company profile - interarchitectskenya portfolio.pdf · operations in 2001 as providers of...
TRANSCRIPT
Page 1 of 12
Company Profile
Inter Architects & Environmental ConsultantsBomas of Kenya Building,Off Lang’ata Road,P O Box 5015-00506, Nyayo Stadium,Nairobi, Kenya.Tel: 890672, 892281 Fax: 890672E-Mail: [email protected]: www.inter.co.ke
Page 2 of 12
CONTENTS
v Introduction.
v Consultancy Services.
v Areas of Specialisation
v Key Staff.
v Key Projects.
v Proposed Projects
Page 3 of 12
INTRODUCTION
Inter Architects and Environmental Consultants was established in 2000. The firm began itsoperations in 2001 as providers of architectural consultancy services. The firm has since widenedits scope of services.
Inter now provides total building solutions from Initial design to Interior Achitecture,Environmental Studies & Project Management.In general, Inter provides the following services:-
i) Feasibility Studies,ii) Architectural Design services,iii) Planning And Interior Designsiv) Environmental Studies (Environmental Impact Assessments & Environmental Audits),v) Monitoring & Evaluation,vi) Project Management &vii) GIS Consultancy.
The firm is led by Mr. Patrick Mugo Karugo the Principal/Lead Expert of Inter Architectsalongside his partner Mr. Athman Noorein and other Associate Professionals in the field ofArchitecture and Environmental Studies. Inter Architects has 10 full-time staff and 1 part-timestaff.
The firm is committed to the new world order dedicated to the environment and its sustainabilityin line with the resolutions of Agenda 21.
The firm’s professionals experience in the fields of Architecture, Environmental Studies and GISspans for over 15 years.
We at Inter Architects believe that we have the most capable team with the right qualificationsand experience in providing high quality, efficient and timely services.
Page 4 of 12
CONSULTANCY SERVICESThe firms full spectrum of Professional Services, include:
2.1 Architectural ServicesEntails:• Site Analysis.• Preliminary Design and report.• Presentation drawings• Architectural drawings• Working drawings• Construction details• Engineering drawings• Bills of Quantities• Final design and details• Measurements and quantities certification• Interiors portioning and designs• Tenders Documentation• Progress and Quality control
2.2 Environmental StudiesEntails:
• Environmental Impact Assessments and Auditing reports.• Sustainable Resources Management• Solid waste management
2.3 Client ManagementEntails:• Tender documents• Project proposals• Feasibility analysis• Commission & contract• Correspondence• Contract Liaison
2.4 Feasibility StudiesEntails:• Advising on development of and choice of sites.• Assessing the financial feasibility of Proposal projects.• Evaluating cost alternatives design solutions in projects.• Cost estimates and cost planning at Preliminary stages.
Page 5 of 12
2.5 Project ManagementEntails:• Coordination of team consultants during design.• Advising and reporting on tenders.• Appointment of main contractor, sub-contractors and suppliers.• Holding of regular site/project meetings with clients, consultants and contractors• Maintain cost control at all stages.• Financial Control, appraisals and certifying work• Materials approval• Contract administration
2.6 Monitoring and Evaluation
MonitoringKey Issues:
• How well has the program been implemented• How much does the implementation vary from site to site• Did the program benefit the intended people?• At what cost• Is it a continuous process• Requires collection of data at multiple points through out the program cycle;
including at the beginning to provide baseline and• Can be used to determine if activities need adjustments during the intervention to
improve desired outcomes.
Evaluation/Impact Evaluation
Key Issues:• Data collection at the start and end of the program.• A control or comparison group in order to measure whether the changes in• outcomes can be attributed to the program and• A well planned study design
M & E helps program implementers:• Make informed decisions regarding program operations and service delivery based
on objectives evidence.• Ensure the most effective and efficient use of resources• Objectively assess the extent to which the program is having or has made the
desired impact, in what areas it is effective and where corrections need to beconsidered.
Page 6 of 12
AREAS OF SPECIALISATION
• Architectural designs
• Interior designs
• Environmental Impact Assessments
• Environmental Audits
• Project Management
• Tendering and evaluations
• Planning
• Site Supervision
• Feasibility study
• Monitoring & Evaluation
• Land scapping
Page 7 of 12
KEY STAFF
Principal Architect/Environmental Planner –Patrick Mugo Karugo, M Env Planning & Mgmt.KU. B Arch (Hons) UN (K)
ArchitectPatrick Mugo Karugo, M Env Planning & Mgmt.KU. B Arch (Hons) UN (K)Noorein Athman, B Arch (Hons) PAK
Assistant Architect –Joshua Mwaka Musyoni, Dip Build & Tech.(K)
Quantity Surveyor –S. N Ogari, BA. BLD.ECON (Hons)
Environmental planners –Esther K Mbithe. M Env Mgmt & Planning KU.BA Geo (Hons)Ongeto Walter Omwenga, B Env Mgmt & Planning. (Hons).Dip HR
Project Management/Interior DesignsPatrick Mugo Karugo, M Env Planning & Mgmt.KU. B Arch (Hons) UN (K)
Cert. Interior Designs.
