company profile - ba (pvt) ltd arfan (2017) 1berkeley associates (pvt) ltd introduction f berkeley...

156
Company Profile 24 D-1, NESPAK Colony Phase-I, Lahore-53700 Phone: +92 423 5181331-3, E- mail: [email protected] Web http://www.berkeley.com

Upload: others

Post on 19-Nov-2020

22 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Company Profile 24 D-1, NESPAK Colony Phase-I, Lahore-53700 Phone: +92 423 5181331-3, E- mail: [email protected] Web http://www.berkeley.com

Page 2: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Berkeley Associates (Pvt.) Ltd.

CONTENTS INTRODUCTION

OUR DOMAIN

ORGANIZATION

TURNOVER

SPECTRUM OF SERVICES

COMPLETED PROJECTS

CLIENTS

TOPOGRAPHIC SURVEY EQUIPMENT

DRILLING EQUIPMENT

LABORATORY TESTING EQUIPMENT

KEY PERSONNEL

FIELD STAFF

REGISTRATION

QUALITY & SAFETY POLICY

Page 3: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Berkeley Associates (Pvt) Ltd

Introduction f 

 

 Berkeley Associates (Pvt.) Ltd. Consulting Engineers

Berkeley Associates (Pvt.) Ltd. is an engineering firm providing highly professional services in various disciplines of Civil Engineering. We provide project management, design, supervision, planning and drafting services in the fields of Construction, Geotechnical, Groundwater and Structural Engineering for various infrastructure and development Projects including Buildings, Highways, Motorways, Hydropower, Dams, Power Transmission Lines, and Airfields. Main areas of our Engineering Services include Topographic and Bathymetric Surveys, Project Management, Value Engineering, Geotechnical Investigations and Design, Foundation Engineering, Site Evaluation, Site Improvement, Pavement Design and Evaluation, Material Engineering, Construction Supervision of Earthworks and Foundations and Ground Water Studies. The project planning services are provided for all project stages including inception, feasibility, design, construction, and operation. Computer aided drafting facilities are provided for all kinds of engineering drawings.

INTRODUCTION 

Page 4: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Our Domain

For Civil Engineering Projects we provide services in the following engineering disciplines;

1. Project/ Construction Management

2. Hydropower Engineering

3. Value Engineering

4. Geotechnical Engineering

5. Pile Foundation and Construction of Fills

6. Groundwater Engineering

7. Structural Engineering

8. Transmission Line / Grid Station & Power Plants

9. Highways & Bridges

10. Detailed Engineering & Drafting

11. Dewatering Design / Supervision

12. Topographic and Bathymetric Surveys

OUR DOMAIN

Page 5: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

CHIEF EXECUTIVE OFFICER

Jahangir Akhtar

BOARD OF DIRECTORSJahangir Akhtar

Khalid AyyubMuhammad Abbas

Office AdministrationAslam Hayat

Accounts and RecordKeeping

Asif Chughtai

Structural EngineeringIjaz Shafi

GeotechnicalEngineering

Khalid Ayyub

Senior StructuralEngineers

Junior StructuralEngineers

CAD Operators

Senior GeotechnicalEngineers

Site Staff i/cDrillers & Helpers

EnvironmentalEngineer

Public HealthEngineers

Environmental & PublicHealth Engineering

Syed Azhar Maqsood

Hydropower & DamsEngineering

Janghir Akhtar

Civil DesignEngineers

E&M DesignEngineers

Project Management &Business Development

Sheikh Ilyas Ahmad

Planning Engineers

Schedulers

Environmentalists

Contract ManagementSyed Hamid Hassan

Groundwater EngineeringAhmed Nawaz

Geophysicists

Site Staff

Survey SectionRaja Naeem

Surveyors

Helpers

Draftsman

Geotechnical Engg.Laboratory Technicians

Junior Engineers/Geologists

BERKELEY ASSOCIATES (PVT) LTDORGANIZATION CHART

Page 6: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Organization Chart

Page 7: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Spectrum of Services

For Civil Engineering Projects we provide services in the following engineering fields

The Geotechnical Engineering services include planning and execution of field investigations,

preparation of geotechnical investigation reports, evaluation of geotechnical design parameters,

analyses and design of foundations, slopes, embankments. Evaluation of existing foundations,

and earth retaining structures are also carried out.

Carrying out field investigations including drilling of boreholes, sampling, field tests,

installation of piezometers, monitoring of ground water table, etc., using our in-

house facilities.

Planning of comprehensive Geotechnical investigation program tailored to specific

needs of the Project with particular aim of obtaining safety and economy in the design

of foundations and earth structures. Planning includes establishing drilling

requirements, extent of drilling, method of drilling, method of soil sampling etc.

Prepare cost estimates and specifications for the geotechnical investigations.

Supervision and monitoring the progress of field investigations ensuring

that investigations are being carried out in accordance with the internationally

recognized standard practice.

Carrying out initial analyses of the field data and modifying (if required) the field

investigation program.

Inspection of soil samples and preparation of most efficient laboratory testing

Program.

Carryout the laboratory testing under technical supervision.

Carryout geophysical surveys.

Evaluation of physical and engineering characteristics of soils/ rocks on the basis of

field and laboratory test results.

Determination of foundation design parameters.

Design of shallow and deep foundations i.e. spread foundations, rafts, piles etc.

Preparation of geotechnical investigation reports.

Design of earthen embankments for roads and water retaining structures.

Analyses & Design of Foundations & Embankments

Soil Investigations

Geotechnical Engineering

SPECTRUM OF SERVIC ES

Page 8: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Spectrum of Services

Slope stability analyses

Design of cut slopes and slope stabilization systems.

Design of excavation support systems.

Design of dikes and coffer dams.

Design of under-ground water cut-off systems.

Seepage analyses of water retaining structures.

Liquefaction analyses.

Evaluation of dynamic design parameters for design of foundations.

Evaluation and remediation of problematic soil conditions.

Design of site improvement systems.

Design, performance and analyses of pile load tests.

Design and construction supervision of cast in-situ piles.

Design and construction of contiguous pile system.

Preparation of technical specifications for earthworks.

Quality control of large earthworks.

Assessment of engineering characteristics of earthworks.

Supervision of construction of foundations, earthwork and soil improvement works.

Pile load tests and evaluation.

In order to assess the groundwater potential for various projects, we plan and execute field

investigations, computer modelling, assessment of aquifer parameters, prediction of availability

of groundwater, ground water quality analyses. Design of tube wells and influence of exiting

water facilities on pumping of new wells is also carried out. Groundwater Engineering services

include;

Design of dewatering systems.

Design and installation of piezometers.

Performance of electrical resistivity surveys for initial assessment of ground water quality.

Groundwater monitoring.

Groundwater quality assessment.

Planning and execution of pump out tests.

Interpretation of pump out test data and evaluation of aquifer parameters.

Installation and development of tube wells.

Groundwater Engineering

Piling and Construction of Fills

Page 9: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Spectrum of Services  

 

Topographic surveys are carried out for all types of projects for developing the surface

contours, area assessments, project planning and layout studies. Underwater surveys

(Bathymetric Survey) are carried out to develop underwater bed profiles required for

placement of intake and outfall structures. The services include;

Performance of Topographic Surveys of land for infrastructures projects.

Preparation of topographic maps at desired contour intervals.

Establishment of Benchmarks.

Performance of underwater (Bathymetric) survey of canals and offshore sites.

Feasibility stage structural designs are carried out for development of cost estimates.

Detailed analyses and design of structures are carried out using computer aided tools for all

type of projects. Construction drawings are prepared for material take-offs and

implementation. Design review services are also provided. Other service include;

Planning stage design of various structures.

Analyses of structural elements of all types of projects.

Detailed design of structures.

Preparation of tender drawings and construction drawings.

Preparation of bar bending schedules.

Preparation of as-built drawings.

Review of Civil works Design prepared by EPC contractors.

Optimization of design and Value Engineering.

Design for strengthening and rehabilitation of structures

Project Management services are provided for optimizing the available resource. Resident

construction supervision services are provided for ensuring quality construction and

adherence to agreed time line. The services include;

Preparation and monitoring of project implementation schedules.

Preparation and implementation of quality control/ quality assurance plans.

Providing resident supervision and monitoring progress of works.

Maintaining construction and QA/QC records.

Preparation of as built drawing.

Verify construction quantities and progress payment invoices.

Project Management & Construction Supervision

Structural Engineering

Topographic and Bathymetric Surveys

Page 10: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Spectrum of Services  

 

Contract management, issuance of variation orders.

Preparation of detailed Bill of Quantities (BOQ) for construction projects.

Page 11: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Completed Projects  

 

COMPLETED PROJECTS

Page 12: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Completed Projects  

 

150 MW Patrint Hydropower Project, AJK

22 MW Jabban Hydropower Project, KPK

90 MW Batakundi Hydropower Project, KPK

180 MW Naran Hydropower Project, KPK

300 MW Balakot Hydropower Project, KPK

100 MW Solar Power Project, Bahawalpur

Cooling Tower for AES Lal Pir Power Project, Muzaffargarh

120 MW Shushghai Zhendoli Hydropower Project, Chitral

100 MW Kotli Hydropower Project, AJK

100 MW Shogo Sin Hydropower Project, Chitral

762 MW AES Power Project, Muzaffarabad

232 MW Karkey Rental Power Project, Karachi

120 MW Rajdhani Hydropower Project, AJK

Engro Rice Plant Extensions, Bhikki

Engro Food Plant Floor Rehabilitation

New Ammonia / Urea Plants Project of Engro Dharki

Machai Hydropower Project, AJK

Fire Water Tanks in UAE

Khari Hydropower Project, AJK

Sind Engro Coal Mining Project, Thar

Foundation Piling for Mabarak Center, Lahore

Hub Water Treatment Plant, Hub, Karachi

Effluent Treatment Plant for Tanneries, Kasur

Additional Cooling Towers for AES Power Project , Mahmood Kot, Muzaffargarh

Water Supply & Sewerage System and Sewage Treatment Plant for New Mir Pur City

CONTRACT MANAGEMENT, CONSTRUCTION SUPERVISION & QUALITY CONTROL SERVICES

FEASIBILITY STUDIES DESIGN & PROJECT MANAGEMENT SERVICES

Page 13: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Completed Projects  

 

Project, AJK

Water Supply & Sewerage System for Defense Housing Scheme, Islamabad New

Ammonia/ Urea Plants Project at Engro Chemicals Pakistan, Daharki Commercial

Complex at G-4, Clifton Road Karachi

Commercial Complex at F-99, Clifton Road Karachi

Page 14: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Dewatering Design / Supervision Projects  

 

DEWATERING DESIGN / SUPERVISION PROJECTS

Page 15: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Dewatering Design / Supervision Projects  

 

Estimation of drainage requirements and design of dewatering system for Lusai Underground Railway Construction Project, Qatar Estimation of drainable surplus using available data on aquifer parameters.

Doha Conventional Centre and Tower Project, Doha, Qatar Aquifer testing and data analysis, estimation of dewatering requirements, design of dewatering system and dewatering wells for construction below water table.

Site B-201 Nawabshah, Sindh, Pakistan - Conducted aquifer tests (pump out tests), analysis of test data, estimation of aquifer parameters, design and construction of dewatering systems for pumping drainable surplus to lower water table below foundation (50 ft. below NSL) of the buildings.

Site B-109, Sargodha, Punjab, Pakistan - Conducted aquifer tests (pump out tests), analysis of test data, estimation of aquifer parameters, design and construction of dewatering systems for pumping drainable surplus to lower water table below foundation (50 ft. below NSL) of the buildings.

Study causes of rise of water table and proposed remedial measures - Industrial and ResidentialAreas in Dammam, Saudi Arabia.

Chashma Hydropower Project Member of panel of experts for dewatering. Analysis of aquifer test data, estimation of dewatering requirements to lower water table about 15 m to facilitate construction of power plant.

CHASNUPP - Evaluation of pumping requirements and design of dewatering system to facilitate construction of intake structure.

Supervision of 26 numbers dewatering tubewells installation at CHASNUPP Assuring installation in accordance with the design specifications

Dewatering Design / Supervision Projects

Page 16: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Geotechnical Investigations

GEOTECHNICAL INVESTIGATIONS

Page 17: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Geotechnical Investigations

Berkeley Associates (Pvt.) Ltd.

Army Officers Housing Scheme ASKARI-II, Gujranwala Cant.

Army Officers Housing Scheme ASKARI-III, Sargodha Cant.

Army Officers Housing Scheme ASKARI-VII, Rawalpindi.

Prime Minister Housing Scheme Peshawar.

Prime Minister Housing Scheme Faisalabad.

Prime Minister Housing Scheme Gujranwala.

Commercial Plaza at Army Welfare Housing Society Morgah Rawalpindi.

Park View Housing Society, Lahore Cant.

Punjab Housing Scheme Satiana Road Faisalabad.

Eden Canal Villas, Lahore.

High rising building at DHA Morgah-II Islamabad.

Sport Complex DHA Morgah-II Islamabad.

Sukh Chayn Gardens Housing Society Multan road Lahore.

WAPDA Finance Housing Scheme Raiwind Road Lahore.

WAPDA Finance Subsistence Farm Homes Lahore.

Mosque at Defense Housing Islamabad.

Construction of Multistory building located at main Boulevard, Gulberg-Lahore

Crescent Bay Project, Karachi

Mabarak Center, A Mixed Use Project, Lahore

Crescent Bay Project, Karachi

Faletti's Hotel Development Project, Lahore

Kalu Khan Girls High School Building at Swabi

District Headquarter Complex at Swabi

Regency Plaza at Mini Market Gulberg Lahore

Aslam Arcade Mcleod Road Lahore

Pakistan Air Force Complex at Abbott Road Lahore

Police Club Complex at Race Course Road Lahore

Mosque at Rinala Kurd

Rahber Center at Jail Road Lahore

Tax Free Plaza on Lawrance Road Lahore

Extension Unit for Pakistan Air Force Complex at Abbott Road Lahore Shopping

Complex at Main Market Gulberg Lahore

Extension Units for Tax Free Plaza on Lawrance Road Lahore Pakistan Bait-ul-Maal

Complex on Dev Smaj Road Lahore

Leeds Center Main Boulevard Gulberg Lahore

Ibrahim Mosque at Ferozepur Road Lahore

High-Rise Buildings

Housing Schemes

Page 18: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Geotechnical Investigations

Big City Plaza Building at Liberty Chowk Lahore

Multi storey building at Narang Mandi

Multi-storey building at Bhatta Chowk Lahore

Benevolent Fund Building at Peshawar

Residential Villas Saudi Embassy Islamabad

NHA Building at Thokar Niaz Baig, Lahore

MCB Building, Jail Road Lahore

Aitchison College, Lahore

McDonald's Allama Iqbal Town , Lahore

Jamia Mosque, Kala Shah Kaku, Lahore

Descon ES Building, Lahore

Zohra Heights, Gulberg Lahore

Garrison Academy for Girls, Lahore Cantt.

Garrison Degree College, Lahore Cantt.

McDonalds, Faisalabad

Fauji Foudation Medical College, Rawalpindi

Honda Building Ferozpur Road, Lahore

IT Building, Raiwind Road, Lahore

A.D. Palace Rahim Yar Khan

Aitchison College, Junior Wing, Lahore

Babul Islam, Sargodha

Bank Alhabib, Gulberg Lahore

PSO Retail Stations at Lahore, D.G. Khan and Sargodha

Law Chambers at Fan Road Lahore

Neighbourhood G-11/4 Islamabad

Detatched Houses at I-8 Islamabad

New Auriga Shopping Plaza, Gulberg Lahore

International Islamic Center, Johar Town Lahore

PIA Facilities at New Terminal Lahore Airport

Aligarh college, Gulberg Lahore

Aitchison College Staff Housing Lahore

River Side Hotel Jhelum

FFC Tower The Mall Rawalpindi

PC Hotel Muzzaffarabad

PIA Engineering Transportation Site

PIA Cargo Complex Site

Shaheen Airport Services SAPS Cargo Complex site

Sheikh Zayyed Complex at Ferozpur road Lahore

Expo Center Johar Town Lahore

Page 19: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Geotechnical Investigations

Kohat University of Science and Technology Kohat

Schlumberger offices and workshop at Sukkur

Plaza at Liberty Market

Bahria Town Lahore

PSO Zoom Logo Sign Tower Pattoki Bypass

Plaza at Abbott Road Lahore

Plaza at 37-P, Gulberg Lahore

Plaza at Davis Road Lahore

Plaza at Mcleod Road Lahore

Commercial plaza at Bedian Road Lahore

Eden Palace Villas

Mediacom Faisalaba

Comsat Complex Islamabad

PACE complex Gujrat

Decent Plaza Gujranwala

Government College Lahore

Al-Nafah Tower Gujranwala

Commercial Plaza Faisalabad

Historical Structural at Shalimar Garden Lahore

Enplan Plaza Garden Town Lahore

IT Park Ferozepur Lahore

Suzuki Motors Showroom Sargodha

Mian Tyre Office at Jail Road Lahore

Sterling Plaza at M M Alam Road Lahore

North East Hospital Complex, Peshawar

Ammar Medical Complex at Jail Road, near bypass, Lahore

Rahmat-ul-Alameen Trust Hospital Pak Patten

Muhammad Nawaz Sharif Kidney Institute at Shaikh Zayed Hospital Lahore

Alkhidmat Hospital, Sialkot

Hospital at Ferozpur road Lahore

Federal Hospital Rawalpindi

Saudi-German Hospital at Bahria Town, Lahore-Pakistan

Hospitals

Page 20: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Geotechnical Investigations

Cherished Pharmaceutical Industry at Raiwind

MSB Industries on Ferozepur Road Lahore

Cholistan Sugar Mill Liaquatpur

ICI go down near Kala Shah Kaku

Rawat Switchyard

FJFC Complex Bin Qasim Karachi

Merino Textile Mill on Faisalabad Shahkot Road Shahkot

International Juice Factory Azad Jammu & Kashmir

Sapphire Textile at Bhai Pharu

Pharmagen Beximco on Ferozpur Road Lahore

CCL extension unit at Kot Lakhpat Industrial Area Lahore

ProDiesal Services on Firozpur Road Lahore

Genesis Pharmaceutical Complex on Sheikhupura Faisalabad Road

Tower Crane Foundation at Fauji Cement, Jhang Bhatar

Ammar Textiles on Defence Road near Multan Road Lahore

Gas Treatment Plant at Liberty Power Project Ghotki Sind

CCL Godowns at Industrial Area Kot Lahkpat Lahore

Maria Balal Garment Factory and its Extension Units at Raiwind Road Lahore

Zuchini Industries Raiwind Road Lahore

Expansion of Caustic Soda Plant at Sitara Chemicals Limited on Faisalabad Sheikhupura Road

Carpet Processing Unit at Defence - Raiwind Road Lahore for Abbas Corporation (Pvt) Ltd

Expansion Unit for Dynamic Sportswear (Pvt) Ltd Canal Road Lahore

New Processing Unit for Vision Technologies (Pvt) Ltd Sialkot

Burhan Flour Mill at Gujrat Bypass

Kohat Cement Factory at Kohat

Coca Cola Plant, Gugranawala

Millac Foods, Manga Raiwind Road, Lahore

Merit Pharmaceutical, 34 km Ferozpur Road Lahore

Pepsi Cola International, Hattar

Pakistan Gloves Manufacturers & Export, Building, Sialkot

Shangai Chemicals, Sheikhupura Road

Nishat Dying and Finishing, Lahore

Ramey Textile Mills, Lahore

Forest Sweaters Pvt Limited

SKB Milk Plant, Raiwind Road, Lahore

Sitara Chemicals, Faisalabad

Rizwan Textile, Lahore

Industrial Buildings

Page 21: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Geotechnical Investigations

SKB Factory at Raiwind Road, Lahore

Tandlianwala Suger Mill

CSK Distilleries Palia

Kohat Cement Plant Kohat

ICI extension for polyester plant Sheikhupura

Infra-structural for DHA Phase-VI Lahore

Packages Pulp and Paper Factory Kasur

Shed for Pepsi Cola Hattar

Export Processing Zone Gujranwala

Waste water treatment plant Rawalpindi

Madina Cold Storage Sillanwali Road Faisalabad

Food Processing Plant at Export Promotion Zone Gujranwala

Pepsi cola Manga Road Lahore

Rest House Building at Packages Kasur

Hitech Feeds Rawalpindi, Sheikhupura, Sharakpur and Fatehjang

Snack Green Field Factory at Sunder Industrial Estate for Pepsi.

Faisal Asad Textile Mill Muzaffargarh

Sitara Agriculture Research Centre Gutwala Faisalabad

Sitara Hydrogen peroxide Plant Faisalabad

Sitara Chemicals Faisalabad

Underpasses at Committee Chowk and Rawalpindi General Hospital Chowk on

Murree Road Rawalpindi

Sub-soil Investigation for Internal Roads for Rupafab at Raiwind

Sub-soil Investigation for Internal Roads for District Headquarter at Swabi

Sub-soil Investigation for Lahore Bypass (sub-contract)

Sub-soil Investigation for Rawalpindi Ring Road Project Rawalpindi

Road Side Soil Investigation & Borrow Material Exploration/Testing For ADB

Assisted Rural Access Roads Project Phase - I in District Mandi Bahauddin,

Jhelum, Khushab, Kasur and Okara.

Road Side Soil Investigation & Borrow Material Exploration & Existing Road

Condition Survey for Dualization of Sheikhupura Faisalabad Road

Soil Investigation for Seven Nos. Of Bridges For Sheikhupura Faisalabad Dual Carriage

Way

Flyover bridge at Sherpao bridge Lahore

Flyover bridge at Katchary Chowk Multan

Underpass bridge at Jail Road Lahore

Roads and Bridges

Page 22: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Geotechnical Investigations

.

Additional Carriage Way (N-5) Section: TMP-Bahawalpur.

Road Side Soil Investigation & Borrow Material Exploration/Testing & Existing Condition

Survey for Khwaza Khela Besham Road Malakand Division.

