commssioner ahmednagar municipal corporation,...
TRANSCRIPT
-1-
COMMSSIONER AHMEDNAGAR MUNICIPAL CORPORATION,
AHMEDNAGAR
B-1 TENDER
B-1 / For 2012-2013
Office of the
Commissioner
Ahmednagar Municipal Corporation
Ahmednagar
-2-
INDEX
Page No Sr.No. Description
From To
1 Cover Page 1 1
2 Index 2 2
3 Brief Tender Notice 3 6
4 Detailed Tender Notice 7 8
5
Detailed Tender Notice / Check Sheet /Earnest Money
i) Tendering Procedure
ii) Model form of bank Guarantee bond for security deposit
iii) Declaration of Contractor
9
12
16
19
11
15
18
19
6 Printed B-1 Agreement Form 20 58
7 Price Variation Clause 59 62
8 Schedule 'A' : For Building Work General 63 63
9 Additional Condition 64 64
10 Under Taking For Guarantee 65 65
11 General Condition 66 67
12 Special Condition Contract 68 70
13 Dataled Specifications 71 74
14 Acqaintance With Site Condition & Work 75 78
15 Affidavit 79 79
16 Schedule 'B' Of All Works 80 121
-3-
अहमदनगरअहमदनगरअहमदनगरअहमदनगर महानगरपािलकामहानगरपािलकामहानगरपािलकामहानगरपािलका,,,, अहमदनगरअहमदनगरअहमदनगरअहमदनगर
ईईईई---- िनिवदा िनिवदा िनिवदा िनिवदा बमांक बमांक बमांक बमांक :- 275 तेतेतेते 285/ सनसनसनसन ----2012201220122012----13131313 पाणी पुरवठा िवभाग / ई-िनिवदा जािहरात ब- िदनांक- /06/2012
मा.आयु(,,,,अहमदनगर महानगरपािलका हे खालील नमुद नागरी दिलत वःती नागरी दिलत वःती नागरी दिलत वःती नागरी दिलत वःती अंतग,तअंतग,तअंतग,तअंतग,त कामां- या ई ट/डर प1 दतीने खालीलूमाणे नमूद केले4 या कामांचा अनुभव आहे
अशा ठेकेदाराकडून B -1 िनिवदा माबिवत आहे. िनिवदे बाबत- या या 8 यितिर: त असले4 या अटी व शत; िनिवदा फॉम, म1 ये नमुद के4 या असुन िनिवदा फॉम, िवबी व
िनिवदा ूिबये बाबतचा तपिशल खालील ूमाणे.
ईईईई----िनिवदािनिवदािनिवदािनिवदा बबबब.... :::: 275275275275 तेततेेते 283283283283
Sr.No Envelopes Start Date & Time Expiry Date & Time
1 िनिवदा िवबी 08-06- 2012 15:01 15 -06-2012 15:00
2 ई िनिवदा तयार करणे 08-06- 2012 15:01 18 -06-2012 15:00
3 तांिऽक व 8यापारी िलफाफा ब Óद ूिबया 18 -06-2012 15:01 19 -06-2012 17:45
4 िनिवदा िःवकृती 19 -06-2012 17:46 20 -06 -2012 15:00
5 तांिऽक िलफाफा उघडणे 20 -06-2012 15:01 21 -06-2012 17:45
6 8यापारी िलफाफा उघडणे 21 -06-2012 17:46 22 -06-2012 15:00
ईईईई----िनिनिनिनिवदािवदािवदािवदा बबबब. : : : : 284284284284 ते ते ते ते 285285285285
Sr.No Envelopes Start Date & Time Expiry Date & Time
1 िनिवदा िवबी 08-06- 2012 15:01 22 -06-2012 15:00
2 ई िनिवदा तयार करणे 08 -06- 2012 15:01 25 -06-2012 15:00
3 तांिऽक व 8यापारी िलफाफा ब Óद ूिबया 25 -06-2012 15:01 26 -06-2012 17:45
4 िनिवदा िःवकृती 26 -06-2012 17:46 27 -06 -2012 15:00
5 तांिऽक िलफाफा उघडणे 27 -06-2012 15:01 28 -06-2012 17:45
6 8यापारी िलफाफा उघडणे 28 -06-2012 17:46 29 -06-2012 15:00
-4-
िनिवदा
बमांक
कामाचा तपिशल
कामाची िनिवदा
र:कम
िनिवदा संच
िकंमत( ना
परतावा)
बयाना
र:कम
कामाची
मुदत
1 2 3 4 5 6
पा. प.ुिव/ ई-
िनिवदा ब.275
/ 2012-2013
ू.ब.15 मधील सावेडी गावठाण दिलत वः ती येथील िभंगारिदवे घर ते संत तुकाराम
मंिदरापयMत 75 एमएम 8 यासाची व 63 एमएम 8 यासाची पी 8 ही सी पाईपलाईन
टाकण.े
33,826/- 500/- 350/- 2 मिहने
पा. प.ुिव/ ई-
िनिवदा ब.276
/ 2012-2013
ू.ब.49 मधील कोिहनूर अपाट,म/ट ते मेहतर कॉलनी अंतग,त 63 एमएम 8 यासाची
पी 8 ही सी व 80 एमएम 8 यासाची जी आय पाईप लाईन टाकणे.
58,185/- 500/- 600/- 2 मिहने
पा. प.ुिव/ ई-
िनिवदा ब.277
/ 2012-2013
ू.ब.23 अहीर गवळी झोपडपSटी मधील नगर औरंगाबाद रोड भैयया सेठ यांचे
दकानापासुन शेख अलमाश घरु , राजू पाटेवाले घर ते आमVचरवाले घरापासुन रः W या
पयMत 75 एमएम 8 यासाची पी 8 ही सी पाईप लाईन टाकणे
58,469/- 500/- 600/- 2 मिहने
पा. प.ुिव/ ई-
िनिवदा ब.278
/ 2012-2013
ू.ब.23 मधील तारकपुर येथील महारां श जीवन ूािधकारण कंपाउंड पासुन ते
रामवाडी साव,जिनक शौचालयापयMत 63 एमएम 8 यासाची पी 8 ही सी पाईप लाईन
टाकण.े
63,593/- 500/- 700/- 2 मिहने
पा. प.ुिव/ ई-
िनिवदा ब.279
/2012-2013
ू.ब.29 म1 ये ौी गोगादेव मंदीर ते माचवे यांचे घरापयMत 90 एमएम 8 यासाची
तसेच अंतग,त 63 एमएम 8 यासाची पी 8 ही सी पाईप लाईन टाकण.े
87,596/- 500/- 900/- 2 मिहने
पा. प.ुिव/ ई-
िनिवदा ब.280
/ 2012-2013
ू.ब.13 म1 ये गांधीनगर जवळील चौभे कॉलनी येथे 110 एमएम व 63 एमएम
8 यासाची पी 8 ही सी जलवािहनी टाकणे.
1,45,016/- 500/- 1,500/- 3 मिहने
पा. प.ुिव/ ई-
िनिवदा ब.281
/ 2012-2013
ू.ब.27 म1 ये बािलकाौम रोड भुतकरवाडी ूाथिमक शाळा ते बनकर घर ते महेश
कॉलनी ते पुंड जनरल ः टोअस, पयMत 150 एमएम 8 यासाची पी 8 ही सी पाईप लाईन
टाकण.े
1,99,199/- 500/- 2,000/- 3 मिहने
पा. प.ुिव/ ई-
िनिवदा ब.282
/ 2012-2013
ू.ब.50 म1 ये इंिदरानगर झोपडपSटी येथे 110 व 90 एमएम 8 यासाची पी 8 ही सी
पाईप लाईन टाकण.े
2,24,890/- 500/- 2,300/- 3 मिहने
पा. प.ुिव/ ई-
िनिवदा ब.283
/ 2012-2013
ू.ब.49 म1 ये इंिपिरयल हॉटेल चौक येथील िशवाजी पुतळयापासुन संमाम वाईन
पयMत 150 एमएम 8 यासाची पी 8 ही सी पाईप लाईन टाकण.े
4,30,425/- 500/- 4,400/- 4 मिहने
-5-
पा. प.ुिव/ ई-
िनिवदा ब.284
/ 2012-2013
ू.ब.55 म1 य ेरे4 वे ः टेशन पिरसर गावडे घर हैदर आखाडा ते िफरोज घरापयMत 100
एमएम 8 यासाची जी आय पाईप लाईन टाकणे.
6,24,941/- 500/- 6,300/- 4 मिहने
पा. प.ुिव/ ई-
िनिवदा ब.285
/ 2012-2013
ू.ब.55 पंचशीलवाडी अंतग,त भागात हनुमान मंदीर ते सरोदे घर ते जाधव घरापयMत
100 एमएम 8 यासाची जी आय पाईप लाईन टाकणे
8,91,178/- 500/- 9,000/- 4 मिहने
अटीअटीअटीअटी - शत;शत;शत;शत; 1111) सदर कामाबाबत िनिवदा अटी शत; इ बाबतचा सव, तपशील िनिवदा संचाम1य ेव जािहर ट/डर नोटीसम1ये नमुद केलेला असुन िनिवदा संच ऑनलाईन पहावयास उपल_ध आहे.
2222) सदर कामाची िनिवदा संच खरेदी िकंमत व बयाना र:कम ःवतंऽपण ेरा`ीयकृत अथवा अनुसुिचत (शेडयुल) बकॅेचे िडमांड साcटdारे मनपाचे AXIS BANK येथेयेथेयेथेयेथे असलेलेअसलेलेअसलेलेअसलेले " E- TENDER DEPOSIT
FUND AHMEDNAGAR MUNICIPAL CORPORATION" A/C NO. 911020011270125 यायायाया खाWयावरखाWयावरखाWयावरखाWयावर भरणेकामीभरणेकामीभरणेकामीभरणेकामी बकॅिःलपबकॅिःलपबकॅिःलपबकॅिःलप म1येम1येम1येम1ये दोeहीदोeहीदोeहीदोeही
बाजुलाबाजुलाबाजुलाबाजुला (Customer Copy and Bank Copy) डीमांडडीमांडडीमांडडीमांड साfटसाfटसाfटसाfट बमांकबमांकबमांकबमांक,,,,बकॅेचेबकॅेचेबकॅेचेबकॅेचे नांवनांवनांवनांव वववव उपरो(उपरो(उपरो(उपरो( िनिवदािनिवदािनिवदािनिवदा बमांकबमांकबमांकबमांक सिवःतरसिवःतरसिवःतरसिवःतर िलहावािलहावािलहावािलहावा.... िनिवदा संच खरेदी िकंमती-या DD ची Scan Copy कgन
amc_anr@rediffmail .com या E-mail Address वर E-mail करावा व नंतरच िनिवदा संच खरेदी करhयात यावा.तसेच बयाणा र:कम DD ची Scan Copy कgन amc_anr@rediffmail .com या E-mail
Address वर E-mail करावा.
3333) िनिवदा संचाची िवबी http://amc.maharashtra.etenders.in या वेबसाईटवgन फ( ऑनलाईन चालु आहे.
4444) वरील वेबसाईट वgन िनिवदाम1ये सहभागी होhयासाठी बेबसाईटवर युजर आयडी व पासवड, बनिवणे बंधनकारक आहे.यासाठी िकंवा ई-िनिवदा बाबत माग,दश,नासाठी 020 - 2531 5555/56-022-
26611117(Ext25/26)- 91679 69601 / 04 / 14 तसेच िवभाग िवभाग िवभाग िवभाग ूूूूमुख मुख मुख मुख मोबाईमोबाईमोबाईमोबाईल ल ल ल बबबब. . . . 9561004656 9561004656 9561004656 9561004656 या बामांकावर संपक, करावा.
5555) वरील िनिवदा सादरीकरण /िःवकृती फ( ऑनलाईन प1दतीन ेकरhयात येईल.पेटी प1दत पुण,पण ेबंद करhयात आली आहे.
6666) िनिवदा सादरीकरण हे दोन पाकीट प1दतीने(Technical व Commercial bid) करण ेआवँयक आहे.
7777) िसलबिसलबिसलबिसलबÓदददद ü तािऽकतािऽकतािऽकतािऽक िलफाफा िलफाफा िलफाफा िलफाफा बबबब . 1 म1य ेपुढील कागदपऽे जोडण ेआवँ यक आहे.
अअअअ) इनकम टकॅ ्स व सेल टकॅ ्स ूमाण पऽ ूत मागील 3333 वषा,चे
बबबब) बयाणा रक ्कम भरले बाबतचा तपिशल ऑनलाईन िनिवदा सादर करतांना मनपा-या बकॅ खाWयाम1ये जमा केलेले िडमांड साfटची छायांकीत ूत (झेरॉ:स) व बकॅ मोहर असलेली िःलप ःकॅिनंग
कgन िनिवदा िःवकृती-या वेळेम1ये ऑनलाईन अपलोड टे:नीकल डो:युम/ट या बटनाचा वापर कgन जोडणे बंधनकारक आहे .िनिवदा उघड4यानंतर संबंिधत िवभागाकडे बयाना र:कम िडमांड साफdारे
बकॅ खाWयाम1ये जमा के4याची िनिवदा धारकाकडील पावती (Counter Slip) जमा करhयात यावी.
कककक) मािगल 5555 वषा,त हाती घेतले4या व पुण, केले4या कामा-या िकंमतीसह मािहतीची कागद पऽे
डडडड) मागील 5555 वषा,म1ये समकo कामे केले4या कामांची यादी
ई)))) तािऽक िलफाफा ब. 1 म1ये जोडले4या कागदपऽां-या सWयतेबाबत िनिवदे म1ये िदले4या नमुhयात तसेच संबंधीत
ठेकेदार कोणW याही शासकीय / िनमशासकीय संः थेकडुन काळया यादीत टाकh यात आलेला नाही याबाबतचे g.100/- -या ःटpॅप पेपरवर मा.तहिसलदार / नोटरी पि_लक यांचे कडील
ूितqा पऽ जोडणे आवँ यक आहे.
िसलबंदिसलबंदिसलबंदिसलबंद दराचादराचादराचादराचा िलफाफािलफाफािलफाफािलफाफा बबबब 2222 म1ये संबंधीत ठेकेदाराने िनिवदा संचामधील Tender for Works वर दर नमुद कgन ः वाoरीसह सोबत जोडणे आवँ यक आहे....
8) अटीय:ु त िनिवदा िवचारात घेतली जाणार नाही
9999) यशःवी ठेकेदारास योrय िकंमती-या ःटpॅप पेपरवर करारनामा कgन sावा लागेल.
10000) यशःवी ठेकेदारास कामगार िवमा काया,रंभ आदेश पुव; सादर करावा लागेल.
-6-
11111) यशःवी ठेकेदारास कामापोटी 2222....5555% (ट:के) अनामत र:कम रोखीन ेभरावी लागेल िकंवा काया,रंभ आदेश पुव; सेि8हंग बकॅ िडपॉिझट ग8हर,म/ट ूॉिमसरी नोटस िकंवा नशॅनल सेि8हंग सटtिफकेट अथवा
एफ.िड.आर. ःवgपाम1ये महानगरपािलके-या नाव ेकgन िदले4या अस4यास िःवकारhयात येईल.व उव,रीत र:कम िबलातुन वसुल करhयात येईल.
12222) कुठलेही साहीWय मटेरीयल महानगरपािलका पुरिवणार नाही.
13333) वरील कामासाठी वापरhयात येणारे साहीWय (मटेरीयल) योrय अस4याबाबतचा शासकीय ूयोगशाळेकडील तपासणी अहवाल ठेकेदाराने ःवखचा,ने महानगरपािलकेकडे सादर करण ेबंधनकारक आहे .सव,
साहीWय भारतीय रःत ेमाणकाूमाण ेअसण ेआवँयक आहे.
14444) ट/डर मधील दर ट/डर उघडलेपासुन 111120000 िदवस माu राहतील
15555) िनिवदा िवबी-या शेवट-या िदवशी संच ूाv न झा4यास व िःवकृती -या शेवट-या िदवशी ऑन लाईन सादरीकरण न झा4यास Wयाची सव,ःवी जबाबदारी िनिवदा धारकाची राहील.
16666) ऑनलाईन िनिवदा ूिबयासाठी िनिवदाकाराने िडजीटल ःवाoरीचा ( DIGITAL SIGNATURE KEY ) वापर करावा तसेच
DIGITAL SIGNATURE KEY उपल_ध कgन घेhयाची सव,ःवी जबाबदारी सबँिधत िनिवदा धारकाची राहील.
18888) िनिवदा उघडhया-या अखेर-या िदवशी काया,लयीन सुSटी अस4यास िनिवदा पुढील काया,लयीन िदनांकास उघडhयात येईल....
19191919) िनिध उपल_ धतेनुसार देयक अदा करh यात यईेल.
20000) कोणतीही िनिवदा ःवीकारणे,,,,नाकारण ेअथवा रx करण ेयाबाबतचे अंितम अिधकार मा.आयु(,,,,अहमदनगर महानगरपािलका यांना राहतील
आयु(
अहमदनगर महानगरपािलका
-7-
DETAILS TENDER NOTICE TO CONTRACTOR
Tenders in B-1 Form on Department’s design are invited for the following work, from Commissioner, Ahmednagar Municipal
Corporation, Ahmednagar invites sealed tenders under Nagari Dalit Vasti Scheme as per the rules & regulations in the tender form Set will be
received online only at http://amc.maharashtra.etenders.in payment of cost of each Tender Form as mentioned below.
Tender
No.
Name of The Work
Estimated
Cost of
work
Cost of
each
Tender
Form
Earnest
Money
Security
Deposit
2.5%
Deposit to
be
deducted
From Bills
2.5%
Time limit
for
Completion
of work
Defect
liability
period
Validity
Period Of
Tender
After
Oppening
The Tender
1 2 3 4 5 6 7 8 9 10 Water
Suply
Sect./
E -Tender
No. 275 /
2012-2013
Providing and Lowering laying 75
and 63 mm dia P.V.C. line at savedi
gaothan dalitwasti from Bhingardive
mala house to saint Tukaram Temple,
33,826/- 500/- 350/-
846/-
846/- 2 Months 24
Months 120 Days
Water
Suply
Sect./
E -Tender
No. 276 /
2012-2013
Providing and Lowering laying 63 mm
dia P.V.C. and 80 mm dia G.I. pipe
line from Kohinoor Apartment to
Mehtar Colony In Ward No. 49,
Ahmeadnagar
58,185/- 500/- 600/- 1,455/- 1,455/- 2 Months 24
Months 120 Days
Water
Suply
Sect./
E -Tender
No. 277 /
2012-2013
Providing and Lowering laying 75 mm
dia P.V.C. line at kothala,Aher galli
zopadpatti internal in ward no.23 ,
Ahmeadnagar
58,469/- 500/- 600/- 1,462/- 1,462/- 2 Months 24
Months 120 Days
Water
Suply
Sect./
E -Tender
No. 278 /
2012-2013
Providing and Lowering laying 63 mm
dia P.V.C. line in from MJP-Tarkapur
compound to ramwadi akolkar house
inward no.23 , Ahmeadnagar
63,593/- 500/- 700/- 2,190/- 2,190/- 2 Months 24
Months 120 Days
Water
Suply
Sect./
E -Tender
No. 279 /
2012-2013
Providing and Lowering laying 63 mm
dia P.V.C. and 80 mm dia G.I. pipe
line from Kohinoor Apartment to
Mehtar Colony In Ward No. 49,
Ahmeadnagar
87,596/- 500/- 900/- 2,190/- 2,190/- 2 Months 24
Months 120 Days
-8-
Water
Suply
Sect./
E -Tender
No. 280 /
2012-2013
Providing and Lowering laying 110 &
75 mm dia P.V.C. line in Gandhinagar
Chobhe Colony In Ward No. 13,
Ahmeadnagar
1,45,016/- 500/- 1,500/- 3,626/- 3,626/- 3 Months 24
Months 120 Days
Water
Suply
Sect./
E -Tender
No. 281 /
2012-2013
Providing and Lowering laying 160
mm dia P.V.C. line at balikashram
road from bhutkarwadi ZP school at
bhingardiwemala in inward no.27 ,
Ahmeadnagar
1,99,199/- 500/- 2,000/- 4,980/- 4,980/- 3 Months 24
Months 120 Days
Water
Suply
Sect./
E -Tender
No. 282 /
2012-2013
Providing Lowering and laying 100
mm and 90 mm dia P.V.C. pipe line
for internal lanes in Indira nagar, In
Ward No. 50, Ahmeadnagar
2,24,890/- 500/- 2,300/- 5,622/- 5,622/- 3 Months 24
Months 120 Days
Water
Suply
Sect./
E -Tender
No. 283 /
2012-2013
Providing and Lowering laying 160
mm dia P.V.C. pipe line from Shivaji
Status at Imperial Chowk to Sangram
Wines In Ward No. 49, Ahmeadnagar
4,30,425/- 500/- 4,400/- 10,761/- 10,761/- 4 Months 24
Months 120 Days
Water
Suply
Sect./
E -Tender
No. 284 /
2012-2013
Providing and laying 100 mm dia G.I.
pipe line at Ward No. 55, at in Slum
Area From Gavade House to Haidar
Akhada to Fairoz House,
Ahmeadnagar.
6,24,941/- 500/- 6,300/- 15,624/- 15,624/- 4 Months 24
Months 120 Days
Water
Suply
Sect./
E -Tender
No. 285 /
2012-2013
Providing and laying 100 mm, 80mm
dia G.I. pipe line at Ward No. 55, at
Panchasil Nagar Internal Area From
Hanuman Temple to Sarode House to
Jadhav House, Ahmeadnagar.
8,91,178/- 500/- 9,000/- 22,280/- 22,280/- 4 Months 24
Months 120 Days
9
AHMEDNAGAR MUNICIPAL CORPORATION AHMEDNAGAR
Name of Work : As per E Tender Notice
C H E C K S H E E T
1. Tweo envelope system shall be followed.
2. Earnest money should be submitted as mentioned in E-Tender
Notice
3. Initial Security Deposit shall be in the form of Cash or FDR / Bank
Guarntee of any Nationalized Bank or Schedule Bank
4. The Contractor should fill in the percentage in B-1 form in
figures and words and on recapitulation sheet also. The
Contractor all pages of Tender including Drawing, etc.
