company profile - neovibe blog · irrigation pipeline installation. 4. ... dubai, u a e) client :...
TRANSCRIPT
COMPANY PROFILE
“Novelty, Reliability, Responsibility
&
Prosperity of its Services”
COMPANY PROFILE
“Novelty, Reliability, Responsibility
&
Prosperity of its Services”
COMPANY PROFILE
“Novelty, Reliability, Responsibility
&
Prosperity of its Services”
INTRODUCTION
TAURUS GENERAL CONTRACTING L.L.C. is envisaged as a service
provider in Construction Industry, covering Rain water Drainage
Contracting, Sub-Sewage Networks Connections & Homes
Connections Contracting, On-Shore & Off-Shore Oil and Gas field
Services, Sub-Water Networks Contracting works.
TAURUS instituted its office in the capital city of Abu Dhabi in
2010. TAURUS is able to allocate an entire workforce for a specific
project from professionally qualified engineers backed by university
degrees in engineering construction and engineering management
to administrative support staff to field hands. Also, hiring
domestically enables the company to become well integrated into
the community.
ACTIVITIES
PIPELINE PROJECTS
1. Chilled water pipe line installations.
2. Storm water pipeline installation.
3. Irrigation pipeline installation.
4. Sewerage Works (Relocation, Sewer Diversion including
inflatable stopper installation and over pumping.)
CIVIL WORKS
1. Small building construction works.
2. Minor road works.
3. All kind of surveying works.
4. Excavation and leveling works.
5. Foundations constructions.
ORGANIZATION CHART
GENERAL MANAGER
ANOJ S. KUMAR
FINANCE
FAISAL
HR
JISHA DIPU
FOREMAN
VINOD, GUNA
HSE ENGINEER
MOHAMED JAVED
SUPERVISOR
NOUFAL
WORK FORCE&
MACHINERY
PROJECT DIRECTOR
C.P.S. KUMAR
PROJECT ENGINEER
AKHIL
SITE ENGINEER
RATHEESHKUMAR
List of Organization Key Staff
Name Position Phone No.
Anoj S. Kumar General Manager +971-56-1234701
C.P Suresh Kumar Project Director +971-50-6616542
Akhil Project Engineer +971-50-9934281
Ratheesh Kumar Site Engineer +971-55-9947030
Javed Safety +971-56-2376813
Vinod Foreman +971-55-2097577
ABU DHABI OFFICE
P.O. Box:- 36402 – Defense Street – Abu Dhabi – U.A.E
Tel: 02 – 6506023
Fax: 02 - 6506026
Email: [email protected]
CV OF PROJECT DIRECTOR
C.P. Suresh KumarAddress : Abu DhabiMobile No. : 00971553007016E-mail : [email protected]
Personal Information
Age : 53 years oldDate of Birth : 15 May 1960Nationality : IndianGender : MalePassport No. : 1240409Permanent Residence : IndiaLanguages Known : English, Hindi, Malayalam & Arabic
Qualifications
Diploma in Civil Engineering (3 Years Course)
Professional Experience (27 years in various utility projects)
Project ManagerMay 2012 to March 2013 Client : Todini Costruzioni Generali Spa(Arabtec Eng. Services LLC Project : R881/3A - Comprehensive RoadDubai U.A.E) Improvement-Diversion
Underground ServiceLocation : Dubai U.A.E
Consultant: Parsons International
Project Manager2011 September to 2012February(MACE Contractors L.L.CAbu Dhabi, U A E)
Client : Al Naboodah National ContractingGroup L.L.C
Project : Al Ras Al Akhdar and BaynoonahStreet Improvements Package 1&2
Location : Abu Dhabi, U.A.EConsultant : Parsons International
Project Manager2010 July to 2011 August
(MACE Contractors L.L. CAbu Dhabi, U A E)
Client : Samsung Saif Bin Darwish JVProject : Upgrading Al Salam Street and Abu
Dhabi City Ring Road - Storm WaterWorks.
Location : Abu Dhabi, U.A.EConsultant : Parsons International
Project Manager2009 June to 2010 June(MACE Contractors L.L.CAbu Dhabi, U A E)
Client : Al Naboodah - MubadallaProject : Sowah Island Sewerage Works &
Potable Water WorksLocation : Abu Dhabi, U.A.EConsultant : Keo International / Tebodin, Middle
East, Abu Dhabi
Project Manager2009 January to 2009 May(MACE Contractors L.L.CAbu Dhabi, U A E)
Client : CAT / TABREEDProject : Yas Island Underground Chilled Water.
Piping Networks – Civil WorksLocation : Abu Dhabi, U.A.EConsultant: M/s Tebodin, Middle East, Abu Dhabi
2008 June to 2008 December(MACE Contractors L.L.CAbu Dhabi, U A E)
Client : Abu Dhabi Distribution CompanyProject : Diversion of 600dia & 250dia Potable
Water Line in Plot no–W45, (1600mts)Khalidiya, Abu Dhabi
Location : Abu Dhabi, U.A.ESupervision: Project Department ADSSC.