Road Side Soil Investigation & Borrow Material Exploration/Testing & Existing Condition

Survey for Three Roads in Malakand Division.

Bridge Over Sutlej River

Soil Investigation and Testing at Ferozpur Road Lahore

Quetta Chamman Road

200 km Roads in Wanna

200 km Roads in MRDP

Sibbi Much Road

Internal and Main Boulevard for Bahria Town Lahore M3

Confirmatory Investigations

Lahore Ring Road Project Package VIII, IX, XI, VII and VIII

Chukiatian Barawal Road

Feasibility study for 1.2 Mw Marchai Hydropower Project.

Feasibility Study for 1.5 MW Khari II Hydropower Project.

Feasibility Study for 120 MW Shushghai Zhendoli Hydropower Project.

EPC Bid Preparation for 100 MW Kotli Hydropower Project.

Feasibility Study for 100 MW Shogo Sin Hydropower Project.

Detail Civil Design for 22 MW Jabban Hydropower Project.

EPC Bid Preparation for 120 Mw Rajdhani Hydropower Project.

Periodic Inspection of 1450 Mw Ghazi Brotha Hydropower Project.

Feasibility Study for 300 MW Naran Hydropower Project.

Feasibility Study for 98 MW Batakundi Hydropower Project.

Feasibility Study for 180 MW Balakot Hydropower Project.

Bid Preparation for Small Hydropower Project on Canal in Punjab.

Engineering Services for Lucky Hydropower Project, Marala

Engineering Services for LBDC Hydropower Project, Chichawatni.

Engineering Services for JBC Hydropower Project.

Engineering Services for 130 MW Sehra Hydropower Project.

Keyal Khuwar Hydropower Project, KPK

Azad Patten Hydropower Project

Geotechnical Investigation of Mahl HPP (Quarry sites), AJK

Hydropower Projects

Page 23: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Geotechnical Investigations  

 

Coal Exploration Projects

Geotechnical Investigation of Coal Field Block-I at Islamkot Thar, Sindh

Soil Investigation K-2 Project, Sindh

Punjab Coal Mine Project Kallar Kahaar, Punjab

Cement Quarry Exploration Projects

Geotechnical Investigation at D.G Khan Cement (Kallar Kahaar).

Geotech Investigation at Maple leaf cement Iskandrabad in Mianwali

Geotechnical Investigation at Gharibwal Cement

Mass Transit Projects

Lahore Rapid Mass Transit Project, Lahore

Orange Line Metro Train Project, Lahore

Page 24: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Geotechnical Investigations  

 

1180 MW RLNG Bhikki Power Project

230 MW LNG Based Engro Power Project Port Qasim

350 MW Coal Based Power Project of Siddique Sons, Port Qasim

2 x 330 MW Coal Fired Power Project in Thar, Engro Energy.

100 MW Charbon Coal Power Project.

2 x 60 MW Coal Fired Power Project, Fatima Energy.

50 MW Coal Power Project near Johar Abad, Orient Power.

11 MW Biomass Based Project in Faisalabad.

1 x 46 MW Coal Based captive power plant of Nishat Chunian Ltd., Pakistan

425 MW Combined Cycle Nandipur Power Plant

152 MW Combined Cycle Diesel Engine Power Project Pasrur Sialkot

225 MW Shahpur Power Plant, Sargodha

135 MW Bhiki Power Project

225 MW Combined Cycle Balloki Power Plant

225 MW Combined Cycle Saif Power Plant, Sahiwal

AES Power Plant; Design of Cooling Towers and Construction Supervision

Preliminary sub-soil Investigation for 481 MW Thermal Power Plant on Sheikhupura

Faisalabad Road

Preliminary sub-soil Investigation for proposed Thermal Power Plant near Kot Addu

Detail Design stage sub-soil Investigation for 481 MW Thermal Power Plant on

Sheikhupura Faisalabad Road

Confirmatory sub-soil investigation for Olympia Power Project on Sheikhupura

Faisalabad Road

1 x 46 MW Coal Based captive power plant of Nishat Chunian Ltd., Pakistan

425 MW Combined Cycle Nandipur Power Plant

152 MW Combined Cycle Diesel Engine Power Project Pasrur Sialkot

225 MW Shahpur Power Plant, Sargodha

225 MW Combined Cycle Balloki Power Plant

225 MW Combined Cycle Saif Power Plant, Sahiwal

Engro Chemicals Pakistan; Design of Pile Foundations and Supervision of Piling Works

AES Power Plant; Design of Cooling Towers and Construction Supervision

Preliminary sub-soil Investigation for 481 MW Thermal Power Plant on Sheikhupura

Faisalabad Road (Main contract with M/s Mirza Associates (pvt) Ltd

Preliminary sub-soil Investigation for proposed Thermal Power Plant near Kot Addu

Power Plant and Fertilizer Plants

Thermal Power Plants

Page 25: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Geotechnical Investigations  

 

Cement Industry

(Main contract with M/s Habib Rafiq (pvt) Ltd)

Detail Design stage sub-soil Investigation for 481 MW Thermal Power Plant on

Sheikhupura Faisalabad Road (Main contract with M/s Progressive Consultants (pvt) Ltd

PAK and M/s Black & Veatch USA)

Confirmatory sub-soil investigation for Olympia Power Project on Sheikhupura

Faisalabad Road (Main contract with M/s Olympia Group)

135 MW Bhiki Power Project (Main contract M/s Pakistan Power Resources LLC)

Engro Chemicals Pakistan; Design of Pile Foundations and Supervision of Piling Works

Preliminary Geotechnical Investigation for New Processing Units at Attock Refinery

Morgah Rawalpindi (Main contract with M/s ARL Rawalpindi Pakistan)

Detail design Geotechnical Investigation for New Processing Units at Attock Refinery

Morgah Rawalpindi (sub-contract with M/s Mitsui Japan)

Geotechnical Investigation for New tank area sites at Attock Refinery Morgah

Rawalpindi (Main contract with M/s ARL Rawalpindi Pakistan)

Preliminary Geotechnical Investigation for Pak Arab Refinery (PARCO) Mahmood Kot

(sub-contract with M/s Habib Rafiq (pvt) Ltd).

Geotechnical Investigation for Flare Stack Structure at Attock Refinery Rawalpindi (sub-

contract with M/s Descon Engineering (pvt) Ltd)

Detail design Geotechnical Investigation for Central Processing Plant for REHMAT-1

Gas Field at Sardar Garh near Gotki (Main contract with M/s Presson International of

Canada)

Detail design Geotechnical Investigation for Central Processing Plant for MOL Gas Plant

at GURGURI (Main contract with M/s Presson International of Canada)

Soil Survey Along 6” Dia. Oil Pipeline From Turkwal to ARL Via Pindori (for K.F.

Corporation (Pvt.) Ltd

New Grey 6700 TPD Cement Plant for M/s Kohat Cement Company Ltd at Kohat

New Grey 7600 TPD Cement Plant for M/s Fauji Cement Company Ltd at Fatehjang

Oil & Gas Sector

Oil Refinery & Fertilizer Plants

Page 26: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Geotechnical Investigations  

 

28 Nos. of 30 m to 60 m High GF Towers in Lahore for Nortel Networks

18 Nos. of 30 m to 60 m High GF Towers in Sialkot for Nortel Networks

18 Nos. of 30 m to 60 m High GF Towers in Gujrat for Nortel Networks

18 Nos. of 30 m to 60 m High GF Towers in Gujranwala for Nortel Networks

18 Nos. of 30 m to 60 m High GF Towers in Faisalabad for Nortel Networks

14 No. of 30 m to 60 m High GF Towers in Sheikhupura for Nortel Networks

18 Nos. of 30 m to 60 m High GF Towers in Multan for Nortel Networks

3 Nos. of 30 m to 60 m High GF Towers in Attock for Nortel Networks

8 Nos. of 30 m to 60 m High GF Towers in Islamabad and Rawalpindi

45 Nos. of 30 m to 60 m High GF Towers in Lahore for Ericsson Pakistan 8

Nos. of 30 m to 60 m High GF Towers in wazirabad for Ericsson Pakistan

7 Nos. of 30 m to 60 m High GF Towers in Gujrat for Ericsson Pakistan

9 Nos. of 30 m to 60 m High GF Towers in Gujranwala for Ericsson Pakistan

21 Nos. of 30 m to 60 m High GF Towers in Faisalabad for Ericsson Pakistan

14 No. of 30 m to 60 m High GF Towers in sialkot for Ericsson Pakistan

12 Nos. of 30 m to 60 m High GF Towers in Multan for Ericsson Pakistan

8 Nos. of 30 m to 60 m High GF Towers in sargodha for Ericsson Pakistan

5 Nos. of 30 m to 60 m High GF Towers in sheikhupura for Ericsson Pakistan

8 Nos. of 30 m to 60 m High GF Towers in phalia for Ericsson Pakistan

5 Nos. of 30 m to 60 m High GF Towers in tandianlwala for Ericsson Pakistan

3 Nos. of 30 m to 60 m High GF Towers in Okara for Ericsson Pakistan

8 Nos. of 30 m to 60 m High GF Towers in Gujrat for Alandick Pakistan

4 Nos. of 30 m to 60 m High GF Towers in Gujranwala for Alandick Pakistan

8 Nos. of 30 m to 60 m High GF Towers in Faisalabad for Alandick Pakistan

11 No. of 30 m to 60 m High GF Towers in sialkot for Alandick Pakistan

17 Nos. of 30 m to 60 m High GF Towers in Multan for Alandick Pakistan

18 Nos. of 30 m to 60 m High GF Towers in sargodha for Alandick Pakistan

15 Nos. of 30 m to 60 m High GF Towers in sheikhupura for Alandick Pakistan

5 Nos. of 30 m to 60 m High GF Towers in phalia for Alandick Pakistan

8 Nos. of 30 m to 60 m High GF Towers in tandianlwala for Alandick Pakistan

Tele Communication Towers

Page 27: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Geotechnical Investigations  

 

Tarbela-Ghatti 500 kv in-out arrangement for M/s ICC (Pvt) Ltd

Rawat Islamabad 220 kv transmission line towers for M/s ICC (Pvt) Ltd

Shahibagh - Peshawar 220 kv transmission line towers for M/s ICC (Pvt) Ltd

Barotha Nowshera Shahibagh 220 kv transmission line towers for M/s ICC (Pvt) Ltd

Rahim Yar Khan - Jamshoro 500 Kv Transmission Line, 3rd Circuit

Zahir Pir - Guddu 500 Kv Transmission Line

Jamshoro - Dadu 500 Kv Transmission Line (partial)

132/11.5 kV GIS Station at Lahore Airport

500 kV Grid station at Sahiwal for Siemens

Ghatti-Muzzaffargarh 500 kv Transmission Line Project

220 kv AIS Substation

Dadu and Moro Substation

Ghazi Barotha 550/220kv Substation

Peshawar Shahi Bagh Transmission Line

Mansehra Allai Khwar 220kv

Dubar Khwar-Khan Khwar-Allai Khwar Twin Bundle 132 kv Transmission Line

220kv Grid Station Gujrat

500 kv Rawat-Ghakhar-Lahore Transmission Line

500 kv Rawat-Mandi Bahauddin Transmission Line

Guddu-Sibbi Substation

Thal Canal Project

PSO Petrol Pump

Sewerage Treatment Plant Rahim Yar Khan

Mazar at Chalay Sharif Gujrat

Weather Radar Station Islamabad

Swimming Pool at Aitchison College Lahore

Beacon House Complex Raiwing Road Lahore

Bridge at Abdullahpur Faisalabad

Office building for DESCON Ferozepur Road Lahore

Sethi Motor Showroom Ferozpur Road Lahore

Beacon House School Walton Road Lahore

Magic park Motorway

State Bank of Pakistan

Suzuki Motors Sargodha Road Lahore

Schlumberger S.A. offices and workshop at Sukkur

Miscellaneous

Power Transmission Lines

Page 28: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Piling Projects  

 

PILING PROJECTS

Page 29: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Piling Projects  

 

Construction and Load Testing of 14 test piles for Orange Line Metro Train Project, Lahore

Construction of 40 pile foundations for Barotha Nowshera Industrial Shahi Bagh D/C Twin Bundle 220 kV Transmission Line (Diameter of pile 900 mm each 20 m deep, Diameter of piles 1220 mm each 30 m deep, using Percussion Method) in year 2003

Construction of 32 pile foundations for Peshawer Shahi Bagh D/C Twin Bundle 220 kV Transmission Line (Diameter of pile 900 mm each 20 m deep, Diameter of piles 1220 mm each 30 m deep, using Percussion Method) in year 2003

Construction of 28 pile foundations for Rewat Islamabad D/C Twin Bundle 220 kV Transmission Line (Diameter of pile 900 mm each 20 m deep, Diameter of piles 1220 mm each 30 m deep, using Percussion Method) in year 2003

Construction of 1500 nos of 760 mm each of 40 m deep diameter piles for New Grey Cement Plant for Kohat Cement (Pvt) Ltd at Kohat.

Construction of pile foundation for Highway Bridge near Muridkay. (Diameter of pile = 760 mm, Nos. of piles = 36, Using reverse rotary method)

Construction of pile foundation for Highway Bridge over B.S. Link Canal near Chunian. (Diameter of pile = 760 mm, Nos. of piles = 26, Using percussion method)

Construction of pile foundation for railway overhead bridge Ghari Shahu. (Diameter of pile = 840 mm, Nos. of piles = 126, Using reverse rotary method)

Construction of pile foundation for nullah at kharian Cantt. (Diameter of pile = 610 mm, Nos. of piles = 6, Using reverse rotary method)

Construction of pile foundations for 25 m high Mobilink Tower at Chung. (Diameter of pile = 760 mm, Nos. of piles = 4, Using reverse rotary method)

Construction of pile foundations for 25 m high Mobilink Tower at Muridkay.(Diameter of pile = 760 mm, Nos. of piles = 4, Using reverse rotary method)

Construction of 1220 mm dia piles for towers for 220 KV Transmission Lines (76 nos. of towers)

Construction of 1000 mm diameter piles for bridge at Bahria Town Rawalpindi

Piling Projects

Page 30: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Well Drilling Projects  

Berkeley Associates (Pvt.) Ltd.

WELL DRILLING PROJECTS

Page 31: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Well Drilling Projects  

Berkeley Associates (Pvt.) Ltd.

Design and Construction of Four (4) tubewells having 3.2 cusec discharge capacity at

425 MW CCPP Nandipur for M/s DEC China

Design and Construction of six (6) tubewells having 3 cusec discharge capacity at

PARCO Mid-Country Refinery Project Mahmood Kot for M/s Marubeni

Corporation (MC / JJC) Japan.

Construction of one (1) tubewell at Rehmat Oil and Gas Processing Plant for Presson /

Petronas Canada.

Construction of one (1) tubewell for Wapda at Gujrat

Construction of one (1) tubewell at Liberty Power Project Ghotki Sind.

Construction of one (1) tube well having 2 cusec discharge capacity at Sunny

View Housing Scheme Lahore for M/s Habib Rafiq (pvt) Ltd.

Construction of seven (7) tube wells having 3 cusec discharge capacity for

construction of Lahore Islamabad Motorway on Section - I.

Construction of five (5) tube wells for water supply in Islamabad.

Construction of two (2) tube wells for water supply at Bhimber and Mirpur.

Construction of two (2) tube wells for L.D.A. in under construction Gujarpura Scheme as

sub-contract.

Construction of seven (7) tube wells for WASA Faisalabad as sub-contract.

Construction of three (3) tube wells for agriculture purpose in Kasur.

Construction of one no. of tubewell at Labour Colony Gujrat for M/s Ghulam Habib

Construction.

Construction of one no. of tubewell at Gujrat for WAPDA Colony.

Construction of one tubewell at Rehmat Gas Treatment Plant Gothki.

Page 32: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Completed Projects

Berkeley Associates (Pvt.) Ltd.

 

 

Topographic Surveys

Page 33: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Completed Projects

Berkeley Associates (Pvt.) Ltd.

 

 

75 KTPA LIGHT ASH EXPANSION (PHASE‐I) ICI Khewera 

425 MW Combined Cycle Nandipur Power Plant 

1180 MW CCPP at Bhikki 

1223 MW CCPP at Balloki 

Calci Packages Limited 

100 MW Fatima Energy Cogen Power Project 

New Ammonia / Urea Plants Project of Engro Dharki 

PARCO Mid‐Country Refinery Project Mahmood Kot 

Pepsi Cola International, Multan 

660 Lucky Hydropower Project 

Gulf Rental Power 

230 MW LNG Based Engro Power Project Port Qasim 

Green Power CNEC 

Rehabilitation of Building Defects of Malala Yousaf Zai Daanish School (Boys and Girls) Jand 

District Attock 

100 MW Solar Power Project 

300 MW Coal Based Power Project of Siddique Sons, Port Qasim 

1 x 46 MW Coal Based Captive Power Plant of Nishat Chunian Ltd, Pakistan 

90 MW Batakundi Hydropower Project, KPK 

180 MW Naran Hydropower Project, KPK 

300 MW Balakot Hydropower Project, KPK 

120 MW Shushghai Zhendoli Hydropower Project, Chitral 

200 Bed North East Hospital Complex, Peshawar 

Moro & Dadu 500Kv substations 

22 MW Jabban Hydropower Project, KPK 

Residential Villas Saudi Embassy Islamabad 

JBC Hydropower Project, Sukheke 

Page 34: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

PROJECT SHEETS

Page 35: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: 1180 MW CCPP at Bhikki

Location: Bhikki, District Shekhupura, Pakistan

Client: Quaid-e-Azam Thermal Power (Pvt.) Ltd., Govt. of Punjab

Scope of Services:

Geotechnical  Investigations  for  Power  Plant  and  Access  Road  comprising 

3,500  m  drilling  of  investigation  boreholes,  down‐hole  seismic  survey, 

electrical resistivity survey, and laboratory testing 

 

Topographic Survey and Bathymetric Survey of canal 

  Groundwater Studies comprising site survey, groundwater modeling, design  of 

pumping wells 

 

Construction of test piles, pile load testing, evaluation of pile load tests  

Construction of 1300 cast in‐situ concrete piles   

 Start date: October 2015

End date: Dec. 2015

Page 36: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets

Berkeley Associates (Pvt) Ltd

Project: 1223 MW CCPP Balloki Pakistan

Location: Balloki, District Kasur, Pakistan

Client: National Power Parks Management Co. (Pvt.) Ltd.,

Government of Pakistan

Scope of Services:

Geotechnical Investigations for Power Plant and Access Road comprising

3,400 m drilling of investigation boreholes, down-hole seismic survey,

electrical resistivity survey, and laboratory testing

Groundwater Studies comprising site survey, groundwater modeling, design of

pumping wells

Construction of test piles

Performance of lateral free and fixed head pile load test

Carrying out pile load test in compression and tension

Slope stability analyses for intake and outlet structures

Core drilling in working piles

Start date: November 2015

End date: January 2017

Page 37: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets

Berkeley Associates (Pvt) Ltd

Project: 2 x 330 MW Engro Thar Coal Project

Location: Block 2, Thar, Sind, Pakistan

Client: Engro Power Thar Limited

Scope of Services:

Supervision and Review of Topograpic Survey and Geotechnical Investigations

for Power Plant carried out by the EPC Contractor.

Civil Design Review of the Power Plant Structures and all Civil related

components including pavements, drainage system, sewerage, water supply

and water treatment.

Review of Groundwater Studies

Quality Control through resident supervision

Design of Evaporation Pond

Start date: October 2015

End date: On going

Page 38: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: 350 MW Coal Fired Power Plant

Location: Port Qasim

Client: Siddique Sons Energy

Scope of Services:

Geotechnical Investigations  

Topographic Survey & Bathymetric Survey 

  Groundwater Studies 

  Resistivity Survey 

  

 Start date: Jan, 2015

End date: Mar, 2015

Page 39: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets

Berkeley Associates (Pvt) Ltd

Project: Groundwater PEPSICO Greenfield Project in Multan Industrial Estate, Multan

Location: Multan Industrial Estate, Multan, Pakistan

Client: PEPSICO, Pakistan

Scope of Services

Desk Studies and Collection of available hydrogeological data

Field reconnaissance survey

Electrical Resistivity Survey for groundwater quality and quantity assessment

Drilling and Installation of test well and piezometers

Performance of aquifer test

Collection of water samples and their chemical analysis

Mathematical Modelling

Analysis of aquifer test data and determination of aquifer parameters

Submission of detailed report

Start Date: May, 2015

End Date: June, 2015

Page 40: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets

Berkeley Associates (Pvt) Ltd

Project: Groundwater Studies for 1x300 MW Local Coal Power Plant at Lilah Pind-Dadan Khan, Salt Range, Pakistan

Location: Pind-Dadan Khan, Punjab, Pakistan

Client: China Machinery Engineering Corporation

Scope of Services

Desk Studies and Collection of available hydrogeological data

Field reconnaissance survey

Electrical Resistivity Survey for groundwater quality and quantity assessment

Drilling and Installation of test well and piezometers

Performance of aquifer test

Collection of water samples and their chemical analysis

Mathematical Modelling

Analysis of aquifer test data and determination of aquifer parameters

Submission of detailed report

Start Date: December, 2014

End Date: January, 2015

Page 41: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets

Berkeley Associates (Pvt) Ltd

Project: Groundwater Studies for 1x40 MW Coal based Captive Power Plant for Nishat Chunian Limited, Bhai Pheru

Location: Bhai Pheru, district Kasur, Punjab, Pakistan

Client: Quaid-e-Azam Thermal Power Pvt. Ltd.