5. Declaration of the Contractor
10
Ahmednagar Municipal Corporation Ahmednagar
INVITATION FOR TENDERS
DETAILED TENDER NOTICE
NAME OF WORK :- As per mentioned in E-Tender
Sealed Tenders in B-1 Form on are invited for the following work, from contractors who have Experience of Simillar type of work and will be received in sealed covers, addressed The office of Dy. Commissioner, Ahmednagar Municipal Corporation, Ahmednagar in his office as mentioned in E-Tender Notice of Ahmednagar Municipal Corporation, Ahmednagar on all working days except Sundays and Public Holidays declared by Government of Maharashtra, during working hours as per E tender Notice on payment of cost of each Tender Form as mentioned below
1. Name of Work :
As per E Tender Notice
2. Cost of each Tender Form As per E Tender Notice
3. Estimated Cost of work put to tender As per E Tender Notice
4. Earnest Money As per E Tender Notice
5. A) Initial Security Deposit
B) Further Security Deposit
to be deducted from bills
As per E Tender Notice
6. Time Limit As per E Tender Notice
7. Last Date and time upto which blank tender forms will be issued
As per E Tender Notice
8. Date and time of receipt of Tender As per E Tender Notice
9. Probable date and time of opening of tender if possible
As per E Tender Notice
11
10) Valiity period : The offer of the contractor shall remain valid for 120 days from the date of opening of Envelope No.2 (MAIN TENDER) and thereafter until it is withdrawn by the contractor.
11) The tender notice shall form a part of the contract agreement.
12) The blank tender forms will be sold only to the Who have Experience of Simillar type of work /registered contractors of appropriate category
13) The tenderer, if firm or company shall in their forwarding letter
mention the names of all the partners of the firm or the company, (as the case may be) and the name of the partner who holds the power of attorney if any, authorizing him to conduct transaction on behalf of the firm or company.
14) Right is reserved to revise or amend the contract documents fully or
part thereof prior to the date notified or amended for the receipt of tender. Such deviations/amendments if any shall be communicated in the form of corrigendum or by a letter as may be considered suitable.
15) Right is reserved to reject any or all tenders without assigning any
reason thereof. (2) EARNEST MONEY : 2.1 Earnest Money of Rs. As per E Tender Notice along with the tender
should be in the form of receipted challan of Government Treasury/Sub Treasury or term deposit receipt for a period of One year issued by Scheduled Bank in favour of Commissioner , Ahmednagar Municipal Ahmednagar.
2.3 Tender of those who do not deposit earnest money in one of the
above acceptable forms shall be summarily rejected without opening Envelope No.2
2.4 The amount of earnest money will be refunded to the unsuccessful
tenderers on deciding about the acceptance or otherwise of the tender or on expiry of the validity period whichever is earlier, In case of the successful tenderer, it will be refunded on his paying the initial security deposit and completing the tender documents or will be transferred towards a part of security deposit to be paid after awarding of the work. If successful tenderer does not pay the security deposit in the prescribed time limit and complete the agreement bond, his earnest money deposit will be forfeited to the Government.
12
(3) TENDERING PROCEDURE
3.1 Issue of Blank tender forms:As mentioned in E tender notice. 3.2 Manner of Submission tender and its accompaniments :- Tender and its accompaniments to be submitted in two separate
sealed envelopes. 3.2.1. ENVELOPE NO. 1 (DOCUMENTS) :-
The first envelope clearly marked as “Envelope No.1” shall contain the following documents dully attested by a Gazetted office of not below the rank of Deputy Engineer.
(a) Government Treasury challan or in original Term Deposit Receipt for a period of one year of any scheduled Bank for the amount of earnest money, or certificate of exemption for payment of earnest money, if applicable.
(b) Certificate as a registered Contractor with the Government of Maharashtra may be applicable duly attested.
(c) An up-to-date Income Tax clearance certificate in original, from Income Tax Officer of the Circle (or True copy thereof duly attested by a Gazetted Officer) valid on the date fixed for receipt of tender, unless specifically exempted in this respect by the Government.
(d) Attested copy of registered partnership deed if the tenderer is a partnership firm and power of attorney.
(i) Work Experience Certificate of Simillar Type of Work. ( j ) Pan Card duly Attested. All above documents should be enclosed in envelope no. 1. If these documents found incomplete in envelope no. 1, then the envelope no. 2 will not be opened.
3.2.2 ENVELOPE NO.2 (Main Tender) : (Financial Bid)
The second envelope clearly marked as Envelope No.2 shall contain only the main tender including the common set of conditions/ stipulations issued by the Department after the pre-tender conference. A tender submitted without this would be considered as invalid. The Tenderer should quote his offer on Schedule B of the tender as percentage of Estimated cost put to tender at the appropriate place in tender documents, to be submitted only in Envelope No.2. He should not quote this offer any where directly or indirectly in Envelope No.1. The contractor shall quote for the work as per details given in the main tender also based in the detailed set of conditions issued additional stipulations made by the Department as infrmed to him by a letter from Commissioner, AMC, after Pre-Tender conference this tender shall be unconditional.
13
3.3 SUBMISSION OF TENDER : The two sealed Envelopes No.1 and 2 shall again put together in one common cover and sealed. This sealed cover shall be marked on the left hand top corner “Tender for the work of As per E Tender Notice The full name and address of the tenderer and the name of the authorised agent delivering the sealed cover containing the tender shall be written on the bottom left hand corner. The tenders should be submitted in the office of Commissioner, Ahmednagar Municipal Corporatin, Ahmednagar as per mentioned in E-Tender notice
3.4 OPENING OF TENDERS :-
The Tenders will be opened as per the schedule given in E-Tender notice, if possible in the office of the Dy. Commissioner AMC in the presence of intending bidders or their authorized representatives, to whom they may choose to remain present. Following procedure will be adopted for opening of Tender. ENVELOPE NO. 1:- First of all, Envelope No.1 of the tender will be opened to verify its contents as per requirements. If the various documents contained in this envelope do not meet the requirements of the Ahmednagar Municipal Corporation, Ahmednagar a note will be recorded accordingly by the tender opening authority and the said tenderer’s Envelope No.2 will not be considered for further action but the same will be recorded. ENVELOPE NO.2:- This envelope shall be opened immediately after opening of Envelope No.1, only if contents of Envelope No.1 are found to be acceptable to the Department, the tendered rates in Schedule-B or percentage above/ below the estimated rates shall then be read out.
3.5 Additional Conditions 3.5.1 Appointment of Arbitrator: Arbitrator will not be appointed. In case of any dispute, the
decision given by the Commissioner AMC will be final. If at all the contractor goes in the court in the intrest of work, the process of getting work done from another contractor will be in continuation
14
3.5.2 Break up payment for the items of supply of pipes, valves, etc.
will be as under: 1) 80 % after inspection and receipt of pipes, valves etc. on site. 2) 10 % after Lowering, Laying and jointing. 3) 10 % after successful hydraulic testing. 3.5.3 Third Party Inspection should be carried out by following
agencies at the cost of the Contractor : 1) RITES 2) SGS India Ltd. 3) Superintendance Company of India Pvt. Ltd. 3.6 Payment will be made as per the availability of funds from AMC
If it is found that, even sufficient funds are available, the contractor
delays work first as per clause 2 of accepted tender the action will be taken. Even after the action as per clause 2 the contractor fails to show proper progress, notice of 15 days will be served on contractor and his registration will be suspended for 3 years
3.7 SECURITY DEPOSIT: 3.7.1 The successful tenderer shall have to pay 50% security deposit in
cash or in shape of National Saving Certificate pledged in favour of Commissioneer, Ahmednagar Municipal Corporation, Ahmednagar and complete the contract documents, failing which his earnest money will be forfeited to Government. The balance 50% security deposit will be recovered from the R. A. bills at 4(four) % of the bill amount.
3.7.2 All compensation or other sums payable by the Contractor under the terms of this contract or any other contract or on any account may be deducted from his Security Deposit or from any sums which may be due to him or may become due to him by Government on any account and in the event of the security deposit being reduced by reason of any such above noted deductions, the Contractor shall within 10 days of receipt of notice of demand from the Commissioner, AMC make good the deficit.
3.7.3 There shall be no liability on the Department to pay any interest on the Security Deposited by or recovered from the Contractor.
3.7.4 The Security Deposit shall be refunded after completion of defect liability period prescribed for this contract in accordance with the provisions in clause 1 and 20 of the contract.
3.8 Any dispute arising between AMC and Contractor as to the contract terms and conditions shall be subject to the Ahmednagar jurisdication.
15
3.9 Royalty: During the execution of work or till the completion of work
after completion of work after completion of defect liability period if Royalty raised by the District Collector / Revenue department, amount involved will have to be paid by the contractor only. Such ncertificate of payment of Royalty or NOC from said authority is necessary, without which no payment of final or refund of security will be made.
3.10 Insurance :
Contractor should deposit the 1 % amount of accepted cost of Tender befor the issue of eork order in the account of Insurance
3.11 Stamp Duty: 2 % of total Security Deposit will have to be paid as
stamp duty on the date of agreement to be in the form of adhesive stamp/ franking fixed on stamp paper of Rs. 100/- Stamp paper cost will be borne by the contractor If Security Deposit is paid in cash, then stamp duty will have to be paid @ 3 % of total security deposit or as per the amendments made by Govt. from time to time.
16
MODEL FORM OF BANK GUARANTEE BOND FOR SECURITY
DEPOSIT AND PERFORMANCE GUARANTEE DEPOSIT
In consideration of the Government of Maharashtra (herein after referred to as
“The Government”) having agreed to exempt
(herein after referred to as The Contractor”) from depositing with the Gov-
ernment in cash the sum of Rs.
(Rupees
only.)
being the amount of security deposit payable by the Contractor to the
Government under the terms and conditions of the agreement dated the
day of and made between the Government of the
one part and the Contractor of the other part (herein after referred to as “the
said Agreement”) for as security for due observance and
performance by the Contractor of the terms and conditions of the said
Agreement, on the contractor furnishing to the Government a guarantee in the
prescribed form of a scheduled bank in India in face those presents in the like
sum of Rs. (Rupees
only).
BANK / LIMITED registered in India under Act and having
one of our local Head office at do here by
1. GUARANTEE TO THE GOVERNMENT :-
(A) Due performance and observance by the Contractor of the terms and
conditions on the part of the contractor contained in the said Agreement and
17
(B) Due and punctual payment by the Contractor to the Government of all
sums of money, losses, damages, cost charges, penalties and expenses payable
to the Government by the Contractor under or in respect to the said
Agreement.
2. Undertake to pay to the Government on demand and without demur and not
withstanding any dispute or disputes raised by the Contractor(s) in any
suit or proceeding filed in any Court of tribunal relating thereto the
said sum of Rs. (Rupees only)
or such less sum may be demanded by the Government from us, our
liability hereunder being absolute and unequivocal and agree that.
3. a) The guarantee herein contained shall remain in full force and effect during the
subsistence of the said Agreement and that the same will continue to
enforceable till all the dues of the Government under or by virtue of the said
Agreement have been duly paid and it’s claims satisfied or discharged
and till the Government certifies that the terms and conditions of the said
Agreement have been fully, properly carried out by the Contractor.
(b) We shall not be discharged or released from the liability under this guarantee
by reasons of
(i) Any change in the constitution of the bank of the Contractor, or
(ii) Any arrangement entered into between the Government and the Contractor with
or without our consent;
Ahmednagar Municipal Corporation 18
Contractor HOD Water supply Deptt. Dy. Commissioner
(iii) Any forbearance or indulgence shown to the Contractor.
(iv) Any variation in the terms and conditions contained in the said Agree- ment.
(v) Any time given to the Contractor, or
(vi) Any other conditions or circumstances under which, in law, a surety would be
discharged.
(c) Our liability herein under shall be joint and several with that of the Con- tractor as if
we were principal debtors in respect of the said sum of Rs. (Rupees
only).
(d) We shall not revoke this guarantee during its currency except with the previous
consent in writing of the Government.
IN WITNESS WHERE OF THE common seal of
has been herein affixed this
day of 200
The common seal of was pursuant to the resolution of the Board of
Directors of the Company dated the day of __________________________
herein affixed in the presence of
who, in token thereof, have here to set their respective hands in the
presence of.
1)
2)
Ahmednagar Municipal Corporation 19
Contractor HOD Water supply Deptt. Dy. Commissioner
DECLARATION OF THE CONTRACTOR Name of Work - As per E Tender Notice
I/We, hereby, declare that I/We have made myself/ourselves thoroughly conversant with the local conditions regarding all materials and labour on which I/We have based my/our rates for this tender. The specifications, and lead of materials on this work have been carefully studied and understood by me/us before submitting this tender. I/We undertake to use only the best materials approved by the Commissioner, DIVISION,AHMEDNAGAR MUNICIPAL CORPORATION, AHMEDNAGAR or his duly authorised assistant, before starting the work and to abide by his decision.
I/We hereby further declare that my/our tender is unconditional in every
manner of whatsoever in nature. I/We hereby undertake to pay the labourers engaged on the work as per Minimum Wages Act. 1948 application to the zone concerned.
Contractor Signature
Ahmednagar Municipal Corporation 20
Contractor HOD Water supply Deptt. Dy. Commissioner
FORM B-1
PERCENTAGE RATE TENDER AND CONTRACT FOR WORKS
OFFICE :Ahmednagar Municipal Corporatin, Ahmednagar
Name of Work : As per E Tender Notice GENERAL RULES AND DIRECTIONS FOR THE GUIDANCE OF CONTRACTORS
1. All works proposed to be executed by contract shall be notified in a form of
invitation to tender pasted on a board hung up in the office of the Commissioner, AMC, Ahmednagar Municipal Corporatin, Ahmednagar and signed by the Commissioner, AMC.
This form will state the work to be carried out as well as the date for submitting and opening tenders, and the time allowed for carrying out the work, also the amount of the earnest money to be deposited with the tender and the amount of security deposit to be deposited by the successful tenderer, and the percentage, if any, to be deducted from bills. It will also state whether a refund of a quarry fees, royalties, dues and ground rents will be granted. Copies of the specifications, designs and drawings, estimated rates, scheduled rates and any other documents required in connection with the work shall be signed by the Commissioner, AMC for the purpose of identification and shall also be open for inspection by contractors at the office of the Ahmednagar Municipal Corporation, Ahmednagar during office hours. Where the works are proposed to be executed according to the specifications recommended by a contractor and approved by a competent authority on behalf of the Governor of Maharashtra such specifications with designs and drawings shall form part of the accepted tender.
2. In the event of the tender being submitted by a firm, it must be signed by each
partner thereof, and in the event of the absence of any partner, it shall be signed his behalf by a person holding a power of attorney authorizing him to do so.
2(a) i) The contractor shall pay along with the tender the sum of Rs. As per E Tender
Notice way of earnest money. The contractor may pay the said amount by forwarding along with the tender treasury challan or short term deposit receipt for a period of one year of any scheduled bank for the like amount in favour of the Commissioner, AMC, Ahmednagar Municipal Corporation, Ahmednagar The said amount of earnest money shall not carry any interest whatsoever.
ii) In the event of his tender being accepted, subject to the provisions of sub clause (iii) below, the said amount of earnest money shall be appropriated towards the amount of security deposit payable by him under conditions of General Conditions of Contract.
Ahmednagar Municipal Corporation 21
Contractor HOD Water supply Deptt. Dy. Commissioner
iii) If, after submitting the tender, the contractor withdraws his offer, or modifies the same or if after the acceptance of his tender the contractor fails or neglects to furnish the balance of security deposit without prejudice to any other right and power of the Government here under, or in law Government shall be entitled to forfeit the full amount of the earnest money deposited by him.
iv) In the event of his tender not being accepted, the amount of earnest money deposited by the Contractor shall, unless it is prior thereto forfeited under the provision of sub-clause (iii) above, refunded to him on his passing receipt therefore.
3. Receipts for payments made on account of any work, when executed by a firm, should also be signed by all the partners, except where the contractors are described in their tender as a firm, in which case the receipt shall be signed in the name of firm by one of the partners or by some other person having authority to give official receipts for the firm.
4. Any person who submits a tender shall fill up the usual printed form stating at what percentage above or below the rates specified in Schedule “B” (memorandum showing items of work to be carried out) he is willing to undertake the work. Only one rate or such percentage on all the estimated rates/Scheduled rates shall be named. Tenders which propose any alteration in the works specified in the said form of invitation to tender, or in the time allowed for carrying out the work, or which contain any other conditions, of any sort will be liable to rejection. No printed form of tender shall include a tender for more than one works but if contractor who wish to tender two or more works, they shall submit separate tender for each. Tender shall have the name and number of the work to which they refer, written outside the envelope.
5. The Commissioner, AMC or his duly authorised Assistant shall open tenders in the presence of contractors who have submitted tenders or their representatives who may be present at the time, and he Will enter the amounts of the several tenders in a comparative statement in a suitable form. In the event of a tender being accepted, the contractor shall for the purpose of identification, sign cop- ies of the specifications and other documents mentioned in Rule 1. In the event of tender being rejected, the competent officer shall authorise the Treasury Officers Scheduled Bank concerned to refund the amount of earnest money deposited to the contractor making the tender, on his giving a receipt for the return of the money.
6. The officer competent to dispose off the tender shall have the right of rejecting all or any of the tender.
7. No receipt for any payment alleged to have been made by contractor in regard to any matter relating to his tender or the contract shall be valid and binding on Government unless it is signed by the Commissioner, AMC.
8. The memorandum of work to be tendered for and the schedule of material to be supplied by Corporation and their rates shall be filled in and completed by the office of the Commissioner, AMC, before the tender form is issued. If a form is sued to an intending tenderer has not been so filled in and completed, he shall request the said office to have this done before he completes and delivers his tender.
9. All works be measured net by standard measure and according to the rules and
Ahmednagar Municipal Corporation 22
Contractor HOD Water supply Deptt. Dy. Commissioner
customs of the Corporation and their rates shall be without reference to any local custom.
10. Under no circumstances shall any contractor be entitled to claim enhanced rates for items in this contract.
11. Every registered contractor should produce along with his tender certificate of registration as approved contractor in the appropriate class and renewal of such registration with date of expiry.
12. All corrections and additions or pasted slips should be initialed. 13. The measurements of work will be taken according to the usual methods in use in
the Ahmednagar Municipal Corporation, Ahmednagar and no propos- als to adopt alternative methods will be accepted. The Commissioner, AMC’s deci- sion as to what is the usual method in use in the Municipal Corporation, Ahmednagar will be final.
14. The tendering contractor shall furnish a declaration along with the tender showing all works for which he has already entered into contract, and the value of work that remains to be executed in each case on the date of submitting the tender.
15. Every tenderer shall furnish along with the tender, information regarding the income-tax circle or ward of a district in which he is assessed to income tax, the reference to the number of assessment year, and a valid Income Tax Clearance certificate.
16. In view of the difficult position regarding the availability of foreign exchange, no foreign exchange would be released by the department for the purchase of plant and machinery required for the execution of the work contracted for (GCV/ PWD/CFM/1058- 62517 dt 26.9.1959).
17. The contractor will have to construct shade for storing controlled and valuable materials issued to him under Schedule ‘A’ of the agreement, at the work site, having double locking arrangement. The materials will be taken for use in the presence of the departmental person. No material will be allowed to be re- moved from the site of works
18. The contractors shall also give a list of machinery in their possessions and which they propose to use on the work in the form of Statement No. II.
19. Every registered contractor should furnish along with tender a statement staff employed by him, in the form of statement No.V.
19. Successful tenderer will have to produce to the satisfaction of the accepting authority a valid and current licence issued in his favour under the provision of Contract Labour (Regulation and Abolition Act, 1973) before starting work, fail- ing which acceptance of the tender will be liable for withdrawal and earnest money will be forfeited to Government.
20. The contractor shall comply with the provision of the Apprentices Act 1961 and rules and orders issued there under from time to time. If he fails to do so, his failure will be a breach of the contract and Commissioner, AMC, may in his discretion cancel the contract. The contractor shall also be liable, for any pecuniary liability arising on account of any violation by him of the provisions of the Act.
Ahmednagar Municipal Corporation 23
Contractor HOD Water supply Deptt. Dy. Commissioner
TENDER FOR THE WORKS
* infigures as well as in words
I / We hereby tender for the execution, for the Government of Maharashtra (herein before and herein after referred to as‘Government’) of the work specified in the under written memo- randum within the time specified in such memorandum at ....................................................... Percent below / above the estimated rates entered in Schedule "B" (memorandum show- ing items of works to be carried out) and in accordance in all respects with the specifications, designs, drawings and instructions in writing referred to in Rule -1 hereof and in clause- 12 of the annexed conditions of the contract and agree that when materials for the work are provided by the Government, such meterials & the rates to be paid for them shall be as provided in Schedule "A" here to.
Signature of Contractor
MEMORANDUM
If several sub works are included they should be detailed in seperate list.
(b) Estimated cost Rs.
The amount of earnest money to be deposited shall be in accordance with the provisions of paras 204 and 205 of the M.P.W. Manual. This deposit shall be in accordance with paras 211 and 212 of the
(c) Earnest money Rs. (d) Security deposit Rs (i) Cash (Not less than the Rs amount of earnest money) (ii) To be deducted from current bills Rs Total
(e)This percentage where no security deposit is taken, will vary frm 5 percent to 10 percent according to the requirement of the case where security deposit is taken see note 1 to clause 1 of conditions of contract.
Percent by the time, half the work as measured bt the cost, is done.
Ahmednagar Municipal Corporation 24
Contractor HOD Water supply Deptt. Dy. Commissioner
(f) Give schedule where necessary by which the various items are to be completed.
(f) Time allowed for the work from 12 (Twleve months) calendar months from the date of written order to commense (including monsoon)
2. I/we agree that the offer shall remain open for acceptance for a minimum period
of 120 days from the date fixed for opening the same and thereafter until it is withdrawn by me/us by notice in writing duly addressed to the authority opening the tenders and sent by registered post AD or otherwise delivered at the office of such authority, Treasury or Term Bank Challan No. And date or Deposit at call receipt No. and date ______ in respect to the sum of Rs. As per E Tender Notice representing the earnest money is herewith forwarded.
The amount of earnest money shall not bear interest and shall be liable to be forfeited to the Government, should I/ we fail to (i) abide by the stipulation to keep the offer open for the period mentioned above or (ii) Sign and complete the contract documents as required by the Engineer and furnish the security deposit as specified in item (d) of the memorandum contained in paragraph 1 above within the time limit laid down in clause (1) of the annexed General conditions of contract. The amount of earnest money may be adjusted towards the security deposit or refunded to me / us if so desired by me/us in writing, unless the same or any part thereof has been forfeited as aforesaid.
3. I/We secured exemption from payment of earnest money after executing the
necessary bond in favour of the Govt., a true copy of which is en- closed herewith, should any occasion for forfeiture of earnest money for this work arise due to failure on my/our part to (i) abide by the stipulations to keep the offer open for the period mentioned above or (ii) sign and complete the contract documents & furnish security deposit as specified in item (d) of the Memorandum contained .in paragraph (1) above within the time limit laid down in clause (1) of the annexed General Condition of contract, the amount payable by me/us may, at -the option of the Engineer, be recovered out of the amount deposited in lump sum for securing exemption in so far as the same may extend in terms of the said bond & in the event of the deficiency out of any other moneys which are due to payable to me/us by the Government under any other contract or transaction of any nature whatsoever or otherwise.
4. Should this tender be accepted I/We hereby agree to abide by and fulfill all the
terms, and provision of the conditions of contract annexed hereto so far as applicable, and in default thereof to forfeit and pay to Govern- ment the sums of money mentioned in the said conditions.
