be involved in the implementation of this sub -

    programme. The challenges are inadequate logistic/resources and funding.

    3. BUDGET SUB - PROGRAMME RESULTS STATEMENT The table indicates the main outputs, its indicators and projections by which the ANMA

    measures the performance of this sub - programme. The past data indicates actual

    performance whilst the projections are the ANMA’s estimate of future performance.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 23

    KEY PERFOMANCE INFORMATION FOR BUDGET PROGRAMMES

    (SOCIAL SERVICES DELIVERY)

    MAIN OUTPUTS OUTPUT

    INDICATOR

    PAST YEARS PROJECTIONS

    2015 2016

    BUDGET

    YEAR

    2017

    INDICATIV

    E YEAR

    2018

    INDICATIVE

    YEAR

    2019

    3 No. 6 Unit Classroom

    Blocks provided.

    No. of 6 Unit

    Classroom Blocks

    provided. 3

    3 3 3 3

    3 No. KG Blocks

    provided

    No. of KG Blocks

    provided. 3 3 3 3 3

    3 No. 3 Unit Classroom

    Block (JHS).

    No. of 3 Unit

    Classroom Blocks

    provided. 3 3 3 3 3

    Bursary support

    provided for at least 20

    students annually.

    No. of

    Pupils/students

    supported with

    bursary.

    20 30 40 40 40

    Various categories of

    500 furniture provided

    (Pre-school, dual, mono

    & teacher’s).

    Number of

    Furniture provided

    for the various

    categories.

    500 500 500 500 500

    At least 25% of

    educational programmes

    supported annually.

    % of Educational

    programmes

    supported. 25% 30% 50% 50% 50%

    4. BUDGET SUB - PROGRAMME OPERATIONS AND PROJECTS

    The table lists the main Operations and projects to be undertaken by the sub –

    programme.

    OPERATIONS PROJECTS

    Provide Educational Infrastructure Construction/Completion of various of

    classroom blocks

    Supply school furniture Supply of furniture (Tables and Dual Desks)

    Provide Bursary Completion of Teachers’ Quarters

    Support Educational programmes

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 24

    BUDGET SUB - PROGRAMME SUMMARY

    PR O GR A MME 2 : SOCIAL SERVICES DELIVERY

    S UB - PROGRAMME 2. 2: PUBLIC HEALTH SERVICE MANAGEMENT

    1. BUDGET SUB - PROGRAMME OBJECTIVE - To provide resources (finance and material) to enhance an efficient and effective

    health service delivery that would ensure sustainable health service delivery.

    - To minimize the transmission of communicable diseases.

    2. BUDGET SUB - PROGRAMME DESCRIPTION With resource provided, the GHs in collaboration with other health care service

    providers in the Municipality will ensure that efficient/effective health service delivery is

    provided that lead to sustainable health service delivery to bridge the gap in geographical

    access to health service/care and that would also reduce the spread of diseases.

    The beneficiaries would be the people/communities where Ghana Health Service Clinics

    are situated/built.

    The funding source would be IGF, DDF, UDG and DACF.

    The staff strength for this budget sub - programmes would be twenty-five, (25).

    Some of the challenges are inadequate resources both material and finance.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 25

    3. BUDGET SUB - PROGRAMME RESULTS STATEMENT The table indicates the main outputs, its indicators and projections by which the ANMA

    measures the performance of this sub - programme. The past data indicates actual

    performance whilst the projections are the ANMA’s estimate of future performance.

    MAIN OUTPUTS OUTPUT

    INDICATOR

    PAST YEARS PROJECTIONS

    2015 2016

    BUDGET

    YEAR

    2017

    INDICATIVE

    YEAR

    2018

    INDICATIVE

    YEAR

    2019

    3 No. CHIPS

    Compounds provided

    annually.

    No. of CHPS

    Compounds

    provided. 3 3 3 3 3

    1 category (set) of theatre

    equipment provided

    annually.

    No. of categories

    (sets) of theatre

    equipment

    provided.

    1 1 1 1 1

    1 No. Midwifery

    Training School facility

    provided.

    Availability of

    Midwifery

    Training School

    facility provided.

    10% 35% 70% 80% 95%

    At least 25% of GHS

    programmes supported

    annually.

    % of GHS

    programmes

    supported. 25% 30% 50% 50% 50%

    Provide Theatre Building

    provided at Assin Fosu

    Polyclinic.

    Theatre building

    provided. - - 50% 80% 95%

    4. BUDGET SUB - PROGRAMME OPERATIONS AND PROJECTS The table lists the main Operations and projects to be undertaken by the sub –

    programme.

    OPERATIONS

    PROJECTS

    Support GHS Programmes and others

    Office/Residential Accommodation for Midwifery

    Training School

    Completion of CHPS Compounds

    Provide Theatre equipment to Assin – Fosu

    Polyclinic

    Provide Theatre Building

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 26

    BUDGET PROGRAMME SUMMARY

    PROGRAMME 2.3: ENVIRONMENTAL HEALTH AND SANITATION SERVICE

    1. BUDGET SUB - PROGRAMME OBJECTIVES - To provide resource to promote environmental health and sanitation service in the

    Municipality.

    - To deepen the Community lead Total Source (CLTS) programme in the Municipality / communities involved.

    2. BUDGET SUB - PROGRAMME DESCRIPTION The programme seeks to sanitize the general public on, environmental health and

    sanitation issue in the municipality and also deepen the implantation of the CLTS in

    the communities and also strengthen the campaign or minimization of communicable

    diseases in the communities.

    The beneficiaries are all the seven (7) Urban/Town/Area Councils. The funding for

    this sub-programme would be; IGF, DACF and IDA. The relevant challenges are

    inadequate funding and resources/logistics.

    3. BUDGET SUB - PROGRAMME RESULTS STATEMENT The table indicates the main outputs, its indicators and projections by which the ANMA

    measures the performance of this sub - programme. The past data indicates actual

    performance whilst the projections are the ANMA’s estimate of future performance.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 27

    MAIN OUTPUTS OUTPUT INDICATOR

    PAST YEARS PROJECTIONS

    2015 2016

    BUDGET

    YEAR

    2017

    INDICATIVE

    YEAR

    2018

    INDICATIVE

    YEAR

    2019

    At least 2 Public

    Sensitization held

    annually.

    No. of Public

    Sensitization

    organized annually.

    2 5 10 12 15

    Coverage of

    Community Lead

    Total Sanitation.

    Community Lead

    Total Sanitation

    percentage covered.

    50% 70% 80% 80% 85%

    1 No. Health

    Screening Exercise

    held annually.

    No. of Health

    Screening Exercise

    held annually.

    1 1 1 1 1

    1 No Review

    meetings held

    quarterly.

    No. of Review

    meetings conducted. 4 4 4 4 4

    4 Conference /Seminars

    /Symposia organised

    annually.

    No. of Conference/

    seminars/ symposia

    Organized.