Scope of Services

Desk Studies and Collection of available hydrogeological data

Field reconnaissance survey

Electrical Resistivity Survey for groundwater quality and quantity assessment

Drilling and Installation of test well and piezometers

Performance of aquifer test

Collection of water samples and their chemical analysis

Mathematical Modelling

Analysis of aquifer test data and determination of aquifer parameters

Submission of detailed report

Start Date: October, 2014

End Date: November, 2014

Page 42: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Orange Line Metro Train, Project

Location: Lahore, Pakistan

Client: Punjab Metro bus Authority

Scope of Services:

Geotechnical Investigations along the alignment of the Orange Line 

  Execution of 14 Test Piles and Pile Load Tests up to 12000 tons, interpretation of pile load tests, and design recommendations for working piles 

  

Start date: July 2015

End date: September 2015

Page 43: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: 150 MW Patrind Hydropower Project

Location: Muzaffarabad, AJK

Client:  Daewoo Engineering &  Construction     

 

    

Scope of Services:

Preparation of Construction Drawings for Power House, Weir, Excavation, Retaining System.

Detailed Design and preparation of Construction Drawings for Access Roads

Page 44: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Feasibility Study of 12 MW Biomass Based IPP Project

Location: Faisalabad, Punjab

Client: Masood Textile Mills

Scope of Services:

Sitting Studies Topographic

survey Geotechnical

investigations Initial

Environmental Examination Grid

interconnection studies

Completion Time: 9 Months

Completion Date: March 2013

Page 45: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets

Completion Date: December, 2013

 

 

Project: Feasibility Study for 180 MW Naran Hydropower Project

Location: Naran, Khyber Pakhtunkhwa

Client: Sarhad Hydel Development Organization (SHYDO)

Scope of Services: Preparation of Geotechnical investigations program and tender documents

Top supervision of Geotechnical investigations

Preparation of laboratory testing program

Geotechnical analysis and design for feasibility study

Preparation of geotechnical investigations report

Feasibility level design of all hydraulic structures

Preparation of drawings for feasibility level design

Financial and economic analyses of the project

Seismological studies and geological mapping

Environmental studies

Completion Time: 18 Months

Page 46: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets

Completion Time: 18 Months

Completion Date: December, 2013

 

 

Project: Feasibility Study for 300 MW Balakot Hydropower Project

Location: Balakot, Khyber Pakhtunkhwa

Client: Sarhad Hydel Development Organization (SHYDO)

Scope of Services: Preparation of Geotechnical investigations program and tender documents

Top supervision of Geotechnical investigations

Preparation of laboratory testing program

Geotechnical analysis and design for feasibility study

Preparation of geotechnical investigations report

Feasibility level design of all hydraulic structures

Preparation of drawings for feasibility level design

Financial and economic analyses of the project

Seismological studies and geological mapping

Environmental studies

Page 47: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets

Completion Time: 18 Months

Completion Date: December, 2013

 

 

Project: Feasibility Study for 98 MW Batakundi Hydropower Project

Location: Batakundi, Khyber Pakhtunkhwa

Client: Sarhad Hydel Development Organization (SHYDO)

Scope of Services: Preparation of Geotechnical investigations program and tender

documents

Top supervision of Geotechnical investigations

Preparation of laboratory testing program

Geotechnical analysis and design for feasibility study

Preparation of geotechnical investigations report

Feasibility level design of all hydraulic structures

Preparation of drawings for feasibility level design

Financial and economic analyses of the project

Seismological studies and geological mapping

Environmental studies

Page 48: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Shogo – Sin Hydropower Project

Location: Chitral

Client: Private Power Infrastructure Board (PPIB)

Scope of Services: Preparation of Geotechnical investigations program

Preparation of Tender documents for Geotechnical investigations

Top supervision of Geotechnical investigations

Preparation of Laboratory testing program

Geotechnical analysis and design for feasibility study

Preparation of geotechnical investigations report

Feasibility level design of all structures

Preparation of drawings for feasibility level design

Completion Time: 15 Months

Completion Date: April, 2010

Page 49: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Shushghai - Zhendoli Hydropower Project

Location: Chitral

Client: Private Power Infrastructure Board (PPIB)

Scope of Services: Preparation of Geotechnical investigations program

Preparation of Tender documents for Geotechnical investigations

Top supervision of Geotechnical investigations

Preparation of Laboratory testing program

Geotechnical analysis and design for feasibility study

Preparation of geotechnical investigations report

Feasibility level design of all structures

Preparation of drawings for feasibility level design

Completion Time: 15 Months

Completion Date: April, 2010

Page 50: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: 548 MW Kaigah Hydropower Project

Location: Kandian River

Client: Kaigah Power Pvt Ltd

Scope of Services: Preparation of Geotechnical investigations program

Preparation of Tender documents for Geotechnical investigations

Top supervision of Geotechnical investigations

Preparation of Laboratory testing program

Geotechnical analysis and design for feasibility study

Preparation of geotechnical investigations report

Feasibility level design of all structures

Preparation of drawings for feasibility level design

Completion Time: 15 Months

Completion Date: February, 2011

Page 51: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: 22 MW Jabban Hydroelectric Power Station Rehabilitation Project

Location: Jabban – District Malakand

Client: WAPDA

EPC Contractor: HRL – CCPG JV

Scope of Services: Preparation of Geotechnical investigations program

Carrying out geotechnical investigation at site

Preparation of geotechnical investigations report

Geotechnical analysis and design for various components of

Project (i.e. power house, substation, and penstock)

Structural design of powerhouse, penstocks and 132 kV substation

Rehabilitation design for Forebay structure

Preparation of civil work construction drawings

Page 52: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: JBC Hydropower Project, Sukheke

Location: Sukheke, (50km from Lahore)

Client: JBC Powr Ltd.

Consultants: Pakistan Consulting Services

Scope of Services: Drilling of 4 boreholes ranging in depth from 30m to 50m along with SPT

and undisturbed soil sampling

Total exploratory drilling – 130m

Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

Factual and Interpretative Reports

Completion Time: Eight (04) weeks

No. of Drill Rigs: One straight rotary drilling rigs along with necessary crew and

accessories

Completion Date: August 30th 2008

Page 53: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: LBDC Hydropower Project, Chichawatni

Location: Chichawatni, (180km from Lahore)

Client: LBOD Power Ltd.

Consultants: Pakistan Consulting Services

Scope of Services: Drilling of 4 boreholes ranging in depth from 30m to 50m along with SPT

and undisturbed soil sampling

Total exploratory drilling – 130m

Field permeability tests in boreholes

Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

Factual and Interpretative Reports

Completion Time: Eight (04) weeks

No. of Drill Rigs: One straight rotary drilling rigs along with necessary crew and

accessories

Completion Date: September 10th 2008

Page 54: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Lucky Hydropower Project

Location: Sialkot

Client: Olympus Energy (Pvt.) Ltd.

Consultants: Barqab

Scope of Services: Drilling of 5 boreholes ranging in depth from 20m to 30m along with SPT and undisturbed soil sampling

Total exploratory drilling – 155m

Field permeability tests in boreholes

Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

Factual and Interpretative Reports

Completion Time: Eight (04) weeks

No. of Drill Rigs: One straight rotary drilling rigs along with necessary crew and

accessories

Completion Date: August 30th 2008

Page 55: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: 100 MW Fatima Energy Cogen Power Project

Location: Sanawan - Pakistan

Client: Fatima Energy Limited (FEL)

Scope of Services:

Sitting Studies

Topographic survey

Groundwater studies

Material studies

Coal Transportation studies

Geotechnical investigations Initial

Environmental Examination

Preliminary design of civil structures

Completion Time: 10 Months

Completion Date: May 2011

Page 56: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

COOLING TOWERS FOR AES THERMAL POWER PLANT

Scope of Work:

o Preparation of detailed design of all civil and mechanical works, and preparation

of technical specifications, drawings, and Bill of Quantities

o Preparation of tender documents

o Prequalification of Contractors and Invitation of Bids

o Evaluation of Bids

o Award of construction contract

o Construction Supervision for all site works

o Quality Control and Quality Assurance audits

o Verification of contractors running bills

o Preparation of completion reports

o Preparation of progress reports

o Preparation of as-built drawings

Page 57: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Fatima Energy Cogen Power Project

Location: Sanawan, Pakistan

Client: Fatima Energy Limited

Scope of Services:

Geotechnical Investigation (Drilling of 5 boreholes ranging from 15m to 30 m depth along with SPT and undisturbed soil sampling, 4 testpits, laboratory testing including PSD, consolidation, direct shear, unconfined compression and Factual and Interpretative Reports)

Electrical Resistivity Survey Geologic al Hazard Assessment

Completion Date: May 2011 (4 Weeks)

Page 58: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: 234 MW Combined Cycle Power Plant

Location: Muridke, Lahore

Client: Albario Engineering (Pvt) Ltd.

Project Consultants: Skoda Export

Scope of Services:

Geotechnical Investigation (Drilling of 3 boreholes each down to 15m depth along with SPT and undisturbed soil sampling, laboratory testing including PSD, consolidation, direct shear, unconfined compression and Factual and Interpretative Reports)

Pile Integrity Test (Total Tested Piles = 23 Piles)

Completion Time: April 2008 (02 Weeks)

Page 59: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Feasibility Studies for 11 MW Biomass Based Power Plant

Location: Jhang, Punjab

Client: Lumen Energia (Private) Limited

Scope of Services:

Sitting Studies Topographic

survey Geotechnical

investigations Initial

Environmental Examination Grid

interconnection studies

Completion Time: 9 Months

Completion Date: July 2011

Page 60: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Feasibility Study of 100 MW Charbon Coal Power Project

Location: Chakwal, Punjab

Client: Habib Rafiq (Pvt.) Limited

Scope of Services:

Sitting Studies

Topographic survey

Groundwater studies

Material studies

Coal Transportation studies

Geotechnical investigations Initial

Environmental Examination

Preliminary design of civil structures

Completion Time: 12 Months

Completion Date: June 2013

Page 61: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: 100 MW Solar Power Project

Location: Quaid-e-Azam Solar Park, Bahawalpur, Pakistan

Client: TBEA, China

Scope of Services:

Review of Geotechnical Data  

Review Design of foundations for the Solar Panels and Buildings  

Evaluation of the load test results of the screw piles used for panels  

Start date: June 2014

End date: Nov. 2014

Page 62: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: 50 MW Coal Fired Khushab Power Plant

Location: Khushab - Pakistan

Client: Shahpur Energy (Pvt.) Limited

Scope of Services:

Sitting Studies

Topographic survey

Groundwater studies

Material studies

Coal Transportation studies

Geotechnical investigations Initial

Environmental Examination

Preliminary design of civil structures

Completion Time: 12 Months

Completion Date: April 2011

Page 63: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Lahore Rapid Mass Transit System Project

Location: Lahore

Client: Metro Associates, Lahore

Consultants: Systra Group, France

Scope of Services: Drilling of 78 boreholes ranging in depth from 28m to 50m along with SPT and undisturbed soil sampling along the 27km long alignment

Total exploratory drilling – 2,622m

Field permeability tests in boreholes

Installation of fourteen piezometer

Thirty shallow test pits along with field density tests

Five Plate Load tests

Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

Factual and Interpretative Reports

Completion Time: Eight (08) weeks

No. of Drill Rigs: Six straight rotary

drilling rigs along

with necessary

crew and

accessories; and

seven crews of

hand auger cum

light percussion

Page 64: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: 425 MW CCPP Nandipur, Pakistan

Location: Nandipur (160 km from Lahore)

Client: Dongfang Electric Corporation Limited (DEC), China

EPC Contractor: DEC, China

Scope of Survey: Topographic Survey

on Land and under

water for Canal

Preparation of

Survey Maps and

Report

Scope of Services: Drilling of 137 boreholes ranging in depth from 15m to 50m along with

SPT and undisturbed soil sampling

Total exploratory drilling = 4,200 m

Down hole shear wave velocity tests in six boreholes 50 m deep

Cone Penetration Tests (CPT) at 23 locations

Field permeability test

Six Plate load tests

Electrical resistivity tests at 83 locations

Laboratory testing including PSD, consolidation, direct shear, unconfined compression

Factual and Interpretative Reports on the basis of Chinese Code

- Construction of a 120 m deep well,

and five piezometers Performance of pump out test, analyses of data and design of pumping wells.

- Tubewell

- Ground water studies

- Surface water studies

Page 65: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: 225 MW CCPP Saif Power Project Sahiwal

Location: Sahiwal (150 km from Lahore)

Client: Saif Power Limited, Islamabad

EPC Contractor: CMEC, China

Scope of Services: Drilling of 112 boreholes ranging in depth from 30m to 40m along with SPT and undisturbed soil sampling

Total exploratory drilling – 2,800m

Down hole shear wave velocity tests in three boreholes 80m deep

Six Plate load tests

Electrical resistivity tests at 20 locations

Laboratory testing including PSD, consolidation, direct shear, unconfined compression

Factual and Interpretative Reports

Completion Time: Ten (10) weeks

No. of Drill Rigs: Nine straight rotary drilling rigs along with necessary crew and

accessories

Page 66: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: 152 Combined Cycle Diesel Engine Power Plant, Pasrur

Location: Eastern Power Company (EPCO), Islamabad

Client: Eastern Power Company (EPCO), Islamabad

EPC Contractor: Gama Power, Turkey

Scope of Services: Drilling of 20 boreholes ranging in depth from 30m to 50m along with SPT and undisturbed soil sampling

Total exploratory drilling – 920m

Five shallow test pits along with field density test

Installation of piezimeters

Aquifer Pump out test

Electrical resistivity tests at 12 locations

Laboratory testing including PSD, consolidation, direct shear, unconfined compression

Factual and Interpretative Reports

Completion Time: Eight (08) weeks

No. of Drill Rigs: Three straight rotary drilling rigs along with necessary crew and

accessories

Page 67: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: New Urea / Amonia Plants Project, Engro Dharki

Location: Dharki, Dist. Ghotki, Sindh

Client: Engro Chemicals Pakistan Ltd

EPC Contractor: Snamprogatti, Italy

Descon, Pakistan

Scope of Services:

- Geotechnical Investigation and foundation design

- Design coordination with EPC contractor

- Supervision of piling constructions

- Design of dewatering system

- Design of parameters for PMS buildings

- Design review of ammonia storage tanks

- Quality control and quality assurance of all civil works through

resident team of engineers

- Trouble shooting and assistance in design and construction

bottle necks

Completion Time: Three (03) Years

Page 68: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Design of Cofferdam for Construction of Intake Structure

Location: Guddu, Sindh

Client: Habib Rafiq (Pvt.) Ltd.

Scope of Services:

- Development of design of cofferdam including stability analysis,

seepage analysis

- Preparation of construction drawings

- Preparation of detailed method statement

- Analysis to find out impact of construction of cofferdam on the

following canal and development of remedial measures

Page 69: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets

Project: PARCO Refinery

Location: Mahmood Kot, Near Multan

Client: Marubeni Corporation of Japan

Consultants: NA

Scope of Services: Design, Construction, and Commissioning of 6 deep wells of 2 cusec (ft3/sec) capacity each. The scope included drilling of wells, procurement of all materials and machinery required for the works.

Completion Time: Eight (08) weeks

No. of Drill Rigs: Two (reverse rotary type)

Page 70: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets

Project: Flattie’s Hotel Development Project

Location: Lahore

Client: Gulf Commercial Bank, Abu Dhabi

Consultants: Meinhardt, Singapore

Scope of Services: Drilling of 25 boreholes ranging in depth from 65m to 80m along with SPT and undisturbed soil sampling

Total exploratory drilling – 1925m

12 CPT probes to 30m depth each

Field permeability tests in boreholes

Installation of piezometers

Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests

Factual and Interpretative Reports

Completion Time: Eight (08) weeks

No. of Drill Rigs: Nine straight rotary

drilling rigs along with

necessary crew and

accessories

Page 71: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Mobilink Office Building at Quaid-e-Azam Industrial Estate

Location: Lahore, Punjab

Client: Progressive Consultants (Pvt.) Ltd.

Scope of Services:

Comparison of different layout of shoring systems

Finalizing the layout of shoring system

Evaluation of lateral loading at different support levels

Design of different structural components of shoring system

Design of in-situ tangent concrete piles

Preparation of detailed construction drawings

Preparation of Tender Documents for the construction of shoring system

Page 72: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Safety Assessment of Existing Shoring System and Design of Rehabilitation/ Strengthening Measures at Mubarak Center, Ferozepur Road, Lahore

Location: Lahore, Punjab

Client: M/s Taavun (Pvt.) Ltd.

Scope of Services:

Stage – I Assessment of existing retaining system and establish the need for remedial/ strengthening measures, which included;

a) Condition survey/ physical inspection of entire shoring system

b) In-situ Testing; Anchor lift-off tests; Integrity of concrete piles

and bracing beams using Schmidt hammer and PUNDIT

c) Evaluation of existing shoring system by incorporating results of in-situ testing

Stage – II Suggesting the most appropriate and economical strengthening measures to ensure safety of the shoring system and adjacent buildings

Page 73: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Pindi Bhattian Faisalabad Motorway (M-3)

Location: Pindi Bhattian-Faisalabad

Client: National HighwayAuthorities (NHA)

Scope of Work:

Drilling of 40 boreholes ranging in depth from 05m to 10m along with SPT and undisturbed soil sampling along the 60km long alignment

Forty (40) test pits along with field density tests

Laboratory testing including PSD, consolidation, direct shear, unconfinedcompression, triaxialcompressiontests

Factualand Interpretative Reports

Preparationofcomprehensiveevaluationrep 

 

 

Page 74: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Bridge on Sutlej River, Bahawalpur.

Location: Bahawalpur

Client: SKB Pvt. Ltd.

Scope of Work: Drilling of 2 boreholes to maximum depth of 50.0m along with SPT and undisturbedsoilsampling Laboratory testing including PSD, consolidation, direct shear, unconfinedcompression, triaxialcompressiontests

Preparation ofgeotechnical

investigation report Design of bridge

foundations

Start Date: July 01, 2003

End Date: July 20, 2003

Page 75: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Naran Jalkhan Road

Location: Naran to Jakkhad

Consultants: Republic Engineering Corporation (REC), Lahore

Scope of Work: Eighty (80) test pits along with field density tests along the

60km long alignment

Laboratory testing including PSD, Liquid Limit, Plastic Limit, consolidation, direct shear, CBR tests

Preparation of geotechnical investigation reports for the road and all the structures along the road including bridges, culverts, and cross drainage structures

Design of pavement

Design of foundations for all the structures along the road

Date of Work Started: July 5, 2000

Page 76: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Lai Nullah Road Project, Rawalpindi Package-1)

Location: Rawalpindi

Client: National Engineering Services Pakistan (Pvt.) Limited

Scope of Work: Drilling of 20 boreholes ranging in depth from 20m to 40m along

with SPT and undisturbed soil sampling.

Thirty Two shallow test pits along with field density tests

Laboratory testing including PSD, consolidation, direct shear,

unconfinedcompression, triaxialcompressiontests

Preparation of factual reports for geotechnical investigations

Start Date: March 21, 2007

  

End Date: April 21, 2007

Completion Time: Eight (04) weeks

Page 77: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Lukpass Tunnel Quetta

Location: Quetta,Baluchistan

Client: Associated Consulting Engineers (ACE) Pvt. Ltd.

Scope of Work: Drilling of 2 boreholes to maximum depth of 120m along with SPT and undisturbedsoilsampling

Laboratory testing including PSD, consolidation, direct shear, unconfinedcompression, triaxialcompressiontests

Preparationofgeotechnical

investigation reports Initial design of

tunnels support system

Design of slope stabilization near portals

Start Date: February 15, 2006

  

End Date: March 30, 2006

Page 78: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Improvement/Renovation of Existing Multan Road from Thokar Niaz Baig to Chauburji, Lahore

Location: Lahore

Client: National Engineering Services Pakistan (Pvt.) Limited

Scope of Work: Drilling of 4 boreholes to maximum depth of 06m along with

SPT and undisturbedsoilsampling

Laboratory testing including PSD, consolidation, direct shear, unconfinedcompression, triaxialcompressiontests

Fourteen (14) test pits along with field density tests

Start Date: October 01, 2009

End Date: November 01, 2009

Page 79: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

EFFLUENT TREATMENT PLANT FOR TANNERIES,   KASUR  

 

 

 Scope of Work:

Detailed design of Treatment Ponds, Screen House, Equalization Tanks, Settling tanks, Pump House, Embankments, Sludge Disposal Lagoons

Construction supervision for all site works

Quality Control and Quality Assurance audits

Page 80: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

HUBB WATER TREATMENT PLANT  

 

 

 Scope of Work:

Detailed design of civil works of entire treatment plant including building, roads, and tanks

Construction Supervision for all site works

Quality Control and Quality Assurance audits

Preparation of progress report

Page 81: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Project Sheets  

 

Project: Design, Construction and commissioning of six (6) tubewells having 1.0 cusec discharge capacity

Location: PARCO Mid-Country Refinery Project Mahmood Kot, Pakistan

Client: M/s Marubeni Corporation (MC) JGC Japan

Scope of Work:

Design of wells, procurement of well material and pump / motor units, construction of wells, development and testing of wells

Completion Time: Two Months

Completion Date: November 1997

Page 82: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Clients  

 

CLIENTS

Page 83: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Clients  

 

Contractors

Harbin Electric International, China Dong Fong Electric Corporation, China CMEC, China CHINT, China TBEA, China Deawoo Corporation, Koria Karkey International, Turkey Sinogy, China Vestas, Australia M/s Mitsui Engineering & Shipbuilding Co Ltd Japan M/s Marubeni Corporation (JGC) Japan M/s Petrosin Pakistan Ltd M/s Presson Pakistan Ltd M/s Habib Rafiq (Pvt) Ltd M/s General Construction Company (Pvt) Ltd M/s Al-Wasay Construction Company (Pvt) Ltd M/s Walee Builders (Pvt) Ltd M/s Nowshera Engineering Services NENSER (Pvt) Ltd M/s Hisar Corporation (Pvt) Ltd M/s Ghulam Habib Construction (Pvt) Ltd M/s Nazir & Company (Pvt) Ltd

Private Agencies

Engro Pakistan Pepsicola, Pakistan Siddique Sons Energy, (Pvt.) Ltd. Tetra Pack, Pakistan Packages Pakistan Nishat Group Shareef Group M/s Align Technologies (pvt) Ltd USA M/s Fauji Fertilizer Rawalpindi M/s Pakistan Services Limited PSL Karachi M/s Regency Developer Group (Pvt) Ltd M/s Rupali Group (Pvt) Ltd M/s Crescent Services (Pvt) Ltd M/s Attock Refinery Ltd M/s Four Brothers (Pvt) Ltd M/s Global Marketing (Pvt) Ltd M/s Zafar Sons (Pvt) Ltd M/s Rahmat-ul-Alameen Trust M/s Cherished Pharmaceuticals (Pvt) Ltd M/s MSB Industries (Pvt) Ltd M/s Cholistan Sugar Mills (Pvt) Ltd M/s ICI Group Ltd M/s Merino Textile (Pvt) Ltd M/s International Juices (Pvt) Ltd M/s Sapphire Textile Group (Pvt) Ltd M/s Pharmagen Beximco (Pvt) Ltd M/s ProDiesal Services (Pvt) Ltd M/s Genesis Pharmaceuticals (Pvt) Ltd M/s Olympia Power Ltd M/s Hoechst Ravi Chemical Ltd M/s Sitara Chemicals Limited M/s Zuchini Industries Limited M/s Kohat Cement Limited

Page 84: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Clients  

Berkeley Associates (Pvt.) Ltd.