Ahmednagar Municipal Corporation 25
Contractor HOD Water supply Deptt. Dy. Commissioner
Receipt No. _________ dated ___________ from the Government Treasure or Sub Treasury at _________ in respect of the sum of Rs.*._________ is herewith forwarded representing the earnest money (a) the full value of which is to be absolutely forfeited to Government should I/We not deposit the full amount of security deposit specified in the above memorandum in accordance with clause I (A) of the said conditions of contract, otherwise the said sum Rs. _________/- (Rupees ______________ __________________________) shall be refunded.
*Amount to be Specified in words And figures. *Strike Out (a) if no cash security de- posit is to be taken Address
Address Signature of Contractor
before submission of tender.
Dated the day of 20 (witness)
Signature of witness to contractor’s signature
Address (Occupation)
The above tender is hereby accepted by me for and on Commissioner Ahmednagar Municipal Corporation, Ahmednagar
Dated the day of 2000
Commissiioner Ahmednagar Municipal
Corporation Ahmednagar
Ahmednagar Municipal Corporation 26
Contractor HOD Water supply Deptt. Dy. Commissioner
CONDITIONS OF CONTRACT
Clause 1 :- The person/persons whose tender may be accepted (hereinafter called the contractor, which expression shall unless excluded by or repugnant to the contest include his heirs, execu- tors, administrators, and assigns) shall (A) within 10 days (which may be extended by the City Engineer concerned upto 15days if the Superintending Engineer thinks fit to do so) of the receipt by him of the notification of the acceptance of his tender deposit with the Commissioner, AMC in cash or Govt. Securities endorsed to the Commissioner, AMC, (if deposited for more than 12 months) of sum sufficient which will made up the full security deposit specified in the tender or (B) (Permit Government at the time of making any payment to him for work done under the contract to deduct such as will amount to *FOUR percent of all moneys so payable such deductions to be held by Government by way of security deposit.) Provided always that in the event of the contractor depositing a lump sum by way of security deposit as contemplated at (A) above, then and in such case, if the sum so deposited shall not amount to FOUR percent of total estimated cost of the work, it shall be lawful for Government at the time of making any payment to the contractor for work done under the contract to make up the full amount to FOUR percent by deducting a sufficient sum from every such payment at last aforesaid until the full amount of the security deposit is made up. All compensation or other sums of money payable by the contractor to Government under the terms of his contract may be deducted from or paid by sale of sufficient part of his security deposit or from the interest arising there from, or from any sums which may be due or may become due by Government to the contractor under any other contract or transaction of any nature on any account whatsoever and in the event of his security deposit being reduced by reason of any such deduc- tion or sale as aforesaid, the contractor shall, within ten days thereafter, make good in cash or Government securities endorsed and aforesaid any sum or sums which may have been deducted from or raised by sale of his security deposit or any part thereof. The security deposit referred to, when paid in cash may, at the cost of the depositor, be converted into interest bearing securities provided that the depositor has expressly desired this in writing. The security deposit will not be accepted in forms of Insurance company bonds as per Government orders contained in No.CCM/
Security deposit PWD Resolution No CAT/ 1087/ CR-94/ Bldg.2 dt. 14/6/89
Ahmednagar Municipal Corporation 27
Contractor HOD Water supply Deptt. Dy. Commissioner
PWD/CAT/4250 Dt.27/2/1956. If the amount of.the security deposit to be paid in a lump sum within the period specified at (A) above is not paid, the tender/contract already accepted shall be considered as cancelled and legal steps taken against the contractor for recovery of the amounts. The amount of the security deposit lodged by a contractor shall be refunded along with the payment of the final bill, if the date upto which the contractor has agreed to maintain the work in good order is over. If such date is not over, only 50% amount of security deposit shall be refunded along with the payment of the final bill. In the event of the contractor failing or neglecting to complete rectifica- tion work within the period upto which the contractor has agreed to maintain the work in good order , then , subject to provisions of clauses 17 and 20 hereof the amount of Security Deposit retained by Government shall be adjusted towards the excess cost incurred by the department on rectification work .
*Note :This will be the same percentage as that in the tender at (e)
Clause 2 :- The time allowed for carrying out the work as entered in the tender shall be strictly observed by the contractor and shall be reckoned from the date on which the order to commence work is given to the contractor. The work shall throughout the stipulated period of the contract be proceeded with all due diligence (time being deemed to the essence of the contractor) and the contractor shall pay as compensation as amount equal to one percent or such final) may decide of the amount as the Commissioner, AMC (whose decision in writing shall be final) may decide of the amount of the estimated cost of the whole work as shown by the tenderer for everyday that the work remians uncommenced or unfinished after the proper dates. and further to ensure good progress furing execution of the work, the contractor shall be bound, in all cases in which the time allowed for any work exceeds one month to complete. The programme for completion of work is at Mhad in form of bar chart on page No............. The contractor is supposed to carryout the work and keep the progress as per bar chart on page No. ............. The contractor should complete the work as per phase period given below, which is arrived from the bar chart. 1/4 th of the work in ** 1/4 th of the time 1/2 th of the work in ** 1/2 th of the time 3/4 th of the work in _______ ** 3/4 th of the time
Compensation for delay
Ahmednagar Municipal Corporation 28
Contractor HOD Water supply Deptt. Dy. Commissioner
Full work to be competed in 2 (Two ) Calender months (including monsoon) ** Note : The quantity of the work to be done within a particular time to be specified shall be fixed and inserted in the blank space kept for the purpose by the Officer competent to accept the contractor after taking into consideration the circumstances of each case and abide by the programme of detailed process laid down by the Commissioner, AMC. The following proporation will usually be found suitable in 1/4, 1/2, 3/4 of the time. Reasonable progress of earth work, 1/6, 1/2, 3/4 of the total value of the work to be done. Reasonable progress of masonry 1/10, 4/10, 8/10 of the total value of the work to be done. In the event of Contractor failing to comply with these condi- tions he shall be liable to pay as compensation an amount equal to one percent or such smaller amount as the Commissioner, AMC (whose decision in writing shall be fianl) may decide of thesaid estimated cost of the whole work for every day that the due quantity of work remains incomplete provide always that the total amount of compensation to be paid under provi- sion of this Clause shall exceed 10 percent of the estimated cost of the work shown in the Tender. City Engineer should be the final authority in this respect irrespective ofthe fact that tender is accepted by Commissioner, AMC
Clause 3:- In any case in which under any clause of this contract, the contractor shall have rendered himself liable to pay compensation amounting to the whole of this security deposit whether paid in one sum or deducted by installment or in the case of abandonment of the work owing to serious illness or death of the contractor or any other cause the Commissioner, AMC, on behalf of the Governor of the Maharashtra , shall have power to adopt any of the following courses, as he may deem suited to the interest of the Government.
Action when whole of security deposit is forfeited.
Ahmednagar Municipal Corporation 29
Contractor HOD Water supply Deptt. Dy. Commissioner
a) To rescind the contract (for which rescission notice in
writing to the contractor under the head of City Engi- neer shall be conclusive evidence) and in that case the security deposit of the contractor shall stand forfeited and be absolutely at the disposal of Govern- ment.
b) To carry out the work or any part of the work depart-
mentally debiting the contractor with the cost of the work, expenditure incurred on tools and plant, and charges on additional supervisory staff including the cost of work-charged establishment employed for getting the unexecuted part of the work completed and crediting him with the value of the work done departmentally in all respects in the same rates as if it had been carried out by the Contractor under the terms of his contract. The certificate of the City Engi- neer as to the costs and other allied expenses so incurred and as to the value of the work so done departmentally shall be final and conclusive against the contractor.
c) To order that the work of the contractor be measured
upto and take such part thereof as shall be unex- ecuted out of his hands, and to give it to another contractor to complete, in which case all expenses incurred on advertisement for fixing a new contract- ing agency, additional supervisory staff including the cost of work-charged establishment and the cost of the work executed by the new contract agency will be debited to the contractor and the value of the work done or executed through the new contractor shall be credited to the contractor in all respects and in the same manner and at the same rates as if it had been carried out by the contractor under the terms of his contract. The certificate of the Commissioner, AMC as to all the cost of the work and other expenses incurred as aforesaid for or in getting the unexecuted work done by the new contractor and as to the value of the work so done shall be final and conclusive against the contractor.
Ahmednagar Municipal Corporation 30
Contractor HOD Water supply Deptt. Dy. Commissioner
In case the contract shall be rescinded under clause (a) above the contractor shall not be entitled to re- cover or be paid, any sum for any work therefore actually performed by him under this contract unless and until the City Engineer shall have certified in writing the performance of the such work and the amount payable to him in respect thereof and he shall only be entitled to be paid the amount so certified. In the event of either of the courses referred to in clause (b) or (c) being adopted and the cost of the work executed departmentally or through a new contractor and other allied expenses exceeding the value of such work credited to the contractors the amount of excess shall be deducted from any money due to the contractor, by Government under the con- tract otherwise howsoever or from his security de- posit or the sale proceeds thereof provided, however, that contractor shall have no claim against Govern- ment even if the certified value of the work done departmentally or through a new contractor exceeds the certified cost of such work and allied expenses provided always that whichever of the three courses mentioned in clause (a), (b) or (c) is adopted by the City Engineer, the contractor shall have no claim to compensation for any loss sustained by him by rea- son of his having purchases or procured any materi- als, or with a view to the execution of work or the performance of the contract.
Clause 4 :- If the progress of any particular portion of the work unsatisfactory, the Commissioner, AMC, shall notwithstanding, that the general progress of the work is in accorda nce with the conditions mentioned in clause 2, be entitled to take action and of clause 3(b) after giving the contractor 10 days notice in writing. The contractor will have no claim for com- pensation, for any loss sustained by him owing to such action.
Action when the progress of any par- ticular portion of the work is unsatisfac- tory.
Ahmednagar Municipal Corporation 31
Contractor HOD Water supply Deptt. Dy. Commissioner
Clause 5:- In any case in which any of the powers conferred upon the City Engineer by clause 3 and 4 hereof shall have become exercisable and the same shall not have been exercised, the non exercise thereof shall not constitute a waving of any of the conditions hereof and such powers shall notwithstanding be exercisable in the event of any future case of default by the contractor for which under any clause hereof he is declared liable to pay compensation amounting to the whole of his security deposit and the liability of the contractor for past and future compensation shall remain unaffected. In the event of the City Engineer taking action under sub-clause (a) or (c) of clause 3, he may, if he so desires, take possession of all or any tools and plant, mate- rials and stores in or upon the work of the site thereof or belonging to the contractor, or procured by him and intended to be used for the execution of the work or any part thereof paying or allowing for the same in account at the contract rates, or in the case of contract rates not being applicable at current market rates to be certified by the City Engineer whose certificate thereof shall be final. In the alternative the City Engineer, may, after giving notice in writing to the contractor or his clerk of the work, foreman or other autho- rized agent require him to remove such tools and plants, materials, or stores from the premises within a time to be specified in such notice, and in the event of.the contractor failing to comply with any such requisition, the Commissioner, AMC may remove them at the contractor’s expense or sale them by auction or private sale on account of the contractor and at his risk in all respects and the certificate of the Commissioner, AMC as to the expense of any such removal and the amount of the pro- ceeds and expense of any such sale shall be final and conclu- sive against the contractor.
Contractor remains liable to pay compensation if action not taken under clause 3 and 4. Power to take possesstion of or required removal of or sell contractor’s plant.
Ahmednagar Municipal Corporation 32
Contractor HOD Water supply Deptt. Dy. Commissioner
Clause 6 - If the contractor shall desire an extension of the time for completion of work on the ground of his having been un- avoidably hindered in its execution or on any other grounds he shall apply in writing to the City Engineer berore expiration of the period stipulated in the tender or before the expiration of 30 days form the date on which he was hindered as aforesaid or on which the cause for asking for extension occurred, whichever is earlier and the Commissioner, AMC, or in the opinion of Commissioner, AMC as the case may be if his opinion, there were reasonable grounds for granting an extension, grant such extension as he thinks necessary or proper. The decision of the Commissioner, AMC in this matter shall be final.
Clause 6A :- In case of delay in handing over the land required for the work due to unforeseen cases the contractor shall not be entitled for any compensation whatsoever from Government on ground that the machinery or labour for a certain period remain idle. Contractor may however apply for extension of time limit which may be granted on the merit of he cases. Clause 7:- On the completion of the work, the contractor shall be furnished with a certificate by the Commissioner, AMC (hereinafter called the Engineer-in-charge) of such completion but no such certificate shall be given nor shall have the work be considered to the completed until the contractor shall have removed from the premises on which the work shall have been executed, all scaffolding, surplus materials and rubbish and shall have cleaned off, the dirt from all wood work, doors, windows, walls, floor or other parts of any building in or upon which the work has been executed or which he may have had possession for the purpose of executing the work, not until the work shall have been measured by the Engineer-in-charge or where the mea- surements have been taken by his subordinates until they have received approval from the Engineer-in-charge, the said mea- surements being binding and conclusive against contractor. If the contractor shall fail to comply with requirements of this clause as to the removal of scaffolding surplus materials and rubbish and the cleaning of dirt on or before the date fixed for the completion of the work the Engineer-in-charge may at the expense of the contractor remove such scaffolding, surplus materials as aforesaid except for any sum actually realised by the sale thereof.
Extension of time. Final Certificate
Ahmednagar Municipal Corporation 33
Contractor HOD Water supply Deptt. Dy. Commissioner
Clause 8 :- No payment shall be made for any work estimated to cost less than rupees one thousand till after the whole of work shall have been completed and a certificate of completion given, But in the case of work estimated to cost more than rupees one thousand the contractor shall on submitting a monthly bill therefore, be entitled to receive payment proportionate to the part of the work then approved and passed by the Engineer-in-charge, whose certificate of such approval and passing of the sum so payable shall be final and conclusive against the contractor. All such intermediate payments shall be regarded as payments by way of advance against the final payments only and not as payment for work actually done and completed, and shall not preclude the Engineer-in-charge from requiring any bad, un- sound, imperfect or unskillful work to be removed or taken away and reconstructed or rejected nor shall any such payment be considered as an admission of the due performance of the contractor or any part thereof if any respect or the occurring of any claim nor shall it conclude, determine or affect in any other way, the powers of the Engineer-in-charges as to the final settlement and adjustment of the accounts or otherwise, or in any other way vary or effect the contract. The final bill shall be submitted by the contractor within one month of the date fixed for the completion of the work, otherwise the Engineer-in-charge’s certificate of the measurements and of the total amount payable for the work shall be final and binding on all the parties.
Clause 9 :- The rates for several items of work estimated to cost more than Rs. 1000/- agreed to within shall be valid only when the item concerned is accepted as having been completed fully in accordance with the sanctioned specification. In cases, where the items of work are not accepted as so completed by the Engineer-in-charge, he may make payment on account of such items at such reduced rates as he may consider reasonable in the preparation of final or on account bills.
Payment on inter- mediate certificate to be regarded as advances Payment at reduced rates on account of items of work not accepted as completed, to be at the discretion of the Commissioner, AMC
Ahmednagar Municipal Corporation 34
Contractor HOD Water supply Deptt. Dy. Commissioner
Clause 10 :- A bill shall be submitted by the Contractor in each month or before the date fixed by the Engineer-in-charge for all work executed in the previous month, and the Engineer-in- charge shall take or cause to be taken the requisite measure- ments for the purpose of having the same verified and the claim, so far as it is admissible, shall be adjusted, if possible, within ten days from the presentation of the bill. If the contractor does not submit the bill within the time fixed as aforesaid, the Engi- neer-in-charge may depute a subordinate to measure up the said work in the presence of the contractor or his duly autho- rized agent whose countersignature to the measurements list shall be sufficient warrant, and Engineer-in-charge may prepare a bill from such list which shall be binding on the contractor in all respects.
Clause 11:- The contractor shall submit all bills on the printed forms to be had on application at the office of the Engineer- in- charge. The charges to be made in the bills shall always be entered at the rates specified in the tender or in the case of any extra work ordered in pursuance of these conditions, and not mentioned or provided for in the tender at the rates hereinafter provided for such work.
Clause 12 :- If the specification or estimate of the work provides for the use of any special description of material to be supplied from the stores of the Public Works Dept. store or if it is required that the contractor shall use certain stores to be provided by the Engineer-in-charge (such material and stores and the prices to be charged therefore as hereinafter mentioned being so far as practicable for the convenience of the contractor but not so as in any way to control the meaning or effect of this contract specified in the schedule or memorandum hereto annexed) the contractor shall be supplied with such materials and stores as may be required from time to time to be used by him for the purpose of the contract only, and the value of the full quantity of the materials and stores so supplied shall be set off or deducted from any sums then due or thereafter to become due to the contractor under the contract, or otherwise, or from the security deposit or the proceeds of sale thereof, if the security deposit is held in Government securities, the same or a sufficient portion thereof shall in that case be sold for the purpose.
Bill to be submitted monthly Bills to be on printed form. Stores supplied by Government
Ahmednagar Municipal Corporation 35
Contractor HOD Water supply Deptt. Dy. Commissioner
All materials supplied to the contractor shall remain the absolute property of Govern- ment and shall on no account be removed from site of the work, and shall at all times be open for inspection by the Engineer-in- charge. Any such materials unused and in perfectly good condi- tion shall be returned to the Public Works Departmental store if the Engineer-in-charge so requires by a notice in writing given under his hand but the contractor shall not be entitled to return any such materials except with consent of the Engineer-in- charge and he shall have no claim for compensation on account of any such material supplied to him as aforesaid but remaining unused by him or for any wastage in or damage to any such materials.
Clause 12 (a) :- All stores of controlled materials such as cement, steel etc. to be supplied by Government to the contractor should be kept by the contractor under lock and key and will be accessible for inspection by the Commissioner, AMC or his agent at all times.
Clause 13 :- The contractor shall execute the whole and every part of the work in the most substantial and workmanlike manner, and both as regards materials and every other respect in strict accordance with specifications. The contractors shall also con- form exactly, fully and faithfully to the designs, drawings and instructions in writing relating to the work signed by the Engi- neer-in-charge and lodged in his office and to which the contrac- tor shall be entitled to have access for the purpose of inspection at such office, or on the site of the work during office hours. The contractor will be entitled to receive three sets of contract drawings and working drawings as well as one certified copy of the accepted tender along with the work order free of cost. Further copies of the contract drawings and working drawings if re- quired by him, shall be supplied at the rate of Rs. 100/- per set contract drawings and Rs. 20/- per working drawing except where otherwise specified.
Works to be executed in accordance with specifications, drawings, orders, etc.
Ahmednagar Municipal Corporation 36
Contractor HOD Water supply Deptt. Dy. Commissioner
Clause 14 :- The Engineer-in-charge shall have power to make any alteration in or additions to the original specifications, drawings, designs and instructions that may appear to him to be necessary or advisable during the progress of the work and the contractor shall be bound to carry out the work in accordance with any instructions in this connection which may be given to him in writing signed by the Engineer-in-charge and such alteration shall not invalidate the contract, and any additional work which the contractor may be directed to do in the manner above specified as part of the work shall be carried out by the contractor on the same conditions in all respects on which he agreed to do the main work, and at the same rates as are specified in the tender for main work, and if the additional and altered work includes any class of work for which no rate is specified in this contract, then such class of work shall be carried out at the rates entered in the Schedule of Rates of the Division or at the rates mutually agreed upon between the Engineer-in-charge and contractor, whichever are lower. If the additional or altered work for which no rate is entered in the schedule of rates of Division is ordered to be carried before the rates ara agreed upon then the contractor shall within seven days of the date of receipt by him of the order to carry out the work inform the Engineer-in-charge of the rate which it is his intention to charge for such class of work. And if the Engineer- in-charge does not agree to this rate he shall by notice in writing be at liberty to cancel his order to carry out such class of work and arrange to carry out in such manner as he may consider advisable provided always that if the contractor shall commence work or incur any expenditure in regard thereto before the rates shall have been determined as lastly here in before mentioned, then in such case he shall only be entitled to be paid in respect of the work carried out or expenditure incurred by him prior to the date of the determination of the rate as aforesaid according to such rate or rates as shall be fixed by the Engineer-in-charge. In the event of dispute, the decision of the Commissioner, AMC of the circle will be final.
Alternations in specifications and designs not to invalidate contracts. Rates for works not entered in estimate or schedule of rate of the district. Extension of time in consequence of additions or alterations
Ahmednagar Municipal Corporation 37
Contractor HOD Water supply Deptt. Dy. Commissioner
.
Where, however, the work is to be executed according to the designs, drawings and specifications recommended by the con- tractor and accepted by the competent authority the alterations above referred to shall be within the scope of such designs drawings, and specifications appended to the tender.
The time limit for the completion of the work shall be extended in the proportion that the increase in its cost occasioned by, alter- ations or additions bears to the cost of the original contract work, and the certificate of the Engineer-in-Charge as to such propor- tion shall be conclusive.
Clause 15 (1) If at any time after the execution of the contract documents
the Engineer-in-Charge shall for any reason what-so- ever(other than default on the part of the contractor for which the Government is entitled to rescind the contract) desire that the whole or any part of the work specified in the tender should be suspended for any period or that the whole or part of the work should not be carried out at all, he shall give to the contractor a notice in writing of such desire and upon the receipt of such notice the contractor shall forthwith suspend or stop the work wholly or in part as required, after having due regard to the appropriate stage at which the work should be stopped or sus- pended so as not to cause any damage or injury to the work already done or endanger the safety thereof, provided that the decision of the Commissioner, AMC as to the stage at which the work or any part of it could be or could have been safely stopped or suspended shall be final and conclusive against the contractor. The contractor shall have no claim to any payment or compen sation whatsoever by reason of or in pursuance of any notice aforesaid, on account of any suspension stoppage or curtailment except to the extent specified hereinafter.
No claim to any payment or compensation for alteration in or restriction of work
Ahmednagar Municipal Corporation 38
Contractor HOD Water supply Deptt. Dy. Commissioner
(2) Where the total suspension of the work ordered as
aforesaid continued for a continuous period exceeding 90 days, the contractor shall be at liberty to withdraw from the contractual obligations under the contract so far as it pertains to the unex- ecuted part of the work bv giving a 10 day’s prior notice in writing to the Engineer, within 30 days of the expiry of the said period of the 90 days, of such intention and requiring the Engineer to record the final measurement of the work already done and to pay final bill. Upon giving such notice the contractor shall be deemed to have been discharged from his obligations to com- plete the remaining unexecuted work under his contract. On receipt of such notice the Engineer shall proceed to complete the measurements and make such payment as may be finally due to the contractor within a period of 90 days from the receipt of such notice in respect of the work already done by the contractor. Such payment shall not in any matter prejudice the right of the contractor to any further compensation under the remaining provision of the this clause.
