company profile - ba (pvt) ltd arfan (2017) 1berkeley associates (pvt) ltd introduction f berkeley...
TRANSCRIPT
Company Profile 24 D-1, NESPAK Colony Phase-I, Lahore-53700 Phone: +92 423 5181331-3, E- mail: [email protected] Web http://www.berkeley.com
Berkeley Associates (Pvt.) Ltd.
CONTENTS INTRODUCTION
OUR DOMAIN
ORGANIZATION
TURNOVER
SPECTRUM OF SERVICES
COMPLETED PROJECTS
CLIENTS
TOPOGRAPHIC SURVEY EQUIPMENT
DRILLING EQUIPMENT
LABORATORY TESTING EQUIPMENT
KEY PERSONNEL
FIELD STAFF
REGISTRATION
QUALITY & SAFETY POLICY
Berkeley Associates (Pvt) Ltd
Introduction f
Berkeley Associates (Pvt.) Ltd. Consulting Engineers
Berkeley Associates (Pvt.) Ltd. is an engineering firm providing highly professional services in various disciplines of Civil Engineering. We provide project management, design, supervision, planning and drafting services in the fields of Construction, Geotechnical, Groundwater and Structural Engineering for various infrastructure and development Projects including Buildings, Highways, Motorways, Hydropower, Dams, Power Transmission Lines, and Airfields. Main areas of our Engineering Services include Topographic and Bathymetric Surveys, Project Management, Value Engineering, Geotechnical Investigations and Design, Foundation Engineering, Site Evaluation, Site Improvement, Pavement Design and Evaluation, Material Engineering, Construction Supervision of Earthworks and Foundations and Ground Water Studies. The project planning services are provided for all project stages including inception, feasibility, design, construction, and operation. Computer aided drafting facilities are provided for all kinds of engineering drawings.
INTRODUCTION
Our Domain
For Civil Engineering Projects we provide services in the following engineering disciplines;
1. Project/ Construction Management
2. Hydropower Engineering
3. Value Engineering
4. Geotechnical Engineering
5. Pile Foundation and Construction of Fills
6. Groundwater Engineering
7. Structural Engineering
8. Transmission Line / Grid Station & Power Plants
9. Highways & Bridges
10. Detailed Engineering & Drafting
11. Dewatering Design / Supervision
12. Topographic and Bathymetric Surveys
OUR DOMAIN
CHIEF EXECUTIVE OFFICER
Jahangir Akhtar
BOARD OF DIRECTORSJahangir Akhtar
Khalid AyyubMuhammad Abbas
Office AdministrationAslam Hayat
Accounts and RecordKeeping
Asif Chughtai
Structural EngineeringIjaz Shafi
GeotechnicalEngineering
Khalid Ayyub
Senior StructuralEngineers
Junior StructuralEngineers
CAD Operators
Senior GeotechnicalEngineers
Site Staff i/cDrillers & Helpers
EnvironmentalEngineer
Public HealthEngineers
Environmental & PublicHealth Engineering
Syed Azhar Maqsood
Hydropower & DamsEngineering
Janghir Akhtar
Civil DesignEngineers
E&M DesignEngineers
Project Management &Business Development
Sheikh Ilyas Ahmad
Planning Engineers
Schedulers
Environmentalists
Contract ManagementSyed Hamid Hassan
Groundwater EngineeringAhmed Nawaz
Geophysicists
Site Staff
Survey SectionRaja Naeem
Surveyors
Helpers
Draftsman
Geotechnical Engg.Laboratory Technicians
Junior Engineers/Geologists
BERKELEY ASSOCIATES (PVT) LTDORGANIZATION CHART
Organization Chart
Spectrum of Services
For Civil Engineering Projects we provide services in the following engineering fields
The Geotechnical Engineering services include planning and execution of field investigations,
preparation of geotechnical investigation reports, evaluation of geotechnical design parameters,
analyses and design of foundations, slopes, embankments. Evaluation of existing foundations,
and earth retaining structures are also carried out.
Carrying out field investigations including drilling of boreholes, sampling, field tests,
installation of piezometers, monitoring of ground water table, etc., using our in-
house facilities.
Planning of comprehensive Geotechnical investigation program tailored to specific
needs of the Project with particular aim of obtaining safety and economy in the design
of foundations and earth structures. Planning includes establishing drilling
requirements, extent of drilling, method of drilling, method of soil sampling etc.
Prepare cost estimates and specifications for the geotechnical investigations.
Supervision and monitoring the progress of field investigations ensuring
that investigations are being carried out in accordance with the internationally
recognized standard practice.
Carrying out initial analyses of the field data and modifying (if required) the field
investigation program.
Inspection of soil samples and preparation of most efficient laboratory testing
Program.
Carryout the laboratory testing under technical supervision.
Carryout geophysical surveys.
Evaluation of physical and engineering characteristics of soils/ rocks on the basis of
field and laboratory test results.
Determination of foundation design parameters.
Design of shallow and deep foundations i.e. spread foundations, rafts, piles etc.
Preparation of geotechnical investigation reports.
Design of earthen embankments for roads and water retaining structures.
Analyses & Design of Foundations & Embankments
Soil Investigations
Geotechnical Engineering
SPECTRUM OF SERVIC ES
Spectrum of Services
Slope stability analyses
Design of cut slopes and slope stabilization systems.
Design of excavation support systems.
Design of dikes and coffer dams.
Design of under-ground water cut-off systems.
Seepage analyses of water retaining structures.
Liquefaction analyses.
Evaluation of dynamic design parameters for design of foundations.
Evaluation and remediation of problematic soil conditions.
Design of site improvement systems.
Design, performance and analyses of pile load tests.
Design and construction supervision of cast in-situ piles.
Design and construction of contiguous pile system.
Preparation of technical specifications for earthworks.
Quality control of large earthworks.
Assessment of engineering characteristics of earthworks.
Supervision of construction of foundations, earthwork and soil improvement works.
Pile load tests and evaluation.
In order to assess the groundwater potential for various projects, we plan and execute field
investigations, computer modelling, assessment of aquifer parameters, prediction of availability
of groundwater, ground water quality analyses. Design of tube wells and influence of exiting
water facilities on pumping of new wells is also carried out. Groundwater Engineering services
include;
Design of dewatering systems.
Design and installation of piezometers.
Performance of electrical resistivity surveys for initial assessment of ground water quality.
Groundwater monitoring.
Groundwater quality assessment.
Planning and execution of pump out tests.
Interpretation of pump out test data and evaluation of aquifer parameters.
Installation and development of tube wells.
Groundwater Engineering
Piling and Construction of Fills
Spectrum of Services
Topographic surveys are carried out for all types of projects for developing the surface
contours, area assessments, project planning and layout studies. Underwater surveys
(Bathymetric Survey) are carried out to develop underwater bed profiles required for
placement of intake and outfall structures. The services include;
Performance of Topographic Surveys of land for infrastructures projects.
Preparation of topographic maps at desired contour intervals.
Establishment of Benchmarks.
Performance of underwater (Bathymetric) survey of canals and offshore sites.
Feasibility stage structural designs are carried out for development of cost estimates.
Detailed analyses and design of structures are carried out using computer aided tools for all
type of projects. Construction drawings are prepared for material take-offs and
implementation. Design review services are also provided. Other service include;
Planning stage design of various structures.
Analyses of structural elements of all types of projects.
Detailed design of structures.
Preparation of tender drawings and construction drawings.
Preparation of bar bending schedules.
Preparation of as-built drawings.
Review of Civil works Design prepared by EPC contractors.
Optimization of design and Value Engineering.
Design for strengthening and rehabilitation of structures
Project Management services are provided for optimizing the available resource. Resident
construction supervision services are provided for ensuring quality construction and
adherence to agreed time line. The services include;
Preparation and monitoring of project implementation schedules.
Preparation and implementation of quality control/ quality assurance plans.
Providing resident supervision and monitoring progress of works.
Maintaining construction and QA/QC records.
Preparation of as built drawing.
Verify construction quantities and progress payment invoices.
Project Management & Construction Supervision
Structural Engineering
Topographic and Bathymetric Surveys
Spectrum of Services
Contract management, issuance of variation orders.
Preparation of detailed Bill of Quantities (BOQ) for construction projects.
Completed Projects
COMPLETED PROJECTS
Completed Projects
150 MW Patrint Hydropower Project, AJK
22 MW Jabban Hydropower Project, KPK
90 MW Batakundi Hydropower Project, KPK
180 MW Naran Hydropower Project, KPK
300 MW Balakot Hydropower Project, KPK
100 MW Solar Power Project, Bahawalpur
Cooling Tower for AES Lal Pir Power Project, Muzaffargarh
120 MW Shushghai Zhendoli Hydropower Project, Chitral
100 MW Kotli Hydropower Project, AJK
100 MW Shogo Sin Hydropower Project, Chitral
762 MW AES Power Project, Muzaffarabad
232 MW Karkey Rental Power Project, Karachi
120 MW Rajdhani Hydropower Project, AJK
Engro Rice Plant Extensions, Bhikki
Engro Food Plant Floor Rehabilitation
New Ammonia / Urea Plants Project of Engro Dharki
Machai Hydropower Project, AJK
Fire Water Tanks in UAE
Khari Hydropower Project, AJK
Sind Engro Coal Mining Project, Thar
Foundation Piling for Mabarak Center, Lahore
Hub Water Treatment Plant, Hub, Karachi
Effluent Treatment Plant for Tanneries, Kasur
Additional Cooling Towers for AES Power Project , Mahmood Kot, Muzaffargarh
Water Supply & Sewerage System and Sewage Treatment Plant for New Mir Pur City
CONTRACT MANAGEMENT, CONSTRUCTION SUPERVISION & QUALITY CONTROL SERVICES
FEASIBILITY STUDIES DESIGN & PROJECT MANAGEMENT SERVICES
Completed Projects
Project, AJK
Water Supply & Sewerage System for Defense Housing Scheme, Islamabad New
Ammonia/ Urea Plants Project at Engro Chemicals Pakistan, Daharki Commercial
Complex at G-4, Clifton Road Karachi
Commercial Complex at F-99, Clifton Road Karachi
Dewatering Design / Supervision Projects
DEWATERING DESIGN / SUPERVISION PROJECTS
Dewatering Design / Supervision Projects
Estimation of drainage requirements and design of dewatering system for Lusai Underground Railway Construction Project, Qatar Estimation of drainable surplus using available data on aquifer parameters.
Doha Conventional Centre and Tower Project, Doha, Qatar Aquifer testing and data analysis, estimation of dewatering requirements, design of dewatering system and dewatering wells for construction below water table.
Site B-201 Nawabshah, Sindh, Pakistan - Conducted aquifer tests (pump out tests), analysis of test data, estimation of aquifer parameters, design and construction of dewatering systems for pumping drainable surplus to lower water table below foundation (50 ft. below NSL) of the buildings.
Site B-109, Sargodha, Punjab, Pakistan - Conducted aquifer tests (pump out tests), analysis of test data, estimation of aquifer parameters, design and construction of dewatering systems for pumping drainable surplus to lower water table below foundation (50 ft. below NSL) of the buildings.
Study causes of rise of water table and proposed remedial measures - Industrial and ResidentialAreas in Dammam, Saudi Arabia.
Chashma Hydropower Project Member of panel of experts for dewatering. Analysis of aquifer test data, estimation of dewatering requirements to lower water table about 15 m to facilitate construction of power plant.
CHASNUPP - Evaluation of pumping requirements and design of dewatering system to facilitate construction of intake structure.
Supervision of 26 numbers dewatering tubewells installation at CHASNUPP Assuring installation in accordance with the design specifications
Dewatering Design / Supervision Projects
Geotechnical Investigations
GEOTECHNICAL INVESTIGATIONS
Geotechnical Investigations
Berkeley Associates (Pvt.) Ltd.
Army Officers Housing Scheme ASKARI-II, Gujranwala Cant.
Army Officers Housing Scheme ASKARI-III, Sargodha Cant.
Army Officers Housing Scheme ASKARI-VII, Rawalpindi.
Prime Minister Housing Scheme Peshawar.
Prime Minister Housing Scheme Faisalabad.
Prime Minister Housing Scheme Gujranwala.
Commercial Plaza at Army Welfare Housing Society Morgah Rawalpindi.
Park View Housing Society, Lahore Cant.
Punjab Housing Scheme Satiana Road Faisalabad.
Eden Canal Villas, Lahore.
High rising building at DHA Morgah-II Islamabad.
Sport Complex DHA Morgah-II Islamabad.
Sukh Chayn Gardens Housing Society Multan road Lahore.
WAPDA Finance Housing Scheme Raiwind Road Lahore.
WAPDA Finance Subsistence Farm Homes Lahore.
Mosque at Defense Housing Islamabad.
Construction of Multistory building located at main Boulevard, Gulberg-Lahore
Crescent Bay Project, Karachi
Mabarak Center, A Mixed Use Project, Lahore
Crescent Bay Project, Karachi
Faletti's Hotel Development Project, Lahore
Kalu Khan Girls High School Building at Swabi
District Headquarter Complex at Swabi
Regency Plaza at Mini Market Gulberg Lahore
Aslam Arcade Mcleod Road Lahore
Pakistan Air Force Complex at Abbott Road Lahore
Police Club Complex at Race Course Road Lahore
Mosque at Rinala Kurd
Rahber Center at Jail Road Lahore
Tax Free Plaza on Lawrance Road Lahore
Extension Unit for Pakistan Air Force Complex at Abbott Road Lahore Shopping
Complex at Main Market Gulberg Lahore
Extension Units for Tax Free Plaza on Lawrance Road Lahore Pakistan Bait-ul-Maal
Complex on Dev Smaj Road Lahore
Leeds Center Main Boulevard Gulberg Lahore
Ibrahim Mosque at Ferozepur Road Lahore
High-Rise Buildings
Housing Schemes
Geotechnical Investigations
Big City Plaza Building at Liberty Chowk Lahore
Multi storey building at Narang Mandi
Multi-storey building at Bhatta Chowk Lahore
Benevolent Fund Building at Peshawar
Residential Villas Saudi Embassy Islamabad
NHA Building at Thokar Niaz Baig, Lahore
MCB Building, Jail Road Lahore
Aitchison College, Lahore
McDonald's Allama Iqbal Town , Lahore
Jamia Mosque, Kala Shah Kaku, Lahore
Descon ES Building, Lahore
Zohra Heights, Gulberg Lahore
Garrison Academy for Girls, Lahore Cantt.
Garrison Degree College, Lahore Cantt.
McDonalds, Faisalabad
Fauji Foudation Medical College, Rawalpindi
Honda Building Ferozpur Road, Lahore
IT Building, Raiwind Road, Lahore
A.D. Palace Rahim Yar Khan
Aitchison College, Junior Wing, Lahore
Babul Islam, Sargodha
Bank Alhabib, Gulberg Lahore
PSO Retail Stations at Lahore, D.G. Khan and Sargodha
Law Chambers at Fan Road Lahore
Neighbourhood G-11/4 Islamabad
Detatched Houses at I-8 Islamabad
New Auriga Shopping Plaza, Gulberg Lahore
International Islamic Center, Johar Town Lahore
PIA Facilities at New Terminal Lahore Airport
Aligarh college, Gulberg Lahore
Aitchison College Staff Housing Lahore
River Side Hotel Jhelum
FFC Tower The Mall Rawalpindi
PC Hotel Muzzaffarabad
PIA Engineering Transportation Site
PIA Cargo Complex Site
Shaheen Airport Services SAPS Cargo Complex site
Sheikh Zayyed Complex at Ferozpur road Lahore
Expo Center Johar Town Lahore
Geotechnical Investigations
Kohat University of Science and Technology Kohat
Schlumberger offices and workshop at Sukkur
Plaza at Liberty Market
Bahria Town Lahore
PSO Zoom Logo Sign Tower Pattoki Bypass
Plaza at Abbott Road Lahore
Plaza at 37-P, Gulberg Lahore
Plaza at Davis Road Lahore
Plaza at Mcleod Road Lahore
Commercial plaza at Bedian Road Lahore
Eden Palace Villas
Mediacom Faisalaba
Comsat Complex Islamabad
PACE complex Gujrat
Decent Plaza Gujranwala
Government College Lahore
Al-Nafah Tower Gujranwala
Commercial Plaza Faisalabad
Historical Structural at Shalimar Garden Lahore
Enplan Plaza Garden Town Lahore
IT Park Ferozepur Lahore
Suzuki Motors Showroom Sargodha
Mian Tyre Office at Jail Road Lahore
Sterling Plaza at M M Alam Road Lahore
North East Hospital Complex, Peshawar
Ammar Medical Complex at Jail Road, near bypass, Lahore
Rahmat-ul-Alameen Trust Hospital Pak Patten
Muhammad Nawaz Sharif Kidney Institute at Shaikh Zayed Hospital Lahore
Alkhidmat Hospital, Sialkot
Hospital at Ferozpur road Lahore
Federal Hospital Rawalpindi
Saudi-German Hospital at Bahria Town, Lahore-Pakistan
Hospitals
Geotechnical Investigations
Cherished Pharmaceutical Industry at Raiwind
MSB Industries on Ferozepur Road Lahore
Cholistan Sugar Mill Liaquatpur
ICI go down near Kala Shah Kaku
Rawat Switchyard
FJFC Complex Bin Qasim Karachi
Merino Textile Mill on Faisalabad Shahkot Road Shahkot
International Juice Factory Azad Jammu & Kashmir
Sapphire Textile at Bhai Pharu
Pharmagen Beximco on Ferozpur Road Lahore
CCL extension unit at Kot Lakhpat Industrial Area Lahore
ProDiesal Services on Firozpur Road Lahore
Genesis Pharmaceutical Complex on Sheikhupura Faisalabad Road
Tower Crane Foundation at Fauji Cement, Jhang Bhatar
Ammar Textiles on Defence Road near Multan Road Lahore
Gas Treatment Plant at Liberty Power Project Ghotki Sind
CCL Godowns at Industrial Area Kot Lahkpat Lahore
Maria Balal Garment Factory and its Extension Units at Raiwind Road Lahore
Zuchini Industries Raiwind Road Lahore
Expansion of Caustic Soda Plant at Sitara Chemicals Limited on Faisalabad Sheikhupura Road
Carpet Processing Unit at Defence - Raiwind Road Lahore for Abbas Corporation (Pvt) Ltd
Expansion Unit for Dynamic Sportswear (Pvt) Ltd Canal Road Lahore
New Processing Unit for Vision Technologies (Pvt) Ltd Sialkot
Burhan Flour Mill at Gujrat Bypass
Kohat Cement Factory at Kohat
Coca Cola Plant, Gugranawala
Millac Foods, Manga Raiwind Road, Lahore
Merit Pharmaceutical, 34 km Ferozpur Road Lahore
Pepsi Cola International, Hattar
Pakistan Gloves Manufacturers & Export, Building, Sialkot
Shangai Chemicals, Sheikhupura Road
Nishat Dying and Finishing, Lahore
Ramey Textile Mills, Lahore
Forest Sweaters Pvt Limited
SKB Milk Plant, Raiwind Road, Lahore
Sitara Chemicals, Faisalabad
Rizwan Textile, Lahore
Industrial Buildings
Geotechnical Investigations
SKB Factory at Raiwind Road, Lahore
Tandlianwala Suger Mill
CSK Distilleries Palia
Kohat Cement Plant Kohat
ICI extension for polyester plant Sheikhupura
Infra-structural for DHA Phase-VI Lahore
Packages Pulp and Paper Factory Kasur
Shed for Pepsi Cola Hattar
Export Processing Zone Gujranwala
Waste water treatment plant Rawalpindi
Madina Cold Storage Sillanwali Road Faisalabad
Food Processing Plant at Export Promotion Zone Gujranwala
Pepsi cola Manga Road Lahore
Rest House Building at Packages Kasur
Hitech Feeds Rawalpindi, Sheikhupura, Sharakpur and Fatehjang
Snack Green Field Factory at Sunder Industrial Estate for Pepsi.
Faisal Asad Textile Mill Muzaffargarh
Sitara Agriculture Research Centre Gutwala Faisalabad
Sitara Hydrogen peroxide Plant Faisalabad
Sitara Chemicals Faisalabad
Underpasses at Committee Chowk and Rawalpindi General Hospital Chowk on
Murree Road Rawalpindi
Sub-soil Investigation for Internal Roads for Rupafab at Raiwind
Sub-soil Investigation for Internal Roads for District Headquarter at Swabi
Sub-soil Investigation for Lahore Bypass (sub-contract)
Sub-soil Investigation for Rawalpindi Ring Road Project Rawalpindi
Road Side Soil Investigation & Borrow Material Exploration/Testing For ADB
Assisted Rural Access Roads Project Phase - I in District Mandi Bahauddin,
Jhelum, Khushab, Kasur and Okara.
Road Side Soil Investigation & Borrow Material Exploration & Existing Road
Condition Survey for Dualization of Sheikhupura Faisalabad Road
Soil Investigation for Seven Nos. Of Bridges For Sheikhupura Faisalabad Dual Carriage
Way
Flyover bridge at Sherpao bridge Lahore
Flyover bridge at Katchary Chowk Multan
Underpass bridge at Jail Road Lahore
Roads and Bridges
Geotechnical Investigations
.
Additional Carriage Way (N-5) Section: TMP-Bahawalpur.
Road Side Soil Investigation & Borrow Material Exploration/Testing & Existing Condition
Survey for Khwaza Khela Besham Road Malakand Division.