Government Agencies

National Highway Authority Building Division Swabi Pakistan Air Force Police Club Pakistan Bait-ul-Maal Rawalpindi Metropolitan Corporation Pakistan Television Corporation (Headquarter) Islamabad Assistant Director Housing Gujranwala Cantt General Headquarter AG's Branch Rawalpindi National Engineering Services Pakistan (NESPAK) Lahore Development Authority Engineering Consultancy Services Punjab (ECSP) Public Health Engineering Department, Punjab

Page 85: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Topographic Survey Equipment  

Berkeley Associates (Pvt.) Ltd.

TOPOGRAPHIC SURVEY EQUIPMENT

Page 86: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Completed Projects

RTK DGPS (Dual Frequency) 

2 NO, SET  Trimble R10 GNSS System,440 Channel Dual Frequency GPS and 

WAAS/EGNOS receiver system with L2C capability and integrated UHF 

radio modem 

4 NO, SET  Trimble R8 GNSS System, 440 Channel Dual Frequency GPS and 

WAAS/EGNOS receiver system with L2C capability and integrated UHF 

radio modem 

2 NO, SET  Trimble 5700 DGPS Receiver Advanced Dual Frequency GPS and 

WAAS/EGNOS receiver system with L2C capability and integrated UHF 

radio modem. 

2 N0'S  Sokkia Stratus L1 12 channel single frequency Receivers. 

3 NO’S  Magellan Triton series 400 

3 NO’S  Garmin Hand Held GPS E Series. 

TOTAL STATION 

5 No’s  (I)  Sokkia CX‐105 (10,000 point) Built in Memory with Reflector  less) 

2 No’s  (II)  Sokkia 530 RK, (10,000 point) Built in Memory with Reflector  less 

1 No’s  (III)  Nikon NPl‐632, 2” accuracy (Built in Memory with SD card) 

2 No’s  (IV)  Nikon Nivo 5‐M (Built in Memory) 

ECHO SOUNDERS 

2 No’s  GPSMAP 527xs ‐ Garmin 

LEVELS 

10 No’s  (I)  Digital Level, Sokkia, NIKON, PENTAX (Level accuracy 0.10 mm) 

(ii)  Wild B2 

* Above all items are available with their accessories.                  

 

  

 

Berkeley Associates (Pvt.) Ltd.

Page 87: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Drilling Equipment  

 Berkeley Associates (Pvt.) Ltd.

DRILLING EQUIPMENT

Page 88: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Drilling Equipment  

 Berkeley Associates (Pvt.) Ltd.

DESCRIPTION

Rotary Boring Rig for Soil Investigations

Wash Boring Rig for Soil Investigation

CPT Rig (Manual)

Percussion Rig for Soil Investigation

Percussion Rig for Piling

Reverse Rotary for Tube well & Piling

Auger Bucket Dry Drilling Rigs for Piling

Auger boring for Soil Investigation

Tremie, Funnel, Bucket and Pipes

Core Extraction Machine

Hydraulic Jack

Casing 100mm Diameter

Shelby Tubes

Speedy Moisture Tester

Pitcher Sampler

Denison Sampler

SPT Rods (AW)

SPT Apparatus

Sand Cone Apparatus

Drive Cylinder

QTY

12 No. 2 No. 1 No. 4 No. 15 No. 6 No. 3 No. 8 No. 5 No. 1 No. 2 No. Sufficient

Sufficient

2 No.

5 No. 5 No. 800 m 3 No. 3 No. 10 No.

MAKE

Pakistan Pakistan

Pakistan

Pakistan

Pakistan

Pakistan

Pakistan

Pakistan

Pakistan

Pakistan

Pakistan

Pakistan

Pakistan

USA

Pakistan

Pakistan

USA

USA

Pakistan Pakistan

Page 89: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Laboratory Testing Equipment  

 

LABORATORY TESTING EQUIPMENT

Page 90: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Laboratory Testing Equipment  

 

MAKE

Germany USA

USA

China China

Imported Mesh

Pakistan

China

Imported Ring

Imported Ring

Pakistan

Pakistan

Pakistan

Pakistan

Pakistan

Pakistan

Pakistan

China

China

China

China

QTY

2 Nos. 2 Nos. 4 Nos. 1 Nos. 2 Nos. 4 Sets 2 Sets 3 Sets 2 Nos. 1 Nos. 4 Nos. 2 Nos. 2 Nos. 12 Nos. 1 Nos. 1 Nos. 2 Sets 12 Nos. 2 Nos. 12 Nos.

6 Nos.

Sufficient

Sufficient

DESCRIPTION

Electric Oven Triple Beam Balance

Digital Balance

Analytical Balance

Field Balance

US Standard Sieve US

Standard Sieve (Coarse)

Liquid Limit Device

Unconfined Compression Machine

Direct Shear Machine

Consolidation Machine

Standard Proctor Apparatus

Modified Proctor Apparatus

CBR Molds

CBR Machine Sample

Extruder AASHTO

Compaction Test Cylinder

1000 ml

Cylinder 500 ml Beaker 250 ml

Pycnometers 50 ml

Moisture Can

Allied Accessories

Page 91: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Key Personnel  

Berkeley Associates (Pvt.) Ltd.

KEY PERSONNEL

Page 92: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Key Personnel

Berkeley Associates (Pvt) Ltd

NAME AND DESIGNATION QUALIFICATION EXPERIENCE

B.Sc. Civil Engineering

M.Sc. in Geotechnical Engineering

M.Sc. Geology

B.Sc. Civil Engineering

B.Sc. Civil Engineering

B.Sc. Civil Engineering

B.E Civil Engineering

B.Sc. Civil Engineering

48 years experience in Geotechnical and Geoenvironmental Engineering, design of dams and overall engineering management of large projects

24 years in Geotechnical Engineering, field work, Laboratory work, Analyses and design.

46 years experience in ground water Hydrology

48 years experience of Structural Design of Building, hydropower Project.

40 years experience

15 years experience

2.5 years experience

1 year experience

Jahangir Akhtar Chief Executive Officer

Khalid Ayyub Director/ Head Geotechnical Engineering

Ahmad Nawaz Groundwater Expert

Sheikh Ilyas Ahmed Chief Structural Engineer Head Project Manager

Ijaz Shafi Head Structural

Saqib Mir Principal Structural Engineer

Umar Maqsood Senior Structural Engineer

Hafiz Muhammad Hassan Ajmal Junior Structural Engineer

Page 93: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Key Personnel

Berkeley Associates (Pvt) Ltd

Farooq Naveed M. Sc. Civil 8 years in Geotechnical Senior Geotechnical Engineering Engineering Engineer

Imran Farooq M.Sc. Civil 5 years in Geotechnical Senior Geotechnical Engineering Engineering Engineer

Abdullah Masood B.Sc. Civil 1 years experience Junior Engineer Engineering

Mannan Ali B.Sc. Geological 2 years experience Geological Engineer Engineering

Hafiz Abdur Razzaque M.Sc. Geology 5 years experience Senior Geologist

Asad Ali BS Applied Geology 2.5 years experience Geologist

Maheen Malik M.Sc. Environmental 2.5 years experience Public Health and EngineeringEnvironmental Engineer

Raja Naeem Diploma in Civil 35 Year Experience in Chief Surveyor Technology Surveying, BOQs, Bar

Bending Schedule and rate analyses

EXPERIENCE QUALIFICATION NAME AND DESIGNATION

Page 94: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Field Staff  

Berkeley Associates (Pvt.) Ltd.

FIELD STAFF

Page 95: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Berkeley Associates (Pvt.) Ltd.

Field Staff

NAME AND DESIGNATION QUALIFICATION EXPERIENCE

Abdur Razzaque M. Sc. Applied 5 years experience Site Geologist Geology

Asif Ali M. Phil Applied 2 years experience Site Supervisor Geology

Muhammad Ali Chughtai B. Sc. Geology 30 years experience Site Supervisor

Usman Majeed B. Sc. Geology 1 year experience Site Supervisor Engineering

Muhammad Ishaq F. Sc. 5 years in field and Site Supervisor Laboratory Testing

Muhammad Tariq Matric 15 years in piling

and Site Supervisor well drilling works

Muhammad Naeem Matric 15 years in piling and Site Supervisor well drilling works

Muhammad Saeed F.A 30 years in laboratory Laboratory Technician testing at UET Lahore

Ajmal Hahat B. A 25 years experience in Laboratory Technician material testing lab.

Sikandar Hayat F.A 5 years experience in Laboratory Assistant laboratory testing

Abdul Hameed Middle 15 years experience in Driller drilling

Abdur Razzaque Middle 13 year experience in Driller drilling

Muhammad Imtiaz Middle 13 year experience in Driller drilling

Page 96: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Curriculum Vitae of Key Personnel  

 

CURRICULUM VITAE OF

KEY PERSONNEL

Page 97: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Curriculum Vitae of Key Personnel  

 

Khalid Ayyub Partner / Geotechnical Specialist

DATE OF BIRTH NATIONALITY EDUCATION

OTHER TRAINING

LANGUAGES

MEMBERSHIP OF PROFESSIONAL SOCIETIES

PROFESSIONAL RECORD

December 22, 1967. Pakistani. B.Sc. Civil Engineering.

M.Sc. Soil Mechanics & Foundation Engineering.

Advance computer course in C language from University of Engineering & Technology Lahore.

Special training course on the design and construction of horizontal drainage system organized by IWASRI and sponsored by UNDP/DTCD in collaboration with ILRI Netherland.

Advance course in Hydrology from University of Punjab Lahore.

Special course in saline water movement in response to pumping from Center of Excellence University of Engineering & Technology Lahore.

English Urdu

Pakistan Engineering Council, Islambad. Pakistan Engineering Congress, Lahore. Institution of Engineers, Pakistan. Pakistan National Society For Soil Mechanics And Foundation Engineering.

(a) From April 1999 Up to date

Partner Berkeley Associates.

Page 98: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Curriculum Vitae of Key Personnel  

(b) From May 1994

Chief Executive

March 1999

Kenrock Geotechnical Services

(c)

From December 1993

April 1994

  GEOTECHNICAL ENGINEER ON DESIGN OF EARTH DAMS FOR IRAN, INDONESIA & MALAYSIA.

M/S ACE (PVT) LTD

(d) From October 1993 December 1993

  GEOTECHNICAL ENGINEER ON DESIGN OF CHASMA HYDRO POWER PROJECT.

M/S ACE (PVT) LTD

(e) From September 1991 October 1993

  GEOTECHNICAL ENGINEER ON GHAZI - BAROTHA HYDRO POWER PROJECT.

M/S ACE (PVT) LTD

(f) From May 1990 September 1991

  GEOTECHNICAL ENGINEER ON TARBELA - LAHORE 500 KV TRANSMISSION LINE PROJECT.

M/S ACE (PVT) LTD

(g) From January 1990 May 1990

  STRUCTURAL ENGINEER ON DESIGN OF BRIDGES.

M/S SHEIKH RAIZ AHMAD & ASSOCIATES.

Page 99: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Curriculum Vitae of Key Personnel

Berkeley Associates (Pvt.) Ltd.

JAHANGIR AKHTAR :

Nationality :

Date & Place of Birth :

Profession :

Position in Firm :

Registration Number with : Pakistan Engineering Council

Affiliation with : Professional Institutions

Partner/ Project Management Specialist

Pakistani

November 05, 1947 Lahore Pakistan

Civil Engineer

Chief Executive Officer

CIV-00873

Member Pakistan Engineering Council Member Institution of Engineers Pakistan Member Pakistan Geotechnical Engineering Society Member International Society for Soil Mechanics & Geotechnical Engineering

Key Qualifications

Practicing Professional Engineer since 1968.

Presently working as Chief Executive Officer in Berkeley Associates (Pvt.) Ltd., Responsible for technical coordination, business development, budget monitoring, overseeing the coordination of mega projects. Responsible for technical management, corporate technical monitoring and control, and value addition to the technical outputs of existing projects and review of proposals, bids and TORs for new mega projects.

Worked as Chief Operating Officer and Senior General Manager/Head Geotechnical and Geoenvironmental Division in Engineering Consultancy Services Punjab (Pvt. Limited, Lahore (ECSP from February, 2012 to April, 2016.

Worked as Chief Executive in Jahangir Akhtar and Associates (J&A) from 2009 to January 2012. In this capacity, handled geotechnical problems of Al-Ilam Bridge along Ring Road and two bridge projects along Batinah Coastal Road Sultanate of Oman for M/s Turkpak International. Besides worked as project manager for hydropower, management consultancy and off shore engineering works in Pakistan.

Worked with NESPAK from 1973 to 2009 as Geotechnical Engineer in various positions starting from Senior Engineer to Vice President (Technical Coordination and Vice President / Head of Geotechnical and Geoenvironmental Engineering Division Worked on a wide range of Projects as designer, head of design teams, review expert and coordinator including large dams and water supply projects, hydropower projects, small and medium dams, Highways, Motorways, Airports and bridge projects, Industrial and Energy Projects and Buildings.

During the career with NESPAK, worked on the following major engineering projects, as a Geotechnical Engineer in different capacities ranging from team leader to a team member.

Dams, Water Supply and Drainage Projects

Ghazi-Barotha Hydropower Project, Raising of Mangla Dam, Basha Diamer Dam, Mirani Dam, 12 small dams in FATA, 3 small dams in NWFP, Khanpur Dam Project, Simly Dam

Page 100: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Curriculum Vitae of Key Personnel

Berkeley Associates (Pvt.) Ltd.

Islamabad; Anchor Sihala Dam; 706 Army Base Workshop Water Supply Project; Gadani Water Supply Project Lasbela; Goronyo Dam, Nigeria; Euphrates East Drain Project Iraq; Eastern Province Water Transmission Project,K.S.A; Remodelling of Kinjhar-Gujjo Canal; Quetta Water Supply Project; Qusayba Drainage Project, K.S.A; Fordwah-Sadqia Surface Drainage Project; South Jazira Tunnel Project, Iraq; Hofuf Water Transmission System, K.S.A; Buraidah Feeder Line Project, K.S.A; Sabya Water Network Project (Phase-I), K.S.A.

Participated in inspection of Chashma Barrage, Simly Dam and Khanpur Dam as a member of Panel of Experts.

Energy and Power Projects

Chashma Nuclear Power Plant; 500 KV Transmission Network Towers Pakistan; Kot Addu Gas Turbine PowerStation Pakistan; Efficiency ImprovementofWAPDAThermal Power Plants;450 MW Combined Cycle Thermal Power Plant Guddu; Tarbela and Mangla Hydropower Extension projects Pakistan; KCP Workshop Jauharabad.

Bridges and Highway Projects

Third IBRD financed highway projects in Pakistan; Pategi-Eggan Road Project Nigeria; Bridges in Northern Areas; Sohar Roads-Sultanate of Oman; Khasab Coastal Road, Oman; Additional Carriageway Mianchannu-Sahiwal Highway; various portions of Indus Highway Pakistan; Djouju-Porga Road Benin; Overhead Bridge at Quetta; Chitral Booni Road; upgrading of Old Bridges on Kohat Thal Road; Farm to Market Roads in NWFP and Punjab; Rahim Yar Khan - Tarinda M. Pannah Highway; Strengthening and extension of N-70 Highway; Balochistan Development Authority (BDA) Roads, Islamabad-Muzaffarabad Dual Carriageway, N-70 Road Project.

Motorway Projects

Pakistan Motorway Lahore-lslamabad Section (M-2 Section) and Pakistan Motorway Sheikhupura-Multan-D.G. Khan Section(Old M-3 Section), Pakistan MotorwayPindi Bhattian- Faisalabad Section (current M-3 Section).

Buildings

UBL Multistoreyed Buildings at Karachi, Lahore and Islamabad; Armed Forces Medical City Rawalpindi; Overseas Pakistanis Foundation Head Office Islamabad, Aiwan-e-lqbal Complex Lahore; Air and Naval Headquarters Islamabad; Pakistan Engineering Council Head Office Islamabad; Gomal University D.I. Khan; EFU Head Office Lahore; SLIC Head Office Islamabad; State Bank Building Sialkot; Army Welfare trust Plaza Rawalpindi; PISIC House Lahore; MCB Head Office Building Karachi; OGDC Energy House Islamabad; Prime Minister's House and Secretariat Islamabad; Airport Terminal Buildings at Karachi; Lahore and Islamabad, Pakistan Housing Project spread all over Pakistan; Kidney Centers in Pakistan.

Industrial Facilities

Pak-Saudi Fertilizer Complex; Iron Ore and Coal Berths Port Qasim; Sea Water Intake and Disposal System Karachi Steel Mills; Galadari Cement Works Karachi; Mustehkam Cement Factory Hattar; Maple Leaf Cement Factory Iskandarabad; Storage Facilities for 40,000 tons of rice in Punjab Pakistan, Bhit Gas Field Development Project.

Page 101: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Curriculum Vitae of Key Personnel

Berkeley Associates (Pvt.) Ltd.

Education

Name of Institution Year Degree/Diploma

University of Engineering & Technology, Lahore-Pakistan

1968 B.Sc. Civil Engineering

Other Courses

University of Engineering & 1977 Certificate in Computer Technology, Lahore-Pakistan Programming

L'AllianceFrancaiseLahore 1990 Three Units Course in French Language

EXPERIENCE

I Name of Employing Agency Berkeley Associates (Pvt.) Ltd. Title of Position Executive Director Location of Assignment Lahore-Pakistan Period of Assignment May, 2016 to date

Activities

Working as Director in Berkeley Associates (Pvt.) Ltd., Responsible for technical coordination, business development, budget monitoring, overseeing the coordination of mega projects. Responsible for technical management, corporate technical monitoring and control, and value addition to the technical outputs of existing projects and review of proposals, bids and TORs for new mega projects.

II Name of Employing Agency Engineering Consultancy Services Punjab (Pvt.) Title of Position Chief Operating Officer Location of Assignment Lahore-Pakistan Period of Assignment February, 2012 to April, 2016.

Activities

Worked as Chief Operating Officer and Senior General Manager/Head Geotechnical and Geoenvironmental Division in Engineering Consultancy Services Punjab (Pvt.) Limited, Lahore (ECSP) from February, 2012 to April, 2016.

III Name of Employing Agency Jahangir Akhtar and Associates (J&A) Title of Position Chief Operating Officer Location of Assignment Lahore-Pakistan Period of Assignment September, 2009 to January, 2012.

Activities

In this capacity, handled geotechnical problems of Al-Ilam Bridge along Ring Road and two bridge projects along Batinah Coastal Road Sultanate of Oman for M/s Turkpak International. Besides worked as project manager for hydropower, management consultancy and off shore engineering works in Pakistan.

IV Name of Employing Agency National Engineering Services Pakistan (Pvt.) Ltd

Page 102: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Curriculum Vitae of Key Personnel

Berkeley Associates (Pvt.) Ltd.

 

 

(NESPAK) Title of Position Vice President Technical Coordination

Convenor Board of Management NESPAK Member Board of Management - Mangla Raising Project Member Board of Management - Dasu Hydropower Project

Location of Assignment Lahore-Pakistan Period of Assignment September 2006 to August 2009

Activities

As Vice President Technical Coordination, heading the Technical Coordination Division. Responsible for technical coordination, budget monitoring, business development, overseeing and coordination for mega projects. Responsible for technical management, corporate level technical monitoring and control, and value addition to the technical outputs. Incharge of overall coordination of ERRA Projects.

V Name of Employing Agency National Engineering Services Pakistan (Pvt.)

Limited (NESPAK) Title of Position Vice President Technical Coordination Division

& Convenor BOM Location of Assignment Lahore -Pakistan Period of Assignment September 2006 to November 2007

Activities

As Vice President Technical Coordination, heading the Technical Coordination Division. Responsible for technical coordination, budget monitoring, business development, overseeing and coordination for mega projects. Responsible for technical management, corporate level technical monitoring and control, and value addition to the technical outputs. Inchargeofoverallcoordinationof ERRAProjects.

VI Name of Employing Agency National Engineering Services Pakistan (Pvt.)

Limited (NESPAK) Title of Position Vice President /Head Geotechnical &

Geoenvironmental Engineering Division Convenor BOM

Location of Assignment Lahore -Pakistan Period of Assignment February 2000 to August 2006

Activities

As Vice President/Head Geotechnical and Geoenvironmental Engineering Division, guided the geotechnical team during the Concept Design Phase and reviewed the reports for preparation of the requirements of Geotechnical Studies for Al Shamiya Redevelopment Project, MakkahAl-Mukarrammah, KSA. Theprojectincludesdesignof tunnels, roadnetwork, undergroundspines, bridges/ flyovers, utilityworksetc.

As Vice President/Head Geotechnical and Geoenvironmental Engineering Division, responsible for planning/management of geotechnical studies, geotechnical design of dams and structures and review & quality assurance of geotechnical documents and proposals. Also responsible for administrative and financial management of Geotechnical & Geoenvironmental Engineering Division.

