company profile - baker electric · commitment baker electric is committed to keeping our employees...

8
Full Service For Four Generations Baker Electric has been in business since 1938 and is a fourth generation, full service Electrical Contractor. We have completed multi-million dollar contracts throughout Southern California, acting as both a prime and subcontractor. Our project portfolio includes Commercial, Industrial, Military, Hospitality, Multi-Family, Institutional, Healthcare, and Education sectors. Revenue in excess of $100 million 4th largest electrical contractor in San Diego $75 Million Single projects bonding capacity Average 600 employees Excel at Design-Build and BIM Modeling Single largest contract for electrical $22 million 2014 EMR of .77 Serving all construction MARKET SECTORS in Southern California Construction: Company Profile Irvine Valley College Performing Arts Center Irvine, CA Industrial Utility Scale Solar Commerical Solar Controls Services Education Multi-Family Commercial Public Works Healthcare

Upload: dohanh

Post on 19-May-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

Full Service For Four GenerationsBaker Electric has been in business since 1938 and is a fourth generation, full service Electrical Contractor. We have completed multi-million dollar contracts throughout Southern California, acting as both a prime and subcontractor. Our project portfolio includes Commercial, Industrial, Military, Hospitality, Multi-Family, Institutional, Healthcare, and Education sectors.

• Revenue in excess of $100 million

• 4th largest electrical contractor in San Diego

• $75 Million Single projects bonding capacity

• Average 600 employees

• Excel at Design-Build and BIM Modeling

• Single largest contract for electrical $22 million

• 2014 EMR of .77

Serving all construction MARKET SECTORS in Southern California

Construction:

Company Profile

Irvine Valley College PerformingArts Center Irvine, CA

• Industrial

• Utility Scale Solar

• Commerical Solar

• Controls

• Services

• Education

• Multi-Family

• Commercial

• Public Works

• Healthcare

Dun & BradstreetIn business since 1938 Dun’s # 00-955-5087 Rating: 1R2

BondingBonding Capacity: $150 million aggregate/ $75 million single project Zurich North American Surety 701 B Street, 6th Floor San Diego, CA 92101

Alliant Insurance Services Larry McMahon, Bonding Agent (619) 849-3821

Bank ReferencesPacific Western Bank 900 Canterbury Place, Suite 100 Escondido, CA 92025 Scott Word, Sr. VP & Commercial Loan Manager (951) 587-5225 www.pacificwesternbank.com

Financial Information

Alexan ApartmentsSan Diego, CA

InsuranceAlliant Insurance Services 701 B Street, 6th Floor San Diego, CA 92101 Jim Castle, Vice President (619) 238-1828 www.alliantinsurance.com

Workers CompensationZurich American Insurance Company Alliant Insurance Services 701 B Street, 6th Floor San Diego, CA 92101 Jim Castle Vice President (619) 238-1828 www.alliantinsurance.com

Annual Revenue

2014 2013 2012 2011

$94,400,000 $75,400,000 $68,413,652 $77,108,785

CommitmentBaker Electric is committed to keeping our employees and all others in the workplace safe. Our belief that people and property are our most valuable assets is the cornerstone of our Safety Program. We are continually recognized by our customers for leading the way when it comes to safe work practices.

Besides our moral obligation and concern for our employees, safety is also important because it can affect financial results, our reputation, and employee relationships.

Program And ProceduresBaker Electric has a written safety plan, pro-active accident program, Code of Safe Work Practices, Hazardous Communication Program, Safety Council, designated Safety Director and Safety Manager, and a strictly enforced substance abuse program.

We hold weekly safety “tailgate” meetings, monthly safety committee meetings, quarterly foreman meetings, pre-job planning conferences with management, and random job site audits by our Safety Manager. A site specific safety plan is developed for every project Baker is involved in. Our Superintendents regularly inspect the job sites, and, each month, senior management reviews company wide job safety performance.

TrainingOur management and foremen have all completed extensive course work in Occupational Safety and Health. The curriculum includes the OSHA 10, Competent Person for Excavation, Forklift Operator Certification and First Aid / CPR.

