compliance report of environmental clearances · during construction phase. and around the project...

21
COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES [October ’2015 to March ’2016] Submitted By: M/S. ADITYA GRAND INFRA LINK., For ”ISCON JEWEL” Jodhpur, Dist. Ahmedabad, JULY 2016

Upload: others

Post on 06-Sep-2019

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES

[October ’2015 to March ’2016]

Submitted By: M/S. ADITYA GRAND INFRA LINK.,

For ”ISCON JEWEL”

Jodhpur,

Dist. Ahmedabad,

JULY 2016

Page 2: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

CONTENTS Sr. No. Title Pg. No.

1. Introduction 1

2. Compliance Status of Environment Clearance (EC) 2

3. Annexure 6

LIST OF ANNEXURE

Annexure no. Title Pg. No.

1. Copy of EC letter vides Letter No. SEIAA/GUJ/EC/8(a)/3087/2015 6

2. Ambient Air Quality Monitoring Report 11

3. Noise Monitoring Report 12

4. Photographs of Project Site 13

Page 3: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

ISCON JEWEL Compliance Report of Environmental Clearance

Residential Building Construction Project at Vil. Jodhpur, Dist. Ahmedabad

Page 1 of 5

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE

Plot area

INTRODUCTION

The residential project “ISCON JEWEL” is located in one of the developed area of the

Ahmedabad city. Unit had obtained EC in August, 2015 letter vide SEIAA/GUJ/EC/8(a)/ 3087 /2015. Details of EC letter is given in following table. Copy of EC letter is attested as

Annexure 1.

9,238 m2 Built up area 65,108.55 m2 Project fall under category 8(a) –B2 Height of building 29.18 No of shops 105 No of offices 348 No of Floors 7 No of Basement 3 Status of the Project • Project is in construction phase. • Constructions of six floors have been completed. • Approximately 70% of work is completed.

The purpose of this report is to ensure the compliance of “Iscon Jewel” to the stipulated

terms and conditions of above referenced Environmental Clearance.The compliance has

been done through the Observation, Documents Verification and Interview process.

Page 4: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

ISCON JEWEL Compliance Report of Environmental Clearance Commercial Building Construction Project at Vil. Jodhpur, Dist. Ahmedabad

Page 2 of 5

Compliance Status of Environment Clearance A. SPECIFIC CONDITION 1 No manufacturing activity shall be

allowed in the project premises. Complied. No any manufacturing activity will take place at site.

2 The project proponent shall not sold / allot any commercial unit for storage of chemicals, flammable substances, explosives, fire crackers or any other material of hazardous characteristics.

Complied. The project proponent will not allot any commercial unit for storage of chemicals, flammable substances, explosive or any other hazardous material.

A.1 CONSTRUCTION PHASE : A.1.1 WATER : 3 Fresh water requirement during the

construction phase shall be 547.0 KL/day and it shall be met through bore well water. Permission of concerned authority shall be obtained for ground water abstraction

Fresh water requirement during construction phase is taken from the bore well existing at site. In the construction phase Bore well will be kept as a standby.

4 Sewage generated during the construction phase shall be disposed off through the septic tank - soak pit.

Sewage generated during construction phase is disposed off in to soak pit via septic tank.

5 Water demand during construction shall be reduced by use of curing agents, super plasticizers and other best construction practices.

Complying. Best efforts had been made to reduce the water demand by using the best construction practices and curing agents. Ready Mix Concrete has been used for construction activity.

A.1.2 AIR : 6 Peripheral barricading shall be done to

prevent dust emission spreading outside the project premises.

Complied. Peripheral barricading has been provided all around the construction site to prevent dust spreading outside the project premises. It is shown in Photo 1 of this report.

7 Water sprinkling shall be done in vulnerable areas for controlling fugitive emission.

Complied. Water sprinkling is regularly done to control fugitive emission as shown in Photo 2.

8 Material shall be covered during transportation to avoid the fugitive emission.

Complied. Materials were covered during transportation as necessary to avoid the fugitive emission.

9 The roads inside the project area and roads connected to the main road shall be paved or shall be water sprinkled to avoid the fugitive emissions during construction.

All the roads within and around the site are paved and water sprinkled as necessary to avoid the fugitive emissions. It is shown in Photo 3 of this report.

10 The ambient air quality shall be monitored in and around the project area

Ambient air quality is monitored in

Page 5: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

ISCON JEWEL Compliance Report of Environmental Clearance

Residential Building Construction Project at Vil. Jodhpur, Dist. Ahmedabad

Page 3 of 5

during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached as Annexure 2. All the parameters are within the limit.

