Colchester Local Highway Panel Meeting Agenda Date: Wednesday 18 th June 2014 Time 18.00 hrs Public Meeting - Grand Jury Room Chair Panel Members Other Attendees CC Member Anne Brown/Colchester Cllr Nick Barlow CC Member Kevin Bentley, CC Member Julie Young, CC Member Sue Lissimore, Colchester Cllr Lesley Scott-Boutell, Colchester Cllr Theresa Higgins, Colchester Cllr William Quince, Parish Cllr John Gili-Ross ECC Officer Alan Lindsay Strategy & Engagement Manager, ECC Officer, Rob Macdonald Highways Liaison Officer, Secretariat: TBC Remaining budget: £514,525 Time Item Lead: Papers: 1 Welcome and Introductions – composition of the LHP Chair Verbal 2. Declarations of Interest All Verbal 3. Minutes of meeting held on 9th April 2014 to be agreed as correct record Chair Attached 4 University to Wivenhoe Cycle Link All Verbal 5 Casualty Reduction schemes All Verbal 6 Potential Schemes for consideration of Panel Improvement schemes Small Works Bus Stop Improvements Cycling PROW All Attached 7 Passenger Transport Infrastructure 8. Colchester District Approved Scheme List - Any queries please contact [email protected] All attached 9. AOB All Verbal 10. Date of next meetings: September 10 th Private December 3 rd Public March TBC 2015 Private All Verbal Public question time: Immediately after the minutes of the previous meeting have been approved there will be a period of up to 15 minutes when members of the public can speak for up to three minutes on items on the agenda. Members of public wishing to speak should contact Rob Macdonald by e-mail [email protected] or 0845 6037631 prior to the meeting.

Upload: hanga

Post on 02-Sep-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Colchester Local Highway Panel Meeting Agenda · Colchester Local Highway Panel Meeting Agenda . Date: Wednesday 18. th. ... Reduce the carriageway width on the south-west bound approach

Colchester Local Highway Panel Meeting Agenda

Date: Wednesday 18th June 2014 Time 18.00 hrs Public Meeting - Grand Jury Room

Chair

Panel Members

Other Attendees

CC Member Anne Brown/Colchester Cllr Nick Barlow CC Member Kevin Bentley, CC Member Julie Young, CC Member Sue Lissimore, Colchester Cllr Lesley Scott-Boutell, Colchester Cllr Theresa Higgins, Colchester Cllr William Quince, Parish Cllr John Gili-Ross ECC Officer Alan Lindsay Strategy & Engagement Manager, ECC Officer, Rob Macdonald Highways Liaison Officer, Secretariat: TBC

Remaining budget: £514,525

Time Item Lead: Papers:

1 Welcome and Introductions – composition of the LHP Chair Verbal

2. Declarations of Interest All Verbal

3. Minutes of meeting held on 9th April 2014 to be agreed as correct record

Chair Attached

4 University to Wivenhoe Cycle Link All Verbal

5 Casualty Reduction schemes

All Verbal

6 Potential Schemes for consideration of Panel Improvement schemes Small Works Bus Stop Improvements Cycling PROW

All Attached

7 Passenger Transport Infrastructure

8. Colchester District Approved Scheme List - Any queries please contact [email protected]

All attached

9. AOB All Verbal

10. Date of next meetings:

September 10th Private

December 3rd Public

March TBC 2015 Private

All Verbal

Public question time: Immediately after the minutes of the previous meeting have been approved there will be a period of up to 15 minutes when members of the public can speak for up to three minutes on items on the agenda. Members of public wishing to speak should contact Rob Macdonald by e-mail [email protected] or 0845 6037631 prior to the meeting.

Page 2: Colchester Local Highway Panel Meeting Agenda · Colchester Local Highway Panel Meeting Agenda . Date: Wednesday 18. th. ... Reduce the carriageway width on the south-west bound approach

Capital Highway Improvements Programme Colchester Safety Schemes

ID LocationProblem

Proposed Solution Cost (£)

LCOL131020

B1022 Maldon Road j/w Braxted Park Road

pattern of collisions involving vehicles turning right into Braxted Park Road.

Undertake options study with RSE into junction redesign. Outline Design (£15,000) and studys (Ecology, Topo and trial holes) £12,000 £27,000

LCOL131025

Brinkley Grove roundabout with Gavin Way, Brinkley Grove

A study of the Personal Injury Collision data for the period from 01/05/2008 to 31/08/2013 at this location

shows that there have been 4 Personal Injury Collisions, including one serious and three slight,

resulting in one serious and three slight casualties.

i)Reposition the eastbound ‘roundabout ahead’ sign to diagram 610, so that it is located further west along Brinkley Grove Road; ii)Reposition the

westbound ‘roundabout ahead’ sign to diagram 610, so that it is located further east along Brinkley Grove Road, prior to the bend in the road as indicated in photo 2. iii)Provide ‘distance ahead to hazard’ sub-plate to diagram 572 for each repositioned ‘roundabout ahead’ warning sign,

iv)Undertaken vegetation removal on the westbound nearside of Brinkley Grove Road in order to improve the forward visibility of both the roundabout

and ‘roundabout ahead’ warning sign. Preliminary Design and

Investigation Cost £3,000 previously agreed

Detailed Design and

Scheme Build Cost £13,000

LCOL131026

Gosbecks Road / Layer Road / Berechurch Hall

Road

A study of the Personal Injury Collision data for the period from 01/05/2008 to 31/08/2013 at this location

shows that there have been 7 Personal Injury Collisions, including two serious and five slight, resulting in two serious and six slight casualties.

i)Reduce the carriageway width on the south-west bound approach to Layer Road / Gosbecks Road roundabout to a single vehicle capacity at the give-

way line, by increasing the central hatched areas adjacent to the centre island; ii)Reduce the carriageway width on the south-west bound approach

to Layer Road / Berechurch Hall Road roundabout to a single vehicle capacity at the give-way line, but increasing the central hatched areas adjacent to the centre island; and iii) Increase the diameter of the mini

roundabout dome markings and circulatory arrows to diagram 1003.4 at both mini roundabouts; iv)Refresh the give-way markings to diagram 1003.1

on each approach, v)Undertake carriageway resurfacing throughout both mini-roundabouts Preliminary Design and Investigation Cost £5,000

previously agreed

Detailed Design and

Scheme Build Cost £32,000

LCOL131024

A1124 Essex Yeomanry Way / Eight Ash Green

Interchange

A study of the Personal Injury Collision data for the period from 01/05/2008 to 31/08/2013 at this location

shows that there have been 26 Personal Injury Collisions, including one serious and 25 slight,

resulting in one serious and 30 slight casualties.