Recent Safety Awards

First Place Winner

AGC National Safety Excellence Award 2014 Specialty Division

700,001 - 1 million work hours

First Place Winner

AGC San Diego Safety Excelence Award 2014 Specialty Division

700,001 - 1 million work hours

First Place Winner

AGC San Diego Safety Excellence Award 2011, 2012 & 2013 Specialty Division

500,001 - 700,000 work hours

Safety

Annual Experience Mod Rating

Policy Year End - September 30th

2014 2013 2012 2011

0.77 0.75 0.70 0.81

Sharp Grossmont HospitalEast Nursing Tower

La Mesa, CA

President: Ted Baker, fourth generation President of Baker Electric, has been with Baker for 21 years and has over 22 years of electrical contracting management experience. Ted received his Bachelor of Arts degree from the University of San Diego.

Chief Financial Officer: Brian Miliate, Chief Financial Officer for Baker Electric, possesses over 20 years of professional experience. Brian received a Bachelor of Science degree from San Diego State University.

Vice President: Keith Fleming, Vice President Pre-Construction has over 29 years of electrical contracting management and estimating experience and has been with Baker 29 years. Professional accreditations include being American Society of Professional Estimators (ASPE) Certified.

Vice President: Jim Gagnon, Vice President Construction, LEED AP, whose responsibility includes oversight of Project Management is a former Master Chief of the U.S. Navy Seabees. Jim has over 30 years of professional electrical construction experience along with a Masters Degree in Organizational Management from University of Phoenix.

Vice President: George England, Vice President, Electrical Service and Controls Group, has over 30 years of professional experience in the electrical contracting industry. Professional accreditations include completion of a five year Electrician Apprenticeship as well as completion of numerous National Electrical Contractors Association (NECA) Estimating and Management courses.

Senior Management Team

Bachelors Enlisted Quarters 9 Twentynine Palms, CA

Construction Division - Partial Listing

Stateline Solar ......................................................................$19,923,142.46

Seville Solar ..........................................................................$12,259,092.00

Lost Hills & Blackwell ............................................................$12,129,630.00

VA Loma Linda Healthcare ....................................................$9,523,896.00

3033 Wilshire Blvd. ...............................................................$6,316,979.00

Antelope West-Acacia ...........................................................$6,238,727.00

Alamo Solar ..........................................................................$5,797,658.00

Columbia Solar Energy Project ...............................................$5,176,718.95

Maricopa West Solar Project ..................................................$4,900,818.00

P114 Double Hanger Replacement.........................................$4,795,196.58

Bldg. 1- Waste Drain Pipe .....................................................$3,641,118.78

Palomar College Learning .....................................................$3,579,000.00

Mesa CC Bookstore/Cafeteria ................................................$3,318,261.76

E Tower Nursing Unit Grossmont Hospital ...............................$3,015,206.86

Solana Ranch Elementary School ...........................................$2,610,440.10

SDSU Main Chiller Plant ........................................................$2,459,139.90

Catalina 2 Solar ....................................................................$2,195,251.00

SunEd-AP North Lake Solar ...................................................$2,187,021.89

Pumpjack Solar .....................................................................$1,911,388.00

Wildwood Solar 1 ..................................................................$1,895,389.00

Panasonic ............................................................................$1,880,684.00

NMC Building 1H HVAC upgrd-2 ...........................................$1,592,122.09

Restore General Surgery .......................................................$1,580,596.67

O’Farrell Charter High School & Gym .....................................$1,335,000.00

SEPV Palmdale East ..............................................................$1,332,144.00

Oceanside Block 18 Apartments ............................................$1,137,637.00

CSU Collins College Expansion ...............................................$1,050,000.00