11 The construction materials and debris shall be properly stored and handled to avoid negative impacts such as air pollution and public nuisances by blocking the roads and public passages.

Complied. The construction material have been properly handled and stored. It is shown in Photo 4 of this report. Construction debris has been used in backfilling.

A.1.3 SAFETY : 12 Structural design of the project shall

strictly adhere to the seismic zone norms for earthquake resistant structures.

Complied. Structural design is prepared by certified structural engineer. Project is designed to adhere to the IS codes of 1893 (part-1, June 2002).

13 During construction Personal Protective Equipment shall be provided to the construction workers and its usage shall be ensured and supervised.

Complied. Personal protective equipments have been provided and usage has been ensured as shown in Photo 5.

14 First Aid Box shall be made readily available in adequate quantity at all the times.

Complied. First aid box is readily available at the construction site.It is given in Photo 6 of this report.

15 Training shall be given to all workers on construction safety aspects

Complied. Periodic trainings are given to all the workers to ensure safety during construction activity.

16 The project proponent shall strictly comply with the Gujarat Building and other Construction Workers Act & Rules.

Project proponent is complying with the Gujarat Building and other Construction Workers Act & Rules.

A.1.4 NOISE : 17 The overall noise level in and around the

project area shall be kept well within the prescribed standards by providing noise control measures including acoustic insulation, hoods, silencers, enclosures vibration dampers etc. on all sources of noise generation. The ambient noise levels shall confirm to the standards prescribed under the Environment (Protection) Act and Rules.

Acoustic insulation, enclosures, vibration dampers on all sources of noise generations such as Concrete Mixer, Batching Plant, Lift for material transfer etc. have been provided. Ambient noise & machine noise levels are measured and found within standards prescribed under the Environment (Protection) Act and Rules. Refer Annexure 3. Noise level in and around the project site is within limit.

18 The noise generating equipments, machinery and vehicles shall not be

Complied. All the equipments, machinery and vehicles are only

Page 6: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

ISCON JEWEL Compliance Report of Environmental Clearance Commercial Building Construction Project at Vil. Jodhpur, Dist. Ahmedabad

Page 4 of 5

operated during the night hours and shall be maintained properly to avoid generation of high noise due to lack of wear and tear.

operated during day hours and maintained properly to avoid generation of high noise due to lack of wear and tear.

19 Use of diesel generator sets during construction phase shall be strictly with acoustic enclosure and shall confirm to EPA Rules for air and noise emission standards.

Complied. The project is in construction phase and no D.G has been provided yet.

A.2 OTHER CONDITION : 20 The safe disposal of wastewater and

solid wastes generated during the construction phase shall be ensured.

Complied. Waste water is disposed off to the soak pit via septic tank. Safe disposal of solid waste is also ensured.

21 The NBC norms shall be strictly adhered to.

Complied. NBC norms are strictly adhered during construction phase.

22 Barricade of adequate height shall be provided on the periphery of the construction site with adequate signage.

Barricades have been provided along the site periphery with signage. It is shown in Photo 1 of this report.

23 All topsoil excavated during construction activity shall be used in horticultural / landscape development within the project site.

All top soil excavated during construction has been stored and will be used for landscape development.

24 The debris generated during the construction work shall be re-used in filling and resurfacing of the area and recyclable scrap shall be sold to vendors.

Complying. The debris generated during the construction has been re-used in footing, filling and resurfacing area. Recyclable scrap is sold to the vendors.

25 Vehicles hired for bringing construction material at site shall be in good conditions and confirm to applicable air and noise emission standards and shall be operated only during day time and non-peak hours.

Complied. All vehicles used for the construction are confirming to the applicable air and noise emission standards and operated only during the day time. It is made sure all the vehicles have valid PUC certificate.

26 Project proponent shall ensure use of eco-friendly building materials including fly ash bricks, fly ash paving blocks and Ready mix concrete [RMC] in the project.

Fly ash bricks, fly ash blocks and Ready Mix Concretes are used on the project most of the times. It is shown in Photo 7 of this report.

27 Necessary sanitary, hygiene and first aid measures shall be provided before starting the construction activities and to

Necessary sanitary, hygiene and first aid measures have been provided and continue the same

Page 7: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

ISCON JEWEL Compliance Report of Environmental Clearance

Residential Building Construction Project at Vil. Jodhpur, Dist. Ahmedabad

Page 5 of 5

be maintained throughout the construction phase.

practice for remaining work.

