COLORADO BOULEVARD RECONSTRUCTION Existing Site COLORADO BOULEVARD RIVERSIDE DRIVE MINER STREET 23rd AVENUE

Upload: others

Post on 14-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: COLORADO BOULEVARD RECONSTRUCTION Existing Site · Rafting parking is shown as short term along Colorado Blvd., west of 23rd Ave. Road pavement area represented along Colorado (highlighted

COLORADO BOULEVARD RECONSTRUCTION

Existing Site

COLORADO BOULEVARD

RIVERSIDE DRIVE

MINER STREET

23rd

AV

EN

UE

Page 2: COLORADO BOULEVARD RECONSTRUCTION Existing Site · Rafting parking is shown as short term along Colorado Blvd., west of 23rd Ave. Road pavement area represented along Colorado (highlighted

COLORADO BOULEVARD RECONSTRUCTION

Least contiguous park space

~1.2 acres to the north of Colorado Blvd.

~1 acre to the south of Colorado Blvd.

Parking (125 spaces)

Visitors Center parking lot is expanded to show 44 spaces

On-street parking for the park is shown with a combination of parallel and angled parking: 80 spaces

This parking can be relocated off -street to the green space to the southeast. This could allow for the

park space along the creek to grow.

Rafting parking is shown as short term along Colorado Blvd., west of 23rd Ave.

DESIGN CONCEPT SITE STATISTICS

Colorado Boulevard Stays in Place

POTENTIAL NEW BRIDGE

ANGLE PARKING (28)

EXISTING PARALLEL PARKING (25)

PLAY

GREENWAYTRAIL

GREENWAYTRAIL

PLAZA

EXISTING RAFTPUT-IN

EXISTING HIGH WATER RAFT PUT-IN

PARALLELPARKING

PARALLELPARKING

(SHORT TERM LARGE VEHICLE)

EXPANDED VISITORS CENTER PARKING LOT

(44)

MINER STREET

ONE WAY

Road pavement area represented along Colorado (highlighted in white), intersection of Miner and

Colorado, one way and exit route of Miner and Visitors Center parking

Approximately 2 acres

Miner St. becomes one way, east of the Visitors Center

Does not create a gateway

Least pedestrian and bike friendly option

Page 3: COLORADO BOULEVARD RECONSTRUCTION Existing Site · Rafting parking is shown as short term along Colorado Blvd., west of 23rd Ave. Road pavement area represented along Colorado (highlighted

COLORADO BOULEVARD RECONSTRUCTION

Most contiguous park space

~2.4 acres

Buff er space shown between Miner St. and Colorado Blvd.: 0.4 acres

Parking (92 spaces)

Visitors Center parking lot is expanded to show 26 spaces

On-street parking for the park is shown with a combination of parallel and angled parking: 66 spaces

Rafting parking is shown as relocated to the north side of the creek

Relocate Colorado Boulevard with ‘T’-Intersection

POTENTIAL NEW BRIDGE

36 SPACES

5 SPACES

PLAY

GREENWAYTRAIL

GREENWAYTRAIL

RAFTINGBUS PARKING

PARALLELPARKING (5)

ANGLEDPARKING (20)

VISITORS CENTER (26)

MINER STREET

ONE WAY

DESIGN CONCEPT SITE STATISTICSRoad pavement area represented along Colorado (highlighted in white), intersection of Miner and

Colorado, one way and exit route of Miner and Visitors Center parking

Approximately 1.6 acres

Miner St. becomes one way, east of the Visitors Center

New road alignment will slow traffi c

Creates a gateway

Pedestrian and bike friendly

EXISTING RAFTPUT-IN

EXISTING HIGH WATER RAFT PUT-IN

Page 4: COLORADO BOULEVARD RECONSTRUCTION Existing Site · Rafting parking is shown as short term along Colorado Blvd., west of 23rd Ave. Road pavement area represented along Colorado (highlighted

COLORADO BOULEVARD RECONSTRUCTION

Contiguous park space

~2 acres

Parking (93 spaces)

Visitors Center Parking Lot is expanded to show 27 spaces

On-street parking for the park is shown as parallel parking: 28 spaces

Off -street parking for the park is shown with 38 spaces

Rafting parking is shown as short term along Colorado Blvd., west of 23rd Ave.

Road pavement area represented along Colorado (highlighted in white), roundabout at Miner and

Colorado, one way and exit route of Miner and Visitors Center parking

Approximately 2.1 acres

Miner St. becomes one way, east of the Visitors Center

Best pedestrian and bike safety option

Creates a strong gateway

Relocate Colorado Boulevard with Round About

POTENTIAL NEW BRIDGE

38 SPACES

PLAY

GREENWAYTRAIL

VISITORS CENTER (27)

MINER STREET

ONE WAY

DESIGN CONCEPT SITE STATISTICS

EXISTING RAFTPUT-IN

EXISTING HIGH WATER RAFT PUT-IN

PARALLELPARKING

PARALLELPARKING

(SHORT TERM LARGE VEHICLE)

Page 5: COLORADO BOULEVARD RECONSTRUCTION Existing Site · Rafting parking is shown as short term along Colorado Blvd., west of 23rd Ave. Road pavement area represented along Colorado (highlighted

COLORADO BOULEVARD RECONSTRUCTION

Relocate Colorado Boulevard with Full Intersection at 23rd Avenue

POTENTIAL NEW BRIDGE

PLAY

GREENWAYTRAIL

34 SPACES

VISITORS CENTER (15)

MINER STREET

ONE WAY

DESIGN CONCEPT SITE STATISTICSContiguous park space

~1.8 acres

Parking (72 spaces) - least effi cient

Visitors Center parking lot is expanded to show 15 spaces

On-street parking for the park is shown as parallel parking: 23 spaces

Off -street parking for the park is shown with 34 spaces

Rafting parking is shown as short term along Colorado Blvd., west of 23rd Ave.

Road pavement area represented along Colorado (highlighted in white), intersection of Miner,

23rd and Colorado, one way and exit route of Miner and Visitors Center parking

Approximately 1.8 acres

Miner St. becomes one way, east of the Visitors Center

Good pedestrian and bike safety

Creates a strong gateway

EXISTING RAFTPUT-IN

EXISTING HIGH WATER RAFT PUT-IN

PARALLELPARKING