(3) Where the Engineer required the contractor to suspend
the work for a period in a excess of 30 days at any time or 60 days in the aggregate, the contractor shall be entitled to apply to the City Engineer within 30 days of resumption of work after such suspension for payment of compensations to the extent of pecuniary loss suffered by him in respect of working machinery remained idle on the site or on the account of his having and to pay the salary or wages of labour engaged by him during the said period of suspension provided always that the contractor shall not be entitled to any claim in respect of any such working machinery salary or wages for the first 30 days whether con- secutive or in the aggregate or such suspension or in respect or any suspension whatsoever occasioned unsatisfactory work or any other default on his part. The decision of the Engineer in this regard shall be final and conclusive against the contractor.
Ahmednagar Municipal Corporation 39
Contractor HOD Water supply Deptt. Dy. Commissioner
(4) In the event of .................
(i) Any total stoppage of work on notice from Engineer under Sub clause (1) in that behalf.
(ii) Withdrawal by the contractor from the contractual obliga-
tions complete the remaining unexecuted work under sub clause (2) on account of continued suspension of work for a period exceeding 90 days
OR
(iii) Curtailment in the quantity of item or items originally
tendered on account of any alteration, omission or substitution in the specifications, drawings, designs or instructions under clause (14) 1 where such curtailment exceeds 25% in quantity and the value of the quantity curtailed beyond 25 percent at the rates for the item specified in the tender is more than Rs. 5000/-
It shall be open to the contractor, within 90 days from the service of (i) the notice of stoppage of work or (ii) the notice of withdrawal from the contractual obligations under the contract on account of the continued suspension of work or (iii) notice under clause 14(1) resulting in such curtailment to produce to the Commissioner, AMC satisfactory documentary evidence that he had purchased or agreed to purchase material for use in the contracted work, before receipt by him of the notice of stoppage, suspension or curtailment and require the Government to take over on payment of such material at the rates determined by the Engineer, pro- vided, however, such rates shall in no case exceed the rates at which the same was acquired by the contractor. The government shall their after take over the material so offered, provided quan- tities offered are not in excess of the requirement of the unexecuted work as specified in the accepted tender and are of quality and specification approved by the Engineer.
Ahmednagar Municipal Corporation 40
Contractor HOD Water supply Deptt. Dy. Commissioner
Clause 15 A - The contractor shall not be entitled to claim any compensation from Government for the loss suffered by him on account of delay by Government in the supply of materials entered in Schedule A where such delay caused by
(i) Difficulties relating to the supply of railway wagons, (ii) Force major. (iii) Act of God.
Act of enemies of the State or any other reasonable cause beyond the control of Government.
In the case of such delay in the supply of materials,
Government shall grant such extension of time for the completion of the work as shall appear to the City Engineer to be reasonable in accordance with the circumstances of the case. The decision of the City Engineer as to the extension of time shall be accepted as final by the Contractor.
Clause 16 :- Under no circumstances whatever shall the contractor be entitled to any compensation from Government on any account unless the contractor shall have submitted a claim in writing to the Engineer-in-charge within one month of the case of such occurring.
Clause 17 :- If at any time before the security deposit or any part thereof is refunded to the contractor, it shall appear to the Engineer-in-charge or his subordinate in charge of the work, that any work has been executed with unsound, imperfect or unskill- ful workmanship or with materials of inferior quality, or that any materials or articles provided by him for the execution of the work are unsound, or of a quality inferior to that contracted for, or are otherwise not in accordance with the contract, it shall be lawful for the Engineer-in-charge to intimate this fact in writing to the contractor and then notwithstanding the fact that the work, materials or articles complained of many have been inadvert- ently passed, certified and paid for, the contractor shall be bound forthwith to rectify, or remove and reconstruct the work so specified in whole or in part, as the case may require or if so required, shall remove the materials or articles so specified and provided other proper and suitable materials or articles at his own charge and cost and in the event of his failing to do so within a period to be specified by the Engineer-in-charge
No claim to compensation on account of loss due to delay in supply of material by Government. Time limit for unforeseen claims Action and compensation payable in case of bad work.
Ahmednagar Municipal Corporation 41
Contractor HOD Water supply Deptt. Dy. Commissioner
in the written intimation aforesaid the contractor shall be liable to pay compensation at the rate of one percent on the amount of the estimate for every day not exceeding 10 days, during which the failure, so contin- ues and in the case of any such failure the Engineer-ln-charge may rectify or remove and re-execute the work or remove, and replace the materials or articles complained of as the case may be at the risk and expense in all respects of the contractor. Should the Engineer-in-charge consider that any such inferior work or materials as described above may be accepted or made use of it shall be within his discretion to accept the same at such reduced rates as he may fixed therefore.
Clause 18 :- All works under or in course of execution or executed in pursuance of the contract shall at all times be open to the inspection and supervision of the Engineer-in-charge and his subordinates, and the contractor shall at all times during the usual working hours, and at all other times at which reasonable notice of the intention of the Engineer-in-charge and his subordi- nate to visit the work shall have been given to the contractor, either himself be present to receive orders and instructions or have responsible agent duly accredited in writing present for that purpose. Orders given to the contractor’s duly authorized agent shall be considered to have the some force and effect as if they had been given to the contractor himself.
Clause 19 :- The contractor shall give not less than five days notice in writing to the Engineer-in-charge or his subordinate in charge of the work before covering up or otherwise placing beyond the reach of measurement any work in order that the same may be measured and correct dimensions thereof taken before the same is so covered or placed beyond the reach of measurement and shall not cover up or place beyond the reach of measurement any work without the consent in writing of the Engineer-in-charge or his subordinate in charge of the work, and if any work shall be covered up or placed beyond the reach of measurement, without such notice having been given consent obtained the same shall be uncovered at the contractor’s ex- penses, and in default thereof, no payment or allowance shall be made for such work or for the materials with which the same was executed.
P.W.D. Resolu- tion No. CAT- 1087/CR-94/ Building-2 dt. 14/ 6/1989. Work to be open to inspection. Contractor or responsible agent to be present. Notice to be given before work is covered up
Ahmednagar Municipal Corporation 42
Contractor HOD Water supply Deptt. Dy. Commissioner
.
Clause 20 :- If during the period of 24 months from the date of completion as certified by the Engineer-in-Charge pursuant to Clause-7 of the contract or 36 months after commissioning the work, whichever is later in the opinion of theCommissioner, AMC, the said work is defective in any manner whatsoever, the contractor shall forthwith on receipt of notice in that behalf from the Commissioner, AMC, duly commence execution and completely carry out at his cost in every respect all the work that may be necessary for rectifying and setting right the defects specified therein including dismantling and reconstruction of unsafe portions strictly in accor- dance with and in the manner prescribed and under the supervi- sion of the Commissioner, AMC. In the event of the contractor failing or neglecting to commence execution of the said rectification work within the period prescribed therefore in the said notice and/ or complete the same as aforesaid as required by the said notice, the Commissioner, AMC get the same executed and carried out depart- mentally or by any other agency at the risk on account and at cost of the contractor. The contractor shall forthwith on demand pay to the Govt, the amount of such costs, charges and expenses sus- tained or incurred by the Government of which the certificate of the City Engineer shall be final and binding on the contractor. Such costs, charges and expenses shall be deemed to be arrears of land revenue and in the event of the contractor failing or neglect- ing to pay the same on demand as aforesaid without prejudice to any other rights and remedies of Government, the same may be recovered from the contractor as arrears of land revenue. The Government shall also be entitled to deduct the same from any amount which may then be payable or which may thereafter become payable by the Government to the contractor either in respect of the said work or any other work whatsoever or from the amount of security deposit retained by Government. The defect liabilities period in particular for water proofing treatment (Building works) shall be 7 years.
. Contractor liable for damage done and for imperfections.
Ahmednagar Municipal Corporation 43
Contractor HOD Water supply Deptt. Dy. Commissioner
Clause 21- The contractor shall supply at his own cost all material (except such special materials if any as may in accordance with the contract, be supplied from the P.W.D. stores), plant, tools, appliances, implements, ladders, cordage, tackle, scaffolding and temporary works requisite or proper for the proper execution of the work, whether, in the original, altered or substi- tuted form, and whether included in the specifications or other documents forming part of the contract or referred to in these conditions or not and which may be necessary for the purpose of satisfying or complying with the requirements of the Engineer-in- charge as to which under these conditions he is entitled to be satisfied or which he is entitled to be required together with the carriage therefore to and from the work. The contractor shall also supply without charge the requisite number of persons with the means and materials necessary for the purpose of setting out works and counting, weighing and assisting in the measurement or examination at any time and from time to time of the work or the failing which the same may be provided by the Engineer-in- charge at the expense of the contractor and the expenses may be deducted from any money due to the contractor under the contract or from his security deposit or the proceeds of sale thereof, or of a sufficient portion thereof. The contractor shall provide all necessary fencing and lights required to protect the public from accident and shall also be bound to bear the ex- penses of defence of every suit, action or other legal proceeding, that may be brought by any person for injury sustained owing to neglect of the above precautions, and to pay any damages and cost which may be awarded in any such suit action or proceed- ings to any such person or which may with consent of the contractor be paid for compromising any claim by any such person List of machinery in contractor’s possession and which they propose to use on the works should be submitted along with the tender.
Contractor to supply plant, ladder, scaffolding etc. And it is liable for damages arising from nonprovisions of lights, fencing, etc.
Ahmednagar Municipal Corporation 44
Contractor HOD Water supply Deptt. Dy. Commissioner
Clause 21 A :- The contractor shall provide suitable scaffolds and working platforms, gangways and stairways and shall comply with the following regulations in connections therewith.
(a) Suitable scaffolds shall be provided for workmen for all
works that can not be safely done from a ladder or by other means.
(b) A scaffold shall not be constructed, taken down or sub-
stantially altered except.
(i) under the supervision of a competent and responsible person; and
(ii) as far as possible by competent workers possessing adequate experience in this kind of work.
(c) All scaffolds and appliances connected therewith and
ladders shall.
(i) be of sound material.
(ii) be of adequate strength having regard to the loads and strains to which they will be subjected, and
(iii) be maintained in proper condition.
(d) Scaffolds shall be so constructed that no part thereof can
be displaced in consequence of normal use.
(e) Scaffolds shall not be over loaded and so far as practi- cable the load shall be evenly distributed.
(f) Before installing lifting gear on scaffolds, special precau-
tions shall be taken to ensure the strength and stability of the scaffold.
(g) Scaffold shall be periodically inspected by the competent
person.
(h) Before allowing a scaffold to be used by his workmen, the contractor shall, whether the scaffold has been erected by his workmen or not, take steps to ensure that it complies fully with the regulations here-in-specified.
Ahmednagar Municipal Corporation 45
Contractor HOD Water supply Deptt. Dy. Commissioner
(i) Working platform, gangways stairways shall.
i) be so constructed that no part thereof can sag unduly or unequally.
ii) be so constructed and maintained having regard to the prevailing conditions as to reduce as far as practicable risks of persons tripping or slipping, and
iii) be kept free from any unnecessary obstruction.
(j) in the case of working platform, gangway, working places
and stairways at a height exceeding 2 meters, (to be specified)
(i) every working platform and every gangway shall be closely boarded unless other adequate measures are taken to ensure safety.
(ii) every working platform and gangway shall have ad- equate width and
(iii) every working platform, gangway, working place and stairway shall be suitably fenced.
(k) Every opening in the floor of a building or in working
platform shall except for the time and to the extent re- quired to allow the excess of persons or the transport or shifting of materials be provided with suitable means to prevent the fall of persons or materials.
(I) When persons are employed on a roof where there is a
danger of failing from a height exceeding 3 meters suit- able precautions shall be taken to prevent the fall of persons or materials. (to be prescribed).
(m) Suitable precautions shall be taken to prevent persons
being struck by articles which might fall from scaffolds or other working places.
(n) Safe means of access shall be provided to all working
platforms and other working places.
(o) The contractor(s) will have to make payments to the labourers as per Minimum Wages Act.
Ahmednagar Municipal Corporation 46
Contractor HOD Water supply Deptt. Dy. Commissioner
Clause 21 B - The contractor shall comply with the following regulations as regards the Hoisting Appliances to be used by him :-
(a) Hoisting Machine and tackle, including their attachments,
anchorages and support shall (i) be of good mechanical construction, sound material and adequate strength and free from patent defect;
and (ii) be kept in good repair and in good working order.
(b) Every rope used in hoisting or lowering materials or as a means of suspension shall be of suitable quality and adequate strength and free from patent defect.
(c) Hoisting machine and tackle shall be examined and adequately tested after erection on the site and before use and be re-examined in position at intervals to be pre- scribed by the Government.
(d) Every chain, ring, hook, shackle, swivel and pulley block used, in hoisting or lowering materials or as a means of suspension shall be periodically examined.
(e) Every crane driver or hoisting appliances operator shall be properly qualified.
(f) No person who is below the age of 21 years shall be in control of any hosting machine, including any scaffold which, or give signals to the operator.
(g) In the case of every hoisting machine and of every chain, ring, hook, shackle, swivel pulley block used’ in hosting or lowering or as means of suspension, the safe working load shall be ascertained by adequate means.
(h) Every hoisting machine and all gear referred to in preceding regulation shall be plainly marked ‘with the safe working load
(i) In the case of hoisting machine having a variable
safe working load, each safe working, load and the conditions under which it is applicable shall be clearly indicated.
(j) No part of any hoisting machine or of any gear referred to
in regulation(g) above shall be loaded beyond the safe working load except for the purpose of testing.
Ahmednagar Municipal Corporation 47
Contractor HOD Water supply Deptt. Dy. Commissioner
(k) Motors, gearing transmissions, electric writing and other
dangerous part or hoisting appliances shall be provided with efficient safeguards.
(I) Hoisting appliances shall be provided with such means
as will reduce to minimum the risk of the accidental descent of the load.
(m) Adequate precaution shall be taken to reduce to a mini-
mum, the risk of any part of a suspended load becoming accidentally displaced.
Clause 22 - The contractor shall not set fire to any standing jungle, trees, brush-wood or grass without a written permit from the City Engineer. When such permit is given, and also in all cases when destroying cut or drag trees brushwood, grass etc. By fire, the contractor shall taken the necessary measure to prevent such fire spreading to or otherwise damaging surround- ing property. The contractor shall make his own arrangements for drinking water for the labour employed by him and provide sanitary and other arrangements.
Clause 23 - Compensation for all damages done intentionally or unintentionally by contractor’s labour whether in or beyond the limits of Government property including any damage caused by spreading of fire mentioned in clause 22 shall be estimated by the Engineer-in-Charge or such other officer as he may appoint and the estimate of the Engineer-in-Charge subject to the deci- sion of the City Engineer on appeal shall be final and the contractor shall be bound to pay the amount of the assessed compensation on demand, failing which, the same will be recov- ered from the contractor as damages in the manner prescribed in the clause 1 or deducted by the Engineer-in-Charge from any sums that may be due or become due form Government to contractor under this contract or otherwise. The contractor shall bear the expenses of defending any action or other legal pro- ceeding that may be brought by any persons for injury sustained by him owing to neglect of precautions to prevent the spread of fire and he shall pay any damages and cost that may be awarded by the court in consequences.
Measure for prevention of fire Liability of contractor for any damage done in or outside work area
Ahmednagar Municipal Corporation 48
Contractor HOD Water supply Deptt. Dy. Commissioner
Clause 24 - The employment of female labourers on works of in neighborhood of soldier’s barracks should be avoided as far as possible. The contractor shall employ the labourers with the nearest Employment Exchange.
Clause 25 - No Work shall be done on a Sunday without the sanction in writing of the Engineer-in-Charge.
Clause 26 - The contract shall not be assigned or sublet without the written approval of the Engineer-in-Charge and if the con- tractor shall assign or sublet his contract, or attempt to do so or become insolvent or commence any proceedings to get himself adjudicated and insolvent or make any composition with his creditors,-or attempt to do so or if bribe, gratuity, gift loan, perquisite .reward or advantage, pecuniary or otherwise shall either directly or indirectly be given, promised or offered by the Contractor or any of his servants or agents to any public officer or person in the employment of Government in any way relating to his office or employment, or if any such officer or person shall become in any way directly or indirectly interested in the con- tract, the Engineer-in-Charge may thereupon by notice in writing rescind the contract, and the security deposit of the Contractor shall thereupon stand forfeited and be absolutely at the disposal of Government, and the same consequences shall ensure as if the contract had been rescinded under Clause 3 thereof and in addition the Contractor shall not be entitled to recover or be paid for any work therefore actually performed under the contract. Clause 27 :- All sums payable by a contractor by way of compensation under any of these conditions shall be considered as a reasonable compensation to be applied to the use of Government without reference to the actual loss or damage sustained, and whether any damage has or has not been sustained. Clause 28 :- In the case of tender by partners, any change in the constitution of a firm shall be forthwith notified by the contractor to the Engineer-in-charge for his information
Employment of female labour
Work on Sunday
Work not to sublet Contract may be rescinded and security deposti forfeitted for subleting it without approval or for briging a public officer or if contractor becomes insolvent. Sum payable by way of compensation to be considered as reasonable compensation without reference to actual loss Changes in the constitution of the firm to be notified
Ahmednagar Municipal Corporation 49
Contractor HOD Water supply Deptt. Dy. Commissioner
Clause 29 :- All works to be executed under the contract shall be executed under the direction and subject to the approval in all respects of the City Engineer of the Circle, for the time being, who shall be entitled to direct, at what point or points and in what manner they are to be commenced, and from time to time carried on. Clause 30 :-
30.1 Except where otherwise specified in the contract and subject to the powers delegated to him by Government under the code, rules then in force, the decision of the Superintending Engineer of the circle, for the time being shall be final, conclusive, and binding on all parties of the contract upon all question relating to the meaning of the specification, design, drawing, & instructions, hereinbe- fore mentioned and as to the quality or workmanship, or materials used on the work, or relating to the contract, designs, drawings, specifications, estimates, instructions, orders, or these conditions, or otherwise concerning the works, or the execution, or failure to execute same whether arising, during the progress of the work, or after the completion or abandonment thereof.
30.2 The contractor may within thirty days of receipt by him of any order passed by the City Engineer concerned with the contract, Work Project provided that (a) The accepted value of the Contract exceeds
Rs. 10 Lacks (Rs. Ten Lacks) (b) Amount of claim is not less than Rs. 1.00
lack (Rupees one lack) 30.3 If the contractor is not satisfied with the order passed by
the Commissioner, AMC as aforesaid, the contractor may, within thirty days of receipt by him of any such order, appeal against it to the concerned Secretary, Public Works Department/Irrigation Department who if convinced that prima facie the contractor’s claim rejected by Commissioner, AMC is not frivolous and that there is some substance in the claim of the contractor as would merit a detailed examination and decision by the Standing Com- mittee, shall put up to the Standing Committee at Govern- ment level for suitable decision, (vide PW Circular, No. CAT-1086-CR-110/Bldg-2 dt 7.5.86)
Direction and control of the Commissioner, AMC Direction and control of the Commissioner, AMC
Ahmednagar Municipal Corporation 50
Contractor HOD Water supply Deptt. Dy. Commissioner
Clause 31 - The contractor shall obtain from the Departmental stores, all stores and articles of European or American manufac- ture which may be required for the work, or any part thereof or in making up any articles required therefore or in connection there- with unless he has obtained permission in writing from, the Engineer-in-charge to obtain such stores and articles elsewhere. The value of such stores and articles as may be supplied to the contractor by the Engineer-in-Charge will be debited to the contractor in his account at the rates shown in the schedule, in Form A attached to the contract, and if they are not entered in the said schedule, they shall be debited to him at cost price which for the purpose of this contract shall include the cost of carriage and other expenses whatsoever, which shall have been incurred in obtaining delivery of the same at the stores aforesaid.
Clause 32 :- When the estimate on which a tender is made includes lump sums in respect of part of the work, the contractor shall be entitled to payment in respect of the items of work involved or the part of the work in question at the same rates as are payable under this contract for each item, or if the part of work in question is not in the opinion of the Engineer-in-Charge capable of measurement, the Engineer-in-Charge may as his discretion pay the lump sum amount entered in the estimate and certificate in writing of the Engineer-in-charge shall be final and conclusive against the contractor with regard to any sum or sums payable to him under the provision of this clause.
Clause 33 :- In the case of any class of work for which there is no such specification as is mentioned in rule 1 of form B-1, such work shall be carried out in accordance with the Divisional specifications, and in the event of there being no Divisional specifications, then in such case the work shall be carried out in all respects in accordance with all instructions and requirement of the Engineer-in-charge.
Clause 34 :- The expression “works” or “work” where used in these conditions, shall unless there be something in the subject or context repugnant to such constructions, be construct, to mean the work or works contracted to be executed under or in virtue of the contract, whether temporary or permanent and whether original, altered, substituted or additional
Stores of European or American manufacture to be obtained from Government. Lump sums in estimates Action where no specifications Definition of work
Ahmednagar Municipal Corporation 51
Contractor HOD Water supply Deptt. Dy. Commissioner
.
Clause 35 :- The percentage referred to in the tender shall be deducted from/ added to the gross amount of the bill, before deducting the value of any stock issued. Clause 36 :- All quarry fees, royalties, octroi dues and ground rent for stacking materials, if any shall be paid by contractor. The Royalty Charges towards each category of material as per Govt. Rules and Regulation are to be paid by the contractor to the Competent Authority of respective Department. If contractor fails to do so the same will be recovered from him at prevailing / appropriate rates applicable from time to time as and when required.
Clause 37:- The Contractor shall be responsible for and shall pay any compensation to his workmen payable under the Workmen’s Compensation act, 1923 ( VIII of 1923 ), (hereinafter called the said Act) for injuries caused to the workmen, if such compensation is payable / paid by the Government as principal under sub-section (1) of Section 12 of the said act on behalf of the Contractor, it shall be recoverable by the Government from the Contractor under sub-section (2) of the said section. Such compensation shall be recovered in the manner laid down in Clause 1 above.
Clause 37 (A) :- The Contractor shall be responsible for and shall pay the expenses of providing medical aid to any workman who may suffer a bodily injury as a result of an accident. If such expenses are incurred by Government the same shall be recov- erable from the Contractor forthwith and be deducted without prejudice to any other remedy of the Government from any amount due or that may become due to the Contractor. Clause 37 (B) :- the contractor shall provide all necessary personal safety equipment and first aid apparatus available for the use of the persons employed on the site and shall maintain the same in condition suitable for immediate use at any time shall comply with the following regulations in connection there- with .
Contractor’s percentage whether applied to net or gross amount of bill Quarry fees and royalties Compensation under Workmen’s Compensation Act.
Ahmednagar Municipal Corporation 52
Contractor HOD Water supply Deptt. Dy. Commissioner
a) The workers shall be required to use the equipments so
provided by the Contractor and the Contractor shall take adequate steps to ensure proper use of the equipment by those concerned.
b) When work is carried on in proximity to any place where
there is a risk of drowning all necessary equipment shall be provided and kept ready for use and all necessarv steos shall be taken for the oromot rescue
Clause 37 (C) :- The Contractor shall duly comply with the provisions of “The Apprentices Act, 1961” (III of 1961). The rules made there under and the orders that may be issued from time to time under the said Act and the said Rules and on his failure or neglect to do so, he shall be subjected to all the liabilities and penalties provided by said Act and said Rules.