28 Adequate accommodation, drinking water, sanitary facilities, first aid center, utensils and cooking fuel shall be provided for construction workers at the site.

Mostly local workers withinproximity of site have been employed for the Construction activities.

29 Adequate care shall be taken to see that the surrounding landscape at the project site is not environmentally degraded.

To save the surrounding landscape from environmental damage, barrier & barricades are provided around the project site. Also, proper management of solid waste and wastewater is ensured to avoid disposal outside the project site.

30 Fly ash shall be used in the construction wherever applicable as per provisions of Fly Ash Notification under the E.P. Act, 1986

Mostly autoclaved aerated concrete blocks made of fly ash are used at the site as shown in Photo 7.

31 Used cement bags, waste paper and cardboard packing material shall be sold off to recyclers. Residual steel scrap shall be collected at site and sold to recyclers.

Complied. Used cement bags, waste paper, cardboard packing material and steel scrap are collected at site and sold to the recyclers.

32 Only lead free paints shall be used in the project

Will be complied. Lead free paints will be used for the project.

Note- All other conditions of operation phase will be compiled after completion of construction phase.

Page 8: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

ANNEXURES

Page 9: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

COPY OF EC LETTER

ANNEXURE 1

Page 10: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

STATE LEVEL ENVIROONMENT DARPANA DHIMMAR IMPACT ASSESSMENT MEMBER SECRETARY AUTHOORITY SEIAA (GUJARAT) GUJARAT Government of Gujarat

No. SEIAA/GUJ/EC/8(a)/ 3087 /2015 Date: 21-08-2015 BY R.P.A.D Time Limit

Sub: Environment Clearance for the Commercial Building Construction Project – “Iscon Jewel” at S.No.123+124,F.P.No.19 +21,TPS No.5+6, Jodhpur, Ahmedabad proposed by M/s Aditya Grand Infra

Link.................................................Construction project in Category 8 (a) of Schedule annexed with EIA Notification dated 14/9/2006.

Dear Sir, This has reference to your application along with Form-I, Form-1 A dated 30/09/2014, seeking Environmental Clearance under Environment Impact Assessment Notification, 2006. The project was scheduled for hearing in the SEAC meeting held on 09/02/2015. The project proponent submitted additional information / documents vide letter dated 01/05/2015 to the SEAC. The proposal is for Environmental Clearance for the Commercial Building Construction Project – “Iscon Jewel” at S.No.123+124,F.P.No.19 +21,TPS No.5+6, Jodhpur, Ahmedabad proposed by M/s Aditya Grand Infra Link. This is a commercial building construction project having plot area of 9,238.0 m2 and the proposed built up area of the project is 65,108.55 m2. As the built up area is >20,000 m2 and <1,50,000 m2, it falls in the category 8(a) of the Schedule of EIA Notification, 2006. The project will comprise of 01 building consisting of 02 building blocks. The project will comprise of 105 Shops & 348 Offices. Scope of the building in the project will be 3 level basement + ground floor + 7 floors. Maximum height of the buildings will be 29.18 m.

The project activity is covered in 8(a) and falls in Category ’B’. Since the proposed project is in item no.8 of the EIA notification, 2006, it does not need Public Consultation as per Para 7(i) III. Stage (3) (d) – Public Consultation of EIA Notification, 2006. The SEAC, Gujarat had recommended the project vide their letter dated 01.08.2015 to grant Environmental Clearance to the SEIAA, Gujarat based on the decision taken during SEAC meeting held on 19.05.2015. The proposal was considered by SEIAA, Gujarat in its meeting held on 07.08.2015 at Gandhinagar. After careful consideration, the SEIAA hereby accords Environmental Clearance to above project under the provisions of EIA Notification dated 14th September, 2006 subject to the compliance of the following conditions. CONDITIONS: A.SPECIFIC CONDITIONS:

1. No manufacturing activity shall be allowed in the project premises. 2. The project proponent shall not sold / allot any commercial unit for storage of chemicals, flammable substances,

explosives, fire crackers or any other material of hazardous characteristics. A.1 CONSTRUCTION PHASE: A.1.1 WATER:

3. Fresh water requirement during the construction phase shall be 547.0 KL/day and it shall be met through borewell water. Permission of concerned authority shall be obtained for ground water abstraction.