    4 4 4 4 4

    Refuse heaps

    evacuated from all

    Communal Container

    Sites weekly.

    No. of weeks per

    year that refuse is

    evacuated.

    52 52 52 52 52

    4. BUDGET SUB - PROGRAMME OPERATIONS AND PROJECTS The table lists the main Operations and projects to be undertaken by the sub-programme

    OPERATIONS PROJECTS

    Public sensitization

    CLTS

    Review meetings

    Health screening exercise

    Seminars, conference. symposium

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 28

    BUDGET SUB - PROGRAMME SUMMARY

    PR O GR A MME 2 : SOCIAL SERVICE DELIVERY

    S UB - PROGRAMME 2.4: BIRTH AND DEATH REGISTRATION SERVICE

    1. BUDGET SUB - PROGRAMME OBJECTIVE - To enhance an effective and efficient birth and death servicer delivery in the

    municipality.

    2. BUDGET SUB - PROGRAMME DESCRIPTION This sub - programme seeks to rejuvenate the birth and death registration Unit in

    teams of its service delivery in the Municipality.

    The beneficiaries would be the clients who obtain birth/death certificates from this outfit

    and the general public. One Officer would be responsible for this sub – programme. The

    sources of funds for this sub – programme are IGF and DACF. Challenges are in

    adequate funding and logistics.

    3. BUDGET SUB - PROGRAMME RESULTS STATEMENT The table indicates the main outputs, its indicators and projections by which the ANMA

    measures the performance of this sub - programme. The past data indicates actual

    performance whilst the projections are the ANMA’s estimate of future performance.

    MAIN OUTPUTS OUTPUT INDICATOR

    PAST YEARS PROJECTIONS

    2015 2016

    BUDGET

    YEAR

    2017

    INDICATIVE

    YEAR

    2018

    INDICATIVE

    YEAR

    2019

    Birth and Death

    Registration

    services

    programmes

    Birth and Death

    Registration services

    programmes

    conducted

    1 1 3 4 4

    4. BUDGET SUB - PROGRAMME OPERATIONS AND PROJECTS

    The table lists the main Operations and projects to be undertaken by the sub -

    programme.

    OPERATIONS PROJECTS

    Public Education

    Review Meetings

    Capacity Building

    Seminars, Conference, etc.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 29

    BUDGET SUB - PROGRAMME SUMMARY

    PR O GR A MME 3 : SOCIAL SERVICES DELIVERY

    S UB - PROGRAMME 2.5: SOCIAL WELFARE AND COMMUNITY DEVELOPMENT

    SERVICES

    1. BUDGET SUB - PROGRAMME OBJECTIVE - To ensure an effective/efficient social welfare/ community service delivery. - To co - ordinate and sustain LEAP/PWD Programmes

    2. BUDGET SUB - PROGRAMME DESCRIPTION The sub - programme would ensure that resources are used to implement social

    welfare/ community services delivery in terms of LEAP programme, PWD activities and

    completion of recreation park/centres/facilities. The beneficiaries of this sub –

    programme would be the general public and the people who live around the facilities.

    The funding for this sub – programme would be DDF and UDG. The units that would be

    responsible are Community Development, Social Welfare and Municipal Works

    Department. A total strength of fifteen (15) staffs would be involved. The challenges are

    inadequate funds and resources/logistics.

    3. BUDGET SUB - PROGRAMME RESULTS STATEMENT The table indicates the main outputs, its indicators and projections by which the ANMA

    measures the performance of this sub - programme. The past data indicates actual

    performance whilst the projections are the ANMA’s estimate of future performance.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 30

    MAIN OUTPUTS OUTPUT INDICATOR

    PAST YEARS PROJECTIONS

    2015 2016

    BUDGET

    YEAR

    2017

    INDICATIVE

    YEAR

    2018

    INDICATIVE

    YEAR

    2019

    Phase II of Recreational Park at

    Assin Fosu Completed.

    Spectator stand, pitch,

    changing room, water

    connection etc

    completed.

    - - 60% 100%

    -

    Community centre at Assin

    Akonfudi Completed.

    100% completion level

    for Community centre at

    Assin Akonfudi.

    - - 70% 100%

    -

    Community centre at Assin

    Nyankumase Completed 100% completion level

    for Community centre at

    Assin Nyankumase.

    - 60% 100% - -

    At least 10 PWD Activities or

    Organisations of PWDs supported

    annually.

    No. of PWDs/ OPWDs

    supported annually. 10 10 15 15 15

    6 LEAP Activities undertaken

    annually. No. of LEAP Activities

    undertaken annually. 6 6 6 6 6

    7 No. Zonal Council Mobilisation

    and Sensitisation Activities

    conducted annually.

    No. of Zonal Council

    Mobilisation and

    Sensitisation Activities

    conducted annually.

    7 7 7 7 7

    10 communities (Kena, Wawase,

    Amoahkrom, Afenase,

    Nyamebekyere, Asempaneye etc.)

    sensitised on Environmental

    Sanitation, Personal Hygiene And

    Women Empowerment.

    No. of communities

    sensitised.

    10 10 10 10 10

    15 communities sensitised

    annually on Social and Public

    Education and Community

    Sensitisation on Child Welfare,

    Child Rights and Juvenile Justice,

    Domestic Violence and Radio

    Discussions.

    No. of Communities

    sensitised annually.

    15 15 15 15 15

    Social Enquiries/ Investigations

    and Family Welfare and Casework

    Settlements conducted weekly.

    No. of Social Enquiries/

    Investigations and

    Family Welfare and

    Casework Settlements

    conducted.

    52 52 52 52 52

    Persons with Disability registered

    quarterly. No. of registrations

    conducted. 4 4 4 4 4

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 31

    4. BUDGET SUB - PROGRAMME OPERATIONS AND PROJECTS The table lists the main Operations and projects to be undertaken by the sub -

    programme.

    OPERATIONS PROJECTS

    LEAP/PWD Activities

    Completion of recreational

    park/facilities/community centres

    Community development activities

    Social Welfare Activities

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 32

    BUDGET PROGRAMME SUMMARY

    PROGRAMME 3: INFRASTRUCTURE DELIVERY AND MANAGEMENT

    1. BUDGET PROGRAMME OBJECTIVES To enhance infrastructure development and management in the areas of

    transportation, spatial, planning, public works, housing and water management.

    2. BUDGET PROGRAMME DESCRIPTION This programme would ensure that all resources allocated are used to provide

    efficient and effective infrastructure development that will provide good transportation

    network, public works, rural housing, spatial planning and water management in the

    Municipality.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 33

    BUDGET SUB - PROGRAMME SUMMARY

    PR O GR A MME 3 : INFRASTRUCTURE DELIVERY AND MANAGEMENT

    S UB - PROGRAMME 3 .1 URBAN ROADS/FEEDER ROADS AND

    TRANSPORTATION SERVICES

    1. BUDGET SUB - PROGRAMME OBJECTIVE To provide an effective and efficient transport system in tunes of improving the road

    networks feeder/urban roads in the Municipality

    2. BUDGET SUB - PROGRAMME DESCRIPTION This sub - programme would be implemented by allocating enough resource to improve

    the road networks through reshaping of feeder roads, spot improvement on the exiting

    coal tar roads in the urban centres and also construction of new roads in the urban

    centres and reshaping of feeder roads.

