Gettysburg Energy & Nutrient Recovery Facility

Lessons from the Front Lines ofManure‐to‐Energy Project Development

Presented by Patrick Thompson

President & CEO, EnergyWorks Groupwww.energyworks.com

Hunt Valley, MarylandSeptember 8, 2011

Page 2: Community Scale Patrick Thompson, Energy Works

Discussion Outline

• The Farm Host• Business As Usual• Gettysburg ENRF Highlights• The Development Odyssey

– Long‐Term ELM Supply Agreement– Technology Selection & Tests– Nutrient Credit Generator Certification– Permitting– Off‐take Agreements– Financing

• Lessons Learned• Policy Recommendations

Page 3: Community Scale Patrick Thompson, Energy Works

The Farm Host

Layer Site 2

Feed Mill

Pullet Site 1

Layer Site 3

Layer Site 5

GENRF

Layer Site 1

Pullet Site 2

• Pennsylvania’s largest egg laying complex• Currently expanding to 5 million layer hens• State‐of‐the art facilities• Owned & operated by Hillandale Farms

Page 4: Community Scale Patrick Thompson, Energy Works

Typical Manure Storage Barn

240 tons of egg layer manure collected from storage barns daily

The Farm Host

Page 5: Community Scale Patrick Thompson, Energy Works

Business As Usual

PA  Lower W. Susquehanna

MD Upper Potomac

PA Upper Potomac

MD Upper W. Shore

MD Patapsco/Back

MD Patuxent

MD Lower E. Shore

Manure is currently exported to tributary basins in Pennsylvania & Maryland for land application

Page 6: Community Scale Patrick Thompson, Energy Works

Gettysburg ENRF HighlightsFully enclosed process, LEED Certified, 30‐year design life

• 3.24 MWe Generator Output• 35 Tons/Day Mineral Product• Over 1 Million Nitrogen Credits/year• Over 53 Thousand Phosphorus Credits/year• Begin Commercial Operation in October 2012

• Water for Process Use is Recovered from ELM Dehumidification

• Zero Liquid Discharge

Page 7: Community Scale Patrick Thompson, Energy Works

Nutrient Credit Generation• Eliminates non‐point source releases• Real‐time monitoring and 

management of nutrient mass flows

Exhaust

BiomassDelivery 1

Plant S

tack

MineralProducts

Credit Documentation

Energy & Nutrient Recovery Process

3

Environmental Credit Data Management System

Recycle

2

4

Page 8: Community Scale Patrick Thompson, Energy Works

ELM Supply Agreement

• Exclusive long‐term Buy/Sell Agreement• EnergyWorks is obligated to take the entire amount of manure produced by the Farm Host

• Parties are aligned through shared benefits• EnergyWorks develops, finances, builds, owns and operates the facility

• Time required for parties to reach signed term sheet: 18 months

Page 9: Community Scale Patrick Thompson, Energy Works

Technology Selection & Tests

• Demonstrated sustained gasification of ELM without adding secondary biomass

• Feedstock conditioning is critical to effective control of gasification process

• Obtained data for design, permitting and nutrient credit process certification

• Identified essential technical features for successful energy & nutrient recovery

• NTCs and Mineral Products found to have greater economic potential than energy (Energy is the byproduct!)

Page 10: Community Scale Patrick Thompson, Energy Works

Permitting

• Township amended its zoning ordinance to specify requirements for an Energy & Nutrient Recovery Facility

• The project obtained Pennsylvania’s first Air Quality Plan Approval for a gasification facility using manure as feedstock

• The project has experienced enthusiastic private and public support throughout the development process

• Total time from submittal first permit application to approvals: 12 months

Page 11: Community Scale Patrick Thompson, Energy Works

Nutrient Credit Generator Certification 

• Largest amount of annual credits for a single generator certified in Pennsylvania to date

• Certification is to be renewed every 5 years over the life of the facility

• The Pennsylvania Department of Environmental Protection used an innovative “Watershed Segment Mass Balance” approach to aggregate the regional water quality benefits

• Credits are certified for trading in both Susquehanna and Potomac Watersheds

• Time from submittal of application to receipt of Credit Generator Certification: 9 months

Page 12: Community Scale Patrick Thompson, Energy Works

Off‐Take Agreements • NTC Sales

– Market slow to develop; limited demand, price uncertainty– EnergyWorks recently announced an introductory offer sell one fourth of its 

annual credits for three years at $1.99/credit‐year

• Mineral Product Sales– Signed Letters of Intent obtained from several buyers– GRAS/FDA testing set to be completed in time for start of commercial ops.

• REC Sales

• GHG Credit Sales

• Electricity Sales– The facility will connect to a private distribution network owned by the Host– Facility will supply Farm Host and export excess power to the grid– Utility rules and jurisdictional boundaries have been an impediment

Page 13: Community Scale Patrick Thompson, Energy Works

Grid Access Challenges

Layer Site 2

Feed Mill

Pullet Site 1

Layer Site 3

Layer Site 5

GENRF

Layer Site 1

Pullet Site 2

Net MeteringInterconnection

Met‐Edison Co.  Adams Electric

• Both utilities prohibit the ENRF from providing service to both sides of the jurisdictional divide

• A diesel generator was added to eliminate concern over backfeed of power across the divide

• As a rural co‐op, Adams is exempt from the state’s net  metering rules

• Met‐Ed has agreed that the generation facility can qualify as a Customer Generator, even though it is located outside its service area

• Time to obtain interconnection agreement: TBD

Page 14: Community Scale Patrick Thompson, Energy Works

Financing• Pennsylvania Energy Development Authority (PEDA) Grant 

(Awarded October 2007)

• Commonwealth Financing Authority (CFA) loan under the Alternative Clean Energy (ACE) Program (Closed April 2011)

• Pennsylvania Infrastructure Investment Authority (PENNVEST) loan (Close scheduled for mid‐October)

• Commercial Bank bridge loan secured by Section 1603 ARRA Grant in lieu of tax credit (Close concurrent with PENNVEST)

• Equity investments by partners

• Time from start of development to financial close: 56 months

• Time from financial close to project completion: 12 months

Page 15: Community Scale Patrick Thompson, Energy Works

Lessons Learned• Ecosystems infrastructure solutions are cost effective and can provide 

predictable, long‐term and verifiable benefits

• The absence of a viable regional nutrient trading market is the greatest barrier to creation of technology‐based nutrient credit generators (ARRA funding fills the gap partly)

• Long‐term, low interest debt financing through a public agency such as PENNVEST is effective means to promote private ecosystem investments

• Community scale projects enable economies of scale and professional management necessary to ensure consistent performance 

• A community scale project creates significant social and economic benefit through jobs, investment and environmental improvement

• A new framework is needed to quantify environmental benefits from community scale infrastructure solutions (Farm BMPs are not adequate)

Page 16: Community Scale Patrick Thompson, Energy Works

Policy Recommendations• Establish uniform regional standards for certification of 

infrastructure‐based nutrient credit generators

• Establish public sources of long‐term, low interest debt financing for certified nutrient credit generator projects

• Establish uniform regional standards and rules for grid interconnection by nutrient generator facilities

• Provide support and incentives for nutrient recycling

• Initiate state or regional competitive solicitations for long‐term supply of certified nutrient credits

• Project Review Committee• Aggregation models• Measurement & Verification

• 10 year certifications• Credit banking• Credit reserves