4. Sewage generated during the construction phase shall be disposed off through the septic tank - soak pit. 5. Water demand during construction shall be reduced by use of curing agents, super plasticizers and other best

construction practices. A.1.2 AIR:

6. Peripheral barricading shall be done to prevent dust emission spreading outside the project premises. 7. Water sprinkling shall be done in vulnerable areas for controlling fugitive emission.

Office : Gujarat Pollution Control Board, “Paryavaran Bhavan” Sector-10 A, Gandhinagar-382010 Page 1 of 6

Phone No.:- (079) 232-32152,232-41514 Fax No.:-(079) 232-22784 E-mail : [email protected], Website:- www.seiaa.gujarat.gov.in

6

6

Page 11: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

8. Material shall be covered during transportation to avoid the fugitive emission. 9. The roads inside the project area and roads connected to the main road shall be paved or shall be water

sprinkled to avoid the fugitive emissions during construction. 10. The ambient air quality shall be monitored in and around the project area during construction phase. 11. The construction materials and debris shall be properly stored and handled to avoid negative impacts such as

air pollution and public nuisances by blocking the roads and public passages. A.1.3 SAFETY:

12. Structural design of the project shall strictly adhere to the seismic zone norms for earthquake resistant structures.

13. During construction Personal Protective Equipment shall be provided to the construction workers and its usage shall be ensured and supervised.

14. First Aid Box shall be made readily available in adequate quantity at all the times. 15. Training shall be given to all workers on construction safety aspects. 16. The project proponent shall strictly comply with the Gujarat Building and other Construction Workers Act &

Rules. A.1.4 NOISE :

17. The overall noise level in and around the project area shall be kept well within the prescribed standards by providing noise control measures including acoustic insulation, hoods, silencers, enclosures vibration dampers etc. on all sources of noise generation. The ambient noise levels shall confirm to the standards prescribed under the Environment (Protection) Act and Rules.

18. The noise generating equipments, machinery and vehicles shall not be operated during the night hours and shall be maintained properly to avoid generation of high noise due to lack of wear and tear.

19. Use of diesel generator sets during construction phase shall be strictly with acoustic enclosure and shall confirm to EPA Rules for air and noise emission standards.

A 2. OTHER CONDITIONS : 20. The safe disposal of wastewater and solid wastes generated during the construction phase shall be ensured. 21. The NBC norms shall be strictly adhered to. 22. Barricade of adequate height shall be provided on the periphery of the construction site with adequate signages. 23. All topsoil excavated during construction activity shall be used in horticultural / landscape development within the

project site. 24. The debris generated during the construction work shall be re-used in filling and resurfacing of the area and

recyclable scrap shall be sold to vendors. 25. Vehicles hired for bringing construction material at site shall be in good conditions and confirm to applicable air

and noise emission standards and shall be operated only during day time and non-peak hours. 26. Project proponent shall ensure use of eco-friendly building materials including fly ash bricks, fly ash paving

blocks and Ready mix concrete [RMC] in the project. 27. Necessary sanitary, hygiene and first aid measures shall be provided before starting the construction activities

and to be maintained throughout the construction phase. 28. Adequate accommodation, drinking water, sanitary facilities, first aid center, utensils and cooking fuel shall be

provided for construction workers at the site. 29. Adequate care shall be taken to see that the surrounding landscape at the project site is not environmentally

degraded. 30. Fly ash shall be used in the construction wherever applicable as per provisions of Fly Ash Notification under the

E.P. Act, 1986. 31. Used cement bags, waste paper and cardboard packing material shall be sold off to recyclers. Residual steel

scrap shall be collected at site and sold to recyclers. 32. Only lead free paints shall be used in the project.

A.3 OPERATION PHASE: A 3.1 WATER

33. Total water requirement during the operation phase shall be 126.0 KL/day, out of which fresh water requirement shall be met from the water supply system of Ahmedabad Municipal Corporation (AMC) and water requirement for gardening & flushing shall be met by reuse of treated sewage from the proposed STP. Metering of the water shall be done and its records shall be maintained. No ground water shall be tapped during the operation phase of the project.

34. The sewage generation shall not exceed 97.0 KL/day, which shall be treated in the proposed sewage treatment plant (STP) of adequate capacity. The STP shall be operated regularly and efficiently so as to achieve the GPCB norms at the STP outlets.

35. Treated sewage shall be reused within the premises for gardening & flushing purpose at the maximum extent possible and only remaining quantity of treated sewage shall be discharged into the drainage line AMC.