Project Manager2007 February to 2008 May(MACE Contractors L.L.CAbu Dhabi, U A E)
Client : Emicool / CAT DubaiProject : Dubai Investment Park Chilled Water
Networks.Consultant: Khatib & Alami & Shankland Cox Ltd.
Site Engineer2006 June to 2007 January(MACE Contractors L.L.CAbu Dhabi, U A E)
Client : CAT / TABREEDProject : Chilled Water Networks Connections to
Abu Dhabi Government Head Quartersand Potable Water Line Connection toTabreed Chilling Plant.
Consultant: Tebodin Middle East.
Site Engineer2004 June to 2006 May(MACE Contractors L.L.CAbu Dhabi, U A E)
Client : Abu Dhabi MunicipalityProject : C 186/3-Sewer Bypass to Pumping
Stations in Abu DhabiConsultant: M/s Hyder Consultants.
Site Engineer2002 January to 2004 May(MACE Contractors L.L.CAbu Dhabi, U A E)
Client : Abu Dhabi Municipality, SewerageProjects Committee
Project : C142/20 Various Sewerage & DrainageMiscellaneous works in Abu Dhabi
Consultant: M/s Hyder Consultants.Position : Site Engineer.
Site Engineer2000 January to 2001DecemberMACE Contractors L.L.CAbu Dhabi, U A E
Client : Abu Dhabi Municipality, SewerageProjects Committee
Project : C142/16 Various Sewerage & Drainageworks in Abu Dhabi
Consultant: M/s Hyder Consultants.
Site Engineer1998 February to 1999December(MIDFA MACEContractors L.L.CDUBAI, U A E)
Client : Dubai MunicipalityProject : DS 68/1A – Jumeira and Al Saffa
Drainage Miscellaneous and Sewerworks
Consultant: M/s Khatib & Alami.
Site Engineer1996 January to 1998December(MIDFA MACEContractors L.L.CDUBAI, U A E)
Client : Dubai MunicipalityProject : DS 68/4 – Jumeira and Al Saffa
Drainage and Sewerage worksConsultant: M/s Khatib & Alami.
Site Engineer1993 December to 1996 April(M/s Bartawi Group ofCompaniesDubai, U A E)
Client : Dubai MunicipalityProject : DS 95 – House Connections & Minor
Miscellaneous works in DubaiConsultant: M/s Montgomery Watson.
Junior Engineer1985 to 1992(Al Manartine ConstructionsBahrain )
Projects : Hamad Town Sewerage Works, Phase1, Phase 2, Phase 3.
Consultant: M/s Dar Al Handash, Consultants.
List of Projects Executed in U.A.E
SerialNo. Client Consultant Project Cost Duration
01 ContractingAnd TradingCompany(CAT) AbuDhabi (SubContract)
ParsonsInternational
Chilled Water PipesInstallation includes all asCivil Works, Trenching,Chamber Construction
AED: 5.2Million
8 Months
02 MACEContractor –Abu Dhabi(Sub Contract)
KEOInternational
Falcon Eye – Abu DhabiTrenching and PipingWorks in Abu Dhabi Cityfor Camera InstallationNet Works.
AED: 1.2Million
6 Months
03 MACEContractor –Abu Dhabi /Samsung / SaifBin Darwish(Sub Contract)
ParsonsInternational
Up gradation of Al SalamStreet1800 mm RC Pipe Stormwater works
A.E.D: 1.5Million
6 Months
04 MACEContractor –Abu Dhabi(Sub Contract)
DorshConsultant
Construction WorksAssociated withRehabilitation andReplacement of ExistingSewer Lines in Abu DhabiIsland Area – Contract 0-2536
A.E.D: 1Million
4 Months
05 Al Salmeen/Advanced PipeLine Services.(Sub Contract)Abu Dhabi
DorshConsultant
Construction WorksAssociated withRehabilitation andReplacement of ExistingSewer Lines in Abu DhabiIsland Area – Contract 0-2535
A.E.D: 1Million
4 Months
06 EmiratesDistrictCooling L.L.C.(Emicool)Dubai
Khatib & AlamiCivil Works.1200mm Dia preinsulated GRP PipeInsulation.
A.E.D: 1.7Million
8 Months
07 EmiratesDistrictCooling L.L.C.(Emicool)Dubai
Emicool Various MiscellaneousEmergency Works ofChilled Water network.Operations AndMaintenance Contract
A.E.D: 2.8Million
On Perusal
08 MAX BOGL/ADSOAbu Dhabi
Obermeyer Laying of Sewerage,Drainage, Irrigation Linesin FGB MultifunctionalArena Zayed Sports City
A.E.D: 1.3Million
3 Months
Quality Policy
TAURUS GENERAL CONTRACTING L.L.C. is committed to provide timely
quality service that, as a minimum, conforms to contractual requirements in all
areas of construction and operations and maintenance to achieve customer’s
full satisfaction.