Road Side Soil Investigation & Borrow Material Exploration/Testing & Existing Condition
Survey for Three Roads in Malakand Division.
Bridge Over Sutlej River
Soil Investigation and Testing at Ferozpur Road Lahore
Quetta Chamman Road
200 km Roads in Wanna
200 km Roads in MRDP
Sibbi Much Road
Internal and Main Boulevard for Bahria Town Lahore M3
Confirmatory Investigations
Lahore Ring Road Project Package VIII, IX, XI, VII and VIII
Chukiatian Barawal Road
Feasibility study for 1.2 Mw Marchai Hydropower Project.
Feasibility Study for 1.5 MW Khari II Hydropower Project.
Feasibility Study for 120 MW Shushghai Zhendoli Hydropower Project.
EPC Bid Preparation for 100 MW Kotli Hydropower Project.
Feasibility Study for 100 MW Shogo Sin Hydropower Project.
Detail Civil Design for 22 MW Jabban Hydropower Project.
EPC Bid Preparation for 120 Mw Rajdhani Hydropower Project.
Periodic Inspection of 1450 Mw Ghazi Brotha Hydropower Project.
Feasibility Study for 300 MW Naran Hydropower Project.
Feasibility Study for 98 MW Batakundi Hydropower Project.
Feasibility Study for 180 MW Balakot Hydropower Project.
Bid Preparation for Small Hydropower Project on Canal in Punjab.
Engineering Services for Lucky Hydropower Project, Marala
Engineering Services for LBDC Hydropower Project, Chichawatni.
Engineering Services for JBC Hydropower Project.
Engineering Services for 130 MW Sehra Hydropower Project.
Keyal Khuwar Hydropower Project, KPK
Azad Patten Hydropower Project
Geotechnical Investigation of Mahl HPP (Quarry sites), AJK
Hydropower Projects
Geotechnical Investigations
Coal Exploration Projects
Geotechnical Investigation of Coal Field Block-I at Islamkot Thar, Sindh
Soil Investigation K-2 Project, Sindh
Punjab Coal Mine Project Kallar Kahaar, Punjab
Cement Quarry Exploration Projects
Geotechnical Investigation at D.G Khan Cement (Kallar Kahaar).
Geotech Investigation at Maple leaf cement Iskandrabad in Mianwali
Geotechnical Investigation at Gharibwal Cement
Mass Transit Projects
Lahore Rapid Mass Transit Project, Lahore
Orange Line Metro Train Project, Lahore
Geotechnical Investigations
1180 MW RLNG Bhikki Power Project
230 MW LNG Based Engro Power Project Port Qasim
350 MW Coal Based Power Project of Siddique Sons, Port Qasim
2 x 330 MW Coal Fired Power Project in Thar, Engro Energy.
100 MW Charbon Coal Power Project.
2 x 60 MW Coal Fired Power Project, Fatima Energy.
50 MW Coal Power Project near Johar Abad, Orient Power.
11 MW Biomass Based Project in Faisalabad.
1 x 46 MW Coal Based captive power plant of Nishat Chunian Ltd., Pakistan
425 MW Combined Cycle Nandipur Power Plant
152 MW Combined Cycle Diesel Engine Power Project Pasrur Sialkot
225 MW Shahpur Power Plant, Sargodha
135 MW Bhiki Power Project
225 MW Combined Cycle Balloki Power Plant
225 MW Combined Cycle Saif Power Plant, Sahiwal
AES Power Plant; Design of Cooling Towers and Construction Supervision
Preliminary sub-soil Investigation for 481 MW Thermal Power Plant on Sheikhupura
Faisalabad Road
Preliminary sub-soil Investigation for proposed Thermal Power Plant near Kot Addu
Detail Design stage sub-soil Investigation for 481 MW Thermal Power Plant on
Sheikhupura Faisalabad Road
Confirmatory sub-soil investigation for Olympia Power Project on Sheikhupura
Faisalabad Road
1 x 46 MW Coal Based captive power plant of Nishat Chunian Ltd., Pakistan
425 MW Combined Cycle Nandipur Power Plant
152 MW Combined Cycle Diesel Engine Power Project Pasrur Sialkot
225 MW Shahpur Power Plant, Sargodha
225 MW Combined Cycle Balloki Power Plant
225 MW Combined Cycle Saif Power Plant, Sahiwal
Engro Chemicals Pakistan; Design of Pile Foundations and Supervision of Piling Works
AES Power Plant; Design of Cooling Towers and Construction Supervision
Preliminary sub-soil Investigation for 481 MW Thermal Power Plant on Sheikhupura
Faisalabad Road (Main contract with M/s Mirza Associates (pvt) Ltd
Preliminary sub-soil Investigation for proposed Thermal Power Plant near Kot Addu
Power Plant and Fertilizer Plants
Thermal Power Plants
Geotechnical Investigations
Cement Industry
(Main contract with M/s Habib Rafiq (pvt) Ltd)
Detail Design stage sub-soil Investigation for 481 MW Thermal Power Plant on
Sheikhupura Faisalabad Road (Main contract with M/s Progressive Consultants (pvt) Ltd
PAK and M/s Black & Veatch USA)
Confirmatory sub-soil investigation for Olympia Power Project on Sheikhupura
Faisalabad Road (Main contract with M/s Olympia Group)
135 MW Bhiki Power Project (Main contract M/s Pakistan Power Resources LLC)
Engro Chemicals Pakistan; Design of Pile Foundations and Supervision of Piling Works
Preliminary Geotechnical Investigation for New Processing Units at Attock Refinery
Morgah Rawalpindi (Main contract with M/s ARL Rawalpindi Pakistan)
Detail design Geotechnical Investigation for New Processing Units at Attock Refinery
Morgah Rawalpindi (sub-contract with M/s Mitsui Japan)
Geotechnical Investigation for New tank area sites at Attock Refinery Morgah
Rawalpindi (Main contract with M/s ARL Rawalpindi Pakistan)
Preliminary Geotechnical Investigation for Pak Arab Refinery (PARCO) Mahmood Kot
(sub-contract with M/s Habib Rafiq (pvt) Ltd).
Geotechnical Investigation for Flare Stack Structure at Attock Refinery Rawalpindi (sub-
contract with M/s Descon Engineering (pvt) Ltd)
Detail design Geotechnical Investigation for Central Processing Plant for REHMAT-1
Gas Field at Sardar Garh near Gotki (Main contract with M/s Presson International of
Canada)
Detail design Geotechnical Investigation for Central Processing Plant for MOL Gas Plant
at GURGURI (Main contract with M/s Presson International of Canada)
Soil Survey Along 6” Dia. Oil Pipeline From Turkwal to ARL Via Pindori (for K.F.
Corporation (Pvt.) Ltd
New Grey 6700 TPD Cement Plant for M/s Kohat Cement Company Ltd at Kohat
New Grey 7600 TPD Cement Plant for M/s Fauji Cement Company Ltd at Fatehjang
Oil & Gas Sector
Oil Refinery & Fertilizer Plants
Geotechnical Investigations
28 Nos. of 30 m to 60 m High GF Towers in Lahore for Nortel Networks
18 Nos. of 30 m to 60 m High GF Towers in Sialkot for Nortel Networks
18 Nos. of 30 m to 60 m High GF Towers in Gujrat for Nortel Networks
18 Nos. of 30 m to 60 m High GF Towers in Gujranwala for Nortel Networks
18 Nos. of 30 m to 60 m High GF Towers in Faisalabad for Nortel Networks
14 No. of 30 m to 60 m High GF Towers in Sheikhupura for Nortel Networks
18 Nos. of 30 m to 60 m High GF Towers in Multan for Nortel Networks
3 Nos. of 30 m to 60 m High GF Towers in Attock for Nortel Networks
8 Nos. of 30 m to 60 m High GF Towers in Islamabad and Rawalpindi
45 Nos. of 30 m to 60 m High GF Towers in Lahore for Ericsson Pakistan 8
Nos. of 30 m to 60 m High GF Towers in wazirabad for Ericsson Pakistan
7 Nos. of 30 m to 60 m High GF Towers in Gujrat for Ericsson Pakistan
9 Nos. of 30 m to 60 m High GF Towers in Gujranwala for Ericsson Pakistan
21 Nos. of 30 m to 60 m High GF Towers in Faisalabad for Ericsson Pakistan
14 No. of 30 m to 60 m High GF Towers in sialkot for Ericsson Pakistan
12 Nos. of 30 m to 60 m High GF Towers in Multan for Ericsson Pakistan
8 Nos. of 30 m to 60 m High GF Towers in sargodha for Ericsson Pakistan
5 Nos. of 30 m to 60 m High GF Towers in sheikhupura for Ericsson Pakistan
8 Nos. of 30 m to 60 m High GF Towers in phalia for Ericsson Pakistan
5 Nos. of 30 m to 60 m High GF Towers in tandianlwala for Ericsson Pakistan
3 Nos. of 30 m to 60 m High GF Towers in Okara for Ericsson Pakistan
8 Nos. of 30 m to 60 m High GF Towers in Gujrat for Alandick Pakistan
4 Nos. of 30 m to 60 m High GF Towers in Gujranwala for Alandick Pakistan
8 Nos. of 30 m to 60 m High GF Towers in Faisalabad for Alandick Pakistan
11 No. of 30 m to 60 m High GF Towers in sialkot for Alandick Pakistan
17 Nos. of 30 m to 60 m High GF Towers in Multan for Alandick Pakistan
18 Nos. of 30 m to 60 m High GF Towers in sargodha for Alandick Pakistan
15 Nos. of 30 m to 60 m High GF Towers in sheikhupura for Alandick Pakistan
5 Nos. of 30 m to 60 m High GF Towers in phalia for Alandick Pakistan
8 Nos. of 30 m to 60 m High GF Towers in tandianlwala for Alandick Pakistan
Tele Communication Towers
Geotechnical Investigations
Tarbela-Ghatti 500 kv in-out arrangement for M/s ICC (Pvt) Ltd
Rawat Islamabad 220 kv transmission line towers for M/s ICC (Pvt) Ltd
Shahibagh - Peshawar 220 kv transmission line towers for M/s ICC (Pvt) Ltd
Barotha Nowshera Shahibagh 220 kv transmission line towers for M/s ICC (Pvt) Ltd
Rahim Yar Khan - Jamshoro 500 Kv Transmission Line, 3rd Circuit
Zahir Pir - Guddu 500 Kv Transmission Line
Jamshoro - Dadu 500 Kv Transmission Line (partial)
132/11.5 kV GIS Station at Lahore Airport
500 kV Grid station at Sahiwal for Siemens
Ghatti-Muzzaffargarh 500 kv Transmission Line Project
220 kv AIS Substation
Dadu and Moro Substation
Ghazi Barotha 550/220kv Substation
Peshawar Shahi Bagh Transmission Line
Mansehra Allai Khwar 220kv
Dubar Khwar-Khan Khwar-Allai Khwar Twin Bundle 132 kv Transmission Line
220kv Grid Station Gujrat
500 kv Rawat-Ghakhar-Lahore Transmission Line
500 kv Rawat-Mandi Bahauddin Transmission Line
Guddu-Sibbi Substation
Thal Canal Project
PSO Petrol Pump
Sewerage Treatment Plant Rahim Yar Khan
Mazar at Chalay Sharif Gujrat
Weather Radar Station Islamabad
Swimming Pool at Aitchison College Lahore
Beacon House Complex Raiwing Road Lahore
Bridge at Abdullahpur Faisalabad
Office building for DESCON Ferozepur Road Lahore
Sethi Motor Showroom Ferozpur Road Lahore
Beacon House School Walton Road Lahore
Magic park Motorway
State Bank of Pakistan
Suzuki Motors Sargodha Road Lahore
Schlumberger S.A. offices and workshop at Sukkur
Miscellaneous
Power Transmission Lines
Piling Projects
PILING PROJECTS
Piling Projects
Construction and Load Testing of 14 test piles for Orange Line Metro Train Project, Lahore
Construction of 40 pile foundations for Barotha Nowshera Industrial Shahi Bagh D/C Twin Bundle 220 kV Transmission Line (Diameter of pile 900 mm each 20 m deep, Diameter of piles 1220 mm each 30 m deep, using Percussion Method) in year 2003
Construction of 32 pile foundations for Peshawer Shahi Bagh D/C Twin Bundle 220 kV Transmission Line (Diameter of pile 900 mm each 20 m deep, Diameter of piles 1220 mm each 30 m deep, using Percussion Method) in year 2003
Construction of 28 pile foundations for Rewat Islamabad D/C Twin Bundle 220 kV Transmission Line (Diameter of pile 900 mm each 20 m deep, Diameter of piles 1220 mm each 30 m deep, using Percussion Method) in year 2003
Construction of 1500 nos of 760 mm each of 40 m deep diameter piles for New Grey Cement Plant for Kohat Cement (Pvt) Ltd at Kohat.
Construction of pile foundation for Highway Bridge near Muridkay. (Diameter of pile = 760 mm, Nos. of piles = 36, Using reverse rotary method)
Construction of pile foundation for Highway Bridge over B.S. Link Canal near Chunian. (Diameter of pile = 760 mm, Nos. of piles = 26, Using percussion method)
Construction of pile foundation for railway overhead bridge Ghari Shahu. (Diameter of pile = 840 mm, Nos. of piles = 126, Using reverse rotary method)
Construction of pile foundation for nullah at kharian Cantt. (Diameter of pile = 610 mm, Nos. of piles = 6, Using reverse rotary method)
Construction of pile foundations for 25 m high Mobilink Tower at Chung. (Diameter of pile = 760 mm, Nos. of piles = 4, Using reverse rotary method)
Construction of pile foundations for 25 m high Mobilink Tower at Muridkay.(Diameter of pile = 760 mm, Nos. of piles = 4, Using reverse rotary method)
Construction of 1220 mm dia piles for towers for 220 KV Transmission Lines (76 nos. of towers)
Construction of 1000 mm diameter piles for bridge at Bahria Town Rawalpindi
Piling Projects
Well Drilling Projects
Berkeley Associates (Pvt.) Ltd.
WELL DRILLING PROJECTS
Well Drilling Projects
Berkeley Associates (Pvt.) Ltd.
Design and Construction of Four (4) tubewells having 3.2 cusec discharge capacity at
425 MW CCPP Nandipur for M/s DEC China
Design and Construction of six (6) tubewells having 3 cusec discharge capacity at
PARCO Mid-Country Refinery Project Mahmood Kot for M/s Marubeni
Corporation (MC / JJC) Japan.
Construction of one (1) tubewell at Rehmat Oil and Gas Processing Plant for Presson /
Petronas Canada.
Construction of one (1) tubewell for Wapda at Gujrat
Construction of one (1) tubewell at Liberty Power Project Ghotki Sind.
Construction of one (1) tube well having 2 cusec discharge capacity at Sunny
View Housing Scheme Lahore for M/s Habib Rafiq (pvt) Ltd.
Construction of seven (7) tube wells having 3 cusec discharge capacity for
construction of Lahore Islamabad Motorway on Section - I.
Construction of five (5) tube wells for water supply in Islamabad.
Construction of two (2) tube wells for water supply at Bhimber and Mirpur.
Construction of two (2) tube wells for L.D.A. in under construction Gujarpura Scheme as
sub-contract.
Construction of seven (7) tube wells for WASA Faisalabad as sub-contract.
Construction of three (3) tube wells for agriculture purpose in Kasur.
Construction of one no. of tubewell at Labour Colony Gujrat for M/s Ghulam Habib
Construction.
Construction of one no. of tubewell at Gujrat for WAPDA Colony.
Construction of one tubewell at Rehmat Gas Treatment Plant Gothki.
Completed Projects
Berkeley Associates (Pvt.) Ltd.
Topographic Surveys
Completed Projects
Berkeley Associates (Pvt.) Ltd.
75 KTPA LIGHT ASH EXPANSION (PHASE‐I) ICI Khewera
425 MW Combined Cycle Nandipur Power Plant
1180 MW CCPP at Bhikki
1223 MW CCPP at Balloki
Calci Packages Limited
100 MW Fatima Energy Cogen Power Project
New Ammonia / Urea Plants Project of Engro Dharki
PARCO Mid‐Country Refinery Project Mahmood Kot
Pepsi Cola International, Multan
660 Lucky Hydropower Project
Gulf Rental Power
230 MW LNG Based Engro Power Project Port Qasim
Green Power CNEC
Rehabilitation of Building Defects of Malala Yousaf Zai Daanish School (Boys and Girls) Jand
District Attock
100 MW Solar Power Project
300 MW Coal Based Power Project of Siddique Sons, Port Qasim
1 x 46 MW Coal Based Captive Power Plant of Nishat Chunian Ltd, Pakistan
90 MW Batakundi Hydropower Project, KPK
180 MW Naran Hydropower Project, KPK
300 MW Balakot Hydropower Project, KPK
120 MW Shushghai Zhendoli Hydropower Project, Chitral
200 Bed North East Hospital Complex, Peshawar
Moro & Dadu 500Kv substations
22 MW Jabban Hydropower Project, KPK
Residential Villas Saudi Embassy Islamabad
JBC Hydropower Project, Sukheke
Project Sheets
PROJECT SHEETS
Project Sheets
Project: 1180 MW CCPP at Bhikki
Location: Bhikki, District Shekhupura, Pakistan
Client: Quaid-e-Azam Thermal Power (Pvt.) Ltd., Govt. of Punjab
Scope of Services:
Geotechnical Investigations for Power Plant and Access Road comprising
3,500 m drilling of investigation boreholes, down‐hole seismic survey,
electrical resistivity survey, and laboratory testing
Topographic Survey and Bathymetric Survey of canal
Groundwater Studies comprising site survey, groundwater modeling, design of
pumping wells
Construction of test piles, pile load testing, evaluation of pile load tests
Construction of 1300 cast in‐situ concrete piles
Start date: October 2015
End date: Dec. 2015
Project Sheets
Berkeley Associates (Pvt) Ltd
Project: 1223 MW CCPP Balloki Pakistan
Location: Balloki, District Kasur, Pakistan
Client: National Power Parks Management Co. (Pvt.) Ltd.,
Government of Pakistan
Scope of Services:
Geotechnical Investigations for Power Plant and Access Road comprising
3,400 m drilling of investigation boreholes, down-hole seismic survey,
electrical resistivity survey, and laboratory testing
Groundwater Studies comprising site survey, groundwater modeling, design of
pumping wells
Construction of test piles
Performance of lateral free and fixed head pile load test
Carrying out pile load test in compression and tension
Slope stability analyses for intake and outlet structures
Core drilling in working piles
Start date: November 2015
End date: January 2017
Project Sheets
Berkeley Associates (Pvt) Ltd
Project: 2 x 330 MW Engro Thar Coal Project
Location: Block 2, Thar, Sind, Pakistan
Client: Engro Power Thar Limited
Scope of Services:
Supervision and Review of Topograpic Survey and Geotechnical Investigations
for Power Plant carried out by the EPC Contractor.
Civil Design Review of the Power Plant Structures and all Civil related
components including pavements, drainage system, sewerage, water supply
and water treatment.
Review of Groundwater Studies
Quality Control through resident supervision
Design of Evaporation Pond
Start date: October 2015
End date: On going
Project Sheets
Project: 350 MW Coal Fired Power Plant
Location: Port Qasim
Client: Siddique Sons Energy
Scope of Services:
Geotechnical Investigations
Topographic Survey & Bathymetric Survey
Groundwater Studies
Resistivity Survey
Start date: Jan, 2015
End date: Mar, 2015
Project Sheets
Berkeley Associates (Pvt) Ltd
Project: Groundwater PEPSICO Greenfield Project in Multan Industrial Estate, Multan
Location: Multan Industrial Estate, Multan, Pakistan
Client: PEPSICO, Pakistan
Scope of Services
Desk Studies and Collection of available hydrogeological data
Field reconnaissance survey
Electrical Resistivity Survey for groundwater quality and quantity assessment
Drilling and Installation of test well and piezometers
Performance of aquifer test
Collection of water samples and their chemical analysis
Mathematical Modelling
Analysis of aquifer test data and determination of aquifer parameters
Submission of detailed report
Start Date: May, 2015
End Date: June, 2015
Project Sheets
Berkeley Associates (Pvt) Ltd
Project: Groundwater Studies for 1x300 MW Local Coal Power Plant at Lilah Pind-Dadan Khan, Salt Range, Pakistan
Location: Pind-Dadan Khan, Punjab, Pakistan
Client: China Machinery Engineering Corporation
Scope of Services
Desk Studies and Collection of available hydrogeological data
Field reconnaissance survey
Electrical Resistivity Survey for groundwater quality and quantity assessment
Drilling and Installation of test well and piezometers
Performance of aquifer test
Collection of water samples and their chemical analysis
Mathematical Modelling
Analysis of aquifer test data and determination of aquifer parameters
Submission of detailed report
Start Date: December, 2014
End Date: January, 2015
Project Sheets
Berkeley Associates (Pvt) Ltd
Project: Groundwater Studies for 1x40 MW Coal based Captive Power Plant for Nishat Chunian Limited, Bhai Pheru
Location: Bhai Pheru, district Kasur, Punjab, Pakistan
Client: Quaid-e-Azam Thermal Power Pvt. Ltd.