Current Projects

Florida Street Apartments San Diego, CA

CoGen / Central PlantsCogeneration Conversion @ CUF

John Wayne Airport Central Plant

Cal Poly Pomona Central Plant

Commercial / IndustrialSprinter Maintenance Facility

City of Riverside Electronic Security

Hemet Professional Development Service Center

Brawley Waste Water Treatment Plant Improvements

Central Justice Center Floors 4,5,6

Riverside Courthouse Renovation

Liberty Station Building 902

Central Justice Center Renovation Floors 7 & 8

USPS San Diego FSS Expansion

ESD HP El Segundo

SCE Test & Maintenance Bldg. – Blythe

SCE Test & Maintenance Bldg. – Desert Center

TVRW Reclamation Facility Expansion

Carmel Valley Com Park

Atomics Aeronautical Division—Diazyme Lab

Qualcomm AX

North City Center Parking Structure

Qualcomm Building D & E Remodel

Marwaha Group

Fort Rosecrans

South Bay Bus Maintenance Facility

North Broadway Fire Alarm Replacement

UCSD Birch Aquarium

1 Columbia Place

Commercial & Utility Scale SolarAntelope Valley Solar Ranch 1

BEQ 9

VA Medical Center - Grand Junction, CO

SDCWA PV San Diego

T.A. Acacia West Antelope Solar

J. Craig Venter Institute

Project Experience

Agua CalienteHeadliner Room

Rancho Mirage, CA

Palomar College - Humanities Building

Solana Ranch Elementary School

Data CentersBAE Central Plant DistributionHewlett Packard – Cerritos

HealthcareSharp East Tower Nursing Unit

- & Infrastructure Upgrade

Desert Regional Medical Center

Euclid Family Health Center

San Gorgonio Memorial Hospital Helipad

VA Loma Linda – ENT Clinic

Sharp Chula Vista Medical Center

Hospitality / Indian GamingValley View Casino Expansion

Agua Caliente Casino Headliner Room

Fantasy Springs Casino Parking Garage

Morongo Tower & Room Corridor Renovation

MilitaryQuality of Life Package 4

Design Build USMC BEQ Package 9

Renovate Hangar 1456

Renovate Building 3143 NAB San Diego

P-578 Van Pad Relocation MCAS Yuma

China Lake P-719V

Victory Field Exchange MCAGCC

Renovate Root & Spanagel Hall NPGS Monterey

Repair BEQ 783 & 787 NAS Coronado

TEMF Fort Hunter Liggett

General Instructional Buildings (US Army)

BEQ 41371 | Renovation

Commercial Division - Partial Listing

Engineering FirmsEPI Engineering Partners, Inc. Matt Long (858) 541-0442

Michael Wall Engineering Michael Wall (858) 638-0600

Randall-Lamb Gary Eastley (619) 814-4000

Sparling Jeffry Hankin (858) 622-2700

SuppliersAmerican Electric Supply Mike Pratt, President (951) 734-7910

Beacon Electric Supply Dan Vivier, General Manager (858) 279-9770

Jobsite Supply Skeet Simmons, Vice President (619) 843-4014

Walters John Beruman, Branch Manager (858) 737-7000

PV SuppliersSunpower Corporation Joel Jacons, Regional Sales Manager (949) 943-0479

CED Greentech Jim Delaney 858-449-4937

General ContractorsBalfour Beatty Construction Brian Cahill, Executive (858) 385-8200

Soltek Pacific Kevin Cammall (619) 296-6247

Suffolk - Roel Doug Briggs (619) 297-4156

Reno Contracting Chris Heim (619) 220-0224

West Coast Air Conditioning Company David Dudley (619) 561-8000

Bernards Armando Ortega (951) 830-7191

Richard & Richard Dave Rex (760) 759-2260

References

Santa Ana Court of AppealsSanta Ana, CA

Baker Electric, Inc. Values Giving Back to Our Community From charitable donations, sponsoring fund raising events, providing volunteers, to donating time and electrical resources...we enjoy giving back! Baker Electric has been giving to many organizations for many years. Below is a list of some of the wonderful community organizations we are proud to support!

Boys & Girls Club of Escondido

Escondido History Center

Junior Achievement

Make-A-Wish Foundation

Palomar College Foundation

Ronald McDonald House Charities

Shakti Rising – Changing Women’s Lives in San Diego

Susan G. Komen Breast Cancer Foundation

TERI – Training Education & Research Institute

The LR Green Educational Foundation

YMCA of San Diego

Community Involvement& Memberships

Memberships: National Electrical Contractors Association (NECA), American Subcontractors Association (ASA), Associated General Contractors of America (AGC), National Association of Women in Construction (NAWIC), Solar Energy Industries Association (SEIA), American Solar Energy Society (ASES), San Diego North Chamber of Commerce, Professional Association of Specialty Contractors (PASC).