Clause 38 :-
1) Quantities in respect of the several items shown in the
tender are approximate and no revision in the tendered rates shall be permitted in respect of any of the items so long as, subject of any special provision contained in the specifications prescribing a different percentage of per- missible variation in the quantity of the item does no exceed the tender quantity by more than 25 percent and so long as the value of the excess quantity beyond this limit at the rate of the item specified in the tender, is not more than Rs. 5,000/-
2) The Contractor shall if ordered in writing by the
Commissioner, AMC to do so, also carry out any quantities in excess of the limit mentioned above in sub clause (i) hereof on the same condition as and in accordance with the speci- fications in the tender and at the rates (i) derived from the rates entered in current schedule of rates and in the absence of such rates (ii) at the rates prevailing in the market. The said rates being increased or decreased as the case may be, by the percentage which the total tendered amount bears to the estimated cost of the works as based upon the schedule of rates applicable to the year in which the tenders where accepted (For the purpose of operation of this clause) this cost shall be worked out from the DSR prevailing at the time of acceptance of tender.
Govt.. circular No.PWD/ CAT/ 6076/3336/ (400) / Bldg2 dt 16/8/85. Claim for quantities entered in the tender or estimates
Ahmednagar Municipal Corporation 53
Contractor HOD Water supply Deptt. Dy. Commissioner
(3) Claims arising out of reduction in the tendered quantity of
any item beyond 25% will be governed by the provision of clause 15 only when the amount of such reduction beyond 25 % at the rate of the item specified in the tender is more that Rs.5000/- (The clause is not applicable to extra items).
(4) This clause is not applicable to extra items.
(5) There is no change in the rate if the excess is more than
25% of the tendered quantity, but the value of the excess work at the Tendered rates does no exceed Rs. 5000/-.
(6) The quantities to be paid at tendered rate shall include:-
(a) Tendered quantity plus (b) 25% excess of the Tendered quantity or the
excess quantity of the value of Rs.5000/- at the Tendered rates whichever is more.
Clause 39 :- The contractor shall employ any famine, convict or other labour of a particular kind or class if ordered in writing to do so by the Engineer-in-Charge .
Clause 40 :- No compensation shall be allowed for any delay caused in the starting of the work on account of acquisition of land or in the case of clearance works, on account of any delay in according to sanction of estimates.
Clause 41:- No compensation shall be allowed for any delay in the execution of the work on account of water standing in borrow pits or compartments. The rates are inclusive for hard or cracked soil, excavation in mud, sub soil, water standing in borrow pits and no claim for an extra rate shall be entertained, unless otherwise expressly specified.
Clause 42 :- The contractor shall not enter upon or commence any portion of work except with the written authority and instruc- tions of Engineer-in-Charge or of his subordinate in charge of the work. Failing such authority, the contractor shall have no claim to ask for measurements of or payments for work.
Employment of famine labour etc Claim for compensation for delay in execution of work Claim for compensation for delay in execution of work Entering upon or commencing any portion of work
Ahmednagar Municipal Corporation 54
Contractor HOD Water supply Deptt. Dy. Commissioner
Clause 43 :-
(i) No contractor shall employ any person who is under the age of 18 years.
(ii) No contractor shall employ donkeys or other animals with
breaching of string or thin rope. The breaching must be at least three inches wide and should be of tape (Newar).
(iii) No animal suffering from sores, lameness or emaciation
or which is immature shall be employed on the work.
(iv) The Engineer-in-Charge or his Agent is authorized to remove from the work, any person or animal found working which does not satisfy these conditions and no re- sponsibility shall be accepted by the Government for any delay caused in the completion of the work by such removal.
(v) The contractor shall pay fair and reasonable wages to the
workmen employed by him in the contract undertaken by him. In the event of any dispute arising between the contractor and his workmen on the grounds that the wages paid are not fair and reasonable, the dispute shall be referred without delay to the Commissioner, AMC, who shall decide the same. The decision of the Commissioner, AMC shall be conclusive and binding on the contractor but suchdecision shall not in any way affect the conditions in the contract regarding the payment to be made by the Government at the sanctioned tender rates.
(vi) Contractor shall provide drinking water facilities to
the workers. Similar amenities shall be provided to the work- ers engaged on large work in urban areas.
(vii) Contractor to take precaution against accidents which
take place on account of labour using loose garments while working near machinery.
Clause 44 :- Payment to contractors shall be made by cheque
drawn on any treasury within the division convenient to them provided the amount exceeds Rs.10. Amounts not exceeding Rs.10 will be paid in cash
Minimum age of person employed, the employment of donkeys and/or other animals and the payment of fair wages Method of payment
Ahmednagar Municipal Corporation 55
Contractor HOD Water supply Deptt. Dy. Commissioner
. Clause 45 :- Any contractor who does not accept these conditions shall not be allowed to tender for works.
Clause 46 :- If Government declares a state of scarcity or famine to exist in any village situated within 10 miles of the work, the contractor shall employ upon such parts of the work, as are suitable for unskilled labour, any person certified to him by the Commissioner, AMC, or be any person to whom the Commissioner, AMC may have delegated this duty in writing to be in need of relief and shall be bound to pay to such person wages not below the minimum which Government may have fixed in this behalf. Any disputes which may arise in connection with the Implementation of this clause shall be decided by the City Engineer whose decision shall be final and binding on the contractor.
Clause 47 :- The price quoted by the contractors shall not in any case exceed the control price, if any, fixed by Govt. or reasonable price which it is permissible for him to charge a private purchaser for the same class and description, the controlled price or the price permissible under the provisions of Hoarding and Profiteering Prevention Ordinance, 1948 as amended from time to time. If the price quoted exceeds the controlled price or the price permissible under Hoarding and Profiteering Preven- tion Ordinance, the contractor will specifically mention this fact in his tender along with the reasons for quoting such higher prices. The purchaser at his discretion will in such case exer- cise the right of revising the price at any stage so as to conform with the controlled price as permissible under the Hoarding and Profiteering Prevention Ordinance, This discretion will be exer- cised without prejudice to any other action that may be taken against the Contractor.
Acceptance of conditions compulsory before tendering the work Employment of scarcity labour
Ahmednagar Municipal Corporation 56
Contractor HOD Water supply Deptt. Dy. Commissioner
.
Clause 47 A :- The tender rates are inclusive of all taxes, rates, cesses and are also inclusive of the leviable tax in respect of sale by transfer of property in goods involved in the execution of a work contract under the provision of Rule 58 of Maharashtra
Clause 48 :- The Rates to be quoted by the contractor must be inclusive of Sales Tax. and VAT Tax. No extra payment on this account will be made to the contractor.
Clause 49 :- In case of materials that may remain surplus with the contractor from those issued for the work contracted for, the date of ascertainment of the materials being surplus will be taken as the date of sale for the purpose of sales tax and the sales tax will be recovered on such sale.
Clause 50 :- The contractor shall employ the unskilled labour to be employed by him on the said work only from locally available Labourers and shall give preference enrolled under Maharashtra Government and Self Employment Departments Scheme.
Provided, however, that if the required unskilled labour are not available locally, the contractor shall in the first instance employ such number of persons as is available and thereafter may with previous permission, in writing of the Executive Engineer-in- Charge of the said work, obtained the rest of requirements of unskilled the labour from outside the above scheme.
Maharashtra Act XIX of 1985 clause regarding Turnover Tax vide P.W.D. circular No. CAT-1086/CR-330/Bldg.-2 dt.10-6-1987
Ahmednagar Municipal Corporation 57
Contractor HOD Water supply Deptt. Dy. Commissioner
Clause 51 :- Wages to be paid to the skilled and unskilled labourers engaged by the contractor.
The contractor shall pay the labourers skilled and unskilled according to the wages prescribed by the Minimum Wages Act of 1948 applicable to the area in which the work of the Contrac- tor is in progress.
1) The Contractor shall comply with the provisions of the Ap- prentices Act, 1961, and the rules and orders issued there under from time to time. If he fails to do so, his failure will be a breach of the contract and the Commissioner, AMC , may in his discretion may cancel the contract. The contractor shall also be liable, for any pecuniary liability arising out on account of any violation by him of the provision of the Act.
The contractor shall pay the labourers skilled and unskilled according to the wages prescribed by the Minimum Wages act of the 1948 applicable to the area in which the work is in progress.
Clause 52 :- All accounts whatsoever which the contractor is liable to pay to the Government in connection with execution of the work including the amount payable in respect of (i) materi- als/ and or stores supplied/issued hereunder by the Government to contractor (ii) hire charges in respect of heavy plant, machin- ery and equipment given or hire by the Government to the contractor for execution by him of the work and/or which ad- vances have been given by the Government to the contractor shall be deemed to be arrears of the Land Revenue and the Government may without prejudice to any other rights and remedies of the Government recover the same from the contractor as arrears of Land Revenue.
Ahmednagar Municipal Corporation 58
Contractor HOD Water supply Deptt. Dy. Commissioner
Clause 53 :- The contractor shall duly comply with all the provisions of the Contract Labour ( Regulation and Abolition) Act, 1970 (37 of 1970) and the Maharashtra Contract Labour (Regulation and abolition) Rules, 1971 as amended from time to time and all other relevant statues and statutory provisions concerning payment of wages particularly to workmen employed by the contractor and working on the site of the work. In particu- lar the contractor shall pay wages to each worker employed by him on the site of the work at the rates prescribed under the Maharashtra Contract labour (Regulation and Abolition) Rules, 1971. If the contractor fails or neglects to pay wages at the said rates or makes short payments and the Government makes such payment of wages in full or part thereof less paid by the Contractor as the case may be, the amount so paid by the Government to such workers shall be deemed to be arrears of Land Revenue and the Government shall be entitled to recover the same as such from the contractor or deduct same from the amount payable by the Government to the contractor hereunder or from any other amount/s payable to him by the Government. Clause 54 :- The contractor shall engage apprentices such as brick-layer, carpenter, wiremen, plumber, as well as black-smith by recommended by the State Apprenticeship Advisor Director of Technical Education, Dhobi-Talao, Bombay-1. In the construction work (As per Government of Maharashtra, Education Department No. TSA/5170/T/56689, dated 7/7/72). Clause 55 :- a) The anti-malariya and other health measures shall be taken
as directed by the Joint Director (Malariya and Fileria) of health services, Pune.
b) Contractor shall see that mosquitogenic conditions are not created so as to keep vector population to minimum level.
c) Contractor shall carry out anti-malariya measures in the area as per guidelines prescribed under National Malariya Eradication Programme and as directed by the Joint Director (Malariya and Fileria) of Health Services, Pune.
d) In case of default in carrying out prescribed anti-malariya masures resulting in increase in malariya incidence, contractor shall be liable to pay to Government the amount spent by Government the amount spent by Government on anti-malariya measures to control he situation in addition to fine.
e) Relation with Public Authorities
The contractor shall make sufficient arrangements for draining away the sullage water as well as water coming from bathing and washing places and shall dispose off this water in such a way so as not to cause any nuisance. He shall also keep the premises clean by employing sufficient number of sweepers. The contractor shall comply with rules, regulations, bye-laws and directions given from time to time by any local or public authority in conncetion with this work and shall pay fees charges which are leviable on him without ant extra cost to Government.
(Government Circular No.:CAT 1284�120) building-2, Mantralaya, Bombay-400032 Dated 14/8/85) Anti malaria and other health measures
Ahmednagar Municipal Corporation 59
Contractor HOD Water supply Deptt. Dy. Commissioner
PRICE VARIATION CLAUSE :-
I. A. If during the operative period of the contract as defined in condition (I) below,
there shall be any variation in the Consumer Price Index (New series) for Industrial
Workers for the centre as shown as per Labour Gazette published by
the Commissioner of Labour. Government of Maharashtra and / or in the wholesale
Price Index for all commodities prepared by the Office of Economic Adviser.
Ministry of Industry. Government of India, or in the prices of Petrol/Oil and
lubricants. and main construction materials like bitumen, cement, steel,
various types of metal pipes etc. then, subject to the other conditions
mentioned below price adjustment on account of
1) Labour Component.
2) Material Component.
3) Petrol, Oil and Lubricants Component.
4) Bitumen Component.
5) HYSD and Mild steel component.
6) Cement Component.
7) C.I. and D.I. Pipe component.
Calculated as per the formula hereinafter appearing shall be made apart
from these, no other adjustments shall be made to the contract price for any
reasons whatsoever, component percentage as given below are as of the total
cost of work put to tender. Total of Labour, Material and POL components shall
be 100 and other components shall be as per actuals.
Sr.
No.
Name of
Subwork
Comp
(PL)%
Labour
Comp
(PC)%
Cement
Comp
(PS) %
Seel
Comp
(PB)
%
Bitrumen
Lubricant
(PF) %
Fuel &
Material
Comp
(PM)%
Other
Pipe
Com.
C.I.
and
D.I.
1 As above 22 5 00 18 13 02 40
Ahmednagar Municipal Corporation 60
Contractor HOD Water supply Deptt. Dy. Commissioner
}
2 }
Note : If Cement, Steel, Bitumen, C.I.& D.I. Pipes are supplied on Schedule "A", then respective component shall not be considered. Also if particular component is not relevant same shall be deleted.
1. Formula for Labour Component :
V1 = 0.85 x P K1 x L1 - Lo
100 Lo Where, V1 = Amount of price variation in Rupees to be Allowed for Labour component.
P = Cost of work done during the quarter under Consideration minus in the cost of Cement, TMT and Mild Steel, bitumen, C.I. & D.I.Pipes calculated at the basic star rates as the lender, consumed during the quarter under consideration applicable for (These star rates shall be specified here)
K1
Lo
=
=
Percentage of labour component as indicated above.
Basic consumer price index for Nashik centre shall be average consumer price index for the quarter preceding the month in which the last date prescribed for receipt of tender, falls.
. L1 = Average consumer price index for Nashik centre for the quarter under consideration.
(2) Formula for Materials Component
V = 0.85 P K2 x M1 - Mo
100where, V = Amount of price variation in Rupees to be Allowed for Labour Component. P = Same as worked out for labour component. K2 = Percentage of material component as indicated above. Mo = Basic wholesale price index shall be average wholesale price index for the quarter preceding the month in which, the last date prescribed for receipt of tender, falls.
M1 = Average wholesale price index during the quarter under consideration.
(3) FORMULA FOR PETROL. OIL AND LUBRICANT COMPONENT.
P1 - Po
V3 = 0.85P K3X P1-Po
V3 =Amount of price variation in Rupees to be Allowed for POL Component. P =Same as worked out for labour component K
3 =Percentage of Petrol, Oil and Lubricant Component
Po =Average price of HSD at - IOC Mumbai during the quarter preceding the month in which the last date prescribed for receipt of tender, falls.
P1
= Average price of HSD at IOC Mumbai during the quarter under consideration
(4) Formula for Bitumen Component.
V4 = QB (B1 – B0) V4 = Amount of price variation in Rupees to be Allowed for Botumen
Component. QB = Quantity of Bitumen (Grade) in metric tones used in the permanent works
and approved enabling works during the quarter under consideration. B1 = Current, average ex-refinery price per metric tonne of Bitumen(Grade)
under consideration including taxes (octroi, excise sales tax) during the quarter under consideration.
B0 = Basic rate of Bitumen in rupees per metric tone as considered for working ou
Ahmednagar Municipal Corporation 61
Contractor HOD Water supply Deptt. Dy. Commissioner
value of P or average ex-refinery price in rupees per metric ton including taxes (octroi, excise sales tax)
5) Formula for HYSD and Mild Steel Component.
V5 = So (Sl1-Slo) x T
Sl0
V5 = Amount of price variation in Rupees to be allowed for TMT / Mild Steel Component.
So = Basic rate of TMT / Mild Steel in rupees per metric tonne as considered for working out value of P
Sl = Average Steel Index as per RBI Bulletin during the quarter
under consideration.
Slo = Average of Steel Index as per RBI Bulletin for the quarter preceding the month in which the last date prescribed for receipt of tender, falls
T = Tonnage of steel used in the permanent works for the quarter under consideration.
6) Formula for Cement Component
V6 = Co (Cl1-Clo) x T
Cl0
V6 = Amount of price escalation in Rupees to be allowed for cement component.
Co = Basic rate of cement in rupees per metric tonne as considered for working out value of P.
Cl = Average cement Index published in the RBI bulletin for the
quarter under consideration. CIo = Average of cement Index published in the RBI bulletin for the quarter
preceding the month in which to the last date prescribed for receipt of tender, falls.
T = Tonnage of cement used in the permanent works for the quarter under consideration.
7) Formula f o r C.I./D.I. Pipe component
V7 = Qd (D1-D0) V7 = Amount of price escalation in Rupees to be allowed for CI/DI pipe
component. Do = Pig Iron basic price in rupees per tonne considered for working
out value of P. D1 = Average Pig iron price in rupees per tonne during the quarter
under consideration (published by IISCO).
Qd = Tonnage of CI/DI. Pipesused in the works during the quarter under consideration.
62
Contractor HOD Water supply Deptt. Dy. Commissioner
The following conditions shall prevail : i) The operative period of the Contract shall mean the period 9ommencing from the
date of work order issued to the Contractor and ending on the date on which the time allowed for the completion of the works specified in the Contract for work expires, taking into consideration the extension of time, if any, for completion of the work granted by the City Engineer under the relevant clause of the Conditions of Contract in cases other than those where such extension is necessitated on account of default of the Contractor. The decision of the Commissioner, AMC as regards the operative period of the Contract shall be final and binding on the Contractor. Where any compensation for liquidated damages is levied on the Contractor on account of delay in comple- tion or inadequate progress under the relevant Contract provisions, the price adjustment amount for the balance of work from the date of levy of such compensation shall be worked out by pegging the indices, L1. M1.C1, P1, & Sl1 to the levels corresponding to the date from which such compensation is levied.
ii) This price variation clause shall be applicable to all contracts in B1, B2 and C form
but shall not apply to piece works. The price variation shall be determined during each quarter as per formula given above in this clause.
iii) The price variation under this Clause shall not be payable for the extra items
required to be executed during the completion of the work and also on the excess quantities of items payable under the provisions of Clause 38/37 of the contract from B1/B2 respectively. Since the rates payable for extra items or the extra quantities under Clause. 38/37 are to be fixed as per current DSR or as mutually agreed to yearly revision till completion of such work. In other words, when the completion / execution of extra items as well as extra quantities under Clause 38/37 of the contract from B1/B2 extends beyond the operative date of the DSR then rates payable for the same beyond the date shall be revised with reference to the current DSR prevalent at that time on year to year basis or revised in accordance with mutual agreement thereon, as provided for in the Contract, whichever is less.
iv) This clause is operative both ways, i.e. if the price variation as calculated above is
on the plus side, payment on account of the price variation shall be allowed to the contractor and if it is on the negative side, the Government shall be entitled to recover the same from the Contractor and the amount shall be deductible from any amounts due and payable under the contract.
v) To the extent that full compensation for any rise or fall in costs to the Contractor is
not entirely covered by the provision of this or other clauses in the contract, the unit rate and prices included in the contract shall be deemed to include amounts to cover the contingency of such other- actual rise or fall in costs.
63
Contractor HOD Water supply Deptt. Dy. Commissioner
Name of Work – As Per E – Tender Notice
SCHEDULE "A" Schedule showing (approximately) the quantities of material to be supplied by the Department to the Contractor with his own cost
Particulars Quantity
Unit Remarks
-------------
--------------
----
----
-------------
-----------------
-----
-----
All material which is approved by Engineer-in-charge is to be brought by contractor at his own cost including transportation, loading, unloading, stacking and storing till its use in work etc. complete. The testing charges will be paid by the contractor.
Note :- Conditions of Schedule ‘A’ attached separately.
64
Contractor HOD Water supply Deptt. Dy. Commissioner
ANNEXURE
ADDITIONAL CONDITION FOR THE PROCUREMENT OF MATERIALS
The contractor shall make his own arrangements for supply of materials including bitumen, 30/40, 60/70 grade, emulsion, cement and steel, RCC pipes, Collars. The Contractor shall be responsible for all transportation and storage of materials at site and shall be bear all the related cost. The Engineer shall be entitled at any time to inspect or examine all such materials. The contractor shall provide reasonable assistance for such inspection of examiniation as may be required. The Contractor shall keep as accurate record of use of materials like bitumen cement and steel used in he works in a manner prescribed by the Engineer. After receiving the bitumen the authorized challan / gate pass should be obtained from the refinery mentioning he quantity of bitumen grade of bitumen date time of delivery etc. and it should be handed over to Department for each consignment. While transportation of Bouzer if passes through city / municipality / corporation area then the octroi receipts of the municipality / corporation should be handed over to the authorized person of Department. If there is any doubt regarding the materials received the same should be got tested from the District Govt. laboratory at he cost of the contractor and if the results are sub standard the materials or the work executed with such material will be rejected . The day-today record of the receipt / utilized / Balance of materials shall be kept by the contractor at plant site / site of work / store and the same will be checked by the Engineer in charge or authorized Engineer at any time. The procurement of cement / Steel / RCC pipe etc. should be from authorized manufacture company / and the Vouchers regarding purchase there of shall be submitted to Engineer in charge. The testing charges shall be borne by he Contractor.
65
Contractor HOD Water supply Deptt. Dy. Commissioner
AHMEDNAGAR MUNCIPAL CORPORATION, AHMEDNAGAR
UNDERTAKING FOR GAURANTEE
I/WE GAURANTEE THAT:
1. I / We Will replace, repair and adjust free of all charges, to the employer any part of work which fails to comply with the specifications or amendment to such specifications as referred to in our specification attached to tender, fair wear and tear excepted until the completion and a period of 12 months for the date of Acceptance Certificate issued under Article 20 of General Condition of Contract.
2. All the work will be reliable.
3. All the work will be of type which has been proved in service, to be suitable for the duty required by the specification and will be manufactured and tested in accordance with appropriate standard specification approved by the Engineer-in- charge.
4. I/We accept and abide by the clause relating to quality and guarantee of work.
Contractors Signature
AHMEDNAGAR MUNCIPAL CORPORATION, AHMEDNAGAR.
66
Contractor HOD Water supply Deptt. Dy. Commissioner
1. Unless otherwise specifically provided for either in tender item or in specification
or in the schedule of supply of materials, all items in the tender are inclusive of cost of all material required for the execution of the item and these, as, are proposed to be supplied by the A.M.C
as per respective schedule shall be provided of the approved type and make by the Contractor. 2. All the Material used in the work shall be of best quality and any materials rejected shall be removed from the site within 24 hours. 3. All the other rules regarding Workmen’s Compensation, etc.shall be binding on the Contractor.
