    Completion Process

    Ricki Jannise

    Technical Advisor - Completion Tools

  • 8/10/2019 Completion Process HAL

    2/29

    2009 Halliburton. All Rights Reserved. 2

  • 8/10/2019 Completion Process HAL

    3/29

    2009 Halliburton. All Rights Reserved. 3

    Well Completion

    Defined as the design, selection

    and installation of equipment and

    the specification of treatment and

    procedures necessary to bring the

    well into production and thereafter

    to produce in a manner which

    satisfies the operators objectives

    for the field development.

    TWBPERMA-SERIES

    PACKER

    HYDRAULIC CONTROL

    LINE

    SURFACE-CONTROLLED

    TUBING-RETRIEVABLESAFETY VALVE

    SIDE

    POCKETMANDREL

    LANDING

    NIPPLE

    FLOW COUPLING

    FLOW COUPLING

    SIDE POCKET

    MANDREL

    SIDE POCKET

    MANDREL

    LO LINERHANGER

    RH HYDRAULIC-SET

    PACKER

    CIRCULATINGDEVICE

    BLAST

    JOINT

    NO-GO NIPPLE

    SLIDING SIDE-DOOR

    CIRCULATING DEVICE

  • 8/10/2019 Completion Process HAL

    4/29

    2009 Halliburton. All Rights Reserved. 4

    ( )( )( )

    Evaluating the Well

    valuating the Well

    After the drill bitAfter the drill bitreaches target depthreaches target depth

    the well must bethe well must be

    evaluated.evaluated.

    Logging WhileLogging While

    Drilling (LWD)Drilling (LWD)

    Electric WirelineElectric Wireline

    conveyedconveyed

    logginglogging

  • 8/10/2019 Completion Process HAL

    5/29

    2009 Halliburton. All Rights Reserved. 5

    Data Inputs to Formulate Design Criteria

    Reservoir

    Parameters

    Fluid

    Characteristics

    Rock

    Characteristics

    Production

    Constraints

    Well and

    Completion

    Appraisal

    Design

    Criteria

  • 8/10/2019 Completion Process HAL

    6/29

    2009 Halliburton. All Rights Reserved. 6

    Run and Cement

    un and Cement

    the Casing

    he Casing

    Zonal IsolationZonal Isolation

    Control flow from theControl flow from the

    desired formationdesired formation Run the casingRun the casing

    Completing the Well

    ompleting the Well

    A.A. Run and cementRun and cementthe casingthe casing

  • 8/10/2019 Completion Process HAL

    7/29

    2009 Halliburton. All Rights Reserved. 7

    Run and Cement

    un and Cement

    the Casing

    he Casing

    Zonal IsolationZonal Isolation

    Control flow from theControl flow from the

    desired formationdesired formation Run the casingRun the casing

    Cement the casingCement the casing

    Swell packersSwell packers

    Completing the Well

    ompleting the Well

    A.A. Run and cementRun and cementthe casingthe casing

  • 8/10/2019 Completion Process HAL

    8/29

    2009 Halliburton. All Rights Reserved. 8

    What is a Packer?

