CONTENT

CAPABILITIES02OVERVIEWPROJECTMANAGEMENTENGINEERINGPROCUREMENTCONSTRUCTIONCOMMISSIONING& START-UPMANUFACTURING

13

14151617

1921

PROJECTS04OIL & GASLIST OF COMPLETEDPROJECTS

28

32

CLIENTS05CLIENT LIST 37

CERTIFICATIONS06CERTIFICATIONS 38

MARKETS03OVERVIEWOIL & GASWATERINFRASTRUCTUREPOWER

2324252627

0405060708

10

COMPANY01CEO MESSAGEABOUT USVISION & MISSION VALUESHEALTH, SAFETY & ENVIRONMENTQUALITY

Page 4: COMMITTED TO DELIVERING EXCELLENCE

4 |

CEO’SMESSAGE

It has been a pleasure serving the industry and valuable clients since 1979. I would like to thank you for taking the time to learn more about our Company. In order to serve you better, I would like to take this opportunity to offer you insight about Techno’s proven capabilities.

Since the foundation of Techno Engineering Services (TES) in 1979, TES has delivered some of the most challenging oil and gas

facilities, oil and gas pipelines, and infrastructure projects in Pakistan, Iraq, and UAE. Our projects are now the key assets of the clients as they are delivering high Return-on-Investment (ROI) for them.

While leveraging on Techno’s Engineering, Procurement and Construction (EPC) project delivery strength in Oil & Gas Pipelines, Storage & Terminal Facilities, Infrastructure Development i.e. Motorways, Bridges, Tunnels, Power Plants, Overhead Transmission Lines, and API Pipe Manufacturing, Techno is looking forward to expand in delivering full-scale EPC contracts for Oil Refinery projects, Oil/Gas Central Processing Facilities projects, Water Treatment projects and projects for Conceptual to FEED Phases, EPCM and PMC Services in Oil/Gas, Power, Water and Infrastructure Development.

One of the key elements of our business is establishing long-lasting relationships with our clients. Techno is offering its clients Project Development and Delivery Services across the entire life cycle of a project – starting from project initiation to hand over to operations.

I invite you to visit our website www.technoengineering.com and browse our company’s strengths and our services portfolio. I am confident that our portfolio will encourage you to consider TES to be part of your current and future project development and execution initiatives.

With corporate culture embedded in our system, I assure you that our clients are in trusted hands because our approach is to find solutions, to all kind of problems during the project execution, in a tactical, methodical and logical manner. Our prime focus is delivering excellence to our employees, suppliers, subcontractors and clients.

I would like to offer my thanks for the patronage & continued business support of our valuable clients.

Yours sincerely,

Abid Ali CEO

Page 5: COMMITTED TO DELIVERING EXCELLENCE

| 5

ABOUT US

INTRODUCTION:

Techno Engineering Services (Pvt.) Ltd. (TES) is a privately owned firm established in 1979 which began its services by serving Pakistan’s domestic oil and gas industry. Since then, TES has focused on growing and expanding its professional services not only in the domestic and global markets of Oil and Gas but also in Power, Water, Infrastructure Development and API Pipeline manufacturing sectors. Over the years, TES has served hundreds of clients across Pakistan, Iraq & UAE and has gained reputable position in the business community. TES was founded on core values of integrity, client focus, teamwork, and sustained excellence which, over the years, has resulted in beyond 85% of our projects coming from previously satisfied clients. It realizes the extensive growth over the years through the rigorous pursuit of catering to the needs of the clients by adjusting to the dynamically changing environment.

Currently, TES core strength is in Engineering, Procurement and Construction (EPC) phase of the project life cycle in Oil & Gas Pipelines, Storage & Terminal Facilities, and Infrastructure development i.e. Motorways, Bridges, Tunnels, Power Plants, Overhead transmission lines and API Pipe manufacturing. However, Techno is looking forward to delivering full-scale EPC contracts for Oil Refinery Projects, Oil/Gas Central Processing Facilities Projects, Water Treatment Projects and Projects for Conceptual to FEED Phases, EPCM and PMC Services in oil/gas, power, water and infrastructure development sectors.

Techno Engineering Services (PVT.) LTD takes pride in establishing the highest standard of business professionals in its roots through which it has been providing the utmost level of performance; this effort has always been rewarded with positive feedback.

Some of the highlights of the challenging projects are:

OIL & GAS PROJECTS:n EPC 18”-dia. 107.5 Kms. “Gas Export Pipeline” Badra – Zubaidah Project, Republic of IRAQ.

n EPC 42”-dia. 102 Kms. Onshore Export Pipeline & Associated Works (i.e. 67Kms. 33kV Overhead Power Line) from Central Processing Facilities to Tuba Tank Farm, Republic of IRAQ.

n Construction of 24ӯ x 201.00 Kms. EXLI Pipeline of AHDEB OIL Field Project РRepublic of IRAQ.

n Pipeline Construction Section IV – 48”-dia. 100Kms. Abu Dhabi Crude Oil Pipeline Project (ADCOP), United Arab Emirates.

n Construction of Main Oil Terminal (Civil Works Tank Foundations & Area Development) - Abu Dhabi Crude Oil Pipeline Project (ADCOP) United Arab Emirates.

n EPC 26”-dia. 817 Kms. White Oil Pipeline Project (WOPP) Pakistan – Consortium CPECC and Techno.

POWER PROJECT:n EPC 67Kms. 33kV Overhead Power Line as Part of EPC 42”-dia. 102Kms Onshore Export Pipeline & Associated Works, Republic of IRAQ.

Page 6: COMMITTED TO DELIVERING EXCELLENCE

6 |

VISION & MISSION

We’re committed to delivering excellence in executing the projects across the full project life-cycle in line with the agreed capital and operating targets including but not limited to HSE, Quality, Cost and Schedule.

VISION:

Our aim is to deliver exceptional project management and engineering services ensuring high value for our clients by implementing global best-in-class customized project & engineering management services and tools by a team of highly skilled professionals.

MISSION:

Page 7: COMMITTED TO DELIVERING EXCELLENCE

| 7

VALUESVALUES:

INTEGRITY

Carrying out our business activities in an ethical manner and in strict compliance with the local and international law, wherever we operate.

RESPONSIBLE

We are committed to our employees, stakeholders and our clients with prime focus in their growth and in providing them safe and healthy environment.

VALUE OUR PEOPLE

We invest in individuals working for us. We empower them to reach their full potential where they have the freedom to take their own decisions.

FLEXIBILITY

Flexible and practical approach to client requirements in delivering high-value work, on time, within budget and expected key performance indicators.

