complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise...

28
L8543185 ENG 03/2016 rev 0 Complete kit for the automation of swinging gates Instructions and Recommendations for installation and use MADE IN ITALY BEAUTY

Upload: others

Post on 19-Jul-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

L8543185 ENG 03/2016 rev 0

Complete kit for the automation of swinging gatesInstructions and Recommendations for installation and use

MADE IN ITALY

BEAUTY

Page 2: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

2

Index

General recommendations .....................................................................3

Product description ................................................................................3

Content of the kit ....................................................................................4

Description of the automation ................................................................4

Preliminary checks .................................................................................5

Technical Data, dimensions and limits of use ........................................5

Electric connections ...............................................................................6

Tools and materials ................................................................................7

Choice of installation measurements - 1 ................................................7

Choice of installation measurements - 2 ................................................8

Adjustable brackets BTY.1 ......................................................................8

Fixing the gear motor brackets BTY.1 .....................................................9

Fixing the gear motor brackets BTY.2 ...................................................10

Regulation of mechanical opening and closing stops ..........................11

Gear motors wiring ...............................................................................11

Fixing the CP.BTY control unit ...............................................................11

Installation of the flashing light F.BY ..................................................12

Installation of photocells P.BY ...............................................................13

Installation of selector K.BY ..................................................................14

Small columns C.BY ..............................................................................15

Transmitter BY ......................................................................................15

Control unit CP.BTY connections ...........................................................16

Self-regulation of the functioning parameters (AUTO) ..........................17

Programming the CP.JMP control unit - Introduction ...........................17

Regulation of the motor thrust (PMOT) .................................................18

Regulation of the automatic closure time (TCA) ..................................18

Step-by-Step functioning mode (PP) ....................................................19

Pre-flashing functioning mode (Pre) .....................................................19

Regulation of the phase shift time when closing (TDMC) .....................19

Condominium function (IBL) .................................................................20

Selection of the opening/closure speed (Sld) .......................................20

Resetting the control unit (Res) ............................................................20

Memorising new transmitters (RADI>PP) .............................................21

Memorising pedestrian function (RADI>Ped) .......................................21

Deleting transmitters (RADI>CLR) ........................................................22

Complete deletion of the receiver memory (RADI>RTR) .......................22

Remote controls quick duplication .......................................................22

Inspection and commissioning .............................................................23

What to do if... ......................................................................................24

User guide ............................................................................................25

Dear Customer We would like to congratulate and thank you for choosing the BYOU systems.BEAUTY like all other products in the range it is the fruit of careful and accurate choice of materials and components. The result is a product that interprets and embodies captivating designs and state-of-the-art technolog.

BYOU products are covered by a warranty with duration of 2 years.BYOU is not liable for damage caused by improper use or by incorrect installation of products or components.The descriptions and illustrations in this manual may be subject to modification at any time by the manufacturer, who reserves the right to make updates to the product of a technical, con-struction or commercial type, without having to update this publication within specific times.

For any information of a technical or commercial manner, contact:

BYOU è un marchio di AUTOMATISMI BENINCÀ SpAvia Capitello, 4536066 Sandrigo (VI) ITALYTel +39 0444 1510294Fax +39 0444 [email protected]

Page 3: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

3

General recommendations

WARNING: Important safety instructions. Follow all instructions since incorrect installation can lead to severe injury.f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual carefully as it contains important advice and information for the realisation of the plant in safe conditions.Keep the various components on hand to gain confidence with them while reading this manual.Keep this manual for future use.BEAUTY is realised in a way to allow easy installation and configuration of the system, however, some phases require the presence of qualified staff.When reading this manual pay particular attention to these symbols:

Authorised technician. Indicates the phases to be performed in the pres-ence of mains voltage. The presence of qualified staff is required (electrician or authorised installer), in complete respect with the Safety Standards in force.

Attention! Potentially dangerous operations. Scrupulously respect the indications given.

Useful indication.Suggestions and recommendations for simplifying and/or improving the installation operations.

The automation of a door cannot be considered the only device for protection against intrusion.

Do not use any of the components in unsuitable environ-ments (salty, acid or potentially explosive atmosphere)

All operations that require the protection shells of the devices opened, must take place without mains power supply.

This item is not intended to be used by people (including children) with reduced physical, sensorial or mental abili-ties, or without adequate knowledge of the product, unless they are under the supervision of eligible persons or they have received instructions for use by people in charge of their security.

Check that the temperature range marked on the drive is suitable for the location.

The drive cannot be used with a driven part incorporating a wicket door (unless the drive cannot be operated with the wicket door open).

Ensure that entrapment between the driven part and the surrounding fixed parts due to the opening movement of the driven part is avoided.

After installation, ensure that the mechanism is properly adjusted and that the protection system and any manual release function correctly.

DESTINATION OF USEThis product is destined exclusively for the opening and closure of swing doors for the passage of vehicles, charac-terised by dimensional limits and weight as indicated in this manual in the “Limits of use” paragraph. No other use is allowed. BYOU is not liable for uses that are not in compliance with those indicated in these instructions.

The kit is made up from two electromechanical operators with 24V direct current motor, which allows movement of the leaves via a worm screw.The control unit commands the movement of the two motors and the functioning of the various accessories.The supplied accessories are:- 1 P.BY pair of photocells: they interrupt the movement of the leaf if there are obstacles present.- 1 F.BY flashing light: flashing light that indicates that the door is moving. - 1 K.BY key selector switch: installed externally, allows the opening and closure by means of a customised key.- 2 BY radio transmitters: remote control for opening/clos-ing the door.Other accessories available as options:- CB.BY emergency battery kit: in case of a power cut, it allows the functioning of the leaf by batteries and relative battery charger installed inside the operator.- C.BY pair of small columns for additional pair of photo-cells F.BY: to be installed within the property (see para-graph C.BY).

Product description

Page 4: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

4

Content of the kit

1 BEAUTY: Pair of electromechanical operators.

2 BTY.1: Pair of pillar fixing brackets with screws and bolts.

3 BTY.2: Pair leaf fixing brackets with screws and bolts.

4 CP.BTY: Control unit with plugs and screws.

5 K.BY: Key selector.

6 BY: Pair of 4-channel radio transmitter.

7 P.BY: Pair of photocells for wall installation 1 transmitter( “TX”) 1 receiver (“RX”)

8 BTY.3: Release keys for manual manoeuvre

9 Plugs and screws for fixing the accessories (flashing light, key selector, photocells)

10 F.BY: Flashing light with built-in aerial

Note: The content of the package may undergo variations. If in doubt, consult your local dealer.