i)      Install a new yellow backed chevron sign (with an increased yellow reflectivity border) for northbound road users on the A1124 approaching the roundabout circulatory. This sign is to be positioned further east within the

roundabout island. ii)Remove vegetation on the A1124 northbound nearside approach to roundabout circulatory in order to increase the forward visibility of the nearside lane give-way markings. iii)Remove vegetation from within the southeast quadrant of the centre island of the roundabout. Preliminary

Design and Investigation Cost £3,000 previously agreed

Detailed Design and

Scheme Build Cost £15,500

LCOL141003

Colchester sites - yet to be confirmed

Preliminary Design and Investigation Cost for 2015/16 schemes Design work and investigation required to produce schemes for 2015-16 £20,000

Total £107,500

Printed on 11/06/2014 Page 1 of 11

Page 3: Colchester Local Highway Panel Meeting Agenda · Colchester Local Highway Panel Meeting Agenda . Date: Wednesday 18. th. ... Reduce the carriageway width on the south-west bound approach

Capital Highway Improvements Programme Colchester Improvement Schemes

ID Location Scheme Problem Justification / Comments

Requeste

d By

Estimated

Cost (£)

LCOL132093

Abberton Road, Fingringhoe

buffer zone of 40mph - two terminal signs and junction warning sign and

TROrestricted visibility and speed

. A speed survey was carried out on Fri 31st Jan 2014 at the speed limit change for a total duration of 7 days. It was found the average speed of north bound traffic was 46.3mph and the average speed for south bound traffic was 37.3mph. The survey shows that a buffer

zone of 40mph is warranted.

Fingringhoe Parish Council

£3,000

LCOL142061

London Road Copford Zebra Crossing

difficulties in crossing the busy London Road and wish to

encourage children from both parts of the Village to use the

recreational facilities

PV2 survey shows that there are adequate numbers of pedestrians crossing at this location to warrant a zebra crossing. There is an existing pedestrian refuge in the

desired crossing point area. we should convert that for use as a zebra crossing. Street lighting would need to

be increased in the area to conform to standards

Cllr McLean

and Easthorpe Parish Council

£35,000

LCOL132022 Roach Vale 20mph

Request for 20 mph in Roach Vale – speed results highlight low speeds. petition submitted at full

council on 14 May 2013

Southbound traffic average speed over 7 days: 18.4mph, Northbound traffic average speed over 7

days: 17.8mph Good speed compliance however 20mph can be installed.

Cllr Higgins £12,200

LCOL132081

West Bergholt: Roads around

Heathlands Primary School

To install 20mph limits

The local community are of the opinion that a formal 20mph limit would have the effect of further

ensuring that motorists notice and take heed of the potential

dangers.

Speed survey data shows that average speeds fall below 20mph in the area

Cllr Willets £7,000

Printed on 11/06/2014 Page 2 of 11

Page 4: Colchester Local Highway Panel Meeting Agenda · Colchester Local Highway Panel Meeting Agenda . Date: Wednesday 18. th. ... Reduce the carriageway width on the south-west bound approach

Capital Highway Improvements Programme Colchester Improvement Schemes

ID Location Scheme Problem Justification / Comments

Requeste

d By

Estimated

Cost (£)

LCOL142024

Bowes Road and Broome

Grove, Wivenhoe

20 mph

There is a high presence of vulnerable road users at both

Bowes Road and Broome Grove. Neither school has a crossing patrol immediately outside the

schools.

BOWES ROAD : Westbound mean speed is 21.4 mph, Eastbound mean speed is 21.3 mph - BROOME GROVE : Northbound mean speed is 21.5 mph,

Southbound mean speed is 19.1 mph - The mean speeds for the areas suggest that the speed of vehicles

falls within the boundaries of a 20 mph zone.

Cllr Kay, Wivenhoe

Town Council

£10,000

LCOL142002

London Rd junction Lucy Lane South

Redesign very busy area - feasibility study

perceived accident hot spot—numerous shunts as well

as witness by the school Crossing Patrol

It is recommended that a feasibility study be carried out. SA2000 would need to be involved with regards to the possibility of traffic signals as they would need to do

modelling work to see how effective a signalled junction would be and what the effects would be on localised

congestion.

Cllr Scott-Boutell £5,000

LCOL144002

North End of Brinkley Grove

Road/Mill Road/

Feasibility study into Safe cycle route from Myland School along Mill Road to

Brinkley Grove Road for the Gilberd School.

safety concerns

It is recommended that a feasibility study is carried out with regard to the potential of a cycle route along

Brinkley Grove road and looking into the possibility of providing something safe for cyclists to use along Mill

Road although this may be harder to achieve along this busy road as space is limited. Footway works between Squirrel Field and Bedford Road cannot be carried out

as it is on country parks land.

Cllr Goss £4,000

Printed on 11/06/2014 Page 3 of 11

Page 5: Colchester Local Highway Panel Meeting Agenda · Colchester Local Highway Panel Meeting Agenda . Date: Wednesday 18. th. ... Reduce the carriageway width on the south-west bound approach

Capital Highway Improvements Programme Colchester Improvement Schemes

ID Location Scheme Problem Justification / Comments

Requeste

d By

Estimated

Cost (£)

LCOL134006 Cymbeline Way Surface applied balotine in the lining

material to increase reflectivity difficult to see cycle route

The method of applying the lining will likely be hand laid so it is possible that an even, straight line would be hard

to achieve. The panel should consider that any lining installed will be a future maintenance liability as the

edges of the verge do encroach onto the track and may cover the lining. The lining may become slippery when

wet

Cllr Scott-Boutell £6,000

LCOL142026

Meyrick Crescent speed humps (x6)

it is felt that traffic passes by much too fast - speeding traffic

and school children use this road.

A speed survey has been requested to ensure that speeding cars are an issue. Residents should be

consulted before design is carried out. They should be made aware that installing speed humps will increase

noise in the area and may damage properties over time.

Cllr Harris £35,000

LCOL142018

B1023 through Inworth Installation of village Gateways

The Parish feel that this particular area is an ‘accident black spot’

and enhancing the gateway entrances would be a great

assistance to changing driver behaviour.

it is also recommended that the signage be raised above the existing level so as to avoid encroachment by

future vegetation growth.

Messing cum

Inworth Parish Council

£11,000

Printed on 11/06/2014 Page 4 of 11

Page 6: Colchester Local Highway Panel Meeting Agenda · Colchester Local Highway Panel Meeting Agenda . Date: Wednesday 18. th. ... Reduce the carriageway width on the south-west bound approach

Capital Highway Improvements Programme Colchester Improvement Schemes

ID Location Scheme Problem Justification / Comments

Requeste

d By

Estimated

Cost (£)

LCOL142008 Wellesley Road to remove brick central reservation and

install an anti-pedestrian barrier:

pedestrians are crossing the dual carriageway at the end of

Wellesley Road

As the brick central reservation does not run along a straight line it is recommended to be removed, along with the bushes in the central reservation. There are

stats present in the central reservation and this will add to the costs, it is unclear as to what effect it will have on

the overall costs of the scheme. Estimated cost to remove brick central reservation: £25,000, Estimated cost of installing an anti-pedestrian barrier: £20,000 Design Costs: £5,000 (including increased Traffic

management costs)

Cllr Lissimore £50,000

LCOL132085

Butt Road (coming up

either Beaconsfield or Salisbury Aves.)