4. All items to be executed in the course of the work have to be executed by
Contractor as specification in the P.W.D. Hand Books, the books of standard specifications, published by the Public Works Board of Government of Maharashtra, relevant I.S. specification, latest edition and practice in vogue, at the rates as per rules of the A.M.C. and condition of agreement in this respect. The Contractor shall be responsible and liable to pay for damage to public property caused by him. He should keep the accounts of such material in suitable look which would be available for inspection to the Engineer-in-charge.The Contractor shall be responsible for proper handling and safe custody of all material delivered by him for use on work. The material including pipes shall be procured by the Contractor as per requirement of work and no excess material shall be procured. Only used material shall be to the Contractor.
5. For all accident on the contracted works the Contractor shall be responsible to pay
the compensation to the sufferer or his legal dependents as per the Legal Compensation Act in force.
6. The Contractor shall engage an authorized agent or an experience qualified supervisor for the work capable of managing and guiding the work on his behalf . He shall take such orders as may be given to him by the Engineer-in charge from time to time and shall be responsible to carry them out promptly. 7. A work order book shall be maintained at the work site. The contractor shall sign the orders given by the Engineer –in- charge and Sub Divisional Officer and shall carry them promptly . After completion of the work , the work order book shall be surrendered to the A.M. C. 8 .Quantities given in the tender are approximately and are liable for variation . Excavation of the trenches will be according to actual strata met with. The contractor shall have no claim for compensation on account of any variation in the quantities and also for any variation in the depth for trenches shown in the drawing.
GENERAL CONDITIONS
67
Contractor HOD Water supply Deptt. Dy. Commissioner
9. The contractor shall at his own expenses make all necessary provision for housing, water supply and sanitary arrangements for his employees and for the work under tender shall pay direct to the authorities concerned all taxes and other charges . The contractor shall also comply with all requirement of the Health Board in regard to anti-malaria. 10. All items occurring in the work and the work and as found necessary in actual execution shall be carried out in the workmanship like manner as per specifications given in P.W.D Hand Book and as per the current specifications prevalent in AMC as per orders of the Engineer –in-charge as stated above. 11. It must be clearly understood that the conditions of the contract and specifications are intended to be rigidly enforce and no relaxation on the ground of conditions prevailing is to be allowed. 12. The Contractor will be entirely responsible for breach of local bodies , Govt. etc. while using private or public conveyance procuring and staking materials Employees of labour etc. and he will meet out all expenses in this contract without any claim whatsoever on the AMC and the AMC shall not take any responsibility on this account. 13. Before entering any property , plot , land , premises or areas ,etc. The contractor shall make his his own independent investigation through the Collector or Inspector of Land Records , etc. on his own about the ownership of the plot , and he will be liable for action for act of encroachment, trespass ,etc. committed by him or his labour or the steps taken by the party concerned. 14.The Contractor shall have to clear the site of work before the commencement of work and after the completion of the work without any extra cost. The Contractor shell construct at his cost a temporary shed of about 20Sq.Mt.As per specification, carpet area for use as office for inspection of the work by the officers and for discussing the details of work, writing work order,etc .Necessary furniture such as chairs, tables, wooden box, etc. will be constructed and provided for within fifteen days from the date of receipt of the work order. It will be maintained properly till the work is completed. The shed and furniture will be allowed to be taken back by the contractor after the work is completed. The A.M.C shall not pay any rent, charges for the shed, etc. and no A.M.C’s materials will be issued by the A.M.C. for this shed. 15. A jeepable services road, wherever necessary shall be provided and maintained by the Contractor at his cost till the completion of the work. 16. The Contractor shall arrange for final lineout of works at his own cost and under supervision of responsible representative of the A.M.C. 17. All cement concrete shall be machine mixed and machine vibrated unless otherwise instructed by the Executive Engineer. 18. The Contractor shall furnish a list of machinery in his possession which he proposes to use on the work. 19. The Contractor shall follow the instruction in general under notes for guidance of page I and II of the P.W.D. Hand Book Volume I. 20.Labour Regulation The Contractor will have to abide by the provision made under the Contract Labour (Regulation and Abolition) Act 1970 and Rules made there under by government of Maharashtra License shall have to be produced prior to starting of work.
68
Contractor HOD Water supply Deptt. Dy. Commissioner
Payment against Excess Quantities of Various Items
1. Before making payment of excess quantities as per rules, the concerned Executive Engineer should get himself satisfied regarding genuineness of the claim and he should also exercise a compulsory check of minimum 5% of measurement for a particular item .Responsibility or informing the excess beyond quantities as per Schedule ‘B’ of the tender for approval to Commissioner A.M.C and also for correctness of claims to be submitted the proposal for approval, concerned authorities should consider the exact position of the revised estimates, if necessary due to this excess.
2. For executing any quantity, the excess over the quantity specified in the tender, the Contractor should be authorized by the on recommendation of A.M.C. in writing. 3. While asking the Contractor to execute such quantity, the concerned Engineer Or Officer depute by Commissioner should inform the Contractor in writing specifically that the payment in excess of quantities specified in the tender will be made only after following concerned prescribed rules. General
The quoted rate shall be total rate for the completed item of work as per the
specifications, and shall be inclusive of all incidental charges such as lifts, leads for
materials, water for construction etc. The rates for excavation are inclusive of the
fine edge of excavated pit beyond foundations.
1. The tender must obtain on his own responsibility and his own expenses all the
information which may be necessary for the purpose of making a tender and for
entering into a contract and must consider and satisfy himself with all execution
and all materials pertaining to work.
2. Specification of item stipulated for other sub-works shall be made applicable,
where relevant.
Outline of Works 1. The Works will be on the lines of plane attached to the tender documents.
The plane are, however liable to be changed and start as shown there in
approximate.
2. The items of work and their approximate quantities are given in Schedule
–B of the tender.
SPECIAL CONDITION CONTRACT
69
Contractor HOD Water supply Deptt. Dy. Commissioner
Unit 1. The rate quoted for each item for units mentioned in Schedule-B against
each item.
Site Conditions 1. It Shall be presumed that contractor has satisfied himself as to the
nature and location of works, general and local conditions, particularly
those bearing on transport handling, storage of materials availability of
labour, weather conditions and has estimated the cost and quoted his
rates accordingly. A.M.C will bear no responsibility for lack of such
acquaintance with site conditions and consequences thereof.
2. Set of tender documents as and conditions ( upto a maximum of three
sets ) at the discretion of the Commissioner A.M.C, will be supplied to
the contractor after acceptance of tender.
Extras, Omissions and Discrepancies. In all cases of the omissions, doubts or discrepancies in yhe dimensions in
the drawing and items of works, reference shall be made to the city of
Engineer, whose elucidation and elaboration shall be considered final.
Supply of Material by the Contractor. 1. The contractor should supply all material mentioned in Schedule ‘B’. This
shall be confirming to relevant ISS. DI pipes will be accepted only after
due inspection of EIL, SGS or RITES. The charges for the same shall
be borne by Contractor. Items such as valves, specials, etc. shall be as
per relevant ISS.
2. Other material such as cement, tor steel, etc. shall be confirming to
relevant ISS. Testing charges for cement, tor steel shall be borne by
the contractor. Ultratech cement shall preferably used for water
retaining structures.
3. The contractor shall provide at the site of work satisfactory storage for
not less than one month’s average consumption of works and shall
keep the cement stored in a manner that will satisfy the Commissioner
A.M.C. The arrangement of storage and utilization of cement in the
order of its arrival at the stores and the contractor shall maintain
satisfactory records, which would have any time show the dates of
receipt and proposed utilization of cement laying in the storage.
4. The engineer-in-charge shall at all the times have access to the stores
and size, method of storage records, and security provided by the
contractor. The Contractor shall comply with instructions that will be
given by Commissioner A.M.C, in this behalf.
70
Contractor HOD Water supply Deptt. Dy. Commissioner
The contractor shall further at all times satiffy the Commissioner A.M.C on demand by the production of books, of submission of returns in performed as directed, other proofs, that, the cement supplied is being used for the purpose for which it is supplied and the Contractor shall at all times all the times keep his records up-to-date and available to the Commissioner A.M.C.
71
Contractor HOD Water supply Deptt. Dy. Commissioner
DETAILED SPECIFICATIONS General Following specifications are in in amplification or in addition to the specifications for the respective items given in PWD Hand Book Volume I and II (Letest Edition ) Red Book of Govt. of Maharashtra and shall be strictly adhered to .Relevant ISS shall also be referred. Alignment Alignment and line out for the works is to be given by the A.M.C’s officials and the work shall be carried as per the A.M.C.’s line out and alignment for which Contractor has to provide at his cost all materials such sight-rails, honing rods, pegnails , chunnam flags etc and also the required labour for line outs. The cost of constructing pillars, platforms for temporary benchmarks is also to be borne by the Contractor. Excavation in Soft Materials and Hard Materials The Classification for all excavation met with shall be two categories only, as under: Soft Materials Soft Materials shall include all types of earthy or sandy materials, soils of all types, clay, soft, average hard murum i.e. all kinds of disintegrated rocks, shingles, clay, sand, made-up soils, bricks, bats and isolated boulders upto the size of 0.1cum. The exacavation in macadam bounds surface shall also be classified in soft materials. Hard Materials Hard Materials will include boulders of size bigger than 0.1cum, all of rocks, soft and hard, which can be best removed by blasting. Blasting will not be permitted in inhabited localities or in vicinity of properties, where damage to human life and property will be involved in the opinion of the Commissioner A.M.C and in that case work will have to be done by chiseling and the like methods in the same tendered rates. By the term “SOFT ROCK” is meant rock in masses but of a softer variety, crystalling in structure in structure, which is otherwise like hard rock. It only indicates the degree of softness, but will not include the disintegrated masses of rock, which generally have fractures or cleavages. Soft rock can be removed by a pick but for mass removal blasting has to be done. On hard rock a crow bar or a pick will only rebound removing but in significant quantity. The exacavation in asphalt or concrete shall be classified as hard materials. The excavation shall be taken down to such depths as shown in drawings and / or as directed and shall be done in extra section shown in drawings and stipulated in specification elsewhere herein. Extra excavation done over and above specified for whatever reasons shall not be paid for. The bottom of the foundation pits shall be perfectly leveled before any concrete or masonry is put in an shall be watered and thoroughly rammed. No filling will be allowed for bringing the foundation pit to proper level. The excavation may go down deeper by3.0M more to reach proper foundations and arriving certain levels etc. for which necessary payments shall be done. The section of excavation, however, may be increased correspondingly, if necessary, as directed by the Commissioner A.M.C, for such extra depth and such increased
72
Contractor HOD Water supply Deptt. Dy. Commissioner
section as directed by Commissioner A.M.C, shall be admissible for payment at respective tendered items. All foundation pits shall be filled on the sides of masonry and concrete by the excavated stuff to the original surface of ground as required, watered and rammed, in 20 cms. Thick layers and the tendered rate includes this operation. Exacavated materials from foundation shall not be placed nearer than 1.2M from the edges of excavation. In case of excavation in towns and inhabited places, it shall be strongly fenced and lighted during night by red lights in charge of watchman at Contractor’s cost. Material should not be dumped on road. Unless otherwise specific lifts and leads are mentioned in the tendered item the tendered rate shall be for all lifts and leads involved in the work m. The Contractor shall provide shoring and strutting of approved size and type for normal conditions wherever necessary for execution in soft materials without extra cost unless otherwise provided for in separate tender item. Excavation carried out in excess of the width specified shall be at Contractor’s own risk and shall not been measured . So also the execution carried out in excess of the required depth shall be made good to the required level by the either concrete masonry of proportion as directed by the Commissioner AMC without extra cost . The tendered rate for excavation items shall include lifting and removing the excavated material for proper disposal in the vicinity as directed by the Engineer –in Charge. Nothing extra shall be paid for removal of masonry concrete structures, or for removal of stumps or roots of trees met with during excavation and for filling of holes or hollow due to removal of roots etc. or existing originally which shall be filled up by earth and will be rammed and leveled. If there is no separate item of dewatering in the tender, the Contractor’s tendered rate shall include manual bailing, drawing of the trench and the excavation shall be kept free from water, while the work is in progress in a manner as may be directed by the Commissioner A.M.C. Where is a tender item of dewatering then payment shall be admissible under dewatering required for all item in the tender from start till its completion. In either case the excavation item shall be dry as well as in wet condition, unless otherwise separate item exist for wet excavation. In case of pipe trenches, the Engineer-in-charge may reduce the width of trench wherever a hard strata is met with, if he feels adequate and just sufficient to lay the pipeline in order to reduce the hard quality. In such cases the Contractor will be paid on the actual measurements. No extra cost will be paid for putting the pipe all along the trenches before laying in the trenches. Average width of excavation trenches that shall be admissible for payment for various diameters of pipeline (excepting PVC pipes) Shall be as under.
73
Contractor HOD Water supply Deptt. Dy. Commissioner
Sr. No
Internal Dia. of Pipe Width of Excavation of Trench
Nature of Strata
1 80mm and below 0.70 M In soft & Hard aterials 2 100 mm 0.75 M In soft & Hard aterials 3 150 mm 0.75 M In soft & Hard aterials 4 200 mm 0.85 M In soft & Hard aterials 5 250 mm 0.85 M In soft & Hard aterials 6 300 mm 0.90 M In soft & Hard aterials 7 350 mm 0.95 M In soft & Hard aterials 8 400 mm 1.10 M In soft & Hard aterials 9 450 mm 1.15 M In soft & Hard aterials 10 500 mm 1.20 M In soft & Hard aterials 11 550 mm 1.25 M In soft & Hard aterials 12 600 mm 1.25 M In soft & Hard aterials 13 700 mm 1.30 M In soft & Hard aterials 14 750 mm 1.40 M In soft & Hard aterials 15 More than 750mm O.D +0.60M In soft & Hard aterials
Any width excavated more than above shall not be measured and paid for. The Contractor shall carry out extra excavation for collars pits at joint wherever necessary and such extra collar pit excavation shall not be admissible for payment and will not be measured. The Contractor shall at his own cost give the satisfactory hydraulic testing which shall include all labour cost of water to feed and while testing, repairs required shall have to be carried out by the Contractor. No extra cost shall be paid. Refilling Trenches of Pipelines In no case the Contractor shall be allowed to refill the trenches in hard excavated portion to be refilled by the boulders or the excavated stuff. This portion of trench shall be refilled by the soft murum or soft from excavated stuff from distant place. No extra cost shall be paid. After the pipelines are laid, joined and tested, the refilling of trenches with excavated stuff shall be done approximately in 20 to 30cms.higher than road or natural ground level, to allow for sinking afterwards. The refilling shall be done in 15cms.thick layers, duly watering completing, each layer. The 15cms thick layer immediately in contact on or under pipe shall have no stones or chips, but only soil or soft murum selected from the excavated stuff after refilling. If it is sunk below the road level after some time till completion of work, the Contractor shall have to make it good at his cost. Before lowering of all pipes in trenches a layer of murum selected from excavated stuff shall be provided below pipe line for proper grading and to act as cushion etc.
74
Contractor HOD Water supply Deptt. Dy. Commissioner
Murum Bedding The murum to be used shall be of approved quality soft murum to be laid in 15cms average thickness to the grade as directed by the Engineer-in-charge. The width admissible for payment shall be the same as per excavation trench width admissible under excavation item. The murum bedding shall be provided where there is black cotton soil or hard material below pipes or wherever directed and it shall be well rammed so as not to sink the pipe line. Extra excavation tender items. B.B Masonry Chamber (Providing and Construction) The work is to be done in workmanlike manner as per type design of the A.M.C. and as directed. The cost of extra excavation in all strata which is in addition to the pipeline trench excavation is included in this item, while the excavation covered under pipeline trenches coming in the chambers is admissible for payment separately under the respective tender item of excavation for pipe trenches. Sizes of chamber mentioned in tender item are the internal dimension of the chamber. The tended item covers 1:3:6 CC bedding 15cms thick on the well rammed bottom 23cms thick BB Masonry walls in Cm 1:6 cement plaster 12 mm in CM 1:3 from inside and cement pointing 1:2 from outside,1:2:4 CC either plain or RCC as required 10 mm thick for coping and providing and fixing M.H. frame and cover 1M x 0.5 M. This is a completed item and any incidental not mentioned above but are necessary as per type design are deemed to be included in this item. The finished top the chamber shall be flush with road surface and shall not cause any hindrance to the traffic. The measurement shall be on the basis of completed number of chambers. Measurement and Mode of Payment Measurement The measurements are to be recorded in Measurement Book as per Manual on Water Supply & Treatment, not below the rank of Deputy Engineer. Mode of Payment The payment can be made after carrying out recuperation test as indicated above, at least for five consecutive days. The Engineer In Charge should record in Measurements Book that “I am satisfied with the test conducted and the result of recuperation test”.
75
Contractor HOD Water supply Deptt. Dy. Commissioner
1. The Contractor shall study the site condition, general and data included in the
tender papers and get it verified from actual inspection of the site etc. before
submitting the tender. In case of double about any item or data included in this
tender or otherwise, it shall be got clarified by applying in writing to the
Commissioner A.M.C. 15 days in advance before date of submission of the
tender. Once the tender is submitted, it shall be considered that the Contractor
has verified and made himself conversant with all the details as required for
quoting the rates and completing the work as per tender conditions and
specification.
2. Contractor shall not sell or otherwise dispose off or remove except for the
purpose of this contract, the rubble, stone metal, sand or other material which
may be obtained from any excavation, made for the purpose of the contract. All
such materials shall be A.M.C.’s property and shall be disposed off in the
manner and at place as may be directed by the Engineer-in-Charge. Contractor
may with the permission of the Engineer-in-charge in writing and when directed
by him, use any of the material free of cost.
3. Other unforeseen items to be done in the course of work will have to be done
by the Contractor as per specification in P.W.D. Hand Book Volume I and II and
will be paid at mutually agreed rates, ISS and standard practice in vogue.
Extra charge of claims in respect of extra work shall not be allowed unless the work to which they relate are in the spirit and meaning of the specification or unless such works are ordered in writing by the Engineer-in-charge and claimed for in the specified manner before the work is taken in hand. Material
4. The Contractor shall make his own arrangements for obtaining rubble, khandki,
headers, metal, sand, murum, etc. from A.M.C. or private quarry. Application of
the Contractor for reasonable area of Government land required for this
purpose can be recommended to Revenue Authorities without any guarantee of
making the land for quarry available.
All the material involved in the construction shall be of best quality and specifications and shall be got approved from the Engineer-in-charge before use. If necessary, materials shall be got tested from the Laboratory at his cost. Samples requiring approval shall be submitted by the Contractor to the Engineer-in-charge in good time before the use of each material. The Samples shall be properly marked to show the name of the material place.
5. The Contractor shall provide all labour, skilled as well as unskilled, pegs lime,
strings, site-rails (Wooden as well as steel, etc.) as and when required as per
approved design and make available such other materials for surveying, lining
out, setting out, checking of works, taking measurement, testing of hydraulic
ACQUAINTANCE WITH SITE CONDITION AND WORK
CONDITIONS
76
Contractor HOD Water supply Deptt. Dy. Commissioner
and other structures, without any payment by the A.M.C. to him . He will also
provide proper approach and access to all his work and stores without any
extra cost over his tender rates for item to be inspected.
6. Rates quoted include clearance of site (prior to commencement of work and its
closure) in all respects and hold good for work under all condition of sites,
moisture, weather, etc.
7. Failure to comply with any of the above instruction will result in the A.M.C’s
doing the needful at the risk and cost of the Contractor. These conditions are
for all times and as such no extra payment shall be made for observing these
conditions.
8. The Contractor shall make his own arrangements for quarrying of rubble, stone,
murum, sand, lime, metal.etc.
9. Overburden in quarry will have to be removed by the Contractor at his own cost.
10. Unless a separate item is provided in Schedule ‘B’ minor dewatering of
foundation in excavation and during the construction of foundation masonry if
required shall be done by the Contractor without claiming extra cost.
11. Masonry shall be kept wet for atleast 15 days and concrete work shall be kept
wet for atleast 21 days commencing from the date of its final laying in position.
In case during execution curing is found inadequate, it will be carried out by
A.M.C.’s and the cost thereof shall be recovered from the Contractor shall make
his own arrangements for getting water at site at own cost.
12. The proportion of cement concrete specified in the Schedule ‘B’ are nominal
and are only an indication of approximate proportion of cement, fine aggregate
and coarse aggregate which may quantity of cement shall not be less than the
one specified below.
Nominal Mix 1:1:2 (M 250) 8.50 bags /one cum of Cement Concrete 1:11/2 :3 (M 200) 7.90 bags /one cum of Cement Concrete 1:2:4 (M 150) 6.27 bags /one cum of Cement Concrete 1:3:6 (M 100) 4.42 bags /one cum of Cement Concrete 1:4:8 (M 80) 3.39 bags /one cum of Cement Concrete
In case of major items of concrete for RCC works the Contractor shall prepare test blocks as per IS specification for testing its tensile and compressive strength at his own cost. These blocks will be tested in any of the Government Test Laboratories at the cost of the Contractor. The number of test blocks, frequency etc. shall be as per
77
Contractor HOD Water supply Deptt. Dy. Commissioner
ISS 456/2000 Latest Edition (CL.14) and acceptance criteria of concrete shall be as per Clause of ISS 456-2000 Latest Edition.
13. Damage by Floods or Accident
The Contractor shall take all precaution against damage by floods and from accidents, No compensation will be allowed to the Contractor for his plant, material and work etc. lost or damaged by floods or from other causes. The Contractor shall be liable to make good any part of material which is in charge of the Contractor and which is lost to make good any part of material which is in charge of the Contractor and which is lost or damaged by floods or from any other cause. If the work executed is damaged, trenches filled due to any reason, Contractor shall have to make it good at his cost only.
14. Testing of Structure
In case of work which creates reasonable doubts about quality of workmanship or of materials used in the construction, the Commissioner A.M.C. may order the Contractor to satisfy the A.M.C. by carrying out a suitable load test or test of the structure or parts thereof, in the manner as prescribed in Clause-16.5 on Page No. 45. The Indian Standard Code of Practice for, plain and reinforced concrete for general building construction or as may be approved by him, in regard to the sufficiency of the strength as designed and in the event of any deficiency being noticed as a result of the test, the Contractor shall carry out necessary strengthening as may be directed by the Commissioner A.M.C. The load test and strengthening or dismantling whenever directed shall be carried out by the Contractor entirely at his risk and cost to the entire satisfaction of Engineer-in-Charge or his authorized agent and till then the work shall not be considered to have been completed. No payment for dismantled work shall be made.
15. Supply of Rates Analysis in case of Extra Item
In case of the E.I.R.L. the Contractor shall supply Rate Analysis based on labour and material in case he is called upon to do so.
16. Water required for Construction
The Contractor has to make his own arrangements at his cost for water required for construction, testing, filling, structures, etc. either from local bodies or from elsewhere, by paying the charges directly and arranging tankers, etc. as per necessity. No claim for extra payment on account of non-availability of water nearby, or extra lead for bringing water shall be entertained. All required piping arrangements and pumping if required for water shall be made by the Contractor at his cost. If Contractor fails to pay the water charges to local bodies or private parties these shall be recovered by the A.M.C. from his bills. In case A.M.C’s water supply is available, a connection at a suitable place may be sanctioned but, all further arrangements of pumping if required, piping, etc. shall be done by the Contractor at his cost, and water charges in such case, shall be paid by the Contractor at the rates as decided by the Commissioner A.M.C., which shall be final and binding on the Contractor.