Scope of Services
Desk Studies and Collection of available hydrogeological data
Field reconnaissance survey
Electrical Resistivity Survey for groundwater quality and quantity assessment
Drilling and Installation of test well and piezometers
Performance of aquifer test
Collection of water samples and their chemical analysis
Mathematical Modelling
Analysis of aquifer test data and determination of aquifer parameters
Submission of detailed report
Start Date: October, 2014
End Date: November, 2014
Project Sheets
Project: Orange Line Metro Train, Project
Location: Lahore, Pakistan
Client: Punjab Metro bus Authority
Scope of Services:
Geotechnical Investigations along the alignment of the Orange Line
Execution of 14 Test Piles and Pile Load Tests up to 12000 tons, interpretation of pile load tests, and design recommendations for working piles
Start date: July 2015
End date: September 2015
Project Sheets
Project: 150 MW Patrind Hydropower Project
Location: Muzaffarabad, AJK
Client: Daewoo Engineering & Construction
Scope of Services:
Preparation of Construction Drawings for Power House, Weir, Excavation, Retaining System.
Detailed Design and preparation of Construction Drawings for Access Roads
Project Sheets
Project: Feasibility Study of 12 MW Biomass Based IPP Project
Location: Faisalabad, Punjab
Client: Masood Textile Mills
Scope of Services:
Sitting Studies Topographic
survey Geotechnical
investigations Initial
Environmental Examination Grid
interconnection studies
Completion Time: 9 Months
Completion Date: March 2013
Project Sheets
Completion Date: December, 2013
Project: Feasibility Study for 180 MW Naran Hydropower Project
Location: Naran, Khyber Pakhtunkhwa
Client: Sarhad Hydel Development Organization (SHYDO)
Scope of Services: Preparation of Geotechnical investigations program and tender documents
Top supervision of Geotechnical investigations
Preparation of laboratory testing program
Geotechnical analysis and design for feasibility study
Preparation of geotechnical investigations report
Feasibility level design of all hydraulic structures
Preparation of drawings for feasibility level design
Financial and economic analyses of the project
Seismological studies and geological mapping
Environmental studies
Completion Time: 18 Months
Project Sheets
Completion Time: 18 Months
Completion Date: December, 2013
Project: Feasibility Study for 300 MW Balakot Hydropower Project
Location: Balakot, Khyber Pakhtunkhwa
Client: Sarhad Hydel Development Organization (SHYDO)
Scope of Services: Preparation of Geotechnical investigations program and tender documents
Top supervision of Geotechnical investigations
Preparation of laboratory testing program
Geotechnical analysis and design for feasibility study
Preparation of geotechnical investigations report
Feasibility level design of all hydraulic structures
Preparation of drawings for feasibility level design
Financial and economic analyses of the project
Seismological studies and geological mapping
Environmental studies
Project Sheets
Completion Time: 18 Months
Completion Date: December, 2013
Project: Feasibility Study for 98 MW Batakundi Hydropower Project
Location: Batakundi, Khyber Pakhtunkhwa
Client: Sarhad Hydel Development Organization (SHYDO)
Scope of Services: Preparation of Geotechnical investigations program and tender
documents
Top supervision of Geotechnical investigations
Preparation of laboratory testing program
Geotechnical analysis and design for feasibility study
Preparation of geotechnical investigations report
Feasibility level design of all hydraulic structures
Preparation of drawings for feasibility level design
Financial and economic analyses of the project
Seismological studies and geological mapping
Environmental studies
Project Sheets
Project: Shogo – Sin Hydropower Project
Location: Chitral
Client: Private Power Infrastructure Board (PPIB)
Scope of Services: Preparation of Geotechnical investigations program
Preparation of Tender documents for Geotechnical investigations
Top supervision of Geotechnical investigations
Preparation of Laboratory testing program
Geotechnical analysis and design for feasibility study
Preparation of geotechnical investigations report
Feasibility level design of all structures
Preparation of drawings for feasibility level design
Completion Time: 15 Months
Completion Date: April, 2010
Project Sheets
Project: Shushghai - Zhendoli Hydropower Project
Location: Chitral
Client: Private Power Infrastructure Board (PPIB)
Scope of Services: Preparation of Geotechnical investigations program
Preparation of Tender documents for Geotechnical investigations
Top supervision of Geotechnical investigations
Preparation of Laboratory testing program
Geotechnical analysis and design for feasibility study
Preparation of geotechnical investigations report
Feasibility level design of all structures
Preparation of drawings for feasibility level design
Completion Time: 15 Months
Completion Date: April, 2010
Project Sheets
Project: 548 MW Kaigah Hydropower Project
Location: Kandian River
Client: Kaigah Power Pvt Ltd
Scope of Services: Preparation of Geotechnical investigations program
Preparation of Tender documents for Geotechnical investigations
Top supervision of Geotechnical investigations
Preparation of Laboratory testing program
Geotechnical analysis and design for feasibility study
Preparation of geotechnical investigations report
Feasibility level design of all structures
Preparation of drawings for feasibility level design
Completion Time: 15 Months
Completion Date: February, 2011
Project Sheets
Project: 22 MW Jabban Hydroelectric Power Station Rehabilitation Project
Location: Jabban – District Malakand
Client: WAPDA
EPC Contractor: HRL – CCPG JV
Scope of Services: Preparation of Geotechnical investigations program
Carrying out geotechnical investigation at site
Preparation of geotechnical investigations report
Geotechnical analysis and design for various components of
Project (i.e. power house, substation, and penstock)
Structural design of powerhouse, penstocks and 132 kV substation
Rehabilitation design for Forebay structure
Preparation of civil work construction drawings
Project Sheets
Project: JBC Hydropower Project, Sukheke
Location: Sukheke, (50km from Lahore)
Client: JBC Powr Ltd.
Consultants: Pakistan Consulting Services
Scope of Services: Drilling of 4 boreholes ranging in depth from 30m to 50m along with SPT
and undisturbed soil sampling
Total exploratory drilling – 130m
Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests
Factual and Interpretative Reports
Completion Time: Eight (04) weeks
No. of Drill Rigs: One straight rotary drilling rigs along with necessary crew and
accessories
Completion Date: August 30th 2008
Project Sheets
Project: LBDC Hydropower Project, Chichawatni
Location: Chichawatni, (180km from Lahore)
Client: LBOD Power Ltd.
Consultants: Pakistan Consulting Services
Scope of Services: Drilling of 4 boreholes ranging in depth from 30m to 50m along with SPT
and undisturbed soil sampling
Total exploratory drilling – 130m
Field permeability tests in boreholes
Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests
Factual and Interpretative Reports
Completion Time: Eight (04) weeks
No. of Drill Rigs: One straight rotary drilling rigs along with necessary crew and
accessories
Completion Date: September 10th 2008
Project Sheets
Project: Lucky Hydropower Project
Location: Sialkot
Client: Olympus Energy (Pvt.) Ltd.
Consultants: Barqab
Scope of Services: Drilling of 5 boreholes ranging in depth from 20m to 30m along with SPT and undisturbed soil sampling
Total exploratory drilling – 155m
Field permeability tests in boreholes
Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests
Factual and Interpretative Reports
Completion Time: Eight (04) weeks
No. of Drill Rigs: One straight rotary drilling rigs along with necessary crew and
accessories
Completion Date: August 30th 2008
Project Sheets
Project: 100 MW Fatima Energy Cogen Power Project
Location: Sanawan - Pakistan
Client: Fatima Energy Limited (FEL)
Scope of Services:
Sitting Studies
Topographic survey
Groundwater studies
Material studies
Coal Transportation studies
Geotechnical investigations Initial
Environmental Examination
Preliminary design of civil structures
Completion Time: 10 Months
Completion Date: May 2011
Project Sheets
COOLING TOWERS FOR AES THERMAL POWER PLANT
Scope of Work:
o Preparation of detailed design of all civil and mechanical works, and preparation
of technical specifications, drawings, and Bill of Quantities
o Preparation of tender documents
o Prequalification of Contractors and Invitation of Bids
o Evaluation of Bids
o Award of construction contract
o Construction Supervision for all site works
o Quality Control and Quality Assurance audits
o Verification of contractors running bills
o Preparation of completion reports
o Preparation of progress reports
o Preparation of as-built drawings
Project Sheets
Project: Fatima Energy Cogen Power Project
Location: Sanawan, Pakistan
Client: Fatima Energy Limited
Scope of Services:
Geotechnical Investigation (Drilling of 5 boreholes ranging from 15m to 30 m depth along with SPT and undisturbed soil sampling, 4 testpits, laboratory testing including PSD, consolidation, direct shear, unconfined compression and Factual and Interpretative Reports)
Electrical Resistivity Survey Geologic al Hazard Assessment
Completion Date: May 2011 (4 Weeks)
Project Sheets
Project: 234 MW Combined Cycle Power Plant
Location: Muridke, Lahore
Client: Albario Engineering (Pvt) Ltd.
Project Consultants: Skoda Export
Scope of Services:
Geotechnical Investigation (Drilling of 3 boreholes each down to 15m depth along with SPT and undisturbed soil sampling, laboratory testing including PSD, consolidation, direct shear, unconfined compression and Factual and Interpretative Reports)
Pile Integrity Test (Total Tested Piles = 23 Piles)
Completion Time: April 2008 (02 Weeks)
Project Sheets
Project: Feasibility Studies for 11 MW Biomass Based Power Plant
Location: Jhang, Punjab
Client: Lumen Energia (Private) Limited
Scope of Services:
Sitting Studies Topographic
survey Geotechnical
investigations Initial
Environmental Examination Grid
interconnection studies
Completion Time: 9 Months
Completion Date: July 2011
Project Sheets
Project: Feasibility Study of 100 MW Charbon Coal Power Project
Location: Chakwal, Punjab
Client: Habib Rafiq (Pvt.) Limited
Scope of Services:
Sitting Studies
Topographic survey
Groundwater studies
Material studies
Coal Transportation studies
Geotechnical investigations Initial
Environmental Examination
Preliminary design of civil structures
Completion Time: 12 Months
Completion Date: June 2013
Project Sheets
Project: 100 MW Solar Power Project
Location: Quaid-e-Azam Solar Park, Bahawalpur, Pakistan
Client: TBEA, China
Scope of Services:
Review of Geotechnical Data
Review Design of foundations for the Solar Panels and Buildings
Evaluation of the load test results of the screw piles used for panels
Start date: June 2014
End date: Nov. 2014
Project Sheets
Project: 50 MW Coal Fired Khushab Power Plant
Location: Khushab - Pakistan
Client: Shahpur Energy (Pvt.) Limited
Scope of Services:
Sitting Studies
Topographic survey
Groundwater studies
Material studies
Coal Transportation studies
Geotechnical investigations Initial
Environmental Examination
Preliminary design of civil structures
Completion Time: 12 Months
Completion Date: April 2011
Project Sheets
Project: Lahore Rapid Mass Transit System Project
Location: Lahore
Client: Metro Associates, Lahore
Consultants: Systra Group, France
Scope of Services: Drilling of 78 boreholes ranging in depth from 28m to 50m along with SPT and undisturbed soil sampling along the 27km long alignment
Total exploratory drilling – 2,622m
Field permeability tests in boreholes
Installation of fourteen piezometer
Thirty shallow test pits along with field density tests
Five Plate Load tests
Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests
Factual and Interpretative Reports
Completion Time: Eight (08) weeks
No. of Drill Rigs: Six straight rotary
drilling rigs along
with necessary
crew and
accessories; and
seven crews of
hand auger cum
light percussion
Project Sheets
Project: 425 MW CCPP Nandipur, Pakistan
Location: Nandipur (160 km from Lahore)
Client: Dongfang Electric Corporation Limited (DEC), China
EPC Contractor: DEC, China
Scope of Survey: Topographic Survey
on Land and under
water for Canal
Preparation of
Survey Maps and
Report
Scope of Services: Drilling of 137 boreholes ranging in depth from 15m to 50m along with
SPT and undisturbed soil sampling
Total exploratory drilling = 4,200 m
Down hole shear wave velocity tests in six boreholes 50 m deep
Cone Penetration Tests (CPT) at 23 locations
Field permeability test
Six Plate load tests
Electrical resistivity tests at 83 locations
Laboratory testing including PSD, consolidation, direct shear, unconfined compression
Factual and Interpretative Reports on the basis of Chinese Code
- Construction of a 120 m deep well,
and five piezometers Performance of pump out test, analyses of data and design of pumping wells.
- Tubewell
- Ground water studies
- Surface water studies
Project Sheets
Project: 225 MW CCPP Saif Power Project Sahiwal
Location: Sahiwal (150 km from Lahore)
Client: Saif Power Limited, Islamabad
EPC Contractor: CMEC, China
Scope of Services: Drilling of 112 boreholes ranging in depth from 30m to 40m along with SPT and undisturbed soil sampling
Total exploratory drilling – 2,800m
Down hole shear wave velocity tests in three boreholes 80m deep
Six Plate load tests
Electrical resistivity tests at 20 locations
Laboratory testing including PSD, consolidation, direct shear, unconfined compression
Factual and Interpretative Reports
Completion Time: Ten (10) weeks
No. of Drill Rigs: Nine straight rotary drilling rigs along with necessary crew and
accessories
Project Sheets
Project: 152 Combined Cycle Diesel Engine Power Plant, Pasrur
Location: Eastern Power Company (EPCO), Islamabad
Client: Eastern Power Company (EPCO), Islamabad
EPC Contractor: Gama Power, Turkey
Scope of Services: Drilling of 20 boreholes ranging in depth from 30m to 50m along with SPT and undisturbed soil sampling
Total exploratory drilling – 920m
Five shallow test pits along with field density test
Installation of piezimeters
Aquifer Pump out test
Electrical resistivity tests at 12 locations
Laboratory testing including PSD, consolidation, direct shear, unconfined compression
Factual and Interpretative Reports
Completion Time: Eight (08) weeks
No. of Drill Rigs: Three straight rotary drilling rigs along with necessary crew and
accessories
Project Sheets
Project: New Urea / Amonia Plants Project, Engro Dharki
Location: Dharki, Dist. Ghotki, Sindh
Client: Engro Chemicals Pakistan Ltd
EPC Contractor: Snamprogatti, Italy
Descon, Pakistan
Scope of Services:
- Geotechnical Investigation and foundation design
- Design coordination with EPC contractor
- Supervision of piling constructions
- Design of dewatering system
- Design of parameters for PMS buildings
- Design review of ammonia storage tanks
- Quality control and quality assurance of all civil works through
resident team of engineers
- Trouble shooting and assistance in design and construction
bottle necks
Completion Time: Three (03) Years
Project Sheets
Project: Design of Cofferdam for Construction of Intake Structure
Location: Guddu, Sindh
Client: Habib Rafiq (Pvt.) Ltd.
Scope of Services:
- Development of design of cofferdam including stability analysis,
seepage analysis
- Preparation of construction drawings
- Preparation of detailed method statement
- Analysis to find out impact of construction of cofferdam on the
following canal and development of remedial measures
Project Sheets
Project: PARCO Refinery
Location: Mahmood Kot, Near Multan
Client: Marubeni Corporation of Japan
Consultants: NA
Scope of Services: Design, Construction, and Commissioning of 6 deep wells of 2 cusec (ft3/sec) capacity each. The scope included drilling of wells, procurement of all materials and machinery required for the works.
Completion Time: Eight (08) weeks
No. of Drill Rigs: Two (reverse rotary type)
Project Sheets
Project: Flattie’s Hotel Development Project
Location: Lahore
Client: Gulf Commercial Bank, Abu Dhabi
Consultants: Meinhardt, Singapore
Scope of Services: Drilling of 25 boreholes ranging in depth from 65m to 80m along with SPT and undisturbed soil sampling
Total exploratory drilling – 1925m
12 CPT probes to 30m depth each
Field permeability tests in boreholes
Installation of piezometers
Laboratory testing including PSD, consolidation, direct shear, unconfined compression, triaxial compression tests
Factual and Interpretative Reports
Completion Time: Eight (08) weeks
No. of Drill Rigs: Nine straight rotary
drilling rigs along with
necessary crew and
accessories
Project Sheets
Project: Mobilink Office Building at Quaid-e-Azam Industrial Estate
Location: Lahore, Punjab
Client: Progressive Consultants (Pvt.) Ltd.
Scope of Services:
Comparison of different layout of shoring systems
Finalizing the layout of shoring system
Evaluation of lateral loading at different support levels
Design of different structural components of shoring system
Design of in-situ tangent concrete piles
Preparation of detailed construction drawings
Preparation of Tender Documents for the construction of shoring system
Project Sheets
Project: Safety Assessment of Existing Shoring System and Design of Rehabilitation/ Strengthening Measures at Mubarak Center, Ferozepur Road, Lahore
Location: Lahore, Punjab
Client: M/s Taavun (Pvt.) Ltd.
Scope of Services:
Stage – I Assessment of existing retaining system and establish the need for remedial/ strengthening measures, which included;
a) Condition survey/ physical inspection of entire shoring system
b) In-situ Testing; Anchor lift-off tests; Integrity of concrete piles
and bracing beams using Schmidt hammer and PUNDIT
c) Evaluation of existing shoring system by incorporating results of in-situ testing
Stage – II Suggesting the most appropriate and economical strengthening measures to ensure safety of the shoring system and adjacent buildings
Project Sheets
Project: Pindi Bhattian Faisalabad Motorway (M-3)
Location: Pindi Bhattian-Faisalabad
Client: National HighwayAuthorities (NHA)
Scope of Work:
Drilling of 40 boreholes ranging in depth from 05m to 10m along with SPT and undisturbed soil sampling along the 60km long alignment
Forty (40) test pits along with field density tests
Laboratory testing including PSD, consolidation, direct shear, unconfinedcompression, triaxialcompressiontests
Factualand Interpretative Reports
Preparationofcomprehensiveevaluationrep
Project Sheets
Project: Bridge on Sutlej River, Bahawalpur.
Location: Bahawalpur
Client: SKB Pvt. Ltd.
Scope of Work: Drilling of 2 boreholes to maximum depth of 50.0m along with SPT and undisturbedsoilsampling Laboratory testing including PSD, consolidation, direct shear, unconfinedcompression, triaxialcompressiontests
Preparation ofgeotechnical
investigation report Design of bridge
foundations
Start Date: July 01, 2003
End Date: July 20, 2003
Project Sheets
Project: Naran Jalkhan Road
Location: Naran to Jakkhad
Consultants: Republic Engineering Corporation (REC), Lahore
Scope of Work: Eighty (80) test pits along with field density tests along the
60km long alignment
Laboratory testing including PSD, Liquid Limit, Plastic Limit, consolidation, direct shear, CBR tests
Preparation of geotechnical investigation reports for the road and all the structures along the road including bridges, culverts, and cross drainage structures
Design of pavement
Design of foundations for all the structures along the road
Date of Work Started: July 5, 2000
Project Sheets
Project: Lai Nullah Road Project, Rawalpindi Package-1)
Location: Rawalpindi
Client: National Engineering Services Pakistan (Pvt.) Limited
Scope of Work: Drilling of 20 boreholes ranging in depth from 20m to 40m along
with SPT and undisturbed soil sampling.
Thirty Two shallow test pits along with field density tests
Laboratory testing including PSD, consolidation, direct shear,
unconfinedcompression, triaxialcompressiontests
Preparation of factual reports for geotechnical investigations
Start Date: March 21, 2007
End Date: April 21, 2007
Completion Time: Eight (04) weeks
Project Sheets
Project: Lukpass Tunnel Quetta
Location: Quetta,Baluchistan
Client: Associated Consulting Engineers (ACE) Pvt. Ltd.