Zebra Crossing no crossing point Top up required due to changes to the street lighting

Cllr Sue Lissimore/Councillo

r Nick Cope/Cllr

Hunt

£11,000

LCOL132042

Drury Arms, Shrub End, Colchester

extension of traffic island, repositioning KLB and additional lining improvements

to assist drivers in aligning long vehicles.

long vehicles turning right from Layer Road

Evidence of kerbing damaged caused by overrunning vehicles. Feasibility waiting for the results of a topo

survey - implementation estimateCllr Lucas £6,500

Printed on 11/06/2014 Page 5 of 11

Page 7: Colchester Local Highway Panel Meeting Agenda · Colchester Local Highway Panel Meeting Agenda . Date: Wednesday 18. th. ... Reduce the carriageway width on the south-west bound approach

Capital Highway Improvements Programme Colchester Improvement Schemes

ID Location Scheme Problem Justification / Comments

Requeste

d By

Estimated

Cost (£)

LCOL132040

Straight Road/Langham Road/Pepper Road Junction

Add Cross Road sign, 2) Add carriageway SLOW marking

Project to stop dangerous emerge incidents onto Straight

Road Boxted

The matter was discussed at Neighbourhood Development Plan Committee meeting and it was

agreed that these are dangerous junctions which need attention. Design previously recommended

Boxted Parish Council

£6,200

LCOL132084

Severalls Lane near the

Honorius drive bus stop

Pedestrian Refuge & Footway Works - Design previously approved

number of residents concerned about difficulties crossing the

road, Local residents believe that highway safety is compromised

by the lack of safe crossing

October 2103; Survey analysis – 12hr Mean Speed is 35.0mph and 12hr 85%ile speed is 40.5mph, October

2103 PV2 analysis; Severalls Lane near Honorius Drive – PV2 crossing criteria not met due to high speeds;

however a pedestrian refuge can be installed. County Councillor Anne Turrell supports this application

Cllr Oxford £25,000

LCOL132036

Stanway Garage Zebra Crossing, London Road,

Stanway

Add Pedestrian Crossing signs. Design Complete visibility and crossing

Site location with good visibility. Top up required - owing receipt of the stats I will need to undertake trial hole for this scheme along with the sign needing to mounted on a separate pole (as it can not be attached to the lamp

column)

Cllr Scott-Boutell £1,100

Printed on 11/06/2014 Page 6 of 11

Page 8: Colchester Local Highway Panel Meeting Agenda · Colchester Local Highway Panel Meeting Agenda . Date: Wednesday 18. th. ... Reduce the carriageway width on the south-west bound approach

Capital Highway Improvements Programme Colchester Improvement Schemes

ID Location Scheme Problem Justification / Comments

Requeste

d By

Estimated

Cost (£)

LCOL142063

Layer Bridge, Layer de la Haye

advertising and then implementation (pending the statutory process) of a

reduction in speed limit and feasibility and design to improve awareness of the Bridge and bend and the need to check

speeds further

speed of vehicles. number of accidents including driving into

the property of people along the road

The speed survey was undertaken 340m south of Berechurch Road and shows average speeds to be 41 MPH. This indicates that drivers feel that 40mph is an

appropriate speed to be travelled. I would like to undertake a speed survey at the southern end just to ensure drivers have not increased their speeds as we

have had several collisions on the bridge structure in the last few years and this information will help inform what

improvements should be made to ensure drivers are informed of the need to slow and take the bend with the

bridge at a slower speed

Cllr Bentley £20,000

LCOL133001

Land Lane, Colchester

dropped kerb, there is a dropped kerb at the end of Land Lane, there is no

dropped kerb opposite

people with walking aids are faced with the difficulty of

negotiating the kerb on a difficult bend and those with mobility

scooters are forced to drive along the roadway rather than the

footpath

Design previously agreed Cllr Higgins £3,250

LCOL142064

Tesco at The Hythe

Colchester

investigation into the signals and how they are operating

concerns raised about the sequences of lights and

congestion

an initial check completed and confirmation that the site is operating as designed without faults . we need to fully investigate the situation and understand any potential

impact

Cllr Young £2,000

Total: £253,250

Printed on 11/06/2014 Page 7 of 11

Page 9: Colchester Local Highway Panel Meeting Agenda · Colchester Local Highway Panel Meeting Agenda . Date: Wednesday 18. th. ... Reduce the carriageway width on the south-west bound approach

Capital Highway Improvements Programme Colchester Small Works

ID Location Scheme Other issues / commentsRequested

By

Estimated

Cost

LCOL142019 Mill Road towards Maximus Drive. speed survey for VAS Cllr Goss £210

LCOL142021 Goojerat Road/ Circular Road West PV2 for crossing consideration Cllr Barton £890

LCOL142022 A1124 Eight Ash Green speed survey for VAS Cllr Harrington £210

LCOL142026 Meyrick Crescent speed survey for traffic calming consideration Cllr Harris £210

LCOL142027 Spring Lane & cul-de-sacs off , Eight Ash green two speed surveys for 20 mph consideration Cllr Willits £420

LCOL142029 Berechurch Road speed survey for traffic calming considerationfrom the junction with Gurdon Road to junction with Chariot

Drive

Cllr Harris and Sir Bob Russell MP

£210

LCOL142059 Berechurch Road / Chariot Drive PV2 for crossing consideration Cllr Harris £890

LCOL142062 Broman’s Road, East Mersea speed survey for 20mph consideration Cllr Bentley £210

LCOL142065 Whitehall Hall Road/Old Heath road PV2 for crossing consideration Cllr Young £890

Total: £4,140

Printed on 11/06/2014 Page 8 of 11

Page 10: Colchester Local Highway Panel Meeting Agenda · Colchester Local Highway Panel Meeting Agenda . Date: Wednesday 18. th. ... Reduce the carriageway width on the south-west bound approach

Capital Highway Improvements Programme Colchester Bus Stop improvements

ID

LCOL145013

Sainsbury store, Stanway 3308502A

2 back to back RTPI signs o/s the new Sainsbury store

Stanway, visible from each passenger shelter.

new bus layby and shelter due to volume of passenger RTPI improve the stop and

facilities

Passenger Transport £17,000

LCOL145014 Iceni way

request from 2 bay passenger shelter at

this location

large number of residents waiting for a bus with no

protection from the elements Sir Bob Russell £5,000

Total £22,000

Scheme

Origination

Estimate

d CostLocation Details of Scheme

Issues / Comments /

Reason for Scheme

Printed on 11/06/2014 Page 9 of 11

Page 11: Colchester Local Highway Panel Meeting Agenda · Colchester Local Highway Panel Meeting Agenda . Date: Wednesday 18. th. ... Reduce the carriageway width on the south-west bound approach

