COMMERCIALIZING PICO AND NANO GRIDSby Mason Wallick
Infunde Development is InfraCo Asia’s exclusive Developer for South East Asia (excluding Myanmar & Co-Development program)
Exclusive InfraCo Asia DeveloperInfunde Development is responsible, on behalf of InfraCo Asia for project origination, pre-financial close project development, EPC management and financial structuring activities inSoutheast Asia.
InfraCo Asia is a company of the Private Infrastructure Development Group a coalition ofdonors mobilising private sector investment to assist developing countries attaininfrastructure vital to boosting their economic growth and combating poverty. InfraCo Asia iscurrently funded by three PIDG members - Australian Department of Foreign Affairs andTrade (DFAT), the Swiss State Secretariat for Economic Affairs (SECO), and the UKDepartment for International Development (UKAid).
www.infracoasia.com
@InfraCoAsia
InfraCo Asia
@pidgorg
Private Infrastructure Development Group
www.PIDG.org
WE SEEK PROJECTS THAT
Reduce poverty and provide social benefit
Complement, not compete, with the private sector
Are commercially viable
EXPERIENCEWITH SMALL AND LARGEHYBRIDS IN ASIA
TelecommunicationsLogistics & Transport
InfrastructureWater & Waste Water
Urban & Social Infrastructure Agriculture Waste Management
Power & Energy Oil & Gas Distribution Manufacturing
SECTOR FOCUS
Indonesia
PRESENCE SingaporePhilippines
Laos CambodiaVietnam
Technical
Commercial
Financing
Sell-side
Full DevelopmentCapability& Skillsets
PICO & NANO GRIDUPSCALING OPPORTUNITIES
ELECTRICITYfor All
Philippines7,107 islands103 M POP.
Indonesia17,508 islands
62.4M*258 M POP.
Access to Electricity
(*unelectrified number of population)
9.5M*
(*unelectrified number of population)
FUEL DISPLACEMENTAND HYBRIDIZATION
Low Income Demand
200
220
240
260
280
300
320
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
GW
h
Solar Irradiation
150
200
250
300
350
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
HOURS
GW
h
Battery Storage
150
200
250
300
350
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
GW
h
ALLOWS TIME SHIFTING FOR RENEWABLE ENERGY
HOURS
Battery Cost Falling
0
200
400
600
800
1000
1200
1400
2008 2012 2014 2016 2017 2018 2019 2020 2021 2022 2023 2024
$/k
Wh
Economic?
33% SAVINGS
16
14
12
10
8
6
4
2
0
RETAIL PRICE SUBSIDY GENERATION COST HYBRID
Php/k
Wh
6.5
8.5
15 10
SYSTEM DESIGN &TECHNOLOGIES ADVANCES
AdvancedMeteringInfrastructure
CloudCameras