Working as Project Coordinator, review expert and Member of BOM for the following

Page 103: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Curriculum Vitae of Key Personnel

Berkeley Associates (Pvt.) Ltd.

 

 

large Dams and Hydropower Projects:

Ghazi Barotha Hydropower/Dam Project Basha Diamer Dam Project Mirani Dam Project Mangla Dam Raising Project

Providing technical coordination for the design and construction supervision of the following small to medium dams:

Kot Ragha Dam Maidani Dam Mir Kalam Dam Marsi Khel Dam Kharosha dam Dargai Pal Dam Dande Dam

Technical coordination is also being provided for the feasibility study of the following dams:

Zamir Gul Dam Rajoyia Dam Marobi Dam

VII Name of Employing Agency National Engineering Services Pakistan (Pvt.)

Limited Deputed to Pakistan Hydro Consultants (Joint Venture of 5 National and International Consulting firms).

Title of Position General Manager/Chief Geotechnical Location of Assignment Lahore -Pakistan Period of Assignment January 1994 to March 2000

Activities

As Chief Geotechnical for the Ghazi-Barotha Hydropower/Dam Project (a multi-billion dollars project consisting of a barrage, a 52 km long 1,600 cusecs capacity lined power channel and a 1,450 MW power house), responsible for the following activities:

Complete review of geotechnical design aspects of the project; including

barrage and headpond embankments (up to 60 m high), seepage control measures for the barrage (including plastic concrete cutoff, treatment of openworks, relief wells, drainage blanket, filter etc.), elaborate underdrainage system for the lined channel, deep excavations (up to 40 m for power channel and 70 m for power house), instrumentation system etc.

Preparation of construction drawings. Review of contractor's method statement, and other submissions. Construction material valuation and concrete mix design. Attending to geotechnical site related problems and coordination with other

specialists. Design of project roads Planning and setting up of material testing laboratories.

IV Name of Employing Agency National Engineering Services Pakistan (Pvt.) Limited Deputed to BCEOM -NESPAK Joint Venture for the design ofM-3 Motorway Project

  Title of Position Chief Engineer/Senior Advisor (Geotechnical)   Location of Assignment Lahore -Pakistan

Page 104: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Curriculum Vitae of Key Personnel

Berkeley Associates (Pvt.) Ltd.

 

 

PeriodofAssignment March 1992 to Jan 1994

Activities

Worked as Senior Advisor (Geotechnical) for the Pakistan Motorway Sheikhupura- Multan - D.G. Khan Section (Old M-3 Section); a multi-billion rupee project. Project consisted of a 6 lane, 450 km long motorway. Responsibilities included:

Planning and implementation of geotechnical investigations. Design of geotechnical aspects of roadways and enroute structures including

two major river bridges, a number of flyovers and interchanges. Construction material studies using satellite imageries. Preparation of design report and tender documents. Assistance to the Project Manager in successful execution of the project Expert review of reports and study documents

V Name of Employing Agency National Engineering Services Pakistan (Pvt.)

Limited. (Deputed to Joint Venture for the detailed design of M-2 Motorway Project)

Title of Position Chief Engineer/Chief Geotechnical Location of Assignment Lahore -Pakistan Period of Assignment May 1991 to March 1992

Activities

Worked as Chief Geotechnical for the joint venture. Responsible for the detailed design ofPakistanMotorwayM-2(Lahore-lslamabadSection).Responsibilities included:

Planning and implementation of geotechnical investigations. Recommendations for the geotechnical design aspects of the road

embankment/pavement, river bridges, flyovers and interchanges. Construction material studies Documentation and preparation of design report and tender documents. Expert review of design reports and tender documents

VI Name of Employing Agency National Engineering Services Pakistan

(Pvt) Limited Title of Position Chief Engineer/Principal Engineer/Deputy

Chief Geotechnical Engineer

Location of Assignment Lahore -Pakistan Period of Assignment 1981 to 1991 and 1994 to 1995

Activities

As Chief Engineer (from July 1987 to May 1991 and January 1994 to April 1995), responsible for management of geotechnical engineering and foundation aspects and review of design reports of the following projects which also involved close interaction with theclients:

Water supply projects including Balochistan Water Supply Project; Water

Supply System for Sakardu; Islamabad Water Supply Extension Project; bridges, culverts and aqueducts of Fordwah Sadqia Surface Drainage Project in Punjab; Eastern Province Water Supply Project, K.S.A. and Qusayba Drainage Project, K.S.A.

Multistoried buildings namely Muslim Commercial Bank Head Office

Page 105: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Curriculum Vitae of Key Personnel

Berkeley Associates (Pvt.) Ltd.

 

 

Building Karachi, United Bank Head Office Buildings Karachi and Lahore; Commercial Complex Hayatabad Peshawar; Pakistan Engineering Council Buildings Islamabad; Air and Naval Headquarter Building Islamabad; AWT Plaza Rawalpindi; State Bank Building Sialkot; PISIC House Lahore; OGDC Energy House Islamabad; Prime Minister's House and Secretariat Building, Islamabad.

Highways and bridges namely upgrading of all bridges on Kohat - Thal road and Chitral - Booni road NWFP, Sibi - Talli Road, Balochistan; Bridges in Northern Areas, Farm to Market Roads Swat NWFP.

New proposed International Airports at Karachi, Lahore and Islamabad. Responsible for the geotechnical aspects including soil classification, rock

mass rating, calculation of rock loads and geotechnical design of the following: Feasibility studies for increasing discharge of Benton Tunnel NWFP Pakistan.

South Jazira Tunnel Project, Iraq.

As Deputy Chief (July 1981-June 1987), responsible for management and review of foundation and geotechnical aspects of the following engineering projects.

Geotechnical engineering investigations for Karachi Steel Mills. Design of dykes, drains and other structures of Euphrates East Drain Project,

Iraq. Subsurface investigations of 40,000 tons of Rice Storage Facilities in Punjab. Foundation design of towers for 500 KV Transmission Network. Pavement design for Pategi-Eggan Road Project Nigeria, Sohar Roads

Sultanate of Oman and DjoujuPorga Road, Benin.

Also managed geotechnical engineering works and reviewed the reports for:

Highways bridges in NWFP on Kohat-Bannu Road Galadari Cement Works at Karachi. Chashma Nuclear Power Plant Eastern Taxiway Islamabad, New Islamabad International Airport. UBL Head Office Building Islamabad, Medical City Rawalpindi. Quetta Water Supply Project Second Tarbela-Faisalabad 500 KV Transmission Line Project.

As Geotechnical Engineer (August 1973 to June 1981), responsible for:

Design of water supply dam of 706 Army Base. Geotechnical investigations for Sea Water Intake and Disposal System of

Karachi Steel Mills; Pak Saudi Fertilizer Factory; Mustehkam Cement Plant; Maple Leaf Cement Factory; Pipri Thermal Power Station of Karachi Electric Supply Corporation (KESC).

Foundation related works for various features of Port Qasim Project, Karachi. Galadari Cement Works -Foundation analysis and design. Geotechnical investigations for 500 KV Transmission Line Project (Jamshoro-

Multan and Tarbela-Faisalabad). Geotechnical investigations for Left Bank Irrigation Tunnel of Tarbela Dam.

VII Name of Employing Agency Water and Power Development Authority

(WAPDA) Title of Position Assistant Design Engineer Location of Assignment Lahore-Pakistan Period of Assignment 1971 to 1973

Activities

Structural design of WAPDA Buildings, Tarbela Hospital and design review

Page 106: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Curriculum Vitae of Key Personnel

Berkeley Associates (Pvt.) Ltd.

 

 

of a sewage treatment plant at Tarbela. Assistance in the design of Simly Dam Project, Islamabad.

VIII Name of Employing Agency Associated Consulting Engineers Limited (ACE)   Title of Position

Location of Assignment Period of Assignment

Site Engineer Khanpur -Pakistan 1968 to 1971

Activities

Construction supervision of Khanpur Dam Project including grouting at abutments, tunnelandspillway.

PUBLICATIONS

"Influence of boring and construction methods on the performance of bored

cast in-situ R.C. piles of a bridge" published in Piletalk Int'l Seminar in Kuala Lumpur in

March, 1989. “Prediction and performance of bored cost in-situ R.C. Piles in load tests in

Pakistan” published in XIIth ICSMFE in Rio de Janiero in August, 1989. "Time efficient and cost effective decisions during pile construction for a

building project" First Asian Young Geotechnical Engineers Conference Bangkok Thailand in 1991.

"SPT for evaluation of unit skin friction and tip resistance of piles in Punjab sands" published in Int'l Conf. on Soil Improvement and Pile Foundations in China in 1991.

“Roadwork Related Properties of Punjab Area Soils” published in proceedings of the 10th Asian Regional Conference on Soil Mechanics and Foundation Engineering Beijing in 1996.

“Evaluation of seepage under the Ghazi Barrage-A case study” published in XIVth International Conference on Soil Mechanics and Foundation Engineering in Hamburg,

Germany in 1997. “Cracking of Structures on Swelling Soils A Case Study” published in the

proceedings of Symposium 2000 of C&W Department., Govt. of Punjab, held in Lahore in November 2000.

Language capability

English and Urdu - Excellent in speaking, reading and writing

French - Fair in speaking, reading and writing

Page 107: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Curriculum Vitae of Key Personnel  

 

1. Proposed Position: Structural Engineer

2. Name of Firm: Berkeley Associates

3. Name of Staff: Sheikh Ilyas Ahmad

4. Profession: Civil Engineer

5. Date of Birth: 16th March, 1947

6. Years with the Firm: 1.0 years

7. Nationality: Pakistani

8. Membership in Professional Societies:

Member Institution of Engineers Pakistan Member Pakistan Engineering Congress Member Pakistan Engineering Council

9. Key Qualifications:

Practicing Professional Engineer since 1968

As Deputy Chief Executive Nespak Foundation, controlled & managed the Administrative & Financial operations of the Foundation (August 2007 to March 2010).

As Vice President/ Head Structural Engineering Division(2003 to 2007)supervised the Planning & Design and Project Management activities of various projects comprising Bridges, Hydropower, Nuclear Power, Oil & Gas transmission, Buildings, Cement Plants, Hydraulic Structure.

As Team Leader (Civil Designs) on deputation to Pakistan Hydro Consultants from 1995 to 2003, responsible for the preparation of detailed designs and construction drawings of 1,450 MW Ghazi-Barotha Hydropower Project consisting of the following major components:

- Ghazi Barrage across river Indus - 1,600 cumecs capacity, 52 km long power channel including nearly 80 cross drainage

structures/ bridges. - Power complex comprising powerhouse, spillway, tail regulator, low level outlets,

switchyard, sill structures, headponds.

As Chief Engineer Structures Division (1987 - 1995) responsible for the planning, design, Tender documents and Construction drawings of Tarbela Hydro power Third Extension, Mangla Hydroelectric 2nd Extension, Tarbela Tunnel 4 Hoist Bridge Remedial Measures, Kundal Shahi Hydel Scheme Muzaffarabad, Water Supply Schemes of Al-Majmaah-Shaqrah Saudi Arabia & Kachhi, Ziarat, Quetta (Balochistan), Auxiliary Buildings of Multan-2 Thermal Power Station, Mirani Dam and Hingol Dam Projects Balochistan.

As Principal Engineer Structures Division (1985 - 87) worked on the design review of pumping station structures of North Jazira Irrigation Project Iraq; Zubair Irrigation Project Iraq, design, contract documents, construction drawings of Chattar Bagh Suspension Bridge Islamabad,

Page 108: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Curriculum Vitae of Key Personnel  

 

Kahlian-Sahlian Suspension Bridge, UGC Centres at Lahore & Karachi, Tourist Resort at Sahiwal, 50m high Steel Chimney of Guddu Thermal Power Station.

As Principal Engineer with Kalabagh Consultants on deputation from NESPAK from 1981-85, worked on planning, design and preparation of tender documents of major structures (i.e. Powerhouse, Power Intakes, Power Tunnels and Low Level Outlet Works) of Kalabagh Dam Project, Pakistan.

As Principal Engineer (1981-1982) and Senior Engineer (1974-1981) in Structures Division of NESPAK, responsible for planning and detailed structural design of civil works of 700 MW Tarbela Hydropower First Extension Project; structural design of eight bridges on Al-Khabura- Dariz Highway Oman and three superhighway bridges of Zubair Irrigation Project-Iraq, planning & design of 20 storey 233 ft. high HBFC House, Islamabad, two industrial complexes in Peshawar and tower foundations for 500 KV Transmission Line (Pakistan) and design review of 50,000 ton capacity Grain Silos Project Chichawatni, (Pakistan).

As Assistant Executive Engineer/Design Engineer with Irrigation Department/ Pakistan Water and Power Development Authority (1968-1974), worked on the design and construction supervision of Marala Drainage Syphon, District road bridge over Upper Gogera Branch Canal, design of concrete lining of irrigation tunnels of Khanpur Dam Project and planning and design of irrigation systems of Hub Dam and Chashma Right Bank Canal.

10. Education Name of Institution

Year

Degree/Diploma

University of Engineering & Technology, Lahore-Pakistan University of Engineering &

1968

1977

B.Sc. Civil Engineering - Degree

Computer Programming in FORTRAN Technology, Lahore-Pakistan   IV Language (Certificate)

11. Employment Record:    

I Name of Employing Agency Berkeley Associates

Title of Position Advisor Structures

Location of Assignment Lahore – Pakistan

Period of Assignment October 2011 to date

Activities

Supervising the structural design of the following projects:

i) 22MW Jabban Hydroelectric Power Station ii) Machai Hydropower Project at RD 47+000

II Name of Employing Agency Noor Durrani & Associates

Title of Position Structural Engineer

Page 109: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Curriculum Vitae of Key Personnel  

 

Location of Assignment Lahore – Pakistan

Period of Assignment May 2010 to October 2011

Activities

Planning, design and preparation of Tender Documents & EPC Bids for the following projects:

i) 17.0MW capacity Ranolia Hydropower Project ii) 2.6MW capacity Machai Hydropower Project iii) 7.6MW capacity Marala Hydropower Project iv) 4.0MW capacity Deg Outfall Hydropower Project v) 5.4MW capacity Chianwali Hydropower Project vi) 4.2MW capacity Okara Hydropower Project vii) 2.8MW capacity Pakpattan Hydropower Project

III Name of Employing Agency Nespak Foundation

Title of Position Deputy Chief Executive

Location of Assignment Lahore – Pakistan

Period of Assignment August 2007 to March 2010

Activities

Supervised and managed the administrative and financial operations of Nespak Foundation

IV Name of Employing Agency National Engineering Services Pakistan (Pvt.)

Limited

Title of Position Vice President (Str. Eng. Division)

Location of Assignment Lahore – Pakistan

Period of Assignment August 2003 to March 2007

Activities

As Head of Structural Engineering Division, supervised the activities of the Division including Planning & design, Project management, Business promotion etc on various Projects. Major projects included the following:

- KCP - Workshops (PAEC Project) - White Oil Pipeline Crossing over river Indus at Ghazi Ghat - Suigas Pipeline crossing over river Chenab at Shershah - Suigas Pipeline crossing over river Indus at Khairabad - Design of Road Bridge over river chenab at Shershah - Design of 9 bridges on Mansehra-Naran-Jhalkhad Road - 500 TPD White Cement Plant at Maple Leaf Factory - Acetic Acid Recovery Plant (PAEC Project) - Nuclear Safety Related Buildings

Page 110: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Curriculum Vitae of Key Personnel  

 

- Up-gradation/ Renovation of Govt. College University Lahore - Government College University at Faisalabad - Servants Housing Scheme at Mohlanwal, Lahore - Peshawar Flyover Project - Rustik-Miskin Road bridges, Oman - Lahore Ring Road Project - Structures on Sewerage projects of Nizwa, Sur, Khasab, Buraimi and Misfat,

Oman - Sabakzai Dam Project - 12 Small Dams Project, NWFP - Rehabilitation of Torkham - Jalalabad road Project, Afghanistan - National Bank of Pakistan, Islamabad - KAPCO High School, Kot Addu - Rehabilitation of bridges on N-70 - Saudi German Hospital Complex Project

V. Name of Employing Agency National Engineering Services Pakistan (Pvt.)

Limited

Title of Position Team Leader (Civil Designs) Pakistan Hydro Consultants

Location of Assignment Lahore – Pakistan

Period of Assignment March 1995 to June 2003

Activities

Supervision / coordination of all civil design activities of US $ 2.5 billion Ghazi- Barotha Hydropower Project which included analysis & design, review of tender stage designs, production of construction drawings in the Hydraulics, Geotechnical and Structural Sections. The following major activities were carried out:

- Review/checking of the tender stage designs - Review and updating of Tender design Criteria for forming basis of detailed designs - Detailed designs of component features of the project

Important structures include:

- Barrage (Standard Bays, Head Regulator, Under-sluices, Left & Right Guide Embankments, Separation Dyke)

- 1,600 cumecs power channel containing nearly 50 cross drainage structures and as many bridges including National Highway Bridge and Lahore-Peshawar Main Railway Bridge

- Power complex (1,450 MW Powerhouse having 5 unit bays, two erection bay and one unloading bay, siphon spillway, tail regulator, intake structure, sill structures, low level outlets, switchyard, tailrace channel and head pond and fore bay embankments)

- Checking/Quality Assurance of nearly 2,200 construction drawings pertaining to

barrage, power channel and power complex - Review/ Quality Assurance & finalization design of reports of Barrage, Power

Channel, Power Complex and Project Instrumentation - Review/comments on Contractor's detailed construction schedule

Page 111: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Curriculum Vitae of Key Personnel  

 

- Review/approval of Contractor's submissions on Contractor's colonies at Hattian, Tarbela & Barotha, Contractor's alternative designs for Super-passages and bridges, Contractor’s design of Railway bridge based on alternate Chinese profiles

- Review/approval of Contractor's River Diversion Scheme, Work Programme, Aggregate production plant, concrete Batching Plant, Powerhouse Excavation & dewatering schemes etc.

VI. Name of Employing Agency: National Engineering Services Pakistan (Pvt.)

Limited

Title of Position: Chief Engineer

Location of Assignment: Lahore – Pakistan

Period of Assignment: July 1987 to March 1995

Activities:

Planning, design and preparation of construction drawings for the following projects:

- Civil Works of U.S. $ 760 million 1700 MW Tarbela Hydro power Third Extension Project, (4 x 432 MW)

- Civil Works of U.S. $ 80 million 200 MW Mangla Hydroelectric 2nd Extension (2 x 100 MW)

- Tarbela Dam Spillway Stoplogs (Main & Auxiliary Spillways) - Remedial Measures of Tarbela Tunnel-4 Hoist Bridge - Kundal Shahi Hydel Scheme (2MW) Muzaffarabad - Water Supply Schemes of Al-Majmaah-Shaqrah, Saudi Arabia - Quetta, Kachhi and Ziarat Water Supply Schemes, Balochistan - Auxiliary Buildings of Multan-2 Thermal Power Station - Inlet, outlet & spillway structures and tunnel of Mirani Dam Project, Balochistan

Intake, tunnel and outlet structures of Hingol Dam Project, Balochistan

VII. Name of Employing Agency National Engineering Services Pakistan (Pvt.) Limited

Title of Position Principal Engineer

Location of Assignment Lahore – Pakistan

Period of Assignment January 1986 to June 1987

Activities:

- Design review of Pumping Station Structures of North Jazira Irrigation Project, Iraq. - Detailed Design, Tender Documents and construction drawings of:

Chitral Airport Terminal Building University Grants Commission Buildings at Lahore & Karachi Tourist Resorts at Multan, Khanewal, Sahiwal, Rahim Yar Khan and Panjnad Chattar Bagh Pedestrian Suspension Bridge Kahlian-Sahilian Suspension Bridge 50 meter high Steel Chimney of Guddu Thermal Power Station Preliminary design and Tender Documents of Civil works of Zubair

Irrigation Scheme,Iraq

Page 112: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Curriculum Vitae of Key Personnel  

 

VIII. Name of Employing Agency: National Engineering Services Pakistan (Pvt.) Limited

Title of Position: Principal Engineer (Kalabagh

Consultants)

Location of Assignment: Lahore – Pakistan

Period of Assignment: March 1982 to December 1985

Activities:

Planning, design and preparation of tenders of major structures including Powerhouse, Power Intakes, Low Level Outlet Works of U.S. $ 3400 million Kalabagh Dam Project, Pakistan.

IX. Name of Employing Agency: National Engineering Services Pakistan (Pvt.) Limited

  Title of Position: Senior Engineer

  Location of Assignment: Lahore – Pakistan

  Period of Assignment:

Activities:

September 1974 to December 1981

- Design review of U.S. $ 4 million Grain Silos Project, Pakistan (50,000 ton capacity)

- Design of Super Highway Bridges for Zubair Irrigation Project, Iraq - Planning design and preparation of construction drawings of:

Civil Works of U.S. $ 50 million, 700 MW Tarbela Hydropower Extension Project (4 x

175 MW) Highway Bridges of U.S. $ 15 million Al-Khabura-Dariz Road Project, Oman Civil Works of U.S. $ 8 million Industrial Complex, including cold storages, for Sarhad

Development Authority Peshawar (Pakistan) 20 Storey 233 ft. high building of “House Building Finance Corporation”, Islamabad,

Pakistan Tower foundations for U.S.$ 183 million 500 KV (Guddu-Jamshoro)

Transmission Line

- Preparation of Prefeasibility Report on 480 Km long, U.S. $ 50 million Inland Water Route connecting Port Mohammad Bin Qasim with Sukkur, Pakistan

X. Name of Employing Agency Water & Power Development     Authority (WAPDA)/ Irrigation  

Title of Position

Department Punjab

Assistant Executive Engineer/Design Engineer

Page 113: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Curriculum Vitae of Key Personnel  

Location of Assignment Lahore – Pakistan

Period of Assignment July 1968 to September 1974

Activities

Design and construction supervision of irrigation and drainage systems, bridges, cross drainage works, design of concrete lining for irrigation tunnels of Khanpur Dam Project and irrigation system design of Hub Dam & Chashma Right Bank Canals.