    TUBING

    SEAL

    CASING

    Tool used to form an

    annular seal between

    two concentric stringsof pipe

    OR

    Tool used to form an

    annular seal between the

    pipe and the wall of the

    open hole

  • 8/10/2019 Completion Process HAL

    9/29

    2009 Halliburton. All Rights Reserved. 9

    Completing the Well

    ompleting the Well

    A.A. Run and cement theRun and cement thecasingcasing

    B.B. Displace to completionDisplace to completion

    brinebrine

    Displace to Completion

    isplace to Completion

    rine

    rine

    Replace solids ladenReplace solids laden

    fluid with solids freefluid with solids free

    fluidfluid

    Run in the work stringRun in the work string

    Circulate out the drillingCirculate out the drilling

    mud with themud with the

    completion brinecompletion brine

    Filter the brineFilter the brine

    Pull the work stringPull the work string

  • 8/10/2019 Completion Process HAL

    10/29

    2009 Halliburton. All Rights Reserved. 10

    Completing the Well

    ompleting the Well

    A.A. Run and cement theRun and cement thecasingcasing

    B.B. Displace to completionDisplace to completion

    brinebrineC.C. Perforate the casingPerforate the casing

    Perforate the Casing

    erforate the Casing

    Provide a flow pathProvide a flow pathfrom the reservoir tofrom the reservoir to

    the well borethe well bore

    Run the packerRun the packer

  • 8/10/2019 Completion Process HAL

    11/29

    2009 Halliburton. All Rights Reserved. 11

    Completing the Well

    ompleting the Well

    A.A. Run and cement theRun and cement thecasingcasing

    B.B. Displace to completionDisplace to completion

    brinebrineC.C. Perforate the casingPerforate the casing

    Perforate the Casing

    erforate the Casing

    Provide a flow pathProvide a flow pathfrom the reservoir tofrom the reservoir to

    the well borethe well bore

    Run the packerRun the packer Run the perforatingRun the perforating

    assemblyassembly

    Fire the guns andFire the guns andstabilize the wellstabilize the well

    Pull the spent gunsPull the spent guns

  • 8/10/2019 Completion Process HAL

    12/29

    2009 Halliburton. All Rights Reserved. 12

    Perforating

    Wireline casing guns

    Through tubing wireline guns

    Tubing conveyed perforating

  • 8/10/2019 Completion Process HAL

    13/29

    2009 Halliburton. All Rights Reserved. 13

    Completing the Well

    ompleting the Well

    A.A. Run and cement theRun and cement thecasingcasing

    B.B. Displace to completionDisplace to completion

    brinebrineC.C. Perforate the casingPerforate the casing

    D.D. Install sand control?Install sand control?

    Install Sand Control

    nstall Sand Control

    Filter formation materialFilter formation materialfrom oil, gas or waterfrom oil, gas or water

    production.production.

    Run screen and packerRun screen and packerassemblyassembly

    Drop the ball and setDrop the ball and set

    the packerthe packer

  • 8/10/2019 Completion Process HAL

    14/29

    2009 Halliburton. All Rights Reserved. 14

    Completing the Well

    ompleting the Well

    A.A. Run and cement theRun and cement thecasingcasing

    B.B. Displace to completionDisplace to completion

    brinebrineC.C. Perforate the casingPerforate the casing

    D.D. Install sand control?Install sand control?

    Install Sand Control

    nstall Sand Control

    Filter formation materialFilter formation materialfrom oil, gas or waterfrom oil, gas or water

    production.production.

    Run screen and packerRun screen and packerassemblyassembly

    Drop the ball and setDrop the ball and set

    the packerthe packer

    Perform gravel packPerform gravel pack

  • 8/10/2019 Completion Process HAL

    15/29

    2009 Halliburton. All Rights Reserved. 15

    Completing the Well

    ompleting the Well

    A.A. Run and cement theRun and cement thecasingcasing

    B.B. Displace to completionDisplace to completion

    brinebrine

    C.C. Perforate the casingPerforate the casing

    D.D. Install sand control?Install sand control?

    Install Sand Control

    nstall Sand Control

    Filter formation materialFilter formation materialfrom oil, gas or waterfrom oil, gas or water

    production.production.

    Run screen and packerRun screen and packer

    assemblyassembly

    Drop the ball and setDrop the ball and set

    the packerthe packer

    Perform gravel packPerform gravel pack

    ReverseReverse--out excessout excess

  • 8/10/2019 Completion Process HAL

    16/29

    2009 Halliburton. All Rights Reserved. 16

    Completing the Well

    ompleting the Well

    A.A. Run and cement theRun and cement thecasingcasing

    B.B. Displace to completionDisplace to completion

    brinebrine

    C.C. Perforate the casingPerforate the casing

    D.D. Install sand control?Install sand control?

    Install Sand Control

    nstall Sand Control

    Filter formation materialFilter formation materialfrom oil, gas or waterfrom oil, gas or water

    production.production.

