common permit by rule authorizations in texas
DESCRIPTION
Common Permit by Rule Authorizations in Texas. Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2014. Permit by Rule 106.A3168 Alchemy. Definition - the ability to transform base metals into the noble metals ( gold or silver ). Alchemy. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/1.jpg)
Common Permit by Rule Authorizations in Texas
Joe ShineAir Permits Division
Texas Commission on Environmental QualityEnvironmental Trade Fair 2014
![Page 2: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/2.jpg)
Permit by Rule 106.A3168Alchemy
Definition - the ability to transform base metals into the noble metals (gold or silver)
![Page 3: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/3.jpg)
Alchemy
![Page 4: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/4.jpg)
Permit by Rule 106.A3168Alchemy
Rule language –
Equipment and facilities used for the process of alchemy is permitted by rule.
![Page 5: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/5.jpg)
Today’s Topics
General Information About Using PBRs
Most Common PBRs
What to Include in the Application
New Processes
![Page 6: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/6.jpg)
Using a PBR
Pros Other Considerations
No circumvention
No partial permitting
No customization
Lower fees
Faster response time
Quicker response time Lower fees Cannot customize – all or nothing Cannot partially permit a process Cannot circumvent permitting
![Page 7: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/7.jpg)
Using a PBR
Claiming vs. Registering◦Claiming – Keep records to show compliance
with all rules and regulations◦Registering – Submitting documentation to
TCEQ and paying a fee
Certification vs. Registration◦PI-7◦PI-7CERT or APD-CERT
![Page 8: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/8.jpg)
Most Common PBRs
§106.433 – Surface Coating §106.452 – Dry Abrasive Cleaning §106.261/262 – Facilities 470 series – Tanks, Loading, Storage 140 Series – Aggregate & Pavement §§106.352, 359, 492, 512 – Oil and Gas
![Page 9: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/9.jpg)
Surface Coating
![Page 10: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/10.jpg)
§106.433
Enclosed vs. non-enclosed surface coating
13 tpy VOC vs. 25 tpy VOC
Exempt solvents
Process MSS vs. non-process MSS
![Page 11: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/11.jpg)
§106.433
MSDS: technical and air quality data
Calculations
◦Surface Coating Facilities Guide
◦Calculation Spreadsheet for Estimating Emissions
Chapter 115, Federal Standards, MSS
![Page 12: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/12.jpg)
Dry Abrasive Cleaning
![Page 13: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/13.jpg)
§106.452
Enclosed vs. non-enclosed
Blast media Distance limits Usage limits MSS
![Page 14: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/14.jpg)
Facilities
![Page 15: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/15.jpg)
§106.261 and §106.262
Only use when there is not a more specific rule
Account for all upstream/downstream impacts
MSS Represent all associated NSR Permits Certify major sites
![Page 16: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/16.jpg)
§106.261 and §106.262 Common Issues
Can you use current version of TLV? Annual submittal ◦Easier, cheaper when prepared all together ◦We allow “portable” annual notifications
if each site < 5 tpy
![Page 17: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/17.jpg)
§106.261 and §106.262Limits
6 lb/hr & 10 tpy 1 lb/hr & 4.38 tpy E=L/K Net increase on new hour Netting Is it okay to exceed permitted allowable?