DELIVERING ON COMMITMENTS

Every day we focus on our employees, stakeholders and clients and deliver our promises. We work hard to build long-term partnerships with clients for mutual benefit.

We believe in working together to foster creativity and leverage individual strengths in order to achieve common goals and objectives.

HEALTH, SAFETY& ENVIRONMENT

VALUES

EMPOWERMENT HIGH VALUE WORK

Page 8: COMMITTED TO DELIVERING EXCELLENCE

8 |

HEALTH SAFETY & ENVIRONMENT

(HSE)

Safeguarding the Environment and Health & Safety of our employees, suppliers, contractors, clients, third parties & communities are of utmost importance. Techno is committed to provide accident free and healthy work place for all involved in the project activities and is committed to designing and constructing safe, reliable and environmentally friendly facilities. Our goal is continuous improvement and for that purpose, we regularly review our Health, Safety and Environment procedures to prevent any adverse impacts to environment and to our staff, clients and other stakeholders.

Techno’s Management communicates the HSE Policy to all personnel and stakeholders associated with our business and ensure its conformance in the project activities.

Techno believes:n All incidents are preventable. n HSE matters can be systematically identified, controlled, corrected and improved.n Individual awareness, personal engagement, and appropriate behavior are the key drivers in promoting effective and efficient HSE culture.

Our HSE management system is based on ISO 9001 and ISO 14001:2004, occupational health and safety systems using OHSAS 18001 and the OHSMS guidelines.

We are constantly working on improving workplace Health, Safety and Environment activities guided by the principles as below:

WORKFORCE PARTICIPATIONWe provide a supportive environment in which employees and contractors are involved in all aspects of our HSE management program. This program allows to collect data and provide a statistical overview of our safety performance along with the implementation of corrective actions to improve the performance.

CONTINUAL IMPROVEMENTWe regularly conduct audits for HSE performance for every project to correct and implement the necessary changes in a timely fashion.

ENVIRONMENTAL STEWARDSHIPWe perform activities that are environmentally friendly. Our aim is to minimize any adverse impacts by finding out innovative ways to deliver projects.

HSE PERFORMANCETo minimize accidents, Techno uses implementation and tracking of HSE leading indicators in our systems. HSE leading indicators are used to improve performance by eliminating defects in current work processes that may lead to injuries, property damage, regulatory non-compliance, negative perceptions and undermine the HSE culture.

Page 9: COMMITTED TO DELIVERING EXCELLENCE

| 9

Techno Engineering Services (Pvt.), Ltd.

Head Office: 3rd Floor Al-Malik Complex 80-East Jinnah Avenue Blue Area Islamabad, Pakistan Tel # +92 51 2207864 Abu Dhabi Branch: Office No. M-15, Building No. 158, Executive Business Center - Heirs of Saoud Mohammed Arar Al Dhaheri,

P.O Box # 105424, Abu Dhabi UAE. Tel # +971 2 6790119, Fax # +971 2 6740066 E-mail: [email protected] JAFZA Branch: Plot No S10204 (South Zone) Jebel Ali Free Zone PO Box 261401 Dubai, UAE Phone: +971 4 8807386 Fax: +971 4 880 7935

HEALTH, SAFETY AND ENVIRONMENT (HSE) POLICY

We believe every incident is preventable. Our health, safety and environmental (HSE) management program is an essential part of Techno’s everyday culture. Our philosophy of “Zero Incident” begins in the workplace and extends to the communities where we conduct our business. This fundamental belief, outlined in our HSE Policy is embedded in our corporate culture and integrated into every aspect of TES business activities.

We are committed to a process of continuous improvement in all we do and to the adoption of international industry standards and codes as the Company achieved ISO 14001: 2004 and OHSAS 18001: 2007 Certifications. The company ensures that the work environment for all employees is set in such manner as to keep all health, safety & environmental factors in place as well as providing services and measures to avoid hazardous scenarios for all personnel.

Management has a leadership role in the communication and implementation of, and ensuring compliance with, HSE policy, procedures and standards. We are committed to:

Identify and strive for best practices for continuous improvement of HSE system performance; Comply with Health, Safety & Environment codes and legislation, and co-operate with relevant

enforcement agencies including local communities; Systematically identify potential hazards, assess their relative significance, develop reduction

measures and establish suitable controls to ensure that risks are minimized; Plan for, respond to and recover from any emergency, crisis and business disruption; Minimize our impact on the environment through pollution prevention, reduction of natural

resource consumption and emissions, and the reduction and recycling of waste; Monitor HSE performance of all stakeholders involved in the TES business activities using

agreed key performance indicators; Provision of training, controls, and protective measures based on sound assessment of

personal health and safety, equipment and process safety, workforce and asset security, and environmental and social responsibility;

Audit and review of HSE systems & performance and continually improve the effectiveness of system;

Allocation of appropriate resources to implement this policy;

This policy shall be regularly reviewed and updated to ensure the quality and appropriateness of its implementation. The Management commitments to HSE are in addition to comply with International standards as well as all applicable law and regulations where we operate. Company measures the achievement of this HSE Policy by setting measurable HSE performance targets in our business plans, which we are all committed to. This Policy Statement shall be made freely available to all interested parties.

_______________

Arsalan Ali Director 21st August 2017

ENGINEERING

Page 10: COMMITTED TO DELIVERING EXCELLENCE

10 |

QUALITY

Techno Engineering Services (Pvt.) Ltd ensures client satisfaction by implementing class quality assurance guidelines & procedures, strict quality control program and its well-defined Quality Policy for the execution of projects.A strong, client focused approach and constant quest for top class quality has enabled us to deliver projects within the expected quality targets and meeting key performance indicators. Techno Engineering Services (Pvt.) Ltd utilizes a Quality Management System in compliance with the International Standard ISO 9001:2008.

We are committed to adhering to highest standards of quality assurance and controls by implementation of Quality Management System through all phases of the project including tendering, project management, engineering design, procurement, inspection, construction, commissioning and start up. Guided by our Quality Management System, we are dedicated to providing a complete professional engineering and project management services with adherence to the following key goals:

n Achieve excellence through the active participation of all levels of management, our

staff and other stakeholders in our Quality Management System

n Meet or exceed the international standards and client requirements

ISO 9001-2008 CERTIFICATE

Page 11: COMMITTED TO DELIVERING EXCELLENCE

| 11

Techno Engineering Services (Pvt.), Ltd.