Scope of Work: Drilling of 2 boreholes to maximum depth of 120m along with SPT and undisturbedsoilsampling
Laboratory testing including PSD, consolidation, direct shear, unconfinedcompression, triaxialcompressiontests
Preparationofgeotechnical
investigation reports Initial design of
tunnels support system
Design of slope stabilization near portals
Start Date: February 15, 2006
End Date: March 30, 2006
Project Sheets
Project: Improvement/Renovation of Existing Multan Road from Thokar Niaz Baig to Chauburji, Lahore
Location: Lahore
Client: National Engineering Services Pakistan (Pvt.) Limited
Scope of Work: Drilling of 4 boreholes to maximum depth of 06m along with
SPT and undisturbedsoilsampling
Laboratory testing including PSD, consolidation, direct shear, unconfinedcompression, triaxialcompressiontests
Fourteen (14) test pits along with field density tests
Start Date: October 01, 2009
End Date: November 01, 2009
Project Sheets
EFFLUENT TREATMENT PLANT FOR TANNERIES, KASUR
Scope of Work:
Detailed design of Treatment Ponds, Screen House, Equalization Tanks, Settling tanks, Pump House, Embankments, Sludge Disposal Lagoons
Construction supervision for all site works
Quality Control and Quality Assurance audits
Project Sheets
HUBB WATER TREATMENT PLANT
Scope of Work:
Detailed design of civil works of entire treatment plant including building, roads, and tanks
Construction Supervision for all site works
Quality Control and Quality Assurance audits
Preparation of progress report
Project Sheets
Project: Design, Construction and commissioning of six (6) tubewells having 1.0 cusec discharge capacity
Location: PARCO Mid-Country Refinery Project Mahmood Kot, Pakistan
Client: M/s Marubeni Corporation (MC) JGC Japan
Scope of Work:
Design of wells, procurement of well material and pump / motor units, construction of wells, development and testing of wells
Completion Time: Two Months
Completion Date: November 1997
Clients
CLIENTS
Clients
Contractors
Harbin Electric International, China Dong Fong Electric Corporation, China CMEC, China CHINT, China TBEA, China Deawoo Corporation, Koria Karkey International, Turkey Sinogy, China Vestas, Australia M/s Mitsui Engineering & Shipbuilding Co Ltd Japan M/s Marubeni Corporation (JGC) Japan M/s Petrosin Pakistan Ltd M/s Presson Pakistan Ltd M/s Habib Rafiq (Pvt) Ltd M/s General Construction Company (Pvt) Ltd M/s Al-Wasay Construction Company (Pvt) Ltd M/s Walee Builders (Pvt) Ltd M/s Nowshera Engineering Services NENSER (Pvt) Ltd M/s Hisar Corporation (Pvt) Ltd M/s Ghulam Habib Construction (Pvt) Ltd M/s Nazir & Company (Pvt) Ltd
Private Agencies
Engro Pakistan Pepsicola, Pakistan Siddique Sons Energy, (Pvt.) Ltd. Tetra Pack, Pakistan Packages Pakistan Nishat Group Shareef Group M/s Align Technologies (pvt) Ltd USA M/s Fauji Fertilizer Rawalpindi M/s Pakistan Services Limited PSL Karachi M/s Regency Developer Group (Pvt) Ltd M/s Rupali Group (Pvt) Ltd M/s Crescent Services (Pvt) Ltd M/s Attock Refinery Ltd M/s Four Brothers (Pvt) Ltd M/s Global Marketing (Pvt) Ltd M/s Zafar Sons (Pvt) Ltd M/s Rahmat-ul-Alameen Trust M/s Cherished Pharmaceuticals (Pvt) Ltd M/s MSB Industries (Pvt) Ltd M/s Cholistan Sugar Mills (Pvt) Ltd M/s ICI Group Ltd M/s Merino Textile (Pvt) Ltd M/s International Juices (Pvt) Ltd M/s Sapphire Textile Group (Pvt) Ltd M/s Pharmagen Beximco (Pvt) Ltd M/s ProDiesal Services (Pvt) Ltd M/s Genesis Pharmaceuticals (Pvt) Ltd M/s Olympia Power Ltd M/s Hoechst Ravi Chemical Ltd M/s Sitara Chemicals Limited M/s Zuchini Industries Limited M/s Kohat Cement Limited
Clients
Berkeley Associates (Pvt.) Ltd.
Government Agencies
National Highway Authority Building Division Swabi Pakistan Air Force Police Club Pakistan Bait-ul-Maal Rawalpindi Metropolitan Corporation Pakistan Television Corporation (Headquarter) Islamabad Assistant Director Housing Gujranwala Cantt General Headquarter AG's Branch Rawalpindi National Engineering Services Pakistan (NESPAK) Lahore Development Authority Engineering Consultancy Services Punjab (ECSP) Public Health Engineering Department, Punjab
Topographic Survey Equipment
Berkeley Associates (Pvt.) Ltd.
TOPOGRAPHIC SURVEY EQUIPMENT
Completed Projects
RTK DGPS (Dual Frequency)
2 NO, SET Trimble R10 GNSS System,440 Channel Dual Frequency GPS and
WAAS/EGNOS receiver system with L2C capability and integrated UHF
radio modem
4 NO, SET Trimble R8 GNSS System, 440 Channel Dual Frequency GPS and
WAAS/EGNOS receiver system with L2C capability and integrated UHF
radio modem
2 NO, SET Trimble 5700 DGPS Receiver Advanced Dual Frequency GPS and
WAAS/EGNOS receiver system with L2C capability and integrated UHF
radio modem.
2 N0'S Sokkia Stratus L1 12 channel single frequency Receivers.
3 NO’S Magellan Triton series 400
3 NO’S Garmin Hand Held GPS E Series.
TOTAL STATION
5 No’s (I) Sokkia CX‐105 (10,000 point) Built in Memory with Reflector less)
2 No’s (II) Sokkia 530 RK, (10,000 point) Built in Memory with Reflector less
1 No’s (III) Nikon NPl‐632, 2” accuracy (Built in Memory with SD card)
2 No’s (IV) Nikon Nivo 5‐M (Built in Memory)
ECHO SOUNDERS
2 No’s GPSMAP 527xs ‐ Garmin
LEVELS
10 No’s (I) Digital Level, Sokkia, NIKON, PENTAX (Level accuracy 0.10 mm)
(ii) Wild B2
* Above all items are available with their accessories.
Berkeley Associates (Pvt.) Ltd.
Drilling Equipment
Berkeley Associates (Pvt.) Ltd.
DRILLING EQUIPMENT
Drilling Equipment
Berkeley Associates (Pvt.) Ltd.
DESCRIPTION
Rotary Boring Rig for Soil Investigations
Wash Boring Rig for Soil Investigation
CPT Rig (Manual)
Percussion Rig for Soil Investigation
Percussion Rig for Piling
Reverse Rotary for Tube well & Piling
Auger Bucket Dry Drilling Rigs for Piling
Auger boring for Soil Investigation
Tremie, Funnel, Bucket and Pipes
Core Extraction Machine
Hydraulic Jack
Casing 100mm Diameter
Shelby Tubes
Speedy Moisture Tester
Pitcher Sampler
Denison Sampler
SPT Rods (AW)
SPT Apparatus
Sand Cone Apparatus
Drive Cylinder
QTY
12 No. 2 No. 1 No. 4 No. 15 No. 6 No. 3 No. 8 No. 5 No. 1 No. 2 No. Sufficient
Sufficient
2 No.
5 No. 5 No. 800 m 3 No. 3 No. 10 No.
MAKE
Pakistan Pakistan
Pakistan
Pakistan
Pakistan
Pakistan
Pakistan
Pakistan
Pakistan
Pakistan
Pakistan
Pakistan
Pakistan
USA
Pakistan
Pakistan
USA
USA
Pakistan Pakistan
Laboratory Testing Equipment
LABORATORY TESTING EQUIPMENT
Laboratory Testing Equipment
MAKE
Germany USA
USA
China China
Imported Mesh
Pakistan
China
Imported Ring
Imported Ring
Pakistan
Pakistan
Pakistan
Pakistan
Pakistan
Pakistan
Pakistan
China
China
China
China
QTY
2 Nos. 2 Nos. 4 Nos. 1 Nos. 2 Nos. 4 Sets 2 Sets 3 Sets 2 Nos. 1 Nos. 4 Nos. 2 Nos. 2 Nos. 12 Nos. 1 Nos. 1 Nos. 2 Sets 12 Nos. 2 Nos. 12 Nos.
6 Nos.
Sufficient
Sufficient
DESCRIPTION
Electric Oven Triple Beam Balance
Digital Balance
Analytical Balance
Field Balance
US Standard Sieve US
Standard Sieve (Coarse)
Liquid Limit Device
Unconfined Compression Machine
Direct Shear Machine
Consolidation Machine
Standard Proctor Apparatus
Modified Proctor Apparatus
CBR Molds
CBR Machine Sample
Extruder AASHTO
Compaction Test Cylinder
1000 ml
Cylinder 500 ml Beaker 250 ml
Pycnometers 50 ml
Moisture Can
Allied Accessories
Key Personnel
Berkeley Associates (Pvt.) Ltd.
KEY PERSONNEL
Key Personnel
Berkeley Associates (Pvt) Ltd
NAME AND DESIGNATION QUALIFICATION EXPERIENCE
B.Sc. Civil Engineering
M.Sc. in Geotechnical Engineering
M.Sc. Geology
B.Sc. Civil Engineering
B.Sc. Civil Engineering
B.Sc. Civil Engineering
B.E Civil Engineering
B.Sc. Civil Engineering
48 years experience in Geotechnical and Geoenvironmental Engineering, design of dams and overall engineering management of large projects
24 years in Geotechnical Engineering, field work, Laboratory work, Analyses and design.
46 years experience in ground water Hydrology
48 years experience of Structural Design of Building, hydropower Project.
40 years experience
15 years experience
2.5 years experience
1 year experience
Jahangir Akhtar Chief Executive Officer
Khalid Ayyub Director/ Head Geotechnical Engineering
Ahmad Nawaz Groundwater Expert
Sheikh Ilyas Ahmed Chief Structural Engineer Head Project Manager
Ijaz Shafi Head Structural
Saqib Mir Principal Structural Engineer
Umar Maqsood Senior Structural Engineer
Hafiz Muhammad Hassan Ajmal Junior Structural Engineer
Key Personnel
Berkeley Associates (Pvt) Ltd
Farooq Naveed M. Sc. Civil 8 years in Geotechnical Senior Geotechnical Engineering Engineering Engineer
Imran Farooq M.Sc. Civil 5 years in Geotechnical Senior Geotechnical Engineering Engineering Engineer
Abdullah Masood B.Sc. Civil 1 years experience Junior Engineer Engineering
Mannan Ali B.Sc. Geological 2 years experience Geological Engineer Engineering
Hafiz Abdur Razzaque M.Sc. Geology 5 years experience Senior Geologist
Asad Ali BS Applied Geology 2.5 years experience Geologist
Maheen Malik M.Sc. Environmental 2.5 years experience Public Health and EngineeringEnvironmental Engineer
Raja Naeem Diploma in Civil 35 Year Experience in Chief Surveyor Technology Surveying, BOQs, Bar
Bending Schedule and rate analyses
EXPERIENCE QUALIFICATION NAME AND DESIGNATION
Field Staff
Berkeley Associates (Pvt.) Ltd.
FIELD STAFF
Berkeley Associates (Pvt.) Ltd.
Field Staff
NAME AND DESIGNATION QUALIFICATION EXPERIENCE
Abdur Razzaque M. Sc. Applied 5 years experience Site Geologist Geology
Asif Ali M. Phil Applied 2 years experience Site Supervisor Geology
Muhammad Ali Chughtai B. Sc. Geology 30 years experience Site Supervisor
Usman Majeed B. Sc. Geology 1 year experience Site Supervisor Engineering
Muhammad Ishaq F. Sc. 5 years in field and Site Supervisor Laboratory Testing
Muhammad Tariq Matric 15 years in piling
and Site Supervisor well drilling works
Muhammad Naeem Matric 15 years in piling and Site Supervisor well drilling works
Muhammad Saeed F.A 30 years in laboratory Laboratory Technician testing at UET Lahore
Ajmal Hahat B. A 25 years experience in Laboratory Technician material testing lab.
Sikandar Hayat F.A 5 years experience in Laboratory Assistant laboratory testing
Abdul Hameed Middle 15 years experience in Driller drilling
Abdur Razzaque Middle 13 year experience in Driller drilling
Muhammad Imtiaz Middle 13 year experience in Driller drilling
Curriculum Vitae of Key Personnel
CURRICULUM VITAE OF
KEY PERSONNEL
Curriculum Vitae of Key Personnel
Khalid Ayyub Partner / Geotechnical Specialist
DATE OF BIRTH NATIONALITY EDUCATION
OTHER TRAINING
LANGUAGES
MEMBERSHIP OF PROFESSIONAL SOCIETIES
PROFESSIONAL RECORD
December 22, 1967. Pakistani. B.Sc. Civil Engineering.
M.Sc. Soil Mechanics & Foundation Engineering.
Advance computer course in C language from University of Engineering & Technology Lahore.
Special training course on the design and construction of horizontal drainage system organized by IWASRI and sponsored by UNDP/DTCD in collaboration with ILRI Netherland.
Advance course in Hydrology from University of Punjab Lahore.
Special course in saline water movement in response to pumping from Center of Excellence University of Engineering & Technology Lahore.
English Urdu
Pakistan Engineering Council, Islambad. Pakistan Engineering Congress, Lahore. Institution of Engineers, Pakistan. Pakistan National Society For Soil Mechanics And Foundation Engineering.
(a) From April 1999 Up to date
Partner Berkeley Associates.
Curriculum Vitae of Key Personnel
(b) From May 1994
Chief Executive
March 1999
Kenrock Geotechnical Services
(c)
From December 1993
April 1994
GEOTECHNICAL ENGINEER ON DESIGN OF EARTH DAMS FOR IRAN, INDONESIA & MALAYSIA.
M/S ACE (PVT) LTD
(d) From October 1993 December 1993
GEOTECHNICAL ENGINEER ON DESIGN OF CHASMA HYDRO POWER PROJECT.
M/S ACE (PVT) LTD
(e) From September 1991 October 1993
GEOTECHNICAL ENGINEER ON GHAZI - BAROTHA HYDRO POWER PROJECT.
M/S ACE (PVT) LTD
(f) From May 1990 September 1991
GEOTECHNICAL ENGINEER ON TARBELA - LAHORE 500 KV TRANSMISSION LINE PROJECT.
M/S ACE (PVT) LTD
(g) From January 1990 May 1990
STRUCTURAL ENGINEER ON DESIGN OF BRIDGES.
M/S SHEIKH RAIZ AHMAD & ASSOCIATES.
Curriculum Vitae of Key Personnel
Berkeley Associates (Pvt.) Ltd.
JAHANGIR AKHTAR :
Nationality :
Date & Place of Birth :
Profession :
Position in Firm :
Registration Number with : Pakistan Engineering Council
Affiliation with : Professional Institutions
Partner/ Project Management Specialist
Pakistani
November 05, 1947 Lahore Pakistan
Civil Engineer
Chief Executive Officer
CIV-00873
Member Pakistan Engineering Council Member Institution of Engineers Pakistan Member Pakistan Geotechnical Engineering Society Member International Society for Soil Mechanics & Geotechnical Engineering
Key Qualifications
Practicing Professional Engineer since 1968.
Presently working as Chief Executive Officer in Berkeley Associates (Pvt.) Ltd., Responsible for technical coordination, business development, budget monitoring, overseeing the coordination of mega projects. Responsible for technical management, corporate technical monitoring and control, and value addition to the technical outputs of existing projects and review of proposals, bids and TORs for new mega projects.
Worked as Chief Operating Officer and Senior General Manager/Head Geotechnical and Geoenvironmental Division in Engineering Consultancy Services Punjab (Pvt. Limited, Lahore (ECSP from February, 2012 to April, 2016.
Worked as Chief Executive in Jahangir Akhtar and Associates (J&A) from 2009 to January 2012. In this capacity, handled geotechnical problems of Al-Ilam Bridge along Ring Road and two bridge projects along Batinah Coastal Road Sultanate of Oman for M/s Turkpak International. Besides worked as project manager for hydropower, management consultancy and off shore engineering works in Pakistan.
Worked with NESPAK from 1973 to 2009 as Geotechnical Engineer in various positions starting from Senior Engineer to Vice President (Technical Coordination and Vice President / Head of Geotechnical and Geoenvironmental Engineering Division Worked on a wide range of Projects as designer, head of design teams, review expert and coordinator including large dams and water supply projects, hydropower projects, small and medium dams, Highways, Motorways, Airports and bridge projects, Industrial and Energy Projects and Buildings.
During the career with NESPAK, worked on the following major engineering projects, as a Geotechnical Engineer in different capacities ranging from team leader to a team member.
Dams, Water Supply and Drainage Projects
Ghazi-Barotha Hydropower Project, Raising of Mangla Dam, Basha Diamer Dam, Mirani Dam, 12 small dams in FATA, 3 small dams in NWFP, Khanpur Dam Project, Simly Dam
Curriculum Vitae of Key Personnel
Berkeley Associates (Pvt.) Ltd.
Islamabad; Anchor Sihala Dam; 706 Army Base Workshop Water Supply Project; Gadani Water Supply Project Lasbela; Goronyo Dam, Nigeria; Euphrates East Drain Project Iraq; Eastern Province Water Transmission Project,K.S.A; Remodelling of Kinjhar-Gujjo Canal; Quetta Water Supply Project; Qusayba Drainage Project, K.S.A; Fordwah-Sadqia Surface Drainage Project; South Jazira Tunnel Project, Iraq; Hofuf Water Transmission System, K.S.A; Buraidah Feeder Line Project, K.S.A; Sabya Water Network Project (Phase-I), K.S.A.
Participated in inspection of Chashma Barrage, Simly Dam and Khanpur Dam as a member of Panel of Experts.
Energy and Power Projects
Chashma Nuclear Power Plant; 500 KV Transmission Network Towers Pakistan; Kot Addu Gas Turbine PowerStation Pakistan; Efficiency ImprovementofWAPDAThermal Power Plants;450 MW Combined Cycle Thermal Power Plant Guddu; Tarbela and Mangla Hydropower Extension projects Pakistan; KCP Workshop Jauharabad.
Bridges and Highway Projects
Third IBRD financed highway projects in Pakistan; Pategi-Eggan Road Project Nigeria; Bridges in Northern Areas; Sohar Roads-Sultanate of Oman; Khasab Coastal Road, Oman; Additional Carriageway Mianchannu-Sahiwal Highway; various portions of Indus Highway Pakistan; Djouju-Porga Road Benin; Overhead Bridge at Quetta; Chitral Booni Road; upgrading of Old Bridges on Kohat Thal Road; Farm to Market Roads in NWFP and Punjab; Rahim Yar Khan - Tarinda M. Pannah Highway; Strengthening and extension of N-70 Highway; Balochistan Development Authority (BDA) Roads, Islamabad-Muzaffarabad Dual Carriageway, N-70 Road Project.
Motorway Projects
Pakistan Motorway Lahore-lslamabad Section (M-2 Section) and Pakistan Motorway Sheikhupura-Multan-D.G. Khan Section(Old M-3 Section), Pakistan MotorwayPindi Bhattian- Faisalabad Section (current M-3 Section).
Buildings
UBL Multistoreyed Buildings at Karachi, Lahore and Islamabad; Armed Forces Medical City Rawalpindi; Overseas Pakistanis Foundation Head Office Islamabad, Aiwan-e-lqbal Complex Lahore; Air and Naval Headquarters Islamabad; Pakistan Engineering Council Head Office Islamabad; Gomal University D.I. Khan; EFU Head Office Lahore; SLIC Head Office Islamabad; State Bank Building Sialkot; Army Welfare trust Plaza Rawalpindi; PISIC House Lahore; MCB Head Office Building Karachi; OGDC Energy House Islamabad; Prime Minister's House and Secretariat Islamabad; Airport Terminal Buildings at Karachi; Lahore and Islamabad, Pakistan Housing Project spread all over Pakistan; Kidney Centers in Pakistan.
Industrial Facilities
Pak-Saudi Fertilizer Complex; Iron Ore and Coal Berths Port Qasim; Sea Water Intake and Disposal System Karachi Steel Mills; Galadari Cement Works Karachi; Mustehkam Cement Factory Hattar; Maple Leaf Cement Factory Iskandarabad; Storage Facilities for 40,000 tons of rice in Punjab Pakistan, Bhit Gas Field Development Project.
Curriculum Vitae of Key Personnel
Berkeley Associates (Pvt.) Ltd.
Education
Name of Institution Year Degree/Diploma
University of Engineering & Technology, Lahore-Pakistan
1968 B.Sc. Civil Engineering
Other Courses
University of Engineering & 1977 Certificate in Computer Technology, Lahore-Pakistan Programming
L'AllianceFrancaiseLahore 1990 Three Units Course in French Language
EXPERIENCE
I Name of Employing Agency Berkeley Associates (Pvt.) Ltd. Title of Position Executive Director Location of Assignment Lahore-Pakistan Period of Assignment May, 2016 to date
Activities
Working as Director in Berkeley Associates (Pvt.) Ltd., Responsible for technical coordination, business development, budget monitoring, overseeing the coordination of mega projects. Responsible for technical management, corporate technical monitoring and control, and value addition to the technical outputs of existing projects and review of proposals, bids and TORs for new mega projects.
II Name of Employing Agency Engineering Consultancy Services Punjab (Pvt.) Title of Position Chief Operating Officer Location of Assignment Lahore-Pakistan Period of Assignment February, 2012 to April, 2016.
Activities
Worked as Chief Operating Officer and Senior General Manager/Head Geotechnical and Geoenvironmental Division in Engineering Consultancy Services Punjab (Pvt.) Limited, Lahore (ECSP) from February, 2012 to April, 2016.
III Name of Employing Agency Jahangir Akhtar and Associates (J&A) Title of Position Chief Operating Officer Location of Assignment Lahore-Pakistan Period of Assignment September, 2009 to January, 2012.
Activities
In this capacity, handled geotechnical problems of Al-Ilam Bridge along Ring Road and two bridge projects along Batinah Coastal Road Sultanate of Oman for M/s Turkpak International. Besides worked as project manager for hydropower, management consultancy and off shore engineering works in Pakistan.
IV Name of Employing Agency National Engineering Services Pakistan (Pvt.) Ltd
Curriculum Vitae of Key Personnel
Berkeley Associates (Pvt.) Ltd.
(NESPAK) Title of Position Vice President Technical Coordination
Convenor Board of Management NESPAK Member Board of Management - Mangla Raising Project Member Board of Management - Dasu Hydropower Project
Location of Assignment Lahore-Pakistan Period of Assignment September 2006 to August 2009
Activities
As Vice President Technical Coordination, heading the Technical Coordination Division. Responsible for technical coordination, budget monitoring, business development, overseeing and coordination for mega projects. Responsible for technical management, corporate level technical monitoring and control, and value addition to the technical outputs. Incharge of overall coordination of ERRA Projects.
V Name of Employing Agency National Engineering Services Pakistan (Pvt.)
Limited (NESPAK) Title of Position Vice President Technical Coordination Division
& Convenor BOM Location of Assignment Lahore -Pakistan Period of Assignment September 2006 to November 2007
Activities
As Vice President Technical Coordination, heading the Technical Coordination Division. Responsible for technical coordination, budget monitoring, business development, overseeing and coordination for mega projects. Responsible for technical management, corporate level technical monitoring and control, and value addition to the technical outputs. Inchargeofoverallcoordinationof ERRAProjects.