![Page 18: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/18.jpg)
Tanks, Storage, and Loading
![Page 19: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/19.jpg)
§106.470 - §106.478
Authorizes:◦New construction◦New service of existing tank◦Change of service
Is “tank memo” still in effect?◦Using PBRs §106.261 and §106.262
![Page 20: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/20.jpg)
Aggregate & Pavement
![Page 21: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/21.jpg)
§106.141- §106.150
Calculations: AP-42 and throughput Using engines? §106.4(a)(4) ◦PM10 limit = 15 tpy
◦PM2.5 limit = 10 tpy
Include a project description
![Page 22: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/22.jpg)
§106.141- §106.150
MSS: process vs. non-process Include a plot plan RFC (site review) required Distance limitations
![Page 23: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/23.jpg)
Oil and Gas Sites
![Page 24: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/24.jpg)
Oil and Gas §106.352 - Oil and Gas Handling and
Production Facilities §106.492 - Flares §106.512 - Stationary Engines and
Turbines §106.359 - Planned Maintenance, Startup,
and Shutdown (MSS) at Oil and Gas Handling and Production Facilities
![Page 25: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/25.jpg)
PBR Options – Location
In Barnett Shale counties
• New – 30 TAC §106.352(a)-(k)
• Existing – 30 TAC §106.352(l)
Not in Barnett Shale counties
• New & existing – 30 TAC §106.352(l)
• May voluntarily register under §106.352 (a)-(k)
![Page 26: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/26.jpg)
Barnett Shale Counties
![Page 27: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/27.jpg)
§106.352(l)
§106.352 (l)◦Sweet:
No registration required, meet §106.4 limits, and keep records
◦Sour (> 24 ppm H2S): Registration required ¼ mile distance limit, 4.0 lb/hr limit of sulfur
compounds, vent height requirements
![Page 28: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/28.jpg)
§106.352(a-k)
§106.352 (a-k)◦Notification and registration through ePermits
system◦Notification - Prior to construction or
implementation of changes◦Registration
Level 1 - Within 180 days from start of operation Level 2 - Within 90 days from start of operation
![Page 29: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/29.jpg)
§106.492 and §106.512
§106.492◦May be used in combination with §106.352 (l)◦May require certification
§106.512◦May be used in combination with §106.352(l)◦Requires registration if > 240 hp ◦May require certification
![Page 30: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/30.jpg)
Submitting
the
Application
![Page 31: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/31.jpg)
Application Admin. Documents Preferred Order
Cover letter Core Data Form PI-7, PI-7-CERT, APD-CERT Copy of check or ePay voucher
![Page 32: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/32.jpg)
When Do I Need to Certify?
Emission limitations for Title V applicability Federal applicability Control/destruction efficiency claims Operating hours
![Page 33: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/33.jpg)
Application Technical Documents Preferred Order
Introduction Table of Contents Process and flow diagram Summary of emissions Emission calculations Impact analysis/NAAQS Applicability Lab analysis Maps Tables
![Page 34: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/34.jpg)
Summary of Emissions
![Page 35: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/35.jpg)
Application Technical Documents Preferred Order
Introduction Table of Contents Process and flow diagram Summary of emissions Emission calculations Impact analysis/NAAQS Applicability Lab analysis Maps Tables
![Page 36: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/36.jpg)
Lab AnalysisSite Specific/Representative
Guidance at www.TexasOilandGasHelp.org
Three criteria◦Reservoir/formation◦API gravity◦Process/treatment
![Page 37: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/37.jpg)
Application Technical Documents Preferred Order
Introduction Table of Contents Process and flow diagram Summary of emissions Emission calculations Impact analysis/ NAAQS Applicability Lab analysis Maps Tables
![Page 38: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/38.jpg)
New Processes
and Changes
New Processesand
Changes
![Page 39: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/39.jpg)
Enhanced Application Review (E.A.R.)
Purpose E-mail notification ◦[email protected]
Expectations Approval letter will be sent through e-mail
unless specified otherwise.
![Page 40: Common Permit by Rule Authorizations in Texas](https://reader033.vdocuments.site/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/40.jpg)
Auto Deficiency
All Applications Oil & Gas Specific
Emissions Summary Table Gas and liquid analysis
Emission calculations/ documentation
Sour site < ¼ mile (for §106.352 (l) only)
RO signature matches (certifications only)
Flash calculations
Response to a VOID and not all issues addressed
NOX NAAQS compliance(§106.512 only)
Justification for DRE above default allowables
Begins 6/1/2014: