column lengths to be determined on site...

1
3D View A C . 1 . B . . . 3 2 3D View 2 B C A 3 1 Grid 2 C -500 B A 0 4687 PART CHECK LIST Assembly Name Mark Main part profile Qty. BR1 1 CHS76.2*3.5 Bracing BR2 1 CHS76.2*3.5 Bracing BR3 1 CHS76.2*3.5 Bracing BR4 1 CHS76.2*3.5 Bracing BR5 1 CHS76.2*3.5 Bracing BR6 1 CHS76.2*3.5 Bracing BR7 1 CHS76.2*3.5 Bracing BR8 2 CHS76.2*3.5 Bracing BR9 1 CHS76.2*3.5 Bracing BR10 1 CHS76.2*3.5 Bracing BR11 1 CHS76.2*3.5 Bracing CA1 3 UC152*152*30 Column CA2 3 UC152*152*30 Column CA3 3 UC152*152*30 Column FR1 2 L50*50*5 False Rafter PA1 1 CFLC175*75*20*2.5 Purlin PA2 1 CFLC175*75*20*2.5 Purlin PA3 5 CFLC175*75*20*2.5 Purlin RA1 1 UB203*133*25 Rafter RA2 1 UB203*133*25 Rafter RA3 1 UB203*133*25 Rafter RHS1 4 RHS120*60*3.0 Louvre RHS2 4 RHS120*60*3.0 Louvre SA1 1 L40*40*5 SagAngle SA2 1 L40*40*5 SagAngle SA3 4 L40*40*5 SagAngle SA4 4 L40*40*5 SagAngle SA5 1 L40*40*5 SagAngle SA6 1 L40*40*5 SagAngle SA7 1 L40*40*5 SagAngle SA8 1 L40*40*5 SagAngle SA9 1 L40*40*5 SagAngle SA10 1 L40*40*5 SagAngle All Quantities Must Be Checked Prior To Loading WBS Hurlingham Canopy Rev 1 1 G [1] 27.07.2015 28.07.2015 Issued Revised WILLBERG STEEL HURLINGHAM ENTRANCE COVER ENTRANCE CANOPY Fax: 086 579 3950 [email protected] Scale Drawn JHL 1:75 1:50 Project Number 150736 Drawing Rev A1 General Arrangement Drawing Checked by: Approved by: Cel : 082 806 7600 JHL A1 27.07.2015 1 HL Drawings revised as per engineers drawings Date Revision Description Mark Rev 5 225 CA3 PA3 SA4 BR2 SA8 CA2 1 519 SA7 SA1 RHS1 PA3 SA6 300 BR7 CA1 SA4 BR3 BR4 PA3 PA3 PA3 RA1 RA3 RA2 PA1 PA2 RHS2 RHS2 RHS2 SA4 SA3 SA2 RHS2 SA3 SA3 SA3 SA5 SA10 SA9 RHS1 RHS1 RHS1 BR1 BR8 BR6 BR5 SA4 CA2 CA3 CA1 300 1 300 5 225 4 975 4 700 3 250 971 4 975 250 250 500 4 687 CA1 Column UC152*152*30 CA2 Column UC152*152*30 CA3 Column UC152*152*30 RA2 Rafter UB203*133*25 PA3 Purlin CFLC175*75*20*2.5 RHS1 Louvre RHS120*60*3.0 500 5 460 500 6 033 500 6 736 Column Lengths to be determined on site

Upload: others

Post on 11-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Column Lengths to be determined on site A1hldetailing.co.za/wp-content/uploads/2015/07/20150727-A1... · 2015-07-28 · UB203*133*25 PA3Purlin CFLC175*75*20*2.5 RHS1Louvre RHS120*60*3.0

3D View

A

C

. 1

.

B

.

..

3

2

3D View

2

BC A

3

1

Grid 2

C

-500

B A

0

4687

PART CHECK LISTAssembly Name Mark Main part profile Qty.

BR1 1CHS76.2*3.5Bracing

BR2 1CHS76.2*3.5Bracing

BR3 1CHS76.2*3.5Bracing

BR4 1CHS76.2*3.5Bracing

BR5 1CHS76.2*3.5Bracing

BR6 1CHS76.2*3.5Bracing

BR7 1CHS76.2*3.5Bracing

BR8 2CHS76.2*3.5Bracing

BR9 1CHS76.2*3.5Bracing

BR10 1CHS76.2*3.5Bracing

BR11 1CHS76.2*3.5Bracing

CA1 3UC152*152*30Column

CA2 3UC152*152*30Column

CA3 3UC152*152*30Column

FR1 2L50*50*5False Rafter

PA1 1CFLC175*75*20*2.5Purlin

PA2 1CFLC175*75*20*2.5Purlin

PA3 5CFLC175*75*20*2.5Purlin

RA1 1UB203*133*25Rafter

RA2 1UB203*133*25Rafter

RA3 1UB203*133*25Rafter

RHS1 4RHS120*60*3.0Louvre

RHS2 4RHS120*60*3.0Louvre

SA1 1L40*40*5SagAngle

SA2 1L40*40*5SagAngle

SA3 4L40*40*5SagAngle

SA4 4L40*40*5SagAngle

SA5 1L40*40*5SagAngle

SA6 1L40*40*5SagAngle

SA7 1L40*40*5SagAngle

SA8 1L40*40*5SagAngle

SA9 1L40*40*5SagAngle

SA10 1L40*40*5SagAngle

All Quantities Must Be Checked Prior To Loading

WBS

Hur

lingh

am C

anop

y Rev

1

1G [1]

27.07.201528.07.2015Issued

Revised

WILLBERG STEELHURLINGHAM ENTRANCE COVERENTRANCE CANOPY

Fax: 086 579 3950

[email protected]

ScaleDrawn JHL

1:75 1:50

Project Number

150736Drawing Rev

A1 General Arrangement Drawing

Checked by:

Approved by:

Cel : 082 806 7600 JHL

A1

27.07.20151 HL Drawings revised as per engineers drawingsDateRevision DescriptionMarkRev

5 22

5

CA3

PA

3

SA4

BR2

SA8

CA2

1 519

SA7

SA1

RHS1

PA

3

SA6

300

BR7

CA1

SA4

BR3

BR4

PA

3

PA

3

PA

3

RA1

RA3

RA2

PA

1PA

2

RHS2RHS2

RHS2

SA4

SA3

SA2

RHS2

SA3SA3SA3SA5

SA10

SA9

RHS1RHS1RHS1

BR1

BR8

BR6

BR5

SA4

CA2 CA3

CA1

300

1 300

5 22

54

975

4 700 3 250971

4 97

5

250

250

500

4 68

7

CA1 ColumnUC152*152*30

CA2 ColumnUC152*152*30

CA3 ColumnUC152*152*30

RA2 RafterUB203*133*25

PA3 PurlinCFLC175*75*20*2.5

RHS1 LouvreRHS120*60*3.0

500

5 46

050

0

6 03

350

0

6 73

6

Column Lengths to be determined on site