    3. BUDGET SUB - PROGRAMME RESULTS STATEMENT The table indicates the main outputs, its indicators and projections by which the ANMA

    measures the performance of this sub - programme. The past data indicates actual

    performance whilst the projections are the ANMA’s estimate of future performance.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 34

    MAIN OUTPUTS OUTPUT

    INDICATOR

    PAST YEARS PROJECTIONS

    2015 2016

    BUDGET

    YEAR

    2017

    INDICATIVE

    YEAR

    2018

    INDICATIVE

    YEAR

    2019

    Improve safety

    road networks

    Improve safety

    road networks

    done

    50% 50% 60% 70% 80%

    Road safety

    seminars

    Road safety

    seminars done Quarterly Quarterly Quarterly Quarterly Quarterly

    Public

    sensitization

    programmes

    Public

    sensitization

    programmes

    done

    Monthly Monthly Monthly Monthly Monthly

    Reshaping of

    feeder roads

    Reshaping of

    feeder roads

    done

    50% 50% 50% 50% 50%

    Completion of

    tarring of urban

    roads

    Completion of

    tarring of

    urban roads

    done

    30% 50% 70% 80% 90%

    4. BUDGET SUB - PROGRAMME OPERATIONS AND PROJECTS

    The table lists the main Operations and projects to be undertaken by the sub-programme

    OPERATIONS PROJECTS

    Improve road networks Reshaping of feeder roads

    Road safety seminars Completion of tarring of urban roads

    Public sensitization programmes

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 35

    PR O GR A MME 3 : INFRASTRUCTURE DELIVERY AND MANAGEMENT

    S UB - PROGRAMME 3.2: SPATIAL PLANNING

    5. BUDGET SUB - PROGRAMME OBJECTIVE - To ensure and enhance effective/efficient spatial planning of the building and other

    constructional works in the municipal polices.

    - To co - ordinate and ensure that all resource allocated to physical planning are used to improve the spatial planning processes/procedures in the Municipality.

    6. BUDGET SUB - PROGRAMME DESCRIPTION This sub - programme would ensure that proper spatial planning of structures and

    other constructional works are effectively/efficiently implemented and appreciated by

    the citizenry the Municipality. The public would also be sensitized on the various

    processes/procedures involved in spatial planning.

    The Physical Planning Unit, specifically the Town & Country Planning Unit (T&CP)

    would be the lead organisation in the implementation of this sub - programme.

    About four (4) staff would be involved in this work.

    The most beneficiaries if this sub - programme would be the clients/public in general.

    The main challenges are inadequate funding of programmes and staff.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 36

    7. BUDGET SUB - PROGRAMME RESULTS STATEMENT The table indicates the main outputs, its indicators and projections by which the

    ANMA measures the performance of this sub - programme. The past data indicates

    actual performance whilst the projections are the ANMA’s estimate of future

    performance.

    MAIN OUTPUTS OUTPUT

    INDICATOR

    PAST YEARS PROJECTIONS

    2015 2016

    BUDGET

    YEAR

    2017

    INDICATIV

    E YEAR

    2018

    INDICATIVE

    YEAR

    2019

    At least 2

    Public sensitization

    organised annually on

    Street naming and

    Property Address

    System.

    No. of Sensitization

    conducted annually.

    2 3

    4

    5

    6

    12 publications executed

    annually by Town &

    Country Planning

    Department.

    No of publications

    executed annually. 12 12 12 12 12

    Building Permit and

    Annual Action Plan

    Prepared.

    Availability of

    Building Permit and

    Annual Action Plan.

    1 1 1 1 1

    4 No. Statutory Planning

    Committee meeting held

    annually.

    No. of Statutory

    Planning

    Committee meeting

    held annually.

    4 4 4 4 4

    At least 15% of ANMA

    Lands registered

    annually.

    Percentage of

    ANMA lands

    registered.

    15% 40% 80% 90% 100%

    8. BUDGET SUB - PROGRAMME OPERATIONS AND PROJECTS The table lists the main Operations and projects to be undertaken by the sub-programme

    OPERATIONS PROJECTS

    Public sensitization on building permit

    Spatial planning education

    Provision of stationery, flyers, bulleting

    Registration of Annual Action Plan in building

    Permit

    Statutory Planning Committee meeting

    Monthly Monitoring

    Property Address System and Street Naming

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 37

    BUDGET SUB - PROGRAMME SUMMARY

    PR O GR A MME 3 : INFRASTRUCTURE DELIVERY AND MANAGEMENT

    S UB - PROGRAMME 3.3: PUBLIC WORKS RURAL HOUSING AND WATER

    MANAGEMENT

    1. BUDGET SUB - PROGRAMME OBJECTIVE

    - To ensure efficient and effective use of infrastructure. - To ensure proper maintenance of existing office accommodation, residential,

    maintenance and other assets of ANMA.

    - To facilitate the provision of potable water (DA water Project) in the Municipality.

    2. BUDGET SUB - PROGRAMME DESCRIPTION This sub - programme would ensure that public/government buildings are

    properly maintained and used for their intended purposes.

    This sub - programmes would also ensure the facilitation of provision of potable water

    (IDA water project) in the Municipality.

    The organizational unit that would be responsible is Municipal Works Department and

    the Community Water & Sanitation Unit in the Municipality. The beneficiaries of this

    sub - programmes are the general public and staff of the ANMA.

    The challenges are inadequate funding and resources/logistics. The funding source are

    DACF, IDA and IGF.

    3. BUDGET SUB - PROGRAMME RESULTS STATEMENT

    The table indicates the main outputs, its indicators and projections by which the ANMA

    measures the performance of this sub - programme. The past data indicates actual

    performance whilst the projections are the ANMA’s estimate of future performance.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 38

    MAIN OUTPUTS OUTPUT

    INDICATOR

    PAST YEARS PROJECTIONS

    2015 2016

    BUDGET

    YEAR

    2017

    INDICATIV

    E YEAR

    2018

    INDICATIVE

    YEAR

    2019

    At least 40% coverage

    achieved in the provision

    of potable water in the

    municipality.

    Percentage

    coverage of

    potable water in

    the

    Municipality.

    40% 50% 70% 80% 90%

    4 No. annual

    maintenance activities of

    buildings and other

    immovable properties.

    No. of

    maintenance

    services

    provided

    annually.

    4 4 4 4 4

    Facilitate provision of

    potable water.

