Page 1 of 88
CCEEOOSS AAGGEENNCCYY PPOORRTTAALL –– UUSSEERR GGUUIIDDEE
Colorado Department of Public Health & Environment (CDPHE)
Version: 1.0
July 22nd, 2016
1368 How Lane
North Brunswick, New Jersey 08902 www.enfotech.com
Page 2 of 88
TABLE OF CONTENTS
1 DOCUMENT OVERVIEW ...................................................................................................................... 4
1.1 DOCUMENT PURPOSE ....................................................................................................................... 4
1.2 DEFINITIONS, ACRONYMS, AND ABBREVIATIONS ................................................................................. 4
1.3 PREREQUISITES ................................................................................................................................ 4
2 OVERVIEW OF BUSINESS PROCESSES IN CEOS ........................................................................... 5
2.1 ACCOUNTS AND SECURITY MANAGEMENT .......................................................................................... 5
2.1.1 Public Account Creation .......................................................................................................... 5
2.1.2 CDPHE Agency Account Creation .......................................................................................... 6
2.2 SUBMITTAL AND PERMIT MANAGEMENT .............................................................................................. 6
2.3 PERFORMANCE METRICS MANAGEMENT ............................................................................................ 8
3 WEB PART ............................................................................................................................................ 8
3.1 SUBMITTAL SUMMARY ....................................................................................................................... 8
3.2 MY TASKS ........................................................................................................................................ 9
3.3 MESSAGE CENTER ............................................................................................................................ 9
3.4 MY QUERIES ..................................................................................................................................... 9
3.4.1 System Default Queries .......................................................................................................... 9
3.4.2 Self-Created Queries ............................................................................................................... 9
4 ACCOUNT AND SECURITY MANAGEMENT.................................................................................... 10
4.1 MANAGE “MY ACCOUNT” ................................................................................................................. 10
4.2 MANAGE SYSTEM USERS ................................................................................................................ 11
4.2.1 Viewing User Information ...................................................................................................... 12
4.2.2 Creating New Agency User ................................................................................................... 15
4.3 MANAGE PUBLIC USERS .................................................................................................................. 16
4.3.1 Viewing User Information ...................................................................................................... 17
4.3.2 Change User’s Account Type and Account Association ....................................................... 18
4.3.3 Creating New Public User ..................................................................................................... 20
5 SUBMITTAL AND ISSUANCE MANAGEMENT ................................................................................ 20
5.1 OVERVIEW OF SUBMITTAL REVIEW FEATURES .................................................................................. 21
5.1.1 Submittal List ......................................................................................................................... 21
5.1.2 Summary of Review Status ................................................................................................... 21
5.1.3 Submission Info ..................................................................................................................... 22
5.1.4 Work Activities ....................................................................................................................... 23
5.1.5 Final Decision ........................................................................................................................ 25
5.1.6 Issuance ................................................................................................................................ 26
5.1.7 Correspondence .................................................................................................................... 26
5.1.8 Email History ......................................................................................................................... 27
5.2 PERMIT / CERTIFICATE MANAGER .................................................................................................... 28
5.3 TRACKING CORRESPONDENCES WITH FACILITY USERS ..................................................................... 29
5.4 MANAGE PAPER SUBMITTAL ............................................................................................................ 30
5.4.1 Create New Submittal ........................................................................................................... 30
5.4.2 Edit Pending Submittal .......................................................................................................... 31
Page 3 of 88
6 PROJECT MANAGEMENT ................................................................................................................. 32
6.1 CREATE A NEW PROJECT: ............................................................................................................... 32
6.2 MANAGE AN EXISTING PROJECT: ..................................................................................................... 33
7 ENTITY SEARCH ................................................................................................................................ 33
8 PERFORMANCE METRICS TRACKING ........................................................................................... 34
8.1 OVERVIEW OF REPORT VIEWER FUNCTIONS ..................................................................................... 35
8.1.1 Filtering Criteria ..................................................................................................................... 35
8.1.2 Export & Print Report ............................................................................................................ 35
8.2 APPLICATIONS PROCESSED REPORT ............................................................................................... 35
8.3 INTERMEDIATE MILESTONES REPORT ............................................................................................... 36
8.4 PENDING APPLICATIONS REPORT .................................................................................................... 37
9 ADDITIONAL CEOS FUNCTIONALITIES .......................................................................................... 38
9.1 CALENDAR ........................................................................................................................................... 38
9.1.1 Inspection Calendar .............................................................................................................. 39
9.1.2 Task Calendar ....................................................................................................................... 39
9.2 WORK TASK MANAGEMENT ............................................................................................................. 40
9.2.1 Tracking My Task .................................................................................................................. 42
10 OTHER HELPFUL INFORMATION ................................................................................................. 43
10.1 SUBMITTAL STATUS DESCRIPTIONS .............................................................................................. 43
10.2 PERMIT STATUS DESCRIPTIONS ................................................................................................... 44
10.3 INSPECTION STATUS DESCRIPTIONS ............................................................................................. 45
10.4 SUBMITTAL WORKFLOW ............................................................................................................... 46
10.4.1 Water Quality Control Division Work Flow ............................................................................ 46
10.4.2 Air Pollution Quality Control Division Work Flow ................................................................... 48
10.4.3 Grant and Loan Division Work Flow ...................................................................................... 51
CEOS Agency Portal-User Guide
Page 4 of 88
1 Document Overview
1.1 Document Purpose
This document serves the purpose of providing instructions on the usage of the Georgia CDPHE Online Permitting & Reporting Services System (CEOS). The documentation has been divided into two major sections:
Overview of business process
Detailed instructions on independent modules
1.2 Definitions, Acronyms, and Abbreviations
This subsection provides the definitions of all terms, acronyms, and abbreviations required to properly interpret the System Design Document.
1.3 Prerequisites
Requirement Impact on Project
Internet Connection Necessary for connecting to the CEOS Submittal Site
Internet Explorer (version 7.0 or above) Optimal for capitalizing on the features of the CEOS System
PDF file viewer View any system-generated reports in PDF format
Term Definition
CEOS Colorado Environmental Online Services
WQCD Water Quality Control Division
APCD Air Pollution Control Division
FIS Facility Identification System
CBR Clean Water Benefits Reporting System
RO Responsible Official
ESA Electronic Signature Agreement
HAP Hazardous Air Pollutants
CEOS Agency Portal-User Guide
Page 5 of 88
2 Overview of Business Processes in CEOS This section provides a high level overview of the business processes supported by CEOS similar to use case descriptions as a table.
2.1 Accounts and Security Management
This section details the various processes in creating and managing accounts in CEOS.
2.1.1 Public Account Creation
The diagram below outlines the steps necessary to create and activate an account.
CEOS Agency Portal-User Guide
Page 6 of 88
2.1.2 CDPHE Agency Account Creation
2.2 Submittal and Permit Management
The below diagram displays a high level description of how submittals are processed utilizing the CEOS system for both the Air and Water Branch.
CEOS Agency Portal-User Guide
Page 8 of 88
2.3 Performance Metrics Management
CEOS provides several management tools to track performance metric for CDPHE management, which include:
Dashboard Summary: to track branch wide submittal review status, as well as work task status of each staff (Please refer to Section 3)
Summary Reports: which include Submittals Processed Report, Intermediate Milestones Report, Pending Submittals Report, and Inspection Status Report (Please refer to Section 0)
Work Tasks Management Tool: using Calendar View and Grid View to intuitively track the progress of each work task. (Please refer to Section 9)
These tools will be described in the later sections of this guide.
3 Web Part The home screen of CEOS, also known as the dashboard, contains several elements customized to display to the user a general overview of current activities associated to them.
Submittals/ Request Summary
My Task
Message Center
My Queries
3.1 Submittal Summary
1The submittal, permit, and reporting summary of the dashboard display several breakdown analyses of the
system activities. In the ‘Submittal Summary’ the user can view the number of submittal that has been submitted alongside those that need attention, approved, amended, revised, withdrawn, or denied/failed in the CEOS system. The user can view the items that have been categorized by clicking on the number of submittals in that category. This will bring the user to ‘Submittal Review’ section of CEOS, displaying only those submittals that belonged to the specified category.
CEOS Agency Portal-User Guide
Page 9 of 88
3.2 My Tasks
2The ‘My Task’ feature is a useful feature that has been implemented so that the user can see what tasks
have been assigned to them. The list is ordered by the ‘Due Date’ descending so that the activities that have been overdue the longest take priority in the view. Currently ‘My Tasks’ has been configured to only show scheduled submittal statuses.
3CEOS provides additional visibility tools for users in multiple groups and/or who manages other users. The
filter tool above ‘My Task’ allows the user to view tasks for their associated groups or by individuals.
3.3 Message Center
4The ‘Message Center’ notifies the user of any sort of communication that requires attention. By clicking on
the notification, it will bring the user to the section where the message is displayed.
3.4 My Queries
5‘My Queries’ is versatile in its approach to provide information to the user. The details of these queries are
configured under ‘Report -> Query -> My Queries’. This allows the user to customize their results with precision. Unless the user is extremely familiar with the database structure, modification of these queries is not advised.
3.4.1 System Default Queries
Currently CEOS is able to pre-configure queries based on requirements. The pre-configured queries will be shown on every agency user account.
3.4.2 Self-Created Queries
The self-created query requires an in-depth knowledge of the current database structure in order for this tool to be useful. For example, if the current search filters did not contain a filter option, then a query could be created to compensate. In the example below, the query will return all the addresses in the database filtered by the city named ‘Atlanta’.
CEOS Agency Portal-User Guide
Page 10 of 88
Query Statement
Query Result
4 Account and Security Management This section contains details on not only how to manage the personal account but also details on managing other system users and public accounts.
4.1 Manage “My Account”
In ‘My Account’ the user can modify their personal information. Situations where a user might need to change their information could be if the user changed their e-mail or telephone number. Having a valid current e-mail address is extremely important for using CEOS in situations where the user password needs to be reset, the user wants to receive e-mail notifications when they are assigned a new task, and etc. Additionally, in this section, the user can change their password. If the user desires, the user can upload a digital signature that can be used when sending out e-mails generated by the system.
CEOS Agency Portal-User Guide
Page 11 of 88
My Account Information Page
My Account Change Password Section
My Account Digital Signature Upload
4.2 Manage System Users
From time to time, agency users will need to manage the account settings of both agency users. This module is only opened for managers. Cases where a user will need to access this section would be adding a new user or deleting a user from their group. To manage system users, navigate to ‘System Settings -> System Users’. This feature will only be available to those with certain access levels.
CEOS Agency Portal-User Guide
Page 12 of 88
System User Menu
In the above Search Screen, the administrator can search for a system user based on the search filter criteria. The search can be conducted by using the following fields:
User Name: Indicate the system user account name
First Name: User given name
Last Name: User family name
E-Mail: Email address
User Account Accepted: Yes. No, or All
Account Status: Choose a status for your account: Active, Inactive or All
Security Group: Group in which user is associated with (i.e. Grants and Loans Unit) A User can also sort the search results by simply clicking the corresponding label. (For example, click First Name label to sort the results in ascending/descending order).
4.2.1 Viewing User Information
System User Grid View
CEOS Agency Portal-User Guide
Page 13 of 88
In the above Search Results screen, the administrator can view any User Information by simply clicking the View /
Edit ( ) button. In the User Information screen, the administrator can navigate through the different sections for making updates, if required.
4.2.1.1 General Information
System User Detailed Information
In the above General Information screen, the administrator can update or change an user’s information through the following fields; First Name, Last Name, Employer, Job Title, Address Line 1, Address Line 2, City, State, Zip, Country, Phone Number, Extension, Mobile Number, and Email.
4.2.1.2 User Account Information
System User Account Activation
In the above User Account Information screen, the administrator can select the status of User Status to either active or inactive from the drop down list. By setting the user to ‘Inactive’, the user can no longer access the CEOS
CEOS Agency Portal-User Guide
Page 14 of 88
system. The administrator can also change the status of Account Approval Status to either Yes or No from the drop down list. If needed, the system provides a field to input notes about the user account.