    Run screen and packerRun screen and packer

    assemblyassembly

    Drop the ball and setDrop the ball and set

    the packerthe packer

    Perform gravel packPerform gravel pack

    ReverseReverse--out excessout excess

  • 8/10/2019 Completion Process HAL

    17/29

    2009 Halliburton. All Rights Reserved. 17

    Completing the Well

    ompleting the Well

    A.A. Run and cement theRun and cement thecasingcasing

    B.B. Displace to completionDisplace to completion

    brinebrine

    C.C. Perforate the casingPerforate the casing

    D.D. Install sand control?Install sand control?

    Install Sand Control

    nstall Sand Control

    Filter formation materialFilter formation materialfrom oil, gas or waterfrom oil, gas or water

    production.production.

    Run screen and packerRun screen and packer

    assemblyassembly

    Drop the ball and setDrop the ball and set

    the packerthe packer

    Perform gravel packPerform gravel pack

    ReverseReverse--out excessout excess

    Pull out of the wellPull out of the well

  • 8/10/2019 Completion Process HAL

    18/29

    2009 Halliburton. All Rights Reserved. 18

    Completing the Well

    ompleting the Well

    A.A. Run and cement theRun and cement thecasingcasing

    B.B. Displace to completionDisplace to completion

    brinebrine

    C.C. Perforate the casingPerforate the casing

    D.D. Install sand control?Install sand control?

    E.E. Install productionInstall productionpacker and tubingpacker and tubing

    Install Production

    nstall Production

    Packer and Tubing

    acker and Tubing

    Seals and protects theSeals and protects the

    casing from erosion andcasing from erosion and

    corrosioncorrosion

    Run the production tubingRun the production tubing

    in the wellin the well

    Circulate the inhibitedCirculate the inhibited

    packer fluidpacker fluid

    Set the production packerSet the production packer

  • 8/10/2019 Completion Process HAL

    19/29

    2009 Halliburton. All Rights Reserved. 19

    What is a Packer?

    TUBING

    SEAL

    CASING

    Tool used to form an

    annular seal between

    two concentric stringsof pipe

    OR

    Tool used to form anannular seal between the

    pipe and the wall of the

    open hole

  • 8/10/2019 Completion Process HAL

    20/29

    2009 Halliburton. All Rights Reserved. 20

    Packers

    What type of packers

    are there?

    10 basic types of

    packers

    4 most common

    types

    TUBING

    SEAL

    CASING

  • 8/10/2019 Completion Process HAL

    21/29

    2009 Halliburton. All Rights Reserved. 21

    Mechanical Double Grip Packer

    Description:

    Mechanically set using combinations of

    rotation and tension or compression.

    Tubing may be left in tension,

    compression, or neutral.

    Holds pressure from above and below.

    Applications: Production, testing, treating, and

    service work.

    Limitations:

    May be difficult to operate in deep ordeviated conditions.

    Avoid exceeding safe tension rating.

    VALVE

    SLIP

    PACKING

    ELEMENT

    SLIP

  • 8/10/2019 Completion Process HAL

    22/29

    2009 Halliburton. All Rights Reserved. 22

    Hydraulic Set Packer

    Description: Tubing pressure set, shear release.

    Mechanically held, holds pressure from

    above and below. Some have counterbalance valve system.

    Applications: Deviated wellbores.

    Below hydraulic set dual packers.

    Stacked single string completions.

    Limitations:

    Consider load on release pins under allexpected operating conditions.

    With counterbalanced packers, consider

    temperature effect and compensate with

    slack-off weight.

    VALVE

    SLIP

    PACKING

    ELEMENT

    SETTING PORTHYDRAULIC

    SETTING

    CYLINDER

    SLIDING

    SLEEVE

    BLANKINGPLUG

  • 8/10/2019 Completion Process HAL

    23/29

    2009 Halliburton. All Rights Reserved. 23

    Seal Bore Packer

    Description:

    Wireline, Mechanical, or Hydraulic set.