12. Languages:

English and Urdu - Excellent in speaking, reading and writing

Persian - Fair in speaking, reading and writing

Page 114: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

AHMAD NAWAZ

1

 

 

CURRICULUM VITAE

Name of Person : AHMAD NAWAZ

Nationality : Pakistani

Date & Place of Birth : January 28, 1942 Jhang, Pakistan

Marital Status : Married

Profession : Hydro-geology Expert

Areas of Expertise : Groundwater Resources Evaluation, Development and Management, including Groundwater Numerical Modelling, Vertical Drainage and Construction Dewatering.

Affiliation with : Member of Punjab Geological Society Professional Institutions

Residential Address : 23-Badar Block, Allama Iqbal Town, Lahore

Cell No. : 0321-4676943

Email : [email protected] [email protected]

KEY QUALIFICATIONS

Practising as a professional Hydro-geologist / Groundwater Specialist since 1971.

Possess vast experience in exploration, exploitation and management of groundwater resources in arid and semi-arid regions. Prepared feasibility reports, operation manuals, contract documents etc. for groundwater development and management projects.

As a groundwater specialist planned and executed investigations for exploring potentially viable aquifers consisting unconsolidated (sand, gravels etc.) and consolidated sediments (sandstone, limestone, etc.). Investigations comprised monitoring of groundwater sources, geophysical surveys, geological mapping, test drilling, sampling (water and lithology) and aquifer testing.

Interpreted and analyzed hydrogeological data and demarcated potentially viable areas for groundwater development. Designed and conducted aquifer tests, monitored response of groundwater levels, analyzed the test data and evaluated safe yields of various types of aquifers. Design and construction of tubewells (including well fields) for projects involving water supply, drainage of agricultural lands and construction dewatering.

Conducted tubewell performance studies and rehabilitation of deteriorated tubewells.

Developed and calibrated groundwater numerical models (flow and solute transport) to study future behavior of aquifer under various groundwater development scenarios. Selection of the most environment friendly management strategies for groundwater use on sustainable basis.

Page 115: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

AHMAD NAWAZ

2

 

 

Experience in using computer software such as Microsoft Word, Microsoft Excel, Lotus 1.2.3, Surfer, Processing MODFLOW for Windows (PMWin), Groundwater Vistas, GMS 8.1, Learned GIS for preparing maps and data processing.

I have worked in various types of terrains consisting of unconsolidated and consolidated sediments in Pakistan, Iraq, Oman, Qatar Saudi Arabia, and Iran. The major projects completed are listed in the following sections.

EDUCATION

Name of Institution Year Degree

University of Punjab Lahore, Pakistan 1970 M.Sc. Geology (Specialization in Petroleum and Structural Geology)

University of Punjab Lahore, Pakistan 1969 B.Sc. (Hons) Geology,

EXPERIENCE

Position Held and Description of Duties

I- From: 2009 To: Date Employer: Berkeley Associates (Pvt) Limited

Position Held and Description of Duties Groundwater Specialist/Hydrogeologist

Responsible for planning, investigation, evaluation of groundwater resource. Groundwater development and management groundwater resources, including groundwater numerical modelling. Synthesis of various studies and preparation of planning and feasibility reports, PC-Is, tender documents, Operation Manuals. The major projects completed are listed below:

- 1X40MW Nishat Chunian Power Plant Project - Groundwater resources evaluation

to fulfil water requirements of the plant; - 152MW Power Plant, Pasrur, Sialkot - Groundwater investigations including drilling

and development of test tubewell and piezometers, conductance of aquifer test, analysis of aquifer test data to find out aquifer parameters, estimation of safe yield of aquifer; and

- Supervision of installation of water supply tubewells

II- From: 2002 To: 2009

Independent Consultant Hydrogeologist / Groundwater Specialist

As an Independent Consultant Hydrogeologist / Groundwater Specialist provided consultancy services in groundwater resources evaluation, development and management by preparing and calibrating groundwater numerical models both flow and solute transport on project to project basis to various industries and consultants such as National Engineering Services of Pakistan (NESPAK), Berkeley Associates, Halcro Group of Pakistan, National Development Consultants (NDC), Engineering Consultancy Services of Punjab (ECSP) etc. The major projects and the consultancy services provided include:

- Coal Fired Power Plant near Sahiwal – Groundwater resources evaluation to fulfil

make up water requirements during period of canal closure.

Page 116: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

AHMAD NAWAZ

3

 

 

- Groundwater Studies for Quaid-i-Azam Solar Park, Bahawalpur – Delineated

useable groundwater aquifer(s) in and around the project area. - Groundwater Studies for Nishat Crystal Project Expo Centre, Lahore – Study of

aquifer underlain by the project area through test drilling, conducting aquifer test (pump out test) and analyses of the data collected on response of groundwater potential heads.

- Estimation drainage requirements and design of dewatering system for Lusail Underground Railway Construction Project, Qattar – Estimation of drainable surplus using available data on aquifer parameters.

- Lower Bari Doab Canal Improvement Project (LBDCIP) Component 3 (Groundwater Monitoring, Modelling and Management) – Synthesis and processing data on various recharge and discharge sources, developed and calibrated groundwater numerical models.

- Supervision of 26 numbers dewatering tubewells installation at CHASNUPP – Assuring installation in accordance with the design specifications.

- Water Sourcing Study for Safe Water Supply Schemes in Dadu Concessional Area of BHP Petroleum (Pakistan) Pty Ltd. – Reconnaissance of the project area, supervision of electricity resistivity survey, test drilling, delineation of useable groundwater aquifer(s) and development strategy.

- Alborz Integrated Land and Water Management Project, Iran – Synthesis and processing of available data on aquifer parameters and various recharge and discharge sources, developed and calibrated groundwater numerical models, studied various scenarios, with and without Alborz Dam, for efficient development and management of groundwater resources.

- Doha Conventional Centre and Tower Project, Doha, Qattar – Aquifer testing and data analysis, estimation of dewatering requirements, design of dewatering system and dewatering wells for construction below water table.

- Shamiya Redevelopment Project, Saudi Arabia – Prepared technical proposal to study the impact of new infrastructure on Abe Zam Zam.

- Dayqah Storage Dam, Oman – Study the tightness of reservoir banks. - Recharge dam Wadi Kalboh, Oman – Study the impact of dam on groundwater

resources. - AES Lalpir Thermal Power Plant, Kotaddu - Groundwater Resources Evaluation

and Development, including design and construction of water supply tubewells. - Water Supply Schemes in Azad Kashmir – Delineation of potential groundwater

zones for development. - Textile Mills, Power Plants, Dyeing and Finishing Units - Design and installation of

water supply tubewells to pump useable quality groundwater from aquifer underlain and overlain by saline groundwater aquifer(s).

- Site B-109, Sargodha, Punjab, Pakistan Site B-201 Nawabshah, Sindh, Pakistan - Conducted aquifer tests (pump out tests), analysis of test data, estimation of aquifer parameters, design and construction of dewatering systems for pumping drainable surplus to lower water table below foundation of the buildings.

III- From: 1975 To: 2002   Employer: National Engineering Services Pakistan (Pvt) Limited

Position Held and Description of Duties

1989 - 2002 Principal Geologist

As Principal Hydrogeologist, responsible for planning, investigation, evaluation, groundwater computer modelling, synthesis of various studies and preparation of planning and feasibility reports, PC-Is, tender documents, Operation Manuals. The major projects completed are listed below:

- Recharge Dam Wadi Sinaw, Oman – Evaluation of its impact on groundwater

resources located downstream of the dam.

Page 117: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

AHMAD NAWAZ

4

 

 

- Punjab Private Sector Groundwater Development Project - Synthesis and

processing data on various recharge and discharge sources, development and calibration of groundwater numerical models and study of various development scenarios for developing and managing water resources efficiently.

- Tubewell Design and Technical Specifications for 6R-Hakra Sub-Project of Command Water Management Project, Pakistan – Design of well field and tubewells.

- Evaluation of Groundwater Resources and Study of Aquifer under Lahore – Collection, synthesis and processing of pumping data for preparing groundwater numerical models.

- Water Supply Scheme for Private Housing Schemes in Zone-2 and extended areas of Islamabad – Evaluation of groundwater resources to assess availability of groundwater and recommendations to CDA.

- Groundwater studies for developing water supply scheme for Bahria Town Sihala, Islamabad – Reconnaissance survey, monitoring of existing groundwater resources and recommendations to Bahria Town.

- Second SCARP Transition North Rohri Pilot Project - Synthesis and processing data on various recharge and discharge sources, developed and calibrated groundwater numerical models and study of various development scenarios for developing and managing water resources efficiently.

- Industrial and Residential Areas in Dammam, Saudi Arabia – Study causes of rise of water table and proposed remedial measures.

- Second SCARP Transition Project, Punjab - Synthesis and processing data on various recharge and discharge sources, developed and calibrated groundwater numerical models and study of various development scenarios for developing and managing water resources efficiently.

- Chashma Hydropower Project – Estimation of dewatering requirements for construction of power plant.

- CHASNUPP - Evaluation of pumping requirements and design of dewatering system to facilitate construction of intake structure.

- Groundwater Study CHASNUPP – Study of existing conditions of groundwater, synthesis and processing data on various recharge and discharge sources, developed and calibrated groundwater numerical models and study of various development scenarios to determine flow paths of radioactive materials in case of any mishap.

- Strategic Provincial Investment Plan and Project Preparation for Rural Water Supply, Sanitation and Health Project, Baluchistan – Study of available data on groundwater potential areas in various basins and recommendations for developing water supply scheme including design of tubewells.

- Groundwater Study for Fordwah Eastern Sadiqia Drainage Project - Evaluation of project performance, including development of Groundwater Numerical Model, Bahawalnagar.

- Entire Command of Lasbela Canal, Baluchistan – Groundwater study for evaluation of drainage requirements.

- Sehwan Barrage Complex, Sindh - Groundwater studies to assess drain-ability of agricultural soils.

- Feasibility Study for Groundwater Development in Kurram Agency – Study of existing conditions of groundwater and availability of additional potential for further development.

1979 - 1989 Senior Geologist

As Senior Hydrogeologist planned, investigated, designed and performed construction supervision of groundwater development projects for irrigation, drainage and water supply. Participated in the preparation of technical reports i.e. inception, feasibility, design, tender documents, operation manuals. Major Projects completed include:

Page 118: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

AHMAD NAWAZ

5

 

 

- Quetta Water Supply Project, Baluchistan, Pakistan – Siting and designing of tubewells.

- Tubewells for Dhurnal Water Injection (to recover oil) Project, Pakistan - Construction supervision of tubewells.

- Shahkot Drainage Sub-Project, CWMP, Pakistan - Design of drainage tubewells.

- Warsak Lift Canal Sub-Project of CWMP, Pakistan - Survey and investigations to locate the reaches, for lining, where excessive seepage was taking place.

- Groundwater Development for Augmentation of Water Supply to Rawalpindi Cantonment, Pakistan – Groundwater study to delineate potential areas for groundwater development.

- Multan Thermal Power Station, Punjab, Pakistan - Groundwater study, comprising test drilling and conductance of aquifer test (pump out test), analysis of the data and evaluation of groundwater potential to meet the additional requirements as a result of expansion of the power plant.

- Sinking of Tubewells in Federally Administered Area (FATA), NWFP, Pakistan – Study of existing groundwater conditions, delineation of groundwater potential areas for further development.

- Ghotki Fresh Groundwater Irrigation Project, Sindh, Pakistan – Study of existing groundwater conditions and drainage requirements to lower water table in the waterlogged area located along the Ghotki Feeder.

- Vertical Drainage Projects Karbala and Habbaniya, Iraq – Groundwater study to drain the area of run way.

- Master Planing for Development of Irrigation Resources, Karak District, NWFP Pakistan – Groundwater study to assess feasibility of the project.

- Barani Area Master Planning, Pakistan - Groundwater studies.

1975 – 1979 Hydrogeologist

As Hydrogeologist conducted explorations through tubewell inventory, test drilling, construction supervision of tubewells and piezometers, conducting aquifer tests etc. for the following projects:

- Salinity Control and Reclamation Project Fordwah and Eastern Sadiqia,

Pakistan – Supervision of test drilling, monitoring of existing groundwater

sources and collection of water samples.

- Salinity Control and Reclamation Project Dera Ghazi Khan, Pakistan –

Supervision of test drilling.

- Baghalchur, Dera Ghazi Khan, Pakistan – Study of surface and groundwater

resources, geological mapping to understand geometry of various sandstone

aquifer(s), test well drilling and conductance of aquifer test, analysis of the data

and development of water resources.

The projects covered more than 1.00 million hectares and involved construction of 3273 tubewells of capacity ranging from 28 to 112 litres/second. Total estimated cost of these projects was U.S. $ 400 million.

IV- From: 1971 To: 1975   Employer: Associated Consulting Engineering Limited (ACE)

Position Held and Description of Duties

Page 119: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

AHMAD NAWAZ

6

 

 

1971 - 1975 Engineering Geologist

Conducted geotechnical investigations comprising test drilling, pressure tests for determining permeability of consolidated rocks, material investigation, detailed geological mapping, correlation and identification of various formations. The projects completed were:

- Kalabagh Dam Project Punjab, Pakistan – Geotechnical investigations. - American Fertilizer Factory, Iskandarabad, Pakistan - Geotechnical

investigations. - Extension of Cement Factory, Iskandarabad, Pakistan - Geotechnical

investigations.

LANGUAGE CAPABILITY

English: Excellent in speaking, reading and writing Urdu: Excellent in speaking, reading and writing Arabic: Excellent in reading

Page 120: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Curriculum Vitae

1. Name : Farooq Naveed Sheikh

2. Name of the Firm : Berkeley Associates (Pvt.) Ltd.

3. Designation : Principal Geotechnical Engineer

4. Date of Birth : July 11, 1986

5. Year with the Firm : 4 years

6. Nationality : Pakistani

7. PEC Registration No. : Civil/27892

8. Key Qualifications  

As a geotechnical engineer, have worked on the field investigations and subsequent geotechnical design of numerous projects. Major activities included defining scope of work for geotechnical investigations, furnishing technical and financial proposals, supervision of field & laboratory testing, carrying out slope stability analysis, foundation design, ground improvement design through installation of stone columns, settlement analyses, evaluation of rock mass parameters for tunnel design, seepage analysis, stability analyses of rock slopes, design of ground anchors & retaining system and development of computer aided programs.

9. Academic Qualification :

Name of Institution Year Degree/Diploma

University of Engineering and Technology (Lahore)

2012 M.Sc. in Civil Engineering

University of Engineering and Technology (Lahore)

2008 B.Sc. Civil Engineering

10. Employment Record

July 2015 to date - Principal Geotechnical Engineer

Berkeley Associates (Pvt.) Ltd. 316-D, OPF Housing Scheme, Raiwind Road, Lahore

1223 MW CCPP Balloki Pakistan

1180 MW CCPP Bhikki

350 MW Coal Fired Power Plant at Port Qasim, Karachi

IPF Plant at Manga Mandi

Page 121: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Rehabilitation of Building Defects of Malala Yousaf Zai Daanish School (Boys and Girls) Jand District Attock

Treet Project at FIEDMC, Faisalabad

Corporate Office Building at Jail Road Lahore

Jan. 2014 to July 2014 Project Design Engineer

Keller-Turki Co. Ltd. Dammam, Kingdom of Saudi Arabia

Shuqaiq Steam Power Project, Shuqaiq – Kingdom of Saudi Arabia

Yanbu Aramco Sinopec Refining Project, Yanbu – Kingdom of Saudi Arabia

Sabic PCQ-02 Project, Jubail – Kingdom of Saudi Arabia

Saudi Aramco Third Party Cogeneration Project, Ras Tanura - Kingdom of Saudi Arabia

Common Utilities and Tank Farm Area, Rabigh – Kingdom of Saudi Arabia

Residential Building for Al-Mouwasat Hospital Accommodation, Qatif – Kingdom of Saudi Arabia

Aug. 2012 to Jan. 2014 Geotechnical Engineer Berkeley Associates (Pvt.) Ltd. 316-D, OPF Housing Scheme, Raiwind Road, Lahore

Construction of New Khanki Barrage – Design Verification and Construction Supervision

of Geotechnical Aspects of the Project

Feasibility Study of 180 MW Naran Hydropower Project, Khyber Pakhtunkhwa - Pakistan

Feasibility Study of 300 MW Balakot Hydropower Project, Khyber Pakhtunkhwa - Pakistan

Pre-Feasibility Study of 96 MW Batakundi Hydropower Project, Kyhber Pakhtunkhwa - Pakistan

Feasibility Study of 12 MW Biomass Based IPP, Faisalabad - Pakistan

Safety Assessment of Existing Shoring System and Design of Rehabilitation/ Strengthening Measures at Mubarak Center, Ferozepur Road, Lahore – Pakistan

Design of Retaining System without Ground Anchors for Mobilink Office Building at QIE, Lahore - Pakistan

Slope stability analysis of Parking Plazas at Jhika Gali, Bansara Gali, General Bus Stand and Lower Topa, Murree – Pakistan

Aug. 2011 to July 2012 Junior Engineer (Civil)

P&I Organization - Water and Power Development Authority (WAPDA) Sunny View, Lahore

Scope of work for geotechnical investigations of different dam projects like;

- Chiniot Dam Project - Bhimber Dam Project

- Khapalu Dam Multipurpose Project - Sanghar Dam Project - Munda Dam Project

Page 122: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Planning Commission Proforma-II for feasibility studies of dam projects.

Jan. 2011 to Aug. 2011 Lecturer, Civil Engineering Department

The University of Lahore

As a lecturer, assisted in establishment of Soil Mechanics Laboratory along with regular lecture deliverance on Soil Mechanics

Oct. 2008 to Jan. 2011 Staff Engineer Berkeley Associates (Pvt.) Ltd. 316-D, OPF Housing Scheme, Raiwind Road, Lahore

As a staff engineer, assisted in;

- Review of Request for Proposal (RFP) for mega projects - Furnishing technical and financial proposals for geotechnical investigations - Finalizing scope of work for field activities - Preparing laboratory testing advices - Interpreting field results and laboratory test results for geotechnical design - of sub-structure - Coordinating between different organs of JV for successful completion of - civil design - Preparation of EPC/ Turnkey proposals (both technical & financial) for

hydropower projects

Major projects include;

- Feasibility Study of Shogo-Sin Hydropower Project, Chitral - Pakistan - Feasibility Study of Shushghai-Zhendoli Hydropower Project, Chitral -

Pakistan - 22 MW Jabban Hydroelectric Power Station – Rehabilitation Project,

Malakand - Pakistan - 425 MW Combined Cycle Power Plant, Nandipur - Pakistan - Tetra Pak Project 2 Pakistan, Lahore - Pakistan - New Ammonia Urea Plant, Daharki - Pakistan - Girls and Boys Hostels at Sharif Medical City, Lahore - Pakistan - Geotechnical Investigations along LBDC - Pakistan - Preparation of EPC/ Turnkey Proposals for Canal Hydropower Projects at

Pakpattan and Okara - Pakistan

11. Languages :

  Read Write Speak

Urdu: Excellent Excellent Excellent

English: Excellent Excellent Excellent

Page 123: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Page 1 of 5 

 

 

Curriculum Vitae

1.  Name  Sheikh Ilyas Ahmed

2.  Name of the Firm  Berkeley Associates (Pvt) Ltd 

3.  Designation  Hydraulic Structures Expert 

4.  Date of Birth  16 March, 1956 

5.  Years with Firm  06 Years 

6.  Nationality  Pakistani 

7.  PEC Registration No.  CIVIL/257 

8.  Key Qualifications   

Overall 48 years including 26 years’ experience of working on various aspects of Structural Engineering for large hydropower Projects and Infrastructure Projects as; 

Worked as Chief Structure Design Civil for the Feasibility Studies of 188 MW Naran, 300 MW Balakot, 96 MW Batakundi and 218 MW Dhaddar Hydropower Projects. 

Worked  as  Advisor  Structures  at  Berkeley  Associates  and  designed/produced construction drawings for 22 MW Jabban Hydropower Station. 

Worked  as  Advisor  Structures  at  Noor  Durrani  Associats  and  preparated  EPC Bidding  Documents  for  seven  (7)  Nos.  Hydropower  Projects  in  KPK  &  Punjab provinces (2.6 MW to 17 MW) 

Worked  as  Deputy  Executive  NESPAK  Foundation,  controlled  &  managed  the Administrative & Financial operations of  the Foundation  (August  2007  to March 2010). 

As Vice President/Head Structural Engineering Division (2003 to 2007)  supervised the  Planning  &  Design  and  Project  Management  activities  of  various  projects comprising Bridges, Hydropower, Nuclear Power, Oil & Gas transmission, Buildings, Cement Plants, Hydraulic Structures. 

As Team Leader (Civil Designs) on deputation to Pakistan Hydro Consultants  from 1995 to 2003, responsible for the preparation of detailed designs and construction drawings of 1,450 MW Ghazi‐Barotha Hydropower Project consisting of the major components  like Ghazi barrage across river  Indus, 1,600 cumecs capacity, 52 km long power channel including nearly 80 cross drainage structures/ bridges,  power complex  comprising  powerhouse,  spillway,  tail  regulator,  low  level  outlets, switchyard, sill structures, head ponds. 

As Chief Engineer Structures Division (1987  ‐ 1995)  responsible for the planning, design,  Tender  documents  and  Construction  drawings  of  Tarbela  Hydro  Power Third Extension, Mangla Hydroelectric 2nd Extension, Tarbela Tunnel 4 Hoist Bridge Remedial  Measures,  Kundal  Shahi  Hydel  Scheme  Muzaffarabad,  Water  Supply Schemes  of  Al‐Majmaah‐Shaqrah  Saudi  Arabia  &  Kachhi,  Ziarat,  Quetta (Balochistan), Auxiliary Buildings of Multan‐2 Thermal Power Station, Mirani  Dam and Hingol Dam Projects Balochistan. 