Capital Highway Improvements Programme Colchester Cycling

ID Location Scheme

Estimated

Cost (£)

1 LCOL144003 The Thomas Lord Audley School

60 cycle compound. The cycle scheme at The Thomas Lord Audley School has been a huge success increasing numbers by

over 600% Request for another cycle compound as current shelter is bursting with bikes

£11,075

Printed on 11/06/2014 Page 10 of 11

Page 12: Colchester Local Highway Panel Meeting Agenda · Colchester Local Highway Panel Meeting Agenda . Date: Wednesday 18. th. ... Reduce the carriageway width on the south-west bound approach

Capital Highway Improvements Programme Colchester PROW

ID Location Scheme Problem

Justification / Comments

P

r

i

o

r

i

Request

ed By

Cost (£)

LCOL148002

Junction of East Donyland FP2

and 2Colchester FP163

Install bridge footbridge (6-8

metres) and boardwalk and

steps approx. 50 metres

As this is a chronically wet area standing mud over a foot deep discourages even the most hardy walkers from attempting to follow this PROW which should be an important link between Colchester and East Donyland

Reinstating the crossing over the brook will help to join up areas that are extremely well

used by local walkers

PROW Team £7,500

LCOL148003

Birch - Footpath 19, Bridleway 23,

Bridleway 36, Bridleway 35

Drainage, vegetation

clearance, bridge, reinstatement or

diversion

very poor drainage caused by local springs and heavy standing mud for much of the year. This has led to accidents and harm to walkers and

riders.

To reinstate the official line would require installing a surface or boardwalk that would accommodate horses as well as significant vegetation clearance. Improvements to this network would greatly enhance an extremely popular area which would provide excellent walks and rides in a wooded area. At the moment this can only be enjoyed during a few summer months. These PROW link in to paths that connect with the SUSTRANS

network as well as routes to Colchester Zoo.

PROW Team £10,000

Total £17,500

Printed on 11/06/2014 Page 11 of 11

Page 13: Colchester Local Highway Panel Meeting Agenda · Colchester Local Highway Panel Meeting Agenda . Date: Wednesday 18. th. ... Reduce the carriageway width on the south-west bound approach

Key: Cancelled schemes

Completed schemes

Design

Reference

Number

Task Name Finish CMA approved Cost Code Works Description Allocated Budget

DC1225 Ipswich Road at crossing Sth of Dilbridge Rd west 21/11/12 17/07/12 LCOL001007 High friction surfacing. Guardrail, lining. £23,500.00

DC1219 B1022 Tiptree to Colchester 31/10/13 17/07/12 LCOL001001 Surface improvements. Road markings. £34,750.00

DC1222 B1025 Mersea Road nr Meyrick Crescent_ Colchester Thu 02/05/13 17/07/12 LCOL001004 Improvements to crossing. £22,800.00

DC1224 A1232 Ipswich Road j_w A133 Cowdray Avenue Colchester 25/03/13 17/07/12 LCOL001006 Improvements to crossing and surfacing £60,000.00

DC1221 A133 Cowdray Avenue j_w North Station Road_ColchesterTo be

programmed17/07/12 LCOL001003 Signing and lining, improvements to cycle links. £20,000.00

DC1223 A137 Harwich Road j_w Goring Road ColchesterTo be

programmed17/07/12 LCOL001005

Warning signs at Goring Road and improvements to

crossing.£27,000.00

DC1220 Balkerne Hill_ Southway south and west bound approaches to RAB 26/11/13 17/07/12 LCOL001002 Surface improvements. Road markings.

DC221 The Avenue_Wivenhoe 07/02/13 26/09/12 LCOL003001 Remedial works and final safety audit £2,000.00

DC1357O High Street _ Alma Street_ Wivenhoe 19/02/14 26/09/12 LCOL002003 A bollard £1,000.00

DC1358 Straight Road_ Boxted 09/09/13 26/09/12 LCOL001008 40m footway to link existing footway £75,000.00

DC1365A Parsons Heath Primary School A137 Harwich Road_ Colchester 10/02/14 26/09/12 LCOL006006 Installation of four bollards £1,770.00

DC1365B Kings Ford I and J School_ B1026 Layer Road, Colchester 10/02/14 26/09/12 LCOL006001 No advance warning of school - install £3,540.00

DC1365C St Teresas Primary_ Straight Road_ Colchester 10/02/14 26/09/12 LCOL006001Patrol warning sign in Heath Road 03X0C should have

right arrow£2,000.00

DC1365D Prettygate I and J School_ The Commons_ Colchester 10/02/14 26/09/12 LCOL006001Children/Patrol sign - replace plate with School

subplate£1,000.00

DC1365E A1232 Ipswich Road (nr Valentines Drive) Colchester 10/02/14 26/09/12 LCOL006001Removal of 2 school children/patrol and distance

subplates£3,000.00

DC1365F B1408 London Road_ Stanway 10/02/14 26/09/12 LCOL006001Complete removal of 2 school children/patrol

subplates£3,000.00

DC1367A Friers Grove _ Upland Drive_ Colchester 21/02/14 26/09/12 LCOL006002 Harden off area of verge £3,540.00

DC1367B Mersea Primary School_ Bardfield Road_ Mersea Island 21/02/14 26/09/12 LCOL006002 Dropped kerbs need to be aligned £2,950.00

DC1367C Old Heath Primary School_ Old Heath Road__Colchester 21/02/14 26/09/12 LCOL006002Prevent parking on footway close to crossing patrol

site£3,540.00

DC1367D Gosbecks Road_ Colchester 21/02/14 26/09/12 LCOL006002 Replace 2x Patrol subplates with 2x School subplates £1,000.00

DC1367E Layer-de-la-Haye Primary School_ High Road_ Layer-de-la-Haye 21/02/14 26/09/12 LCOL006002Relocate crossing point and install matching pair of

dropped kerbs/ tactile paving.  £5,900.00

DC1367F Hazelmere I and J School_ Hawthorne Avenue_ Colchester 21/02/14 26/09/12 LCOL006002 Reduce risk of visual impairement to pedestrians. £2,950.00

DC1367G Mildene Primary_ Maypole Road_ Tiptree 21/02/14 26/09/12 LCOL006002 Widen footway £3,540.00

DC1366G Port Lane _ Hythe Hill_ Colchester 25/03/13 26/09/12 LCOL005001 Bus stop improvements £3,000.00

DC1366 B St Ives Peldon 12/07/13 26/09/12 LCOL005001 Bus stop improvements £10,000.00