    Water facilities

    provided 40% 50% 70% 80% 90%

    Maintenance of

    buildings and other

    immovable properties

    Maintenance

    services

    provided

    Quarterly Quarterly Quarterly Quarterly Quarterly

    Monitoring and

    Evaluation of facilities

    Monitoring

    and Evaluation

    conducted

    Monthly Monthly Monthly Monthly Monthly

    4. BUDGET SUB - PROGRAMME OPERATIONS AND PROJECTS The table lists the main Operations and projects to be undertaken by the sub-programme

    OPERATIONS PROJECTS

    Facilitate provision of potable water.

    Drilling of 45 no boreholes

    Monitoring and Evaluation of facilities Construction of water systems

    Renovation/maintenance of buildings

    Extension of electricity and street light

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 39

    BUDGET PROGRAMME SUMMARY

    PROGRAMME 4: ECONOMIC DEVELOPMENT

    1. BUDGET PROGRAMME OBJECTIVES - To enhance agricultural production and extension service. - To improve trade and tourism capabilities/potentials of SSMEs in the Municipality - To build artisan village

    2. BUDGET PROGRAMME DESCRIPTION This programmes would be feared to toward increase in animal/crop yield and

    also render an efficient /effective extension services to farmers in the municipality.

    Trade and tourism potentials in the municipality would be harnessed and developed

    for profit maximization.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 40

    BUDGET SUB - PROGRAMME SUMMARY

    PR O GR A MME 4 : ECONOMIC DEVELOPMENT

    S UB - PROGRAMME 4.1 AGRICULTURAL SERVICES AND MANAGEMENT

    1. BUDGET SUB - PROGRAMME OBJECTIVE - To ensure high yield of agricultural production (e.g. Crop/Animals). - To ensure improve extension services delivery.

    2. BUDGET SUB - PROGRAMME DESCRIPTION This sub - programme would ensure that measure are put in place that would

    enhance high yield in crop/animal production. And also to ensure that good extension

    services are delivered. Department of Agriculture would be solely in charge of this sub -

    programme. The beneficiaries would be the general public and farmers. The funding

    sources of this sub - programmes would be the GOG transfer, DACF and IGF. The

    challenges are inadequate funds and resources.

    3. BUDGET SUB - PROGRAMME RESULTS STATEMENT

    The table indicates the main outputs, its indicators and projections by which the ANMA

    measures the performance of this sub - programme. The past data indicates actual

    performance whilst the projections are the ANMA’s estimate of future performance.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 41

    KEY PERFOMANCE INFORMATION FOR BUDGET PROGRAMMES

    (ECONOMIC DEVELOPMENT)

    MAIN

    OUTPUTS

    OUTPUT

    INDICATOR PAST YEARS PROJECTIONS

    AGRICULTURAL

    SERVICES AND

    MANAGEMENT

    2015 2016

    BUDGET

    YEAR

    2017

    INDICATIVE

    YEAR

    2018

    INDICATIVE

    YEAR

    2019

    Quarterly support

    given to agriculture

    programmes.

    Agricultural

    programmes

    receiving

    support.

    Quarterly Quarterly Quarterly Quarterly Quarterly

    National Farmers’ Day

    celebrated.

    Number of

    Farmers’ Day

    celebrated. 1 1 1 1 1

    Veterinary Clinic

    constructed.

    Percentage of

    work done on

    Veterinary

    Clinic.

    - 20% 100% - -

    4 BUDGET SUB - PROGRAMME OPERATIONS AND PROJECTS The table lists the main Operations and projects to be undertaken by the sub - programme

    OPERATIONS PROJECTS

    Increase agriculture production

    Support agriculture programmes

    Celebration of National Farmers’ Day

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 42

    BUDGET SUB - PROGRAMME SUMMARY

    PR O GR A MME 4 : ECONOMIC DEVELOPMENT

    S UB - PROGRAMME 4.2: TRADE, TOURISM AND INDUSTRIAL DEVELOPMENT

    1. BUDGET SUB - PROGRAMME OBJECTIVE - To facilitate, harness and develop the tourism potentials of the ANMA - To preserve and promote the cultural Heritage of ANMA - To enhance the competitive of SMSEs in the Municipality

    2. BUDGET SUB - PROGRAMME DESCRIPTION ANMA would provide the Trade, industry and tourism Unit with the needed

    resources that would ensure that the tourism potentials in the ANMA are usefully tapped

    and developed for profit maximization and also assist SMSEs to develop their

    competitiveness so that they can take their comparative advantage in the business market.

    The Trade, Tourism and Industrial Unit would be the lead organization and about five (5)

    staff would be involved.

    The funding sources would be DACF and IGF. The main challenges are inadequate staff

    and funds/resources.

    3. BUDGET SUB - PROGRAMME RESULTS STATEMENT The table indicates the main outputs, its indicators and projections by which the ANMA

    measures the performance of this sub - programme. The past data indicates actual

    performance whilst the projections are the ANMA’s estimate of future performance

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 43

    KEY PERFOMANCE INFORMATION FOR BUDGET PROGRAMMES

    (ECONOMIC DEVELOPMENT)

    MAIN OUTPUTS OUTPUT

    INDICATOR

    PAST YEARS PROJECTIONS

    2015 2016

    BUDGET

    YEAR

    2017

    INDICATIVE

    YEAR

    2018

    INDICATIVE

    YEAR

    2019

    3 No Feasibility Studies

    conducted.

    No. of Feasibility

    Studies carried

    out

    - - 1 1 1

    Emancipation Day

    celebrated.

    No. of people

    participating in

    Emancipation

    Day.

    150 200 400 500 600

    SMSEs supported

    annually.

    No. of SMSEs

    trained to increase

    their

    competitiveness.

    5 5 10 10 10

    Establishment of

    Artisan Village Artisan Village

    established - - - 1 1

    4. BUDGET SUB - PROGRAMME OPERATIONS AND PROJECTS

    The table lists the main Operations and projects to be undertaken by the sub-programme

    OPERATIONS PROJECTS

    Feasibility Studies Establishment of Artisan Village

    Emancipation Day

    Support SMSEs

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 44

    BUDGET PROGRAMME SUMMARY

    PROGRAMME 5: ENVIRONMENTAL MANAGEMENT

    1. BUDGET PROGRAMME OBJECTIVES - To obtain a tolerable level of green economy in the Municipality. - To reduce the effect of deforestation/depletion of natural resources. - To embark on re - afforestation programme in the Municipality as a sustainable way

    of environmental management.

    - To operationalize/promote activities/programmes of the Disaster Prevention Unit of ANMA.

    2. BUDGET PROGRAMME DESCRIPTION This programme would ensure that resources allocated are purposefully used for

    implementation of disaster prevention programmes, provision of relief items and also

    afforestation and green economy programmes.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 45

    MAIN OUTPUTS OUTPUT

    INDICATOR

    PAST YEARS PROJECTIONS

    2015 2016

    BUDGET

    YEAR

    2017

    INDICATIVE

    YEAR

    2018

    INDICATIVE

    YEAR

    2019

    At least 2 Public

    Sensitization held

    annually.

    No. of Public

    Sensitization

    organized

    annually.

    2 5 \ 10 12 15

    Coverage of

    Community Lead Total

    Sanitation.

    Community Lead

    Total Sanitation

    percentage

    covered.

    50% 70% 80% 80% 85%

    1 No. Health Screening

    Exercise held annually.

    No. of Health

    Screening

    Exercise held

    annually.

    1 1 1 1 1

    1 No Review meetings

    held quarterly.

    No. of Review

    meetings

    conducted.

    4 4 4 4 4

    4

    Conference//Seminars/Sy

    mposia organised

    annually.

    No. of

    Conference/

    seminars/

    symposia

    Organized.

    4 4 4 4 4

    Refuse heaps

    evacuated from all

    Communal Container

    Sites weekly.

    No. of weeks per

    year that refuse is

    evacuated.

    52 52 52 52 52

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 46

    BUDGET SUB - PROGRAMME SUMMARY

    PR O GR A MME 5 : ENVIRONMENTAL MANAGEMENT

    S UB - PROGRAMME 5.1: DISASTER PREVENTION AND MANAGEMENT

    1. BUDGET SUB - PROGRAMME OBJECTIVE

    Educate the public to be disaster-conscious in order to reduce the occurrence of disasters

    Reduce the impact of disaster on victims

    Put in place early warning systems

    Reconstruction systems for affected victims or communities

    2. BUDGET SUB - PROGRAMME DESCRIPTION This unit of the Municipal Assembly (NADMO) would be responsible for dealing

    with disaster of all nature. This would be executed by taking steps to ensure that disasters

    do not occur in the first place by educating citizens on what role they can play to prevent

    it. The unit is also expected to respond immediately to assess the impact of disaster

    occurrences. The strategies that would be used would include; radio, outreach

    programmes to schools and churches, lorry stations, training of artisans and partnership

    with NGO’s.

    3. BUDGET SUB - PROGRAMME RESULTS STATEMENT The table indicates the main outputs, its indicators and projections by which the MMDAs

    measure the performance of this sub-programme. The past data indicates actual

    performance whilst the projections are the MMDA’s estimate of future performance.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 47

    KEY PERFOMANCE INFORMATION FOR BUDGET PROGRAMMES

    (ENVIRONMENTAL MANAGEMENT)

    MAIN OUTPUTS OUTPUT

    INDICATOR PAST YEARS PROJECTIONS

    2015 2016

    BUDGET

    YEAR

    2017

    INDICATIVE

    YEAR

    2018

    INDICATIVE YEAR

    2019

    At least 10 radio

    programmes organised

    annually.

    No. of radio

    programmes

    organised

    annually.

    10 15 21 30 35

    Outreaches in schools

    and churches.

    Percentage

    coverage of

    schools and

    churches.

    30 50% 80% 80% 80%

    At least 30% of

    artisans trained

    annually.

    Percentage of

    artisans

    trained.

    30% 50% 60% 70% 80%

    At least 30% of NGO

    Partnership achieved.

    Percentage of

    NGOs

    partnered.

    30% 50% 50% 60% 60%

    At least 30% of

    victims assisted.

    Percentage of

    victims

    reached.

    30% 50% 80% 80% 80%

    4. BUDGET SUB - PROGRAMME OPERATIONS AND PROJECTS

    OPERATIONS PROJECTS

    Radio programmes Provide reconstruction materials

    Having talk shows in schools and churches

    Training of artisans to inculcate disaster

    prevention measures in construction works

    Assisting victims with relief items

    Partnering with NGOs etc.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 48

    BUDGET SUB - PROGRAMME SUMMARY

    PR O GR A MME 5 : ENVIRONMENTAL MANAGEMENT

    S UB - PROGRAMME 5.2: NATURAL RESOURCE CONSERVATION

    1. BUDGET SUB - PROGRAMME OBJECTIVE

    Proper management of the forest and natural resources in it

    Protection of the forest

    Development of the forest

    2. BUDGET SUB - PROGRAMME DESCRIPTION The activities here would be carried out by the Forestry Commission of the Municipality.

    This would be done in three-fold: management, protection and development of the forest.

    This would be through public sensitization programmes, radio broadcast and

    seminars/workshops/town hall meetings. The staff strength for this sub - programme

    would be ten, (10). And the beneficiaries would be the general public. The challenges are

    inadequate funds and logistics.

    3. BUDGET SUB - PROGRAMME RESULTS STATEMENT The table indicates the main outputs, its indicators and projections by which the ANMA

    measures the performance of this sub - programme. The past data indicates actual

    performance whilst the projections are the ANMA’s estimate of future performance.

  • ASSIN NORTH MUNICIPAL ASSEMBLY, ASSIN - FOSU. C/R. 49

    KEY PERFOMANCE INFORMATION FORBUDGET PROGRAMMES

    (ENVIRONMENTAL MANAGEMENT)

    MAIN OUTPUTS OUTPUT

    INDICATOR PAST YEARS PROJECTIONS

    2015 2016

    BUDGET

    YEAR

    2017

    INDICATIVE

    YEAR

    2018

    INDICATIVE YEAR

    2019

    Weekly (52 annual)

    patrolling of forests

    undertaken.

    No. of patrols

    undertaken

    annually.

    52 52 52 52 52

    At least 30% of forest

    offences prevented.

    Percentage of

    forest offences

    prevented. 30% 50% 80% 80% 80%

    At least 60% coverage for

    exploitation under yield

    basis (permits).

    Percentage of

    permits given. 60% 70% 90% 90% 90%

    At least 5% coverage achieved

    for forest development

    through plantation

    (afforestation).

    Percentage of

    current forest

    covered.

    5% 5% 10% 10% 10%

    4. BUDGET SUB - PROGRAMME OPERATIONS AND PROJECTS The table lists the main Operations and projects to be undertaken by the sub - programme

    OPERATIONS PROJECTS

    Daily patrols

    Prevention of illegal chain-saw operations

    Examination of permits by authorised chain-saw

    operators

    Development of plantations to supplement forests

  • Central Assin North - Assin Foso

    Objective

    In GH¢By Strategic Objective Summary

    % In-Flows ExpenditureSurplus /

    Deficit

    Estimated Financing Surplus / Deficit - (All In-Flows)

    0 2,282,518Compensation of Employees000000

    17,347,779 02.1 Improve fiscal revenue mobilization and management010201

    0 130,0002.2 Improve public expenditure management010202

    0 494,0003.1 Strengthen economic planning and forecasting010301

    0 1,036,0002.1 Promote effective environ. supportive of good corporate governance020201

    0 96,0005.2 Promote sust'nable tourism to preserve hist'cal & cultural heritage020502

    0 331,2081.5. Improve institutional coordination for agriculture development030105