1

Description of the automation

With reference to the list of components in fig. 1, fig. 2 shows a typical plant that can be realised using BEAUTY.

1 4

6

3 3

65

10

2 2

Fig.1

Fig.2

A

2 3

4

5

6

7 10

8

9

1

Page 5: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

5

Preliminary checks

It is indispensable to carry out several checks before starting installation:• Try and open the gate manually, the leaves must move

without effort and without points of resistance for the entire run.

• When left in any intermediate position the leaf must not move.

• The hinges and components subject to wear must be in perfect working condition. If this is not the case, replace the faulty parts.

• The door structure must be strong and the leaves rigid.• With the gate completely closed, check that the leaves are

aligned perfectly along their entire length.• The electric set-ups necessary for installation are highlighted

in the “Electric connections” paragraph. If they are not pre-existing they must be realised, with the aid of a specialised technician, if necessary (electrician).

• The pillars supporting the leaves must be suitable for fixing the gear motors.

• Beauty has adjustable mechanical stops both in opening and closing. However, a stop for closure on the ground is recommended (Fig.2-ref.A).

The reliability and safety of the automation depend on the state of the gate structure.

Check that there is enough space for installation of the operator in safe and comfortable conditions.

Technical Data, dimensions and limits of use

TECHNICAL DATA

BEAUTY

Control unit power supply 230 Vac

Motor power supply 24Vdc

Absorbed power 80 W

Maximum current absorbed 3,5 A

Maximum thrust 1500 N

Maximum frequency of use(complete opening/closure cycles)

15 cycles/hour80 cycles/day

Protection rating IP44

Functioning temperature -20°C / +70°C

Opening time (90°) 12/18 s

Run 300 mm

Noise <70 dB

Weight 4,2 kg

LIMITS OF USETable 1 indicates the maximum values in the grey area (weight by leaf length) acceptable for the BEAUTY automation

For example:200 kg and 1.55 m leafIt lies within the limits of use (black dotted line)270 kg and 1.80 m leaf: It DOES NOT lie within the limits of use (white dotted line)

2,0m1,91,81,71,61,51,41,31,2

DIMENSIONSFig.3 indicates the main overall dimensions.The measurements are expressed in millimetres.The 300 mm measurement represents the maximum run that the rod can make during movement.

715

300

min 150

60

max 150

52

105

89

Fig.3

Check, with the leaf completely open, that there is suf-ficient space for installation (Fig. 4).

Fig.4

Tab. 1

715

300

min 150

60

max 150

52

105

89

Page 6: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

6

Electric connections

The cables necessary for the installation of BEAUTY can vary according to the accessories installed. No connection cable is supplied. Fig. 5 indicates the cables for standard installation.

List of cables

Connection Type Maximum length and notes

A Mains power supply to the control unit 3x1,5mm2 30m - [1]

B Motor connection 2x1,5mm2 15m - [2]

C Photocell transmitter connection 2x0,5mm2 20m - [3]

D Photocell receiver connection 4x0,5mm2 20m - [3]

E Key selector connection for external command 4x0,5mm2 20m

F Flashing signal light connection 2x1,0mm2 10m

G Connection of the aerial built-in the flashing light RG 58 [4]

Notes

[1]

A pre-wired cable with plug is supplied that is to be used exclusively for installation tests and cannot be used for the continuous use of the automation.A qualified BYOU technician will replace it with a network connection that is in compliance with the Standards in force. An omnipolar switch should be provided with the contact opening of at least 3 mm, provided with overload protection and able to cut off the system from the mains.Means for disconnections must be incorporated in the fixed wiring in accordance with the wiring rules.

[2] It is recommended not to exceed 15 m in length. If it is indispensable to exceed this limit, increase the section of the cable.

[3]As the receiver photocell (labelled RX) requires more cables with respect to the transmitter photocell (labelled TX), it is more practical to installed the receiver on the wall nearest to the control unit, while the transmitter can be positioned on the wall furthest away.

[4]There is an aerial pre-installed in the control unit, which in most cases makes this connection superfluous. If reception is disturbed, the capacity of the receiver can be improved by connecting the aerial in the flashing light to the control unit.

As in layout Fig.5, the connections B and C must be underground: for this purpose prepare a suitable connection race-way that is sufficiently resistant for the type of use.If the other connections are not already set-up, they will be realised in a bricked-up raceway or using raceways from the outside (flexible corrugated sheath) that is in compliance with the Standards in force. If in doubt, contact staff that is specialised in the realisation of these set-ups.

The cables used must be suitable for the type of connection. For example, for connection protected by race-ways use H03VV-F cables, for cables in the outdoor environment always use the H07RN-F type.

A

E

G

F

BC

D

Fig.5

B

Page 7: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

7

Tools and materials

#6

Make sure that there are all tools and materials necessary for installation (fig.6). Also check that they are in compliance

with Standards and in perfect working order.

Use suitable individual protection devices I.P.D. (gog-gles, gloves, etc)

The length and type of connection cables depend on the accessories installed (see “Electric connections” paragraph).The fixing devices for the gear motor are not supplied as they depend on the features of the materials used for the pillars and the leaves.

Choice of installation measurements - 1

Fig.6

Fig.7

Fig. 7 represents a view from above of the automation, indicating the most important measurements for installation.R indicates the hole in bracket BTY.1 onto which the gear mo-tor is fixed and corresponds to the rotation axes of the gear motor. It is necessary to calculate the correct positioning as indicated below.

M: is a measurement on the gate and represents the distance between the gate rotation axis and gear motor fixing surface

S: a distance that can be adjusted by means of the supplied bracket BTY.1.

Y: is given by the sum of M+S.

X: depends on the opening angle requested and by the value of the Y measurement.

IMPORTANT: The values of the X and Y measure-ments must be as similar as possible (max difference 50 mm).

Values that are too different to each other do not allow regular movement of the leaves and could cause malfunctioning.

Detect the value of the measurement M precisely and state it in every box in column M in Table 1.

Calculate all values possible of the Y measurement, adding the value M to the various values of the column S, completing all boxes in column Y of table 1.

Tab. 1

S + M = Y

40 mm ......... mm ......... mm

97 mm ......... mm ......... mm

117 mm ......... mm ......... mm

121 mm ......... mm ......... mm

135 mm ......... mm ......... mm

155 mm ......... mm ......... mm

Establish the opening angle of the leaf:- Take the leaf into the completely open position.- If the angle of opening exceeds 90° find the appropriate angle using, if necessary, the goniometer printed on the last page of this manual.

Below find three tables, each referring to one of the opening an-gles possible, up to 90°, from 90° to 100°, from 100° to 110°.