78
Contractor HOD Water supply Deptt. Dy. Commissioner
Whenever Schedule ‘B’ provides for any dewatering item, payment shall be admissible under that item, but apart from that item, no extra claims for dewatering required for executing as all these expenses are deemed to be included in the dewatering item.
17. Leads and Lifts
Unless otherwise specifically mentioned in the tender item, the tendered rate for all items in tender shall cover all lifts and leads encountered for the execution of the work as directed and no extra claims for additional lifts and leads shall be entertained.
18. Unless otherwise specifically mentioned in the tender or a separate item
is provided in Schedule ‘B’, all the sides of excavated trenches after the work is
completed or in progress are to be filled by the Contractor to the original ground
level from excavated stuff at no cost of the A.M.C.
19. Unless otherwise specifically mentioned in the tender item, the net
dimensions of RCC or CC Members actually cast are only admissible for
payment under RCC or plain CC items. No increase in dimension due to
plastering or finishing shall be admissible for payment under RCC or Plains CC
items.
20. Cement that will be supplied by the Contractor shall be in Jute /PVC bags.
21. No claims for any desilting of trenches, etc. filled due to floods, untimely rains,
or any other reasons whatsoever shall be entertained and Contractor shall have
to do this desilting operation together with dewatering operation entirely at his
cost.
22. Electricity supply required for construction of work / labour camp, etc. shall be
arranged by the Contractor at his own cost.
79
Contractor HOD Water supply Deptt. Dy. Commissioner
AFFIDAVIT
(To be done on Stamp Paper of Rs. 100/- infront of Tahsildar / Notary Public. Govt.Of India. )
1. I, the undersigned do hereby certify that all the statements made in the required
attachments are true and correct.
2. The undersigned also hereby certifies that neither our firm
M/s.......................................... have abandoned any work on Govt./Semi Govt./
Private Organisation in India nor any contract awarded to us for such works have
been rescinded during last five years prior to the date of this bid.
3. The undersigned hereby authorise(s) and request(s) any bank, person, firm or
corporation to furnish pertinent information deemed necessary and requested by the
Department to verify this statement or regarding my (our) competence and general
reputation.
4. The undersigned understand and agrees that further qualifying information may be
requested, and agrees to furnish any such information at the request of the Department
/ Project Implementing Agency.
For M/s....................................
.........................................
Title of Officer
.........................................
Name of Firm
Date : / /20
Ahmednagar Municipal Corporation 80
Contractor HOD Water supply Deptt. Dy. Commissioner
AHMEDNAGAR MUNICIPAL CORPORATION
TENDER NO.275
Name of work :- Providing and Lowering laying 75 and 63 mm dia P.V.C. line at savedi gaothan
dalitwasti from Bhingardive mala house to saint Tukaram Temple,
SCHEDULED - B
No. Qty. Item. Rates in Figure Rate Unit Amount
1 54.00 Excavation for pipe trenches in earth
soil and gravel including disposing off
material as directed guardine lighting
barricading etc.
Rs. Ninety two paise forty
only
92.40 Cum 4989.60
2 22.50 Excavation foundation / pipe trenches in
hard material & bounders upto a distance
of 50m. beyond the area and lift as
below stacking & spreading as directed
dewatering showering strutting as
directed preparing the bed for the
foundation etc. complete
Rs. One hundred six paise
seventy only
106.70 Cum 2400.75
3 0.60 Excavation for foundation / pipe trenches
in soft rock & old cement asphalt road
foundation including the excavated
materials up to a distance 50mm beyond
the area and lift as below stacking as
directed etc. complete
Rs. Three hundred thirty
six paise sixty only
336.60 Cum 201.96
Ahmednagar Municipal Corporation 81
Contractor HOD Water supply Deptt. Dy. Commissioner
4
90.00
60.00
Providing and Supplying in standard
lengths ISI mark rigid unplasticised PVC
pipes for potable water with rubber ring
joints including cost of rubber ring as per
IS 4985 – 1988 all local and central taxes
transportation freight charges transit
insurance inspection charges unloading
conveyance to store / site stacking the
same in closed shed duly protected from
sun rays and rains etc. complete.
1) 75 mm 6 kg
2) 63 mm 6 kg
1) Rs. Eighty one only.
2) Rs. Fifty seven only
81.00
57.00
Rmt
Rmt
7290.00
3420.00
5
Job
Providing PVC / G.I. special as per
requirement.
Payment will be made on the basis
of actual consumption on site and
will be paid on the basis of
prevailing and competating market
rates after producing tax invoice in
original in the name of comtractor/
work
---
L / S
Job
457.50
Ahmednagar Municipal Corporation 82
Contractor HOD Water supply Deptt. Dy. Commissioner
6
90.00
60.00
Lowering, laying and jointing PVC pipes
and specials of following class and dia
including conveyance from stores to site
of works all labour giving satisfactory
hydraulic test etc.
1) 75 mm
2) 63 mm
1) Rs. Sixteen paise
ninty eight only
2) Rs. Twelve paise
twenty four only
16.98
12.24
Rmt
Rmt
1528.20
734.40
7
1.00
1.00
Providing & supplying sluice valve PN
for 50 mm including necessary jointing
materials such as nuts, rubbers packing
etc. complete page no. 118 & 120 A (ii)
1) 65 mm
2) 50 mm
1) Rs. Four thousand
seven hundred
seventy two only
2) Rs. Four thousand
two hundred
seventy three only
4772.00
4273.00
No
No
4772.00
4273.00
8
1.00
1.00
Lowering and laying sluice valve PN for
150 mm including necessary jointing
materials such as nuts rubbers packing.
1) 65 mm
2) 50 mm
1) Rs. Six hundred
seven paise ninty
five only
2) Rs. Three hundred
607.95
361.20
No
No
607.95
361.20
Ahmednagar Municipal Corporation 83
Contractor HOD Water supply Deptt. Dy. Commissioner
sixtyone paise
twenty only
9 243.72 Refilling the trenches with available
excavated stuff with soft material first
over pipeline and then hard material in
15 cm layers with all leads and lifts
including consolidation, surcharging, etc.
complete.
Rs. Thirty six paise
seventy five only
36.75 Cum 8956.66
Total Rs 33826.00
Say Rs. – 33,826 /- In words :- Rs. Thirty three Thousand eight hundred twenty six Only
Ahmednagar Municipal Corporation 84
Contractor HOD Water supply Deptt. Dy. Commissioner
AHMEDNAGAR MUNICIPAL CORPORATION
TENDER NO.276
Name of work :- Providing and Lowering laying 63 mm dia P.V.C. and 80 mm dia G.I. pipe line from
Kohinoor Apartment to Mehtar Colony In Ward No. 49, Ahmeadnagar
SCHEDULED - B
No. Qty Item. Rate in Figure Rate Unit Amount
1 39.60 Excavation for pipe trenches in earth
soil and gravel including disposing off
material as directed guardine lighting
barricading etc.
Rs. Ninety two paise forty
only
92.40 Cum 3659.04
2 23.76 Excavation foundation / pipe trenches in
hard material & bounders upto a distance
of 50m. beyond the area and lift as
below stacking & spreading as directed
dewatering showering strutting as
directed preparing the bed for the
foundation etc. complete
Rs. One hundred six paise
seventy only
106.70 Cum 2535.19
3 7.92 Excavation for foundation / pipe trenches
in soft rock & old cement asphalt road
foundation including the excavated
materials up to a distance 50mm beyond
the area and lift as below stacking as
directed etc. complete
Rs. Three hundred thirty
six paise sixty only
336.60 Cum 2665.87
Ahmednagar Municipal Corporation 85
Contractor HOD Water supply Deptt. Dy. Commissioner
4
72.00
Providing and Supplying in standard
lengths ISI mark rigid unplasticised PVC
pipes for potable water with rubber ring
joints including cost of rubber ring as per
IS 4985 – 1988 all local and central taxes
transportation freight charges transit
insurance inspection charges unloading
conveyance to store / site stacking the
same in closed shed duly protected from
sun rays and rains etc. complete.
3) 63 mm 6 kg
Rs. Fifty seven only.
57.00
Rmt
4104.00
5
60.00
Providing ISI mark G.I. pipe mm
diameter medium duty including all
local & central taxes. etc.
1) 80 mm
Rs. Four hundred fifty
nine only
459.00
Rmt
27540.00
6
Job
Providing PVC / G.I. special as per
requirement.
Payment will be made on the basis of
actual consumption on site and will be
paid on the basis of prevailing and
competating market rates after producing
tax invoice in original in the name of
comtractor/ work
---
L / S
Job
1582.20
7
Lowering, laying and jointing PVC pipes
and specials of following class and dia
including conveyance from stores to site
of works all labour giving satisfactory
Ahmednagar Municipal Corporation 86
Contractor HOD Water supply Deptt. Dy. Commissioner
72.00
hydraulic test etc.
3) 63 mm
Rs. Twelve paise twenty
four only.
12.24
Rmt
881.00
8
60.00
Lowering, laying and jointing G.I. pipes
and specials of following class and
diameter including conveyance from
stores to site work, all labour giving
satisfactory testing etc. in level & slope
etc. complete.
1) 80 mm
Rs. Forty three paise zero
five only.
43.05
Rmt
2583.00
9
1.00
1.00
Providing and supplying double flanged
shorty body pattern type manually
operated butterfly valve having body
disc and end cover in graded cast iron to
IS 210 Gr CF 200 generally conforming
in BS 5155 synthetic rubber faced ring
secured on disc by retaining ring with
stainless steel screw stub shaft of
stainless steel riding in Teflon bearing
excluding C.C. foundation structural
steel support confirming to IS 13095-
1991
1) 50 mm
2) 80 mm
1) Rs. Four thousand
two hundred
seventy three only
Rs. Five thousand
one hundred forty
five only
4273.00
5145.00
No
No
4273.00
5145.00
Ahmednagar Municipal Corporation 87
Contractor HOD Water supply Deptt. Dy. Commissioner
10 1.00 Lowering laying jointing CIDF Reflux
Sluice
1) 80 mm
Rs. Eight hundred eighty
seven paise twenty
five only
887.25 No 887.25
11 63.36 Refilling the trenches with available
excavated stuff with soft material first
over pipeline and then hard material in
15 cm layers with all leads and lifts
including consolidation, surcharging, etc.
complete.
Rs. Thirty six paise
seventy five only
36.75 Cum 2328.48
Total Rs 58184.53
Say Rs. – 58, 185 /-
In words :- Rs. Fifty Eight Thousand One Hundred Eighty Five Only
Ahmednagar Municipal Corporation 88
Contractor HOD Water supply Deptt. Dy. Commissioner
AHMEDNAGAR MUNICIPAL CORPORATION
TENDER NO.277
Name of work :- Providing and Lowering laying 75 mm dia P.V.C. line at kothala,Aher galli zopadpatti
internal in ward no.23 , Ahmeadnagar
SCHEDULED - B
NO. Quan Item. Rate in Figure Rate Unit Amount
1 45.00 Excavation for pipe trenches in earth
soil and gravel including disposing off
material as directed guardine lighting
barricading etc.
Rs. Ninety two paise forty
only
92.40 Cum 4158.00
2 45.00 Excavation foundation / pipe trenches in
hard material & bounders upto a distance
of 50m. beyond the area and lift as
below stacking & spreading as directed
dewatering showering strutting as
directed preparing the bed for the
foundation etc. complete
Rs. One hundred six paise
seventy only
106.70 Cum 4801.50
3 30.00 Excavation for foundation / pipe trenches
in soft rock & old cement asphalt road
foundation including the excavated
materials up to a distance 50mm beyond
the area and lift as below stacking as
directed etc. complete
Rs. Three hundred thirty
six paise sixty only
336.60 Cum 10098.00
Ahmednagar Municipal Corporation 89
Contractor HOD Water supply Deptt. Dy. Commissioner
4 250.00 Providing and Supplying in standard
lengths ISI mark rigid unplasticised PVC
pipes for potable water with rubber ring
joints including cost of rubber ring as per
IS 4985 – 1988 all local and central taxes
transportation freight charges transit
insurance inspection charges unloading
conveyance to store / site stacking the
same in closed shed duly protected from
sun rays and rains etc. complete.
4) 75 mm 6 kg
Rs. Eighty one only.
81.00 Rmt
20250.00
5 Job Providing PVC / G.I. special as per
requirement.
Payment will be made on the basis
of actual consumption on site and
will be paid on the basis of
prevailing and competating market
rates after producing tax invoice in
original in the name of comtractor/
work
----- L / S Job 2025.00
6 250.00 Lowering, laying and jointing PVC pipes
and specials of following class and dia
including conveyance from stores to site
of works all labour giving satisfactory
hydraulic test etc.
4) 75 mm
Rs. Sixteen paise ninety
eight only.
16.98 Rmt
4245.00
Ahmednagar Municipal Corporation 90
Contractor HOD Water supply Deptt. Dy. Commissioner
7 ------- Providing ISI mark G.I. pipe mm
diameter medium duty including all
local & central taxes. etc.
2) 50 mm
Rs. Two hundred eighty
two only
282.00 Rmt
------------
8 Job Providing PVC / G.I. special as per
requirement.
Payment will be made on the basis
of actual consumption on site and
will be paid on the basis of
prevailing and competating market
rates after producing tax invoice in
original in the name of comtractor/
work
----- L / S Job ---------
9 --------- Lowering, laying and jointing G.I. pipes
and specials of following class and
diameter including conveyance from
stores to site work, all labour giving
satisfactory testing etc. in level & slope
etc. complete.
2) 50 mm
Rs. Twenty six paise
twenty five only.
26.25 Rmt -----------
10 1.00
Providing & supplying sluice valve PN
for 50 mm including necessary jointing
materials such as nuts, rubbers packing
etc. complete page no. 118 & 120 A (ii)
3) 65 mm
Rs. Four thousand seven
hundred seventy two
only
4772.00
No
4772.00
Ahmednagar Municipal Corporation 91
Contractor HOD Water supply Deptt. Dy. Commissioner
11 1.00
Lowering and laying sluice valve PN for
150 mm including necessary jointing
materials such as nuts rubbers packing.
3) 65 mm
Rs. Six hundred seven
paise ninety five only
607.95 No
607.95
12 105.00 Refilling the trenches with available
excavated stuff with soft material first
over pipeline and then hard material in
15 cm layers with all leads and lifts
including consolidation, surcharging, etc.
complete.
Rs. Thirty six paise
seventy five only
36.75 Cum 3858.75
13 1.00 Providing & constructing B.B. masonry
Valve Chamber with 15cm thick 1:3:6
proportion PCC beading excluding
excavation BBM in 1:5 proportion
precast RCC frame and cover etc.
Note : wall thickness 0.23 m for depth of
1.2 m and 0.35 m for balance depth
exceeding 1.2m.
Valve chamber with precast R.C.C.
As above of 90 x 60 cm internal size and
depth up to 0.9M
Rectangular chamber up to 1 m
Rs. Three thousand six
hundred fifty two
paise ninety five only.
3652.95
No
3652.95
Total Rs 58469.00
Say Rs. – 58, 469 /-
In words :- Rs. Fifty Eight Thousand Four Hundred Sixty Nine Only
Ahmednagar Municipal Corporation 92
Contractor HOD Water supply Deptt. Dy. Commissioner
AHMEDNAGAR MUNICIPAL CORPORATION
TENDER NO.278
Name of work :- Providing and Lowering laying 63 mm dia P.V.C. line in from MJP-Tarkapur compound to
ramwadi akolkar house inward no.23 , Ahmeadnagar
SCHEDULED - B
NO. Quan Item. Rate in Figure Rate Unit Amount
1 72.00 Excavation for pipe trenches in earth
soil and gravel including disposing off
material as directed guardine lighting
barricading etc.
Rs. Ninety two paise forty
only
92.40 Cum 6652.80
2 54.00 Excavation foundation / pipe trenches in
hard material & bounders upto a distance
of 50m. beyond the area and lift as
below stacking & spreading as directed
dewatering showering strutting as
directed preparing the bed for the
foundation etc. complete
Rs. One hundred six paise
seventy only
106.70 Cum 5761.80
3 36.00 Excavation for foundation / pipe trenches
in soft rock & old cement asphalt road
foundation including the excavated
Rs. Three hundred thirty
six paise sixty only
336.60 Cum 12117.60
Ahmednagar Municipal Corporation 93
Contractor HOD Water supply Deptt. Dy. Commissioner
materials up to a distance 50mm beyond
the area and lift as below stacking as
directed etc. complete
4
270.00
Providing and Supplying in standard
lengths ISI mark rigid unplasticised PVC
pipes for potable water with rubber ring
joints including cost of rubber ring as per
IS 4985 – 1988 all local and central taxes
transportation freight charges transit
insurance inspection charges unloading
conveyance to store / site stacking the
same in closed shed duly protected from
sun rays and rains etc. complete.
5) 63 mm 6 kg/cm2
Rs. Fifty seven only
57.00
Rmt
15390.00
5 Job Providing PVC / G.I. special as per
requirement.
Payment will be made on the basis
of actual consumption on site and
will be paid on the basis of
prevailing and competating market
rates after producing tax invoice in
original in the name of comtractor/
work
---- L / S Job 769.50
6 270.00 Lowering, laying and jointing PVC pipes
and specials of following class and dia
including conveyance from stores to site
of works all labour giving satisfactory
hydraulic test etc.
63 mm 6 kg/cm2
3) Rs. Twelve paise
twenty four only.
12.24 Rmt
3304.80
Ahmednagar Municipal Corporation 94
Contractor HOD Water supply Deptt. Dy. Commissioner
7
30.00
Providing ISI mark G.I. pipe
diameter medium duty including all
local & central taxes. etc.
3) 50 mm
Rs. Two hundred eighty
two only
282.00
Rmt
8460.00
8 Job Providing PVC / G.I. special as per
requirement. Payment will be made on
the basis of actual consumption on site
and will be paid on the basis of
prevailing and competating market rates
after producing tax invoice in original in
the name of comtractor/ work
---- L / S Job 423.00
9
30.00
Lowering, laying and jointing G.I. pipes
and specials of following class and
diameter including conveyance from
stores to site work, all labour giving
satisfactory testing etc. in level & slope
etc. complete.
50 mm
Rs. Twenty six paise
twenty five only
26.25
Rmt
787.50
10 1.00
Providing & supplying sluice valve PN
for 50 mm including necessary jointing
materials such as nuts, rubbers packing
etc. complete page no. 118 & 120 A (ii)
50 mm
Rs. Four thousand two
hundred seventy three
only
4273.00
No
4273.00
11
1.00
Lowering and laying sluice valve PN for
150 mm including necessary jointing
materials such as nuts rubbers packing.
50 mm
Rs. Three hundred sixty
one paise twenty
361.20
No
361.20
12 144.00 Refilling the trenches with available
excavated stuff with soft material first
Rs. Thirty six paise
seventy five only
36.75 Cum 5292.00
Ahmednagar Municipal Corporation 95
Contractor HOD Water supply Deptt. Dy. Commissioner
over pipeline and then hard material in
15 cm layers with all leads and lifts
including consolidation, surcharging, etc.
complete. Total Rs 63593.00
Say Rs. – 63, 593/- In words :- Rs. Sixty Three Thousand Five Hundred Ninety Three Only
Ahmednagar Municipal Corporation 96
Contractor HOD Water supply Deptt. Dy. Commissioner
AHMEDNAGAR MUNICIPAL CORPORATION
TENDER NO.279
Name of work :- Providing and Lowering laying 63 mm dia P.V.C. and 80 mm dia G.I. pipe line from
Kohinoor Apartment to Mehtar Colony In Ward No. 49, Ahmeadnagar
SCHEDULED – B
No. Qty Item. Rates in Figure Rate Unit Amount
1 75.00 Excavation for pipe trenches in earth
soil and gravel including disposing off
material as directed guardine lighting
barricading etc.
Rs. Ninety two paise forty
only
92.40 Cum 6930.00
2 45.00 Excavation foundation / pipe trenches in
hard material & bounders upto a distance
of 50m. beyond the area and lift as
below stacking & spreading as directed
dewatering showering strutting as
directed preparing the bed for the
foundation etc. complete
Rs. One hundred six paise
seventy only
106.70 Cum 4801.50
3 30.00 Excavation for foundation / pipe trenches
in soft rock & old cement asphalt road
foundation including the excavated
Rs. Three hundred thirty
six paise sixty only
336.60 Cum 10098.00
Ahmednagar Municipal Corporation 97
Contractor HOD Water supply Deptt. Dy. Commissioner
materials up to a distance 50mm beyond
the area and lift as below stacking as
directed etc. complete
4
120.00
130.00
Providing and Supplying in standard
lengths ISI mark rigid unplasticised PVC
pipes for potable water with rubber ring
joints including cost of rubber ring as per
IS 4985 – 1988 all local and central taxes
transportation freight charges transit
insurance inspection charges unloading
conveyance to store / site stacking the
same in closed shed duly protected from
sun rays and rains etc. complete.
6) 63 mm 6 kg
7) 90 mm 6 kg
Rs. Fifty seven only.
Rs. One hundred sixteen
only
57.00
116.00
Rmt
Rmt
6840.00
15080.00
5 Job Providing PVC / G.I. special as per
requirement.
Payment will be made on the basis of
actual consumption on site and will be
paid on the basis of prevailing and
competating market rates after producing
tax invoice in original in the name of
comtractor/ work
---- L / S Job 2192.00
6
Lowering, laying and jointing PVC pipes
and specials of following class and dia
including conveyance from stores to site
of works all labour giving satisfactory
hydraulic test etc.
Ahmednagar Municipal Corporation 98
Contractor HOD Water supply Deptt. Dy. Commissioner
120.00
130.00
5) 63 mm
6) 90 mm
4) Rs. Twelve paise
twenty four only
5) Rs. Nineteen paise
forty only
12.24
19.40
Rmt
Rmt
1469.16
2522.52
7
4.00
2.00
Providing and supplying double flanged
shorty body pattern type manually
operated butterfly valve having body
disc and end cover in graded cast iron to
IS 210 Gr CF 200 generally conforming
in BS 5155 synthetic rubber faced ring
secured on disc by retaining ring with
stainless steel screw stub shaft of
stainless steel riding in Teflon bearing
excluding C.C. foundation structural
steel support confirming to IS 13095-
1991
3) 50 mm
4) 80 mm
2) Rs. Four thousand
two hundred
seventy three only
3) Rs. Five thousand
one hundred forty
five only
4273.00
5145.00
No
No
17092.00
10290.00
8
4.00
Lowering laying jointing CIDF Reflux
Sluice
2) 50 mm
1) Rs. Three hundred
sixty one paise
twenty only
361.20
No
1444.80
Ahmednagar Municipal Corporation 99
Contractor HOD Water supply Deptt. Dy. Commissioner
2.00 3) 80 mm
2) Rs. Eight hundred
eighty seven paise
twenty five only
887.25
No
1774.50
9 135.00 Refilling the trenches with available
excavated stuff with soft material first
over pipeline and then hard material in
15 cm layers with all leads and lifts
including consolidation, surcharging, etc.
complete.