Office : Gujarat Pollution Control Board, “Paryavaran Bhavan” Sector-10 A, Gandhinagar-382010 Page 2 of 6

Phone No.:- (079) 232-32152,232-41514 Fax No.:-(079) 232-22784 E-mail : [email protected], Website:- www.seiaa.gujarat.gov.in

7

7

Page 12: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

36. A proper logbook of STP operation and also showing the quantity of treated sewage reused in flushing, quantity utilized in plantation / gardening and quantity discharged into the drainage line etc. shall be maintained and furnished to the GPCB from time to time.

37. Low water consuming devices shall be provided. Fixtures for showers, toilet, flushing and drinking shall be of low flow either by use of aerators/ diffusers or pressure reducing devices etc.

38. Dual plumbing system with separate tanks and lines shall be provided for utilization of treated sewage for flushing.

39. No new bore well shall be constructed and existing bore well/s shall be either sealed or converted into the recharge well upon completion of the construction work.

40. Rain water harvesting from rooftop and paved areas and ground water recharge through 3 nos. of percolation wells shall be carried out as per the details submitted. Before recharging the runoff, pre-treatment must be done to remove suspended matter.

A.3.2 AIR: 41. A D. G. Set (200 KVA) proposed as back up power shall be of enclosed type and confirm to prescribe standards

under EPA rules. Necessary acoustic enclosures shall be provided at diesel generator set to mitigate the impact of noise.

42. The exhaust of the D. G. Set shall be at least 3 m above roof top. 43. The gaseous emissions from the D.G. Sets shall conform to the standards prescribed by GPCB. At no time, the

emission levels shall go beyond the stipulated standards. A 3.3 SOLID WASTE:

44. The solid waste generated shall be properly collected and segregated at source. The recyclable material shall be sold to vendors whereas other garbage shall be disposed off properly as per the provisions made by the AMC.

45. Used oil generated shall be sold only to the registered recycler. 46. The project must strictly comply with the rules and regulations with regards to handing and disposal of

Hazardous waste in accordance with the Hazardous Waste (Management, Handling and Transboundary) Rules 2008. Authorization from the GPCB must be obtained for collection / treatment /storage /disposal of hazardous wastes.

A 3.4 SAFETY : 47. The planning, design and construction of all buildings shall be such as to ensure safety from fire. 48. Requisite fire fighting facilities shall be provided as per the requirements of the NBC and local by-laws,

whichever is more stringent. 49. Fire fighting facilities like Underground fire water tank with storage capacity of 100 KL, automatic sprinkler

system @ one no. per 12 m2 of floor area in all basements and fire indication panel at ground level, fire alarm system, external fire hydrant system, hose pipe and fire extinguishers on each floor, yard hydrant system, one wet riser extended from the basement to the terrace floor, a hose box near each internal hydrant, one CO2 (4.5 kg) and one Dry Chemical Powder (5.0 kg) type extinguishers on each floor etc. shall be provided as proposed.

50. The requirements for fire and life safety shall be fulfilled in the project, as per the National Building Code of India so as to minimize danger to life and property from fire.

51. Compulsory Training to the staff for the first aid and fire fighting along with regular mock drill shall be made as an integral part of the emergency management plan of the project.

52. Underground fire water storage tanks and terrace water storage tanks of adequate capacity shall be provided as proposed. Adequate provision shall be made to ensure that water from the Fire Water Tank shall not be used for any other purpose.

53. Dedicated power back up system shall be provided in the case of power failure & emergency of fire water pumps.

54. First Aid Boxes shall be made readily available in adequate quantity at all the times. 55. Main entry and exit shall be separate and clearly marked in the facility. 56. Necessary emergency lighting system along with emergency power back up system shall be provided. Further,

necessary auto glow signage at all appropriate places shall be provided to guide the people towards exits and assembly points during emergency.

57. The project management shall prepare a detailed Disaster Management Plan (DMP) for the operational phase of the project.

58. The project proponent shall prepare an elaborate fire safety plan. 59. Necessary smoke detection systems, comprehensive fire fighting network along with adequate number of fire

extinguishers shall be provided. 60. Automatic sprinklers shall be provided in the building at all appropriate locations based on the proper study to be

conducted for this purpose. 61. Adequate number of staircases and lifts shall open out at ground level for emergency evacuation.