VI Name of Employing Agency National Engineering Services Pakistan (Pvt.)
Limited (NESPAK) Title of Position Vice President /Head Geotechnical &
Geoenvironmental Engineering Division Convenor BOM
Location of Assignment Lahore -Pakistan Period of Assignment February 2000 to August 2006
Activities
As Vice President/Head Geotechnical and Geoenvironmental Engineering Division, guided the geotechnical team during the Concept Design Phase and reviewed the reports for preparation of the requirements of Geotechnical Studies for Al Shamiya Redevelopment Project, MakkahAl-Mukarrammah, KSA. Theprojectincludesdesignof tunnels, roadnetwork, undergroundspines, bridges/ flyovers, utilityworksetc.
As Vice President/Head Geotechnical and Geoenvironmental Engineering Division, responsible for planning/management of geotechnical studies, geotechnical design of dams and structures and review & quality assurance of geotechnical documents and proposals. Also responsible for administrative and financial management of Geotechnical & Geoenvironmental Engineering Division.
Working as Project Coordinator, review expert and Member of BOM for the following
Curriculum Vitae of Key Personnel
Berkeley Associates (Pvt.) Ltd.
large Dams and Hydropower Projects:
Ghazi Barotha Hydropower/Dam Project Basha Diamer Dam Project Mirani Dam Project Mangla Dam Raising Project
Providing technical coordination for the design and construction supervision of the following small to medium dams:
Kot Ragha Dam Maidani Dam Mir Kalam Dam Marsi Khel Dam Kharosha dam Dargai Pal Dam Dande Dam
Technical coordination is also being provided for the feasibility study of the following dams:
Zamir Gul Dam Rajoyia Dam Marobi Dam
VII Name of Employing Agency National Engineering Services Pakistan (Pvt.)
Limited Deputed to Pakistan Hydro Consultants (Joint Venture of 5 National and International Consulting firms).
Title of Position General Manager/Chief Geotechnical Location of Assignment Lahore -Pakistan Period of Assignment January 1994 to March 2000
Activities
As Chief Geotechnical for the Ghazi-Barotha Hydropower/Dam Project (a multi-billion dollars project consisting of a barrage, a 52 km long 1,600 cusecs capacity lined power channel and a 1,450 MW power house), responsible for the following activities:
Complete review of geotechnical design aspects of the project; including
barrage and headpond embankments (up to 60 m high), seepage control measures for the barrage (including plastic concrete cutoff, treatment of openworks, relief wells, drainage blanket, filter etc.), elaborate underdrainage system for the lined channel, deep excavations (up to 40 m for power channel and 70 m for power house), instrumentation system etc.
Preparation of construction drawings. Review of contractor's method statement, and other submissions. Construction material valuation and concrete mix design. Attending to geotechnical site related problems and coordination with other
specialists. Design of project roads Planning and setting up of material testing laboratories.
IV Name of Employing Agency National Engineering Services Pakistan (Pvt.) Limited Deputed to BCEOM -NESPAK Joint Venture for the design ofM-3 Motorway Project
Title of Position Chief Engineer/Senior Advisor (Geotechnical) Location of Assignment Lahore -Pakistan
Curriculum Vitae of Key Personnel
Berkeley Associates (Pvt.) Ltd.
PeriodofAssignment March 1992 to Jan 1994
Activities
Worked as Senior Advisor (Geotechnical) for the Pakistan Motorway Sheikhupura- Multan - D.G. Khan Section (Old M-3 Section); a multi-billion rupee project. Project consisted of a 6 lane, 450 km long motorway. Responsibilities included:
Planning and implementation of geotechnical investigations. Design of geotechnical aspects of roadways and enroute structures including
two major river bridges, a number of flyovers and interchanges. Construction material studies using satellite imageries. Preparation of design report and tender documents. Assistance to the Project Manager in successful execution of the project Expert review of reports and study documents
V Name of Employing Agency National Engineering Services Pakistan (Pvt.)
Limited. (Deputed to Joint Venture for the detailed design of M-2 Motorway Project)
Title of Position Chief Engineer/Chief Geotechnical Location of Assignment Lahore -Pakistan Period of Assignment May 1991 to March 1992
Activities
Worked as Chief Geotechnical for the joint venture. Responsible for the detailed design ofPakistanMotorwayM-2(Lahore-lslamabadSection).Responsibilities included:
Planning and implementation of geotechnical investigations. Recommendations for the geotechnical design aspects of the road
embankment/pavement, river bridges, flyovers and interchanges. Construction material studies Documentation and preparation of design report and tender documents. Expert review of design reports and tender documents
VI Name of Employing Agency National Engineering Services Pakistan
(Pvt) Limited Title of Position Chief Engineer/Principal Engineer/Deputy
Chief Geotechnical Engineer
Location of Assignment Lahore -Pakistan Period of Assignment 1981 to 1991 and 1994 to 1995
Activities
As Chief Engineer (from July 1987 to May 1991 and January 1994 to April 1995), responsible for management of geotechnical engineering and foundation aspects and review of design reports of the following projects which also involved close interaction with theclients:
Water supply projects including Balochistan Water Supply Project; Water
Supply System for Sakardu; Islamabad Water Supply Extension Project; bridges, culverts and aqueducts of Fordwah Sadqia Surface Drainage Project in Punjab; Eastern Province Water Supply Project, K.S.A. and Qusayba Drainage Project, K.S.A.
Multistoried buildings namely Muslim Commercial Bank Head Office
Curriculum Vitae of Key Personnel
Berkeley Associates (Pvt.) Ltd.
Building Karachi, United Bank Head Office Buildings Karachi and Lahore; Commercial Complex Hayatabad Peshawar; Pakistan Engineering Council Buildings Islamabad; Air and Naval Headquarter Building Islamabad; AWT Plaza Rawalpindi; State Bank Building Sialkot; PISIC House Lahore; OGDC Energy House Islamabad; Prime Minister's House and Secretariat Building, Islamabad.
Highways and bridges namely upgrading of all bridges on Kohat - Thal road and Chitral - Booni road NWFP, Sibi - Talli Road, Balochistan; Bridges in Northern Areas, Farm to Market Roads Swat NWFP.
New proposed International Airports at Karachi, Lahore and Islamabad. Responsible for the geotechnical aspects including soil classification, rock
mass rating, calculation of rock loads and geotechnical design of the following: Feasibility studies for increasing discharge of Benton Tunnel NWFP Pakistan.
South Jazira Tunnel Project, Iraq.
As Deputy Chief (July 1981-June 1987), responsible for management and review of foundation and geotechnical aspects of the following engineering projects.
Geotechnical engineering investigations for Karachi Steel Mills. Design of dykes, drains and other structures of Euphrates East Drain Project,
Iraq. Subsurface investigations of 40,000 tons of Rice Storage Facilities in Punjab. Foundation design of towers for 500 KV Transmission Network. Pavement design for Pategi-Eggan Road Project Nigeria, Sohar Roads
Sultanate of Oman and DjoujuPorga Road, Benin.
Also managed geotechnical engineering works and reviewed the reports for:
Highways bridges in NWFP on Kohat-Bannu Road Galadari Cement Works at Karachi. Chashma Nuclear Power Plant Eastern Taxiway Islamabad, New Islamabad International Airport. UBL Head Office Building Islamabad, Medical City Rawalpindi. Quetta Water Supply Project Second Tarbela-Faisalabad 500 KV Transmission Line Project.
As Geotechnical Engineer (August 1973 to June 1981), responsible for:
Design of water supply dam of 706 Army Base. Geotechnical investigations for Sea Water Intake and Disposal System of
Karachi Steel Mills; Pak Saudi Fertilizer Factory; Mustehkam Cement Plant; Maple Leaf Cement Factory; Pipri Thermal Power Station of Karachi Electric Supply Corporation (KESC).
Foundation related works for various features of Port Qasim Project, Karachi. Galadari Cement Works -Foundation analysis and design. Geotechnical investigations for 500 KV Transmission Line Project (Jamshoro-
Multan and Tarbela-Faisalabad). Geotechnical investigations for Left Bank Irrigation Tunnel of Tarbela Dam.
VII Name of Employing Agency Water and Power Development Authority
(WAPDA) Title of Position Assistant Design Engineer Location of Assignment Lahore-Pakistan Period of Assignment 1971 to 1973
Activities
Structural design of WAPDA Buildings, Tarbela Hospital and design review
Curriculum Vitae of Key Personnel
Berkeley Associates (Pvt.) Ltd.
of a sewage treatment plant at Tarbela. Assistance in the design of Simly Dam Project, Islamabad.
VIII Name of Employing Agency Associated Consulting Engineers Limited (ACE) Title of Position
Location of Assignment Period of Assignment
Site Engineer Khanpur -Pakistan 1968 to 1971
Activities
Construction supervision of Khanpur Dam Project including grouting at abutments, tunnelandspillway.
PUBLICATIONS
"Influence of boring and construction methods on the performance of bored
cast in-situ R.C. piles of a bridge" published in Piletalk Int'l Seminar in Kuala Lumpur in
March, 1989. “Prediction and performance of bored cost in-situ R.C. Piles in load tests in
Pakistan” published in XIIth ICSMFE in Rio de Janiero in August, 1989. "Time efficient and cost effective decisions during pile construction for a
building project" First Asian Young Geotechnical Engineers Conference Bangkok Thailand in 1991.
"SPT for evaluation of unit skin friction and tip resistance of piles in Punjab sands" published in Int'l Conf. on Soil Improvement and Pile Foundations in China in 1991.
“Roadwork Related Properties of Punjab Area Soils” published in proceedings of the 10th Asian Regional Conference on Soil Mechanics and Foundation Engineering Beijing in 1996.
“Evaluation of seepage under the Ghazi Barrage-A case study” published in XIVth International Conference on Soil Mechanics and Foundation Engineering in Hamburg,
Germany in 1997. “Cracking of Structures on Swelling Soils A Case Study” published in the
proceedings of Symposium 2000 of C&W Department., Govt. of Punjab, held in Lahore in November 2000.
Language capability
English and Urdu - Excellent in speaking, reading and writing
French - Fair in speaking, reading and writing
Curriculum Vitae of Key Personnel
1. Proposed Position: Structural Engineer
2. Name of Firm: Berkeley Associates
3. Name of Staff: Sheikh Ilyas Ahmad
4. Profession: Civil Engineer
5. Date of Birth: 16th March, 1947
6. Years with the Firm: 1.0 years
7. Nationality: Pakistani
8. Membership in Professional Societies:
Member Institution of Engineers Pakistan Member Pakistan Engineering Congress Member Pakistan Engineering Council
9. Key Qualifications:
Practicing Professional Engineer since 1968
As Deputy Chief Executive Nespak Foundation, controlled & managed the Administrative & Financial operations of the Foundation (August 2007 to March 2010).
As Vice President/ Head Structural Engineering Division(2003 to 2007)supervised the Planning & Design and Project Management activities of various projects comprising Bridges, Hydropower, Nuclear Power, Oil & Gas transmission, Buildings, Cement Plants, Hydraulic Structure.
As Team Leader (Civil Designs) on deputation to Pakistan Hydro Consultants from 1995 to 2003, responsible for the preparation of detailed designs and construction drawings of 1,450 MW Ghazi-Barotha Hydropower Project consisting of the following major components:
- Ghazi Barrage across river Indus - 1,600 cumecs capacity, 52 km long power channel including nearly 80 cross drainage
structures/ bridges. - Power complex comprising powerhouse, spillway, tail regulator, low level outlets,
switchyard, sill structures, headponds.
As Chief Engineer Structures Division (1987 - 1995) responsible for the planning, design, Tender documents and Construction drawings of Tarbela Hydro power Third Extension, Mangla Hydroelectric 2nd Extension, Tarbela Tunnel 4 Hoist Bridge Remedial Measures, Kundal Shahi Hydel Scheme Muzaffarabad, Water Supply Schemes of Al-Majmaah-Shaqrah Saudi Arabia & Kachhi, Ziarat, Quetta (Balochistan), Auxiliary Buildings of Multan-2 Thermal Power Station, Mirani Dam and Hingol Dam Projects Balochistan.
As Principal Engineer Structures Division (1985 - 87) worked on the design review of pumping station structures of North Jazira Irrigation Project Iraq; Zubair Irrigation Project Iraq, design, contract documents, construction drawings of Chattar Bagh Suspension Bridge Islamabad,
Curriculum Vitae of Key Personnel
Kahlian-Sahlian Suspension Bridge, UGC Centres at Lahore & Karachi, Tourist Resort at Sahiwal, 50m high Steel Chimney of Guddu Thermal Power Station.
As Principal Engineer with Kalabagh Consultants on deputation from NESPAK from 1981-85, worked on planning, design and preparation of tender documents of major structures (i.e. Powerhouse, Power Intakes, Power Tunnels and Low Level Outlet Works) of Kalabagh Dam Project, Pakistan.
As Principal Engineer (1981-1982) and Senior Engineer (1974-1981) in Structures Division of NESPAK, responsible for planning and detailed structural design of civil works of 700 MW Tarbela Hydropower First Extension Project; structural design of eight bridges on Al-Khabura- Dariz Highway Oman and three superhighway bridges of Zubair Irrigation Project-Iraq, planning & design of 20 storey 233 ft. high HBFC House, Islamabad, two industrial complexes in Peshawar and tower foundations for 500 KV Transmission Line (Pakistan) and design review of 50,000 ton capacity Grain Silos Project Chichawatni, (Pakistan).
As Assistant Executive Engineer/Design Engineer with Irrigation Department/ Pakistan Water and Power Development Authority (1968-1974), worked on the design and construction supervision of Marala Drainage Syphon, District road bridge over Upper Gogera Branch Canal, design of concrete lining of irrigation tunnels of Khanpur Dam Project and planning and design of irrigation systems of Hub Dam and Chashma Right Bank Canal.
10. Education Name of Institution
Year
Degree/Diploma
University of Engineering & Technology, Lahore-Pakistan University of Engineering &
1968
1977
B.Sc. Civil Engineering - Degree
Computer Programming in FORTRAN Technology, Lahore-Pakistan IV Language (Certificate)
11. Employment Record:
I Name of Employing Agency Berkeley Associates
Title of Position Advisor Structures
Location of Assignment Lahore – Pakistan
Period of Assignment October 2011 to date
Activities
Supervising the structural design of the following projects:
i) 22MW Jabban Hydroelectric Power Station ii) Machai Hydropower Project at RD 47+000
II Name of Employing Agency Noor Durrani & Associates
Title of Position Structural Engineer
Curriculum Vitae of Key Personnel
Location of Assignment Lahore – Pakistan
Period of Assignment May 2010 to October 2011
Activities
Planning, design and preparation of Tender Documents & EPC Bids for the following projects:
i) 17.0MW capacity Ranolia Hydropower Project ii) 2.6MW capacity Machai Hydropower Project iii) 7.6MW capacity Marala Hydropower Project iv) 4.0MW capacity Deg Outfall Hydropower Project v) 5.4MW capacity Chianwali Hydropower Project vi) 4.2MW capacity Okara Hydropower Project vii) 2.8MW capacity Pakpattan Hydropower Project
III Name of Employing Agency Nespak Foundation
Title of Position Deputy Chief Executive
Location of Assignment Lahore – Pakistan
Period of Assignment August 2007 to March 2010
Activities
Supervised and managed the administrative and financial operations of Nespak Foundation
IV Name of Employing Agency National Engineering Services Pakistan (Pvt.)
Limited
Title of Position Vice President (Str. Eng. Division)
Location of Assignment Lahore – Pakistan
Period of Assignment August 2003 to March 2007
Activities
As Head of Structural Engineering Division, supervised the activities of the Division including Planning & design, Project management, Business promotion etc on various Projects. Major projects included the following:
- KCP - Workshops (PAEC Project) - White Oil Pipeline Crossing over river Indus at Ghazi Ghat - Suigas Pipeline crossing over river Chenab at Shershah - Suigas Pipeline crossing over river Indus at Khairabad - Design of Road Bridge over river chenab at Shershah - Design of 9 bridges on Mansehra-Naran-Jhalkhad Road - 500 TPD White Cement Plant at Maple Leaf Factory - Acetic Acid Recovery Plant (PAEC Project) - Nuclear Safety Related Buildings
Curriculum Vitae of Key Personnel
- Up-gradation/ Renovation of Govt. College University Lahore - Government College University at Faisalabad - Servants Housing Scheme at Mohlanwal, Lahore - Peshawar Flyover Project - Rustik-Miskin Road bridges, Oman - Lahore Ring Road Project - Structures on Sewerage projects of Nizwa, Sur, Khasab, Buraimi and Misfat,
Oman - Sabakzai Dam Project - 12 Small Dams Project, NWFP - Rehabilitation of Torkham - Jalalabad road Project, Afghanistan - National Bank of Pakistan, Islamabad - KAPCO High School, Kot Addu - Rehabilitation of bridges on N-70 - Saudi German Hospital Complex Project
V. Name of Employing Agency National Engineering Services Pakistan (Pvt.)
Limited
Title of Position Team Leader (Civil Designs) Pakistan Hydro Consultants
Location of Assignment Lahore – Pakistan
Period of Assignment March 1995 to June 2003
Activities
Supervision / coordination of all civil design activities of US $ 2.5 billion Ghazi- Barotha Hydropower Project which included analysis & design, review of tender stage designs, production of construction drawings in the Hydraulics, Geotechnical and Structural Sections. The following major activities were carried out:
- Review/checking of the tender stage designs - Review and updating of Tender design Criteria for forming basis of detailed designs - Detailed designs of component features of the project
Important structures include:
- Barrage (Standard Bays, Head Regulator, Under-sluices, Left & Right Guide Embankments, Separation Dyke)
- 1,600 cumecs power channel containing nearly 50 cross drainage structures and as many bridges including National Highway Bridge and Lahore-Peshawar Main Railway Bridge
- Power complex (1,450 MW Powerhouse having 5 unit bays, two erection bay and one unloading bay, siphon spillway, tail regulator, intake structure, sill structures, low level outlets, switchyard, tailrace channel and head pond and fore bay embankments)
- Checking/Quality Assurance of nearly 2,200 construction drawings pertaining to
barrage, power channel and power complex - Review/ Quality Assurance & finalization design of reports of Barrage, Power
Channel, Power Complex and Project Instrumentation - Review/comments on Contractor's detailed construction schedule
Curriculum Vitae of Key Personnel
- Review/approval of Contractor's submissions on Contractor's colonies at Hattian, Tarbela & Barotha, Contractor's alternative designs for Super-passages and bridges, Contractor’s design of Railway bridge based on alternate Chinese profiles
- Review/approval of Contractor's River Diversion Scheme, Work Programme, Aggregate production plant, concrete Batching Plant, Powerhouse Excavation & dewatering schemes etc.
VI. Name of Employing Agency: National Engineering Services Pakistan (Pvt.)
Limited
Title of Position: Chief Engineer
Location of Assignment: Lahore – Pakistan
Period of Assignment: July 1987 to March 1995
Activities:
Planning, design and preparation of construction drawings for the following projects:
- Civil Works of U.S. $ 760 million 1700 MW Tarbela Hydro power Third Extension Project, (4 x 432 MW)
- Civil Works of U.S. $ 80 million 200 MW Mangla Hydroelectric 2nd Extension (2 x 100 MW)
- Tarbela Dam Spillway Stoplogs (Main & Auxiliary Spillways) - Remedial Measures of Tarbela Tunnel-4 Hoist Bridge - Kundal Shahi Hydel Scheme (2MW) Muzaffarabad - Water Supply Schemes of Al-Majmaah-Shaqrah, Saudi Arabia - Quetta, Kachhi and Ziarat Water Supply Schemes, Balochistan - Auxiliary Buildings of Multan-2 Thermal Power Station - Inlet, outlet & spillway structures and tunnel of Mirani Dam Project, Balochistan
Intake, tunnel and outlet structures of Hingol Dam Project, Balochistan
VII. Name of Employing Agency National Engineering Services Pakistan (Pvt.) Limited
Title of Position Principal Engineer
Location of Assignment Lahore – Pakistan
Period of Assignment January 1986 to June 1987
Activities:
- Design review of Pumping Station Structures of North Jazira Irrigation Project, Iraq. - Detailed Design, Tender Documents and construction drawings of:
Chitral Airport Terminal Building University Grants Commission Buildings at Lahore & Karachi Tourist Resorts at Multan, Khanewal, Sahiwal, Rahim Yar Khan and Panjnad Chattar Bagh Pedestrian Suspension Bridge Kahlian-Sahilian Suspension Bridge 50 meter high Steel Chimney of Guddu Thermal Power Station Preliminary design and Tender Documents of Civil works of Zubair
Irrigation Scheme,Iraq
Curriculum Vitae of Key Personnel
VIII. Name of Employing Agency: National Engineering Services Pakistan (Pvt.) Limited
Title of Position: Principal Engineer (Kalabagh
Consultants)
Location of Assignment: Lahore – Pakistan
Period of Assignment: March 1982 to December 1985
Activities:
Planning, design and preparation of tenders of major structures including Powerhouse, Power Intakes, Low Level Outlet Works of U.S. $ 3400 million Kalabagh Dam Project, Pakistan.