TAURUS GENERAL CONTRACTING L.L.C. Management will provide sufficient
and appropriate resources to implement and achieve quality objectives within
definite programs and schedules to meet regulatory and obligatory
requirements.
TAURUS GENERAL CONTRACTING L.L.C. will continually seek to improve its
quality management system. Effectiveness towards more customer satisfaction
by refining its Project Quality Plan through use of advanced technology, quality
products, training of staff and implementing quality management system that
meets the requirements of ISO 9001:2008
Carry out all operations in a safe and timely manner, to the benefit of the
client, the employees and the company in general.
The management will review the quality policy on annual basis in line with the
company annual quality objectives.
Continually Review
Complete and handover 100% of company projects on time.
Customer complaints to minimum (<1 per year)
Conduct internal audit as per schedule.
Anoj S. Kumar
General Manager
HEALTH AND SAFETY POLICY
TAURUS GENERAL CONTRACTING L.L.C recognizes the importance of a good
health and safety planning prior to the commencement of project works so as to
avoid any possible injuries or endanger the health and safety of all personnel
involved in the project. To realize our objectives, TAURUS GENERALCONTRACTING L.L.C has prepared the following statements that constitute a
safety plan. Hereby we are going to describe to TAURUS GENERALCONTRACTING L.L.C intends to manage, control and coordinate the works in
order to protect the health, safety and welfare of all personnel engaged in the
project and others who may be affected by the operations.
The following statements aim to provide a plan of TAURUS GENERALCONTRACTING L.L.C (Management and monitoring) systems and measures to
ensure the safe operation of work through the contract period.
TAURUS GENERAL CONTRACTING L.L.C understands the main contractor
has put in great efforts in maintaining good safety and health performance
amongst its projects. TAURUS GENERAL CONTRACTING L.L.C will ensure
that the same scenario is adopted and maintained through the contract period
with the highest priority.
TAURUS GENERAL CONTRACTING L.L.C will try its best to convey the same
message of maintaining high safety and health standards to all subcontractors
and their workers.
TAURUS GENERAL CONTRACTING L.L.C will also ensure that all project
works confirm to the safety standard as required by the main contractors and
relevant statutes and applicable codes and standards.
a. It is the policy of TAURUS GENERAL CONTRACTING L.L.C to provide
safe and healthy working conditions for its employees and to ensure that
the conduct its affairs are not harmful to the safety and health of its
employees and the general community.
b. Accidents cost time and money and create pain and misery. They are
always caused by unsafe working conditions or unsafe practices.
Accidents can and must be prevented by continuous education,
perseverance and determination.
c. Safety is an important aspect and an integral part of our daily operations
and therefore should not be neglected or compromised for the sake of
progress. TAURUS GENERAL CONTRACTING L.L.C objectives can only
be achieved with the joint and determined effort of both management and
employees.
d. Responsibility rests with each employee who is hereby encouraged to
contribute to the attainment of objectives of this policy. With adequate
safety precautions taken, accidents, human sufferings, loss of time and
damage to property and equipment can be avoided. Safety is everyone’s
concern and its achievement requires everybody’s cooperation and
commitment.
…………………
ANOJ SURESHGENERAL MANAGER
TAURUS GENERAL CONTRACTING L.L.C
ISO CERTIFICATE
Company Owned Machinery & Tools
An extensive Range of Tools and Equipments includes (but not limited to)
1. Backhoe - 01 No.
2. 6 Wheel Truck - 03 Nos.
3. Roller & Plate Compactor - 03Nos.
4. Air Compactor & Jack Hammer - 01 No.
5. Welding Machines - 03Nos.
6. Generator Set 55 KVA - 01 No.
7. Disk Cutter 14” - 08 Nos.
8. Disk Cutter 16” - 01 Nos.
9. Table Grinder 8” - 1 No.
10.Tool Boxes - 20 Nos.
GRP LAMINATION SEWER MANHOLES
WRAPPING WATER STOPPER AROUND GRP PIPES,CONCRETE ENCASEMENT WITH RENDEROC AND HIGHPRESSURE NITOFILL TO STOP LEAKAGE FROMCHILLED WATER PIPES
CONCRETE ENCASEMENT TO PROTECT THESUSCEPTIBLE AREA OF CHILLED WATER PIPE LEAK
INSTALLATION OF COUPLERS ON 1200 DIA GRPCHILLED WATER PIPE
SUSCESSFUL INSTALLATION OF COULER TO STOPWATER LEAKAGE
JACKETTING WORKS AROUND GRP PIPES
MUFFLER SYSTEMS INSTALLED IN CHILED WATERLINER TO STOP LEAKAGE WITHOUT SHUTDOWN OFCHILED WATER NETWORK
CONCRETE ENCASEMENT AROUND STORM WATERLINE
INSTALLATION OF PIPE LINES FOR DEEP SEWERLINES
INSTALLATION OF GRP DOUBLE LINER MANHOLE FORSEWER NETWORK
INJECTION WORKS TO STOP WATER LEAKS