    Permanent or retrievable. Holds pressure from above and below.

    Requires tubing seal assembly.

    Applications:

    Production, testing, treating, gravel

    packing, extreme service.

    Limitations:

    Force analysis recommended forall applications.

    STINGER

    POLISHED SEAL

    BORE

    SLIP

    PACKING

    ELEMENT

    SLIP

  • 8/10/2019 Completion Process HAL

    24/29

    2009 Halliburton. All Rights Reserved. 24

    Hydraulic Set Dual Packer

    Description:

    Tubing pressure set, shear release.

    Dual tubing strings. Holds pressure above and below.

    Applications:

    Upper packer in a multi-zone

    production completion. Generally run with hydraulic set or

    seal bore packer below.

    Limitations: Avoid severe pressure reversals.

    Force analysis recommended to

    determine combination of forces.

    SECONDARY

    STRING

    SECONDARY

    STINGER

    HYDRAULIC

    SETTING

    CHAMBER

    HYDRAULIC

    SETTING

    PORT

    PRIMARY

    STRING

    ABOVEPACKER

    SLIP

    PACKING

    ELEMENT

    SLIP

    PRIMARY

    STRING

    BELOW

    PACKER

    SINGLE

    PACKER

    (Hydraulic

    Set)

  • 8/10/2019 Completion Process HAL

    25/29

    2009 Halliburton. All Rights Reserved. 25

    Completing the Well

    ompleting the Well

    A.A. Run and cement theRun and cement thecasingcasing

    B.B. Displace to completionDisplace to completion

    brinebrine

    C.C. Perforate the casingPerforate the casing

    D.D. Install sand control?Install sand control?

    E.E. Install productionInstall productionpacker and tubingpacker and tubing

  • 8/10/2019 Completion Process HAL

    26/29

    2009 Halliburton. All Rights Reserved. 26

    What Do We Do with the Oil at the Surface?

  • 8/10/2019 Completion Process HAL

    27/29

    2009 Halliburton. All Rights Reserved. 27

    Surface Production System

    TO SALES STORAGETO SALES STORAGE

    PNEUMATICPNEUMATIC

    ACTUATORACTUATOR

    PNEUMATICPNEUMATIC

    PRESSUREPRESSURE

    TO SSVTO SSV

    SAFETYSAFETY

    CONTROLCONTROL

    PANELPANEL

    LO AND HILO AND HI

    MONITOR PILOTMONITOR PILOT

    FUSIBLEFUSIBLE

    PLUGPLUGSANDSAND

    EROSIONEROSION

    PILOTPILOT

    HYDRAULIC PRESSURE TO DHSVHYDRAULIC PRESSURE TO DHSV

    FUSIBLEFUSIBLE

    PLUGPLUGLO AND HILO AND HI

    MONITOR PILOTMONITOR PILOT

    INSTRUMENT AIRINSTRUMENT AIR

    SUPPLYSUPPLY

    LEVEL SWITCHLEVEL SWITCH

    TOTO

    SALESSALES

    LINELINE

    SEPARATORSEPARATOR

    LEVELLEVEL

    SWITCHSWITCH

    LegendLegend

    Pneumatic LinePneumatic Line

    Hydraulic LineHydraulic Line

    QUICKQUICK

    EXHAUSTEXHAUST

    HEATERHEATER

    CHRISTMASCHRISTMAS

    TREETREE

  • 8/10/2019 Completion Process HAL

    28/29

    2009 Halliburton. All Rights Reserved. 28

    Standard Three Phase Separator

    Back pressure vale

    Baffle

    Mist Extractor

    Daniels

    Turbinemeters

    Liquid level controllers

    PSV Rupture disk

    Back pressure valve

    Baffle

    Mist Extractor

    Daniels

    Turbinemeters

    Liquid level controllers

    PSV Rupture disk

  • 8/10/2019 Completion Process HAL

    29/29

    Completion Process

    Ricki Jannise

    Technical Advisor - Completion Tools

    281 988 2282 [email protected]

    QUESTIONS & ANSWERS