DC1366 H St Ives Peldon 12/07/13 26/09/12 LCOL005001 Bus stop improvements £5,000.00

DC1366C Roosevelt Way 31/07/13 26/09/12 LCOL005001 Bus stop improvements £4,500.00

DC1366E Tog Lane, Nayland Road Gt. Horkesley 31/07/13 26/09/12 LCOL005001 Bus stop improvements £6,260.00

DC1366I Elmwood Ave., Colchester 15/05/13 26/09/12 LCOL005001 Bus stop improvements £3,000.00

DC1366A B1022 Maldon Road_ Birch 06/03/13 26/09/12 LCOL005001 Bus stop improvements £12,000.00

DC1357A Boxted Road Colchester 05/03/14 26/09/12 LCOL002003 30 Mph repeaters x 3 £500.00

DC1357E Alresford Road_ Wivenhoe 05/03/14 26/09/12 LCOL002003 Slow markings and warning signs £5,000.00

DC1357K Mersea Road Colchester 14/03/14 26/09/12 LCOL002003 Relocate nsl sign - currently obscured by trees £500.00

DC1357L Moor Road j_w High Street_ Langham 17/03/14 26/09/12 LCOL002003 Give way sign £500.00

DC1357M Plummers Road_ Fordham 05/03/14 26/09/12 LCOL002003 New chevron and upgrade exsisting one £500.00

DC1357N The Lane_ West Mersea 14/03/14 26/09/12 LCOL002003 No entry markings - unsuitable for HGVs £1,000.00

DC1360 Berechurch Hall Road_ Colchester 11/04/14 26/09/12 LCOL003004 Kerbing and footway to Maypole Green £90,000.00

DC1362 Brinkley Grove Road _ Mill Road_ Colchester 01/10/14 26/09/12 LCOL002001 Junction Modification to improve bus access £50,000.00

DC1359 New Church Road_ West Bergholt 03/03/14 26/09/12 LCOL003003 Kerbed build-out to assist ped movements £15,000.00

DC1371 Bergholt Road_ Colchester - Stage 1 - Braiswick to North Station Cycle RouteTo be

programmed26/09/12 LCOL004004 Inadequate cycle parking £100,000.00

DC1368 Shrub End Road _ Maldon Road to Town Centre_ ColchesterTo be

programmed26/09/12 LCOL004001 Minor improvements to existing route £70,000.00

DC1369A Access to Marks tey Rail StationTo be

programmed26/09/12 LCOL003006 Walking £5,000.00

DC1357F Pudding Lane_ BirchTo be

programmed26/09/12 LCOL002003 Advisory Freight Route £4,000.00

DC1357B Doucecoft School_ Eight Ash GreenTo be

programmed26/09/12 LCOL002003 School signage £6,000.00

DC1357C Church Road_ Thorrington 21.05.14 26/09/12 LCOL002003 Children warning sign £4,000.00

DC1357D Grosvenor Place _ East Street _ColchesterTo be

programmed26/09/12 LCOL002003 Keep clear signs £2,000.00

DC1357H Layer Road_ AbbertonTo be

programmed26/09/12 LCOL002003 Dragons teeth and 30 mph roundel £2,500.00

DC1357I Lexden Road_ StanwayTo be

programmed26/09/12 LCOL002003 School warning signs x 2 £500.00

DC1357J Lexden Road __ Straight Road_ ColchesterTo be

programmed26/09/12 LCOL002003 Reposition existing lane sign £500.00

DC1363 Ransom Road_ Tiptree 12/05/14 26/09/12 LCOL132021 New footway, two lengths, approx 110m total £3,000.00

DC1357G B1027 Colchester Road,_Hythe (nr Essex University) 13/02/14 26/09/12 LCOL002003 Relocate traffic light ahead warning site £500.00

DC1357P Mersea Road (Barn Hall Estate Folly)_ Colchester 11/02/14 26/09/12 LCOL002003 Add bollard to cycle path £800.00

PROW Essex Way Mutton N/A 26/09/12 LCOL008001Hazardous road walking

£10,000.00

DC1366F Ireton Road Colchester N/A 26/09/12 LCOL005001 Bus stop improvements £3,000.00

DC1366D Tulip Walk N/A 26/09/12 LCOL005001 Bus stop improvements £2,000.00

DC1361 Berechurch Hall Road 2 Colchester N/A 26/09/12 LCOL003005 Widen footway west of Berefield Way £15,000.00

DC1364 Warren Lane _ B1022 Heckford Bridge 21/03/14 26/09/13 LCOL002002 Junction Improvement £10,000.00

DC1370 Northgate Street_ Colchester 21/03/14 26/09/12 LCOL004003 Inadequate cycle facilities £23,000.00

DC1369B Marks Tey Station 04/09/13 26/09/12 LCOL004002 Inadequate cycle parking £0.00

DC1495 Mersea Road, Langenhoe 12/02/14 02/10/12 LCOL005001 Bus stop improvements £3,000.00

DC1496 King Harold Rd.,Colchester N/A 02/10/12 LCOL005001 Bus stop improvements £3,000.00

DC1421 B1026 Colchester to Maldon 04/09/13 08/10/12 LCOL001008 Signage and centreline markings £65,000.00

Moor Road, Langham, Colchester 28/03/14 04/12/12 LCOL005001 Bus stop improvements £3,000.00

School Road, Langham 27/03/14 04/12/12 LCOL005001 Bus stop improvements £3,000.00

St Margaret's Cross, Langham 27/03/14 04/12/12 LCOL005001 Bus stop improvements £3,000.00

Chapel Road, Langham 28/03/14 04/12/12 LCOL005001 Bus stop improvements £3,000.00

Wick Road, LanghamTo be

programmed04/12/12 LCOL005001 Bus stop improvements £3,000.00

DC1713 Five Ways Junction 01/10/14 04/02/13 LCOL002006Road markings and to widen the kerb lines on

approach £25,000.00

DC1717 Fingringhoe Road_ Langenhoe 14/01/14 01/03/13 LCOL002011 Direction signs £500.00

DC1718 Salcott 04/02/14 01/03/13 LCOL002012 No through road signs £500.00

DC1712 Baronia Croft in Highwoods 19/02/14 01/03/13 LCOL001013 Swapping bollard for a collapsible / demountable type £3,000.00

DC1716 Tilehouse Lane from the A134 24/04/14 01/03/13 LCOL002010 Local direction sign £500.00

DC1768 West Bergholt - around Heathlands school - New Church Road 19/03/14 01/03/13 LCOL002004 Flat Top table at each end, £34,200.00

DC1714 Wivenhoe High Street (Quay end) 21/02/14 01/03/13 LCOL002007 Signage for lorries £10,000.00

DC1720 Lexden Road 30/05/14 01/03/13 LCOL006003 School warning signs and slow markings £700.00

