    Commercial Products Training Series

    Commercial Heat PumpInstallation

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    2/30

    Commercial Heat Pump 1. Components

    Manifold Kit (Optional)

    Manifold tube

    Branch Assembly(Gate or Ball Valve Only)

    End cap

    Threaded reducer

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    3/30

    Commercial Heat Pump 1. Components

    Components

    Storage tanksHeat p ump

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    4/30

    Commercial Heat Pump 2. Clearances

    Heat pump requires 900mm

    service clearance at each end.

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    5/30

    Commercial Heat Pump 3. Mark out position of pipes and tanks

    Mark out position of

    all pipes on wall.

    Mark out position of

    storage tanks on floor.Manifold tube

    T Piece

    Copper pip e

    Elbows

    Manifold tub e

    Manifold tube

    Manifold tube

    Manifold tube

    Manifold tube

    Coldwater inlet train

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    6/30

    Commercial Heat Pump 4. Connect pipes

    Solder all joints as required.

    Manifold tubes

    End cap

    T Piece

    Copper pipe

    End cap

    Elbows

    Secure all pipes to wall with

    pipe clamps as required.

    Coldwater inlet train

    Hot Water Supply Out

    End cap

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    7/30

    Commercial Heat Pump 5. Connect cold water inlet train

    Cold water inlet train.

    Drain line must terminate

    at least 1 metre away from tank.

    (AS/NZS 3500.4)

    Copper Inlet Pipe

    Pressure Limiting

    Valve (If Required)

    Isolation Valve

    Expansion Control

    Valve (if required)

    No Return Valve

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    8/30

    Commercial Heat Pump 6. Position storage tanks

    Place storage tanks in position.

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    9/30

    Commercial Heat Pump 7. Connect reducer fittings

    Connect reducer fittings.

    Repeat for all inlets/outlets on each

    storage tank.

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    10/30

    Commercial Heat Pump 8. Fit branch assemblies

    Check position of tanks

    inlets/outlets must be parallel to wall.

    Fit the branch assembly to manifold

    and storage tank.

    Solder connections as required.

    Compression nut,

    Flared pipe end or

    similar

    NB: Gate valve or ball valve ONLY to

    be used in branches

    DO NOT install non-return valves

    or loose jumper valves

    Solder connection here

    Isolation Valve

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    11/30

    Commercial Heat Pump 8. Fit branch assemblies

    Repeat fitting of branch assemblies

    to all required inlets/outlets.

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    12/30

    Commercial Heat Pump 9. Connect TPR valves

    Connect TPR valves to each tank.

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    13/30

    Commercial Heat Pump 9. Connect TPR valves

    Fit drain lines to each

    TPR valve.

    TPR Valves can drain into a

    common tundish.

    Terminate drain lines at least

    1 metre away from tanks.

    Drain line must terminate

    at least 1 metre away from t ank.

    (AS/NZS 3500.4)

    Tundish

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    14/30

    Commercial Heat Pump 10. Position Heat Pump

    Position Heat Pump.

    Note alignment of inlet and outlet pipes

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    15/30

    Commercial Heat Pump 11. Connect cold water inlet pipe

    Connect primary flow to heat pump.

    Note: non return valve is not required

    after primary pump.

    Connect to Heat

    Pump inletPrimary Pump

    Isolation Valve

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    16/30

    Commercial Heat Pump 12. Connect hot water return line

    Connect the primary hot

    water return line.

    Connect to outlet

    Isolation Valve

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    17/30

    Commercial Heat Pump 12. Connect hot water return line

    Connect the drain line to

    the pressure relief valve.

    Drain line must termin ate at least

    1 metre away from Heat Pump

    and Tank(s). (AS/NZS 3500.4)

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    18/30

    Commercial Heat Pump 13. Connect main power

    Remove the front cover panel.

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    19/30

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    20/30

    Commercial Heat Pump 13. Connect main power

    Connect the 3 Phase power cable.

    Secure wires with screws provided

    in the Terminal Block.

    Observe correct phase rotation.

    Tighten firmly.

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    21/30

    Commercial Heat Pump 13. Connect main power

    Secure the conduit to heat pump

    using brackets.

    Tighten screws firmly.

    Do not obstruct cover panel opening.

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    22/30

    Commercial Heat Pump 14. Connect wiring to primary pump

    Connect primary circulation

    pump wiring to heat pump.

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    23/30

    Commercial Heat Pump 14. Connect wiring to primary pump

    Connect primary pump wiring to heat pump.

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    24/30

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    25/30

    Commercial Heat Pump 14. Connect wiring to primary pump

    Remove pump cover screw. Remove pump cover.

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    26/30

    Commercial Heat Pump 14. Connect wiring to primary pump

    Connect wiring to primary pump using push-fit

    connectors on the terminal block.

    Push retaining lug down and insert wire

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    27/30

    Commercial Heat Pump 14. Connect wiring to primary pump

    Replace pump cover and screw.

    If outdoors affix a suitable weather

    cover over the primary pump.

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    28/30

    Commercial Heat Pump 15. Fit tank sensor

    Remove the protective cap from one of the tanks.

    Remove the threaded plug.

    Insert the sensor well into the tank and tighten firmly.

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    29/30

    Commercial Heat Pump 16. Replace heat pump cover panel

    Replace Heat Pump cover panel. Secure conduit.

    Do not obstruct control panel opening.

  • 8/12/2019 Commercial Heat Pump Installation - Sample

    30/30

    Commercial Heat Pump 17. Commissioning

    Refer to instructions for commissioning the unit.