Office : Gujarat Pollution Control Board, “Paryavaran Bhavan” Sector-10 A, Gandhinagar-382010 Page 3 of 6

Phone No.:- (079) 232-32152,232-41514 Fax No.:-(079) 232-22784 E-mail : [email protected], Website:- www.seiaa.gujarat.gov.in

8

8

Page 13: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

62. Sufficient peripheral open passage shall be kept in the margin area for free movement of fire tender/ emergency vehicle around the premises.

63. In basement at least two separate ramps of adequate width and slope shall be provided, located preferably at opposite ends.

64. Provision for adequate air changes per hour in the basement shall be made so as to avoid build up of CO in the area.

65. Car park exhaust system equipped with CO (Carbon Monoxide) sensor shall be provided to ensure operation of exhaust fans as CO concentration levels.

A 3.5 NOISE : 66. The acoustic enclosures shall be installed at all noise generating equipments to mitigate the impact of noise. 67. The overall noise level in and around the project area shall be kept well within the prescribed standards by

providing noise control measures including acoustic insulation, hoods, silencers, enclosures vibration dampers etc. on all sources of noise generation. The ambient noise levels shall confirm to the standards prescribed under the Environment (Protection) Act and Rules.

A3.6 PARKING / TRAFFIC CONGESTION: 68. Parking space of 17,726.0 m2 [16,633.03 m2 in basement + 1,093.35 m2 as open surface parking + mechanical

parking at 2nd level basement] shall be provided as proposed. 69. The area earmarked for the parking shall be used for parking only. No other activity shall be permitted in this

area. 70. Traffic congestion near the entry and exit points from the roads adjoining the proposed project site shall be

avoided. 71. No public space including the service road shall be used or blocked for the parking and the trained staff shall be

deployed to guide the visitors for parking and helping the senior citizens and physically challenged people to park their vehicles at appropriate parking places (valet parking).

72. Necessary signage including continuous display of status of parking availability at entry, exit and all other appropriate places shall be provided which should have appropriate size of letters and shall be visible from the at least 50 meter distance.

A 3.7 ENERGY CONSERVATION: 73. Energy conservation measures viz. solar passive techniques in a building design and enhanced building

material specifications to minimize load on conventional systems (ventilation and lighting), use of efficient lamps, luminaries & control devices, time switches for automatic switching off lighting of buildings and street lights, use of transformers and motors having minimum efficiency of 85%, use of light colors for the walls and ceiling to reduce the UV absorption and minimize the associated cooling requirement, use of building materials, having lower U-value and the insulating material having higher R-value, regular energy auditing of buildings etc. shall be implemented as proposed.

74. The project proponent shall install energy efficient devices, appliances, motors and pumps conforming to the Bureau of Energy Efficiency norms.

75. The transformers and motors shall have minimum efficiency of 85 %. 76. Only variable frequency motor drives shall be used in the project. 77. Solar lights shall be provided in the open sunlit areas. 78. Use of glass shall be minimal to reduce the heat island effect as well as to reduce the electricity consumption.

A 3.8 GREEN BELT : 79. Green belt area of 830.60 m2 comprising of 526.50 m2 tree covered area with 139 nos. of trees shall be

developed as proposed. The other open spaces inside the plot shall be suitably landscaped and covered with vegetation of indigenous tree species.

80. The area earmarked as green area shall be used only for greenbelt and shall not be altered for any other purpose.

81. Drip irrigation / low-volume, low-angle sprinkler system shall be used for the lawns and other green area including tree plantation.

B. OTHER CONDITIONS : 82. All the statutory clearances such as the approvals for storage of diesel from Chief Controller of Explosives, Fire

Department, Airports Authority of India etc., if applicable, shall be obtained by the project proponent from the competent authorities.

83. The project proponent shall strictly comply with the Gujarat Building and other Construction Workers Act & Rules as well as Gujarat Lifts & Escalators Rules.

84. The project proponent shall ensure maximum employment to the local people. 85. The project management shall also comply with all the environment protection measures, risk mitigation

Office : Gujarat Pollution Control Board, “Paryavaran Bhavan” Sector-10 A, Gandhinagar-382010 Page 4 of 6

Phone No.:- (079) 232-32152,232-41514 Fax No.:-(079) 232-22784 E-mail : [email protected], Website:- www.seiaa.gujarat.gov.in

9

9

Page 14: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

measures and safeguards proposed by them. 86. The project proponent shall also comply with any additional condition that may be imposed by the SEAC or the

SEIAA or any other competent authority for the purpose of the environmental protection and management. 87. No further expansion or modifications in the project likely to cause environmental impacts shall be carried out

without obtaining prior Environment Clearance from the concerned authority. 88. The above conditions will be enforced, inter-alia under the provisions of the Water (Prevention & Control of

Pollution) Act,1974, Air (Prevention & Control of Pollution) Act, 1981, the Environment (Protection) Act, 1986 and Hazardous Waste (Management Handling and Transboundary) Rules, 2008 along with their amendments and rules.