Wood Lane j_w Fiddlers Hill Fordham Heath 30/05/14 01/03/13 LCOL001009 Double kerb lines £50,000.00

DC1715 School Road_ Monkwick 01/08/14 01/03/13 LCOL002008 Railings and restriction timings £20,000.00

DC1769 West Bergholt - around Heathlands school - School Lane 03/11/14 01/03/13 LCOL002005 Waiting restrictions. £13,200.00

DC1976 Colne Causeway / Tesco Roundabout 01/08/14 01/03/13 LCOL007001 Minor widening on approach £19,000.00

DC1721 Chapel Road, West BergholtTo be

programmed01/03/13 LCOL006004 School warning signs and slow markings £3,000.00

DC1722 Gazelle Court and Hunters Ridge junctions with ChinookTo be

programmed01/03/13 LCOL006005 Replace sign on lamp column £1,000.00

DC1711 The Strood connecting Mersea Island to the mainland FEASIBILITYTo be

programmed01/03/13 LCOL001012

Triangular 'Flood' warning signs on conventional posts

both sides£3,000.00

DC1921 Glen Avenue and A133 Cymbeline Way Colchester On Hold 01/03/13 LCOL001010 Extension of the exisitng traffic island, £38,000.00

Dyers Road On Hold 01/03/13 LCOL002009 Traffic Calming £6,000.00

Colchester District Approved Scheme List

2012/13 Budget Capital Schemes

\\CHESFS08\Highways\TransPlan\Programme Management\Local Highway Panels\East LHP\Scheme Update reports\Colchester updates\2014\LHP Colchester June V1

Page 14: Colchester Local Highway Panel Meeting Agenda · Colchester Local Highway Panel Meeting Agenda . Date: Wednesday 18. th. ... Reduce the carriageway width on the south-west bound approach

Design

Reference

Number

Task Name Finish CMA approved Cost Code Works Description Allocated Budget

150014013021, Yorick Road, West Mersea 31/03/14 04/09/13 LCOL135018Remove old old pole and replace with new

infrasturcture £750.00

150014013027,The Lawns, West Mersea 31/03/14 04/09/13 LCOL135019 Replace old pole and flag £750.00

150014013032, Underwoods Garage, West Mersea 31/03/14 04/09/13 LCOL135020 Old green pole replace with new £750.00

150014013033, The Fountain, West Mersea 20/12/14 04/09/13 LCOL135021Remove old old pole and replace with new

infrastructure £750.00

150014013035, East Mersea Road, West Mersea 20/12/14 04/09/13 LCOL135022Remove old old pole and replace with new

infrastructure £750.00

1500IM2487,Mill road Corner,West Mersea 20/12/14 04/09/13 LCOL135023Remove old old pole and replace with new

infrastructure £750.00

1500IM2487b, Mill Road Corner,West Mersea 20/12/14 04/09/13 LCOL135024Remove old old pole and replace with new

infrastructure £750.00

1500IM253, The Fox, West Mersea 31/03/14 04/09/13 LCOL135025Remove old old pole and replace with new

infrastructure £750.00

1500IM254, East Road, West Mersea,West Mersea 20/12/14 04/09/13 LCOL135026Remove old old pole and replace with new

infrastructure £750.00

1500IM256, The Fountain, West Mersea 20/12/14 04/09/13 LCOL135027Remove old old pole and replace with new

infrastructure £750.00

1500IM254B, East Road, opp Seaview Avenue, West Mersea 20/12/14 04/09/13 LCOL135028Remove old old pole and replace with new

infrastructure £750.00

1500IM255, East Road, adj Empress Avenue, West Mersea 31/03/14 04/09/13 LCOL135029Remove flag from BT pole and Formalise the location

of the stop pole, flag and TT case£750.00

1500IM255B, East Road, opp Empress Avenue, West Mersea 31/03/14 04/09/13 LCOL135030Formalise the location of the stop pole, flag and TT

case £750.00

1500IM257, High Street, West Mersea 31/03/14 04/09/13 LCOL135031Formalise the location of the stop pole, flag and TT

case£750.00

150014013019, Underwoods Garage (opp), West Mersea 31/03/14 04/09/13 LCOL135032Remove flag from BT pole and Formalise the location

of the stop pole, flag and TT case £750.00

150014013023, West Mersea Church, West Mersea 31/03/14 04/09/13 LCOL135033Formalise the location of the stop pole, flag and TT

case £750.00

150014013025, Barfield Road, adj Yorick Avenue, West Mersea 31/03/14 04/09/13 LCOL135034Formalise the location of the stop pole, flag and TT

case £750.00

150014013026 'Kingsland Road, opp Elmwood Drive, West Mersea 31/03/14 04/09/13 LCOL135035Formalise the location of the stop pole, flag and TT

case £750.00

1500IM2488, Blue Row, West Mersea 14/02/14 04/09/13 LCOL135036

Location is unmaRked and have no bus stop

infrastructure on site. ECC needs to formalise the

location of the stop and install a bus stop pole, flag

and TT case

£750.00

1500IM253B, The Fox, West Mersea 31/03/14 04/09/13 LCOL135037

Location is unmaked and have no bus stop

infrastructure on site. ECC needs to formalise the

location of the stop and install a bus stop pole, flag

and TT case

£750.00

150014013031, Wellhouse Farm, West Mersea 11/02/14 04/09/13 LCOL135038

Location is unmaked and have no bus stop

infrastructure on site. ECC needs to formalise the

location of the stop and install a bus stop pole, flag

and TT case

£750.00

150014013030, Playing Fields, West Mersea 11/02/14 04/09/13 LCOL135039

Location is unmaked and have no bus stop

infrastructure on site. ECC needs to formalise the

location of the stop and install a bus stop pole, flag

and TT case

£750.00

150014013034, Waldegraves Caravan Park, West Mersea 11/02/14 04/09/13 LCOL135040

Location is unmaked and have no bus stop

infrastructure on site. ECC needs to formalise the

location of the stop and install a bus stop pole, flag

and TT case

£750.00

150014013Y31, Wellhouse farm, West Mersea 11/02/14 04/09/13 LCOL135041

Location is unmaked and have no bus stop

infrastructure on site. ECC needs to formalise the

location of the stop and install a bus stop pole, flag

and TT case

£750.00

150014013Y34, Waldegrave Caravan Park, West Mersea 11/02/14 04/09/13 LCOL135042

Location is unmaked and have no bus stop

infrastructure on site. ECC needs to formalise the

location of the stop and install a bus stop pole, flag

and TT case

£750.00

150014013Y30, Playing Fields, West Mersea 11/02/14 04/09/13 LCOL135043

Location is unmaked and have no bus stop

infrastructure on site. ECC needs to formalise the

location of the stop and install a bus stop pole, flag

and TT case

£750.00

150014013Y27, The Lawns, West Mersea 31/03/14 04/09/13 LCOL135044

Location is unmaked and have no bus stop

infrastructure on site. ECC needs to formalise the

location of the stop and install a bus stop pole, flag

and TT case

£750.00

150014013Y35, East Mersea Road, West Mersea 03/12/13 04/09/13 LCOL135045

Location is unmaked and have no bus stop

infrastructure on site. ECC needs to formalise the

location of the stop and install a bus stop pole, flag

and TT case

£750.00

Greenstead Road 31/03/14 04/09/13 LCOL135007All ten stops need new poles and flags, five of them

require new timetables frames. £6,900.00

Chariot Drive, Colchester 24/01/14 04/09/13 LCOL135010 New wooden shelter in keeping with location £12,000.00