As Principal Engineer Structures Division (1985 ‐ 87) worked on the design  review of  pumping  station  structures  of  North  Jazira  Irrigation  Project  Iraq;  Zubair Irrigation  Project  Iraq,  design,  contract  documents,  construction  drawings  of Chattar Bagh Suspension Bridge Islamabad, Kahlian‐Sahlian Suspension Bridge, 

Page 124: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Page 2 of 5 

 

 

UGC Centres at Lahore & Karachi, Tourist Resort at Sahiwal, 50m high  Steel Chimney of Guddu Thermal Power Station. 

As  Principal  Engineer  Structures  with  Kalabagh  Consultants  on  deputation from NESPAK  from  1981‐85,  worked  on  planning,  design  and  preparation  of  tender documents  of major  structures  (i.e.  Powerhouse,  Power  Intakes,  Power  Tunnels and Low Level Outlet Works) of Kalabagh Dam Project, Pakistan. 

As Principal Engineer Structures  (1981‐1982) and Senior Engineer (1974‐1981)  in Structures  Division  of  NESPAK,  responsible  for  planning  and  detailed  structural design  of  civil  works  of  700  MW  Tarbela  Hydropower  First  Extension  Project; structural design of eight bridges on Al‐Khabura‐Dariz Highway Oman and  three superhighway bridges of Zubair Irrigation Project‐Iraq, planning & design of 20 story 233  ft.  high HBFC House,  Islamabad,  two  industrial  complexes  in Peshawar  and tower  foundations  for 500 KV Transmission  Line  (Pakistan)  and design  review of 50,000 ton capacity Grain Silos Project Chichawatni, (Pakistan). 

As  Assistant  Executive  Engineer/Design  Engineer  with  Irrigation  Department/ Pakistan Water  and  Power  Development  Authority  (1968‐1974), worked  on  the design  and  construction  supervision  of  Marala  Drainage  Syphon,  District  road bridge  over  Upper  Gogera  Branch  Canal,  design  of  concrete  lining  of  irrigation tunnels of Khanpur Dam Project and planning and design of  irrigation systems of Hub Dam and Chashma Right Bank Canal. 

   

9.  Academic Qualification  

Name of Institution  Year  Degree/Diploma 

University of Engineering & Technology, Lahore‐Pakistan 

1968  B.Sc. Civil Engineering 

  

10.  Employment Record   

  Name of Employing Agency  Berkeley Associates (Pvt) Ltd 

  Title of Position  Hydraulic Structures Expert 

  Location of Assignment  Lahore‐Pakistan 

  Period of Assignment  January 2015 to date 

  Activities  Structural Design of building for Temporary Facilities, Infrastructural  design  i.e.  Water  Supply/Sewerage, Drainage, roads for 1223 MW Balloki Thermal Power Station & production of construction drawings. 

Review of Contractor’s Submissions on Civil Design Package on 2x330 MW Thar Coal Fired Power Plant. 

 Name of Employing Agency  Mirza Associate Engineering Services & Berkeley Associates 

(Pvt) Ltd JV 

  Title of Position  Chief Structures Design (Civil) 

  Location of Assignment  Lahore‐Pakistan 

Page 125: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Page 3 of 5 

 

 

Period of Assignment  Dec 2013 to Dec 2014 

Activities  Worked  as  Chief Hydraulic  Structures Design  (Civil)  for  the Feasibility  Studies  of  188MW  Naran  HPP  and  102  MW Batakundi HPPs. 

Name of Employing Agency 

Mirza Associate Engineering Services & Berkeley Associates (Pvt) Ltd JV 

Title of Position  Chief Structures Design (Civil) 

Location of Assignment  Lahore‐Pakistan 

Period of Assignment  July 2012 to Dec 2013 

Activities  Worked as Chief Structures Design (Civil) for the Feasibility Studies of 300 MW Balakot Hydropower Project. 

Name of Employing Agency 

Berkeley Associates 

Title of Position  Chief Structures Design (Civil) 

Location of Assignment  Pakistan 

Period of Assignment  September 2011 to July 2012 

Activities  Supervised  the  Structural  design  of  22  MW  Jabban Hydroelectric Power Station and Machai Hydropower Project at RD 47+000. 

Name of Employing Agency 

Noor Durrani & Assoicates 

Title of Position  Structural Engineer 

Location of Assignment  Lahore‐Pakistan 

Period of Assignment  May 2010 to September 2011 

Activities  Planning, design and preparation of Tender documents & EPC Bids for the following projects. 

17.0 MW capacity Ranolia Hydropower Projects 

2.6 MW capacity Machai Hydropower Projects 

7.6 MW capacity Marala Hydropower Projects 

4.0 MW capacity Deg Outfall Hydropower Projects 

5.4 MW capacity Chianwali Hydropower Projects 

4.2 MW capacity Okara Hydropower Projects 

2.8 MW capacity Pakpattan Hydropower Projects 

Name of Employing Agency 

National Engineering Services Pakistan (Pvt.) Limited 

Title of Position  Vice President (Str. Eng. Division) 

Page 126: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Page 4 of 5 

 

 

Location of Assignment  Lahore – Pakistan 

Period of Assignment  August 2003 to March 2007 

Activities  As  Head  of  Structural  Engineering Division,  supervised  the activities of the Division including Planning & design,  Project management, Business promotion etc. on various Projects. 

Name of Employing Agency 

Pakistan Hydro Consultants on deputation from NESPAK 

Title of Position  Team Leader (Civil Designs) 

Location of Assignment  Lahore – Pakistan 

Period of Assignment  March 1995 to June 2003 

Activities  Supervision / coordination of all civil design activities of US $ 2.5 billion Ghazi‐ Barotha Hydropower Project which included review of tender stage designs, updating of Tender Designing Criteria, analysis and production of construction drawings  in the  Hydraulics,  Geotechnical  and  Structural  Sections  for Ghazi  Barrage,  1600  cumecs  power  channel  bridges,  cross drainage structures, and power complex structures. 

Name of Employing Agency 

National Engineering Services Pakistan (Pvt) Ltd 

Title of Position  Chief Engineer 

Location of Assignment  Lahore – Pakistan 

Period of Assignment  July 1987 to March 1995 

Activities  Planning, design and preparation of construction drawings of various projects. 

Name of Employing Agency 

National Engineering Services Pakistan (Pvt) Ltd 

Title of Position  Principal Engineer 

Location of Assignment  Lahore – Pakistan 

Period of Assignment  January 1986 to June 1987 

Activities  Design  review  of  Pumping  Station  Structures  of North Jazira Irrigation Project, Iraq. 

Detailed  Design,  Tender  Documents  and construction  drawings  of  buildings,  suspension bridges at Chattar Bagh & Kahlian‐Sahlian. 

Name of Employing Agency  National Engineering Services Pakistan (Pvt) Ltd 

Title of Position  Principal Engineer (Kalabagh Consultants) 

Location of Assignment  Lahore – Pakistan 

Period of Assignment  March 1982 to December 1985 

Page 127: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Page 5 of 5 

 

 

  Activities  Planning,  design  and  preparation  of  tenders  of  major structures  including Powerhouse, Power  Intakes, Low  Level Outlet Works of U.S. $ 3400 million Kalabagh Dam Project, Pakistan. 

  Name of Employing Agency 

National Engineering Services Pakistan (Pvt) Ltd 

  Title of Position  Senior Engineer     

  Location of Assignment  Lahore – Pakistan     

  Period of Assignment  September 1974 to December 1981   

  Activities  Design review of U.S. $ 4 million Grain Silos  Project, Pakistan (50,000‐ton capacity) 

Design of Super Highway Bridges for Zubair Irrigation Project, Iraq 

Planning  design  and  preparation  of  construction drawings of Tarbela Hydropower Extension Project. 

Industrial  Projects  of  Corn  Complex  &  Leather Tannery,  20  Story  233  ft.  high  Building  of  HBFC House. 

 Name of Employing Agency  WAPDA, Irrigation Department Punjab 

 

  Title of Position  Assistant Executive Engineer/Design Engineer 

  Location of Assignment  Lahore – Pakistan     

  Period of Assignment  July 1968 to September 1974   

  Activities  Design  and  construction  supervision  of  irrigation  and drainage systems, bridges,  cross drainage works, design  of concrete lining for irrigation tunnels of Khanpur Dam Project and  irrigation system design of Hub Dam & Chashma Right Bank Canals 

11.  Language Skills       

    Speaking  Reading  Writing 

  English  Excellent  Excellent  Excellent 

  Urdu  Excellent  Excellent  Excellent 

Page 128: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Curriculum Vitae

1. Name : Imran Farooq

2. Name of Firm : Berkeley Associates (Pvt.) Ltd

3. Designation : Senior Geotechnical Engineer

4. Year with Firm : 3 Years

5. Date of Birth : December 02, 1988

6. Nationality : Pakistani

7. PEC Registration No. : CIVIL/30294

8. Key Qualifications

As a geotechnical engineer, have worked on the field investigations and subsequent geotechnical design of numerous projects. Major activities included defining scope of work for geotechnical investigations, furnishing technical and financial proposals, supervision of field & laboratory testing, carrying out slope stability analysis, foundation design, ground improvement design through installation of stone columns, settlement analyses, evaluation of rock mass parameters for tunnel design, seepage analysis, stability analyses of rock slopes, design of ground anchors & retaining system and development of computer aided programs.

9. Academic Qualification:

Name of Institution Year Degree/Diploma

University of Engineering and to date M.Sc. in Civil Engineering Technology (U.E.T) Lahore Specialization in Geotechnical

Engineering

University of Engineering and 2010 B.Sc. in Civil Engineering Technology (U.E.T) Lahore

. Government College University 2006 Higher Secondary School (GCU) (Pre-Engineering)

10. Employment Record

August, 2014 to Date Senior Engineer Berkeley Associates (Pvt.) Ltd.

Activities

Preparation of scope of work for geotechnical investigations and geophysical surveys Supervision of geotechnical investigations work

Page 129: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Preparation of laboratory testing schedules Design of foundation Geotechnical analyses (slope stability and seepage analyses) for hydropower projects Report writing

Feb 2012 to Aug 2014 Project Manager Client: US Air Force (USAF) Consultant: US Army Corps of Engineers (USACE) Project: Construction of four Pre-Engineered facilities with concrete foundations in the US Air Force base at Manas Transit Center, Kyrgyzstan

Roles and Responsibilities

Handle all engineering and design related issues of project both from technical

and functional

standpoint

Create, update and maintain the project submittal log and all other project specific quality control reports

Prepare/update daily progress report and project status using QCS/RMS

Review/audit and approve for submittal shop drawings and submittals for conformance with project

specifications by direct review and by leveraging the knowledge and experience of others in the project team when necessary

Conduct and document weekly QC meetings with the site superintendent and USACE personnel and provide written minutes as described in project specific contract documents

Have weekly meeting with the QA Engineers (as directed by USACE) to answer any question as to procedures and the future work items

Conduct preparatory, initial and follow-up meetings to establish an understanding of the standards of care desired for each definable feature of work. Working with the Construction Manager and Superintendents develop checklists to be used

Maintain the project "As-Built" drawings on a daily basis

Notify BOD and if necessary stop the work to resolve matters that affect safety, quality and/or inhibit the logical progress of work

Prepare variation orders and RFP’s as per contract requirement

Review and monitor the submission of proper documentation for technical proposal, materials and design approvals

Monitor field-tests and expedites contractor’s required report submittals

Prepare and compliance with the project schedule and quality procedures

Act as liaison between contractor and USACE

Page 130: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

August, 2011 to Feb 2012 Project Engineer- Central

Roles and Responsibilities

New development projects including Knock Down Rebuild, adoption & New to Industry

Project planning as per the international standards

Ensuring HSE standards on all projects

Planning/ proposing the projects in accordance with the local legislations & other allied government departments

Handling entire maintenance activities of the retail stations in the designated area

Hiring of appropriate resources

Defining the visit frequency for all on-going projects

Aug 2010 to Jul 2011 Structure Design Engineer

Roles and Responsibilities

To provide efficient and effective solutions for the construction requirements of clients in the form of structural design

Designing of a hospital comprising of 410 beds in Bahawalpur; which included design of Flat slab, beam slab, combined footing, isolated footing, columns, beams, retaining walls, underground water tank and overhead water tank

Completion of design of commercial plazas using ETABS

Designing of residential houses

Designing of underground water tanks

Designing of retaining walls (cantilever & propped)

Professional Affiliations

Pakistan Geotechnical Engineering Society (PGES- M- 123)

USACE/NAVFAC Certified Engineer for Construction Quality Management CQM (MED021378407)

Professional Development and Trainings

June 1, 3, 8, 10 & 13, 2014 achieved the mandatory professional development units for “Risk Management Professional (PMI-RMP) course”

May1, 4, 11 & 18, 2014 successfully completed the pre-requisite professional development units for “Project Management Professional (PMP) course”

June 10-11, 2013 Network Analysis and Schedule (NAS) for USACE contracts training by Wilhelmina Pierce, P.E

November 13-14, 2012 Construction quality management for contractors- #784 training course by US Army Corps of Engineers (USACE) and Naval Facility Engineering Command (NAVFAC)

March 14-15, 2013 13th National Conference on Geotechnical Engineering held by PGES

Page 131: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

11. Language:

English:

Read

Excellent

Write

Excellent

Speak

Excellent Urdu: Excellent Excellent Excellent

Page 132: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Curriculum Vitae

1. Name : Ijaz Shafi

2. Name of the Firm : Berkeley Associates (Pvt.) Ltd.

3. Designation : Chief Structural Engineer

4. Date of Birth : June 19, 1953

5. Year with the Firm : 2 Years

6. Nationality : Pakistani

7. Reg No. With PEC : CIV-2878

8. Profession : Civil Engineer

9. Key Qualifications  

Practicing professional engineering since 1976.

As a professional engineer I have been involved in the analysis and designing of Arch-cum-Gravity Mana Dam, Baluchistan using finite element technique .Was involved in the designing of under-sluices, skimming platform, Intake Structures, Culverts, Aqueducts and small hydel schemes. Worked on different structures of Warsak Dam Rehabilitation Project. Carried out remedial measures for Wadi Dayqah Dam Project Sultanate of Oman. Also reviewed analysis and design for critical sections with different material properties of Tunnel No. 3 for Tarbela Hydropower Station Project using 2-dimensional model including rock interaction, Inspection of Mangla Powerhouse generating units and Switch yards for up- gradation of the Mangla Power Station.

As Vice President, NESPAK (July, 2011 to June, 2013) carried out the planning, analysis and design of Office buildings, Parking facilities and Pedestrian Under passes. Also worked on review projects including Apartment Buildings and Pedestrian Overhead Bridges . Design of Pedestrian bridges for Lahore Ring Road Project was also carried out.

As General Manager, NESPAK (2006 to 2011) carried out the planning, analysis and design of Office buildings and Multi-storeyed Commercial Plazas. The major projects are 25-storey Commercial plaza with five basements, Nuclear Plant and Safety related Nuclear Structures and 120m high stack. Also worked on the Remedial measures/ rehabilitation of Supreme Court of Pakistan Registary Office Building Lahore and vetting of bridges for improvement/up-gradation of Karakorum highway Raikot-Khunjerab section.

Page 133: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

As Chief Engineer, NESPAK (1999 to 2006) carried out the planning, analysis and design of Industrial buildings, underpass structures and extension of bridges. One of the major projects is the Karachi-Hyderabad Motorway. This involves condition survey, evaluation and rehabilitation/modification of bridges and other structures. Also worked on the Remedial measures/ rehabilitation of industrial and office buildings.

As Principal Engineer, NESPAK (1991 to 1999) carried out analysis and design of Barrage under sluices,500 KV Transmission line tower, PP-9 Thermal Power Plant Riyadh, Prestressed concrete sleepers, Multi-storeyed buildings, Precast prestressed concrete bridges, Design review of box girder cantilever bridges, Rehabilitation works of the powerhouse structure and preparation of Technical specifications of different projects.

As Senior Engineer, NESPAK (1981 to 1991) carried out the planning, analysis and design of Bridges, Culverts, Hydraulic structures, Office buildings, Hospital complexes, Industrial buildings, Tunnels, Arch-cum-gravity dam, Intake structures, Spillways, Elevated tanks, Small hydel scheme and Retrofitting of the buildings. Also prepared the Technical Specifications of different projects.

From 1977 to 1981 as a Junior Engineer, NESPAK , carried out the structural analysis and design of several bridges and reinforced concrete frame buildings.

As Design Engineer (1976 to 1977) with National Design and the Industrial Services Corporation carried out steel structures detailing and fabrication for Karachi Steel Mills project.

10. Academic Qualification

Name of Institution Year Degree/Diploma

Canadian Society for Civil 1984 Workshop on "Bridge and Highway /Institution of Engineering" Engineers, Pakistan

International Institute of 1983 Post-Graduate Diploma in Seismology and Earthquake Earthquake Engineering Engineering, Tsukuba, Japan

University of Engineering& 1976 B.Sc. Civil Engineering - Degree Technology, Lahore-Pakistan

University of Engineering & 1978 Courseon FORTRAN Programming Technology, Lahore-Pakistan & Computer Applications

Page 134: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

11. Experience :

April 01, 2014 to date - Structural Design Expert

Berkeley Associates (Pvt.) Ltd. 316-D, OPF Housing Scheme, Raiwind Road, Lahore

- Reviews/ log study the data information on powerhouse

concrete outline and Excavation drawings. Preparatory work for preparation of construction drawings in hand.

July. 1999 to June. 2013 - V.P. / General Manager/ Chief Engineer

National Engineering Service Pakistan (Pvt.) Limited Lahore, Pakistan.

As a Vice President/ General Manager / Chief Engineer supervised and worked on the following Projects;

Analysis and design of Underground and Overhead Water Tanks to be constructed at Qurtaba City Islamabad was carried out. Bill of quantities along with tender and construction drawings were also prepared and issued for construction at site.

Analysis and design of Pedestrian Underpasses to be constructed at Kalma

Chowk, Ichra, and Canal-Wahdat Road Lahore was carried out along with the preparation of construction drawings.

Vetting of design of Pedestrian Bridges for Package 16 and 17 was carried out.

As per Clients recommendations super-structure of the bridges was replaced with Steel Trusses. Design of the same was carried out. Tender/Construction drawings including fabrication drawings were also prepared along with detailed bill of quantities and cost estimates.

Design review of Pedestrian Steel Bridge at Aamir Road, Lahore was carried out.

Necessary amendments in the design and drawings were made to suite the site conditions.

Design review of Country Club Apartments designed by Mushtaq and Bilal

Associates of Karachi was carried out. Feasibility of two additional floors constructed by the Client was also reviewed. Based upon the design vetting structural stability certificate was issued.

3-dimensional structural analysis/design of a 25 storeyed I.T.TOWER having 5

basements also including design of excavation support system for the basements.

Rehabilitation/Conservations of Supreme Court of Pakistan Registry Office Building at Lahore.

Page 135: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Rehabilitation/Remedial measure design of kiln foundation of Askari Cement Plant, WAH.

3-D analysis and design of 7 storey “Institute Building” and 6 Storey “Hostel and

VIP Suites” buildings of Pakistan Planning and Management Institute(PPMI) Islamabad.

▪ 5 Design of Academic Blocks, Student Hostels, Administration Block, Library Block,

Student Services Center, Apartments/Residences for staff and Residence for Vice Chancellor for University of Education Lahore.

Analysis and design of multi-storeyed building of NESPAK House Peshawar.

Analysis and design of Sewage Pumping Station, Sewage Lift Stations, Clarifier,

Oxidation Ditch, Waste Wash Water pump House, Grit Channels, Screening Chamber, Flow Distribution Chamber, Treated Effluent Storage Tank, Recycle and Waste Sludge Pump house, Administration Building, Sludge Drying Beds, Generator and Guard Rooms for Rehabilitation and up-gradation of Sewage Treatment Plant at Khasab-Sultanate of Oman.

Analysis and design of Sewage Pump Station for Sewage Network and Sewage

treatment plant at SUR-Sultanate of Oman.

Analysis and design of various blocks for University of Agriculture Faisalabad Faculty of Veterinary Science and Animal Husbandary at Paras-Faisalabad.

Analysis and design of Mazar of Hazrat Peeray Shah Ghazi, Mazar of Mian

Muhammad Buksh Sahib, Prayer Hall, Langer Khana and Sarai for Mazar at Khari Sharif.

Analysis and design of 6-Storeyed building for National Bank of Pakistan Mall

Road Branch Lahore.

Participated in the development of the Building Code of Pakistan-Seismic Provisions 2007.

Detailed Condition Survey for Hotel Inter-Continental Kabul, Afghanistan.

Analysis and design of 8-Storeyed Academic Block Building, 4-Storeyed

Apartment Buildings for Offices, Gymnasium, Over Head Water Tank(100,000 gallons), Boys/Girls Hostel for Services Institute of Medical Sciences (SIMS),Lahore.

Remodeling of Auditorium and Main Operation Theaters for Services Hospital

Lahore.

Page 136: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Analysis and design of Structural Steel Canopy of Toll Plaza at Okara By Pass.

3-D Analysis, design and detailed Engineering drawings of 8-Storeyed Structural Steel Cement Mill Building 1 and Cement Mill Building 2 for Mapple Leaf Cement Factory, 6700TPD Grey Cement Plant at Iskandarabad, District Mianwali.

3-dimensional time history dynamic and static analysis of KCP - Workshop

Building including soil structure interaction. Technical Specifications and preparation of detailed construction drawings along with bar bending schedules for KCP- workshop projects-Khushab.

3-D Analysis and design of 120 m high Stack and connected tunnel for safety

Related Nuclear Structure of KCP-workshops Khushab.

Analysis and design of extension of existing Stack from 80 m to 120 m for KCP-II Project Khushab.

Structural assessment of Assembly Plant roof structure damaged by fire for Millat

Tractors Limited Sheikhupura.

Design of overhead/underground Water Tank (200,000 gallons) for Safety Related Nuclear Structure of KCP-workshops Khushab.

Design Review of Addition of two Floors over old wing of Pearl Continental Hotel,

Lahore.

Remedial measure design for basement roof slab of Mazar-e-Qauid-e-Azam Karachi.