Rs. Thirty six paise
seventy five only
36.75 Cum 4961.25
10 15.00 Removing excess materials up to 4 km
Rs. One hundred forty
only
140.00 Cum 2100.00
Total Rs 87595.73
Say Rs. – 87,596 /-
In words :- Rs. Eighty Seven Thousand Five Hundred Ninety Six Only
Ahmednagar Municipal Corporation 100
Contractor HOD Water supply Deptt. Dy. Commissioner
AHMEDNAGAR MUNICIPAL CORPORATION
TENDER NO.280
Name of work :- Providing and Lowering laying 110 & 75 mm dia P.V.C. line in Gandhinagar Chobhe
Colony In Ward No. 13, Ahmeadnagar
SCHEDULED - B
NO. Quan Item. Rate in Figure Rate Unit Amount
1 160.05 Excavation for pipe trenches in earth
soil and gravel including disposing off
material as directed guardine lighting
barricading etc.
Rs. Ninety two paise forty
only
92.40 Cum 14788.62
2 87.30 Excavation foundation / pipe trenches in
hard material & bounders upto a distance
of 50m. beyond the area and lift as
below stacking & spreading as directed
dewatering showering strutting as
directed preparing the bed for the
foundation etc. complete
Rs. One hundred six paise
seventy only
106.70 Cum 9314.91
3 0.90 Excavation for foundation / pipe trenches
in soft rock & old cement asphalt road
foundation including the excavated
materials up to a distance 50mm beyond
the area and lift as below stacking as
directed etc. complete
Rs. Three hundred thirty
six paise sixty only
336.60 Cum 302.94
Ahmednagar Municipal Corporation 101
Contractor HOD Water supply Deptt. Dy. Commissioner
4
300.00
185.00
Providing and Supplying in standard
lengths ISI mark rigid unplasticised PVC
pipes for potable water with rubber ring
joints including cost of rubber ring as per
IS 4985 – 1988 all local and central taxes
transportation freight charges transit
insurance inspection charges unloading
conveyance to store / site stacking the
same in closed shed duly protected from
sun rays and rains etc. complete.
8) 110 mm 6 kg
9) 75 mm 6 kg
3) Rs. One hundred
seventy only.
4) Rs. Eighty one only.
170.00
81.00
Rmt
Rmt
51000.00
14985.00
5
Job
Providing PVC / G.I. special as per
requirement.
Payment will be made on the basis
of actual consumption on site and
will be paid on the basis of
prevailing and competating market
rates after producing tax invoice in
original in the name of comtractor/
work
---
L / S
Job
6321.50
Ahmednagar Municipal Corporation 102
Contractor HOD Water supply Deptt. Dy. Commissioner
6
300.00
185.00
Lowering, laying and jointing PVC pipes
and specials of following class and dia
including conveyance from stores to site
of works all labour giving satisfactory
hydraulic test etc.
7) 110 mm
8) 75 mm
6) Rs. Twenty one
paise thirty seven
only.
7) Rs. Sixteen paise
ninety eight only.
21.37
16.98
Rmt
Rmt
6411.00
3141.30
7
1.00
4.00
Providing & supplying sluice valve PN
for 50 mm including necessary jointing
materials such as nuts, rubbers packing
etc. complete page no. 118 & 120 A (ii)
4) 100 mm
5) 65 mm
3) Rs. Seven thousand
thirty four only
4) Rs. Four thousand
seven hundred
seventy two only
7034.00
4772.00
No
No
7034.00
19088.00
8
1.00
4.00
Lowering and laying sluice valve PN for
150 mm including necessary jointing
materials such as nuts rubbers packing.
4) 100 mm
5) 65 mm
3) Rs. One thousand
two hundred forty
paise zero five only
4) Rs. Six hundred
1240.05
607.95
No
No
1240.05
2431.80
Ahmednagar Municipal Corporation 103
Contractor HOD Water supply Deptt. Dy. Commissioner
seven paise ninety
five only
9 243.72 Refilling the trenches with available
excavated stuff with soft material first
over pipeline and then hard material in
15 cm layers with all leads and lifts
including consolidation, surcharging, etc.
complete.
Rs. Thirty six paise
seventy five only
36.75 Cum 8956.66
Total Rs 145016.00
Say Rs. – 1,45,016 /- In words :- Rs. One Lacs Forty Five Thousand Sixteen Only
Ahmednagar Municipal Corporation 104
Contractor HOD Water supply Deptt. Dy. Commissioner
AHMEDNAGAR MUNICIPAL CORPORATION
TENDER NO.281
Name of work :- Providing and Lowering laying 160 mm dia P.V.C. line at balikashram road from
bhutkarwadi ZP school at bhingardiwemala in inward no.27 , Ahmeadnagar
SCHEDULED - B
No Qty. Item Rates in Figure Rate Unit Amount
1 116.10 Excavation for pipe trenches in earth
soil and gravel including disposing off
material as directed guardine lighting
barricading etc.
Rs. Ninety two paise forty
only
92.40 Cum 10727.64
2 81.27 Excavation foundation / pipe trenches in
hard material & bounders upto a distance
of 50m. beyond the area and lift as
below stacking & spreading as directed
dewatering showering strutting as
directed preparing the bed for the
foundation etc. complete
Rs. One hundred six paise
seventy only
106.70 Cum 8671.51
3
1.32 Excavation for foundation / pipe trenches
in soft rock & old cement asphalt road
foundation including the excavated
materials up to a distance 50mm beyond
Rs. Three hundred thirty six
paise sixty only
336.60 Cum 444.31
Ahmednagar Municipal Corporation 105
Contractor HOD Water supply Deptt. Dy. Commissioner
the area and lift as below stacking as
directed etc. complete
4 387.00 Providing and Supplying in standard
lengths ISI mark rigid unplasticised PVC
pipes for potable water with rubber ring
joints including cost of rubber ring as per
IS 4985 – 1988 all local and central taxes
transportation freight charges transit
insurance inspection charges unloading
conveyance to store / site stacking the
same in closed shed duly protected from
sun rays and rains etc. complete.
160 mm 6 kg/cm2
Rs. Three hundred sixty
five only.
365.00 Rmt
141255.00
5 Job Providing PVC / G.I. special as per
requirement.
Payment will be made on the basis
of actual consumption on site and
will be paid on the basis of
prevailing and competating market
rates after producing tax invoice in
original in the name of comtractor/
work
---- / S Job 7012.75
6
387.00
Lowering, laying and jointing PVC pipes
and specials of following class and dia
including conveyance from stores to site
of works all labour giving satisfactory
hydraulic test etc.
63 mm 6 kg/cm2
Rs. Twenty seven paise forty
nine only
27.49
Rmt
10638.63
Ahmednagar Municipal Corporation 106
Contractor HOD Water supply Deptt. Dy. Commissioner
7
1.00
Providing & supplying sluice valve PN
for 150 mm including necessary jointing
materials such as nuts, rubbers packing
etc. complete page no. 118 & 120 A (ii)
6) 150 mm
Rs. Eleven thousand three
hundred seventy two only
11372.00
No
11372.00
8 1.00
Lowering and laying sluice valve PN for
150 mm including necessary jointing
materials such as nuts rubbers packing.
6) 150 mm
Rs. Two thousand one
hundred nine paise forty five
only
2109.45 No
2109.45
9 189.59 Refilling the trenches with available
excavated stuff with soft material first
over pipeline and then hard material in
15 cm layers with all leads and lifts
including consolidation, surcharging, etc.
complete.
Rs. Thirty six paise seventy
five only
36.75 Cum 6967.36
Total Rs 199199.00
Say Rs. –1,99,199/-
In words :- Rs. One lakh Ninety Nine ThousandOne Hundred Ninety Nine Only
Ahmednagar Municipal Corporation 107
Contractor HOD Water supply Deptt. Dy. Commissioner
AHMEDNAGAR MUNICIPAL CORPORATION
TENDER NO.282
Name of work :- Providing Lowering and laying 100 mm and 90 mm dia P.V.C. pipe line for internal
lanes in Indira nagar, In Ward No. 50, Ahmeadnagar
SCHEDULED - B
No. Qty. Item. Rates in Figure Rate Unit Amount
1 210.00 Excavation for pipe trenches in earth
soil and gravel including disposing off
material as directed guardine lighting
barricading etc.
Rs. Ninety two paise forty only 92.40 Cum 19404.00
2 126.00 Excavation foundation / pipe trenches
in hard material & bounders upto a
distance of 50m. beyond the area and
lift as below stacking & spreading as
directed dewatering showering strutting
as directed preparing the bed for the
foundation etc. complete
Rs. One hundred six paise
seventy only
106.70 Cum 13444.20
3 84.00 Excavation for foundation / pipe
trenches in soft rock & old cement
asphalt road foundation including the
excavated materials up to a distance
Rs. Three hundred thirty six
paise sixty only
336.60 Cum 28274.40
Ahmednagar Municipal Corporation 108
Contractor HOD Water supply Deptt. Dy. Commissioner
50mm beyond the area and lift as
below stacking as directed etc.
complete
4
300.00
400.00
Providing and Supplying in standard
lengths ISI mark rigid unplasticised
PVC pipes for potable water with
rubber ring joints including cost of
rubber ring as per IS 4985 – 1988 all
local and central taxes transportation
freight charges transit insurance
inspection charges unloading
conveyance to store / site stacking the
same in closed shed duly protected
from sun rays and rains etc. complete.
10) 90 mm 6 kg
11) 110 mm 6 kg
Rs. One hundred sixteen only.
Rs. One hundred seventy only.
116.00
170.00
Rmt
Rmt
34800.00
68000.00
5 Job Providing PVC / G.I. special as per
requirement
Payment will be made on the basis of
actual consumption on site and will be
paid on the basis of prevailing and
competating market rates after
producing tax invoice in original in the
name of comtractor/ work
---
L / S
Job
10280.00
6
Lowering, laying and jointing PVC
pipes and specials of following class
and dia including conveyance from
Ahmednagar Municipal Corporation 109
Contractor HOD Water supply Deptt. Dy. Commissioner
300.00
400.00
stores to site of works all labour giving
satisfactory hydraulic test etc.
9) 90 mm
10) 110 mm
8) Rs. Nineteen paise forty
only.
9) Rs. Twenty one paise
thirty seven only
10)
19.40
21.37
Rmt
Rmt
5821.20
8547.00
7
2.00
Providing and supplying double
flanged shorty body pattern type
manually operated butterfly valve
having body disc and end cover in
graded cast iron to IS 210 Gr CF 200
generally conforming in BS 5155
synthetic rubber faced ring secured on
disc by retaining ring with stainless
steel screw stub shaft of stainless steel
riding in Teflon bearing excluding C.C.
foundation structural steel support
confirming to IS 13095-1991
5) 100 mm
Rs. Seven thousand thirty four
only
7034
No
14068.00
8 2.00 Lowering laying jointing CIDF Reflux
Sluice
4) 100 mm
5)
Rs. One thousand two hundred
forty paise zero five only
1240.05 No
2480.10
9 378.00 Refilling the trenches with available
excavated stuff with soft material first
over pipeline and then hard material in
15 cm layers with all leads and lifts
Rs. Thirty six paise seventy
five only
36.75 Cum
13891.50
Ahmednagar Municipal Corporation 110
Contractor HOD Water supply Deptt. Dy. Commissioner
including consolidation, surcharging,
etc. complete.
10 42.00 Removing excess materials up to 4 km Rs. One hundred forty only 140.00 Cum 5880.00 Total Rs 224890.40
Say Rs. – 2, 24,890 /- In words :- Rs. Two Lacs Twenty Four Thousand Eight Hundred Ninety Only
Ahmednagar Municipal Corporation 111
Contractor HOD Water supply Deptt. Dy. Commissioner
AHMEDNAGAR MUNICIPAL CORPORATION
TENDER NO.283
Name of work :- Providing and Lowering laying 160 mm dia P.V.C. pipe line from Shivaji Status at
Imperial Chowk to Sangram Wines In Ward No. 49, Ahmeadnagar
SCHEDULED - B
No. Qty. Item. Rate in Figure Rate Unit Amount
1 168.00 Excavation for pipe trenches in earth
soil and gravel including disposing off
material as directed guardine lighting
barricading etc.
Rs. Ninety two paise forty
only
92.40 Cum 15523.20
2 210.00 Excavation foundation / pipe trenches in
hard material & bounders upto a distance
of 50m. beyond the area and lift as
below stacking & spreading as directed
dewatering showering strutting as
directed preparing the bed for the
foundation etc. complete
Rs. One hundred six paise
seventy only
106.70 Cum 22407.00
3 84.00 Excavation for foundation / pipe trenches
in soft rock & old cement asphalt road
foundation including the excavated
materials up to a distance 50mm beyond
Rs. Three hundred thirty six
paise sixty only
336.60 Cum
28274.40
Ahmednagar Municipal Corporation 112
Contractor HOD Water supply Deptt. Dy. Commissioner
the area and lift as below stacking as
directed etc. complete
4
700.00
Providing and Supplying in standard
lengths ISI mark rigid unplasticised PVC
pipes for potable water with rubber ring
joints including cost of rubber ring as per
IS 4985 – 1988 all local and central taxes
transportation freight charges transit
insurance inspection charges unloading
conveyance to store / site stacking the
same in closed shed duly protected from
sun rays and rains etc. complete.
12) 160 mm 6 kg/cm2
Rs. Three hundred sixty five
only.
365.00
Rmt
255500.00
5 --------- Providing ISI mark G.I. pipe mm
diameter medium duty including all
local & central taxes. etc.
4) 80 mm
Rs. Four hundred fifty nine
only
459.00 Rmt
-------
6 Job Providing PVC / G.I. special as per
requirement on site.
Payment will be made on the basis of
actual consumption on site and will be
paid on the basis of prevailing and
competating market rates after producing
tax invoice in original in the name of
comtractor/ work
---- L / S Job 25550.00
Ahmednagar Municipal Corporation 113
Contractor HOD Water supply Deptt. Dy. Commissioner
7
700.00
Lowering, laying and jointing PVC pipes
and specials of following class and dia
including conveyance from stores to site
of works all labour giving satisfactory
hydraulic test etc.
160 mm
Rs. Twenty seven paise
forty nine only.
27.49
Rmt
19242.30
8
3.00
Providing and supplying double flanged
shorty body pattern type manually
operated butterfly valve having body
disc and end cover in graded cast iron to
IS 210 Gr CF 200 generally conforming
in BS 5155 synthetic rubber faced ring
secured on disc by retaining ring with
stainless steel screw stub shaft of
stainless steel riding in Teflon bearing
excluding C.C. foundation structural
steel support confirming to IS 13095-
1991
6) 150 mm
Rs. Eleven thousand three
seventy two only
11372
No
34116.00
9
3.00
Lowering laying jointing CIDF Reflux
Sluice
6) 150 mm
Rs. Two thousand one
hundred nine paise forty
five only
2109.45
No
6328.35
10 399.00 Refilling the trenches with available
excavated stuff with soft material first
over pipeline and then hard material in
Rs. Thirty six paise seventy
five only
36.75 Cum
14663.25
Ahmednagar Municipal Corporation 114
Contractor HOD Water supply Deptt. Dy. Commissioner
15 cm layers with all leads and lifts
including consolidation, surcharging, etc.
complete.
11 63.00 Removing excess materials up to 4 km
Rs. One hundred forty only
140.00 Cum 8820.00
Total Rs 430424.50
Say Rs. – 4, 30,425 /-
In words :- Rs. Four Lacs Thirty Thousand Four Hundred Twenty Five Only
Ahmednagar Municipal Corporation 115
Contractor HOD Water supply Deptt. Dy. Commissioner
AHMEDNAGAR MUNICIPAL CORPORATION
TENDER NO.284
Name of work :- Providing and laying 100 mm dia G.I. pipe line at Ward No. 55, at in Slum Area
From Gavade House to Haidar Akhada to Fairoz House, Ahmeadnagar.
SCHEDULED - B
No. Qty. Item Rate in Figure Rate Unit Amount
1 163.20 Excavation for foundation/pipe trenches
in earth soil of all types sand and gravel
soft murrum including removing the
excavated material upto a distance of
50m and lifts as below stacking and
spreading as directed manual dewatering
preparing the bed for foundation etc.
Rs. One hundred seventeen
paise sixty only
117.60 Cum 19192.32
2 81.60 Excavation foundation / pipe trenches in
hard material & bounders upto a distance
of 50m. beyond the area and lift as
below stacking & spreading as directed
dewatering showering strutting as
directed preparing the bed for the
foundation etc. complete
Rs. One hundred thirty two
paise thirty only
132.30 Cum 10795.68
3 61.20 Excavation for foundation / pipe trenches
in soft rock & old cement asphalt road
Rs. Three hundred ninety
three paise seventy five
393.75 Cum 24097.50
Ahmednagar Municipal Corporation 116
Contractor HOD Water supply Deptt. Dy. Commissioner
foundation including the excavated
materials up to a distance 50mm beyond
the area and lift as below stacking as
directed etc. complete
only
4 680.00 Providing ISI mark G.I. pipe mm
diameter medium duty including all
local & central taxes. etc.
5) 100 mm
Rs. Six hundred eighty four
only
684.00 Rmt
465120.00
5 Job Providing PVC / G.I. special as per
requirement.
Payment will be made on the basis of
actual consumption on site and will be
paid on the basis of prevailing and
competating market rates after producing
tax invoice in original in the name of
comtractor/ work
--- L / S Job 11628.00
6 680.00 Lowering, laying and jointing G.I. pipes
and specials of following class and
diameter including conveyance from
stores to site work, all labour giving
satisfactory testing etc. in level & slope
etc. complete. 100 mm
Rs. Ninety one paise thirty
five only
91.35
Rmt
62118.00
7 2.00
Providing & supplying sluice valve PN
for 50 mm including necessary jointing
materials such as nuts, rubbers packing
etc. complete page no. 118 & 120 A (ii)
100 mm
Rs. Six thousand three
hundred seven only
6307.00 No
12614.00
Ahmednagar Municipal Corporation 117
Contractor HOD Water supply Deptt. Dy. Commissioner
8 2.00
Lowering and laying sluice valve PN for
50 mm including necessary jointing
materials such as nuts rubbers packing
7) 100 mm
Rs. One thousand seven
hundred ninety five
paise fifty only
1795.50
No
3591.00
9 300.66 Refilling the trenches with available
excavated stuff with soft material first
over pipeline and then hard material in
15 cm layers with all leads and lifts
including consolidation, surcharging, etc.
complete.
Rs. Fifty two paise fifty
only
52.50 Cum 15784.76
Total Rs 624941.26
Say Rs. – 6, 24,941 /-
In words :- Rs. Six Lacs Twenty Four Thousand Nine Hundred Forty One Only.
Ahmednagar Municipal Corporation 118
Contractor HOD Water supply Deptt. Dy. Commissioner
AHMEDNAGAR MUNICIPAL CORPORATION
TENDER NO.285
Name of work :- Providing and laying 100 mm, 80mm dia G.I. pipe line at Ward No. 55, at Panchasil
Nagar Internal Area From Hanuman Temple to Sarode House to Jadhav House,
Ahmeadnagar.
SCHEDULED - B
NO. Quan Item. Rate in Figure Rate Unit Amount
1 278.40 Excavation for foundation/pipe trenches
in earth soil of all types sand and gravel
soft murrum including removing the
excavated material upto a distance of
50m and lifts as below stacking and
spreading as directed manual dewatering
preparing the bed for foundation etc.
Rs. One hundred seventeen
paise sixty only
117.60 Cum 32739.84
2 139.20 Excavation foundation / pipe trenches in
hard material & bounders upto a distance
of 50m. beyond the area and lift as
below stacking & spreading as directed
dewatering showering strutting as
directed preparing the bed for the
foundation etc. complete
Rs. One hundred thirty two
paise thirty only
132.30 Cum 18416.16
Ahmednagar Municipal Corporation 119
Contractor HOD Water supply Deptt. Dy. Commissioner
3 69.60 Excavation for foundation / pipe trenches
in soft rock & old cement asphalt road
foundation including the excavated
materials up to a distance 50mm beyond
the area and lift as below stacking as
directed etc. complete
Rs. Three hundred ninety
three paise seventy five
only
393.75 Cum 27405.00
4
700.00
460.00
Providing ISI mark G.I. pipe mm
diameter medium duty including all
local & central taxes. etc.
6) 80 mm
7) 100 mm
1) Rs. Four hundred
fifty nine only
2) Rs. Six hundred
eighty four only
459.00
684.00
Rmt
Rmt
321300.00
314640.00
5 Job Providing PVC / G.I. special as per
requirement.
Payment will be made on the basis of
actual consumption on site and will be
paid on the basis of prevailing and
competating market rates after producing
tax invoice in original in the name of
comtractor/ work
--- L / S Job 15898.50
6
Lowering, laying and jointing G.I. pipes
and specials of following class and
diameter including conveyance from
stores to site work, all labour giving
satisfactory testing etc. in level & slope
Ahmednagar Municipal Corporation 120
Contractor HOD Water supply Deptt. Dy. Commissioner
700.00
460.00
etc. complete.
11) 80 mm
12) 100 mm
1) Rs. Eighty seven
paise fifteen only
2) Rs. Ninety one paise
thirty five only
87.15
91.35
Rmt
Rmt
61005.00
42021.00
7
4.00
1.00
Providing & supplying sluice valve PN
for 50 mm including necessary jointing
materials such as nuts, rubbers packing
etc. complete page no. 118 & 120 A (ii)
7) 80 mm
100 mm
1) Rs. Four thousand
seven hundred thirty
seven only
Rs. Six thousand
three hundred seven
only
4737.00
6307.00
No
No
18948.00
6307.00
8
4.00
1.00
Lowering and laying sluice valve PN for
50 mm including necessary jointing
materials such as nuts rubbers packing.
8) 80 mm
9) 100 mm
1) Rs. One thousand
three hundred seventy
four paise forty five
only
2) Rs. One thousand
seven hundred ninety
five paise fifty only
1374.45
1795.50
No
No
5497.80
1795.50
Ahmednagar Municipal Corporation 121
Contractor HOD Water supply Deptt. Dy. Commissioner
9 480.07 Refilling the trenches with available
excavated stuff with soft material first
over pipeline and then hard material in
15 cm layers with all leads and lifts
including consolidation, surcharging, etc.
complete.
Rs. Fifty two paise fifty
only
52.50 Cum 25203.79
Total Rs 891177.59
Say Rs. – 8, 91,178 /-
In wards :- Rs. Eight Lacs Ninety One Thousand One Hundred Seventy Eight Only.