Berechurch Road Colchester 31/03/14 04/09/13 LCOL135012 Request for a passenger shelter £10,500.00

B1025 Mersea Road j/w Napier Road, Colchester 30/11/13 04/09/13 LCOL131018 Provide a dedicated right-turn phase - surveys £3,015.00

DC1710 Villa Road_ Stanway 24/04/14 04/09/13 LCOL001011Refeshing centre line road markings & Additonal

'SLOW' markings£6,000.00

New Road, Tiptree, nr Church Rd 15/05/14 04/09/13 LCOL132049Zebra crossing to enable route to shops - Design only

including PV2 first£5,000.00

Villa Farm, Arlesford Road. 24/01/14 04/09/13 LCOL135006 New shelter on very exposed location £10,000.00

Turner Road, Colchester 17/02/14 04/09/13 LCOL135008 Passenger shelter £5,000.00

DC1984Between Millers Lane / Lucy Lane South Zebra Crossing Location – A1124

London Road27/02/14 04/09/13 LCOL132035 Investigate provision of centre refuge to crossing £1,000.00

DC1982 Stanway Garage Zebra Crossing Location – A1124 London Road 12/03/14 04/09/13 LCOL132036 Add Pedestrian Crossing signs - design £1,000.00

DC1997 Straight Road/Queens Head Road Junction 14/04/14 04/09/13 LCOL132039Add T Junction signage x2, Add carriageway SLOW

marking - design£500.00

DC1999 Straight Road/Horkesley Road Junction 14/04/14 04/09/13 LCOL132041Add T Junction signage x2, Add carriageway SLOW

marking - design£500.00

Hawthorn Avenue, Colchester 04/04/14 04/09/13 LCOL132050

Zebra crossing and railing installation along the length

of Hawthorn Avenue outside the school, making good

of footway - Design only including PV2 first

£10,000.00

Bus Stop: 1500IM2006, St Margaret's Cross, Address: School Road,

Langham.31/10/14 04/09/13 LCOL135013

Formalise the location of the stop add raised/dropped

kerbs as required - design£1,000.00

Bus Stop: 1500LANGWIYK, Perry Lane. Address: Perry Lane Langham. 31/10/14 04/09/13 LCOL135014Formalise the location of the stop add raised/dropped

kerbs as required - design£1,000.00

Bus Stop 1500IM20Y2, Chapel Road, Address: Chapel Road, Langham 31/10/14 04/09/13 LCOL135015Formalise the location of the stop add raised/dropped

kerbs as required - design£1,000.00

Bus Stop :1500IM2005, The Shepherd and Dog. Address: Moor Road,

Langham31/10/14 04/09/13 LCOL135016

Formalise the location of the stop add raised/dropped

kerbs as required - design£1,000.00

Bus Stop 1500IM20100, Community Centre, Address: School Road, Langham 31/10/14 04/09/13 LCOL135017Formalise the location of the stop add raised/dropped

kerbs as required - design£1,000.00

Dedham Road, Boxted 15/08/14 04/09/13 LCOL132043

Add T Junction sign and adding School carriageway

markings – TRO. 2 x, carriageway SLOW marking -

feasibility

£1,000.00

DC2000 Drury Arms, Shrub End, Colchester 30/06/14 04/09/13 LCOL132042

Extension of traffic island, repositioning KLB and

additional lining improvements to assist drivers in

aligning long vehicles - feasibility

£1,500.00

Station Road, Wakes Colne 31/10/14 04/09/13 LCOL132046footway and traffic calming - Structure Options survey,

Geotechnical Survey and feasibility study£9,000.00

Blackberry Road junction with Winstree Road, Stanway 31/03/14 04/09/13 LCOL131019Undertake a joint review of site with RSE and D&C to

establish possible change of junction priority.£5,000.00

DC1741 B1022 Maldon Road j_w Braxted Park Road 31/03/14 04/09/13 LCOL131020Undertake options study with RSE into junction

redesign.£5,000.00

Butt Road to Norman Way 01/10/14 04/09/13 LCOL134002 Signs and lining - design £2,000.00

Hospital Lane to Sheepen Road Via Colchester Institute 01/09/14 04/09/13 LCOL134003Existing footpath - conversion and signing and lining -

design£2,000.00

Forge Street, Crown street Dedham  To be

programmed04/09/13 LCOL135009

Yellow bus cage and no waiting plate to enforce

restrictions £1,425.00

Halstead Rd between London rd and King Cole RoadTo be

programmed04/09/13 LCOL135011

Identify, mark and install new bus infrastructure at bus

stops £2,000.00

B1022 Maldon Road j/w Braxted Park RoadTo be

programmed04/09/13 LCOL131020

Undertake options study with RSE into junction

redesign.£5,000.00

DC1998 Junction of the Earls Colne Road with Chapel Road, Great TeyTo be

programmed04/09/13 LCOL132047

Signs and lines works, a full kerbed footway - to the

nearside of the spur to give pedestrians a traffic free

area to walk on

£2,000.00

Spring Lane Roundabout, Colchester To be

programmed04/09/13 LCOL131015

1. Improve the approach to junction with a high

Polished Stone Value (PSV) material.

2. Cut back vegetation on the nearside at the

roundabout.

3. Cut back/remove vegetation on southern section of

the roundabout.

4. Refresh road markings and replace road studs as

required.

5. Provide ‘Side road ahead’ warning sign east of

junction with Maltings Farm.