Head Office: 3rd Floor Al-Malik Complex 80-East Jinnah Avenue Blue Area Islamabad, Pakistan Tel # +92 51 2207864 Abu Dhabi Branch: Office No. M-15, Building No. 158, Executive Business Center - Heirs of Saoud Mohammed Arar Al Dhaheri,

P.O Box # 105424, Abu Dhabi UAE. Tel # +971 2 6790119, Fax # +971 2 6740066 E-mail: [email protected] JAFZA Branch: Plot No S10204 (South Zone) Jebel Ali Free Zone PO Box 261401 Dubai, UAE Phone: +971 4 8807386 Fax: +971 4 880 7935

QUALITY POLICY

We, at Techno Engineering Services (TES), are committed to delivering excellence in all areas of our business and are passionate about providing the best solutions and services to our clients and other stakeholders. We maintain and enhance our reputation in the marketplace by consistently earning the trust of all stakeholders by implementing the best standards of quality assurances and controls while ensuring client’s requirements are met.

TES believes in the accountability for Quality from all our employees, contractors and third parties. We are committed to:

Continuously striving for improvement in Quality at all times and exceeding customers’ expectations;

Ensure that a customer-focused and process-driven quality management approach is maintained;

Meet client’s specific requirements and promote a culture of continual improvement, responsibility and accountability through the use of an effective quality management system;

Ensure that quality policy, standards, programs and performance is communicated openly to all employees and made available to all interested parties;

Increase the motivation and skills of our people to add value to our clients and our businesses, through continual training and development;

Ensure that analysis, monitoring and controlling, inspection, audit and performance measurement systems are established and implemented on regular basis;

Management has the ultimate responsibility for the implementation and effectiveness of the quality management system and ensuring that the quality management system is communicated, understood, implemented within the organization and to the client satisfaction.

This Policy shall be regularly reviewed to ensure that it is always up to date. The commitments listed are in addition to applicable laws and regulations where we provide our services.

_______________

Arsalan Ali Director 14th August 2017

ENGINEERING

Page 12: COMMITTED TO DELIVERING EXCELLENCE

12 |

CAPABILITIES

Project Management

Engineering

Procurement Construction

Commissioning & Startup

Manufacturing

Page 13: COMMITTED TO DELIVERING EXCELLENCE

| 13

Techno Engineering Services (Pvt) Ltd, a well established name and a preferred choice of the customers, is an integrated engineering, procurement and construction (EPC) company, committed to delivering excellence in all aspects of project execution, starting from concept design to detailed engineering, procurement and contracts, construction, commissioning and start up and handover to operations including operator training.Techno is fully equipped with highly skilled local and international expertise and resources including construction equipment and tools to deliver large scale national and international projects for oil and gas, infrastructure, power and water sectors.

We proactively engage with our customers and are flexible in our approach to deliver cost-effective and timely solutions for all our projects. For over 30 years, Techno Engineering Services has shown its ability in successfully managing projects of all types and sizes at national and international level.

CAPABILITIES

Page 14: COMMITTED TO DELIVERING EXCELLENCE

14 |

PROJECT MANAGEMENT

Effective project management is one of the key elements in the successful delivery of the project. Techno has developed and refined project management systems, procedures, and specifications for the effective, fit-for-purpose and customized management and control of engineering, procurement, construction and commissioning of the projects.Our range of project management services is specifically tailored to suit client practices, procedures, and standards which enable us to add maximum value to the projects leading to the expected outcomes.

Some of our services include:n Consultation and supervision of all project phases from the concept phase to hand over to operationsn Pre- FEED / Basic Engineering Design and FEED development services including Supervision and Reviewn Project Assurance Review Servicesn Tender Development, Evaluation, Negotiation and Recommendation

n Setting up Project Management Office (PMO) unitn Planning, Scheduling, Risk, Reporting Managementn Procurement, Contracts and Logistics Managementn Quality and HSE Managementn Construction Managementn Commissioning and Start Up Management

Page 15: COMMITTED TO DELIVERING EXCELLENCE

| 15

ENGINEERING

Capitalizing on Techno’s prior experiences, internal expertise, international best practices along with reputable partners, we are capable of delivering high-quality engineering solutions for the most challenging projects.

Our engineering expertise covers the entire spectrum of projects in Oil/Gas, Infrastructure, Power, and Water sectors. We deliver right and fit-for-purpose services and solutions to our clients to maximize assets value, improve competitive positioning, and increase long-term business success.We offer engineering services and solutions for conceptual design, front-end engineering and detailed engineering including support to procurement, construction and commissioning & start up.Some of our services are highlighted below:n Technical Safetyn Process Engineeringn Plant Layout & Pipingn Civil, Structural and Architectural Engineeringn Mechanical Engineeringn Control Systems Engineering (Instrumentation and Automation)n Electrical Engineeringn Document Managementn Pre- Commissioning, Commissioning and Startup

SOME OF THE SERVICES OF ENGINEERING STAGES AND THE STUDIES ARE:CONCEPTUAL DESIGNn Feasibility Studyn Identify & Determine Conceptual Process Studiesn Concepts Development and Modelingn Basis of Designn Assurance Reviewsn Site Surveysn Safety Philosophy and Environment Impact Assessment

BASIC ENGINEERING DESIGN / PRE- FEEDn Basis of Designn Preliminary plot plans, PFD’s and P&ID’s for Process and Utility Generationn Piping Classes Summaryn Definition and Sizing of main Equipment Resulting in Process Specificationsn Design & Specification for Instrumentation & Controln Preliminary Soil Investigation Reportn Local Effluents Regulationsn HAZID, Safety Philosophy and Environment Impact Assessmentn Concept Selectionn Value Engineeringn Assurance Reviewsn Engineering and Site Surveys

FRONT END ENGINEERING DESIGN (FEED)n Equipment and Instrument process data

sheetsn P &IDs –Packaged unitsn Requisition for inquiry for main equipment and LLIn Plot plans with plan and elevation viewsn Material Selection Diagrams and Piping material class specificationsn System I/O sizing and Instrument Listsn Preliminary cable schedulen Soil Investigation reportn Typical equipment foundations drawingsn HAZOP, Safety Philosophy and Environment Impact Assessmentn Assurance Reviewsn Engineering and Site Surveysn 3D Modeling

DETAIL ENGINEERINGn Development of Piping and Instrument Diagrams issued for constructionn 3D Modelingn Development of detailed piping drawings, including isometrics and stress calculations issued for fabrication and constructionn Development of detailed drawings related to electrical, instrumentation and controls issued for manufacturing and constructionn Development of civil works detailed drawings issued for constructionn Development of technical documents for the purchasing of equipment, main and bulk.n Management of vendor data and documentationn Development of commissioning and Start- up procedures.