IX. Name of Employing Agency: National Engineering Services Pakistan (Pvt.) Limited
Title of Position: Senior Engineer
Location of Assignment: Lahore – Pakistan
Period of Assignment:
Activities:
September 1974 to December 1981
- Design review of U.S. $ 4 million Grain Silos Project, Pakistan (50,000 ton capacity)
- Design of Super Highway Bridges for Zubair Irrigation Project, Iraq - Planning design and preparation of construction drawings of:
Civil Works of U.S. $ 50 million, 700 MW Tarbela Hydropower Extension Project (4 x
175 MW) Highway Bridges of U.S. $ 15 million Al-Khabura-Dariz Road Project, Oman Civil Works of U.S. $ 8 million Industrial Complex, including cold storages, for Sarhad
Development Authority Peshawar (Pakistan) 20 Storey 233 ft. high building of “House Building Finance Corporation”, Islamabad,
Pakistan Tower foundations for U.S.$ 183 million 500 KV (Guddu-Jamshoro)
Transmission Line
- Preparation of Prefeasibility Report on 480 Km long, U.S. $ 50 million Inland Water Route connecting Port Mohammad Bin Qasim with Sukkur, Pakistan
X. Name of Employing Agency Water & Power Development Authority (WAPDA)/ Irrigation
Title of Position
Department Punjab
Assistant Executive Engineer/Design Engineer
Curriculum Vitae of Key Personnel
Location of Assignment Lahore – Pakistan
Period of Assignment July 1968 to September 1974
Activities
Design and construction supervision of irrigation and drainage systems, bridges, cross drainage works, design of concrete lining for irrigation tunnels of Khanpur Dam Project and irrigation system design of Hub Dam & Chashma Right Bank Canals.
12. Languages:
English and Urdu - Excellent in speaking, reading and writing
Persian - Fair in speaking, reading and writing
AHMAD NAWAZ
1
CURRICULUM VITAE
Name of Person : AHMAD NAWAZ
Nationality : Pakistani
Date & Place of Birth : January 28, 1942 Jhang, Pakistan
Marital Status : Married
Profession : Hydro-geology Expert
Areas of Expertise : Groundwater Resources Evaluation, Development and Management, including Groundwater Numerical Modelling, Vertical Drainage and Construction Dewatering.
Affiliation with : Member of Punjab Geological Society Professional Institutions
Residential Address : 23-Badar Block, Allama Iqbal Town, Lahore
Cell No. : 0321-4676943
Email : [email protected] [email protected]
KEY QUALIFICATIONS
Practising as a professional Hydro-geologist / Groundwater Specialist since 1971.
Possess vast experience in exploration, exploitation and management of groundwater resources in arid and semi-arid regions. Prepared feasibility reports, operation manuals, contract documents etc. for groundwater development and management projects.
As a groundwater specialist planned and executed investigations for exploring potentially viable aquifers consisting unconsolidated (sand, gravels etc.) and consolidated sediments (sandstone, limestone, etc.). Investigations comprised monitoring of groundwater sources, geophysical surveys, geological mapping, test drilling, sampling (water and lithology) and aquifer testing.
Interpreted and analyzed hydrogeological data and demarcated potentially viable areas for groundwater development. Designed and conducted aquifer tests, monitored response of groundwater levels, analyzed the test data and evaluated safe yields of various types of aquifers. Design and construction of tubewells (including well fields) for projects involving water supply, drainage of agricultural lands and construction dewatering.
Conducted tubewell performance studies and rehabilitation of deteriorated tubewells.
Developed and calibrated groundwater numerical models (flow and solute transport) to study future behavior of aquifer under various groundwater development scenarios. Selection of the most environment friendly management strategies for groundwater use on sustainable basis.
AHMAD NAWAZ
2
Experience in using computer software such as Microsoft Word, Microsoft Excel, Lotus 1.2.3, Surfer, Processing MODFLOW for Windows (PMWin), Groundwater Vistas, GMS 8.1, Learned GIS for preparing maps and data processing.
I have worked in various types of terrains consisting of unconsolidated and consolidated sediments in Pakistan, Iraq, Oman, Qatar Saudi Arabia, and Iran. The major projects completed are listed in the following sections.
EDUCATION
Name of Institution Year Degree
University of Punjab Lahore, Pakistan 1970 M.Sc. Geology (Specialization in Petroleum and Structural Geology)
University of Punjab Lahore, Pakistan 1969 B.Sc. (Hons) Geology,
EXPERIENCE
Position Held and Description of Duties
I- From: 2009 To: Date Employer: Berkeley Associates (Pvt) Limited
Position Held and Description of Duties Groundwater Specialist/Hydrogeologist
Responsible for planning, investigation, evaluation of groundwater resource. Groundwater development and management groundwater resources, including groundwater numerical modelling. Synthesis of various studies and preparation of planning and feasibility reports, PC-Is, tender documents, Operation Manuals. The major projects completed are listed below:
- 1X40MW Nishat Chunian Power Plant Project - Groundwater resources evaluation
to fulfil water requirements of the plant; - 152MW Power Plant, Pasrur, Sialkot - Groundwater investigations including drilling
and development of test tubewell and piezometers, conductance of aquifer test, analysis of aquifer test data to find out aquifer parameters, estimation of safe yield of aquifer; and
- Supervision of installation of water supply tubewells
II- From: 2002 To: 2009
Independent Consultant Hydrogeologist / Groundwater Specialist
As an Independent Consultant Hydrogeologist / Groundwater Specialist provided consultancy services in groundwater resources evaluation, development and management by preparing and calibrating groundwater numerical models both flow and solute transport on project to project basis to various industries and consultants such as National Engineering Services of Pakistan (NESPAK), Berkeley Associates, Halcro Group of Pakistan, National Development Consultants (NDC), Engineering Consultancy Services of Punjab (ECSP) etc. The major projects and the consultancy services provided include:
- Coal Fired Power Plant near Sahiwal – Groundwater resources evaluation to fulfil
make up water requirements during period of canal closure.
AHMAD NAWAZ
3
- Groundwater Studies for Quaid-i-Azam Solar Park, Bahawalpur – Delineated
useable groundwater aquifer(s) in and around the project area. - Groundwater Studies for Nishat Crystal Project Expo Centre, Lahore – Study of
aquifer underlain by the project area through test drilling, conducting aquifer test (pump out test) and analyses of the data collected on response of groundwater potential heads.
- Estimation drainage requirements and design of dewatering system for Lusail Underground Railway Construction Project, Qattar – Estimation of drainable surplus using available data on aquifer parameters.
- Lower Bari Doab Canal Improvement Project (LBDCIP) Component 3 (Groundwater Monitoring, Modelling and Management) – Synthesis and processing data on various recharge and discharge sources, developed and calibrated groundwater numerical models.
- Supervision of 26 numbers dewatering tubewells installation at CHASNUPP – Assuring installation in accordance with the design specifications.
- Water Sourcing Study for Safe Water Supply Schemes in Dadu Concessional Area of BHP Petroleum (Pakistan) Pty Ltd. – Reconnaissance of the project area, supervision of electricity resistivity survey, test drilling, delineation of useable groundwater aquifer(s) and development strategy.
- Alborz Integrated Land and Water Management Project, Iran – Synthesis and processing of available data on aquifer parameters and various recharge and discharge sources, developed and calibrated groundwater numerical models, studied various scenarios, with and without Alborz Dam, for efficient development and management of groundwater resources.
- Doha Conventional Centre and Tower Project, Doha, Qattar – Aquifer testing and data analysis, estimation of dewatering requirements, design of dewatering system and dewatering wells for construction below water table.
- Shamiya Redevelopment Project, Saudi Arabia – Prepared technical proposal to study the impact of new infrastructure on Abe Zam Zam.
- Dayqah Storage Dam, Oman – Study the tightness of reservoir banks. - Recharge dam Wadi Kalboh, Oman – Study the impact of dam on groundwater
resources. - AES Lalpir Thermal Power Plant, Kotaddu - Groundwater Resources Evaluation
and Development, including design and construction of water supply tubewells. - Water Supply Schemes in Azad Kashmir – Delineation of potential groundwater
zones for development. - Textile Mills, Power Plants, Dyeing and Finishing Units - Design and installation of
water supply tubewells to pump useable quality groundwater from aquifer underlain and overlain by saline groundwater aquifer(s).
- Site B-109, Sargodha, Punjab, Pakistan Site B-201 Nawabshah, Sindh, Pakistan - Conducted aquifer tests (pump out tests), analysis of test data, estimation of aquifer parameters, design and construction of dewatering systems for pumping drainable surplus to lower water table below foundation of the buildings.
III- From: 1975 To: 2002 Employer: National Engineering Services Pakistan (Pvt) Limited
Position Held and Description of Duties
1989 - 2002 Principal Geologist
As Principal Hydrogeologist, responsible for planning, investigation, evaluation, groundwater computer modelling, synthesis of various studies and preparation of planning and feasibility reports, PC-Is, tender documents, Operation Manuals. The major projects completed are listed below:
- Recharge Dam Wadi Sinaw, Oman – Evaluation of its impact on groundwater
resources located downstream of the dam.
AHMAD NAWAZ
4
- Punjab Private Sector Groundwater Development Project - Synthesis and
processing data on various recharge and discharge sources, development and calibration of groundwater numerical models and study of various development scenarios for developing and managing water resources efficiently.
- Tubewell Design and Technical Specifications for 6R-Hakra Sub-Project of Command Water Management Project, Pakistan – Design of well field and tubewells.
- Evaluation of Groundwater Resources and Study of Aquifer under Lahore – Collection, synthesis and processing of pumping data for preparing groundwater numerical models.
- Water Supply Scheme for Private Housing Schemes in Zone-2 and extended areas of Islamabad – Evaluation of groundwater resources to assess availability of groundwater and recommendations to CDA.
- Groundwater studies for developing water supply scheme for Bahria Town Sihala, Islamabad – Reconnaissance survey, monitoring of existing groundwater resources and recommendations to Bahria Town.
- Second SCARP Transition North Rohri Pilot Project - Synthesis and processing data on various recharge and discharge sources, developed and calibrated groundwater numerical models and study of various development scenarios for developing and managing water resources efficiently.
- Industrial and Residential Areas in Dammam, Saudi Arabia – Study causes of rise of water table and proposed remedial measures.
- Second SCARP Transition Project, Punjab - Synthesis and processing data on various recharge and discharge sources, developed and calibrated groundwater numerical models and study of various development scenarios for developing and managing water resources efficiently.
- Chashma Hydropower Project – Estimation of dewatering requirements for construction of power plant.
- CHASNUPP - Evaluation of pumping requirements and design of dewatering system to facilitate construction of intake structure.
- Groundwater Study CHASNUPP – Study of existing conditions of groundwater, synthesis and processing data on various recharge and discharge sources, developed and calibrated groundwater numerical models and study of various development scenarios to determine flow paths of radioactive materials in case of any mishap.
- Strategic Provincial Investment Plan and Project Preparation for Rural Water Supply, Sanitation and Health Project, Baluchistan – Study of available data on groundwater potential areas in various basins and recommendations for developing water supply scheme including design of tubewells.
- Groundwater Study for Fordwah Eastern Sadiqia Drainage Project - Evaluation of project performance, including development of Groundwater Numerical Model, Bahawalnagar.
- Entire Command of Lasbela Canal, Baluchistan – Groundwater study for evaluation of drainage requirements.
- Sehwan Barrage Complex, Sindh - Groundwater studies to assess drain-ability of agricultural soils.
- Feasibility Study for Groundwater Development in Kurram Agency – Study of existing conditions of groundwater and availability of additional potential for further development.
1979 - 1989 Senior Geologist
As Senior Hydrogeologist planned, investigated, designed and performed construction supervision of groundwater development projects for irrigation, drainage and water supply. Participated in the preparation of technical reports i.e. inception, feasibility, design, tender documents, operation manuals. Major Projects completed include:
AHMAD NAWAZ
5
- Quetta Water Supply Project, Baluchistan, Pakistan – Siting and designing of tubewells.
- Tubewells for Dhurnal Water Injection (to recover oil) Project, Pakistan - Construction supervision of tubewells.
- Shahkot Drainage Sub-Project, CWMP, Pakistan - Design of drainage tubewells.
- Warsak Lift Canal Sub-Project of CWMP, Pakistan - Survey and investigations to locate the reaches, for lining, where excessive seepage was taking place.
- Groundwater Development for Augmentation of Water Supply to Rawalpindi Cantonment, Pakistan – Groundwater study to delineate potential areas for groundwater development.
- Multan Thermal Power Station, Punjab, Pakistan - Groundwater study, comprising test drilling and conductance of aquifer test (pump out test), analysis of the data and evaluation of groundwater potential to meet the additional requirements as a result of expansion of the power plant.
- Sinking of Tubewells in Federally Administered Area (FATA), NWFP, Pakistan – Study of existing groundwater conditions, delineation of groundwater potential areas for further development.
- Ghotki Fresh Groundwater Irrigation Project, Sindh, Pakistan – Study of existing groundwater conditions and drainage requirements to lower water table in the waterlogged area located along the Ghotki Feeder.
- Vertical Drainage Projects Karbala and Habbaniya, Iraq – Groundwater study to drain the area of run way.
- Master Planing for Development of Irrigation Resources, Karak District, NWFP Pakistan – Groundwater study to assess feasibility of the project.
- Barani Area Master Planning, Pakistan - Groundwater studies.
1975 – 1979 Hydrogeologist
As Hydrogeologist conducted explorations through tubewell inventory, test drilling, construction supervision of tubewells and piezometers, conducting aquifer tests etc. for the following projects:
- Salinity Control and Reclamation Project Fordwah and Eastern Sadiqia,
Pakistan – Supervision of test drilling, monitoring of existing groundwater
sources and collection of water samples.
- Salinity Control and Reclamation Project Dera Ghazi Khan, Pakistan –
Supervision of test drilling.
- Baghalchur, Dera Ghazi Khan, Pakistan – Study of surface and groundwater
resources, geological mapping to understand geometry of various sandstone
aquifer(s), test well drilling and conductance of aquifer test, analysis of the data
and development of water resources.
The projects covered more than 1.00 million hectares and involved construction of 3273 tubewells of capacity ranging from 28 to 112 litres/second. Total estimated cost of these projects was U.S. $ 400 million.
IV- From: 1971 To: 1975 Employer: Associated Consulting Engineering Limited (ACE)
Position Held and Description of Duties
AHMAD NAWAZ
6
1971 - 1975 Engineering Geologist
Conducted geotechnical investigations comprising test drilling, pressure tests for determining permeability of consolidated rocks, material investigation, detailed geological mapping, correlation and identification of various formations. The projects completed were:
- Kalabagh Dam Project Punjab, Pakistan – Geotechnical investigations. - American Fertilizer Factory, Iskandarabad, Pakistan - Geotechnical
investigations. - Extension of Cement Factory, Iskandarabad, Pakistan - Geotechnical
investigations.
LANGUAGE CAPABILITY
English: Excellent in speaking, reading and writing Urdu: Excellent in speaking, reading and writing Arabic: Excellent in reading
Curriculum Vitae
1. Name : Farooq Naveed Sheikh
2. Name of the Firm : Berkeley Associates (Pvt.) Ltd.
3. Designation : Principal Geotechnical Engineer
4. Date of Birth : July 11, 1986
5. Year with the Firm : 4 years
6. Nationality : Pakistani
7. PEC Registration No. : Civil/27892
8. Key Qualifications
As a geotechnical engineer, have worked on the field investigations and subsequent geotechnical design of numerous projects. Major activities included defining scope of work for geotechnical investigations, furnishing technical and financial proposals, supervision of field & laboratory testing, carrying out slope stability analysis, foundation design, ground improvement design through installation of stone columns, settlement analyses, evaluation of rock mass parameters for tunnel design, seepage analysis, stability analyses of rock slopes, design of ground anchors & retaining system and development of computer aided programs.
9. Academic Qualification :
Name of Institution Year Degree/Diploma
University of Engineering and Technology (Lahore)
2012 M.Sc. in Civil Engineering
University of Engineering and Technology (Lahore)
2008 B.Sc. Civil Engineering
10. Employment Record
July 2015 to date - Principal Geotechnical Engineer
Berkeley Associates (Pvt.) Ltd. 316-D, OPF Housing Scheme, Raiwind Road, Lahore
1223 MW CCPP Balloki Pakistan
1180 MW CCPP Bhikki
350 MW Coal Fired Power Plant at Port Qasim, Karachi
IPF Plant at Manga Mandi
Rehabilitation of Building Defects of Malala Yousaf Zai Daanish School (Boys and Girls) Jand District Attock
Treet Project at FIEDMC, Faisalabad
Corporate Office Building at Jail Road Lahore
Jan. 2014 to July 2014 Project Design Engineer
Keller-Turki Co. Ltd. Dammam, Kingdom of Saudi Arabia
Shuqaiq Steam Power Project, Shuqaiq – Kingdom of Saudi Arabia
Yanbu Aramco Sinopec Refining Project, Yanbu – Kingdom of Saudi Arabia
Sabic PCQ-02 Project, Jubail – Kingdom of Saudi Arabia
Saudi Aramco Third Party Cogeneration Project, Ras Tanura - Kingdom of Saudi Arabia
Common Utilities and Tank Farm Area, Rabigh – Kingdom of Saudi Arabia
Residential Building for Al-Mouwasat Hospital Accommodation, Qatif – Kingdom of Saudi Arabia
Aug. 2012 to Jan. 2014 Geotechnical Engineer Berkeley Associates (Pvt.) Ltd. 316-D, OPF Housing Scheme, Raiwind Road, Lahore
Construction of New Khanki Barrage – Design Verification and Construction Supervision
of Geotechnical Aspects of the Project
Feasibility Study of 180 MW Naran Hydropower Project, Khyber Pakhtunkhwa - Pakistan
Feasibility Study of 300 MW Balakot Hydropower Project, Khyber Pakhtunkhwa - Pakistan
Pre-Feasibility Study of 96 MW Batakundi Hydropower Project, Kyhber Pakhtunkhwa - Pakistan
Feasibility Study of 12 MW Biomass Based IPP, Faisalabad - Pakistan
Safety Assessment of Existing Shoring System and Design of Rehabilitation/ Strengthening Measures at Mubarak Center, Ferozepur Road, Lahore – Pakistan
Design of Retaining System without Ground Anchors for Mobilink Office Building at QIE, Lahore - Pakistan
Slope stability analysis of Parking Plazas at Jhika Gali, Bansara Gali, General Bus Stand and Lower Topa, Murree – Pakistan
Aug. 2011 to July 2012 Junior Engineer (Civil)
P&I Organization - Water and Power Development Authority (WAPDA) Sunny View, Lahore
Scope of work for geotechnical investigations of different dam projects like;
- Chiniot Dam Project - Bhimber Dam Project
- Khapalu Dam Multipurpose Project - Sanghar Dam Project - Munda Dam Project
Planning Commission Proforma-II for feasibility studies of dam projects.
Jan. 2011 to Aug. 2011 Lecturer, Civil Engineering Department
The University of Lahore
As a lecturer, assisted in establishment of Soil Mechanics Laboratory along with regular lecture deliverance on Soil Mechanics
Oct. 2008 to Jan. 2011 Staff Engineer Berkeley Associates (Pvt.) Ltd. 316-D, OPF Housing Scheme, Raiwind Road, Lahore
As a staff engineer, assisted in;
- Review of Request for Proposal (RFP) for mega projects - Furnishing technical and financial proposals for geotechnical investigations - Finalizing scope of work for field activities - Preparing laboratory testing advices - Interpreting field results and laboratory test results for geotechnical design - of sub-structure - Coordinating between different organs of JV for successful completion of - civil design - Preparation of EPC/ Turnkey proposals (both technical & financial) for
hydropower projects
Major projects include;
- Feasibility Study of Shogo-Sin Hydropower Project, Chitral - Pakistan - Feasibility Study of Shushghai-Zhendoli Hydropower Project, Chitral -
Pakistan - 22 MW Jabban Hydroelectric Power Station – Rehabilitation Project,
Malakand - Pakistan - 425 MW Combined Cycle Power Plant, Nandipur - Pakistan - Tetra Pak Project 2 Pakistan, Lahore - Pakistan - New Ammonia Urea Plant, Daharki - Pakistan - Girls and Boys Hostels at Sharif Medical City, Lahore - Pakistan - Geotechnical Investigations along LBDC - Pakistan - Preparation of EPC/ Turnkey Proposals for Canal Hydropower Projects at
Pakpattan and Okara - Pakistan
11. Languages :
Read Write Speak
Urdu: Excellent Excellent Excellent
English: Excellent Excellent Excellent
Page 1 of 5
Curriculum Vitae
1. Name Sheikh Ilyas Ahmed
2. Name of the Firm Berkeley Associates (Pvt) Ltd
3. Designation Hydraulic Structures Expert
4. Date of Birth 16 March, 1956
5. Years with Firm 06 Years
6. Nationality Pakistani
7. PEC Registration No. CIVIL/257
8. Key Qualifications
Overall 48 years including 26 years’ experience of working on various aspects of Structural Engineering for large hydropower Projects and Infrastructure Projects as;
Worked as Chief Structure Design Civil for the Feasibility Studies of 188 MW Naran, 300 MW Balakot, 96 MW Batakundi and 218 MW Dhaddar Hydropower Projects.
Worked as Advisor Structures at Berkeley Associates and designed/produced construction drawings for 22 MW Jabban Hydropower Station.
Worked as Advisor Structures at Noor Durrani Associats and preparated EPC Bidding Documents for seven (7) Nos. Hydropower Projects in KPK & Punjab provinces (2.6 MW to 17 MW)
Worked as Deputy Executive NESPAK Foundation, controlled & managed the Administrative & Financial operations of the Foundation (August 2007 to March 2010).
As Vice President/Head Structural Engineering Division (2003 to 2007) supervised the Planning & Design and Project Management activities of various projects comprising Bridges, Hydropower, Nuclear Power, Oil & Gas transmission, Buildings, Cement Plants, Hydraulic Structures.
As Team Leader (Civil Designs) on deputation to Pakistan Hydro Consultants from 1995 to 2003, responsible for the preparation of detailed designs and construction drawings of 1,450 MW Ghazi‐Barotha Hydropower Project consisting of the major components like Ghazi barrage across river Indus, 1,600 cumecs capacity, 52 km long power channel including nearly 80 cross drainage structures/ bridges, power complex comprising powerhouse, spillway, tail regulator, low level outlets, switchyard, sill structures, head ponds.
As Chief Engineer Structures Division (1987 ‐ 1995) responsible for the planning, design, Tender documents and Construction drawings of Tarbela Hydro Power Third Extension, Mangla Hydroelectric 2nd Extension, Tarbela Tunnel 4 Hoist Bridge Remedial Measures, Kundal Shahi Hydel Scheme Muzaffarabad, Water Supply Schemes of Al‐Majmaah‐Shaqrah Saudi Arabia & Kachhi, Ziarat, Quetta (Balochistan), Auxiliary Buildings of Multan‐2 Thermal Power Station, Mirani Dam and Hingol Dam Projects Balochistan.
As Principal Engineer Structures Division (1985 ‐ 87) worked on the design review of pumping station structures of North Jazira Irrigation Project Iraq; Zubair Irrigation Project Iraq, design, contract documents, construction drawings of Chattar Bagh Suspension Bridge Islamabad, Kahlian‐Sahlian Suspension Bridge,
Page 2 of 5
UGC Centres at Lahore & Karachi, Tourist Resort at Sahiwal, 50m high Steel Chimney of Guddu Thermal Power Station.
As Principal Engineer Structures with Kalabagh Consultants on deputation from NESPAK from 1981‐85, worked on planning, design and preparation of tender documents of major structures (i.e. Powerhouse, Power Intakes, Power Tunnels and Low Level Outlet Works) of Kalabagh Dam Project, Pakistan.
As Principal Engineer Structures (1981‐1982) and Senior Engineer (1974‐1981) in Structures Division of NESPAK, responsible for planning and detailed structural design of civil works of 700 MW Tarbela Hydropower First Extension Project; structural design of eight bridges on Al‐Khabura‐Dariz Highway Oman and three superhighway bridges of Zubair Irrigation Project‐Iraq, planning & design of 20 story 233 ft. high HBFC House, Islamabad, two industrial complexes in Peshawar and tower foundations for 500 KV Transmission Line (Pakistan) and design review of 50,000 ton capacity Grain Silos Project Chichawatni, (Pakistan).
As Assistant Executive Engineer/Design Engineer with Irrigation Department/ Pakistan Water and Power Development Authority (1968‐1974), worked on the design and construction supervision of Marala Drainage Syphon, District road bridge over Upper Gogera Branch Canal, design of concrete lining of irrigation tunnels of Khanpur Dam Project and planning and design of irrigation systems of Hub Dam and Chashma Right Bank Canal.
9. Academic Qualification
Name of Institution Year Degree/Diploma
University of Engineering & Technology, Lahore‐Pakistan
1968 B.Sc. Civil Engineering
10. Employment Record
Name of Employing Agency Berkeley Associates (Pvt) Ltd
Title of Position Hydraulic Structures Expert
Location of Assignment Lahore‐Pakistan
Period of Assignment January 2015 to date
Activities Structural Design of building for Temporary Facilities, Infrastructural design i.e. Water Supply/Sewerage, Drainage, roads for 1223 MW Balloki Thermal Power Station & production of construction drawings.
Review of Contractor’s Submissions on Civil Design Package on 2x330 MW Thar Coal Fired Power Plant.
Name of Employing Agency Mirza Associate Engineering Services & Berkeley Associates
(Pvt) Ltd JV
Title of Position Chief Structures Design (Civil)
Location of Assignment Lahore‐Pakistan
Page 3 of 5
Period of Assignment Dec 2013 to Dec 2014
Activities Worked as Chief Hydraulic Structures Design (Civil) for the Feasibility Studies of 188MW Naran HPP and 102 MW Batakundi HPPs.
Name of Employing Agency
Mirza Associate Engineering Services & Berkeley Associates (Pvt) Ltd JV
Title of Position Chief Structures Design (Civil)
Location of Assignment Lahore‐Pakistan
Period of Assignment July 2012 to Dec 2013
Activities Worked as Chief Structures Design (Civil) for the Feasibility Studies of 300 MW Balakot Hydropower Project.
Name of Employing Agency
Berkeley Associates
Title of Position Chief Structures Design (Civil)
Location of Assignment Pakistan
Period of Assignment September 2011 to July 2012
Activities Supervised the Structural design of 22 MW Jabban Hydroelectric Power Station and Machai Hydropower Project at RD 47+000.
Name of Employing Agency
Noor Durrani & Assoicates
Title of Position Structural Engineer
Location of Assignment Lahore‐Pakistan
Period of Assignment May 2010 to September 2011
Activities Planning, design and preparation of Tender documents & EPC Bids for the following projects.
17.0 MW capacity Ranolia Hydropower Projects
2.6 MW capacity Machai Hydropower Projects
7.6 MW capacity Marala Hydropower Projects
4.0 MW capacity Deg Outfall Hydropower Projects
5.4 MW capacity Chianwali Hydropower Projects
4.2 MW capacity Okara Hydropower Projects
2.8 MW capacity Pakpattan Hydropower Projects
Name of Employing Agency
National Engineering Services Pakistan (Pvt.) Limited
Title of Position Vice President (Str. Eng. Division)
Page 4 of 5
Location of Assignment Lahore – Pakistan
Period of Assignment August 2003 to March 2007
Activities As Head of Structural Engineering Division, supervised the activities of the Division including Planning & design, Project management, Business promotion etc. on various Projects.
Name of Employing Agency
Pakistan Hydro Consultants on deputation from NESPAK
Title of Position Team Leader (Civil Designs)
Location of Assignment Lahore – Pakistan
Period of Assignment March 1995 to June 2003
Activities Supervision / coordination of all civil design activities of US $ 2.5 billion Ghazi‐ Barotha Hydropower Project which included review of tender stage designs, updating of Tender Designing Criteria, analysis and production of construction drawings in the Hydraulics, Geotechnical and Structural Sections for Ghazi Barrage, 1600 cumecs power channel bridges, cross drainage structures, and power complex structures.
Name of Employing Agency
National Engineering Services Pakistan (Pvt) Ltd
Title of Position Chief Engineer
Location of Assignment Lahore – Pakistan
Period of Assignment July 1987 to March 1995
Activities Planning, design and preparation of construction drawings of various projects.
Name of Employing Agency
National Engineering Services Pakistan (Pvt) Ltd
Title of Position Principal Engineer
Location of Assignment Lahore – Pakistan
Period of Assignment January 1986 to June 1987
Activities Design review of Pumping Station Structures of North Jazira Irrigation Project, Iraq.
Detailed Design, Tender Documents and construction drawings of buildings, suspension bridges at Chattar Bagh & Kahlian‐Sahlian.
Name of Employing Agency National Engineering Services Pakistan (Pvt) Ltd
Title of Position Principal Engineer (Kalabagh Consultants)
Location of Assignment Lahore – Pakistan
Period of Assignment March 1982 to December 1985
Page 5 of 5
Activities Planning, design and preparation of tenders of major structures including Powerhouse, Power Intakes, Low Level Outlet Works of U.S. $ 3400 million Kalabagh Dam Project, Pakistan.
Name of Employing Agency
National Engineering Services Pakistan (Pvt) Ltd
Title of Position Senior Engineer
Location of Assignment Lahore – Pakistan
Period of Assignment September 1974 to December 1981
Activities Design review of U.S. $ 4 million Grain Silos Project, Pakistan (50,000‐ton capacity)
Design of Super Highway Bridges for Zubair Irrigation Project, Iraq
Planning design and preparation of construction drawings of Tarbela Hydropower Extension Project.
Industrial Projects of Corn Complex & Leather Tannery, 20 Story 233 ft. high Building of HBFC House.
Name of Employing Agency WAPDA, Irrigation Department Punjab
Title of Position Assistant Executive Engineer/Design Engineer
Location of Assignment Lahore – Pakistan
Period of Assignment July 1968 to September 1974
Activities Design and construction supervision of irrigation and drainage systems, bridges, cross drainage works, design of concrete lining for irrigation tunnels of Khanpur Dam Project and irrigation system design of Hub Dam & Chashma Right Bank Canals
11. Language Skills
Speaking Reading Writing
English Excellent Excellent Excellent
Urdu Excellent Excellent Excellent
Curriculum Vitae
1. Name : Imran Farooq
2. Name of Firm : Berkeley Associates (Pvt.) Ltd
3. Designation : Senior Geotechnical Engineer
4. Year with Firm : 3 Years
5. Date of Birth : December 02, 1988
6. Nationality : Pakistani
7. PEC Registration No. : CIVIL/30294
8. Key Qualifications
As a geotechnical engineer, have worked on the field investigations and subsequent geotechnical design of numerous projects. Major activities included defining scope of work for geotechnical investigations, furnishing technical and financial proposals, supervision of field & laboratory testing, carrying out slope stability analysis, foundation design, ground improvement design through installation of stone columns, settlement analyses, evaluation of rock mass parameters for tunnel design, seepage analysis, stability analyses of rock slopes, design of ground anchors & retaining system and development of computer aided programs.
9. Academic Qualification:
Name of Institution Year Degree/Diploma
University of Engineering and to date M.Sc. in Civil Engineering Technology (U.E.T) Lahore Specialization in Geotechnical
Engineering
University of Engineering and 2010 B.Sc. in Civil Engineering Technology (U.E.T) Lahore
. Government College University 2006 Higher Secondary School (GCU) (Pre-Engineering)
10. Employment Record
August, 2014 to Date Senior Engineer Berkeley Associates (Pvt.) Ltd.
Activities
Preparation of scope of work for geotechnical investigations and geophysical surveys Supervision of geotechnical investigations work
Preparation of laboratory testing schedules Design of foundation Geotechnical analyses (slope stability and seepage analyses) for hydropower projects Report writing
Feb 2012 to Aug 2014 Project Manager Client: US Air Force (USAF) Consultant: US Army Corps of Engineers (USACE) Project: Construction of four Pre-Engineered facilities with concrete foundations in the US Air Force base at Manas Transit Center, Kyrgyzstan
Roles and Responsibilities
Handle all engineering and design related issues of project both from technical
and functional
standpoint
Create, update and maintain the project submittal log and all other project specific quality control reports
Prepare/update daily progress report and project status using QCS/RMS
Review/audit and approve for submittal shop drawings and submittals for conformance with project
specifications by direct review and by leveraging the knowledge and experience of others in the project team when necessary
Conduct and document weekly QC meetings with the site superintendent and USACE personnel and provide written minutes as described in project specific contract documents
Have weekly meeting with the QA Engineers (as directed by USACE) to answer any question as to procedures and the future work items
Conduct preparatory, initial and follow-up meetings to establish an understanding of the standards of care desired for each definable feature of work. Working with the Construction Manager and Superintendents develop checklists to be used
Maintain the project "As-Built" drawings on a daily basis
Notify BOD and if necessary stop the work to resolve matters that affect safety, quality and/or inhibit the logical progress of work
Prepare variation orders and RFP’s as per contract requirement
Review and monitor the submission of proper documentation for technical proposal, materials and design approvals
Monitor field-tests and expedites contractor’s required report submittals
Prepare and compliance with the project schedule and quality procedures
Act as liaison between contractor and USACE
August, 2011 to Feb 2012 Project Engineer- Central
Roles and Responsibilities
New development projects including Knock Down Rebuild, adoption & New to Industry
Project planning as per the international standards
Ensuring HSE standards on all projects
Planning/ proposing the projects in accordance with the local legislations & other allied government departments
Handling entire maintenance activities of the retail stations in the designated area
Hiring of appropriate resources
Defining the visit frequency for all on-going projects
Aug 2010 to Jul 2011 Structure Design Engineer
Roles and Responsibilities
To provide efficient and effective solutions for the construction requirements of clients in the form of structural design
Designing of a hospital comprising of 410 beds in Bahawalpur; which included design of Flat slab, beam slab, combined footing, isolated footing, columns, beams, retaining walls, underground water tank and overhead water tank
Completion of design of commercial plazas using ETABS
Designing of residential houses
Designing of underground water tanks
Designing of retaining walls (cantilever & propped)
Professional Affiliations
Pakistan Geotechnical Engineering Society (PGES- M- 123)
USACE/NAVFAC Certified Engineer for Construction Quality Management CQM (MED021378407)
Professional Development and Trainings
June 1, 3, 8, 10 & 13, 2014 achieved the mandatory professional development units for “Risk Management Professional (PMI-RMP) course”
May1, 4, 11 & 18, 2014 successfully completed the pre-requisite professional development units for “Project Management Professional (PMP) course”
June 10-11, 2013 Network Analysis and Schedule (NAS) for USACE contracts training by Wilhelmina Pierce, P.E
November 13-14, 2012 Construction quality management for contractors- #784 training course by US Army Corps of Engineers (USACE) and Naval Facility Engineering Command (NAVFAC)
March 14-15, 2013 13th National Conference on Geotechnical Engineering held by PGES
11. Language:
English:
Read
Excellent
Write
Excellent
Speak
Excellent Urdu: Excellent Excellent Excellent
Curriculum Vitae
1. Name : Ijaz Shafi
2. Name of the Firm : Berkeley Associates (Pvt.) Ltd.
3. Designation : Chief Structural Engineer
4. Date of Birth : June 19, 1953
5. Year with the Firm : 2 Years
6. Nationality : Pakistani
7. Reg No. With PEC : CIV-2878
8. Profession : Civil Engineer
9. Key Qualifications
Practicing professional engineering since 1976.
As a professional engineer I have been involved in the analysis and designing of Arch-cum-Gravity Mana Dam, Baluchistan using finite element technique .Was involved in the designing of under-sluices, skimming platform, Intake Structures, Culverts, Aqueducts and small hydel schemes. Worked on different structures of Warsak Dam Rehabilitation Project. Carried out remedial measures for Wadi Dayqah Dam Project Sultanate of Oman. Also reviewed analysis and design for critical sections with different material properties of Tunnel No. 3 for Tarbela Hydropower Station Project using 2-dimensional model including rock interaction, Inspection of Mangla Powerhouse generating units and Switch yards for up- gradation of the Mangla Power Station.
As Vice President, NESPAK (July, 2011 to June, 2013) carried out the planning, analysis and design of Office buildings, Parking facilities and Pedestrian Under passes. Also worked on review projects including Apartment Buildings and Pedestrian Overhead Bridges . Design of Pedestrian bridges for Lahore Ring Road Project was also carried out.
As General Manager, NESPAK (2006 to 2011) carried out the planning, analysis and design of Office buildings and Multi-storeyed Commercial Plazas. The major projects are 25-storey Commercial plaza with five basements, Nuclear Plant and Safety related Nuclear Structures and 120m high stack. Also worked on the Remedial measures/ rehabilitation of Supreme Court of Pakistan Registary Office Building Lahore and vetting of bridges for improvement/up-gradation of Karakorum highway Raikot-Khunjerab section.
As Chief Engineer, NESPAK (1999 to 2006) carried out the planning, analysis and design of Industrial buildings, underpass structures and extension of bridges. One of the major projects is the Karachi-Hyderabad Motorway. This involves condition survey, evaluation and rehabilitation/modification of bridges and other structures. Also worked on the Remedial measures/ rehabilitation of industrial and office buildings.
As Principal Engineer, NESPAK (1991 to 1999) carried out analysis and design of Barrage under sluices,500 KV Transmission line tower, PP-9 Thermal Power Plant Riyadh, Prestressed concrete sleepers, Multi-storeyed buildings, Precast prestressed concrete bridges, Design review of box girder cantilever bridges, Rehabilitation works of the powerhouse structure and preparation of Technical specifications of different projects.
As Senior Engineer, NESPAK (1981 to 1991) carried out the planning, analysis and design of Bridges, Culverts, Hydraulic structures, Office buildings, Hospital complexes, Industrial buildings, Tunnels, Arch-cum-gravity dam, Intake structures, Spillways, Elevated tanks, Small hydel scheme and Retrofitting of the buildings. Also prepared the Technical Specifications of different projects.
From 1977 to 1981 as a Junior Engineer, NESPAK , carried out the structural analysis and design of several bridges and reinforced concrete frame buildings.
As Design Engineer (1976 to 1977) with National Design and the Industrial Services Corporation carried out steel structures detailing and fabrication for Karachi Steel Mills project.
10. Academic Qualification
Name of Institution Year Degree/Diploma
Canadian Society for Civil 1984 Workshop on "Bridge and Highway /Institution of Engineering" Engineers, Pakistan
International Institute of 1983 Post-Graduate Diploma in Seismology and Earthquake Earthquake Engineering Engineering, Tsukuba, Japan
University of Engineering& 1976 B.Sc. Civil Engineering - Degree Technology, Lahore-Pakistan
University of Engineering & 1978 Courseon FORTRAN Programming Technology, Lahore-Pakistan & Computer Applications
11. Experience :
April 01, 2014 to date - Structural Design Expert
Berkeley Associates (Pvt.) Ltd. 316-D, OPF Housing Scheme, Raiwind Road, Lahore
- Reviews/ log study the data information on powerhouse
concrete outline and Excavation drawings. Preparatory work for preparation of construction drawings in hand.
July. 1999 to June. 2013 - V.P. / General Manager/ Chief Engineer
National Engineering Service Pakistan (Pvt.) Limited Lahore, Pakistan.
As a Vice President/ General Manager / Chief Engineer supervised and worked on the following Projects;
Analysis and design of Underground and Overhead Water Tanks to be constructed at Qurtaba City Islamabad was carried out. Bill of quantities along with tender and construction drawings were also prepared and issued for construction at site.
Analysis and design of Pedestrian Underpasses to be constructed at Kalma
Chowk, Ichra, and Canal-Wahdat Road Lahore was carried out along with the preparation of construction drawings.
Vetting of design of Pedestrian Bridges for Package 16 and 17 was carried out.
As per Clients recommendations super-structure of the bridges was replaced with Steel Trusses. Design of the same was carried out. Tender/Construction drawings including fabrication drawings were also prepared along with detailed bill of quantities and cost estimates.
Design review of Pedestrian Steel Bridge at Aamir Road, Lahore was carried out.
Necessary amendments in the design and drawings were made to suite the site conditions.
Design review of Country Club Apartments designed by Mushtaq and Bilal
Associates of Karachi was carried out. Feasibility of two additional floors constructed by the Client was also reviewed. Based upon the design vetting structural stability certificate was issued.
3-dimensional structural analysis/design of a 25 storeyed I.T.TOWER having 5
basements also including design of excavation support system for the basements.
Rehabilitation/Conservations of Supreme Court of Pakistan Registry Office Building at Lahore.
Rehabilitation/Remedial measure design of kiln foundation of Askari Cement Plant, WAH.
3-D analysis and design of 7 storey “Institute Building” and 6 Storey “Hostel and
VIP Suites” buildings of Pakistan Planning and Management Institute(PPMI) Islamabad.
▪ 5 Design of Academic Blocks, Student Hostels, Administration Block, Library Block,
Student Services Center, Apartments/Residences for staff and Residence for Vice Chancellor for University of Education Lahore.
Analysis and design of multi-storeyed building of NESPAK House Peshawar.
Analysis and design of Sewage Pumping Station, Sewage Lift Stations, Clarifier,
Oxidation Ditch, Waste Wash Water pump House, Grit Channels, Screening Chamber, Flow Distribution Chamber, Treated Effluent Storage Tank, Recycle and Waste Sludge Pump house, Administration Building, Sludge Drying Beds, Generator and Guard Rooms for Rehabilitation and up-gradation of Sewage Treatment Plant at Khasab-Sultanate of Oman.
Analysis and design of Sewage Pump Station for Sewage Network and Sewage
treatment plant at SUR-Sultanate of Oman.
Analysis and design of various blocks for University of Agriculture Faisalabad Faculty of Veterinary Science and Animal Husbandary at Paras-Faisalabad.
Analysis and design of Mazar of Hazrat Peeray Shah Ghazi, Mazar of Mian
Muhammad Buksh Sahib, Prayer Hall, Langer Khana and Sarai for Mazar at Khari Sharif.
Analysis and design of 6-Storeyed building for National Bank of Pakistan Mall
Road Branch Lahore.
Participated in the development of the Building Code of Pakistan-Seismic Provisions 2007.
Detailed Condition Survey for Hotel Inter-Continental Kabul, Afghanistan.
Analysis and design of 8-Storeyed Academic Block Building, 4-Storeyed
Apartment Buildings for Offices, Gymnasium, Over Head Water Tank(100,000 gallons), Boys/Girls Hostel for Services Institute of Medical Sciences (SIMS),Lahore.
Remodeling of Auditorium and Main Operation Theaters for Services Hospital
Lahore.
Analysis and design of Structural Steel Canopy of Toll Plaza at Okara By Pass.