Administrator/Accounts –Ruth K Muriithi, Adv Dip. HR (K)
Cad Operators/Technicians –Josphat NjauJulius Lemoi, Dip Civil Eng (K)Athman Gongo SwalehJoshua Mwaka Musyoni, Dip Build & Tech. (K)
Webmaster/IT –Alex Ikuha, Bsc. (Hons) Comp Science (K)
Page 8 of 12
KEY PROJECTS
Project: Nuru VillasClient: Nuru Villas LtdLocation: LavingtonStatus: CompletedScope: 1 storey-Residential Court Hses.
Architectural designs
Project: Kenwood CourtsClient: Kenwood C LtdStatus: OngoingCost: 45 MScope: Residential Flats
Architectural designsEnvironmental Impact Assessment.
Project: Bernd Trompel ApartmentsLocation: Lang’ataStatus: CompletedCost: 100 MScope: Hostel Apartments
Architectural designsEnvironmental Impact Assessment.
Project: Rahma EstateClient: Rahma Estates LtdStatus: OngoingScope: Residential Apartments
Concept Design, Detailed Design.
Project: Zamzam CourtsClient: Zam zam court LtdStatus: CompletedScope: 5 Residential Villas
Concept Design, Detailed DesignProgress monitoring.
Nuru Villas
Apartment Blocks
Rahma Estates
Zamzam Villa
Page 9 of 12
Project: Swafiya CenterLocation: Kanamai, KilifiStatus: CompletedScope: Mosque
Architectural Designs
Project: Quresh M FlatsClient: Quresh MohamedLocation: EastleighStatus: OngoingCost: 50 MScope: Hostel Apartments
Concept Design, Detailed DesignEnvironmental Impact Assessment
Project: Tausi ApartmentsLocation: WestlandsStatus: Under ConstructionScope: House of Worship
Architectural designsEnvironmental Impact Assessment
Project: Nyari ResidenceLocation: NyariStatus: CompletedCost: 40 MScope: Residential House
Concept Design, Detailed Design
Swafiya Centre
Nyari residence
Tausi Apartments
Residential Hse-Runda
Page 10 of 12
Project: Pfizer Office RefurbishmentClient: Pfizer Kenya LtdStatus: CompletedCost: 8MScope: Refurbishment of Office Buildings
Environmental Impact Assessment
Project: Oil COM K LtdLocation: Donholm, MlolongoStatus: CompletedScope: Petroleum Station.
Concept Design, Detailed DesignEnvironmental Impact AssessmentEnvironmental Audit
Project: Austria for Kenya KidsLocation: UkundaStatus: Under ConstructionScope: Educational Institution
Concept and Detail designEnvironmental Impact Assessment
Project: Kibe ResidenceLocaton: RundaStatus: CompletedCost: 20 MScope: Residential House
Concept Design, Detailed DesignSite Supervision
Project: Nature Green FactoryClient: Njambi Flora LtdStatus: OngoingCost: 100 MScope: Cold Room
Concept Design, Detailed DesignEnvironmental Impact Assessment
Oil COM
Bungalow
Office Block
Austria for Kenya
Page 11 of 12
INTERIOR ARCHITECTURE
Project: Nyari ResidenceLocation: NyariDescription: Interior modelingStatus: OngoingScope: Design
Project: Rahma EstateClient: Rahma Estate LtdDescription: Interior modeling, Detailed designStatus: OngoingScope: Design
Project: Zamzam CourtClient: Zamzam Court LtdDescription: Interior modelingStatus: OngoingScope: Design
Project: Palm Dreams ApartmentLocation: MombasaDescription: Waiting AreaStatus: CompleteScope: Design
Project: Arunga ResidenceClient: Phillip ArungaDescription: Interior DesigningStatus: OngoingScope: Design
Rahma Duplex KitchenNyari Living
Zamzam Master Bath
Dining Room Staircase Detail
Page 12 of 12
PROPOSED PROJECTS
Project: Office BuildingsLocation: Luthuli Avenue, NairobiStatus: Concepts and Scheme design stageScope: Office Buildings
Project: Office BuildingsLocation: Wilson Airport Lang’ataStatus: Concepts and Scheme design stageScope: Office Buildings
Project: Hellen ResidentialLocation: RundaStatus: Concepts and Scheme design stageScope : Residential Houses
Environmental Impact Assessment & Audit
Project: Hiram ComplexLocation: Ngong TownshipStatus: Concepts and Scheme design stageScope: Office Space & Shopping complex
Environmental Impact Assessment & Audit
Office Block-Wilson
Residential-Runda
Office Block-Luthuli
Hiram Complex