4.2.1.3 Security Groups
Group Association Under System User Settings
In the above Security Groups screen, administrators can associate groups with a particular user by clicking the
button. At any point in time, the administrator can delete the group from the existing
Groups by simply clicking the delete ( ) button of the corresponding Group. The security group feature is extremely important due to the fact that the CEOS system relies heavily on the grouping to assign key tasks and to provide visibility.
4.2.1.4 System Roles
CEOS Agency Portal-User Guide
Page 15 of 88
Role and Group Association
In the above System Roles screen, an administrator can assign any System role to Groups by selecting the corresponding checkbox. Before assigning, the Role must be active by selecting the checkbox in the first column. By associating the group to the role, that user now has the role access level within the associated group.
4.2.2 Creating New Agency User
To create a new agency user, click the button on the agency user home page (System Setting -> Agency Users). In the New User Information screen, enter the necessary information in the following sections and
clicks the button to save the information of newly added user.
New System User Registration
CEOS Agency Portal-User Guide
Page 16 of 88
In addition, the user can designate the username and associate the user to a security group. In order to have the user account acknowledged, set the user status to active.
New System User Account Activation
4.3 Manage Public Users
By clicking System Setting -> Public Users, an admin user can open a search page with all currently existing public users displayed in the results grid-view by default.
Public User Account Grid View
In the above Search Screen, the administrator can search for a public user based on the search filter criteria. The administrator can search by using the following fields:
User Name: Indicate the system user account name
First Name: User given name
Last Name: User family name
Account Status: Choose a status for your account: Active or Inactive
Email: Email address
CEOS Agency Portal-User Guide
Page 17 of 88
The administrator can also sort the search results by clicking the corresponding label. (For example, click First Name label to sort the results in ascending/descending order).
4.3.1 Viewing User Information
Public User Account Management Tool
In the above Search Results screen, the administrator can view any User Information by clicking the View / Edit
( ) button. In the User Information screen, administrators can navigate through the different tabs to make any necessary updates. In addition, administrators can perform the following actions:
a. Click Change Status “ ” icon to change public user’s status.
b. Click Reset Password “ ” icon to reset public user’s login password.
c. Click Reset PIN “ ” icon to reset public user’s PIN.
4.3.1.1 General Information
Public Account Detail Menu
When the View / Edit ( ) button is clicked for the user, the administrator can update or change the public user information through the following fields; First Name, Last Name, User Name, Status, Company, Job Title, Primary Phone Number, Extension, Mobile Phone Number, Fax Number, Email, Address Line 1, Address Line 2, City, Country, State, and Zip.
CEOS Agency Portal-User Guide
Page 18 of 88
4.3.1.2 Address Information
Public Account Information
In the above screenshot, the administrator can update or change the public user address information through the following fields; Address Line 1, Address Line 2, City, country, State, and Zip.
4.3.2 Change User’s Account Type and Account Association
This section describes in detail on how to manage public user accounts so that public users can function properly on the Public Portal.
4.3.2.1 Change User’s Role
Within the public user profile, lies the ‘Manage Account Type’ sub menu. In this menu, the user has the ability to configure the account type of a public user. The user can select whether or not the user is a ‘Preparer’ or a ‘Responsible Official’. If the user was selected as a ‘Preparer’, the ‘Responsible Official’ would associate the ‘Preparer’ via the Public Portal. In addition to selecting the public user role, the type of submittal the ‘Responsible Official’ can utilize can also be selected.
Public Account and Facility Association
CEOS Agency Portal-User Guide
Page 19 of 88
4.3.2.2 Inactivate / Activate Associated Facility
In order to activate an associated facility for a public user account, click on the icon. This will prompt a menu for the user to either switch the account to ‘Active’, ‘Inactive’, or ‘Pending’. If the status is set to ‘Active’, the public user will be able to then create and submit submittal that was selected for that particular facility. If the status is set to ‘Inactive’ or ‘Pending’, the public user can still see the status but will not have any rights to that facility.
Besides being able to manage the associated facility, the agency can also see which ‘Responsible Official’ a ‘Preparer’ is associated with. The ‘Manage Account Association’ tab within ‘Manage Public User’ allows the user to view. CEOS is currently configured so that a ‘Responsible Official’ can be a ‘Preparer’ for another ‘Responsible Official’.
Public Account Association View
4.3.2.3 Issue / Reset PIN
For new ‘Responsible Official’, once their account is set up, they will need a PIN issued in order to submit submittals. In this module, the user would click on the image below to ‘Issue’ a PIN to the public user selected. The PIN will be sent in a form of an e-mail to the selected public user.
CEOS Agency Portal-User Guide
Page 20 of 88
Issue Pin Button
4.3.2.4 Reset Password
In certain cases a user might need their password reset. Through this module, the user can reset a public users password by clicking on the ‘lock’ button displayed in the below image.
Reset Password Button
4.3.3 Creating New Public User
An administrator also has the ability to add a new user by simply clicking the button. In the New User Information screen, a user can enter the necessary information in the following sections and clicks the
button to save the information of newly added user. After saving the user info, a message on the top of the screen will display “Save Successfully” to notify that the user account has been created. The newly created user will then receive an e-mail with new password. They will have to log into the Public Account using the information to reset his/her password, pin, and security questions.
5 Submittal and Issuance Management In this section, the features associated with the work flow and the actual work flow of the submittal process will be detailed. In the next part of this section, this document will discuss how to manage permits once CEOS has the permit issued.
CEOS Agency Portal-User Guide
Page 21 of 88
5.1 Overview of Submittal Review Features
The submittal review features provides the agency several tools to assist in the submittal review process. The submittal features allows the user to see the work activity done per submittal. The user can also view the submittal and its issuance. The section can be broken down into several parts:
Submittal List
Summary of Review Status
Submission Info
Work Activities
Final Decision
Issuance
Correspondence
Email History
5.1.1 Submittal List
When a public user submits a submittal, the submittal will appear in the ‘Submittal Review’ module of the ‘Submittal’ section. From this module, the user is given multiple search functions ranging from ‘Submittal ID’ to ‘Facility Name’. By clicking on ‘Facility’, the submittals will sort by ascending or descending order. By clicking on ‘Submittal Info’, the submittals will sort by submittal ID in ascending or descending order.
Submittal List
5.1.2 Summary of Review Status
The ‘Review Status’ currently displays the current scheduled task. If the submittal is complete, it will display ‘Complete’ and if the submittal is withdrawn, it will display ‘Withdraw’.
CEOS Agency Portal-User Guide
Page 22 of 88
5.1.3 Submission Info
By clicking on the icon on the ‘Submittal Review’ section, the submittal ‘Submission Info’ will open up. In this window, CEOS provides a header that provides additional detail of the submittal. The header has two active features currently: Receipt and Notification. The receipt function provides the digital record of the submission logging the users IP address. The send notification feature allows the user to e-mail the facility user directly.
In the actual ‘Submission Info’ module, the user can view the submittal in either PDF format per each section or in a digital version. To view the submittal as a PDF, the user can select from the ‘Form View’ column and click on the section that is desired to be viewed. If the user wants to view the digital version, the same logic would apply but the user would click on the respective field in the ‘Online Submittal’ column.
The last part of the ‘Submission Info’ section is the ‘Submittal Review History’. This displays any significant acitivites associated with the submittal, such as if the submittal was withdrawn, denied, or in the case below, put on hold.
If the submission had a request for withdrawal, revision, or termination, the status would display in this section for the user to either approve or deny the request.
CEOS Agency Portal-User Guide
Page 23 of 88
The ‘Submission Info’ documents tab displays all current documents associated with the submission. This could range from ‘Building Layout’ to ‘Individual Test Data’ depending on the requirement for the submittal. If documents were received by general mail, the user can scan and upload the documents associated with the submittal in the ‘Recevied Files for Required Documents’ section.
5.1.4 Work Activities
Under ‘Submittal Review’ and the ‘Work Activities’ tab, the user can view each task of the review process. The user can either filter by the ‘Status’ of the task or the ‘Assigned To’ individual. Work tasks highlighted in green marks the task completed, while tasks in tan means scheduled. Any task that is grey signifies that they are not currently accessible. Due to the importance of ‘Public Advisory Determination’, the task is highlighted in yellow and once completed, will be green.
CEOS Agency Portal-User Guide
Page 24 of 88
To view descriptions, documents, and additional information for each work
task, the user can click on the icon to display the detail description of the work task. Although each work task screen may differ slightly, the general format is typical of what is shown below. The detailed work task consists of a status, complete date, and description. Keep in mind that only the person assigned to the work task can change, upload documents, or save.
Currently, CEOS allows for four types of statuses, which are ‘Scheduled’, ‘Cancelled’, ‘Overdue’, and ‘Completed’. Once the task is triggered, the task is defaulted to ‘Scheduled. By setting a work task to ‘Cancelled’, it will grey out the item from the list of tasks in ‘Work Activity Info’ and will open the next task in the sequence. If the status is set to ‘Overdue’, the task will be highlighted in red in the ‘Work Activity Info’ as an overdue task. To complete a task, all the task criteria must be completed such as issuing a permit. A complete date is necessary for the task to be saved as ‘Completed’.
Some work tasks require supporting documents to be uploaded or a permit to be uploaded in order to complete
the task. By clicking the icon, the system will allow the user to upload documents associated with the submission. The documents can be viewed by clicking the item in the ‘Document’ column.
CEOS Agency Portal-User Guide
Page 25 of 88
The work task has an additional feature in which users can assign a particular person to the work task. In the right side of the screen, a side bar is displayed where the user can filter system users by groups or by name. By clicking on the ‘chain’ icon, new users are can be assigned or existing users un-assigned to the task. Once the task is completed, the side bar will disappear from the task.
Once a work task is completed, the work task can be accessed but the information cannot be modified. The sections will be greyed out. The only exception is the ‘Assigned to’ function which will be further described in the review process.
5.1.5 Final Decision
The ‘Final Decision’ tab allows the user to change the status of a submittal during the work flow process. The current statuses are listed below.
Admin Review – Default status when reviewing a submittal
Withdraw – Sets the submittal as withdrawn. All work flow is stopped.
Denied – Sets the submittal as denied. . All work flow is stopped.
Canceled – Sets the submittal as canceled. . All work flow is stopped.
On Hold – Submittal review is put on hold. This pauses the counter for the work flow and due date. To remove the ‘On Hold’ status, return to the ‘Final Decision’ window and select the ‘Resume’ button where the ‘Make Decision’ button was.
The user can monitor the actions taken by the ‘Submittal Review History’ grid below the ‘Decision’ section.
CEOS Agency Portal-User Guide
Page 26 of 88
5.1.6 Issuance
The ‘Issuance’ tab allows the user to view all permits that were issued. CEOS provides two tools for the user in this
section. The first one is the view option. By selecting the icon, the user can view the submitted permit
document. The second tool is the edit button. By selecting the icon, a new menu displays allowing the user to set the effective date, expiration date, change status, or add comments to the permit.
5.1.7 Correspondence
The ‘Correspondence’ section can be accessed in two different ways. If a public user has sent a correspondence to the CDPHE user who is responsible for their submittal, a notification on the dashboard’s ‘Message Center’ will be
displayed. Unread messages are tagged with a yellow flag as an indicator. By clicking on the icon, the conversation detail can be viewed. The screen displays the user who sent the correspondence and a time stamp of when the correspondence was sent.
CEOS Agency Portal-User Guide
Page 27 of 88
If no correspondence exists, one can be created by clicking on ‘New’. The below window will display asking for a ‘Category’ in reference to the matter described in the correspondence. Both the subject and message are mandatory fields in order for the message to be sent.
5.1.8 Email History
CDPHE users can utilize the ‘Email History’ section for reference of what notifications the public user received. By
clicking on the icon, the user can view the notification that was sent to the public user. The CDPHE user can resend the notification in situations where the public user did not receive the notification the first time.
