© 2011 S&C Electric Company 1 IEEE PES Summer, 2011 Community Energy Storage Communicating with a Smart Utility Grid Don Berkowitz

Upload: others

Post on 21-Nov-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 1 IEEE PES Summer, 2011

Community Energy StorageCommunicating with a Smart Utility Grid

Don Berkowitz

Page 2: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 2 IEEE PES Summer, 2011

CES – A “Virtual” Power Plant

• 2 MW Storage-based• Substation-located

Communications• 2 MW Storage-based• Grid-edge

A distributed, storage based power plant…

Page 3: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 3 IEEE PES Summer, 2011

CES – A “Virtual” Power Plant

• Unlimited scalability – no financing• Cost-competitive within 1-2 years• Superior feature set• Limited energy storage• Barriers are regulatory and "mindset”

Page 4: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 4 IEEE PES Summer, 2011

Leveraging the Capabilities of Distributed Storage

• Risk-averse climate of electric distribution• Control system must leverage capabilities• Edge-of-the-grid capacity management• Balance/prioritizing multiple constraints • Improved service reliability

– Islanding– Reserve capacity for reconfiguration

Page 5: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 5 IEEE PES Summer, 2011

New Challenges in Distribution

• Distribution grid design – built for estimated growth• Electric vehicles – significant new load

– High non-linear demand while charging– Two cars per household– Multiple customers per transformer– Growth cannot be predicted

• Multiple cars per transformer already happening• Mindset-changing circumstances

Page 6: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 6 IEEE PES Summer, 2011

Feeder Capacity Management

“Overcapacity Zone”

• Assumptions gone wrong• Abnormal weather• Unexpected growth• Unanticipated technology (Ex. PEVs)

“Normal” or Planned Capacity

~400-640

~800-1000 A(minimum trip)

“Emergency” Cap.

Overload

Protection

“Continuous” Capacity

Current

Time

Page 7: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 7 IEEE PES Summer, 2011

Feeder Capacity Management

Underground Feeder – Cutaway View

Shielded Cable in Conduit Pavement

Sand/earth fillConcrete-lined duct

Page 8: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 8 IEEE PES Summer, 2011

Underground Feeder Capacity

• Thermal factors are complex• Variation over length of run

• Cable life is dominated by thermal history– Through-fault duty– Integrated time while “overcapacity”

Page 9: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 9 IEEE PES Summer, 2011

Underground Feeder Capacity

• Measurement tools• Modeling tools• Real-time capability

Page 10: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 10 IEEE PES Summer, 2011

CES – Distributed Energy Management

• Ability to address thermal capacity• Transformer overload• Phase-dependent issues

– Phase imbalance– Voltage support– Reactive power

Page 11: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 11 IEEE PES Summer, 2011

Control System Architecture - Challenges

• Distribution equipment communications … no

• Algorithms• Reliability• Integration with central office applications• Cyber Security

Page 12: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 12 IEEE PES Summer, 2011

Control System Architecture - Reliability

Substation-centric application

• Colocation with critical equipment• Reduction of NERC-level impacts• Cyber security isolation

Page 13: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 13 IEEE PES Summer, 2011

Reliability – Fault tolerance

Feeders & Communication Infrastructure

Operation Center

Substation 1 Substation 2 Substation 3…

Fleet 1Fleet 2

Fleet 3…

Page 14: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 14 IEEE PES Summer, 2011

Control System Architecture - Reliability

• Substation-hardened• Self-contained • Sized for individual substation• Protected from failures of comm.

backbone

Page 15: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 15 IEEE PES Summer, 2011

Control System Architecture

Integration with operation center & substation applications

• GIS• OMS• DMS/SCADA

– Circuit reconfiguration– Volt/VAR

Page 16: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 16 IEEE PES Summer, 2011

The Smart Grid CES™ Hub Control System

SCADA

DatabasesConfiguration

Real TimeHistorical

Connectivity

Hub GUI HMI

CES Hub(Dispatch Engine)

DNP Device Server

Substation DNP Devices

Wide Area Comm.

Page 17: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 17 IEEE PES Summer, 2011

The Smart Grid CES™ Hub Control System

Page 18: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 18 IEEE PES Summer, 2011

Control System Architecture

Database-driven design

• Oracle database• Secure• Interoperable

Page 19: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 19 IEEE PES Summer, 2011

Control System Architecture

DNP Device Server

• XML-configurable• Isolates applications • DNP-agile

Page 20: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 20 IEEE PES Summer, 2011

Control System Architecture

• Self-contained• Limited application

environment• Application whitelisting• Application blacklisting

• Isolated from the Internet• “Call-home” functions can’t• Intrusion protection• Intrusion detection• Single sign-on

Security… again…

… convenient and transparent

Page 21: Community Energy Storage - ieee-pes.org · S&C Electric Company 5 IEEE PES Summer, 2011. New Challenges in Distribution • Distribution grid design – built for estimated growth

© 2011 S&C Electric Company 21 IEEE PES Summer, 2011

Conclusion

• Scalability and adaptability uniquely address uncertainty• CES can be secure, reliable, cost-effective solution