Page 1: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

1

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Commissioning Toolkit for In-House Commissioning

of Small Buildings

NCBC – April 22, 2008

Dan BurgoyneSustainability ManagerCalifornia Department of General Services

Page 2: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

2

BUILDING GREEN • BUYING GREEN • WORKING GREEN

California’s Motivations for Commissioning

Cost and Energy SavingsEnergy - 10 to 15 Percent over non-commissioned buildingsReduced change orders

Customer / Occupant SatisfactionImproved comfort and indoor air quality

Smoother Construction ProcessAvoided construction problems, reduced callbacks

Meet LEED certification requirements

And, One More Motivation…

Page 3: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

3

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Why Should CA Commission Buildings?

“Get onboard…the train has left and we are moving forward”

Page 4: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

4

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Executive Order S-20-04Signed December 14, 2004

Page 5: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

5

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Green Building Action Plan“The CEC shall develop guidelines and standards for commissioning activities to achieve operational and maintenance efficiency savings in commercial and public buildings.”

California Commissioning Guide: New Buildings

California Commissioning Guide: Existing Buildings

Page 6: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

6

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Green Building Action PlanBenchmark all State Buildings

> 100 M sq. ft. entered into Energy Star Portfolio Manager

Retro-commission all State buildings >50,000 sq. ft.Implementing RCx into 39 buildings, studies underway for 87 bldgs.

LEED-EB Silver for buildings >50,000 sq. ft.6 bldgs certified (2.5 M sq. ft.), 49 buildings underway (>13 M sq. ft.)

Page 7: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

7

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Green Building Action PlanDesign, construct and operate all State facilities as “LEED Silver” or higher

New & renovated buildings > 10,000 sq. ft.12 buildings already certified (2.7 M sq. ft.)Over 215 buildings (6 M sq. ft.) pursuing LEED certification (April 2008)

“Building projects less than 10,000 sq. ft. shall use the same design standard, but certification is not required.”

Page 8: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

8

BUILDING GREEN • BUYING GREEN • WORKING GREEN

State Small Building TypesForest Fire Stations

228 CDF fire stations in 36 counties protecting 31 million acres575 local gov’t stations operated by CDF39 conservation campsStorage facilities for fire trucks, bulldozers, air tankers & air tactical planes, helicoptersBarracks, shops, warehouses, admin facilities, misc. structures

Department of Motor Vehicles170 field offices throughout CAAlso driver safety offices, commercial drive test centers, telephone service centers

California Highway PatrolOver 180 offices throughout CA

Page 9: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

9

BUILDING GREEN • BUYING GREEN • WORKING GREEN

DGS Project Teams

Project Directors

Architects

Mechanical & Electrical Design Engineers

Building Inspectors

Building Inspection Specialists (Mechanical & Electrical)

General Contractor & Sub-contractors

Design & Construction Management Consultants

Page 10: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

10

BUILDING GREEN • BUYING GREEN • WORKING GREEN

LEED

Leadership in Energy and Environmental Design (LEED)Green building rating systemAdministered by U.S. Green Building Council (www.usgbc.org)

Building Criteria for:Sustainable SitesWater EfficiencyEnergy & AtmosphereMaterials & ResourcesIndoor Environmental QualityInnovation in Design

Point System with Levels of CertificationCertified, Silver, Gold, Platinum

EA Prerequisite 1: Fundamental Building Commissioning

EA Credit 3: Enhanced Commissioning

Page 11: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

11

BUILDING GREEN • BUYING GREEN • WORKING GREEN

LEED Cx Requirements

Tasks

Primary Responsibilities

If you are only meeting EA Prerequisite 1

If you are meeting both EAp1 and EA credit 3

Designate Commissioning Authority (CxA) Owner or Project Team Owner or Project Team

Document Owner's Project Requirements (OPR) Owner Owner

Develop Basis of Design (BOD) Design Team Design Team

Incorporate commissioning requirements into the construction documents

Project Team or CxA Project Team or CxA

Conduct commissioning design review prior to mid- construction documents NA CxA

Develop and implement a commissioning plan Project Team or CxA Project Team or CxA

Review contractor submittals applicable to systems being commissioned

NA CxA

Verify the installation and performance of commissioned systems CxA CxA

Develop a systems manual for the commissioned systems NA Project Team and CxA

Verify that the requirements fort training are completed NA Project Team and CxA

Complete a summary commissioning report CxA CxA

Review building operation within 10 months after substantial completion NA CxA

Page 12: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

12

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Coordinated Process to Optimize Building PerformanceQuality Assurance Process

Articulate/verify owners project requirementsConstruction observation / warranty enforcementControlling first costsTraining building operatorsOptimizing performance (comfort, reliability, safety, energy)Creating more cohesion among team membersEnhancing safety and risk management

Building Commissioning Defined

Page 13: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

13

BUILDING GREEN • BUYING GREEN • WORKING GREEN

In-House Commissioning (Cx) Toolkit

Executive SummaryRoadmap/InstructionsTools:

Owner’s Project RequirementsLEED Cx RequirementsBasis of DesignCx PlanContract RequirementsFunctional Performance Test FormsCx Summary Report

Other Resources

www.green.ca.gov/CxToolkit

Page 14: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

14

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Cx Toolkit – Executive Summary

One-page Summary of Cx ToolkitDefinition of CxExecutive Order S-20-04LEED Cx RequirementsPurpose & Content of ToolkitBenefits of Cx Integration

Page 15: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

15

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Instructions on Use of ToolkitIntegrate Cx as Early as Possible

Portions can be integrated in budget pkg.

Identify Cx ProviderDesign Phase – Design engineerConstruction Phase – M/E Inspection Specialists

Develop Cx PlanImplement Activities in Cx Plan

Cx Toolkit – Roadmap/Instructions

Page 16: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

16

BUILDING GREEN • BUYING GREEN • WORKING GREEN

DGS Commissioning Toolkit

Owner’s Project Requirements

Basis of Design

Commissioning Plan

Commissioning Specifications

A&E Commissioning Scope of Work

Functional Performance Test Forms

Commissioning Summary Report

Page 17: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

17

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Owner’s Project Requirements (OPR)

Owner and User Requirements

Environmental and Sustainability Goals

Energy Efficiency Goals

Indoor Environmental Quality Requirements

Equipment and Systems Expectations

Building Occupant and O&M Personnel Expectations

Page 18: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

18

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Page 19: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

19

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Basis of Design (BOD)HVAC System

Narrative Description of System Reasons for System Selection Load CalculationsSequence of Operations

Indoor Lighting SystemNarrative Description of System Reasons for System Selection Lighting Design Criteria Lighting Power Design Targets

Water Heating System Narrative Description of System Reasons for System Selection Water Heating Load Calculations

Page 20: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

20

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Page 21: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

21

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Commissioning Plan

General Project Information

Commissioning Goals

Systems to be Commissioned

Commissioning Team Information

Commissioning Process – Activities, Schedule and Responsibilities

Page 22: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

22

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Commissioning Plan Activities

Commissioning Activity

Timing (Project Phase)

Responsibility

Owner’s project requirements (OPR)

Concept / Budget

Project team, led by Project Director, with CxA review

Cx Plan Concept / Budget or PP

CxA

Basis of Design (BOD) PP or WD Design Team, with CxA review

Cx Specifications WD Design Team, with CxA review

Cx Kick-off Meeting Const. Lead by CxA, attended by Contractor

Develop pre-functional checklists

WD or Const. CxA (or Design Team)

Page 23: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

23

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Commissioning Plan Activities (cont.)

Commissioning Activity

Timing (Project Phase)

Responsibility

Develop functional test procedures

WD or Const. CxA (or Design Team)

Complete prefunctional checklists

Const. Contractor, with CxA (or Inspector) review

Perform functional performance testing

Const. Contractor, with CxA (or Inspector) guidance, witness and approval

Commissioning acceptance

Const. CxA

Cx Summary Report Const. CxA

Page 24: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

24

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Commissioning SpecificationsDescribes contractor participation requirements

Division 1 Section01810 General Commissioning Requirements

References in relevant mechanical and electrical sections

Page 25: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

25

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Page 26: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

26

BUILDING GREEN • BUYING GREEN • WORKING GREEN

A&E Scope of Work

Describes additional scope for commissioning role of design team

Currently under development

Page 27: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

27

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Functional Performance Test (FPT) Forms

HVACPackaged rooftop AC unitsSplit system AC units

LightingOccupancy sensor controls

Water HeatingStorage water heaterPoint-of-use water heater

Page 28: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

28

BUILDING GREEN • BUYING GREEN • WORKING GREEN

FPT – Packaged AC Unit

Monday Tuesday Wednesday Thursday Friday Saturday Sunday Override available?

7AM-6PM 7AM-6PM 7AM-6PM 7AM-6PM 7AM-6PM override override Yes

Per DesignPower to unitPower disconnects installed and labeled.Thermostat is wired to the HVAC system correctlyThermostat meets deadband control requirementsSpace temperature sensor calibratedOccupied, unoccupied, and holiday schedules programmedPre-occupancy purge has been programmedSet up and set back setpoints programmed as requiredThermostat located within the zone that the HVAC unit servesUnoccupied avg. zone set points (e.g. 85°Fsetup/60°Fsetback)Schedule overrideCondensate drain connectedCO2 sensor locationCO2 sensor calibratedReturn air damper moves through full rangeOutdoor air damper moves through full rangeNo excessive damper linkage slop.Permanent label attached.Unit secure and level.Maintenance access ok. Test, adjust and balance complete with deficiencies corrected.Outdoor air economizer switchover type and settingCasing condition ok.

Equipment Tag:

Name OrganizationParticipants:Test Date/Time:

Project Name:

Comments:

Comments:

Prefunctional Checklist

Record values for current setpoints, control parameters, limits, delays, lockouts, etc.and note any deviation from design.

Parameter Observed

Operating Schedule - Record time-of-day and setpoints and note any deviation from DESIGN

DAY OF THE WEEK

Design:Actual:

Page OneGeneral project infoPrefunctional checklist

Monday Tuesday Wednesday Thursday Friday Saturday Sunday Override available?

7AM-6PM 7AM-6PM 7AM-6PM 7AM-6PM 7AM-6PM override override Yes

Per DesignPower to unitPower disconnects installed and labeled.Thermostat is wired to the HVAC system correctlyThermostat meets deadband control requirementsSpace temperature sensor calibratedOccupied, unoccupied, and holiday schedules programmedPre-occupancy purge has been programmedSet up and set back setpoints programmed as requiredThermostat located within the zone that the HVAC unit servesUnoccupied avg. zone set points (e.g. 85°Fsetup/60°Fsetback)Schedule overrideCondensate drain connectedCO2 sensor locationCO2 sensor calibratedReturn air damper moves through full rangeOutdoor air damper moves through full rangeNo excessive damper linkage slop.Permanent label attached.Unit secure and level.Maintenance access ok. Test, adjust and balance complete with deficiencies corrected.Outdoor air economizer switchover type and settingCasing condition ok.

Comments:

Prefunctional Checklist

Record values for current setpoints, control parameters, limits, delays, lockouts, etc.and note any deviation from design.

Parameter Observed

Operating Schedule - Record time-of-day and setpoints and note any deviation from DESIGN

DAY OF THE WEEK

Design:Actual:

Page 29: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

29

BUILDING GREEN • BUYING GREEN • WORKING GREEN

FPT – Packaged AC Unit (cont.)

Simulation Mode/Test Desired System Response (check box if observed)

Other Observed System Responses Pass/ Fail/ NA

1. Heating during occupied conditionSet control system or programmable thermostat to occupied mode (e.g. adjust clock time to normal working hours). Adjust thermostat to 5 deg higher than current room temperature.

Supply fan operates continually.Gas-fired furnace, heat pump, or electric heater stages on.No cooling is provided by the unit.Outside air damper is open to minimum position.

2. No load during occupied conditionLeave system in occupied mode. Adjust thermostat setpoint to equal current room temperature.

Supply fan operates continually.Neither heating or cooling is provided by the unit.Outside air damper is open to minimum position.

3. Heating during unoccupied conditionSet control system or programmable thermostat to unoccupied mode (e.g. adjust clock to after-hours time). Adjust thermostat to 5 deg higher than current room temperature.

Supply fan cycles on. Gas-fired furnace, heat pump, or electric heater stages on.No cooling is provided by the unit.Outside air damper is open to minimum position.

4. No load during unoccupied conditionLeave control system or programmable thermostat in unoccupied mode (e.g. adjust clock to after-hours time). Adjust thermostat to equal current room temperature.

Supply fan shuts off. Neither heating nor cooling is provided by the unit.Outside air damper closes completely.

5. Cooling during occupied conditionReturn control system or programmable thermostat to occupied mode (e.g. adjust clock time is during normal working hours). Adjust thermostat to 5 deg lower than current room temperature. To ensure that airside economizer does not turn on, either warm economizer sensor or if unit has adjustable airside economizer sensor, adjust sensor down to turn off economization.

Supply fan operates continually.No heating provided.Compressor turns on and provides cooling.Outside air damper is open to minimum position.

6. Economizer operation (if unit equipped with economizer)Leave system in occupied mode. Adjust thermostat to 5 deg lower than current room temperature. If outdoor air temperature is lower than return air temperature, verify that economizer dampers are open for 100% outdoor air. Otherwise, use cold spray on outdoor air sensor to simulate condition. Then remove cold spray and verify that economizer dampers return to minimum air position (or warm the outdoor air sensor to simulate condition).

Supply fan operates continually.

No heating provided.

Outside air dampers open to 100%.

There are no signs of building overpressurization.

Outside air dampers return to minimum position.

7. Cooling during unoccupied conditionSet control system or programmable thermostat to unoccupied mode (e.g. adjust clock to after-hours time). Adjust thermostat to 5 deg lower than current room temperature.

Supply fan operates continually.No heating provided.Compressor turns on and provides cooling.Outside air damper is open to minimum position.

8. Manual Override (if system has this capability)

Simulation Mode/Test Desired System Response (check box if observed)

1. Heating during occupied conditionSet control system or programmable thermostat to occupied mode (e.g. adjust clock time to normal working hours). Adjust thermostat to 5 deg higher than current room temperature.

Supply fan operates continually.Gas-fired furnace, heat pump, or electric heater stages on.No cooling is provided by the unit.Outside air damper is open to minimum position.

2. No load during occupied conditionLeave system in occupied mode. Adjust thermostat setpoint to equal current room temperature.

Supply fan operates continually.Neither heating or cooling is provided by the unit.Outside air damper is open to minimum position.

Page 30: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

30

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Commissioning Summary Report

General Project Information

Commissioning Team Information

Executive Summary Commissioning Process Summary Outstanding Issues Observations and Conclusions

History of Deficiencies

Page 31: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

31

BUILDING GREEN • BUYING GREEN • WORKING GREEN

Conclusion / Other Resources

Start Now – Begin with Owner’s Project Requirements

Online Toolkit – www.green.ca.gov/CxToolkit

Other Useful websites/documents:California Cx Guide for New Buildings: www.documents.dgs.ca.gov/green/commissionguidenew.pdfCalifornia Commissioning Collaborative: www.cacx.orgPortland Energy Conservation, Inc. (PECI): www.peci.orgBuilding Commissioning Association (BCxA): www.bcxa.orgCx Assistant Cx Tool: www.ctg-net.com/edr2002/cxLEED-NC v2.2 Reference Guide

• Prerequisite 1 – pp 149-161; • Credit 3 – pp 205-210

Page 32: Commissioning Toolkit for In-House Commissioning of Small Buildings€¦ ·  · 2016-09-28Commissioning Toolkit for In-House Commissioning of Small Buildings NCBC ... A&E Commissioning

32

BUILDING GREEN • BUYING GREEN • WORKING GREEN

For More Information

Dan BurgoyneSustainability ManagerState of CaliforniaDepartment of General ServicesExecutive Office, Green Team707 Third Street, 8th Floor, West Sacramento, CA 95630

(916) 376-5010 - [email protected]