CEOS Agency Portal-User Guide
Page 28 of 88
5.2 Permit / Certificate Manager
The ‘Permit/Certificate Manager’ provides a useful tool in managing permits that were issued through CEOS. The module can be found under the ‘Submittal List’ drop down menu.
The basic search functions allow the user to search permits via certain input parameters such as ‘App ID’, ‘Permit Number’, ‘Site Address’, and ‘Facility Name’. The permits can be further filtered by type of permit with the ‘App List’ function.
CEOS Agency Portal-User Guide
Page 29 of 88
If the user needs to refine his search further, by clicking the ‘Advanced Search’ option lets the user search permits by the date range of submitted/permit date, category, department, and by type.
Once the desired permit is found, the user has several options they can select from. The user can amend the permit by selecting the ‘Amend’ button. This will copy the previous submission and allow the user to submit a new submittal.
By clicking on the icon, the user can change the status of the permit. The edit button when selected will open a pop up where the user can define the effective permit dates and status and add comments. Currently the permit statuses can be set as 'Amend/Modify', 'Terminate', ‘Transfer’, and ‘’Change Contact’. If the user just wants
to view the permit, then the user can click on the icon to load a digital copy of the permit.
5.3 Tracking Correspondences with Facility users
CEOS provides a messaging utility, ‘Correspondence’, to allow the facility users communicate to the CDPHE directly. The Agency has several different ways to access this section. The user can access this section via the dashboard’s ‘Message Center’ or the submittal itself as detailed in the earlier sections. The user can also utilize the
CEOS Agency Portal-User Guide
Page 30 of 88
‘Correspondence’ module which can be found under the ‘Submittal’ tab. New messages are signaled by the icon that appears in the ‘Total Messages’ column. The correspondences are connected through the submittal identification. In order to find the correspondence the user is looking for, CEOS provides a basic search above the grid view. The user can search by the ‘Submittal ID’, ‘Submittal Type’, ‘Correspondence Category’, or the ‘Date Range’. The user can also filter the list by limiting the search to new messages by clicking on the checkbox for ‘New Messages Only’.
By clicking on the icon, the user can view the detail of the correspondence for the selected submittal. The screen will provide a prompt to allow the user to respond back to the facility user. The detail view provides the subject, create date, conversation, facility user name, and timestamps of when each message was sent. The user can also mark the conversation as unread by checking the checkbox. This allows the user to filter and come back to respond to the facility user at a later date.
5.4 Manage Paper Submittal
When the CDPHE receives a paper submission, CEOS provides the agency a way to enter and store the information into CEOS. This allows the agency to have an additional tool to manage paper submission alongside electronic submissions.
5.4.1 Create New Submittal
Once a paper submittal is received, the agency will need to determine which category the submittal would fall under. Once determined, the user can go to the ‘Submittal Module’ and under ‘Paper Submittal’, click ‘Create New Submittal’ to start the process.
At this point, the user can select the submittal type necessary and begin the submittal process
CEOS Agency Portal-User Guide
Page 31 of 88
The first part of the process involves selecting the facility user for the submittal. CEOS provides a search toolbar in order to search by the facility user’s first/last name, address, or the facility name.
If the submittal exists, please select the radio button to make the selection and click ‘Create Submittal’. If the user does not exist, then click on ‘New Facility User’.
The new facility user option allows the user to enter in the ‘Account Type’ the user is responsible for. The facility name contains an auto-fill feature. This allows the user to partially type in a facility name and allow the user to select from facilities that match what already has been entered.
The ‘First Name’, ‘Last Name’, ‘Phone Number’, ‘Email’, ‘Address’, ‘State’, and ‘Zip Code’ are required fields. The Email’ must be unique to the system or it will generate an error in the creation process.
5.4.2 Edit Pending Submittal
In certain cases the user might have not finished a paper submittal completely so CEOS has them categorized under pending submittals. These submittals can be found under the Submittal tab -> paper submittal -> edit pending submittal. The page is defaulted to list the submittal as a gallery view.
CEOS Agency Portal-User Guide
Page 32 of 88
By placing the mouse over the icon, the user will be able to view additional details pertaining to the submittal such as the status, updated date/time, owner, and full address. The user can also at this point decide that the submittal is no longer needed and can
delete the pending submittal by clicking on the icon.
Clicking the ‘edit’ button allows the user to continue on finishing the submittal from the point when the last submittal was saved.
6 Project Management After successful submission, facility user is able to keep track of the submission status of each submittal. The submittal can be tracked using the following steps:
6.1 Create a New Project:
Step 1: User is able to create a new project through Project > Project Search > New Project
Step 2: Enter Project Basic Information. Based on the Project Type selected, project phases will be auto-generated based on the pre-defined template.
Step 3: Go to Phase tab to edit project phase general information, and change phase sequence if necessary
Step 4: Click Edit button to edit project phase detailed information
Step 5: Click on “Associate Submittal” to associate existing submittal with the project phase.
Step 6: Project Name, Phases, Submittal, Milestone, and Work Tasks is displayed as a tree-view on the left-hand side of the page. Click on each level, the corresponding detailed information will be displayed on the right-hand side of the page.
CEOS Agency Portal-User Guide
Page 33 of 88
6.2 Manage an Existing Project:
Go to Project > Project Search to search an existing project by Project Name, Project Type, Project Status, Project Manager, Facility ID, Facility Name, Environmental Interest
Project Name, Phases, Submittal, Milestone, and Work Tasks are displayed as a tree-view on the left-hand side of the page. Click on each level, the corresponding detailed information will be displayed on the right-hand side of the page.
General Information, Phase, Submittal, Work Activity Info, and Documents tabs are available in Project Level.
Phase, Submittal, Work Activity Info, Documents tabs are available in Phase Level.
Submittal ID, submittal name, processing start date and due date are displayed in the tree-view for each submittal. User can manager all submittal detailed information in submittal level.
Milestone name and processing start date and due date are displayed in the tree-view for each milestone. User is able to create ad hoc work task in Milestone level by click on “New Work Task”.
Complete Date, Status, Task name, and Due date are displayed in the tree-view for each work task. Work tasks are color-coded based on task status. User is able to manage task detailed information in Work Task level
Project Gantt Chart is available for CDPHE users
7 Entity Search Originally, Agency User can only access submittal/issuance, inspection, and violation data through Submittal, Inspection, and Violation modules, respectively. Entity Search Module allows Agency User to access such data entries in the manor of (regulated) entities.
Step 1: On the first page of Entity Search module, multiple search criteria will be provided, including:
For Facility/Property: Entity/Property ID, Entity/Property Name, Environmental Interest, Street Number, Street Name, Street Type, City, County, State, Zip Code
For Individual: License/Permit No., First Name, Last Name, Federal Employee No., License Type, License Status, Street Name, City, State, Zip Code
Step 2: Click on Search button, then a list of entity search results will show in a grid.
Step 3: Select a desired entity record by clicking the icon, then a tree-view will show on the left hand side of the page and four tabs: ‘General Informaiton’, ‘Submittal’, ‘Issuance’, and ‘Inspection’ will show on the right hand side of the page
CEOS Agency Portal-User Guide
Page 34 of 88
Step 4: The tree-view is presented as a five-level Hierarchy: Entity Name, Submittal/Issuance/Inspection, Environmental Interest, Submittal Type, Submittal/Issuance/Inspection ID. For a renewal or revision submittal, it will be listed under the original submittal.
Step 5: Click on the highest four levels in the tree-view, the corresponding search results will show in a grid on the right hand side of the page. Click on the fifth level in the tree-view, the detailed page of the selected record will be displayed, and Agency User is able to edit the information from this page without redirecting to Submittal/Inspection/Violation modules.
8 Performance Metrics Tracking With so many different features in CEOS, CEOS provides reporting and task management tools to allow the user gain better visibility of the work task status and progress. To access Report, simply click on the ‘Report’ tab.
CEOS Agency Portal-User Guide
Page 35 of 88
8.1 Overview of Report Viewer Functions
8.1.1 Filtering Criteria
From the report filtering criteria section, records selection can be set based on different individual criteria. Click on
the icon to access.
For example: Date range or Region can be specified to retrieve desired records.
8.1.2 Export & Print Report
Report can be saved by clicking the disk icon. Report can also be exported to different format, such as XML, CSV, PDF, Excel or Word.
8.2 Applications Processed Report
The ‘Application Processed Report’ provides a breakdown of the different types of applications that were processed and the median review time.
CEOS Agency Portal-User Guide
Page 36 of 88
The navigation bar on the side allows the user to look up applications that were used in generating the report. By double clicking on the individual application number, the user will be directed towards the detail application section of the report. This provides the user with a high visibility of the amount of time an application review process takes.
Be sure to click the icon to open the report to view the full details.
8.3 Intermediate Milestones Report
The ‘Intermediate Milestone Report’ plays an intricate role in informing the user how long it has taken a task to be completed for a particular submittal. As an example, the WLA form was selected. The report displays all the work
CEOS Agency Portal-User Guide
Page 37 of 88
activities associated with the particular submittal. The report then breaks down to the number of submittal completed and the length it took to complete.
By utilizing the side navigation bar, the user can navigate to a particular submittal in question. The detail reporting provides information the status, date started, and assigned to for each particular task for that submittal type. This provides the user with a high visibility of each type of work task.
8.4 Pending Applications Report
The ‘Pending Application Report’ can be filtered by application type and age. The report will provide the number of total applications not completed.
The application detail will be listed by the submittal number. It will show the submittal number, the most current task, status, start date, and assigned o user.
CEOS Agency Portal-User Guide
Page 38 of 88
9 Additional CEOS Functionalities
9.1 Calendar
The inspection calendar can be viewed displaying by the week, month, and year. Any scheduled inspection that falls in the date range of the view will be displayed in green. The calendar provides a hyperlink so the user can click on the hyperlink to jump to the specified inspection.
CEOS Agency Portal-User Guide
Page 39 of 88
9.1.1 Inspection Calendar
9.1.2 Task Calendar
The task calendar allows the user to see what tasks are assigned to them and can view them by the week, month, or year. The tasks are highlighted in green and will display the date scheduled, the status, and the duration. If the tasks are viewed by month, the hyperlink will direct the user to my task rather than the task itself.
CEOS Agency Portal-User Guide
Page 40 of 88
9.2 Work Task Management
‘Work Task Management’ is a powerful tool that can modify work task assignments in several different ways. The basic search bar allows the user to search by task name, task type, or filter by status. If additional parameters are needed, the user can use the ‘Advance Search’ option to view additional parameters.
The advance search lets the user specify the date range – start, due, and complete date.
By selecting the icon next to the work task, the user will navigate to the task information menu. In this menu, the user can specify the task name, change the status, due/start date, and type of work item. The user can add additional information in order to track, modify, or simply add a task description.
CEOS Agency Portal-User Guide
Page 41 of 88
By clicking the button, the user can now associate whomever they want the work task to be assigned to. Multiple users can be selected by checking the checkbox of the desired users.
CEOS Agency Portal-User Guide
Page 43 of 88
10 Other Helpful Information
10.1 Submittal Status Descriptions
Submittal Status Status Description
Partial Submittal System automatically updates submission to this status when user submits a submittal with missing attachments. Submittal form is yet to be reviewed by agency staff.
Complete Submittal System automatically updates submission to this status when user submits a submittal with all attachments; submittal form is yet to be reviewed by agency staff.
Scheduled The submittal has a task that has been scheduled but the work task has not been completed.
Admin Review Start The submittal is ready for the agency to start the review process.
Admin Review Completed All attachments have been submitted, fee has been paid in full, and submittal form is complete; Submission ID remains the same when status is updated.
Tech Review Start The submittal is ready for the agency to start the technical review process
Tech Review Completed The submittal has been technical reviewed.
Public Comment Period Open
The public notice stage has begun.
Public Comment Period Closed
The public notice stage is complete.
Approved Submittal has been approved and permit can be issued to the user/facility.