    0 10,0008.2 Ensure sustainable management of natural resources030802

    0 28,00016.3 Promote green economy 031603

    0 5,536,5561.2. Create efficient & effect. transport system that meets user needs050102

    0 388,5404.2 Develop social, community and recreational facilities 050402

    0 352,0676.2 Streamline spatial and land use planning system 050602

    0 317,44711.1 Promote proactive planning to prevent & mitigation disasters 051101

    0 557,84313.2 Accelerate the provision of adequate, safe and affordable water051302

    0 453,00013.5 Adopt sector-wide approach to water & envtal sanitation delivery051305

    0 2,153,7231.3. Improve management of education service delivery060103

    0 1,644,5474.1 Bridge the equity gaps in geographical access to health services 060401

    0 761,4622.4 Mainstream local econ. devt (LED) for growth & employmt creation070204

    0 585,7824.2. Promote & improve performance in the public and civil services070402

    0 566,9115.4 Improve the responsiveness of public service delivery070504

    0 155,85111.4. Ensure effective integration of PWDs into society071104

    Monday, May 15, 2017 Page 50BAETS SOFTWARE Printed on

  • Objective

    In GH¢By Strategic Objective Summary

    % In-Flows ExpenditureSurplus /

    Deficit

    Estimated Financing Surplus / Deficit - (All In-Flows)

    Grand Total ¢ 17,347,779 17,881,455 -533,675 -2.98

    Monday, May 15, 2017 Page 51BAETS SOFTWARE Printed on

  • Revenue Item2017 2016 2016

    Revenue Budget and Actual Collections by Objective

    and Expected Result Variance2016

    Approved and or

    Revised Budget

    Actual

    CollectionProjected2017/

    24194 02 00 001

    Finance, ,

    16,763,988.49 0.00 0.00 0.00

    2.1 Improve fiscal revenue mobilization and management010201Objective

    RATES - IGF0001Output

    Property income 124,146.00 0.00 0.00 0.00

    Property Rate 113,146.00 0.00 0.00 0.001412022

    Basic Rate (IGF) 11,000.00 0.00 0.00 0.001412023

    LANDS AND CONCESSION - IGF0002Output

    Property income 120,795.04 0.00 0.00 0.00

    Sale of Building Permit Jacket 10,000.00 0.00 0.00 0.001412004

    Building Plans / Permit 72,795.04 0.00 0.00 0.001412007

    Comm. Mast Permit 20,000.00 0.00 0.00 0.001412009

    Royalties 18,000.00 0.00 0.00 0.001412015

    FEES - IGF0003Output

    Sales of goods and services 125,330.70 0.00 0.00 0.00

    Markets 63,000.00 0.00 0.00 0.001423001

    Livestock / Kraals 180.00 0.00 0.00 0.001423002

    Registration of Contractors 18,000.00 0.00 0.00 0.001423005

    Burial Fees 2,550.00 0.00 0.00 0.001423006

    Pounds 5,000.00 0.00 0.00 0.001423007

    Entertainment Fees 600.00 0.00 0.00 0.001423008

    Advertisement / Bill Boards 3,000.00 0.00 0.00 0.001423009

    Export of Commodities 20,200.00 0.00 0.00 0.001423010

    Marriage / Divorce Registration 3,800.70 0.00 0.00 0.001423011

    Dislodging Fees 5,000.00 0.00 0.00 0.001423014

    Conservancy 4,000.00 0.00 0.00 0.001423017

    FINES,PENALTIES & FORFIET - IGF0004Output

    Fines, penalties, and forfeits 51,165.00 0.00 0.00 0.00

    Court Fines 4,000.00 0.00 0.00 0.001430001

    Slaughter Fines 4,160.00 0.00 0.00 0.001430006

    Lorry Park Fines 43,005.00 0.00 0.00 0.001430007

    LICENSES - IGF0005Output

    Sales of goods and services 283,896.90 0.00 0.00 0.00

    Pito / Palm Wire Sellers Tapers 10,000.00 0.00 0.00 0.001422001

    Herbalist License 2,002.00 0.00 0.00 0.001422002

    Chop Bar License 3,000.00 0.00 0.00 0.001422005

    Corn / Rice / Flour Miller 2,040.00 0.00 0.00 0.001422006

    Letter Writer License 10.00 0.00 0.00 0.001422008

    Bakers License 1,200.00 0.00 0.00 0.001422009

    Bicycle License 200.00 0.00 0.00 0.001422010

    Artisan / Self Employed 25,002.00 0.00 0.00 0.001422011

    Kiosk License 12,600.00 0.00 0.00 0.001422012

    Monday, May 15, 2017 Page 52ACTIVATE SOFTWARE Printed on

  • Revenue Item2017 2016 2016

    Revenue Budget and Actual Collections by Objective

    and Expected Result Variance2016

    Approved and or

    Revised Budget

    Actual

    CollectionProjected2017/

    Sand and Stone Conts. License 2,000.00 0.00 0.00 0.001422013

    Charcoal / Firewood Dealers 500.00 0.00 0.00 0.001422014

    Hotel / Night Club 3,000.00 0.00 0.00 0.001422017

    Pharmacist Chemical Sell 3,000.00 0.00 0.00 0.001422018

    Sawmills 2,400.00 0.00 0.00 0.001422019

    Taxicab / Commercial Vehicles 10,000.00 0.00 0.00 0.001422020

    Factories / Operational Fee 35,000.00 0.00 0.00 0.001422021

    Communication Centre 11,000.00 0.00 0.00 0.001422023

    Maternity Home /Clinics 495.00 0.00 0.00 0.001422026

    Entertainment Centre 1,000.00 0.00 0.00 0.001422030

    Wheel Trucks 120.00 0.00 0.00 0.001422031

    Akpeteshie / Spirit Sellers 10,000.00 0.00 0.00 0.001422032

    Stores 107,868.40 0.00 0.00 0.001422033

    Petroleum Products 10,000.00 0.00 0.00 0.001422036

    Financial Institutions 13,104.50 0.00 0.00 0.001422044

    Millers 1,500.00 0.00 0.00 0.001422051

    Laundries / Car Wash 200.00 0.00 0.00 0.001422054

    Printing Services / Photocopy 750.00 0.00 0.00 0.001422055

    Private Schools 1,300.00 0.00 0.00 0.001422057

    Cocoa Residue Dealers 2,605.00 0.00 0.00 0.001422059

    Beers Bars 12,000.00 0.00 0.00 0.001422067

    RENT OF LAND AND BUILDINGS - IGF0006Output

    Property income 14,400.02 0.00 0.00 0.00

    Investment Income 3,000.00 0.00 0.00 0.001415008

    Other Investment Income 5,000.00 0.00 0.00 0.001415011

    Rent on Assembly Building 3,900.02 0.00 0.00 0.001415012

    Guest House Proceeds 2,500.00 0.00 0.00 0.001415015

    MISCELLANEOUS AND OTHERS - IGF0007Output

    Miscellaneous and unidentified revenue 5,920.00 0.00 0.00 0.00

    Other Sundry Recoveries 5,920.00 0.00 0.00 0.001450007

    SALARIES / COMPENSATION - GOG0008Output

    From other general government units 2,083,117.20 0.00 0.00 0.00

    Central Government - GOG Paid Salaries 2,083,117.20 0.00 0.00 0.001331001

    GOODS AND SERVICES - GOG TRANSFERS0009Output

    From other general government units 104,588.17 0.00 0.00 0.00

    Goods and Services- Decentralised Department 104,588.17 0.00 0.00 0.001331009

    DONOR FUNDS0012Output

    0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00

    From foreign governments(Current) 9,567,132.73 0.00 0.00 0.00

    INTERNATIONAL GOVERNMENT ASSOCIATION 9,567,132.73 0.00 0.00 0.001311010

    Monday, May 15, 2017 Page 53ACTIVATE SOFTWARE Printed on

  • Revenue Item2017 2016 2016

    Revenue Budget and Actual Collections by Objective

    and Expected Result Variance2016

    Approved and or

    Revised Budget

    Actual

    CollectionProjected2017/

    DACF TRANSFERS0013Output

    From other general government units 3,593,765.00 0.00 0.00 0.00

    DACF - Assembly 3,193,765.00 0.00 0.00 0.001331002

    DACF - MP 400,000.00 0.00 0.00 0.001331003

    REVENUE ZERO COSTING0014Output

    From other general government units 689,731.73 0.00 0.00 0.00

    Ceded Revenue 689,731.73 0.00 0.00 0.001331004

    Grand Total 16,763,988.49 0.00 0.00 0.00

    Monday, May 15, 2017 Page 54ACTIVATE SOFTWARE Printed on

  • Economic Classification

    2017 2018 2019

    Expenditure by Programme and Source of Funding In GH¢

    2015

    Actual

    2016

    forecastBudget Est. Outturn Budget forecast

    Assin North Municipal - Assin Foso 0 0 17,881,455 19,249,5440 17,036,780

    Central GoG Sources 0 0 2,814,170 2,842,3120 2,835,266

    0 0 809,211Management and Administration 817,3030 817,303

    0 0 654,026Social Services Delivery 660,5670 660,498

    0 0 935,135Infrastructure Delivery and Management 944,4870 937,773

    0 0 415,797Economic Development 419,9550 419,692

    IGF-Retained Sources 0 0 895,939 965,4990 897,669

    0 0 796,717Management and Administration 804,6840 798,446

    0 0 35,823Social Services Delivery 36,1810 35,823

    0 0 23,000Infrastructure Delivery and Management 23,2300 23,000

    0 0 32,400Economic Development 93,3240 32,400

    0 0 8,000Environmental Management 8,0800 8,000

    CF (MP) Sources 0 0 290,000 292,9000 290,000

    0 0 30,000Social Services Delivery 30,3000 30,000

    0 0 260,000Infrastructure Delivery and Management 262,6000 260,000

    CF (Assembly) Sources 0 0 4,708,038 4,293,0430 4,265,538

    0 0 857,675Management and Administration 601,1270 610,175

    0 0 2,296,362Social Services Delivery 2,319,3260 2,296,362

    0 0 1,309,000Infrastructure Delivery and Management 1,125,1400 1,114,000

    0 0 145,000Economic Development 146,4500 145,000

    0 0 100,000Environmental Management 101,0000 100,000

    CF Sources 0 0 140,000 141,4000 140,000

    0 0 140,000Social Services Delivery 141,4000 140,000

    Pooled Sources 0 0 75,000 75,7500 75,000

    0 0 75,000Economic Development 75,7500 75,000

    IDAA Sources 0 0 547,843 553,3220 547,843

    0 0 547,843Infrastructure Delivery and Management 553,3220 547,843

    DDF Sources 0 0 1,454,091 1,241,3820 1,229,091

    0 0 76,413Management and Administration 77,1770 76,413

    0 0 248,771Social Services Delivery 251,2590 248,771

    0 0 720,000Infrastructure Delivery and Management 499,9500 495,000

    0 0 161,460Economic Development 163,0750 161,460

    0 0 247,447Environmental Management 249,9210 247,447

    UDG Sources 0 0 6,956,372 8,843,9360 6,756,372

    0 0 200,000Management and Administration 2,222,0000 200,000

    0 0 2,056,676Social Services Delivery 2,077,2430 2,056,676

    0 0 3,951,234Infrastructure Delivery and Management 3,788,7460 3,751,234

    0 0 748,462Economic Development 755,9470 748,462

    Grand Total 0 0 17,881,455 19,249,5440 17,036,780

    Monday, May 15, 2017 Page 55ACTIVATE SOFTWARE Printed on Assin North Municipal - Assin Foso

  • Economic Classification

    2017 2018 2019

    Expenditure by Programme, Sub Programme and Economic Classification In GH¢

    2015

    Actual

    2016

    forecastBudget Est. Outturn Budget forecast

    Assin North Municipal - Assin Foso 0 0 17,881,455 19,249,5440 17,036,780

    Management and Administration 0 0 2,740,016 4,522,2910 2,502,338

    SP1: General Administration0 0 1,747,491 3,784,9660 1,754,019

    0 0 652,81521 Compensation of employees [GFS] 659,3430 659,343

    Wages and Salaries211 0 0 652,815 659,3430 659,343

    Established Position21110 0 0 479,881 484,6790 484,679

    Wages and salaries in cash [GFS]21111 0 0 53,935 54,4740 54,474

    Wages and salaries in cash [GFS]21112 0 0 119,000 120,1900 120,190

    0 0 1,063,67522 Use of goods and services 3,094,3120 1,063,675

    Use of goods and services221 0 0 1,063,675 3,094,3120 1,063,675

    Materials - Office Supplies22101 0 0 204,910 206,9600 204,910

    Utilities22102 0 0 41,000 41,4100 41,000

    General Cleaning22103 0 0 103,000 104,0300 103,000

    Rentals22104 0 0 20,000 20,2000 20,000

    Travel - Transport22105 0 0 123,000 124,2300 123,000

    Repairs - Maintenance22106 0 0 18,000 18,1800 18,000

    Training - Seminars - Conferences22107 0 0 188,000 189,8800 188,000

    Consulting Services22108 0 0 200,000 2,222,0000 200,000

    Other Charges - Fees22111 0 0 5,000 5,0500 5,000

    Emergency Services22112 0 0 160,765 162,3730 160,765

    0 0 31,00028 Other expense 31,3100 31,000

    Miscellaneous other expense282 0 0 31,000 31,3100 31,000

    General Expenses28210 0 0 31,000 31,3100 31,000

    SP2: Finance0 0 410,448 414,5530 413,253

    0 0 280,44821 Compensation of employees [GFS] 283,2530 283,253

    Wages and Salaries211 0 0 280,448 283,2530 283,253

    Established Position21110 0 0 280,448 283,2530 283,253

    0 0 130,00022 Use of goods and services 131,3000 130,000

    Use of goods and services221 0 0 130,000 131,3000 130,000

    Materials - Office Supplies22101 0 0 5,000 5,0500 5,000

    Training - Seminars - Conferences22107 0 0 10,000 10,1000 10,000

    Consulting Services22108 0 0 70,000 70,7000 70,000

    Special Services22109 0 0 45,000 45,4500 45,000

    SP3: Human Resource0 0 63,413 64,0470 63,413

    0 0 12,00022 Use of goods and services 12,1200 12,000

    Use of goods and services221 0 0 12,000 12,1200 12,000

    Training - Seminars - Conferences22107 0 0 12,000 12,1200 12,000

    0 0 51,41326 Grants 51,9270 51,413

    To other general government units263 0 0 51,413 51,9270 51,413

    Re-Current26311 0 0 51,413 51,9270 51,413

    SP4: Planning, Budgeting, Monitoring and Evaluation

    0 0 518,664 258,7260 271,653

    Monday, May 15, 2017 Page 56ACTIVATE SOFTWARE Printed on Assin North Municipal - Assin Foso

  • Economic Classification

    2017 2018 2019

    Expenditure by Programme, Sub Programme and Economic Classification In GH¢

    2015

    Actual

    2016

    forecastBudget Est. Outturn Budget forecast

    0 0 48,88221 Compensation of employees [GFS] 49,3710 49,371

    Wages and Salaries211 0 0 48,882 49,3710 49,371

    Established Position21110 0 0 48,882 49,3710 49,371

    0 0 229,78222 Use of goods and services 88,1550 102,282

    Use of goods and services221 0 0 229,782 88,1550 102,282

    Training - Seminars - Conferences22107 0 0 161,000 47,4700 62,000

    Special Services22109 0 0 68,782 40,6850 40,282

    0 0 240,00031 Non Financial Assets 121,2000 120,000

    Fixed assets311 0 0 240,000 121,2000 120,000

    Transport equipment31121 0 0 240,000 121,2000 120,000

    Social Services Delivery 0 0 5,461,659 5,516,2760 5,468,131

    SP2.1 Education, youth & sports and Library services

    0 0 2,153,723 2,175,2600 2,153,723

    0 0 31,00022 Use of goods and services 31,3100 31,000

    Use of goods and services221 0 0 31,000 31,3100 31,000

    Materials - Office Supplies22101 0 0 10,000 10,1000 10,000

    Travel - Transport22105 0 0 11,000 11,1100 11,000

    Special Services22109 0 0 10,000 10,1000 10,000

    0 0 120,00028 Other expense 121,2000 120,000

    Miscellaneous other expense282 0 0 120,000 121,2000 120,000

    General Expenses28210 0 0 120,000 121,2000 120,000

    0 0 2,002,72331 Non Financial Assets 2,022,7500 2,002,723

    Fixed assets311 0 0 2,002,723 2,022,7500 2,002,723

    Dwellings31111 0 0 117,187 118,3590 117,187

    Nonresidential buildings31112 0 0 1,385,027 1,398,8780 1,385,027

    Infrastructure Assets31131 0 0 500,508 505,5130 500,508

    SP2.2 Public Health Services and management0 0 1,826,499 1,844,7640 1,828,519

    0 0 201,95221 Compensation of employees [GFS] 203,9720 203,972

    Wages and Salaries211 0 0 201,952 203,9720 203,972

    Established Position21110 0 0 201,952 203,9720 203,972

    0 0 26,00022 Use of goods and services 26,2600 26,000

    Use of goods and services221 0 0 26,000 26,2600 26,000

    Materials - Office Supplies22101 0 0 10,000 10,1000 10,000

    Travel - Transport22105 0 0 11,000 11,1100 11,000

    Special Services22109 0 0 5,000 5,0500 5,000

    0 0 1,598,54731 Non Financial Assets 1,614,5330 1,598,547

    Fixed assets311 0 0 1,598,547 1,614,5330 1,598,547

    Nonresidential buildings31112 0 0 1,448,547 1,463,0330 1,448,547

    Other machinery and equipment31122 0 0 150,000 151,5000 150,000

    SP2.3 Environmental Health and sanitation Services0 0 726,622 733,8880 729,048

    0 0 242,62221 Compensation of employees [GFS] 245,0480 245,048

    Wages and Salaries211 0 0 242,622 245,0480 245,048

    Established Position21110 0 0 242,622 245,0480 245,048

    Monday, May 15, 2017 Page 57ACTIVATE SOFTWARE Printed on Assin North Municipal - Assin Foso

  • Economic Classification

    2017 2018 2019

    Expenditure by Programme, Sub Programme and Economic Classification In GH¢

    2015

    Actual

    2016

    forecastBudget Est. Outturn Budget forecast

    0 0 154,00022 Use of goods and services 155,5400 154,000

    Use of goods and services221 0 0 154,000 155,5400 154,000

    Materials - Office Supplies22101 0 0 15,000 15,1500 15,000

    Utilities22102 0 0 11,000 11,1100 11,000

    Repairs - Maintenance22106 0 0 67,000 67,6700 67,000

    Training - Seminars - Conferences22107 0 0 31,000 31,3100 31,000

    Special Services22109 0 0 30,000 30,3000 30,000

    0 0 330,00028 Other expense 333,3000 330,000

    Miscellaneous other expense282 0 0 330,000 333,3000 330,000

    General Expenses28210 0 0 330,000 333,3000 330,000

    SP2.4 Birth and Death Registration Services0 0 22,984 23,2140 23,135

    0 0 15,16121 Compensation of employees [GFS] 15,3130 15,313

    Wages and Salaries211 0 0 15,161 15,3130 15,313

    Established Position21110 0 0 15,161 15,3130 15,313

    0 0 7,82322 Use of goods and services 7,9010 7,823

    Use of goods and services221 0 0 7,823 7,9010 7,823

    Training - Seminars - Conferences22107 0 0 7,823 7,9010 7,823

    SP2.5 Social Welfare and community services0 0 731,832 739,1500 733,706

    0 0 187,44021 Compensation of employees [GFS] 189,3150 189,315

    Wages and Salaries211 0 0 187,440 189,3150 189,315

    Established Position21110 0 0 187,440 189,3150 189,315

    0 0 155,85122 Use of goods and services 157,4100 155,851

    Use of goods and services221 0 0 155,851 157,4100 155,851

    Materials - Office Supplies22101 0 0 4,000 4,0400 4,000

    Repairs - Maintenance22106 0 0 1,000 1,0100 1,000

    Training - Seminars - Conferences22107 0 0 41,008 41,4180 41,008

    Special Services22109 0 0 109,844 110,9420 109,844

    0 0 388,54031 Non Financial Assets 392,4260 388,540