ENGINEERING TOOLS AND SOFTWARESome of the tools and software Techno utilizes for engineering;n HYSYSn Aspen PLUSn SPSn FASTn TANK (2015)n ETAPn STAAD.Pron CASS 9.1n ANSYSn PDMSn AutoCADn CAESAR IIn Microsoft officen Pipeline Construction Management Solutions (CMS)n Material Management and EDM

Page 16: COMMITTED TO DELIVERING EXCELLENCE

16 |

PROCUREMENT

Techno procurement team delivers cost-effective, high-quality equipment and materials for projects through efficient supply chain management, that in turn supports Engineering, Construction and Commissioning requirements and timelines.Our procurement approach is based on a well-coordinated procurement model, which enables Techno to operate as a unified supply chain management organization, capable of delivering successfully procurement targets and benefits to its clients.

Techno’s Global Procurement Mission;n Developing long- term relationships with suppliersn Implementing new procurement strategies to improve competitiveness and qualityn Gathering and updating client’s list of approved suppliersn Hiring of reputed third party inspectors for inspection

Page 17: COMMITTED TO DELIVERING EXCELLENCE

| 17

CONSTRUCTION

Construction is one of the core strengths of Techno. We have unique expertise to manage and deliver most challenging major projects.Creative methods and fit-for-purpose processes enable us to deliver projects as per customer satisfaction and the highest standards in HSE and Quality. Our national and international experience and a network of construction resources enable us to understand the local country’s law, regulations and challenges quite well. Moreover, we have an ability to quickly adapt to the requirements of new locations and devise workable solutions efficiently and quickly mobilize construction equipment and construction crews. Techno has excelled and is well known for its diversified staff which includes people from various culture, race, and regional backgrounds. Techno’s first priority is employing and training local labor to the degree that is possible to add value to each project and to the local economy.

TECHNO’S CONSTRUCTION EXPERTISE INCLUDEOIL AND GASn Export Pipelinesn Brownfield Developmentn Facilities Upgraden Gathering and Injecting Systemsn Pump and Compressor Stationsn Storage Tank Systemsn Receiving Terminalsn Process Plantsn Watern Industrial and Waste Water Treatmentn Produced Water Treatment of Oil and Gas Fieldn Construction of Water Distribution and Network Services

INFRASTRUCTUREn Buildings & Facilitiesn Highways and Bridgesn Tunnelsn Municipal Infrastructuren Dams

POWERn Power Generation Facilities i.e. gas, Hydro and Thermal Power Plantsn Overhead Transmission Linesn Substationsn Distribution Facilities

Page 18: COMMITTED TO DELIVERING EXCELLENCE

18 |

CONSTRUCTION EQUIPMENT

GLOBAL CONSTRUCTION EQUIPMENT RESOURCESS.NO DESCRIPTION UAE IRAQ PAK

1 Bull Dozers 17 4 71

2 Hydraulic Excavators 33 34 81

3 Pipe Layers / Side Booms 80 44 79

4 Motor Graders 3 4 14

5 Wheel / Skid / Backhoe Loaders 13 11 20

6 Mechaincal & Hydraulic Cranes (5T - 70T) 16 6 37

7 Dump Trucks / Quarry Dump Trucks / Head Trucks 98 7 108

8 Vibratory Rollers / Compactors 2 2 20

9 Hydraulic Crawler Rock Drills / Breakers / Hammers 36 0 11

10 Tractors 0 2 12

11 Welding Tractors 33 21 57

12 Light Vehicles 118 71 223

13 Heavy Vehicles 6 10 62

14 Low Beds / Flat Beds 56 4 285

15 Manual Welding Machines with Accessories 195 0 250

16 Semi Automatic Welding Machines with Accessories 0 16 0

17 Auto Welding Machines with Accessories 5 9 0

18 Internal & External Clamps from (10" to 52") 10 10 30

19 Fuel & Water Tankers 59 12 130

20 Mobile Crushers / Screening Plants 9 0 4

21 Generators / Lighting Towers / Compressors 143 30 146

22 Cable Crane System 1 0 0

23 Manlift 0 3 15

24 Scissor Lift 2 0 2

25 Bending Machines with Mandrills ( 10' to 52") 4 4 8

26 Thrust Boring Machines 0 1 2

27 Micro Tunneling Machine (HERRENKNECHT) 2 0 0

28 HDD Drilling Machine (Ditch Witch JT 100 & JT 4020) 2 1 1

29 HDD Drilling Machine (HERRENKNECHT 250T) 0 2 0

30Heavy Bridges for river and canal crossings with accessories

1 1

31 Trenchers 0 1 21

32 Dewatering Pumps 10 0 37

33 Compressers & High Pressure Pumps 10 6 20

34 Pipe Fabrication / Manufacturing Factory 0 0 1

35 3LPE Pipe Coating Plant 0 0 1

TOTAL 963 316 1749

One of Techno’s key assets is its self-owned construction equipment.

Page 19: COMMITTED TO DELIVERING EXCELLENCE

| 19

COMMISSIONING & START-UP

Techno delivers Commissioning and Start-Up scope in a planned, controlled and timely manner with the safety, security, and health of its employees, clients, suppliers and subcontractors an utmost importance.We are well-versed in systems completion, commissioning and start-up activities. Our experienced team, with extensive field proven expertise, delivers client-focused services using proven processes and systems resulting in increased productivity, enhanced construction processes, accurate scheduling, cut-down maintenance cost, reduce downtime, and assure safe operation for every project.

Page 20: COMMITTED TO DELIVERING EXCELLENCE

20 |

Page 21: COMMITTED TO DELIVERING EXCELLENCE

| 21

MANUFACTURING

Techno offers a complete range of API line pipe manufacturing for the oil and gas cross country / export / transmission pipeline applications. Our manufacturing facilities share a unified global quality policy and are ISO 9001 certified. Our line pipe production facility, SHASHI Steel Pipe-Works Ltd is located in Pakistan with the following production capacities: n Covered Area 75 Acresn Production Cap. 200,000 Tons Per Annumn 3 Layer Poly-Ethylene Coating n Current Cap. 12”-100” dia.n Pipe Length 10ft, 20ft, 40ft.n Beveling Capabilityn Thickness up to 25 mm.n Grade up to X70n API 5LPSL2

We have manufactured & supplied pipes for the following Clients: n PARCO, 800 km long three layer coated pipe (X-65 steel grade) having 26 inch diameter in

year 2002

n PARCO, 20 km long three layer coated pipe (X-65 steel grade) having 26 inch diameter on 24 May 2005

n SSGC, 151 km long three layer coated pipe (X-70 steel grade) having 24 inch diameter on 05 June 2006

n SNGPL, 16.9 km long bare pipe (X-46 steel grade) having 16 inch diameter on 26 February 2004

n SSGC, 30 km long three layer coated pipe (X-70 steel grade) having 24 inch diameter on 18 September 2007