Permit Issued The permit has been issued to the facility user.
Withdraw Submittal has been withdrawn by the Facility user; Submission ID remains the same when status is updated, but submission is closed and no further work can be performed on the submission.
Terminated The submittal was requested and approved for termination. The submittal can no longer be altered and all work flow is halted.
Modification The submittal was requested for modification/update.
CEOS Agency Portal-User Guide
Page 44 of 88
Submittal Status Status Description
Revised Archived The submittal was requested and approved for revision/modification. The submittal can no longer be altered and all work flow is halted. A new submittal was created with the data from the revised submittal.
Denied Permit has been denied due to various reasons; Submission ID remains the same when status is updated.
Closed All material has not been submitted for agency user to issue a permit; submittal was previously in Incomplete status for a significant amount of time (manual determination by agency user); Submission ID remains the same when status is updated.
On Hold Submittal is placed on hold due to various reasons (facility user cannot be reached, site cannot be accessed, etc.); time clock to process a submission stops and is resumed once submittal is taken off this status to another status (i.e. technical review complete).
Rejected
Submittal has been rejected for a permit (either because permit is not needed or work has already been completed); with this status, submittal has reached a terminal status and no further work can be performed against the same submission record; Submission ID remains the same when status is updated as such; facility user/agency user must make a new submission to request for a permit.
Renewal When a new submittal is created for permit renewal, system automatically updates the new submittal to this status.
Renewal Archived System automatically updates the original submittal to this status when a new submittal is created for permit renewal.
10.2 Permit Status Descriptions
Issuance Status Status Description
Issued Permit has been issued.
Expired Permit has expired; this occurs when the facility user fails to renew the permit before the permit expiration date; no further action can be performed against the submission.
Termination Permit has terminated and is no longer valid.
CEOS Agency Portal-User Guide
Page 45 of 88
Issuance Status Status Description
Extension The permit was given an extension and given a new expiration date.
Interim Any inspection/site visit proceeding final inspection
Incomplete Inspection conducted; agency awaiting submittal of closeout documents from entity or consultant
10.3 Inspection Status Descriptions
Insp. Status Description
Cancelled Inspection has been cancelled and does not need to be conducted anymore.
Completed The inspection has been completed
Not in Compliance Compliance Inspection completed and site inspection results are in violation of provisions associated to permit
Not Ready Submittal has not been Accepted for system to schedule inspection records
Compliant Compliance Inspection completed and Site inspection results are in compliance of provisions associated to permit
Requested Facility user has requested an inspection for an available date and time
Request Ready Submittal is ready for facility user to schedule based on available inspection dates and times
Scheduled Inspector has accepted to conduct inspection on a specified date and time
Planned Facility has been identified as being due for an inspection
Referred Facility referred for enforcement action based upon results of inspection
CEOS Agency Portal-User Guide
Page 46 of 88
10.4 Submittal Workflow
10.4.1 Water Quality Control Division Work Flow
10.4.1.1 Construction Stormwater Permit
10.4.1.1.1 New Stormwater Construction Certifications Review Work Flow
SEQ #
Work Task Name Optional /
Mandatory
Upload Docum
ent?
Role Assignment
Default Task
Duration (Days)
Issuance?
Special Data Elements to be
Tracked (besides person, due date,
complete date, task status, comments)
Template
1 Submittal Type Determination and Completeness Review
M No Technicians 5 N 1) Submittal Type: New/Renew/Modification (radio button) 2) Complete Package? Yes / No (checkbox)
1) Completeness letter template 2) Email alert body text
2 Prepare Draft Certification
M Yes Administrative Staff
N 1) Issuance Type 2) Issuance Description 3) Generate/upload issuance document
COR030000 Certification Template
3 Technical Review M No Permit Engineer
10 N
4 Fee Determination
M No Administrative Staff
N 1) Facility categories and subcategories
-Less than 1 acre
-1-30 acres
-Greater than 30 acres
-Other
5 Sign and Issue Final Certification
M Yes Administrative Staff
Y 1) Issuance Type 2) Issuance Description 3) Generate/upload issuance document
COR030000 Certification Template
CEOS Agency Portal-User Guide
Page 47 of 88
10.4.1.1.2 Modification Requests Stormwater Construction Certification Review Work Flow
SEQ #
Work Task Name Optional /
Mandatory
Upload Docum
ent?
Role Assignment
Default Task
Duration (Days)
Issuance?
Special Data Elements to be
Tracked (besides person, due date,
complete date, task status, comments)
Template
1 Submittal Type Determination and Completeness Review
M No Administrative Staff
N 1) Submittal Type: New/Renew/Modification (radio button) 2) Complete Package? Yes / No (checkbox)
1) Completeness letter template 2) Email alert body text
2 Technical Review M No Administrative Staff
N
3 Fee Determination M No Administrative Staff
N 1) Facility categories and subcategories
4 Sign and Issue Final Permit
M Yes Administrative Staff
Y 1) Issuance Type 2) Issuance Description 3) Generate/upload issuance document
COR030000 Certification Template
10.4.1.2 Construction Dewatering or Ground Water Remediation Permit
10.4.1.2.1 New Stormwater Dewatering Certification Review Work Flow
SEQ #
Work Task Name Optional /
Mandatory
Upload Docum
ent?
Role Assignment
Default Task
Duration (Days)
Issuance?
Special Data Elements to be
Tracked (besides person, due date,
complete date, task status, comments)
Template
1 Submittal Type Determination and Completeness Review
M No Technicians 5 N 1) Submittal Type: New/Renew/Modification (radio button) 2) Complete Package? Yes / No (checkbox)
1) Completeness letter template 2) Email alert body text
2 Prepare Draft Certification
M Yes Administrative Staff
N 1) Issuance Type 2) Issuance Description 3) Generate/upload issuance document
COR070000 Permit Template COR315000 Permit Template
3 Technical Review M No Permit Engineer
10 N
4 Fee Determination M No Administrative Staff
N 1) Facility categories and subcategories
-Low Complexity $820
-High Complexity $2,000
-Other
CEOS Agency Portal-User Guide
Page 48 of 88
SEQ #
Work Task Name Optional /
Mandatory
Upload Docum
ent?
Role Assignment
Default Task
Duration (Days)
Issuance?
Special Data Elements to be
Tracked (besides person, due date,
complete date, task status, comments)
Template
5 Sign and Issue Final Certification
M Yes Administrative Staff
Y 1) Issuance Type 2) Issuance Description 3) Generate/upload issuance document
COR070000 Permit Template COR315000 Permit Template
10.4.1.2.2 Modification Requests Stormwater Dewatering Certification Review Work Flow
SEQ #
Work Task Name Optional /
Mandatory
Upload Docum
ent?
Role Assignment
Default Task
Duration (Days)
Issuance?
Special Data Elements to be
Tracked (besides person, due date,
complete date, task status, comments)
Template
1 Submittal Type Determination and Completeness Review
M No Administrative Staff
N 1) Submittal Type: New/Renew/Modification (radio button) 2) Complete Package? Yes / No (checkbox)
1) Completeness letter template 2) Email alert body text
2 Technical Review M No Administrative Staff
N
3 Fee Determination M No Administrative Staff
N 1) Facility categories and subcategories
4 Sign and Issue Final Permit
M Yes Administrative Staff
Y 1) Issuance Type 2) Issuance Description 3) Generate/upload issuance document
COR070000 Permit Template COR315000 Permit Template
10.4.2 Air Pollution Quality Control Division Work Flow
10.4.2.1 APEN – Condensate Storage Tanks
10.4.2.1.1 New Application for Coverage under GENERAL PERMIT Workflow
This work flow will not be applicablein pilot phase.
SEQ #
Work Task Name
Optional /
Mandatory
Upload Docume
nt?
Work Group Assignment
Default Task
Duration (Days)
Issue Permit/APEN
?
Special Data Elements to be Tracked (besides person, due
date, complete date, task status, comments)
Template
1 Submittal Type Determination and Completeness Review
M No Log-In Technicians
10 N 1) Submittal Type: New/Update 2) Complete Package? Yes / No 3) Comments
1) Completeness letter template 2) Email alert body text
CEOS Agency Portal-User Guide
Page 49 of 88
SEQ #
Work Task Name
Optional /
Mandatory
Upload Docume
nt?
Work Group Assignment
Default Task
Duration (Days)
Issue Permit/APEN
?
Special Data Elements to be Tracked (besides person, due
date, complete date, task status, comments)
Template
2 Technical Review
M No Permit Engineer
5 N 1) Associate Terms & Conditions 2) Production Levels 3) Control Device(s) Used 4) Minor/Syn Minor Source 5) Site-Specific Emission Factors?
3 Fee Management
M No Administrative Staff
5 N 1) Required Fee? Yes / No 2) If required, Fee Category 3) Fee Amount 4) Comments
4 Prepare Approval Letter
M Yes Permit Engineer
N GP01 Approval Letter Template
5 Issue Final Letter
M No Permit Engineer
Y GP01 Approval Letter Template
10.4.2.1.2 APEN Submittal for Update Only Workflow
SEQ #
Work Task Name
Optional /
Mandatory
Upload Docume
nt?
Work Group Assignment
Default Task
Duration (Days)
Issue Permit/AP
EN?
Special Data Elements to be Tracked (besides person, due date, complete date, task status, comments)
Template
1 Submittal Type Determination and Completeness Review
M No Log-In Technicians
10 N 1) Submittal Type: New/Update 2) Complete Package? Yes / No 3) Comments
1) Completeness letter template 2) Email alert body text
2 Technical Review
M No Permit Engineer
5 N 1) Production Levels 2) Control Device(s) Used 3) Minor/Syn Minor Source 4) Site-Specific Emission Factors?
None
3 Fee Management
M No Administrative Staff
5 N 1) Required Fee? Yes / No 2) If required, Fee Category 3) Fee Amount 4) Comments
10.4.2.2 APEN – Reciprocating Internal Combustion Engines
10.4.2.2.1 New Application for Coverage under General Permit Number GP02 (Natural Gas Only) Workflow
This work flow will not be applicable in pilot phase.
CEOS Agency Portal-User Guide
Page 50 of 88
SEQ #
Work Task Name
Optional /
Mandatory
Upload Docume
nt?
Work Group Assignment
Default Task
Duration (Days)
Issue Permit/APE
N?
Special Data Elements to be Tracked (besides person, due date, complete
date, task status, comments)
Template
1 Submittal Type Determination and Completeness Review
M No Log-In Technicians
10 N 1) Submittal Type: New/Update/AOS Permanent Replacement 2) Complete Package? Yes / No 3) Comments
1) Completeness letter template 2) Email alert body text
2 Technical Review
M Yes Permit Engineer
15 N 1) Associate Terms & Conditions 2) Gas Usage Levels 3) Control Device(s) Used 4) Minor/Syn Minor Source 5) AP-42 Emission Factors or Manufacturer Specific?
GP02 Approval Letter Template
5 Fee Management
M No Administrative Staff
5 N 1) Required Fee? Yes / No 2) If required, Fee Category 3) Fee Amount 4) Comments
3 Prepare Approval Letter
M Yes Administrative Staff
N GP02Approval Letter Template
4 Issue Final Letter
M No Administrative Staff
Y
10.4.2.2.2 APEN Update Workflow
SEQ #
Work Task Name
Optional /
Mandatory
Upload Docume
nt?
Work Group Assignment
Default Task
Duration (Days)
Issue Permit/APEN?
Special Data Elements to be Tracked (besides person, due
date, complete date, task status, comments)
Template
1 Submittal Type Determination and Completeness Review
M No Log-In Technicians
10 N 1) Submittal Type: New/Update/AOS Permanent Replacement 2) Complete Package? Yes / No 3) Comments
1) Completeness letter template 2) Email alert body text
2 Technical Review
M Yes Permit Engineer
15 N 1) Associate Terms & Conditions 2) Gas Usage Levels 3) Control Device(s) Used 4) Minor/Syn Minor Source 5) AP-42 Emission Factors or Manufacturer Specific?
None
3 Fee Management
M No Administrative Staff
5 N 1) Required Fee? Yes / No 2) If required, Fee Category 3) Fee Amount 4) Comments
CEOS Agency Portal-User Guide
Page 51 of 88
10.4.3 Grant and Loan Division Work Flow
10.4.3.1 Drinking Water Revolving Fund Workflow
10.4.3.1.1 Planning Phase
Trigger ID Work Task Name
Optional /
Mandatory
Role Assignme
nt
Seq.
Default Duration
(Days)
Special Data Elements to be Tracked
Upload
?
Issuance
?
End Point of The Task (i.e. Document
to be generated, action completed,
etc.)
If document needs to be generated as
an end point, provide template
name
Eligibility Survey Submitted
0 Eligibility Survey Review
M GLU PM N N
Pre-Qualification Submitted
1 Milestone: Pre-Qualification Review
1-1 GLU Pre-Qual Review
M GLU PM 1 N N
1-2 DOLA Pre-Qual Review
M DOLA 1
Planning Grant are requested? Y/N
Y N DOLA Pre-Qualification Review.
HOP Ch 2 - Attachment 4 DOLA Pre-Qualification Review.
1-3 PA Pre-Qual Review
M PA 1 N N
1-4 ERU Pre-Qual Review
M ERU Engineer
1 Priority Points Calculated
Y N DWRF Eligibility Assessment Memo
HOP Ch 2 - Attachment 5 DWRF Eligibility Assessment Memo
1-5 NEPA Pre-Qual Review
M NEPA 1
Preliminary NEPA Determination: CatEx or FNSI
Y N Environmental Memo
HOP Ch 2 - Attachment 7 Environmental Memo
2 Milestone: Internal Review Meeting
CEOS Agency Portal-User Guide
Page 52 of 88
Trigger ID Work Task Name
Optional /
Mandatory
Role Assignme
nt
Seq.
Default Duration
(Days)
Special Data Elements to be Tracked
Upload
?
Issuance
?
End Point of The Task (i.e. Document
to be generated, action completed,
etc.)
If document needs to be generated as
an end point, provide template
name
2-1 Schedule Internal Pre-Qual Review Meeting
M GLU PM 2 N N
2-2 Internal Review Meeting
M
GLU PM, DOLA, PA, ERU Engineer
3 A week before 4-2
N N
3 Planning Grant Review
M
GLU PM, DOLA, PA, ERU Engineer
3 Planning Grant Decision: Y/N
N N
4 Milestone: Pre-App Meeting
4-1 Schedule Pre-App Meeting
M GLU PM 4 Y Y Pre-Application Meeting Agenda
HOP Ch 3 - Attachment 1 Pre-Application Meeting Agenda
4-2 Pre-App Meeting M GLU PM 5
45 days after Pre-Qual is received
N N
4-3 Prepare Draft Pre-Qual Review Letter
M GLU PM 6 Grant Recommendation Amount
Y N Pre-Qualification Review Letter
HOP Ch 2 - Attachment 8 Pre-Qualification Review Letter
4-4 Review Draft Pre-Qual Review Letter
M
DOLA, PA, ERU Engineer, NEPA
7 Grant Recommendation Amount
N N Pre-Qualification Review Letter
HOP Ch 2 - Attachment 8 Pre-Qualification Review Letter
4-5 Issue Pre-Qual Review Letter
M GLU PM 8 Grant Recommendation Amount
Y Y Pre-Qualification Review Letter
HOP Ch 2 - Attachment 8 Pre-Qualification Review Letter
CEOS Agency Portal-User Guide
Page 53 of 88
Trigger ID Work Task Name
Optional /
Mandatory
Role Assignme
nt
Seq.
Default Duration
(Days)
Special Data Elements to be Tracked
Upload
?
Issuance
?
End Point of The Task (i.e. Document
to be generated, action completed,
etc.)
If document needs to be generated as
an end point, provide template
name
5 Milestone: Planning Grant Execution
5-1 Prepare Draft Planning Grant Agreement
O, show if 3.Planning Grant Decision = Y
GLU PM, PA
9 Y N Planning grant agreement
HOP Ch 2 - Attachment 9 Planning grant agreement example
5-2 Issue Final Planning Grant Agreement
O, show if 3.Planning Grant Decision = Y
GLU PM, PA
10 Y Y Planning grant agreement
HOP Ch 2 - Attachment 9 Planning grant agreement example
Project Needs Assessment (PNA) + Environmental Checklist Submitted
6 Milestone: Project Needs Assessment (PNA) Review
6-1 GLU PNA Review M GLU PM 1 45 N N
6-2 DOLA PNA Review M DOLA 1 45 Y N DOLA - Financial Review Memo
DOLA - Financial Review Memo
6-3 ERU PNA Review M ERU Engineer
1 45 Self-Cert? 100%, Partial, Streamline
Y N
Project Needs Assessment Engineer Review Memo
HOP Ch 4 - Attachment 4b DW Project Needs Assessment Engineer Review Memo
6-4 NEPA PNA Review M NEPA 1 45 NEPA Determinatio
Y N Final Environmental Memo
HOP Ch 4 - Attachment 7 Final
CEOS Agency Portal-User Guide
Page 54 of 88
Trigger ID Work Task Name
Optional /
Mandatory
Role Assignme
nt
Seq.
Default Duration
(Days)
Special Data Elements to be Tracked
Upload
?
Issuance
?
End Point of The Task (i.e. Document
to be generated, action completed,
etc.)
If document needs to be generated as
an end point, provide template
name
n: CatEx or FONSI
Environmental Memo
7 Design and Engineering Grant Review
If 6-5 NEPA Determination = CatEx
7-1-
a
GLU - DE Grant Recommendation Review
M GLU PM 2 N N
7-2-
a
DOLA - DE Grant Recommendation Review
M DOLA 2 N N
7-3-
a
PA - DE Grant Recommendation Review
M PA 2 N N
7-4-
a
ERU - DE Grant Recommendation Review
M ERU Engineer
2 N N
7-5-
a
NEPA - DE Grant Recommendation Review
M NEPA 2 N N
If 6-5 NEPA Determination = FONSI
7-1-
b
GLU - DE Grant Recommendation Review
M GLU PM 2 N N
7-2-
b
DOLA - DE Grant Recommendation Review
M DOLA 2 N N
7-3-
b
PA - DE Grant Recommendation Review
M PA 2 N N
CEOS Agency Portal-User Guide
Page 55 of 88
Trigger ID Work Task Name
Optional /
Mandatory
Role Assignme
nt
Seq.
Default Duration
(Days)
Special Data Elements to be Tracked
Upload
?
Issuance
?
End Point of The Task (i.e. Document
to be generated, action completed,
etc.)
If document needs to be generated as
an end point, provide template
name
7-4-
b
ERU - DE Grant Recommendation Review
M ERU Engineer
2 Y N DW Project Needs Assessment Engineer Review
HOP Ch 4 - Attachment 4a DW Project Needs Assessment Engineer Review Memo
7-5-
b
NEPA - DE Grant Recommendation Review
M NEPA 2 Y N Final Environmental Memo
HOP Ch 4 - Attachment 7 Final Environmental Memo
7-6 Prepare Draft Grant Documents
M GLU PM 3 Y N
-DE Grant Recommendation Memo -Design and Engineer Grant agreement -Planning Grant Agreement
HOP Ch 4 - Attachment 20 DE Grant Recommendation Memo.docx; and HOP Ch 4 - Attachment 19 Design and Engineer Grant agreement example.doc; and HOP Ch 2 - Attachment 9 Planning grant agreement example.docx
CEOS Agency Portal-User Guide
Page 56 of 88
Trigger ID Work Task Name
Optional /
Mandatory
Role Assignme
nt
Seq.
Default Duration
(Days)
Special Data Elements to be Tracked
Upload
?
Issuance
?
End Point of The Task (i.e. Document
to be generated, action completed,
etc.)
If document needs to be generated as
an end point, provide template
name
7-7 Prepare Draft PNA Review Letter
M GLU PM 3 Y N
-PNA Review Letter -SRF DW Sel-Cert Form -DWRF Final Execution Letter -DWRF Loan Agreement - D&E Final Template -DWRF Cover Letter -DWRF Procedure Memo -DWRF Directory - D&E
-HOP Ch 4 - Attachment 8 Project Needs Assessment Review Letter.docx -(HOP Ch 5 - Attachment 1a SRF DW Self-Cert Form) -CWRPDA - DWRF Final Execution Letter-D&E.DOC; -CWRPDA - DWRF Loan Agreement - D&E Final Template.doc; -CWRPDA - DWRF Cover Letter - D&E.DOC; -CWRPDA - DWRF Procedure Memo - D&E.DOC; -CWRPDA - DWRF Directory - D&E.DOC
CEOS Agency Portal-User Guide
Page 57 of 88
Trigger ID Work Task Name
Optional /
Mandatory
Role Assignme
nt
Seq.
Default Duration
(Days)
Special Data Elements to be Tracked
Upload
?
Issuance
?
End Point of The Task (i.e. Document
to be generated, action completed,
etc.)
If document needs to be generated as
an end point, provide template
name
7-8 Issue Final PNA Documents
M GLU PM 4 Y Y
-DE Grant Recommendation Memo -Design and Engineer Grant agreement -Planning Grant Agreement -PNA Review Letter -SRF DW Sel-Cert Form -DWRF Final Execution Letter -DWRF Loan Agreement - D&E Final Template -DWRF Cover Letter -DWRF Procedure Memo -DWRF Directory - D&E
HOP Ch 4 - Attachment 20 DE Grant Recommendation Memo.docx; and HOP Ch 4 - Attachment 19 Design and Engineer Grant agreement example.doc; and HOP Ch 2 - Attachment 9 Planning grant agreement example.docx HOP Ch 4 - Attachment 8 Project Needs Assessment Review Letter.docx (HOP Ch 5 - Attachment 1a SRF DW Self-Cert Form) -CWRPDA - DWRF Final Execution Letter-D&E.DOC; -CWRPDA - DWRF Loan Agreement - D&E Final Template.doc; -CWRPDA - DWRF Cover Letter - D&E.DOC; -CWRPDA - DWRF
CEOS Agency Portal-User Guide
Page 58 of 88
Trigger ID Work Task Name
Optional /
Mandatory
Role Assignme
nt
Seq.
Default Duration
(Days)
Special Data Elements to be Tracked
Upload
?
Issuance
?
End Point of The Task (i.e. Document
to be generated, action completed,
etc.)
If document needs to be generated as
an end point, provide template
name
Procedure Memo - D&E.DOC; -CWRPDA - DWRF Directory - D&E.DOC
10.4.3.1.2 Design Phase
Trigger ID Work Task Name
Optional /
Mandatory
Role Assignment
Seq. Default Duration (Days)
Special Data Elements to be
Tracked
Upload
?
Issuance?
End Point of The Task (i.e. Document to be generated,
action completed,
etc.)
If document needs to be generated as an end point, provide
template name
Public Meeting Documents Submitted
1 Milestone: Public Meeting Review
1-1 GLU Public Meeting Review
M GLU PM 1 N N
1-2 NEPA Public Meeting Review
M NEPA 1 N N
CEOS Agency Portal-User Guide
Page 59 of 88
Trigger ID Work Task Name
Optional /
Mandatory
Role Assignment
Seq. Default Duration (Days)
Special Data Elements to be
Tracked
Upload
?
Issuance?
End Point of The Task (i.e. Document to be generated,
action completed,
etc.)
If document needs to be generated as an end point, provide
template name
1-3 NEPA EA Acceptance Final Review
M NEPA 2 N N
If Planning Phase 6-4 NEPA Determination = CatEx
1-4-
a Prepare Draft EA decision document
M NEPA 3 Y N Categorical Exclusion Template
Categorical Exclusion Template
1-5-
a Issue Final EA decision document
M Division Director
4 Y Y Categorical Exclusion Template
Categorical Exclusion Template
1-6-
a
Publish EA decision document to WQ Website
M NEPA 5 N N
1-8-
a
Prepare Draft PNA & Environmental Approval Letter
M GLU PM 6 Y N
PNA and CatEx Approval Letter
HOP Ch 4 - Attachment 10 Project Needs Assessment and CatEx Approval Letter
1-9-
a
Issue Final PNA & Environmental Approval Letter
M GLU PM 7 Y Y
PNA and CatEx Approval Letter
HOP Ch 4 - Attachment 10 Project Needs Assessment and CatEx Approval Letter
If Planning Phase 6-4 NEPA Determination = FONSI
1-4-
b Prepare Draft EA decision document
M NEPA 3 Y N
Finding of No Significant Impact Template
Finding of No Significant Impact Template
1-5-
b Issue Final EA decision document
M Division Director
4 Y Y Finding of No Significant
Finding of No Significant Impact
CEOS Agency Portal-User Guide
Page 60 of 88
Trigger ID Work Task Name
Optional /
Mandatory
Role Assignment
Seq. Default Duration (Days)
Special Data Elements to be
Tracked
Upload
?
Issuance?
End Point of The Task (i.e. Document to be generated,
action completed,
etc.)
If document needs to be generated as an end point, provide
template name
Impact Template
Template
1-6-
b
Publish EA decision document within Local Newspaper
M NEPA 5 N N
1-7 Public Comment Period
M GLU PM 6 30 All comments/issues resolved? Y/N
N N
1-8-
b
Prepare Draft PNA & Environmental Approval Letter
M GLU PM 7 Y N
PNA and FONSI Approval Letter
HOP Ch 4 - Attachment 9 Project Needs Assessment and FNSI Approval Letter
1-9-
b
Issue Final PNA & Environmental Approval Letter
M GLU PM 8 Y Y
PNA and FONSI Approval Letter
HOP Ch 4 - Attachment 9 Project Needs Assessment and FNSI Approval Letter
Environmental Assessment (EA) Submitted
2 Milestone: Environmental Assessment Review
2 NEPA Environmental Assessment Review
M NEPA 1 Y Y
Environmental Assessment Comment Letter
HOP Ch 4 - Attachment 15 Environmental Assessment Comment Letter
5 Milestone: Plans and Specifications Review
Self-certification + Draft Contract
If Planning Phase 6-3 - Self-Cert = 100% OR Partial
CEOS Agency Portal-User Guide
Page 61 of 88
Trigger ID Work Task Name
Optional /
Mandatory
Role Assignment
Seq. Default Duration (Days)
Special Data Elements to be
Tracked
Upload
?
Issuance?
End Point of The Task (i.e. Document to be generated,
action completed,
etc.)
If document needs to be generated as an end point, provide
template name
Documents + (Plans and Specs) Submitted
5-1 GLU Contract Document Review
M GLU PM 1 N N
5-2 ERU Self-Certification Review
M ERU Engineer
1 Self-Certification Approved? 100%/Partial/No
N N
If 6-3 - Self-Cert = 100%
5-3 Prepare Draft Self-Cert Review Document
M ERU Engineer
2 Y N
SRF Self Certification Form Review Memo
ERU - DW SRF Self Certification Form Review Memo
5-4 Prepare Draft Plans and Specifications Approval Letter
M GLU PM 3 Y N
Plans and Specs Approval Letter
HOP Ch 5 - Attachment 4a DW Plans and Specs Approval Letter
5-5 Issue Final Plans & Specs Approval Letter
M GLU PM 4 Y Y
Plans and Specs Approval Letter
HOP Ch 5 - Attachment 4a DW Plans and Specs Approval Letter
If 6-3 - Self-Cert = Partial
5-3 Prepare Draft Plans and Specifications Approval Letter
M GLU PM 2 Y N
Plans and Specs Approval Letter
HOP Ch 5 - Attachment 4a DW Plans and Specs Approval Letter
5-4 Prepare Draft Self-Cert Review
M ERU Enginee
3 Y N SRF Self Certification
ERU - DW SRF Self Certification Form
CEOS Agency Portal-User Guide
Page 62 of 88
Trigger ID Work Task Name
Optional /
Mandatory
Role Assignment
Seq. Default Duration (Days)
Special Data Elements to be
Tracked
Upload
?
Issuance?
End Point of The Task (i.e. Document to be generated,
action completed,
etc.)
If document needs to be generated as an end point, provide
template name
Document r Form Review Memo
Review Memo
5-5 Issue Final Plans & Specs Approval Letter
M ERU Engineer
4 Y Y
Plans and Specs Approval Letter
HOP Ch 5 - Attachment 4a DW Plans and Specs Approval Letter
A letter of intent with PDR + Draft Contract Documents + Plans and Specs Submitted
If Planning Phase 6-3 - Self-Cert = No, Streamline Review
5-1 GLU Contract Document Review
M GLU PM 1 60 N N
5-2 ERU Streamline Document Review
M ERU Engineer
1 60
Streamline Approved? Y/N PDR Accepted? Y/N
N N
5-3 Prepare Draft Plans and Specifications Approval Letter
M GLU PM 2 Y N
Plans and Specs Approval Letter
HOP Ch 5 - Attachment 4a DW Plans and Specs Approval Letter
5-4 Prepare Draft P&S Review Document
M ERU Engineer
3 Y N
-Plans and Specs Approval Letter -Streamline Design Approval
HOP Ch 5 - Attachment 4a DW Plans and Specs Approval Letter
CEOS Agency Portal-User Guide
Page 63 of 88
Trigger ID Work Task Name
Optional /
Mandatory
Role Assignment
Seq. Default Duration (Days)
Special Data Elements to be
Tracked
Upload
?
Issuance?
End Point of The Task (i.e. Document to be generated,
action completed,
etc.)
If document needs to be generated as an end point, provide
template name
5-5 Issue Final Documents
M ERU Engineer
4 Y Y
-Plans and Specs Approval Letter -Streamline Design Approval
HOP Ch 5 - Attachment 4a DW Plans and Specs Approval Letter
10.4.3.1.3 Funding Phase
Trigger ID Work Task
Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be Tracked
Upload? Issuance?
End Point of The Task (i.e.
Document to be generated,
action completed, etc.)
If document needs to be generated as
an end point, provide template
name
Loan Application Submitted
1 Milestone: Loan Application Review
1-1
Loan Application Completeness Review
M GLU PM 1 LA Complete? Y/N
N N
1-2
PA Loan Application Review
M PA 2
1-3
DOLA Loan Application Review
M DOLA 2
2 Milestone: Credit Report Finalized
CEOS Agency Portal-User Guide
Page 64 of 88
Trigger ID Work Task
Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be Tracked
Upload? Issuance?
End Point of The Task (i.e.
Document to be generated,
action completed, etc.)
If document needs to be generated as
an end point, provide template
name
2-1
Prepare Draft Credit Report
M DOLA 3 Y Y DWRF Credit Report
DOLA - DWRF Credit Report Template.pdf
2-2
GLU Draft Credit Report Review
M GLU PM 4 N N
2-3
PA Draft Credit Report Review
M PA 4 N N
2-4
Finalized Credit Report
M DOLA 5 Y N DWRF Credit Report
DOLA - DWRF Credit Report Template.pdf
2-5
SRF Committee Meeting
M GLU PM, PA, DOLA
6
Financial Credit Report Accepted? Y/N
Y Y Final Credit Report
3 Milestone: Board Meeting Approval
3-1
Authority Board Meeting
M GLU PM, PA, DOLA
7 Loan Approved? Y/N
N N
3-2
Prepare Draft Loan Approval Letter and Loan Agreement
M PA 8 Y Y
-DWRF Approval Letter -DWRF Draft Loan Agreement -DWRF Directory -DWRF Cover Letter
CWRPDA - DWRF Approval Letter.doc; CWRPDA - DWRF Exhibit C - 3.5% Template.xls; CWRPDA - DWRF Draft Loan Agreement - DL 2%.doc; CWRPDA - DWRF
CEOS Agency Portal-User Guide
Page 65 of 88
Trigger ID Work Task
Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be Tracked
Upload? Issuance?
End Point of The Task (i.e.
Document to be generated,
action completed, etc.)
If document needs to be generated as
an end point, provide template
name
Directory.doc; CWRPDA - DWRF Cover Letter.doc
3-3
Issue Final Loan Approval Letter and Loan Agreement
M PA 9 Y Y
-DWRF Approval Letter -DWRF Draft Loan Agreement -DWRF Directory -DWRF Cover Letter
CWRPDA - DWRF Approval Letter.doc; CWRPDA - DWRF Exhibit C - 3.5% Template.xls; CWRPDA - DWRF Draft Loan Agreement - DL 2%.doc; CWRPDA - DWRF Directory.doc; CWRPDA - DWRF Cover Letter.doc
4 Milestone: Loan Execution
4-1
PA Loan Closing Review
M PA 10 N N
4-2
GLU Loan Closing Review
M GLU PM 10 N N
4-3
DOLA Loan Application Review
M DOLA 10 N N
4-4
Loan Execution M GLU PM 11 N N
CEOS Agency Portal-User Guide
Page 66 of 88
Trigger ID Work Task
Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be Tracked
Upload? Issuance?
End Point of The Task (i.e.
Document to be generated,
action completed, etc.)
If document needs to be generated as
an end point, provide template
name
4-5
Issue fully executed loan agreement and supporting docs
M PA 12 Y Y
-DWRF Final Execution Letter -DWRF Final Loan Agreement
[ENTITY NAME] - DWRF Final Execution Letter.doc; [ENTITY NAME] – DWRF Final Loan Agreement.PDF;
10.4.3.1.4 Construction Phase
Trigger ID Work Task
Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e. Document to be generated,
action completed,
etc.)
If document needs to be
generated as an end point,
provide template
name
Pre-Bid Documents Submitted
1 Milestone: Bid Solicitation Review
1-1 Pre-Bid Document Review
M GLU PM 1 N N
1-2 Pre-Bid Meeting
M GLU PM 2 N N
(Pre-Bid Meeting doc attached)
1-3
Pre-Bid Meeting Document Review
M GLU PM 3 N N
(Bid tabulation
1-4 Bid Tabulation Review
M GLU PM 4 N N
CEOS Agency Portal-User Guide
Page 67 of 88
Trigger ID Work Task
Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e. Document to be generated,
action completed,
etc.)
If document needs to be
generated as an end point,
provide template
name
attached)
(Contracting Documents attached)
1-5 Bidding Final Review
M GLU PM 5 Y N
Project Manager SRF Bid Documents Checklist
HOP Ch 8 - Attachment 1 Project Manager SRF Bid Documents Checklist.docx
Pay Request Submitted
2 Milestone: Pay Requests
2-1 GLU Pay Request Review
M GLU PM 1 N N
2-2 PA Pay Request Review
M PA 2 N N
2-3 Issue Verification Letter
M PA 3 Y Y Verification Letter
Change Order Request Submitted
3 Milestone: Change Orders
3-1 ERU Change Order Review
M ERU Engineer
1 N N
3-2 GLU Change Order Review
M GLU PM 1 N N
3-3 Prepare Change Order Approval Letter
M GLU PM 2 Y N CO Approval Letter
3-4 Issue Change M GLU PM 3 Y Y CO Approval
CEOS Agency Portal-User Guide
Page 68 of 88
Trigger ID Work Task
Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e. Document to be generated,
action completed,
etc.)
If document needs to be
generated as an end point,
provide template
name
Order Approval Letter
Letter
4 Milestone: Inspections
4-1 Construction Interim Inspection 1
O GLU PM, ERU Engineer
1 Y Y PM Inspection Letter
HOP Ch 10 - Attachment 2 PM Inspection Letter.docx
4-2 Construction Interim Inspection 2
O GLU PM, ERU Engineer
1 Y Y PM Inspection Letter
HOP Ch 10 - Attachment 2 PM Inspection Letter.docx
4-3 Construction Interim Inspection 3
O GLU PM, ERU Engineer
1 Y Y PM Inspection Letter
HOP Ch 10 - Attachment 2 PM Inspection Letter.docx
4-4 Construction Interim Inspection 4
O GLU PM, ERU Engineer
1 Y Y PM Inspection Letter
HOP Ch 10 - Attachment 2 PM Inspection Letter.docx
(30 days prior to Construction completion or 90% complete)
5 Milestone: Final Inspection
CEOS Agency Portal-User Guide
Page 69 of 88
Trigger ID Work Task
Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e. Document to be generated,
action completed,
etc.)
If document needs to be
generated as an end point,
provide template
name
5-1 Construction Final Inspection
M GLU PM, ERU Engineer
1 Y Y Final Inspection Letter
6 Milestone: Project Closeout
6-1 Project Closeout
M GLU PM 1 N N
10.4.3.2 Water Pollution Control Revolving Fund Workflow
10.4.3.2.1 Planning Phase
Trigger ID Work Task Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e.
Document to be generated,
action completed, etc.)
If document needs to be
generated as an end point,
provide template name
Eligibility Survey Submitted
0 Eligibility Survey Review
M GLU PM N N
Pre-Qualification Submitted
1 Milestone: Pre-Qualification Review
1-1
GLU Pre-Qual Review
M GLU PM 1 N N
1-2
DOLA Pre-Qual Review
M DOLA 1 Planning Grant are requested? Y/N
Y N DOLA Pre-Qualification Review.
HOP Ch 2 - Attachment 4 DOLA Pre-Qualification
CEOS Agency Portal-User Guide
Page 70 of 88
Trigger ID Work Task Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e.
Document to be generated,
action completed, etc.)
If document needs to be
generated as an end point,
provide template name
Review.
1-3
PA Pre-Qual Review
M PA 1 N N
1-4
ERU Pre-Qual Review
M ERU Engineer
1 Priority Points Calculated
Y N WPCRF Eligibility Assessment Memo
HOP Ch 2 - Attachment 6 WPCRF Eligibility Assessment Memo.docx
1-5
NEPA Pre-Qual Review
M NEPA 1 Preliminary NEPA Determination: CatEx or FNSI
Y N Environmental Memo
HOP Ch 2 - Attachment 7 Environmental Memo
2 Milestone: Internal Review Meeting
2-1
Schedule Internal Pre-Qual Review Meeting
M GLU PM 2 N N
2-2
Internal Review Meeting
M
GLU PM, DOLA, PA, ERU Engineer
3 A week before 4-2
N N
3 Planning Grant Review
M
GLU PM, DOLA, PA, ERU Engineer
3 Planning Grant Decision: Y/N
N N
4 Milestone: Pre-App Meeting
4-1
Schedule Pre-App Meeting
M GLU PM 4 Y Y Pre-Application Meeting Agenda
HOP Ch 3 - Attachment 1 Pre-Application Meeting Agenda
CEOS Agency Portal-User Guide
Page 71 of 88
Trigger ID Work Task Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e.
Document to be generated,
action completed, etc.)
If document needs to be
generated as an end point,
provide template name
4-2
Pre-App Meeting M GLU PM 5
45 days after Pre-Qual is received
N N
4-3
Prepare Draft Pre-Qual Review Letter
M GLU PM 6 Grant Recommendation Amount
Y N Pre-Qualification Review Letter
HOP Ch 2 - Attachment 8 Pre-Qualification Review Letter
4-4
Review Draft Pre-Qual Review Letter
M
DOLA, PA, ERU Engineer, NEPA
7 Grant Recommendation Amount
N N Pre-Qualification Review Letter
HOP Ch 2 - Attachment 8 Pre-Qualification Review Letter
4-5
Issue Pre-Qual Review Letter
M GLU PM 8 Grant Recommendation Amount
Y Y Pre-Qualification Review Letter
HOP Ch 2 - Attachment 8 Pre-Qualification Review Letter
5 Milestone: Planning Grant Execution
5-1
Prepare Draft Planning Grant Agreement
O, show if 3.Planning Grant Decision = Y
GLU PM, PA 9 Y N Planning grant agreement
HOP Ch 2 - Attachment 9 Planning grant agreement example
5-2
Issue Final Planning Grant Agreement
O, show if 3.Planning Grant Decision = Y
GLU PM, PA 10 Y Y Planning grant agreement
HOP Ch 2 - Attachment 9 Planning grant agreement example
Project Needs Assessment (PNA) +
6 Milestone: Project Needs Assessment (PNA) Review
CEOS Agency Portal-User Guide
Page 72 of 88
Trigger ID Work Task Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e.
Document to be generated,
action completed, etc.)
If document needs to be
generated as an end point,
provide template name
Environmental Checklist Submitted
6-1
GLU PNA Review M GLU PM 1 45 N N
6-2
DOLA PNA Review
M DOLA 1 45 Y N DOLA - Financial Review Memo
DOLA - Financial Review Memo
6-3
PA PNA Review M PA 1 45 N N
6-4
ERU PNA Review M ERU Engineer
1 45 Self-Cert? 100%, Partial, Streamline
Y N
Project Needs Assessment Engineer Review Memo
HOP Ch 4 - Attachment 4b WPC Project Needs Assessment Engineer Review Memo
6-5
NEPA PNA Review
M NEPA 1 45 NEPA Determination: CatEx or FONSI
Y N Final Environmental Memo
HOP Ch 4 - Attachment 7 Final Environmental Memo
7 Design and Engineering Grant Review
If 6-5 NEPA Determination = CatEx
7-1-a
GLU - DE Grant Recommendation Review
M GLU PM 2 N N
7-2-a
DOLA - DE Grant Recommendation Review
M DOLA 2 N N
7- PA - DE Grant M PA 2 N N
CEOS Agency Portal-User Guide
Page 73 of 88
Trigger ID Work Task Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e.
Document to be generated,
action completed, etc.)
If document needs to be
generated as an end point,
provide template name
3-a
Recommendation Review
7-4-a
ERU - DE Grant Recommendation Review
M ERU Engineer
2 N N
7-5-a
NEPA - DE Grant Recommendation Review
M NEPA 2 N N
If 6-5 NEPA Determination = FONSI
7-1-b
GLU - DE Grant Recommendation Review
M GLU PM 2 N N
7-2-b
DOLA - DE Grant Recommendation Review
M DOLA 2 N N
7-3-b
PA - DE Grant Recommendation Review
M PA 2 N N
7-4-b
ERU - DE Grant Recommendation Review
M ERU Engineer
2 Y N
WPC Project Needs Assessment Engineer Review
HOP Ch 4 - Attachment 4b WPC Project Needs Assessment Engineer Review Memo
7-5-b
NEPA - DE Grant Recommendation Review
M NEPA 2 Y N Final Environmental Memo
HOP Ch 4 - Attachment 7 Final Environmental Memo
CEOS Agency Portal-User Guide
Page 74 of 88
Trigger ID Work Task Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e.
Document to be generated,
action completed, etc.)
If document needs to be
generated as an end point,
provide template name
7-6
Prepare Draft Grant Documents
M GLU PM 3 Y N
-DE Grant Recommendation Memo -Design and Engineer Grant agreement -Planning Grant Agreement
HOP Ch 4 - Attachment 20 DE Grant Recommendation Memo.docx; and HOP Ch 4 - Attachment 19 Design and Engineer Grant agreement example.doc; and HOP Ch 2 - Attachment 9 Planning grant agreement example.docx
7-7
Prepare Draft PNA Review Letter
M GLU PM 3 Y N
-PNA Review Letter -SRF DW Sel-Cert Form -WPCRF Final Execution Letter -WPCRF Loan Agreement - D&E Final Template -WPCRF Cover Letter -WPCRF Procedure Memo -WPCRF Directory - D&E
-HOP Ch 4 - Attachment 8 Project Needs Assessment Review Letter.docx -(HOP Ch 5 - Attachment 1a SRF DW Self-Cert Form) -CWRPDA - WPCRF Final Execution Letter-D&E.DOC; -CWRPDA - WPCRF Loan
CEOS Agency Portal-User Guide
Page 75 of 88
Trigger ID Work Task Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e.
Document to be generated,
action completed, etc.)
If document needs to be
generated as an end point,
provide template name
Agreement - D&E Final Template.doc; -CWRPDA - WPCRF Cover Letter - D&E.DOC; -CWRPDA - WPCRF Procedure Memo - D&E.DOC; -CWRPDA - WPCRF Directory - D&E.DOC
7-8
Issue Final PNA Documents
M GLU PM 4 Y Y
-DE Grant Recommendation Memo -Design and Engineer Grant agreement -Planning Grant Agreement -PNA Review Letter -SRF DW Sel-Cert Form -WPCRF Final Execution Letter -WPCRF Loan Agreement - D&E Final Template -WPCRF Cover
HOP Ch 4 - Attachment 20 DE Grant Recommendation Memo.docx; and HOP Ch 4 - Attachment 19 Design and Engineer Grant agreement example.doc; and HOP Ch 2 - Attachment 9 Planning grant agreement example.docx HOP Ch 4 - Attachment 8
CEOS Agency Portal-User Guide
Page 76 of 88
Trigger ID Work Task Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e.
Document to be generated,
action completed, etc.)
If document needs to be
generated as an end point,
provide template name
Letter -WPCRF Procedure Memo -WPCRF Directory - D&E
Project Needs Assessment Review Letter.docx (HOP Ch 5 - Attachment 1a SRF DW Self-Cert Form) -CWRPDA - WPCRF Final Execution Letter-D&E.DOC; -CWRPDA - WPCRF Loan Agreement - D&E Final Template.doc; -CWRPDA - WPCRF Cover Letter - D&E.DOC; -CWRPDA - WPCRF Procedure Memo - D&E.DOC; -CWRPDA - WPCRF Directory - D&E.DOC
10.4.3.2.2 Design Phase
CEOS Agency Portal-User Guide
Page 77 of 88
Trigger ID Work Task
Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e. Document to be generated,
action completed,
etc.)
If document needs to be
generated as an end point,
provide template
name
Public Meeting Documents Submitted
1 Milestone: Public Meeting Review
1-1 GLU Public Meeting Review
M GLU PM 1 N N
1-2 NEPA Public Meeting Review
M NEPA 1 N N
1-3 NEPA EA Acceptance Final Review
M NEPA 2 N N
If Planning Phase 6-4 NEPA Determination = CatEx
1-
4-a
Prepare Draft EA decision document
M NEPA 3 Y N Categorical Exclusion Template
Categorical Exclusion Template
1-
5-a
Issue Final EA decision document
M Division Director
4 Y Y Categorical Exclusion Template
Categorical Exclusion Template
1-
6-a
Publish EA decision document to WQ Website
M NEPA 5 N N
1-
8-a
Prepare Draft PNA & Environmental Approval Letter
M GLU PM 6 Y N PNA and CatEx Approval Letter
HOP Ch 4 - Attachment 10 Project Needs Assessment and CatEx
CEOS Agency Portal-User Guide
Page 78 of 88
Trigger ID Work Task
Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e. Document to be generated,
action completed,
etc.)
If document needs to be
generated as an end point,
provide template
name
Approval Letter
1-
9-a
Issue Final PNA & Environmental Approval Letter
M GLU PM 7 Y Y PNA and CatEx Approval Letter
HOP Ch 4 - Attachment 10 Project Needs Assessment and CatEx Approval Letter
If Planning Phase 6-4 NEPA Determination = FONSI
1-
4-b
Prepare Draft EA decision document
M NEPA 3 Y N
Finding of No Significant Impact Template
Finding of No Significant Impact Template
1-
5-b
Issue Final EA decision document
M Division Director
4 Y Y
Finding of No Significant Impact Template
Finding of No Significant Impact Template
1-
6-b
Publish EA decision document within Local Newspaper
M NEPA 5 N N
1-7 Public Comment Period
M GLU PM 6 30 All comments/issues resolved? Y/N
N N
1-
8-b Prepare Draft PNA &
M GLU PM 7 Y N PNA and FONSI
HOP Ch 4 - Attachment 9
CEOS Agency Portal-User Guide
Page 79 of 88
Trigger ID Work Task
Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e. Document to be generated,
action completed,
etc.)
