company presentation nidays 2011
DESCRIPTION
Overview of products and services at NIDays 2011TRANSCRIPT
![Page 1: Company presentation NIDays 2011](https://reader035.vdocuments.site/reader035/viewer/2022062617/54c3a23d4a7959096d8b4623/html5/thumbnails/1.jpg)
Engineering the future
Why do you not innovate
What is holding you back to innovate?
![Page 2: Company presentation NIDays 2011](https://reader035.vdocuments.site/reader035/viewer/2022062617/54c3a23d4a7959096d8b4623/html5/thumbnails/2.jpg)
Engineering the future
Short on ideas?
Short on ideas?
![Page 3: Company presentation NIDays 2011](https://reader035.vdocuments.site/reader035/viewer/2022062617/54c3a23d4a7959096d8b4623/html5/thumbnails/3.jpg)
Engineering the future
Short on expertise or resources?
Short on expertise or resources?
![Page 4: Company presentation NIDays 2011](https://reader035.vdocuments.site/reader035/viewer/2022062617/54c3a23d4a7959096d8b4623/html5/thumbnails/4.jpg)
Engineering the future
Short on budget?
Short on budget?
![Page 5: Company presentation NIDays 2011](https://reader035.vdocuments.site/reader035/viewer/2022062617/54c3a23d4a7959096d8b4623/html5/thumbnails/5.jpg)
Engineering the future
We can helpWe can help...
![Page 6: Company presentation NIDays 2011](https://reader035.vdocuments.site/reader035/viewer/2022062617/54c3a23d4a7959096d8b4623/html5/thumbnails/6.jpg)
Engineering the future
Our open innovation approach
• Expertise in measurement & control technology
• Large network of potential technology partners
• Help you to reduce project cost:– Subsidies– Risk-sharing– Outsourcing
![Page 7: Company presentation NIDays 2011](https://reader035.vdocuments.site/reader035/viewer/2022062617/54c3a23d4a7959096d8b4623/html5/thumbnails/7.jpg)
Engineering the future
Open innovation
• Each party focuses on their own core competence
• Advantages:– Each project task can be executed by an
expert => no long learning trajectories– Risk-sharing & cost reduction– Allows small companies to initiate
ambitious innovation projects
![Page 8: Company presentation NIDays 2011](https://reader035.vdocuments.site/reader035/viewer/2022062617/54c3a23d4a7959096d8b4623/html5/thumbnails/8.jpg)
Engineering the future
Our activities
• Contract R&D for machine manufacturersFrom project definition and funding to design and implementation of a solution
• Design and realization of custom measurement systems and test benches
• Measurement services
![Page 9: Company presentation NIDays 2011](https://reader035.vdocuments.site/reader035/viewer/2022062617/54c3a23d4a7959096d8b4623/html5/thumbnails/9.jpg)
Engineering the future
![Page 10: Company presentation NIDays 2011](https://reader035.vdocuments.site/reader035/viewer/2022062617/54c3a23d4a7959096d8b4623/html5/thumbnails/10.jpg)
Engineering the future
Increase quality, reduce cost
• Measurement services– Selection and rental of sensors– Rental of measurement set-ups, including
software– Design and execution of measurement
campaigns– Data analysis & processing
![Page 11: Company presentation NIDays 2011](https://reader035.vdocuments.site/reader035/viewer/2022062617/54c3a23d4a7959096d8b4623/html5/thumbnails/11.jpg)
Engineering the future
INDUCT front-ends
• Eliminate wire cluttering• Allow for a swift and easy connection of sensors• Shielding for high signal quality
![Page 12: Company presentation NIDays 2011](https://reader035.vdocuments.site/reader035/viewer/2022062617/54c3a23d4a7959096d8b4623/html5/thumbnails/12.jpg)
Engineering the future
INDUCT front-ends
The front-ends are easily stackable for use in larger measurement set-ups.
![Page 13: Company presentation NIDays 2011](https://reader035.vdocuments.site/reader035/viewer/2022062617/54c3a23d4a7959096d8b4623/html5/thumbnails/13.jpg)
Engineering the future
INDUCT front-ends
The front-ends can be easily configured with jumpers and switches
![Page 14: Company presentation NIDays 2011](https://reader035.vdocuments.site/reader035/viewer/2022062617/54c3a23d4a7959096d8b4623/html5/thumbnails/14.jpg)
Engineering the future
Front-end specifications
• up to three power supplies selectable per connector• direct connection of the sensor with shielded connectors• pull-up and pull-down selectable per channel• conversion from current to voltage per channel• differential or single-ended measurements• compatible with a wide range of NI data acquisition cards
![Page 15: Company presentation NIDays 2011](https://reader035.vdocuments.site/reader035/viewer/2022062617/54c3a23d4a7959096d8b4623/html5/thumbnails/15.jpg)
Engineering the future
for solutions that stand out
INDUCT, your R&D partner