89. The project authorities shall earmark adequate funds to implement the conditions stipulated by SEIAA as well as GPCB along with the implementation schedule for all the conditions stipulated herein. The funds so provided shall not be diverted for any other purpose.

90. The applicant shall inform the public that the project has been accorded environmental clearance by the SEIAA and that the copies of the clearance letter are available with the GPCB and may also be seen at the Website of SEIAA/ SEAC/ GPCB. This shall be advertised within seven days from the date of the clearance letter, in at least two local newspapers that are widely circulated in the region, one of which shall be in the Gujarati language and the other in English. A copy each of the same shall be forwarded to the concerned Regional Office of the Ministry.

91. It shall be mandatory for the project management to submit half-yearly compliance report in respect of the stipulated prior environmental clearance terms and conditions in hard and soft copies to the regulatory authority concerned, on 1st June and 1st December of each calendar year.

92. The project authorities shall also adhere to the stipulations made by the Gujarat Pollution Control Board. 93. The project authorities shall inform the GPCB, Regional Office of MoEF and SEIAA about the date of financial

closure and final approval of the project by the concerned authorities and the date of start of the project. 94. The SEIAA may revoke or suspend the clearance, if implementation of any of the above conditions is not found

satisfactory. 95. This environmental clearance is valid for seven years from the date of issue. 96. Any appeal against this environmental clearance shall lie with the National Green Tribunal, if preferred, within a

period of 30 days as prescribed under Section 16 of the National Green Tribunal Act, 2010. With regards, Yours sincerely, (DARPANA DHIMMAR) Member Secretary Issued to: Mr. Jayesh T. Kotak Director, Iscon House, Opp. Associated petrol pump, Off C.G.road, Ahmedabad-380009. CCooppyy ttoo::-- 1. The Secretary, SEAC, C/O. G.P.C.B. Gandhinagar - 382010. 2. The Chairman, Central Pollution Control Board , Parivesh Bhavan, CBD -cum-Office Complex, East Arjun Nagar, New Delhi-110032 3. The Chief Conservator of Forests (Central), Ministry of Environment & Forests, Regional Office (WZ), E-5, Arera Colony, Link Road-3, Bhopal-462016, MP 4. Monitoring Cell, Ministry of Environment and Forests, Paryavaran Bhavan, CGO Complex, New Delhi-110003. 5. The Member Secretary, Gujarat Pollution Control Board, Paryavaran Bhavan, Sector-10 A, Gandhinagar-382010 6. Select File

( DARPANA DHIMMAR)

Office : Gujarat Pollution Control Board, “Paryavaran Bhavan” Sector-10 A, Gandhinagar-382010 Page 5 of 6

Phone No.:- (079) 232-32152,232-41514 Fax No.:-(079) 232-22784 E-mail : [email protected], Website:- www.seiaa.gujarat.gov.in

10

10

Page 15: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

REPORT OF AAQM

ANNEXURE 2

Page 16: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

REGD. OFF.: 3rd Floor. Akash Ganga Complex, B/s. Suvidha Shopping Centre, EnvisafeNr. Parimal Underpass, Paldi, Ahmedabad-380 007. GUjarat, INDIA. Tele/Fax: +917926650878,26650473 E-mail: envisafe@gmaiLcom Environment Consultants

Environmental Consultancy &Laboratory

Ref.: EEC/LAB/AMB/16-17/020704 02 July, 2016 Page 1 of 1

TEST REPORT

Name & Address of Client M/s.Iscon Jewel S.No.123+124,F.P.No.19 +21,TPS No.5+6, Jodhpur, Ahmedabad

Date & Time of Sampling

Date of Receipt of Sample

Description of Sample

30/06/2016; 06: 30pm

01/07/2016

Ambient Air (Near Admin Area)

Sample collected By EEC Team

Analysis Starting Date 02/07/2016

Analysis Completion 02/07/2016 Date

MONITORING DATA: Wind Direction

Duration of Sampling

Ambient Temperature

sw to NE

. 24 Hrs

31°C

RESULT TABLE:

Parameter Reference Method

PM 10 1S:5182 (Part - XXIII) 1999

PM2.5 Gravimetric Method

... ~S~O.x_ ~IS-=~51a2_(Pa~II)200L~~

NOx IS: 5182 (Part- VI) 2006

Lab 10 Code

81/lB/AM/PM 10

81/lB/AM/PM2.5

-8lflB/AM/SOx~

81/lB/AM/NOx

Unit

!lg/m3

!lg/m3

~Jlg/m~-~~

!lg/m3

Result GPCB Limit

10065

40 60

I·~---29--~~ i~- ·~80---

8015

For Envisafe Environment Consultants,

\f.L~ Authorized Signatory -----------------------------------------End of Test Report---------------------------------------­This Report is issued under the following terms & conditions:

1. The report is refer only to the sample tested and not applies to the bulk. 2. The results shown in this test report may differ based on various factors including, temperature, humidity,

pressure, retention time etc. 3. The test report cannot be reproduced wholly or in part and cannot be used for promotional or publicity

purpose without the written consent of Laboratory Department, Envisafe Environment Consultants 4. Samples will be retained for a period of Fifteen (15) days after completion of the analysis. Longer retention

periods can be arranged, on request of the customer. 5. We strictly maintain the confidentiality of all the analysis and test result of sample(s) collected by us / supplied

by customer and not reveal to third party unless required by the statutory or legal requirement.

11

11

Page 17: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

REPORT OF NOISE

MONITORING

ANNEXURE 3

Page 18: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

REGD. OFF.: 3rd Floor, Akash Ganga Complex, 8/s. Suvidha Shopping Centre, EnvisafeNr. Parimal Underpass, Paldi, Ahmedabad-380 007. Gujarat, INDIA. Tele/Fax: +91 7926650878,26650473 E-mail: [email protected] Environment Consultants

Environmental Consultancy & Laboratory

EEC/LAB/NSL/16-17/020703 02 July,2016 Page 1 of 1

TEST REPORT

Name & Address of Client MIs. Iscon Jewel S.No.123+124,F.P.No.19 +21,TPS No.5+6, Jodhpur, Ahmedabad

Date & Time Of Sampling

Mode of Sampling

Monitoring Done by

Measuring Condition

30/06/2016; Day Time 05:45pm to 06: 15pm

Grab

EEC

Type ­ 2 SLM Frequency Weighing: Network ­ A Time Weighing: Slow

RESULT TABLE:

Sr. L t- Noise Level, db (A)· I Remarks!

~~. Neara::n'::a :;.~ 1-~~~iP;;7~:~~~~tL~-t----~--1 :__~. . Nr. Mam Gate ,61.3 I 75.3 : 75 (Ambient A~_____~_-__ I

Ambient Noise Standard: Day time shall mean from 6.00 a.m. to 10.00 p.m. l Reference Method: IS 9989:1981 Assessment of Noise with Respect to Community . Response. I

For Envisafe Environment Consultants,

~,~ _________~_AutboriUd-Sig..,at-()ty----~-- -~----~----------~----------~----

------------------------------------------End of Test Report----------------------------··-----------­This Report is issued under the following terms & conditions:

1. The results shown in this test report may differ based on various factors including, temperature, humidity, pressure, etc.

2. The test report cannot be reproduced wholly or in part and cannot be used for promotional or publicity purpose without the written consent of laboratory Department, Envisafe Environment Consultants

3. We strictly maintain the confidentiality of all the monitoring result and not reveal to third party unless required by the statutory or legal requirement.

12

12

Page 19: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

PHOTOGRAPHS OF

PROJECT SITE

ANNEXURE 4

Page 20: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

ISCON JEWEL Compliance Report of Environmental Clearance

Residential Building Construction Project at Vil. Jodhpur, Dist. Ahmedabad

Annexure 4 Photos of Project Site

Photo 1

(Barricading at site) Photo 2

(Water sprinkling to reduce fugitive emission)

Photo 3 (Road connecting to main road)

Photo 4 (Properly stored Construction material)

Photo 5

(Use of PPE during construction activity)

13

13

Page 21: COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCES · during construction phase. and around the project site during construction phase by NABL accredited Laboratory. AAQM results are attached

ISCON JEWEL

Compliance Report of Environmental Clearance Commercial Building Construction Project at Vil Jodhpur, Dist. Ahmedabad

Photo 6

(First Aid box) Photo 7

(Use of Autoclaved aerated Concrete)

14