Page 22: COMMITTED TO DELIVERING EXCELLENCE

22 |

POWER

OIL & GAS

INFRASTRUCTURE

WATER

MARKETS

Page 23: COMMITTED TO DELIVERING EXCELLENCE

| 23

MARKETS

Techno Engineering Services (TES) is a leading engineering, procurement and construction (EPC) company that delivers the most challenging and complex engineering, procurement and construction projects for Oil & Gas, Water, Infrastructure, Power and Manufacturing sectors across Pakistan, United Arab Emirates and Iraq. TES IS NOW EXPANDING IN OTHER MIDDLE EAST COUNTRIES TO PROVIDE ITS HIGH VALUE SERVICES IN OIL & GAS, WATER, INFRASTRUCTURE AND POWER SECTORS.Techno is a reliable name when clients are looking to build oil / gas cross country & export pipelines, well-gathering systems, refining & central processing facilities, invest in power plants & build overhead transmission lines. Furthermore, we build infrastructure (roads, motorways, bridges, and buildings), water pipelines and treatment facilities or upgrade / revamp existing facilities with sustainable infrastructure.

Page 24: COMMITTED TO DELIVERING EXCELLENCE

24 |

OIL & GAS

Techno has over 30 years of experience in the oil and gas industry. We have a strong history of delivering oil and gas projects at all levels from upstream to downstream.

The cross country / export pipelines and facilities we engineer and construct have an outstanding track record with respect to start-up and performance. Our quality-driven approach to project execution enables us to provide customized services with a high degree of predictability and client satisfaction.

Techno has significant experience with various contracting approaches that include EPCM/EPC/Construction. Our scalable EPC solutions are proven in oil / gas projects of varying sizes. Our processes and systems have resulted in the successful management and delivery of projects. We approach every project with strong planning, engineering, procurement, construction, commissioning and operations and maintenance capabilities with a relentless drive to understand and meet our clients’ expectations. Our clients can count on us for adaptability, attention to detail and a commitment to deliver the project towards successful completion.

Our core services include engineering, procurement, construction, commissioning & start-up including full project management for projects across an extensive range of areas including:n Cross Country / Export Pipelinesn Greenfield and Brownfield Developmentn Facilities Upgraden Gathering and Injecting Systemsn Pump and Compressor Stationsn Storage Tank Terminalsn Process Plants

Page 25: COMMITTED TO DELIVERING EXCELLENCE

| 25

WATER

We offer water treatment services and solutions for industrial water treatment, water produced during oil and gas production, waste water treatment and water desalination. We ensure our clients that precious water resources are protected and managed in a sustainable manner. Together with our partners, who have strong expertise in all kind of water treatment areas, we provide engineering, procurement and construction (EPC) and commissioning services for water and wastewater networks, treatment facilities and ancillary equipment.

We have expertise in the design and construction of water distribution and collection pipeline networks. Our highly trained teams design, procure and manage the delivery of complete projects from route selection, laying technique, dealing with utilities, connecting to existing services, testing, commissioning and reinstatement.

Page 26: COMMITTED TO DELIVERING EXCELLENCE

26 |

INFRASTRUCTURE

Our fully integrated teams take full control of a project, from advisory services to design and construction. We offer end-to-end solutions to a broad range of sectors that include:n Buildings & Facilitiesn Highways and Bridgesn Tunnelsn Municipal Infrastructuren Dams

Techno has significant experience in all of the above sectors with various contracting approaches that include EPCM, EPC and Construction services. Whether we provide a separate or one fully integrated solution, both the approaches allow us to deliver outstanding modern infrastructure.

Page 27: COMMITTED TO DELIVERING EXCELLENCE

| 27

POWER

As the demand for sustainable power grows across the globe, so do our contributions to the power sector. We offer a complete set of engineering, procurement, construction (EPC) services for power projects, including: power generation, overhead transmission lines, substations, and distribution facilities. We also offer diversified power distribution services for large and small scale oil and gas pipelines and facilities. Our experience further extends to power generation facilities which include gas, hydro and thermal power plants.

Page 28: COMMITTED TO DELIVERING EXCELLENCE

28 |

PROJECTS

Engineering, Procurement and Construction of 107.5 KMs. 18”-dia. Gas Export Pipeline Badra – Zubaidah Project

PROJECT

OIL & GAS

PRINCIPAL OWNER Midland Oil Company (MdOC)CLIENT Gazprom Neft Badra B.V.LOCATIONBadra – Zubaidah, IRAQREGIONMiddle EastSERVICESEPC - Engineering, Procurement, Construction, Commissioning and Start-up

PROJECT SCOPEEPC of 107.5 KMs 18” dia. Gas Export Pipeline Badra – Zubaidah Project, Republic of IRAQ. (70bar pressure) including Tigris River Crossing (HDD Method), 4 Actuated Block Valve Stations, Bi-directional Launcher / Receiver Stations, Fiber Optic Communication System, SCADA and ESD System, Cathodic Protection System, Solar Power System, Testing, Commissioning & Start-Up.

RESULTMet the Principal Owner and Client’s Gas-in milestone in accordance with the contractual timeline.

PROJECT CHALLENGESAs per the Client’s request the overall design (FEED) has been optimized, so deletion of redundant equipment and design changes were done considering the initial requirements for the project parameters. n The detailed design of more than 150 crossings, including the Tigris river crossing (1200 m length) by horizontal directional drilling method.n Timely delivery of material was a critical requirement to support construction, commissioning & startup schedule. Iraqi custom clearance requirements were communicated to all suppliers proactively and effective coordination was done to release the shipments from the customs and deliver all the material at site as per the project requirements. n Construction of GEP was done throughout the agricultural areas and farmlands. During construction Pipeline had to cross more than 400 irrigation channels, 12 hardtop roads, 2 major rivers;n Facilitate with GPNB & MdOC to coordinate construction works and methodology with local landowners to minimize negative effect on their farmlands and environment;n Scheduling of the works in order to avoid working in lowland areas during rainy seasons. 60% of the area crossed by the pipeline is not accessible during rainy season due to weather and water discharge from Iranian mountainous areas;n Timely & efficient interfaces with GPNB, MdOC, Samsung & Zubaidah Power Plant.