If document needs to be
generated as an end point,
provide template
name
Environmental Approval Letter
Approval Letter
Project Needs Assessment and FNSI Approval Letter
1-
9-b
Issue Final PNA & Environmental Approval Letter
M GLU PM 8 Y Y
PNA and FONSI Approval Letter
HOP Ch 4 - Attachment 9 Project Needs Assessment and FNSI Approval Letter
Environmental Assessment (EA) Submitted
2 Milestone: Environmental Assessment Review
2
NEPA Environmental Assessment Review
M NEPA 1 Y Y
Environmental Assessment Comment Letter
HOP Ch 4 - Attachment 15 Environmental Assessment Comment Letter
Preliminary Effluent Limits (PELS) Submitted
3 Milestone: PELS Submitted
PELs Review M Permit Engineer
1 PEL Request Accepted? Y/N
N N
Site 4 Milestone: Site Application Reviewed
CEOS Agency Portal-User Guide
Page 80 of 88
Trigger ID Work Task
Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e. Document to be generated,
action completed,
etc.)
If document needs to be
generated as an end point,
provide template
name
Application Submitted
Site Location Application Review
M ERU Engineer
1 SA Accepted? N N
5 Milestone: Plans and Specifications Review
Self-certification + Draft Contract Documents + (Plans and Specs) Submitted
If Planning Phase 6-3 - Self-Cert = 100% OR Partial
5-1 GLU Contract Document Review
M GLU PM 1 N N
5-2 ERU Self-Certification Review
M ERU Engineer
1 Self-Certification Approved? 100%/Partial/No
N N
If 6-3 - Self-Cert = 100%
5-3
Prepare Draft Self-Cert Review Document
M ERU Engineer
2 Y N
SRF Self Certification Form Review Memo
ERU - WPC SRF Self Certification Form Review Memo
5-4
Prepare Draft Plans and Specifications Approval
M GLU PM 3 Y N
Plans and Specs Approval Letter
HOP Ch 5 - Attachment 4b WPC Plans and Specs
CEOS Agency Portal-User Guide
Page 81 of 88
Trigger ID Work Task
Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e. Document to be generated,
action completed,
etc.)
If document needs to be
generated as an end point,
provide template
name
Letter Approval Letter
5-5
Issue Final Plans & Specs Approval Letter
M GLU PM 4 Y Y
Plans and Specs Approval Letter
HOP Ch 5 - Attachment 4b WPC Plans and Specs Approval Letter
If 6-3 - Self-Cert = Partial
5-3
Prepare Draft Plans and Specifications Approval Letter
M GLU PM 2 Y N
Plans and Specs Approval Letter
HOP Ch 5 - Attachment 4b WPC Plans and Specs Approval Letter
5-4
Prepare Draft Self-Cert Review Document
M ERU Engineer
3 Y N
SRF Self Certification Form Review Memo
ERU - WPC SRF Self Certification Form Review Memo
5-5
Issue Final Plans & Specs Approval Letter
M ERU Engineer
4 Y Y
Plans and Specs Approval Letter
HOP Ch 5 - Attachment 4b WPC Plans and Specs Approval Letter
CEOS Agency Portal-User Guide
Page 82 of 88
Trigger ID Work Task
Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e. Document to be generated,
action completed,
etc.)
If document needs to be
generated as an end point,
provide template
name
A letter of intent with PDR + Domestic WW Streamlined Design Cert + Draft Contract Documents + Plans and Specs Submitted
If Planning Phase 6-3 - Self-Cert = No, Streamline Review
5-1 GLU Contract Document Review
M GLU PM 1 60 N N
5-2
ERU Streamline Document Review
M ERU Engineer
1 60
Streamline Approved? Y/N PDR Accepted? Y/N
N N
5-3
Prepare Draft Plans and Specifications Approval Lettter
M GLU PM 2 Y N
Plans and Specs Approval Letter
HOP Ch 5 - Attachment 4b WPC Plans and Specs Approval Letter
5-4 Prepare Draft P&S Review Document
M ERU Engineer
3 Y N
-Plans and Specs Approval Letter -Streamline Design
HOP Ch 5 - Attachment 4b WPC Plans and Specs Approval Letter
CEOS Agency Portal-User Guide
Page 83 of 88
Trigger ID Work Task
Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data Elements to be
Tracked Upload? Issuance?
End Point of The Task (i.e. Document to be generated,
action completed,
etc.)
If document needs to be
generated as an end point,
provide template
name
Approval
5-5 Issue Final Documents
M ERU Engineer
4 Y Y
-Plans and Specs Approval Letter -Streamline Design Approval
HOP Ch 5 - Attachment 4b WPC Plans and Specs Approval Letter
10.4.3.2.3 Funding Phase
Trigger ID Work Task
Name
Optional /
Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data
Elements to be Tracked
Upload? Issuance?
End Point of The Task (i.e.
Document to be generated,
action completed, etc.)
If document needs to be generated as
an end point, provide template
name
Loan Application Submitted
1 Milestone: Loan Application Review
1-1 Loan Application Completeness Review
M GLU PM 1 LA Complete? Y/N
N N
1-2 PA Loan Application Review
M PA 2
CEOS Agency Portal-User Guide
Page 84 of 88
Trigger ID Work Task
Name
Optional /
Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data
Elements to be Tracked
Upload? Issuance?
End Point of The Task (i.e.
Document to be generated,
action completed, etc.)
If document needs to be generated as
an end point, provide template
name
1-3 DOLA Loan Application Review
M DOLA 2
2 Milestone: Credit Report Finalized
2-1 Prepare Draft Credit Report
M DOLA 3 Y Y WPCRF Credit Report
DOLA - WPCRF Credit Report Template.pdf
2-2 GLU Draft Credit Report Review
M GLU PM 4 N N
2-3 PA Draft Credit Report Review
M PA 4 N N
2-4 Finalized Credit Report
M DOLA 5 Y N WPCRF Credit Report
DOLA - WPCRF Credit Report Template.pdf
2-5 SRF Committee Meeting
M GLU PM, PA, DOLA
6
Financial Credit Report Accepted? Y/N
Y Y Final Credit Report
3 Milestone: Board Meeting Approval
3-1 Authority Board Meeting
M GLU PM, PA, DOLA
7 Loan Approved? Y/N
N N
3-2
Prepare Draft Loan Approval Letter and Loan Agreement
M PA 8 Y Y
-WPCRF Approval Letter -WPCRF Draft Loac Agreement -WPCRF Directory -WPCRF Cover
CWRPDA - WPCRF Approval Letter.doc; CWRPDA - WPCRF Exhibit C - 3.5% Template.xls; CWRPDA - WPCRF
CEOS Agency Portal-User Guide
Page 85 of 88
Trigger ID Work Task
Name
Optional /
Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data
Elements to be Tracked
Upload? Issuance?
End Point of The Task (i.e.
Document to be generated,
action completed, etc.)
If document needs to be generated as
an end point, provide template
name
Letter Draft Loan Agreement - DL 2%.doc; CWRPDA - WPCRF Directory.doc; CWRPDA - WPCRF Cover Letter.doc
3-3
Issue Final Loan Approval Letter and Loan Agreement
M PA 9 Y Y
-WPCRF Approval Letter -WPCRF Draft Loac Agreement -WPCRF Directory -WPCRF Cover Letter
CWRPDA - WPCRF Approval Letter.doc; CWRPDA - WPCRF Exhibit C - 3.5% Template.xls; CWRPDA - WPCRF Draft Loan Agreement - DL 2%.doc; CWRPDA - WPCRF Directory.doc; CWRPDA - WPCRF Cover Letter.doc
4 Milestone: Loan Execution
4-1 PA Loan Closing Review
M PA 10 N N
4-2 GLU Loan Closing Review
M GLU PM 10 N N
4-3 DOLA Loan Application Review
M DOLA 10 N N
4-4 Loan Execution M GLU PM 11 N N
CEOS Agency Portal-User Guide
Page 86 of 88
Trigger ID Work Task
Name
Optional /
Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data
Elements to be Tracked
Upload? Issuance?
End Point of The Task (i.e.
Document to be generated,
action completed, etc.)
If document needs to be generated as
an end point, provide template
name
4-5
Issue fully executed loan agreement and supporting docs
M PA 12 Y Y
-WPCRF Final Execution Letter -WPCRF Final Loan Agreement
[ENTITY NAME] - WPCRF Final Execution Letter.doc; [ENTITY NAME] – WPCRF Final Loan Agreement.PDF;
10.4.3.2.4 Construction Phase
Trigger ID Work Task
Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data
Elements to be
Tracked
Upload? Issuance?
End Point of The Task (i.e.
Document to be generated, action completed, etc.)
If document needs to be
generated as an end point,
provide template name
Pre-Bid Documents Submitted
1 Milestone: Bid Solicitation Review
1-1 Pre-Bid Document Review
M GLU PM 1 N N
1-2 Pre-Bid Meeting M GLU PM 2 N N
(Pre-Bid Meeting doc attached)
1-3 Pre-Bid Meeting Document Review
M GLU PM 3 N N
(Bid tabulation attached)
1-4 Bid Tabulation Review
M GLU PM 4 N N
CEOS Agency Portal-User Guide
Page 87 of 88
Trigger ID Work Task
Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data
Elements to be
Tracked
Upload? Issuance?
End Point of The Task (i.e.
Document to be generated, action completed, etc.)
If document needs to be
generated as an end point,
provide template name
(Contracting Documents attached)
1-5 Bidding Final Review
M GLU PM 5 Y N
Project Manager SRF Bid Documents Checklist
HOP Ch 8 - Attachment 1 Project Manager SRF Bid Documents Checklist.docx
Pay Request Submitted
2 Milestone: Pay Requests
2-1 GLU Pay Request Review
M GLU PM 1 N N
2-2 PA Pay Request Review
M PA 2 N N
2-3 Issue Verification Letter
M PA 3 Y Y Verification Letter
Change Order Request Submitted
3 Milestone: Change Orders
3-1 ERU Change Order Review
M ERU Engineer
1 N N
3-2 GLU Change Order Review
M GLU PM 1 N N
3-3 Prepare Change Order Approval Letter
M GLU PM 2 Y N CO Approval Letter
3-4 Issue Change Order Approval Letter
M GLU PM 3 Y Y CO Approval Letter
4 Milestone: Inspections
CEOS Agency Portal-User Guide
Page 88 of 88
Trigger ID Work Task
Name Optional / Mandatory
Role Assignment
Seq. Default
Duration (Days)
Special Data
Elements to be
Tracked
Upload? Issuance?
End Point of The Task (i.e.
Document to be generated, action completed, etc.)
If document needs to be
generated as an end point,
provide template name
4-1 Construction Interim Inspection 1
O GLU PM, ERU Engineer
1 Y Y PM Inspection Letter
HOP Ch 10 - Attachment 2 PM Inspection Letter.docx
4-2 Construction Interim Inspection 2
O GLU PM, ERU Engineer
1 Y Y PM Inspection Letter
HOP Ch 10 - Attachment 2 PM Inspection Letter.docx
4-3 Construction Interim Inspection 3
O GLU PM, ERU Engineer
1 Y Y PM Inspection Letter
HOP Ch 10 - Attachment 2 PM Inspection Letter.docx
4-4 Construction Interim Inspection 4
O GLU PM, ERU Engineer
1 Y Y PM Inspection Letter
HOP Ch 10 - Attachment 2 PM Inspection Letter.docx
(30 days prior to Construction completion or 90% complete)
5 Milestone: Final Inspection
5-1 Construction Final Inspection
M GLU PM, ERU Engineer
1 Y Y Final Inspection Letter
6 Milestone: Project Closeout
6-1 Project Closeout
M GLU PM 1 N N