3-D Analysis, design and detailed Engineering drawings of 8-Storeyed Structural Steel Cement Mill Building 1 and Cement Mill Building 2 for Mapple Leaf Cement Factory, 6700TPD Grey Cement Plant at Iskandarabad, District Mianwali.
3-dimensional time history dynamic and static analysis of KCP - Workshop
Building including soil structure interaction. Technical Specifications and preparation of detailed construction drawings along with bar bending schedules for KCP- workshop projects-Khushab.
3-D Analysis and design of 120 m high Stack and connected tunnel for safety
Related Nuclear Structure of KCP-workshops Khushab.
Analysis and design of extension of existing Stack from 80 m to 120 m for KCP-II Project Khushab.
Structural assessment of Assembly Plant roof structure damaged by fire for Millat
Tractors Limited Sheikhupura.
Design of overhead/underground Water Tank (200,000 gallons) for Safety Related Nuclear Structure of KCP-workshops Khushab.
Design Review of Addition of two Floors over old wing of Pearl Continental Hotel,
Lahore.
Remedial measure design for basement roof slab of Mazar-e-Qauid-e-Azam Karachi.
Design review of Main Pump House, Surge Vessels Drainage Shafts/Vent Shafts,
Valve Chamber and Terminal facilities of Hofuf Water Transmission System, Kingdom of Saudi Arabia.
Remedial measure design of 50-Bed Hospital at Said Mitha Bazar, Lahore.
Structural evaluation of 7-Storeyed existing structure of Associated House,
Lahore.
Rehabilitation measure for Babu-Sabu Pumping Station at Mian Mir Drain, Lahore.
Remedial measures design for Pre-Heater Tower of Fauji Cement Plant.
Design review and remedial measures of High Court Bench complex at Sibi, Baluchistan.
Planning, analysis, design and drawings for extension of existing bridges of Karachi - Hyderabad Motorway (M-9) also carried out condition survey of all the existing bridges and cross drainage works. Designed the rehabilitation, and up gradation of structures for 4-lane expressway to 6-lane motorway.
Analysis, design, drawings and technical specifications of Hattar Chemical’s Plant.
Design review of Control Building of Secondary Transmission Line and Grid
Station Project.
Design review of 25 MW KAMC Power Plant Extension - Tabuk, KSA.
Analysis and design of machine hall and Annex-Building of 14 MW power plant at Fatehjang.
Analysis, design and drawings of underpass at New Campus Canal Crossing
Lahore.
Design of Overhead Water tanks of 300m3 and 600m3 for water supply Schemes to Shinas and Liwa Towns Muscat, Sultanate of Oman.
▪ Also worked as Project Manager for some of the Projects.
1991 to 1999 - Principal Engineer (Structures) National Engineering Service Pakistan (Pvt.) Limited Lahore, Pakistan.
As Principal Engineer supervised and worked on the following projects:
Worked on the remedial measures of the Kiln Foundations, Grey and White Cement slurry silos of Mapple Leaf Cement Factory.
Worked on different structures of Warsak Dam Rehabilitation Project. The work
consists of Powerhouse roof repairs, Alignment of powerhouse crane rails, Powerhouse structural system, and Substructure anchorage, Repairs to Draft tube, Spillways and Intake structures.
Planning, analysis, design and review of design of Turbine and workshop building
foundations and various equipment foundations of Riyadh Power Plant (PP-9) Saudi Arabia.
Preparation of shop drawings for Directorate of Antiquities and Multi-media
center building of King Abdul-Aziz Historical Center, Riyadh Saudi Arabia.
Analysis, design and preparation of Punjab Workers Welfare Board's School Buildings at Gujranwala.
Vetting of design and drawings of cast in situ prestressed concrete box girder cantilever bridges over river Jhelum at Kohala and Karote.
Vetting of design of precast prestressed concrete bridge at GarhiHabibUllah.
Design of precast prestressed concrete bridges over link canals, distributaries and
drains of Pakistan Motorway Project (Sheikhupura - Multan - D.G. Khan Section).
Worked on the design, drawings and technical specifications of the Korle Lagoon Ecological Restoration Project Accra-Ghana
Review analysis and design of 500 KV Guddu-Multan Transmission line
suspension type tower.
Analysis and design of Undersluices of barrage structure of Ghazi-Barotha hydel power project.
Vetting and design review of Pre-stressed concrete sleepers for 1 in 16 turnouts
for Pakistan Railways. 1981 to 1991 - Senior Engineer
National Engineering Service Pakistan (Pvt.) Limited Lahore, Pakistan.
Responsible for planning, analysis and structural design of the following projects:
3-dimensional time history dynamic and static analysis of the buildings and
design of remedial measures of Bolan Medical Complex Project, Quetta, Pakistan using computer programs SAP IV & SAP V developed by University of California Berkeley, U.S.A. The cost of the project was U.S. $ 29.3 million.
Analysis, design and preparation of construction drawings of precast, prestressed
girder, highway and freeway bridges and aqueduct structures of Euphrates East Drain Project, Iraq, costing U.S. $ 600 million.
3-dimensional analysis of Arch-cum-Gravity Mana Dam using finite element
technique. The Dam, located in Baluchistan, Pakistan, is more than 100 ft. high and is worth U.S. $ 2.34 million.
Analysis of the Turbo-Generator Building (using computer program SAP IV) of
Kundian Nuclear Complex Project (KNC-3), Pakistan, costing U.S. $ 600 million.
Review analysis and design for critical sections with different material properties of Tunnel No. 3 for Tarbela Hydropower Station Project. 2-dimensional model including rock interaction was run on computer using package program SAP V.
3-dimensional analysis and design of main pumping station supply pipe line Bi- furcation for transient pressure caused by water hammer of North Jazira Project, Iraq.
Remedial measure design of Nurse's and Doctor's Hostel for Bolan Medical
Complex.
Analysis, design, technical specification and preparation of construction drawings of R.C.C. bridges, aqueduct structures, water course crossings, fall structures and siphon of Fordwah Sadiqia Drainage project.
Analysis, design & preparation of detailed construction drawings for multi-storey
office building of Punjab Board of Technical Education. The structure consisted of multi-storeyed frames and waffle/flat slabs system.
Tender drawings and design of 12 storeyed building of State Life Insurance
Corporation at Faisalabad.
Analysis, design and preparation of detailed construction drawings of NESPAK House – Lahore. The structure consists of multi-storeyed frames with waffle slab for upper storeys and beam slab arrangement for basement roof.
Layout, analysis, design and preparation of tender and detailed construction drawings of precast prestressed concrete bridges for distributaries, drains and link canals of Pakistan Motorway Project (Sheikhupura - Multan - D.G. Khan Section).
Tender drawings and design of spillway and intake structure of Gandially Dam
project.
Structural analysis and design of various facilities for Development of Parks and Play Ground at Quetta project.
Analysis, design and preparation of detailed construction drawings for various
branches of Bank of Punjab project.
Analysis, design and drawings of various buildings such as Nurse's Hostel, Doctor's Hostel, Mosque, cafeteria and Residential Quarters of 50 Bed Hospital Complex, Project at Hub.
Technical specification and tender/detail design of Intake Tower, Clarifier, Filters,
Spillway Structure, Residential buildings & Mosque of AkraKaur Dam Project.
Analysis, design and preparation of drawings for Assembly Plant Building and Auxiliary structures of Millat Tractor's Extension works project.
"Updating of Seismic Code" for Quetta based on micro zoning of Quetta and practices in design.
1977 to 1981 - Junior Engineer
National Engineering Service Pakistan (Pvt.) Limited Lahore, Pakistan.
Participated in the analysis and design of the Main Plant Building & auxiliary
buildings of Kundian Nuclear Complex (KNC-2), Pakistan costing U.S. $ 40 million.
Design & supervision of preparation of construction drawings for R.C. and prestressed girder bridges of N.W.F.P., Pakistan. The cost of the project was U.S. $ 2.70 million.
Review of the design of Provincial Assembly Building at Quetta, Pakistan.
Analysis & design of prestressed concrete girder bridges of Al-Khabura Draiz
Road, Project, Oman costing U.S. $15 million.
Analysis & design of various R.C.C. framed residential & office buildings of Al- watba Township Project, Abu-Dhabi costing U.S $300 million.
12. Languages :
Urdu:
Read
Excellent
Write
Excellent
Speak
Excellent
English: Excellent Excellent Excellent
Curriculum Vitae
1. Name : Umar Maqsood
2. Name of the Firm : Berkeley Associates (Pvt.) Ltd.
3. Designation : Senior Engineer Structures
4. Date of Birth : January 01, 1992
5. Year with the Firm : 1.5 years
6. Nationality : Pakistani
7. PEC Registration / : Membership No.
Civil - 40791
8. Key Qualifications :
Practicing Professional engineer since 2008.
Defining Scope of Work Furnishing Technical and Financial Proposals Supervision of Field & Laboratory Testing Development of Computer Aided Designs and Drafts Planning and interpretation of Geotechnical Investigations
9. Academic Qualification :
Name of Institution Year Degree/Diploma
NICE-SCEE-NUST-
Islamabad
2014
BE Civil Engineering
Punjab College of Sciences (Lahore)
2010
F.Sc. Pre Engineering
Education Centre High
School
2008
Matric (Science)
10. Employment Record :
May 2015 to date - Structural Engineer
Berkeley Associates (Pvt.) Ltd. 316-D, OPF Housing Scheme, Raiwind Road, Lahore
1223 MW CCPP Balloki Pakistan
Patrind Hydropower Project
Sep. 2014 to May 2015 Lab Engineer
Structures Lab at NUST NUST Institute of Civil Engineering (NICE) at NUST Islamabad
Shuqaiq Steam Power Project, Shuqaiq – Kingdom of Saudi Arabia
Software Competency
MS Office Suite (Word, PowerPoint, Excel) AutoCAD SAFE Primavera P6 Micro Survey CAD Arc GIS MATLAB SAP-2000pro ETABS
11. Languages :
Urdu:
Read
Excellent
Write
Excellent
Speak
Excellent
English: Excellent Excellent Excellent
Curriculum Vitae
1. Name : Maheen Malik
2. Name of the Firm : Berkeley Associates (Pvt.) Ltd.
3. Proposed Designation : Public Health and Environmental Engineer
4. Date of Birth : November 28, 1989
5. Years with the Firm : Recently Joined
6. Nationality : Pakistani
7. PEC Registration No. : ENVIRO/200
8. Key Qualifications :
As an Environmental Engineer I have worked on various National and International projects for assessing their environmental Impact Assessment. Major scope of work includes preparing technical as well as financial proposals for environmental assignments, formulating environmental management and mitigation plans, devising approach and methodologies for social impact assessment, supervising laboratory testing of various water and waste water samples.
Successful application of numerical analysis for the study of sedimentation in the Kurram Tangi Reservoir.
Poster Publication of “Evaluation of Surface Water Quality Indicators with Socio-Economic Dynamics in the Egyptian Nile” in the European Geoscience Union Conference in 2016 in Vienna, Austria.
Completion of various national and international trainings organized by the World Bank, British Council, National University of Sciences and Technology and USAID.
9. Academic Qualification
Name of Institution Year Degree/Diploma
Technical University of Munich, Germany
2016 Masters in Environmental Engineering
National University of Sciences and Technology (NUST) H-12, Islamabad, Pakistan
2012 Bachelors in Environmental Engineering
University of Massachusetts, Donahue Institute, Amherst, United States of America
2011 Scholarship for the Study of Comparative Public Policy
Kinnaird College for Women Lahore, Pakistan
2008 Intermediate (High School)
Beaconhouse School System, Lahore, Pakistan
2006 O’Levels
10. Employment Record
February, 2017 to date - Public Health & Environmental Engineer
Berkeley Associates (Pvt.) Ltd. 316-D, OPF Housing Scheme, Raiwind Road, Lahore
Preparation of Brochure for the inclusion of various environmental
services.
Formulation of Financial and Technical Proposal for Environmental and Social Impact Assessment studies.
Development of the Environmental and Public Health Department.
July, 2012 to Feb. 2014 Junior Environmental Engineer
National Engineering Services Pakistan (Pvt.) Limited (NESPAK) 1-C Block -N, Model Town Extension, 54700 Lahore (Pakistan)
Preparation of Environmental & Social Assessment Reports.
Preparation of Financial and Technical Proposal for Environmental Impact Assessment studies.
Interpretation of Field and Laboratory Results for air, water and noise samples.
Coordination between NESPAK and other firms (JV) for successful completion of the Project.
Major Projects included Kurram Tangi Dam Project, Alborz Hydropower Project and Iran Pakistan Pipeline Project.
11. Languages :
Urdu:
Read
Excellent
Write
Excellent
Speak
Excellent
English:
German:
Excellent
Basic
Excellent
Basic
Excellent
Basic
Iftikhar Ahmad (IGC NEBOSH Certified, OSHA 30Hrs Construction Safety , BSc Chemical Engineer)
Birth Date: 11‐02‐1985
Email Address: [email protected] Nationality:
Pakistani
Cell: +923007953185
Astute professional with valuable experience managing Health, Safety & Environmental aspects. Apt in major
Safety Program, Work Permit system, Safety at Excavations, Scaffoldings, First Aid, Height work & PPE.
Skilled in all aspects of chemical engineering including process computer simulation, development,
equipment sizing and specification. Also have hands‐on experience in making sure that standards of quality
are met while production costs are kept as low as possible.
Areas of Expertise
Safety, Health & Environment
Drive a culture of “Safety and Health” by ensuring all appropriate actions are taken to implement HS&E procedures/checklist/SSOW/inspection forms and monitoring HS&E performance within area of responsibility for different construction projects.
Review and creation of Job Hazard Analysis (JHA) and Work Method Statements.
Ensuring training to the staff in adherence to HS&E standards and procedures.
Service Delivery
Delivering HS&E training so that all staff is aware of their HS&E obligations.
Acting as an internal coach and advisor to Business Unit, project and subcontractor employees.
Ensuring accurate and up to date documentation and information relating to HS&E issues and training is collected, reported, disseminated and stored in project files.
Monitoring Client Health, Safety and Environment requirements.
Standards / Compliance
Keeping abreast of HS&E legislation, best practices and leveraging to facilitate HS&E practices on the project.
Development of HS&E standards and processes to ensure the Project(s) is in compliance with regulatory and governance requirements.
Monitoring and conducting regular compliance checks and audits within the project sites:
reporting breaches, issuing non compliance reports, recommending remedial actions and
follow‐up to ensure timely closeout.
Iftikhar Ahmad email: [email protected] mobile: (+92) 3007953185
PROFESSIONAL CONTOUR
Berkeley Associates (Pvt.) Ltd ( 27 JULY 2015 To Date) Client :Unilever Pakistan Ltd .
Project: Installation of Iconic Super Structure at Surf Excel Plant Sheikhupura Lahore Pakistan
Currently I am working as a HSE Engineer in Berkeley Associates (Pvt.) Ltd for the erection of Iconic super structure at Surf Excel Plant Unilever Pakistan Ltd.
I am responsible to monitor all work related activities including structure fabrication, sand
blastring and painting of structure, scaffolding erection and inspection, work at height,
crane operation, hot work (Welding , cutting , grinding). My responsibilities also include
PTW issuance, compliance of PTW as per Unilever Standards’ development of SSOW, deliver
TBTs and conduct site safety inspections with client .
HS&E Team Leader Matrix Engg Ltd ( April 2015 to July 2015)
Client: Procter and Gamble Ltd Karachi Pakistan
Project: CI8(Expansion and modification of Arial Plant)
Third Party: TUV
Currently I Have worked as a HS&E team leader in Matrix Engg Ltd for the modification of existing Arial Plant at P&G Port Qasim Karachi Pakistan for 4 months.
Core responsibilities include
Development & monitoring of HSE Managment System
Development of company technical safety (i.e., process safety, asset integrity)
documentation.
Participating in HSE studies/reviews i.e., QRAs, EIAs, , HAZID, HAZOP, Project HSSE Reviews Ensure monitoring and audit of HSE performance standards & their management
Develops & maintains the HSE performance reporting system & mechanisms for reporting
on HSE performance .
Maintains & further refines the process for HSE performance review to enhance & support implementation of HSE Management System
Review and input to the development and maintenance of COMAH reports and HSE Impact Assessments (HSEIA) for Major Hazard sites.
Ensuring process safety principles and best practices are implemented early in the design
phase and carried through to facility completion and operation.
Construction Projects Senior HSE Engineer,Albahr Alarabi Marine & Engineering Services
Hamriyah Free Zone Sharjah ,UAE ,August 2014 to April 2015 .
I have worked in Albahr Alarabi Marine and Engineering Services as a HSE Engineer for about 9 months as projects monitored by me as a HSE Engineer completed .
Projects being supervised regarding HSE
As HSE Engineer monitored and controlled all activities involved in Construction of
emergency block of Khalipha Hospital at Ajman UAE with complete safety compliance as
per UAE laws. Iftikhar Ahmad email: [email protected] mobile: (+92) 3007953185
Construction of 12 Nos. storage tanks foundations, office building construction (G+4), dike
wall, boundary wall, industrial flooring and inter lock work in Green Spring Energy LLC.
Hamriyah Free Zone, Sharjah.
Office Building construction , 8Nos. storatge tanks foundation , dike wall, boundary wall and interlock work at Sharjah National Lube Oils CompanY Ltd LLC. (Sharlu) Sharjah HFZ.
Monitoring of construction work of pump room , office block (G+5) 12 Nos . tanks foundations, dike wall ,boundary wall , industrial flooring , interlock work, weigh bridge construction and fabrication of 12 new storage tanks ( Dia:Height 19.5 : 22 m) at NT Petroleum Ltd Sharjah HFZ.
During excvavation work for under ground pipelines of NT Petroleum along road side
monitoring the all work related activities such as heavy lifting , deep excavation barrication
and risk assesments and road safety.
Risk assessment of a project of fabrication of 6 storage tanks and office block construction (G +4) boundary wall, dike wall and interlock work at Gulf Petroleum Sharjah, HFZ.
Construction of 14 Nos storage tks at ARZOO Energy International Hamriyah Free Zone Sharjah UAE.
Responsible to monitor all the activities such as crane lifting operation, work at height,
Monitoring of scaffolding erection and scaffolding inspection , site safety inspections , safety
surveys, housekeeping, risk assessments, fire safety and trainings about fire fighting to
workforce as all the projects are in oil and gas sector
Senior HSE Process Engineer, Century Paper and Board Mills Limited, Pakistan, January 4, 2010 to July 2014.
Key responsibilities include:
New system installations, process optimizations, process safety & trainings were the key
responsibilities .
During working at Stock Preparation Plant, I was dealing with plant operation, optimization
and trouble shootings about the bottlenecks. I was responsible for the smooth plant
operation using Distributed Control System.
Attending all process safety reviews as necessary and making sure that all agreed recommendations were adhered to.
Estimating production cost reports for senior managers.
Involved in researching ways to develop new and improved chemical manufacturing
processes.
Participating in incident investigations. Preparing plant layout, equipment list, capital cost estimate and operating cost estimate.
Developing process chemistry.
Also responsible for safe operations and inspection of air compressors and Boilers.
Trained workers for evacuation drill during emergencies.
Undertaking regular inspections of site, plant and machinery.
Monitor the effectiveness of existing safety standards.
Accident investigation and reporting to higher managements.
Preparation of weekly, monthly safety reports.
Inspection and positioning of portable fire extinguishers.
Minimization of hazardous wastes, its effective management to protect environment.
Health and hygiene of all employees such as washing / drinking and toilet facilities. out risk assessments for chlorine gas handling at Sodium Hypo Chlorite production Plant.
Iftikhar Ahmad email: [email protected] mobile: (+92) 3007953185
Development of emergency procedures to deal with the leakages of Chlorine gas.
TECHNICAL TRAININGS AND MANAGERIAL SKILLS
A training program on Management systems (ISO 9001:208, ISO 14001:2004, OHSAS 18001:2007) – Auditing Techniques at CPBM by ACS Registrars in April 2012.
A training program on QHSE Introduction & Internal Auditing at Century Paper & Board Mills in January 2011 .
A workshop on Basic Managerial Skills for First Line Managers at CPBM in May 2010.
EDUCATION
B.Sc [Chemical Engineering], [University of Punjab], [2005‐2009]
NEBOSH International General Certificate in Occupational Safety & Health (SHIELD UK) –
2014.
OSHA 30 Hrs Construction Safety ‐2015.
PERSONAL DOSSIER
Permanent Address : Bunga Kharak Singh Tehsil & District – Okara Pakistan .
Languages : English, Urdu, Punjabi, Saraiki
Marital Status : Un‐married
Passport No. : BT1161991
Iftikhar Ahmad email: [email protected] mobile: (+92) 3007953185
Registration
Registration
Berkeley Associates
Berkeley Associates
Registration
Details https://e.fbr.gov.pk/Registration/searchDetail.aspx?rand=0.893128141...
Taxpayer Online Verification
Date : 22-03-2017
Time : 14:35:45
NTN/FTN 4446209-3 Category COMPANY
Name BERKELEY ASSOCIATES (PRIVATE) LIMITED
CNIC/PP/REG/INC No. 0094613
House/Flat/Plot No. --- Street/Lane ---
Block/Sector/Road --- City ---
Principal Business Activity SALARY INCOME
Business Nature
Registered For INCOME TAX w.e.f 03-Sep-2015
Income Tax office CORPORATE RTO LAHORE
Print Back
1 of 1 3/22/2017 2:36 PM
Quality and Safety Policy
Quality and Safety Policy