Design review of Main Pump House, Surge Vessels Drainage Shafts/Vent Shafts,

Valve Chamber and Terminal facilities of Hofuf Water Transmission System, Kingdom of Saudi Arabia.

Remedial measure design of 50-Bed Hospital at Said Mitha Bazar, Lahore.

Structural evaluation of 7-Storeyed existing structure of Associated House,

Lahore.

Rehabilitation measure for Babu-Sabu Pumping Station at Mian Mir Drain, Lahore.

Remedial measures design for Pre-Heater Tower of Fauji Cement Plant.

Design review and remedial measures of High Court Bench complex at Sibi, Baluchistan.

Page 137: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Planning, analysis, design and drawings for extension of existing bridges of Karachi - Hyderabad Motorway (M-9) also carried out condition survey of all the existing bridges and cross drainage works. Designed the rehabilitation, and up gradation of structures for 4-lane expressway to 6-lane motorway.

Analysis, design, drawings and technical specifications of Hattar Chemical’s Plant.

Design review of Control Building of Secondary Transmission Line and Grid

Station Project.

Design review of 25 MW KAMC Power Plant Extension - Tabuk, KSA.

Analysis and design of machine hall and Annex-Building of 14 MW power plant at Fatehjang.

Analysis, design and drawings of underpass at New Campus Canal Crossing

Lahore.

Design of Overhead Water tanks of 300m3 and 600m3 for water supply Schemes to Shinas and Liwa Towns Muscat, Sultanate of Oman.

▪ Also worked as Project Manager for some of the Projects.

1991 to 1999 - Principal Engineer (Structures) National Engineering Service Pakistan (Pvt.) Limited Lahore, Pakistan.

As Principal Engineer supervised and worked on the following projects:

Worked on the remedial measures of the Kiln Foundations, Grey and White Cement slurry silos of Mapple Leaf Cement Factory.

Worked on different structures of Warsak Dam Rehabilitation Project. The work

consists of Powerhouse roof repairs, Alignment of powerhouse crane rails, Powerhouse structural system, and Substructure anchorage, Repairs to Draft tube, Spillways and Intake structures.

Planning, analysis, design and review of design of Turbine and workshop building

foundations and various equipment foundations of Riyadh Power Plant (PP-9) Saudi Arabia.

Preparation of shop drawings for Directorate of Antiquities and Multi-media

center building of King Abdul-Aziz Historical Center, Riyadh Saudi Arabia.

Analysis, design and preparation of Punjab Workers Welfare Board's School Buildings at Gujranwala.

Page 138: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Vetting of design and drawings of cast in situ prestressed concrete box girder cantilever bridges over river Jhelum at Kohala and Karote.

Vetting of design of precast prestressed concrete bridge at GarhiHabibUllah.

Design of precast prestressed concrete bridges over link canals, distributaries and

drains of Pakistan Motorway Project (Sheikhupura - Multan - D.G. Khan Section).

Worked on the design, drawings and technical specifications of the Korle Lagoon Ecological Restoration Project Accra-Ghana

Review analysis and design of 500 KV Guddu-Multan Transmission line

suspension type tower.

Analysis and design of Undersluices of barrage structure of Ghazi-Barotha hydel power project.

Vetting and design review of Pre-stressed concrete sleepers for 1 in 16 turnouts

for Pakistan Railways. 1981 to 1991 - Senior Engineer

National Engineering Service Pakistan (Pvt.) Limited Lahore, Pakistan.

Responsible for planning, analysis and structural design of the following projects:

3-dimensional time history dynamic and static analysis of the buildings and

design of remedial measures of Bolan Medical Complex Project, Quetta, Pakistan using computer programs SAP IV & SAP V developed by University of California Berkeley, U.S.A. The cost of the project was U.S. $ 29.3 million.

Analysis, design and preparation of construction drawings of precast, prestressed

girder, highway and freeway bridges and aqueduct structures of Euphrates East Drain Project, Iraq, costing U.S. $ 600 million.

3-dimensional analysis of Arch-cum-Gravity Mana Dam using finite element

technique. The Dam, located in Baluchistan, Pakistan, is more than 100 ft. high and is worth U.S. $ 2.34 million.

Analysis of the Turbo-Generator Building (using computer program SAP IV) of

Kundian Nuclear Complex Project (KNC-3), Pakistan, costing U.S. $ 600 million.

Review analysis and design for critical sections with different material properties of Tunnel No. 3 for Tarbela Hydropower Station Project. 2-dimensional model including rock interaction was run on computer using package program SAP V.

Page 139: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

3-dimensional analysis and design of main pumping station supply pipe line Bi- furcation for transient pressure caused by water hammer of North Jazira Project, Iraq.

Remedial measure design of Nurse's and Doctor's Hostel for Bolan Medical

Complex.

Analysis, design, technical specification and preparation of construction drawings of R.C.C. bridges, aqueduct structures, water course crossings, fall structures and siphon of Fordwah Sadiqia Drainage project.

Analysis, design & preparation of detailed construction drawings for multi-storey

office building of Punjab Board of Technical Education. The structure consisted of multi-storeyed frames and waffle/flat slabs system.

Tender drawings and design of 12 storeyed building of State Life Insurance

Corporation at Faisalabad.

Analysis, design and preparation of detailed construction drawings of NESPAK House – Lahore. The structure consists of multi-storeyed frames with waffle slab for upper storeys and beam slab arrangement for basement roof.

Layout, analysis, design and preparation of tender and detailed construction drawings of precast prestressed concrete bridges for distributaries, drains and link canals of Pakistan Motorway Project (Sheikhupura - Multan - D.G. Khan Section).

Tender drawings and design of spillway and intake structure of Gandially Dam

project.

Structural analysis and design of various facilities for Development of Parks and Play Ground at Quetta project.

Analysis, design and preparation of detailed construction drawings for various

branches of Bank of Punjab project.

Analysis, design and drawings of various buildings such as Nurse's Hostel, Doctor's Hostel, Mosque, cafeteria and Residential Quarters of 50 Bed Hospital Complex, Project at Hub.

Technical specification and tender/detail design of Intake Tower, Clarifier, Filters,

Spillway Structure, Residential buildings & Mosque of AkraKaur Dam Project.

Analysis, design and preparation of drawings for Assembly Plant Building and Auxiliary structures of Millat Tractor's Extension works project.

Page 140: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

"Updating of Seismic Code" for Quetta based on micro zoning of Quetta and practices in design.

1977 to 1981 - Junior Engineer

National Engineering Service Pakistan (Pvt.) Limited Lahore, Pakistan.

Participated in the analysis and design of the Main Plant Building & auxiliary

buildings of Kundian Nuclear Complex (KNC-2), Pakistan costing U.S. $ 40 million.

Design & supervision of preparation of construction drawings for R.C. and prestressed girder bridges of N.W.F.P., Pakistan. The cost of the project was U.S. $ 2.70 million.

Review of the design of Provincial Assembly Building at Quetta, Pakistan.

Analysis & design of prestressed concrete girder bridges of Al-Khabura Draiz

Road, Project, Oman costing U.S. $15 million.

Analysis & design of various R.C.C. framed residential & office buildings of Al- watba Township Project, Abu-Dhabi costing U.S $300 million.

12. Languages :

Urdu:

Read

Excellent

Write

Excellent

Speak

Excellent

English: Excellent Excellent Excellent

Page 141: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Curriculum Vitae

1. Name : Umar Maqsood

2. Name of the Firm : Berkeley Associates (Pvt.) Ltd.

3. Designation : Senior Engineer Structures

4. Date of Birth : January 01, 1992

5. Year with the Firm : 1.5 years

6. Nationality : Pakistani

7. PEC Registration / : Membership No.

Civil - 40791

8. Key Qualifications :  

Practicing Professional engineer since 2008.

Defining Scope of Work Furnishing Technical and Financial Proposals Supervision of Field & Laboratory Testing Development of Computer Aided Designs and Drafts Planning and interpretation of Geotechnical Investigations

9. Academic Qualification :

Name of Institution Year Degree/Diploma

NICE-SCEE-NUST-

Islamabad

2014

BE Civil Engineering

Punjab College of Sciences (Lahore)

2010

F.Sc. Pre Engineering

Education Centre High

School

2008

Matric (Science)

Page 142: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

10. Employment Record :

May 2015 to date - Structural Engineer

Berkeley Associates (Pvt.) Ltd. 316-D, OPF Housing Scheme, Raiwind Road, Lahore

1223 MW CCPP Balloki Pakistan

Patrind Hydropower Project

Sep. 2014 to May 2015 Lab Engineer

Structures Lab at NUST NUST Institute of Civil Engineering (NICE) at NUST Islamabad

Shuqaiq Steam Power Project, Shuqaiq – Kingdom of Saudi Arabia

Software Competency

MS Office Suite (Word, PowerPoint, Excel) AutoCAD SAFE Primavera P6 Micro Survey CAD Arc GIS MATLAB SAP-2000pro ETABS

11. Languages :

Urdu:

Read

Excellent

Write

Excellent

Speak

Excellent

English: Excellent Excellent Excellent

Page 143: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Curriculum Vitae

1. Name : Maheen Malik

2. Name of the Firm : Berkeley Associates (Pvt.) Ltd.

3. Proposed Designation : Public Health and Environmental Engineer

4. Date of Birth : November 28, 1989

5. Years with the Firm : Recently Joined

6. Nationality : Pakistani

7. PEC Registration No. : ENVIRO/200

8. Key Qualifications :

As an Environmental Engineer I have worked on various National and International projects for assessing their environmental Impact Assessment. Major scope of work includes preparing technical as well as financial proposals for environmental assignments, formulating environmental management and mitigation plans, devising approach and methodologies for social impact assessment, supervising laboratory testing of various water and waste water samples.

Successful application of numerical analysis for the study of sedimentation in the Kurram Tangi Reservoir.

Poster Publication of “Evaluation of Surface Water Quality Indicators with Socio-Economic Dynamics in the Egyptian Nile” in the European Geoscience Union Conference in 2016 in Vienna, Austria.

Completion of various national and international trainings organized by the World Bank, British Council, National University of Sciences and Technology and USAID.

9. Academic Qualification

Name of Institution Year Degree/Diploma

Technical University of Munich, Germany

2016 Masters in Environmental Engineering

National University of Sciences and Technology (NUST) H-12, Islamabad, Pakistan

2012 Bachelors in Environmental Engineering

University of Massachusetts, Donahue Institute, Amherst, United States of America

2011 Scholarship for the Study of Comparative Public Policy

Kinnaird College for Women Lahore, Pakistan

2008 Intermediate (High School)

Beaconhouse School System, Lahore, Pakistan

2006 O’Levels

Page 144: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

10. Employment Record

February, 2017 to date - Public Health & Environmental Engineer

Berkeley Associates (Pvt.) Ltd. 316-D, OPF Housing Scheme, Raiwind Road, Lahore

Preparation of Brochure for the inclusion of various environmental

services.

Formulation of Financial and Technical Proposal for Environmental and Social Impact Assessment studies.

Development of the Environmental and Public Health Department.

July, 2012 to Feb. 2014 Junior Environmental Engineer

National Engineering Services Pakistan (Pvt.) Limited (NESPAK) 1-C Block -N, Model Town Extension, 54700 Lahore (Pakistan)

Preparation of Environmental & Social Assessment Reports.

Preparation of Financial and Technical Proposal for Environmental Impact Assessment studies.

Interpretation of Field and Laboratory Results for air, water and noise samples.

Coordination between NESPAK and other firms (JV) for successful completion of the Project.

Major Projects included Kurram Tangi Dam Project, Alborz Hydropower Project and Iran Pakistan Pipeline Project.

11. Languages :

Urdu:

Read

Excellent

Write

Excellent

Speak

Excellent

English:

German:

Excellent

Basic

Excellent

Basic

Excellent

Basic

Page 145: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Iftikhar Ahmad (IGC NEBOSH Certified, OSHA 30Hrs Construction Safety , BSc Chemical Engineer) 

 Birth Date: 11‐02‐1985 

Email  Address:  [email protected]  Nationality: 

Pakistani 

Cell:  +923007953185  

 

Astute professional with valuable experience managing Health, Safety & Environmental aspects. Apt in major 

Safety  Program, Work  Permit  system,  Safety  at  Excavations,  Scaffoldings,  First  Aid,  Height work  &  PPE. 

Skilled  in  all  aspects  of  chemical  engineering  including  process  computer  simulation,  development, 

equipment sizing and specification. Also have hands‐on experience in making sure that standards of quality 

are met while production costs are kept as low as possible.  

 

Areas of Expertise 

Safety, Health & Environment 

Drive  a  culture  of  “Safety  and  Health”  by  ensuring  all  appropriate  actions  are  taken  to implement  HS&E  procedures/checklist/SSOW/inspection  forms  and  monitoring  HS&E performance within area of responsibility for different construction projects. 

Review and creation of Job Hazard Analysis (JHA) and Work Method Statements. 

Ensuring training to the staff in adherence to HS&E standards and procedures. 

  Service Delivery 

Delivering HS&E training so that all staff is aware of their HS&E obligations. 

Acting  as  an  internal  coach  and  advisor  to  Business  Unit,  project  and  subcontractor employees. 

Ensuring accurate and up to date documentation and information relating to HS&E issues and training is collected, reported, disseminated and stored in project files. 

Monitoring Client Health, Safety and Environment    requirements. 

Standards / Compliance 

Keeping  abreast  of  HS&E  legislation,  best  practices  and  leveraging  to  facilitate  HS&E practices on the project. 

Development of HS&E standards and processes to ensure the Project(s)  is  in compliance with regulatory and governance requirements. 

Monitoring and conducting regular compliance checks and audits within the project  sites: 

reporting breaches, issuing non compliance reports, recommending remedial actions and 

follow‐up to ensure timely closeout. 

 Iftikhar Ahmad email: [email protected] mobile: (+92) 3007953185

Page 146: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

PROFESSIONAL  CONTOUR  

 

Berkeley Associates (Pvt.) Ltd ( 27 JULY 2015 To Date) Client :Unilever Pakistan Ltd . 

Project: Installation of Iconic Super Structure at Surf Excel Plant Sheikhupura Lahore Pakistan 

Currently I am working as a HSE Engineer in Berkeley Associates (Pvt.) Ltd for the erection of Iconic super structure at Surf Excel Plant Unilever Pakistan Ltd. 

I am responsible to monitor all work related activities including structure fabrication, sand 

blastring  and  painting  of  structure,  scaffolding  erection  and  inspection,  work  at height, 

crane operation, hot work  (Welding  ,  cutting  , grinding). My  responsibilities also  include 

PTW issuance, compliance of PTW as per Unilever Standards’ development of SSOW, deliver 

TBTs and conduct site safety inspections with client . 

 HS&E Team Leader Matrix Engg Ltd ( April 2015 to July 2015) 

Client: Procter and Gamble Ltd Karachi Pakistan 

Project: CI8(Expansion and modification of Arial Plant) 

Third Party: TUV 

Currently I Have worked as a HS&E team leader in Matrix Engg Ltd for the modification  of existing Arial Plant at P&G Port Qasim Karachi Pakistan for 4 months. 

 Core  responsibilities include 

Development & monitoring of HSE Managment    System 

Development  of  company  technical  safety  (i.e.,  process  safety,  asset  integrity) 

documentation. 

Participating in HSE studies/reviews i.e., QRAs, EIAs, , HAZID, HAZOP, Project HSSE Reviews Ensure monitoring and audit of HSE performance standards & their  management 

Develops & maintains the HSE performance reporting system & mechanisms for reporting 

on HSE performance . 

Maintains & further refines the process for HSE performance review to enhance & support implementation of HSE Management System 

Review and input to the development and maintenance of COMAH reports and HSE Impact Assessments (HSEIA) for Major Hazard sites. 

Ensuring process safety principles and best practices are implemented early in the  design 

phase and carried through to facility completion and operation. 

 

 Construction Projects Senior HSE Engineer,Albahr Alarabi Marine & Engineering Services 

Hamriyah Free Zone Sharjah ,UAE ,August 2014 to April 2015 . 

 I  have worked  in Albahr Alarabi Marine  and Engineering  Services  as  a HSE  Engineer  for about 9 months as projects monitored by me as a HSE Engineer completed  . 

Projects being supervised regarding HSE 

As  HSE  Engineer  monitored  and  controlled  all  activities  involved  in  Construction  of 

emergency block of Khalipha Hospital at Ajman UAE with complete safety compliance  as 

per UAE laws.   Iftikhar Ahmad email: [email protected] mobile: (+92) 3007953185

Page 147: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Construction of 12 Nos. storage tanks foundations, office building construction (G+4),  dike 

wall,  boundary wall,  industrial  flooring  and  inter  lock work  in Green  Spring  Energy  LLC. 

Hamriyah Free Zone, Sharjah. 

Office Building construction , 8Nos. storatge tanks foundation , dike wall, boundary wall and interlock work at Sharjah National Lube Oils CompanY Ltd LLC. (Sharlu) Sharjah HFZ. 

Monitoring  of  construction  work  of  pump  room  ,  office  block  (G+5)  12  Nos  .  tanks foundations, dike wall  ,boundary wall  ,  industrial  flooring  ,  interlock work, weigh bridge construction  and  fabrication  of  12  new  storage  tanks  (  Dia:Height  19.5  :  22  m)  at NT Petroleum Ltd Sharjah HFZ. 

During  excvavation  work  for  under  ground  pipelines  of  NT  Petroleum  along  road  side 

monitoring the all work related activities such as heavy lifting , deep excavation barrication 

and risk assesments and road safety. 

Risk assessment of a project of fabrication of 6 storage tanks and office block  construction (G +4) boundary wall, dike wall and interlock work at Gulf Petroleum Sharjah, HFZ. 

Construction  of  14  Nos  storage  tks  at  ARZOO  Energy  International  Hamriyah  Free  Zone Sharjah UAE. 

 Responsible  to monitor  all  the  activities  such  as  crane  lifting  operation, work  at height, 

Monitoring of scaffolding erection and scaffolding inspection , site safety inspections , safety 

surveys,  housekeeping,  risk  assessments,  fire  safety  and  trainings  about  fire  fighting  to 

workforce as all the projects are in oil and gas sector 

 

 Senior HSE Process Engineer, Century Paper and Board Mills Limited, Pakistan, January 4, 2010 to July 2014. 

 Key  responsibilities include: 

New  system  installations,  process optimizations, process  safety  &  trainings were the  key 

responsibilities  . 

During working at Stock Preparation Plant, I was dealing with plant operation, optimization 

and  trouble  shootings  about  the  bottlenecks.  I  was  responsible  for  the  smooth  plant 

operation using Distributed Control System. 

Attending  all  process  safety  reviews  as  necessary  and  making  sure  that  all  agreed recommendations were adhered to. 

Estimating production cost reports for senior    managers. 

Involved  in  researching  ways  to  develop  new  and  improved  chemical  manufacturing 

processes. 

Participating in incident   investigations.  Preparing plant layout, equipment list, capital cost estimate and operating cost estimate. 

Developing process   chemistry. 

Also responsible for safe operations  and inspection of air compressors and Boilers. 

Trained workers for evacuation drill during    emergencies. 

Undertaking regular inspections of site, plant and machinery. 

Monitor the effectiveness of existing safety    standards. 

Accident investigation and reporting to higher    managements. 

Preparation of weekly, monthly safety    reports. 

Inspection and positioning of portable fire extinguishers. 

Minimization of hazardous wastes, its effective management to protect  environment. 

Health and hygiene of all employees such as washing / drinking and toilet facilities.  out risk assessments for chlorine gas handling at Sodium Hypo Chlorite production Plant. 

 

Iftikhar Ahmad email: [email protected] mobile: (+92) 3007953185

Page 148: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Development of emergency procedures to deal with the leakages of Chlorine gas.  

 TECHNICAL TRAININGS AND MANAGERIAL SKILLS 

 

 

A training program on Management systems (ISO 9001:208, ISO 14001:2004, OHSAS 18001:2007) – Auditing Techniques at CPBM by ACS Registrars in April 2012. 

A training program on QHSE Introduction & Internal Auditing at Century Paper & Board Mills in January 2011 . 

A workshop on Basic Managerial Skills for First Line Managers at CPBM in May 2010.  

 EDUCATION 

  

B.Sc [Chemical Engineering], [University of Punjab], [2005‐2009] 

  NEBOSH International General Certificate  in Occupational Safety & Health (SHIELD UK) – 

2014. 

  OSHA 30 Hrs Construction Safety ‐2015. 

 

 PERSONAL  DOSSIER 

 

 

Permanent  Address  :  Bunga Kharak Singh Tehsil & District – Okara Pakistan . 

Languages  :  English, Urdu, Punjabi, Saraiki 

Marital Status  :  Un‐married 

Passport No.  :  BT1161991                       

 Iftikhar Ahmad email: [email protected] mobile: (+92) 3007953185

Page 149: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Registration  

Page 150: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Registration  

Berkeley Associates

Page 151: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an
Page 152: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Berkeley Associates

Registration

Page 153: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

 

Details https://e.fbr.gov.pk/Registration/searchDetail.aspx?rand=0.893128141...

Taxpayer Online Verification

Date : 22-03-2017

Time : 14:35:45

NTN/FTN 4446209-3 Category COMPANY

Name BERKELEY ASSOCIATES (PRIVATE) LIMITED

CNIC/PP/REG/INC No. 0094613

House/Flat/Plot No. --- Street/Lane ---

Block/Sector/Road --- City ---

Principal Business Activity SALARY INCOME

Business Nature

Registered For INCOME TAX w.e.f 03-Sep-2015

Income Tax office CORPORATE RTO LAHORE

Print Back

1 of 1 3/22/2017 2:36 PM

Page 154: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Quality and Safety Policy  

 

Page 155: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an

Quality and Safety Policy  

 

Page 156: Company Profile - BA (Pvt) Ltd ARFAN (2017) 1Berkeley Associates (Pvt) Ltd Introduction f Berkeley Associates (Pvt.) Ltd. Consulting Engineers Berkeley Associates (Pvt.) Ltd. is an