Up to 90° from 90° to 100° from 100° to 110°

Y X Y X Y X

100 mm 150 mm 100 mm 140 mm 100 mm 140 mm

110 mm 150 mm 110 mm 140 mm 110 mm 130 mm

120 mm 150 mm 120 mm 140 mm 120 mm 130 mm

130 mm 140 mm 130 mm 130 mm

140 mm 140 mm 140 mm 120 mm

150 mm 130 mm 150 mm 120 mm

160 mm 120 mm

170 mm 120 mm recommended mesaurement

Depending on the values calculated in the Y column of Table 1, select the pairs of measurements Y and X as similar as possible in the table with the requested opening angle.

Make note of the measurement S corresponding to measure-ment Y thus obtained. This value is indispensable for the correct regulation of the bracket BTY.1, described in the “Fixing the gear motor brackets BTY.1” paragraph.

Page 8: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

8

Fig.8

Choice of installation measurements - 2

As an example, let’s suppose that the measurement M detected on the leaf is 35 mm.The value 35 is inserted in the column M and table 1 is com-pleted, calculating the different values Y:

Tab. 1

S + M = Y

40 mm 35 mm 75 mm

97 mm 35 mm 132 mm

117 mm 35 mm 152 mm

121 mm 35 mm 156 mm

135 mm 35 mm 170 mm

155 mm 35 mm 190 mm

We therefore find the opening angle of the leaf. Let’s suppose that the angle detected is 95°, the reference table is that for the angles from 90° to 100°.

from 90° to 100°

Y X

100 mm 140 mm

110 mm 140 mm

120 mm 140 mm

130 mm 130 mm

140 mm 120 mm

150 mm 120 mm

Among the values recommended in this table, note that the Y:130 measurement is the nearest to the measurement of 132 mm in table 1.Our installation measurements are:

Y X S

130 mm 130 mm 97 mm

Make note of these values for positioning of the brackets BTY.1

Adjustable brackets BTY.1

Using the adjustable brackets BTY.1 it is possible to install the BEAUTY gear reducer with different installation measurements, without having to make cuts and perform welding.There are two holes in the bracket, both used to fix the gear motor.Figure 8 shows the main positions with relative measurements, both for hole A and for hole B.

Select the position that corresponds to position “S” calcu-lated in Table 1 of the “Choice of installation measurements” paragraph.The positions 1 and 2 do not modify the value of the X meas-urement, the fixing gear motor hole corresponds to the central axis of the bracket.The positions from 3 to 8 change the value of the X measure-ment.

With reference to the previously described example, the meas-urement S of 97 mm requires the position 6.Note that in this position the measurement X is modified.It will be necessary to add 72 mm to the measurement X pre-viously calculated in order to have the new bracket-fixing axis.

AB

Page 9: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

9

Fixing the gear motor brackets BTY.1

The screws for wall fixing are not supplied, they are selected on the basis of the features of the materials used for the pillars and leaves.

Assemble the fixing brackets BTY.1 (fig.1-ref.2).Figure 8 illustrates an example of fixing position 1:

75

75

X

37,537,5

42

P

H

Before fixing the brackets it is important to determine their height from the ground and, consequently, the height of the motor.1) The measurement H (Fig.10) must be greater than 350 mm. Installation too near to the ground can cause malfunctioning due to humidity, dirt, snow, which infiltrate inside the gear motor.

BTY.1

It is important to consider the correspondence between the height established and the presence of gate support structures:

Fig.9

Fig.10

Fig.11

CF

V

DR

Fig.12

2) The electrical set-up must preferably be under the fixing bracket (fig. 10 - ref.P).Identify measurement X on the pillar, mark 4 holes for fixing the plate BTY.1 with the measurements indicated in figure 10.

Attention: some positions of the bracket BTY.1 require a correc-tion of the measurement X as indicated in Figure 8

Fix the bracket using the plugs and screws that are suitable for the type of material (fig. 11).

Apply the gear motor to the bracket (fig.12):- Loosen screw F and then remove the sump C- Insert the washer R placing it on the bracket - Insert the gear motor- Block the gear motor via the screw V and nut D.

Page 10: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

10

Fixing the gear motor brackets BTY.2

The BEAUTY gear motors supplied with the retracted pin of about 1 cm with respect to the end run stroke (fig. 13).

BTY.2

This is the correct position of the pin for fixing the bracket BTY.2 onto the leaf. Proceed as follows:- Assemble the bracket BTY.2 as indicated in figure 14

- Apply the bracket BTY.2 to the gear motor pin, blocking it with screw V, positioning the washers R1 and R2 as indicated in figure 15.The smooth washer R1, must be positioned above the grooved washer R2.

With the leaf in the completely closed position, take the gear motor with the bracket to rest on the leaf (fig.16):

10 mm

Use a spirit level to check that the gear motor is perfectly horizontal and then mark the two points for drilling the leaf (fig. 17).

V

R2

R1

Also in this case the fixing devices will be selected on the basis of the material with which the leaf is made. Self-threading screws are used in the example in figure 18.

Release the gear motor by turning the circular cover by 180° (fig. 19) and then insert the release key and turn it 90°.

The gear motor is now released and the leaf can be opened and closed manually.Use several complete manoeuvres to check that the fork slides regularly along the entire run.

Check that during movement the gear motor does not collide with the pillar or the leaf. In this case check the positions of the adjustable brackets. In some cases it may be necessary to mount the bracket BTY.2 in a way to move the gear motor away from the leaf (fig.20).

Fig.13

Fig.14

Fig.15

Fig.16

Fig.17

Fig.18

Fig.19

Fig.20

Page 11: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

11

Regulation of opening and closure mechanical stops

There are two adjustable mechanical stops on the bottom of the gear motor, one to stop the opening leaf (fig.20 -ref A), one to stop the closing leaf (fig.20 -ref C).With the leaf released, take the leaf into the completely closed position.Use a 6 mm hex wrench to loosen the mechanical stop C and take it to rest at the pin.Take the leaf to the desired opening position.Loosen the mechanical stop A and take it to rest at the pin.

Using several manual opening and closure manoeuvres, check that the leaf stop point is correct.

Fig. 20C

A

Gear motors wiring

The connection cable to the control unit must have a sufficient curve to follow the movement of the gear motor during the manoeuvre (fig.21 - ref. A).Loosen the fairlead P, insert the cable through the gear motor and then block the fairlead

Make the connections on the clamp as indicated in Fig.22, respecting the connections indicated in the “Electric connec-tions” paragraph.

Fig. 21

P

A

Fixing the CP.BTY control unit

With reference to the “Electric connections” chapter - Fig.5, select the most suitable position for fixing the control unit, in proximity of the gate in a way to reduce the length of the cables and in a position protected from any accidental blows.

Remove the 4 screws A (fig.23) and then remove cover BThere are 4 set-ups (C) present on the base of the control unit container, which must be broken using a screwdriver.Place the base on the wall and mark the 4 drilling points.Make the 4 holes and insert the 4 plugs (E), fix the control unit with the 4 screws D. Plugs and screws are supplied.

There is a seat (F) on the base of the container for the passage of the connection cables. This must be opened using a screw-driver in order to fix a fitting for the corrugated pipe.The control unit has a pre-wired mains power supply cable that can only be used for installation tests, using an exten-sion for example. A qualified BYOU technician will replace it with a network connection that is in compliance with the Standards in force.

Fig. 22

A

C

B

DFig. 23

E

F

Page 12: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

12

Installation of the flashing light F.BY

DescriptionFlashing light signalling that the gate is in movement for auto-matic doors and gates. It has a built-in aerial for the reception of radio transmitters.InstallationChoose the position of the flashing light so that it is proximity of the gate and easily visible.

The flashing light can be fixed onto a horizontal or vertical surface. In the case of vertical installation the protection rating is reduced to X4.

A

Loosen the two screws V and then remove the transparent cover. ANT

SHIELD

ANT

SHIELD

ANT

SHIELD

V

V

H

Remove the electronic circuit, pulling the two plastic tabs H outwards, thus releasing the board.

ANT

SHIELD

Two 6 mm plugs and relative screws are supplied for fixing the flashing light.Make two holes with diameter of 6 mm.Insert the cable and fix the base using the plugs and screws.

ANT

SHIELD

Connections

ANT

SHIELD

Connect the 24V flashing light output of the control unit to the terminal board M1 (see main connection layout).Connect the aerial cable RG58 to the terminal board M2 (if requested). The external shield must be connected to the

B C

Trace the drilling points using the base as a reference. The central hole must correspond to the passage of the cables.

ANT

SHIELD

SHIELD clamp. The signal cable must be connected to the ANT clamp.Put the board back into the relevant sear and then close the

flashing light.

TECHNICAL DATA Flashing light F.BY

Power supply 24Vac Flashing light outputof the BYOU control units

Bulb E14/24Vac/dc

Absorption 600 mA

Functioning temperature -20°C / +70°C

Protection rating IP44

Dimensions 145x65x128 (mm)

Page 13: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

13

40÷60 cm

DescriptionPair of photocells for detection of obstacles for automations for doors and gates.

The pair is made up of a transmitter (labelled TX) that sends and infrared ray towards the receiver (labelled RX). The receiver has an output with NC contact (normally closed). The interruption of the ray causes the contact to open, the control unit detects the receiver switch-over and interrupts the movement according to the settings selected.InstallationOpen the photocells by using a screwdriver as a lever in the slot

The difference between the receiver and the transmitter is evi-dent from the number of clamps present on the boards:4 clamps for the receiver (RX)2 clamps for the transmitter (TX)

The two photocells must be fixed on the outside and as near as possible to the gate:

Trace the drilling holes using the pho-tocell base as a reference. The hole in proximity of the terminal board must correspond to the passage of the cables.Four 6 mm plugs and relative screws are supplied for fixing the photocells.

Make two holes with diam-eter of 6 mm in a way that the hole in proximity of the terminal board corresponds to the set-up of the cables.Insert the cable and fix the base of the photocell to the wall using the plugs and screws.

ConnectionsConnect the TX and RX to the control unit as per the main con-nection layout.TX only requires power supply from the 24V output of the control unit, respect the polarities (+/-).RX requires 24V power supply (respect the polarities +/-) and the connection of the NC contact at the PHOT C input.

(TX)(RX)

Installation of photocells P.BY

(RX)(TX)

Make the connections and re-position the covers checking that the cover with the lens (RX - 4 clamps) is applied to the receiver. The lens can be recognised by the concentric circles that are visible in transparency.

4 2

At a height of 40÷60 cm from the ground:

(RX)(TX)

TECHNICAL DATA P.BY photocells

Power supply 24Vac/dc

Capacity(in optimal conditions)

about 20 metres

Absorption 15mA(TX) - 20mA(RX)

Functioning temperature -20°C / +70°C

Protection rating IP44

Dimensions 90x35x31 (mm)

Page 14: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

14

Installation of selector K.BY

DescriptionKey selector with control of automations for automatic gates and doors.Wall fixing, customised key.The customised key also has a burglar-resistance function as it is indispensable for opening the selector.

InstallationSelect the position of the selector in a way that it is in proximity to the gate, at a height of about 80/100 cm.To open the selector, remove the screw V, insert the key, turn it in one of the two directions and hold it in this position, lift the selector cover, which separates from the fixed base. Keep the screw V, which is indispensable for closing the selector.Two 6 mm plugs and relative screws are supplied for fixing the selector base to the wall.

V

Using the support as a reference, mark and make two holes with diameter of 6 mm in a way that the lower hole corresponds to the set-up of the cables.Insert the cable and fix the base to the wall using the plugs and screws.

ConnectionsA terminal board is installed on the selector for the connection to the Step-by-Step input (PP) of the control unit:No polarity (+/-) has to be respected.

To close the selector, turn the key and hold it in this position, insert the selector into the base fixed to the wall.Release the key and fix the screw V.

TECHNICAL DATA F.BY selector

Contacts 1 micro switch, with spring for return to central position

Functioning temperature -20°C / +70°C

Protection rating IP44

Dimensions 72x90x46 (mm)

V

Page 15: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

15

Small columns C.BY

PHOT C

PHOT

Photocells on small columnThe article C.BY is available as an optional accessory, a pair of small columns measuring 50 cm. for the installation of two additional photocells P.BY. They must be positioned inside the property to protect the movement area of the leaves.

Two distinct connections are envisioned in the control unit that are to be used according to the position of the photocell:PHOT C: The photocell is only active in the closure phase. PHOT: The photocell is active in opening and closure.

This functioning mode allows the vehicle to enter even if the leaf is not completely open, as long as the manoeuvre area is free from obstacles.

C.BY

DescriptionRadio transmitter for the long distance commands for BYOU automations. FunctioningThe transmitter has three buttons through which it is possible to command the various functions of the automation, configurable in the control unit.Replacing the batteryWhen the signal LED starts to flash it means that the battery is starting to go flat and must be replaced.

Use a small screwdriver as a lever in the zone indicated, in a way to open the transmitter.Replace the new battery by inserting it with the positive pole upwards, as indicated in the figure.

IMPORTANT: Do not touch the batteries. Use rubber gloves.