Page 29: COMMITTED TO DELIVERING EXCELLENCE

| 29

Engineering, Procurement and Construction of 102 KMs. 42”dia. Onshore Export Pipeline & Associated Works including 33kV Overhead Power Line from Central Processing Facilities to Tuba Tank Farm

PROJECT

PRINCIPAL OWNER South Oil Company (SOC)CLIENT Lukoil Mid East Ltd.LOCATIONWest Qurna II, IRAQREGIONMiddle EastSERVICESEPC - Engineering, Procurement, Construction, Commissioning and Start-up

PROJECT SCOPEEPC of 102 KM 42” dia. Onshore Export Pipeline West Qurna (Phase II) Project, Republic of IRAQ. (79bar pressure) including Euphrates & Major Canal crossings (HDD method), 6 Actuated Block Valve Stations, Bi-directional Launcher / Receiver Stations, Fiber Optic Communication System, SCADA, ESD System, Cathodic Protection System, Fire & Gas and H2S Detection System and 67Kms long, 33KV Overhead Power Line, Testing & Commissioning.

RESULTMet the Principal Owner’s and Client’s commercial production timeline and targets.

PROJECT CHALLENGESn Design and Construction of 33kV OHL Tower Foundations in High Water Table arean Installation of Lattice Tower for 33kV OHLn HDD Crossing at Major Canal around 841.37mn HDD Crossing at Euphrates River and Major Canal for 33kV Power Line n Construction works for 42”dia. Pipeline in High Water Table area with the installation of Geo-Textile Weightsn 239 Number of Canal, River, Road, Highway and Utilities crossings

PROJECTS

OIL & GAS

Page 30: COMMITTED TO DELIVERING EXCELLENCE

30 |

PROJECTS

OIL & GAS

Construction and Commissioning Services for 201 KMs. 24”dia. AHDEB Oil Field EXL1 (Phase I) Project

PROJECT

PRINCIPAL OWNER Al Waha Petroleum Company Limited CLIENT China Petroleum Engineering & Construction Corporation (CPECC)LOCATIONAl Wasit Governorate, IRAQREGIONMiddle EastSERVICESConstruction and Commissioning

PROJECT SCOPEConstruction of 201KMs 24” dia. Oil Export Pipeline CPF00 to PS2 Project, Republic of IRAQ. (100bar pressure) including River & Major Canal crossings, 8 Block Valve Stations, Cathodic Protection System, Solar Power System and Lightning Protection System, Testing & Commissioning.

RESULTAchieved the required quality targets and met the timeline to support the completion of the entire scope by the Client / Main Contractor CPECC.

PROJECT CHALLENGESn Most of the locations Water Table was very high, so the Contractor installed Set-on-Weights on the Pipelinen Crossing of Al-Gharraf River by Float & Sink Method

Crude Oil 100 Kms 48”Dia Pipeline Construction of Section IV Abu Dhabi Crude Oil Pipeline Project (ADCOP)

PROJECT

PRINCIPAL OWNER International Petroleum Investment Company (IPIC)CLIENT China Petroleum Engineering & Construction Corporation (CPECC)LOCATIONHabshan – Fujairah, UAEREGIONMiddle EastSERVICESConstruction and Commissioning

PROJECT SCOPEConstruction of 100 Kms of 48”Dia. KP 272 to KP 382 with 5 Block Valve Stations, Road Crossings (Micro Tunnelling Method), Fiber Optic Communication System, SCADA System, Cathodic Protection System, Testing & Pre-Commissioning.

RESULTAchieved the required quality targets and met the timeline to support the completion of the entire scope by the Client / Main Contractor CPECC.

PROJECT CHALLENGESn 60~70% works in Mountainous Section, Very Hard Rock, difficult to cut, do blasting works also

n Slopes between 20 to 45 degrees.

n Using the cable crane system for construction in mountainous section

n HDD Crossing at Sheikh’s Farm

n Crossing of Roads by Micro Tunneling Method

Page 31: COMMITTED TO DELIVERING EXCELLENCE

| 31

PROJECTS

OIL & GASPROJECT

Construction of Infrastructure for the Main Oil Terminal (MOT) Abu Dhabi Crude Oil Pipeline Project (ADCOP) United Arab Emirates

PRINCIPAL OWNER International Petroleum Investment Company (IPIC)CLIENT China Petroleum Engineering & Construction Corporation (CPECC)LOCATIONHabshan – Fujairah, UAEREGIONMiddle EastSERVICESConstruction

PROJECT SCOPEConstruction of Tank Foundations (08 Nos.), Dykes, Ramps and Joining Road, Area Development, Fire Water Tanks (02 Nos.) etc.

RESULTAchieved the required quality targets and met the timeline to support the completion of the entire scope of the Main Oil Terminal by the Client / Main Contractor CPECC.

PROJECT CHALLENGESn Cutting of mountain by controlled blasting and jack hammer for collection of Material (0-300mm)

n Construction of Tanks Foundations in layer (11 Layers)

Page 32: COMMITTED TO DELIVERING EXCELLENCE

32 |

LIST OFCOMPLETED

PROJECTS

S.NO Year Owner Client Location WorkDescription Value (Millions)

1 2014 Midland Oil Company (MdOC)

Gazprom Neft Badra B.V

Republic of IRAQ EPC of 107.5KM 18” dia. Gas Export Pipeline Badra – Zubaidah Project, Republic of IRAQ. (70bar pressure) including Tigris River Crossing (HDD Method), 4 Actuated Block Valve Stations, Bi-directional Launcher / Receiver Stations, Fiber Optic Communication System, SCADA and ESD System, Cathodic Protection System, Testing, Commissioning. & Start-Up.

USD 138.50

2 2012 South Oil Company (SOC) Lukoil Mid East Limited

Republic of IRAQ EPC of 102KM 42” dia. Onshore Export Pipeline West Qurna (Phase II) Project, Republic of IRAQ. (79bar pressure) including Euphrates & Major Canal crossings (HDD method), 6 Actuated Block Valve Stations, Bi-directional Launcher / Receiver Stations, Fiber Optic Communication System, SCADA and ESD System, Cathodic Protection System, Fire & Gas and H2S Detection System and 67Km long 33KV Overhead Electric Power Line, Testing & Commissioning

USD 171.53

3 2010 Al-Waha Petroleum Company Ltd.

China Petroleum Engineering & Construction Corporation (CPECC) IRAQ

Republic of IRAQ Construction of 24ӯ x 201.00Kms EXLI Pipeline of AHDEB OIL Field Project РRepublic of IRAQ

USD 87.00

4 2008 - 2010

International Petroleum Investment Company (IPIC)

China Petroleum Engineering & Construction Corporation (CPECC) Abu Dhabi

United Arab Emirates

Construction of 48ӯ x 6.00Kms. Off Shore Oil Loading Line РOnshore Section, Abu Dhabi Crude Oil Pipeline Project (ADCOP) United Arab Emirates (USD 25 Million)

Construction of 100Kms of 48”-Dia. KP 272 to KP 382 with 5 Block Valve Stations, Road Crossings (Micro Tunnelling Method), Fiber Optic Communication System, SCADA System, Cathodic Protection System, Testing & Pre-Commissioning. (USD 120 Million)

Supply & Compaction of Gatch Material for Preparation of ROW for Abu Dhabi Crude Oil Pipeline Project (ADCOP) United Arab Emirates (USD 10 Million)

Main Oil Terminal (Civil Works Tank Foundations & Area Development) - Abu Dhabi Crude Oil Pipeline Project (ADCOP) United Arab Emirates (USD 100 Million)

USD 295.00

Page 33: COMMITTED TO DELIVERING EXCELLENCE

| 33

Inland Transportation 48”-dia., 34000 nos. of Line Pipes from Mina Zayed Abu Dhabi to Storages along ROW (400kms) for Abu Dhabi Crude Oil Pipeline Project (ADCOP) United Arab Emirates (USD 15 Million)

Construction of Residential Camps for 4000 People for Abu Dhabi Crude Oil Pipeline Project (ADCOP) United Arab Emirates (USD 25 Million)

5 2007 ENI Pakistan Limited ENI Pakistan Limited Pakistan The major activity is dismantling and removal of all existing piping and instrumentation works (From K-7 Wellhead) for subsequent reinstallation at another location (K-18 Wellhead). Complete relocation of South valve station, includes Civil, mechanical, E&I work. Supply of all materials, fabrication testing and installation of pig launchers and receivers at relocated South valve Station also includes control panel, solar panel, construction and testing of 12″ dia Duplex flow line completed at Kadanwari Oil and Gas field.

USD 4.28

6 2002 Pak Arab Pipeline Co. Ltd. (PARCO)

Pak Arab Pipeline Co. Ltd. (PARCO)

Pakistan In order to construct a 26″ dia pipeline from Port Qasim to Mahmood Kot the following activities were performed. Excavation: (WOPP) Civil work foundation was excavated and a reinforced concrete wall made. The bottom was Filled with sand in 4″ layers and compacted to ASHTO-98% .Tanks were designed as per API-650.

817 km long Excavation of trenches: construction, including excavation of trench 2x1.5meters, and back filling, Concrete foundations for on surface tanks, 55.5 meter dia 15 meter high, Six foundations using concrete, reinforced steel at Port Qasim, Two main oil terminals at Port Qasim & Mahmood Kot, three pumping stations at Shikarpur, Bubak and port Qasim., 132 KVA/11 KVA grid stations at Bin Qasim & Shikarpur.

Mass excavation, concreting, building roads with in facility, 500major crossings, construction of a new independent bridge 1.3 Km long on Indus river at Ghazi Ghat. Consisted of bored cast in situ piles (Two pile per pier of 1.6 meter dia 48 meter long with a concrete transom slab at top) substructure and steel trusses as super Structure. This job did involve the state of art work of launching of 23 numbers of trusses each weighing of 50 tones from the top. Heavy excavation and dewatering executed.

USD 189.20

7 2002 PKP Exploration Limited PKP Exploration Limited

Pakistan Access Road & Well Sites Construction USD 0.89

8 1994 - 2001

Lasmo Oil Pakistan Limited. Lasmo Oil Pakistan Limited.

Pakistan Construction of 21 Km Access Road, Well Site and Camp Site

Construction of Wellhead Piping, Civil Works and Flowlines 10” Dia Duplex SS for K-11 including Telemtry Cable laying, Instrumentation and Electrical Works

Construction of civil heavy foundations, installation of front end compressor, Fin Fan Air Cooler, interconnecting pipe works, electrical, instrumentation, insulation, painting works etc.

USD 8.17

Page 34: COMMITTED TO DELIVERING EXCELLENCE

34 |

Construction of Well Site, Camp Site and Access Road.

Construction of K10 - Wellhead Facility and Duplex Flowline 3.8 Km

Construction of Well Head Facilities, K9 - SVS, Flowlines, Telemetry System complete with Civil, Electrical and Instrumentation Works

Construction of 10” & 12” ND 22 Km long Duplex SS Flowline.

9 1999 Astaldi - Ferrocemento J.V. Sukkur

Astaldi - Ferrocemento J.V. Sukkur

Pakistan Services for provision of pre-assembled bridge on Indus River.

USD 0.71

10 1999 Tullow Pakistan (development) Ltd.

Tullow Pakistan (development) Ltd.

Pakistan Construction of SARA export Pipeline 43.404 Km Long, 8” dia from Well Sara #1 to WAPDA Terminal at Daharki Civil Construction Services for Culvert Construction near SURI Well:

USD 1.14

12 1993 - 1998

Pak Arab Pipeline Co. Ltd. (PARCO)

Pak Arab Pipeline Co. Ltd. (PARCO)

Pakistan Construction of Oil Pipeline 365 Km Long, 2 Pump Stations And one Terminal Station.Joint Venture with Willbros Middle East Inc.

Construction of Mechanical Work

USD 21.18

11 1998 Gregory & Cook S.A. Gregory & Cook S.A. Pakistan Construction of wellhead Facilities Gas Gathering System and laying of flowlines complete with Electrical, Instrumentation work and SCADA System.

USD 19.54

13 1997 Petrosin Ravi Engineering (Pvt) Ltd.

Petrosin Ravi Engineering (Pvt) Ltd.

Pakistan Fabrication, Welding of special pipe spools of Carbon Steel, Stainless Steel and Duplex Stainless Steel and erection of platforms and ladders for H2S Removal Plant

USD 0.19

14 1995 - 1996

Oil & Gas Development Company Limited (OGDCL)

Oil & Gas Development Company Limited (OGDCL)

Pakistan Development of Panjpir Gas Field, Construction of Well Head Assembly, Process Plant, Dehydration Plant, Central Facilities and Transmission Line complete with Electrical, Instrumentation, SCADA System and Ravi River Crossing etc.

Equipment supplied by Sicon as a Joint Venture Partner

USD 12.23

15 1986 - 1995

Occidental of Pakistan Inc. Occidental of Pakistan Inc.

Pakistan Supply & Construction of 8” Pipeline from Ratana Well # 3 to Ratana Well # 2.

Construction of Location & its Access Road

Foundation and Wash Tank supply / erection.

Installation of Glycol – Gas Separator, Piping , Instrumentation, Civil and Electrical Works.

Supply, Fabrication & erection of Chemical storage shelter.

Construction of Extended test facility including Civil, Electrical and Instrumentation Works

USD 5.93

Laying of 12”, 6” & 2” pipelines.

Supply, Mechanical and Civil construction and erection of Catwalk, walkways, crossovers and ladders.

Construction of right of way for Pipeline.

Page 35: COMMITTED TO DELIVERING EXCELLENCE

| 35

16 1991 - 1995

Union Texas of Pakistan Inc. Union Texas of Pakistan Inc.

Pakistan Construction of 12” Pipe line from Buzdar(South) to Mazari.

Flowline Installation at Badin Gas Development Project.

Construction of Malti Dabhi - Mazari flow lines and pipelines

USD 1.13

17 1989 - 1994

Sui Northern Gas Pipelines Limites (SNGPL)

Sui Northern Gas Pipelines Limites (SNGPL)

Pakistan Construction of 8” ND 11.39 Miles Pipeline Takhtbhai to Sakhakot.

16” dia Operational phase from SMS Sheikhupura Road to G.T Road Gujranwala along Jinnah Road.

Preparation of right of way, Trench excavation in the rocky area for 16” Dia high pressure gas pipeline at Dera Bughti, Pirkoh and Loti site in Baluchistan.

Construction of 16” ND 20 km long pipe line from G.T road, Rawat to Faizabad.

USD 1.58

18 1993 Clough Engineering Group.(Australia)

Clough Engineering Group.(Australia)

Pakistan Construction of Flow lines and Trunk Line USD 1.67

19 1993 SHYDO, NWFP SHYDO, NWFP Pakistan Construction of Tunnel in Mountain for RHPP, 1.6 Km long

USD 2.85

20 1993 Telecom Foundation Telecom Foundation Pakistan Laying of Primary & Secondary Optic Fiber Cables

USD 0.26

21 1992 Aquater SPA-Karachi Aquater SPA-Karachi

Pakistan Construction of the N.D. 14” gas line from Mari Gas Field to Fauji Ammonia-Urea Complex

USD 1.32

22 1991 - 1992

Capital Development Authority (CDA)

Capital Development Authority (CDA)

Pakistan Replacement of PRCC pipe over the river crossing on the Simly conduction Main lines from Filtration Plant to Kurang River near VP-6 Islamabad

Construction of an extension line 36” dia MS Cement Mortar pipeline construction of Main 2nd line ISLAMABAD

Construction of 2Nos. Nullah crossing for re- routing of 16” Dia Conduction main 2nd line near Noorpur Shahan and Quaid-e- Azam University.

USD 1.39

23 1992 Shynrio Corporation Japan (ETV Centre)

Shynrio Corporation Japan (ETV Centre)

Pakistan Electrical, HVAC and plumbing Works at ETV Centre (PTV2)

USD 0.08

24 1992 Pakistan State Oil Co. Ltd. Pakistan State Oil Co. Ltd.

Pakistan Construction of 24” dia main pipeline to connect F.O. Buffer Terminal with Pipri Terminal

USD 0.97

25 1989 - 1991

Pak. Petroleum Limited Pak. Petroleum Limited

Pakistan Construction of high pressure Crude Oil Buried Feeder Line (6”- NPS) installation / welding of fittings, piping & construction of well Perimeter fencing for Adhi Well-11.

Construction/Installation of Feeder Line, wellhead surface fittings and well fencing at Adhi Well - 10

USD 0.20

26 1991 Amoco Pakistan - Exploration Company

Amoco Pakistan - Exploration Company

Pakistan Construction of Location & its Access Road USD 0.24

27 1988 Karachi Shipyard & Engg. Works Limited.

Karachi Shipyard & Engg. Works Limited.

Pakistan Gathering Pipeline from Dhakni Wells 1,2,3, & 4 to Dhakni Treatment Plant

USD 0.40

Page 36: COMMITTED TO DELIVERING EXCELLENCE

36 |

Page 37: COMMITTED TO DELIVERING EXCELLENCE

| 37

CLIENT LISTGazprom Neft Badra B.V.

Lukoil Mid East Limited

China Petroleum Engineering & Construction Corporation (CPECC) IRAQ

China Petroleum Engineering & Construction Corporation (CPECC) Abu Dhabi

ENI Pakistan Limited

Pak Arab Pipeline Co. Ltd (PAPCO)

Pak Arab Refinery Co. Ltd (PARCO)

PKP Exploration Limited

Lasmo Oil Pakistan Limited

Tullow Pakistan (Development) Ltd.

Willbross

Gregory & Cook S.A.

Petrosin Ravi Engineering (Pvt) Ltd.

Sicon Oil & Gas

Oil & Gas Development Company Limited (OGDCL)

Occidental of Pakistan INC.

Union Texas of Pakistan INC.

Sui Northern Gas Pipelines Limited (SNGPL)

Clough Engineering Group.(Australia)

SHYDO, NWFP

Telecom Foundation

Aquater SPA-Karachi

Capital Development Authority (CDA)

Shynrio Corporation Japan (ETV Centre)

Pakistan State Oil Co. Ltd. (PSO)

Pak. Petroleum Limited.

Amoco Pakistan - Exploration Company

Karachi Shipyard & Engg. Works Limited.

Page 38: COMMITTED TO DELIVERING EXCELLENCE

38 |

CERTIFICATES

COMPLETION CERTIFICATES

Page 39: COMMITTED TO DELIVERING EXCELLENCE

| 39

HSE ZERO LTI CERTIFICATES

ISO 14001 & OHSAS 18001 CERTIFICATES

Page 40: COMMITTED TO DELIVERING EXCELLENCE

ABU DHABI OFFICEO�ce No. M-15, Building No. 158,

Executive Business Center -

Heirs of Saoud Mohammed Arar Al Dhaheri,

P.O Box # 105424

Tel : +971 2 6790119

Fax : +971 2 6740066

E-mail : [email protected]

DUBAI OFFICEPlot No S10204 Jebel Ali Free Zone (South Zone),

PO Box 261401

Dubai, United Arab Emirates

Tel : +971 4 8807386

Fax: +971 4 880 7935

E-mail : [email protected]

IRAQ OFFICEKarada - District 905, Street 15 - Building 39/1,

Baghdad, IRAQ

Postal Code: 10069

E-mail : [email protected]

PAKISTAN OFFICE3rd Floor, Al-Malik Complex 80 East Jinnah Avenue,

Blue Area Islamabad

Tel: +92 51 2150391-393,

Fax +9251 2150390

E-mail : [email protected]

W W W . T E C H N O E N G I N E E R I N G . C O M