Transmitter BY

The batteries contain pollutants, do not throw them in the normal waste but dispose of the as special waste according to the Standards in force.

Close the transmitter.

TECHNICAL DATA Transmitter BY

Code Rolling-code

Frequency 433,92 MHz

Functioning temperature -20°C / +70°C

Dimensions 68x33x16 (mm)

Page 16: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

16

Control unit CP.BTY connections

Fig.24

3

52

SH

HIE

LD

AN

T

P.BY

K.BY

RX

PH

OT

PH

OT

C

ST

OP

PP

24V

-+

4

1

BLIN

K

MO

T1

MO

T2

ANT

SHIELD

F.BY

TX

DESCRIPTION OF THE TERMINAL BOARDSCLAMP COLOUR DESCRIPTION

PHOT GREENNC contact input from the RX photocell installed on the pillar. The two clamps are connected to each other by a wire (ref. “A”). Remove this wire only if the photocell is connected.

PHOT C GREENNC contact input from the RX photocell installed inside the small column (optional).The two clamps are connected to each other by a wire (ref. “A”). Remove this wire only if the photocell is connected.

STOP BLACKSTOP input NC contact for auxiliary “STOP” command (optional). The two clamps are connected to each other by a wire (ref. “A”). Remove this wire only if a device is connected to this input.

PP WHITEStep-by Step’ command input from the key selector. At every impulse sent from the selector a sequence of commands, which can be configured using the PP function, is performed cyclically.

24V YELLOW24V output for photocells power supply. Respect the polarities + and - in the connections (ref “B”).

BLINK RED 24 Vdc flashing light connection output MOT1 ORANGE Motor 1 connection output respect red and blue (ref. “C”)MOT2 ORANGE Motor 2 connection output respect red and blue (ref. “C”)

SHIELD/ANT BLUEConnection of the aerial built-in the flashing light.When connecting the RG58 cable, the external shield must be connected to the SHIELD clamp.

3

52

SH

HIE

LD

AN

T

P.BY

K.BY

RX

PH

OT

PH

OT

C

ST

OP

PP

24V

-+

4

1

BLIN

K

MO

T1

MO

T2

ANT

SHIELD

F.BY

TX

BLUE REDP

A

B

M1 M2

C

Except for the mains connection cable, all electric connections have a voltage of 24V and can also be performed by unquali-fied staff.KEY:1 Line protection fuse 2 Accessories protection fuse3 “PGM” programming button4 Programming button “5”5 LCD

Connect all accessories making reference to the layout in figure 24 and to the “Electric connections” paragraph, for that con-

cerning the types of cable.To make connection easier, the accessory clamps have colours that correspond to those of the control unit.

If the leaves have a profile similar to that highlighted in detail P in figure 24, consider that the opening movement always starts with motor 1, while the closure movement always starts with motor 2. The time that passes in between can be regulated using the parameter TDMC (see “Regulation of the phase shift time between the leaves”).

Page 17: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

17

Self-regulation of the functioning parameters (AUTO)

The first and most important function to program is the self-regulation of the parameters, which allows the control unit to auto-matically set the end run points, the torque applied to the leaf and the slowing phases*.

During the autoset operations, the control unit automatically performs several opening and closure manoeuvres.Before proceeding, check that no person, animal or obstacle is or can be in the door manoeuvre area.

Proceed as follows:1- Apply mains power supply to the automation via the pre-wired socket, using an extension if necessary.2- Release the leaves, take them manually to about half of the run and block them again.3- Start the autoset phase as described below. As soon as the first manoeuvre starts, carefully check that:a) both leaves must move in the closure direction. If this is not the case, press “5” and “PGM” at the same time to interrupt the autoset. The display shows the ERR message. Invert the M+/M- wires of the motor/s that moved in the opening direction.b) the first motor to perform closure must be that connected to clamp M2. If this is not the case, invert the connections of mo-tors M1 and M2.

1 Apply mains power supply by connecting the plug

2 Press the button [PGM] to access programming. PGM

3 The display shows AUTO, select Auto by pressing the [PGM] button. AUTO

4AUTO starts to flash slowly. Press and hold the [PGM] key, after 5 seconds AUTO starts to flash quickly, release the key only when the display shows the PRG message.

5The self-regulation phase starts, the display shows PRG. The control unit commands different open-ing and closing manoeuvres at various speeds.At the end of the manoeuvre the display shows “OK”

PRG

6 To go back to the programming menu, press the [PGM] and [5] buttons at the same time. To exit programming, remove the power supply or wait for 60 seconds. PGM+5

* The slowing phase envisions that the last phase of manoeuvre, both opening and closure, are performed at a slower speed, thus allowing a silent manoeuvre.

The intervention of the photocells or any other command from the transmitter or key selector, interrupts the autoset phase, displaying the message ERR1/2/3. The procedure must therefore be repeated.Every self-regulation procedure overwrites the previous one.

Perform an autostop procedure after every maintenance intervention or modification of the door.

Programming of the control unit allows the regulation of all parameters indispensable for the correct functioning of the automation.

Programming takes place by means of a series of menus that can be selected from the LCD. A function corresponds to every menu, which will be described successively.

PGMThe “PGM” button allows to enter programming, select the pre-selected menu and confirm the value selected.

5 The “5” button allows to scroll the various items in the menu and the values to be set cyclically.

PGM+5By pressing “5” and “PGM” at the same time, return to the upper level of the menu or, if already at the first level, exit programming.

Programming the CP.JMP control unit - Introduction

LCD

PGM

With the display off, the “5” button performs a Step-by-Step command. This function can be useful during the programming and inspection phases.

Page 18: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

18

Regulation of the motor thrust (PMOT)

The force applied is normally set automatically by the control unit during the self-regulation phase (AUTO).This menu can be used to modify that set by the control unit, to make up for a friction point for example.

1Press the [PGM] button to access programming or if the control unit is already in the programming menu, press [5] until the PMOT function is displayed.

PMOT

pmotPMOTPMOT

2

Press the [PGM] button to enter the PMOT regulation. The display shows the current value of the PMOT parameter. Use the [5] key to select one of these values:1 low motors torque2 medium/low motors torque (default setting)3 medium/high motors torque4 high motors torque

0001

0004

3 Confirm the desired value using the [PGM] key, the display shows PRG. PRG

4 To go back to the programming menu, press the [PGM] and [5] buttons at the same time. To exit programming, remove the power supply or wait for 60 seconds. PGM+5

Regulation of the automatic closure time (TCA)

The automatic closure function allows to set a time, which, on expiry, if the leaf is in the open position the control unit autono-mously commands a closure manoeuvre. With this function active, if you forget to give the closure command or in the case of simultaneous commands, the control unit closes the leaf after the set time.The factory setting envisions 30 seconds before automatic closure.

1Press the [PGM] button to access programming or if the control unit is already in the programming menu, press [5] until the TCA function is displayed. TCA

2

Press the [PGM] button to enter the TCA parameter regulation. The display shows the current value of the TCA parameter. Use the [5] key to select one of these values:0 The TCA function is deactivated.1 The pause time is set at 10 seconds2 The pause time is set at 30 seconds (default setting)3 The pause time is set at 60 seconds4 The pause time is set at 90 seconds

0000

0004

3 Confirm the desired value using the [PGM] key, the display shows PRG. PRG

4 To go back to the programming menu, press the [PGM] and [5] buttons at the same time. To exit programming, remove the power supply or wait for 60 seconds. PGM+5

Page 19: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

19

Regulation of the phase shift time when closing (TDMC)

In gates that have a profile (figure 24 - part.A), a phase shift time must be set between movements in order to prevent contact between the leaves. In the opening phase, the motor connected to clamp M1 always starts 3 seconds before the motor connected to clamp M2.In the closure phase, the motor connected to clamp M2 starts before the motor connected to clamp M1. This phase shifting can be regulated by the parameter TDMC

1Press the [PGM] button to access programming or if the control unit is already in the programming menu, press [5] until the TDMC function is displayed.

PMOT

Tdmc

2

Press the [PGM] button to enter the TDMC regulation. The display shows the current value of the TDMC parameter.Use the [5] key to select one of these values:0 No phase shifting1 Phase shifting of 5 seconds (default)2 Phase shifting of 10 seconds3 Phase shifting of 15 seconds4 Phase shifting of 20 seconds

0001

0004

3 Confirm the desired value using the [PGM] key, the display shows PRG. PRG

4 To go back to the programming menu, press the [PGM] and [5] buttons at the same time. To exit programming, remove the power supply or wait for 60 seconds. PGM+5

Step-by-Step functioning mode (PP)

It is possible to select two different modes of the Step-by Step command sent from the transmitter or the key selector.Every time the button is pressed in the default mode, the following progression of commands is performed cyclically:OPEN>STOP>CLOSE>STOP>OPEN> and so on.The sequence can be modified by eliminating the intermediate STOP commands: OPEN>CLOSE>OPEN> and so on.

1Press the [PGM] button to access programming or if the control unit is already in the programming menu, press [5] until the PP function is displayed.

PMOT

PP

2

Press the [PGM] button to enter the PP regulation. The display shows the current value of the PP parameter. Use the [5] key to select one of these values:ON OPEN>CLOSE>OPEN functioningOFF OPEN>STOP>CLOSE>STOP>OPEN> functioning (default)

on

off

3 Confirm the desired value using the [PGM] key, the display shows PRG. PRG

4 To go back to the programming menu, press the [PGM] and [5] buttons at the same time. To exit programming, remove the power supply or wait for 60 seconds. PGM+5

Pre-flashing functioning mode (Pre)

An imminent manoeuvre warning mode can be set through the pre-flashing function.Once activated, the flashing light switches on 3 seconds before the door starts to move.

1Press the [PGM] button to access programming or if the control unit is already in the programming menu, press [5] until the Pre function is displayed.

PMOT

Pre

2

Press the [PGM] button to enter the Pre regulation. The display shows the current value of the Pre parameter. Use the [5] key to select one of these values:ON pre-flashing activatedOFF pre-flashing deactivated (default)

on

off

3 Confirm the desired value using the [PGM] key, the display shows PRG. PRG

4 To go back to the programming menu, press the [PGM] and [5] buttons at the same time. To exit programming, remove the power supply or wait for 60 seconds. PGM+5

Page 20: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

20

Resetting the control unit (Res)

This function annuls all settings made, taking the control unit back to the initial conditions.It also deletes the settings of the autostart procedure.NOTE: Any remote controls memorised in the radio receiver are not deleted.

1Press the [PGM] button to access programming or if the control unit is already in the programming menu, press [5] until the Res function is displayed.

PMOT

RES

2 Press and hold [PGM], the RES message starts to flash quickly.

3Release the [PGM] button when the PRG message is displayed. The control unit is now taken to factory values. PRG

4 To go back to the programming menu, press the [PGM] and [5] buttons at the same time. To exit programming, remove the power supply or wait for 60 seconds. PGM+5

Selection of the opening/closure speed (Sld)

If the leaves are particularly heavy, this function can be used to reduce the movement speed.

1Press the [PGM] button to access programming or if the control unit is already in the programming menu, press [5] until the Sld function is displayed.

PMOT

Sld

2

Press the [PGM] button to enter the Sld regulation. The display shows the current value of the Sld parameter. Use the [5] key to select one of these values:ON reduced speedsOFF standard speed (default)

on

off

3 Confirm the desired value using the [PGM] key, the display shows PRG. PRG

4 To go back to the programming menu, press the [PGM] and [5] buttons at the same time. To exit programming, remove the power supply or wait for 60 seconds. PGM+5

Condominium function (IBL)

If used in condominiums, it may be preferable that further commands given during the opening phase are ignored.This function can result useful if many users are involved, in a way to prevent several opening commands, given at the same time, causing the movement to stop.

1Press the [PGM] button to access programming or if the control unit is already in the programming menu, press [5] until the IBL function is displayed.

PMOT

IBL

2

Press the [PGM] button to enter the IBL regulation. The display shows the current value of the IBL parameter. Use the [5] key to select one of these values:ON IBL mode activatedOFF IBL mode deactivated (default)

on

off

3 Confirm the desired value using the [PGM] key, the display shows PRG. PRG

4 To go back to the programming menu, press the [PGM] and [5] buttons at the same time. To exit programming, remove the power supply or wait for 60 seconds. PGM+5

Page 21: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

21

Memorising pedestrian function (RADI>Ped)

The pedestrian function can be associated to any transmitter button. The pedestrian function envisions the opening of just one leaf connected to clamp M1, proceed as follows:

1Press the [PGM] button to access programming or if the control unit is already in the programming menu, press [5] until the Radi menu is displayed.

PMOT

Radi

2Press the [PGM] button to enter the Radi function. The display shows the first sub-menu PP. Press [5] to display the Ped sub-menu

Ped

3Press the [PGM] button to enter the Ped function. The display shows the flashing PUSH message. Push

4Press the BY transmitter button that is to be associated to the Pedestrian function within 5 seconds (e.g. if key 1 has already been associated to the Step-by-Step function, key T2 can be associated to the Pedestrian function).

5 The display shows OK to confirm memorisation. Ok

6To go back to the PP programming menu, press the [PGM] and [5] buttons at the same time.Press the [PGM] and [5] buttons twice at the same time to go back to the main Radi menu.To exit programming, remove the power supply or wait for 60 seconds.

PGM+5

Memorising new transmitters (RADI>PP)

To memorise new transmitters with Step-by-Step function for the automation command, proceed as follows:

1Press the [PGM] button to access programming or if the control unit is already in the programming menu, press [5] until the Radi menu is displayed.

PMOT

Radi

2Press the [PGM] button to enter the Radi function. The display shows the first sub-menu PP.

PP

3Press the [PGM] button to enter the PP function. The display shows the flashing PUSH message. Push

4Press the BY transmitter button that is to be associated to the Step-by-Step function within 5 sec-onds. PRG

5 The display shows OK to confirm memorisation. Ok

6To go back to the PP programming menu, press the [PGM] and [5] buttons at the same time.Press the [PGM] and [5] buttons twice at the same time to go back to the main Radi menu.To exit programming, remove the power supply or wait for 60 seconds.

PGM+5

Page 22: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

22

Remote controls quick duplication

If you have a transmitter that is already memorised, it can be duplicated without accessing the control unit for programming, proceed as follows:

1With remote control that is already memorised, give an opening command and wait for the leaf to be in the completely open position.

PMOT

2Press all three transmitter keys, already memorised, at the same time until the flashing light switches on.

TX1

3Press the button of the remote control that is already memorised that is to be copied into the new transmitter. The flashing light switches off for 5 seconds. PRGTX1

4When the flashing light switches back on, press the button of the new transmitter that is to assume the function of the button selected in point 3. PRGTX2

5If a new transmitter is to be duplicated, repeat the procedure from point 2. Wait 60 seconds to exit the programming procedure.

Complete deletion of the receiver memory (RADI>RTR)

To delete the memory completely, eliminating all previously-inserted remote controls, proceed as follows:

1Press the [PGM] button to access programming or if the control unit is already in the programming menu, press [5] until the Radi menu is displayed.

PMOT

Radi

2Press the [PGM] button to enter the Radi function. The display shows the first sub-menu PP. Press [5] three times to display the RTR sub-menu

rtr

3Press the [PGM] button to enter the RTR function. Press and hold [PGM], the RTR message starts to flash quickly.

4When the RTR message switches off, release the [PGM] button, the display shows the PRG mes-sage. All remote controls are now deleted from the memory. PRG

6To go back to the PP programming menu, press the [PGM] and [5] buttons at the same time.Press the [PGM] and [5] buttons twice at the same time to go back to the main Radi menu.To exit programming, remove the power supply or wait for 60 seconds.

PGM+5

Deleting transmitters (RADI>CLR)

If you have a transmitter that is already memorised, it can be duplicated without accessing the control unit for programming, proceed as follows:

1Press the [PGM] button to access programming or if the control unit is already in the programming menu, press [5] until the Radi menu is displayed.

PMOT

Radi

2Press the [PGM] button to enter the Radi function. The display shows the first sub-menu PP. Press [5] twice to display the CLR sub-menu

Clr

3Press the [PGM] button to enter the CLR function. The display shows the flashing PUSH. Push

4 Press any transmitter button BY that is to be deleted within 10 s. PRG

5 The display shows OK to confirm cancellation. OK

6To go back to the PP programming menu, press the [PGM] and [5] buttons at the same time.Press the [PGM] and [5] buttons twice at the same time to go back to the main Radi menu.To exit programming, remove the power supply or wait for 60 seconds.

PGM+5

Page 23: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

23

Inspection and commissioning

ALL OPERATIONS DESCRIBED IN THIS PARAGRAPH ARE EXCLUSIVE COMPETENCE OF AUTHORISED BYOU STAFF, IN COMPLIANCE WITH THAT ENVISIONED IN THIS MANUAL AND THE STANDARDS IN FORCE.

The respect for the indications given below is indispensable to guarantee the maximum safety of the automation.

The BYOU authorised technician must perform all tests envisioned by the Law, Standards and Regulations in force depending on the risks present, particularly respecting all requisites of the EN 12445 Standard, which establishes the test methods for gate automations.

INSPECTION

1 Check that the model selected is suitable for the type of appli-cation and that all automation components have been installed correctly, with respect to the indications in this manual.

2 Test opening and closure and control that the movement of the leaf is regular without friction points.

3 Check that all electric connections are made correctly and with cables that are in compliance with the Standards.

4 Check the correct functioning of photocells, transmitters, key selectors, manual release devices.

5 For the photocells, check that on the passage of a cylinder with diameter of 5 cm and length of 30 cm the switch-over takes place on the optical axis with the consequent movement stop. The photocells must intervene when passing the cylinder in proximity of the TX, in proximity of the RX and in the centre.

6 Take the measurement of the force of impact according to that indicated by the EN 12445 Standard, intervening, if necessary on the “Regulation of the motor thrust (PMOT) paragraph.

7 Replace the temporary power supply cable with a mains con-nection that is in compliance with the Standards in force and the type of installation.

COMMISSIONING

Commissioning of the automation can only be performed if all of the previously-described inspection phases have had a positive result.

1 Apply the warning plate, supplied with the automation, to the gate in a well-visible position.

2 Apply a plate to the gate that contains the following data: Type of automation, name and address of the person in charge of commissioning (manufacturer), serial number, year of manu-facture and CE mark.

3 Realise the technical file as per indications of the EN 12445 Standard, attaching the entire drawing (e.g. figure 2, electric wiring diagrams (e.g. figure 5), risk analysis and solutions adopted, declaration of conformity of the manufacturer of the devices used (included in this manual).

4 Fill in and supply the owner of the automation with the dec-laration of conformity.

5 Realise and supply the owner with the “user guide” for the automation, also using the user guide present in this manual.

6 Realise and supply the owner of the automation with the periodical maintenance plan.7 Do not start the automation before having informed the owner completely regarding the dangers and risks deriving from incorrect use of the automation.

Safety devices

IMPORTANT!READ CAREFULLY!

In order to comply with regulations EN 12445 the installation of resistive edges is compulsory.It will be duty of the technician responsible for the installation making a risk analysis and decide where and when install the resistive edge.

BYOU can provide all the devices necessary for your instal-lation and relative accessories , contact your trusted supplier for any further information.

On the picture below an example of application on the primary closing edges.

Page 24: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

24

What to do if...

Below find the most common functioning problems and the relative solutions. :

Problem Cause Solution

The automation does not work

There is no mains power supply--------------------------------------------------The control unit is not connected--------------------------------------------------The photocells are engaged--------------------------------------------------One or more protection fuses have inter-vened

Check for the presence of mains power supply--------------------------------------------------Check all connections to the control unit--------------------------------------------------Check that there is no obstacle between the photocells--------------------------------------------------Check the integrity of the fuses and replace them if necessary.

The automation does not work using the remote control.

The remote control battery is flat, the remote control LED flashes quickly--------------------------------------------------the remote control has not been memorised

Replace the remote control batteries--------------------------------------------------Memorise the remote control.

The automation does not work using the key selector

The selector is not connected correctly or is faulty.

Check the key selector connections or re-place them is faulty

The gate stops in the opening or closure phase, inverts the movement for a few sec-onds and then stops.

The obstacle detection sensor has inter-vened

If no obstacles are present, release the motor and check for the presence of friction points. Perform a new self-learning.Increase the value of the PMOT parameter

The door does not close

STOP input active.--------------------------------------------------Obstacle between the photocells or photo-cells broken

Check the connections of the STOP input--------------------------------------------------Remove the obstacle or check the photo-cells

The flashing light does not switch onThe bulb has blown--------------------------------------------------The flashing light is not connected correctly

Replace the bulb--------------------------------------------------Check the connections.

The control unit LCD displays several messages during normal functioning and in the case of breakdown:

Message Description

ERR Stop the autoset phase by pressing the [PGM] and [5]buttons at the same time,

ERR1 Motor error. Check the motor connections or broken motor

ERR2 Photocell error. Check the photocell connections or broken photocells.

ERR3 PP input activation error during the autoset phase

ERR4 STOP input activation error during the autoset phase

STOP STOP input active

PHTO “PHOT” photocell input active

PHTc “PHOT C” photocell input active

OPEN Start of opening manoeuvre

Close Start of closure manoeuvre

alt Stop the manoeuvre by means of the PP command.

BATTThe automation is functioning with the buffer battery in the absence of mains power supply (only with CB.BY ac-cessory installed).

Page 25: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

25

User guide

SAFETY STANDARDSDo not stand in the movement area of the door.Do not allow children to play with the commands or in proximity of the leaves.In the case of functioning anomalies do not at-tempt to repair the fault but contact a BYOU specialised technician.

MAINTENANCE• Periodically check the efficiency of the manual emergency

release.• The actuator does not require routine maintenance, however it

is necessary to periodically check the safety devices and the other parts of the plant that could create dangers following wear.

DISPOSALWhenever the product is put out of service, the legislative provisions in force must be followed regarding differentiated disposal and re-cycling of the various components (metals, plastics, electric cables, etc.). It is advised to contact a BYOU specialised technician or a specialised company that is enabled for this purpose.

KEEP THIS GUIDE AND MAKE IT AVAILABLE TO ALL USERS OF THE AUTOMATION

MANUAL MOVEMENT FROM INSIDEIn the case of functioning anomalies or power cuts, the automa-tion can be released and the door moved manually, proceed as follows:1) Turn the circular cover by 180°, in a way to view the trian-gular pin.

2) Insert the BTY.3 release key and turn by 90°The door is no longer restricted by the automation and can be opened and closed manually.

To go back to automatic functioning mode, put the release key back in the initial position, remove it and put the circular cover back in its initial position.

Page 26: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

26

CE declaration of conformity for machines(Directive 89/392 CE, Attachment II, part B) - Do not put into service

The undersigned Luigi Benincà in quality of the legal representative, declares that the product:

Manufacturer: AUTOMATISMI BENINCA' SpA

Address: Via Capitello 45 36066 Sandrigo (Vicenza) - ITALIA

Description Electromechanical automation with control unit for swinging gates

Model: BEAUTY

Accessories: CP.BTY, BY, F.BY, P.BY, K.BY

conforms with the requirements of the following EU Directives:

• DIRECTIVE 2004/108/CE OF THE EUROPEAN PARLIAMENT AND COUNCIL, 15 December 2004, in relation to the harmonisation of the legislation of member states regarding electromagnetic compatibility , in abrogation of Directive 89/336/CEE, per the following harmonised standards:EN 61000-6-2:2005, EN 61000-6-3:2007.

• DIRECTIVE 2006/95/CE OF THE EUROPEAN PARLIAMENT AND COUNCIL, 12 December 2006, in relation to the harmonisation of the legislation of member states regarding electrical material intended to be used within certain voltage ranges, per the following harmonised standards:EN 60335-1:2002 + A1:2004 + A11:2004 + A12:2006 + A2:2006 + A13:2008; EN 60335-2-103:2003.

• DIRECTIVE 2006/42/CE OF EH EUROPEAN PARLIAMENT AND COUNCIL, 17 May 2006, in relation to ma-chinery, amending Directive 95/16/CE, in relation to the requisites for “partly completed machinerys”, per the following harmonised standard: EN13241-1:2003.

• Automatismi Benincà SpA declares, furthermore, that the pertinent technical documentation has been com-pleted in conformity with Annex VII B of Directive 2006/42/CE and that the following essential requisites have been satisfied: 1.1.1 - 1.1.2 - 1.1.3 - 1.1.5 - 1.2.1 - 1.2.3 - 1.2.6 - 1.3.1 - 1.3.2 - 1.3.3 - 1.3.4 - 1.3.7 - 1.3.9 - 1.5.1 - 1.5.2 - 1.5.4 - 1.5.5 - 1.5.6 - 1.5.7 - 1.5.8 - 1.5.10 - 1.5.11 - 1.5.13 - 1.6.1 - 1.6.2 - 1.6.4 - 1.7.2 - 1.7.4 - 1.7.4.1 - 1.7.4.2 - 1.7.4.3.

• The manufacturer agrees to forward the pertinent information regarding the "partly completed machinery" to the national authorities if justifiably requested to do so. This agreement includes the means of transmission and does not affect the manufacturer's intellectual property rights.

• The "partly completed machinery" may not be put into service unless the machine into which it is to be incor-porated has been declared conforming - as applicable - to the requirements of Directive 2006/42/CE.

• Furthermore, the product, with limitation to the applicable parts, is conforming with the following standards:

EN 12445:2002, EN 12453:2002, EN 12978:2003.

Sandrigo, 10/04/2015 Luigi Benincà, Legal representative.

Page 27: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual
Page 28: Complete kit for the automation of swinging gates ...€¦ · f this is the first time you realise an automation for swing gates with Beauty, we recommend that you read this manual

BYOU è un marchio di Automatismi Benincà SpA

via Capitello, 45 • 36066 Sandrigo (VI) ITALY • Tel +39 0444 1510294 • Fax +39 0444 759728 • [email protected] • www.byouweb.com