£40,641.00

A134 Barrack Street / Hythe Hill j/w Port Lane, ColchesterTo be

programmed04/09/13 LCOL131016

1. Refresh existing road markings

2. Narrow existing footway to 1.5m to maintain vehicle

parking.£20,695.00

2013/14 Budget Capital Schemes

\\CHESFS08\Highways\TransPlan\Programme Management\Local Highway Panels\East LHP\Scheme Update reports\Colchester updates\2014\LHP Colchester June V1

Page 15: Colchester Local Highway Panel Meeting Agenda · Colchester Local Highway Panel Meeting Agenda . Date: Wednesday 18. th. ... Reduce the carriageway width on the south-west bound approach

Design

Reference

Number

Task Name Finish CMA approved Cost Code Works Description Allocated Budget

DC2002 Straight Road Boxted and Langham Road Boxted 01/06/14 04/09/13 LCOL132037

Add Directional Signage opposite junction, Replace

and reposition Give Sign (larger size), add carriageway

SLOW marking - design

£1,000.00

DC1977 B1022 - Maldon road Tiptree 01/08/14 04/09/13 LCOL132038 Footway & Pedestrian Crossing Works -design £5,000.00

DC1998 Straight Road/Langham Road/Pepper Road Junction 01/06/14 04/09/13 LCOL132040Add Cross Road sign, Add carriageway SLOW marking -

design£500.00

Gilberd School, Brinkley Grove Road 12/05/14 04/09/13 LCOL132048PV2 completed - suggesting a pedestrian refuge or

zebra crossing should be consided - Design only£10,000.00

B1022, Colchester Zoo Access 16/04/14 04/09/13 LCOL132051 Improve Access - Design Only £8,000.00

Boxted RoadTo be

programmed04/09/13 LCOL132052 VAS £8,500.00

Severalls Lane To be

programmed04/09/13 LCOL132053 VAS £8,500.00

Land Lane, Colchester 01/06/14 04/09/13 LCOL133001Dropped kerb, there is a dropped kerb at the end of

Land Lane, there is no dropped kerb opposite - design£1,000.00

Colchester Urban areas 01/09/14 04/09/13 LCOL134001

Comprehensive signage of all routes and realign

suitable Routes for main urban area of Colchester -

Design

£20,000.00

Tollgate Roundabout 01/11/14 16/12/13 LCOL131021

Preliminary Design and Investigation - Install a new

yellow backed chevron, Remove vegetationin order to

improve the forward visibility of the toucan crossing

facility; Install signing ‘shared cycle and pedestrian

facility’ and provide a dropped kerb.

£3,000.00

B1027 junction with B1028, Wivenhoe 01/09/14 16/12/13 LCOL131022

Preliminary Design and Investigation -Provide a

‘distance ahead to hazard’ sub-plate , Undertake

substantial vegetation removal, Provide a ‘junction

ahead of non primary route’ sign indicating the layout

of the road ahead

£2,000.00

Highwoods Approach Roundabout jw Eastwood Drive 21/04/14 16/12/13 LCOL131023

Preliminary Design and Investigation - Install ‘Slow’

carriageway markings, Refresh and increase the width

of the give-way lining, Increase width of central

hatching

£1,000.00

A1124 Essex Yeomanry Way / Eight Ash Green Interchange 01/07/14 16/12/13 LCOL131024

Preliminary Design and Investigation - Install a new

yellow backed chevron sign, Remove vegetation,

Remove vegetation from within the southeast

quadrant of the centre island of the roundabout.

£3,000.00

Brinkley Grove roundabout with Gavin Way, Brinkley Grove To be

programmed16/12/13 LCOL131025

Preliminary Design and Investigation - Reposition the

eastbound ‘roundabout ahead’ sign; Reposition the

westbound ‘roundabout ahead’ sign; Provide ‘distance

ahead to hazard’ sub-plate; Undertake vegetation

removal.

£3,000.00

Gosbecks Road / Layer Road / Berechurch Hall Road To be

programmed16/12/13 LCOL131026

Preliminary Design and Investigation - Reduce the

carriageway width to a single vehicle capacity,

increasing the central hatched areas adjacent to the

centre island; Reduce the carriageway width on the

south-west bound approach to a single vehicle

capacity.

£5,000.00

Boxted Road, Mile EndTo be

programmed16/12/13 LCOL132016

1) Add 30mph roundel adjacent to 30mph signage, 2)

Add 30mph repeater signage within unlit section of

road - Design

£500.00

The Folley,Wivenhoe N/A 16/12/13 LCOL134005 Signage - design £500.00

Church Lane Lexden 14/04/14 16/12/13 LCOL132020

Undertake footway improvement works (raise kerbs,

lower crossfall, make good subbase and surface)

design

£3,500.00

Grove Road, TiptreeTo be

programmed16/12/13 LCOL132045

Add 2 No. Playground Signs and posts either side of

Playground - design£500.00

Grove Road, TiptreeTo be

programmed16/12/13 LCOL132083 20mph Speed Limit - design £1,000.00

Severalls Lane near the Honorius drive bus stop 01/07/14 16/12/13 LCOL132084 Pedestrian Refuge & Footway Works - design £1,000.00

London Road in Stanway 07/03/14 16/12/13 LCOL132014 SID - design £500.00

Butt Road (coming up either Beaconsfield or Salisbury Aves.) 01/09/14 16/12/13 LCOL132085 Zebra Crossing - design £2,500.00

Layer road To be

programmed16/12/13 LCOL135047 Clearway marking and no waiting plate - design £150.00

Ash WayTo be

programmed16/12/13 LCOL135048 23m clearway marking no waiting plate - design £150.00

Barrington Road, Colchester On Hold 16/12/13 LCOL136006 Add carriageway lines and markings - design £150.00

Hundred Lane (Cage Lane/ Chapel Road Boxted) 01/09/14 15/04/14 LCOL142033

i) Add 2 No. “Unsuitable for HGVs” sign for Chapel

Road/Straight Road Junction, ii) Add 2 No. “Unsuitable

for HGVs” sign for Cage Lane/Straight Road Junction

£3,000

Plume Avenue, Colchester 01/09/14 15/04/14 LCOL142038 10m of Pedestrian Guard Rail outside entrance £2,500

Boxted Road, Mile End 01/08/14 15/04/14 LCOL142042 Add 30mph roundel adjacent to 30mph signage £1,700

Wivenhoe High Street 01/01/15 15/04/14 LCOL142015

All road markings within 25m of the bridge re-

designed and remarked to reflect the removal of the

priority scheme; Removal of 3 signs, signposts,

foundations and disconnecting the electrical

connections at these locations. As well the subsequent

footway r

£14,000

Grove Road, Tiptree 01/09/14 15/04/14 LCOL142044Add 2 No. Playground Signs and posts either side of

Playground£2,500

New Road, Tiptree, nr Church Rd 15/05/14 15/04/14 LCOL142049Zebra crossing to enable route to shops - Design

previously approved£50,000

B1025 Mersea Road j/w Napier Road, ColchesterTo be

programmed15/04/14 LCOL141001

Video Survey = £1500, and Signal Reconfiguration =

£3500£5,000

Blackberry Road junction with Winstree Road, Stanway 01/02/15 15/04/14 LCOL141002

Undertake a joint review of site with RSE and D&C to

establish possible change of junction priority. The

outline design (£13,200) and studys (Ecology, Topo

and trial holes) £13,000

£26,200

Gilberd School, Brinkley Grove Road 01/02/15 15/04/14 LCOL142030

Pedestrian crossing & associated widening - This

scheme needs to be coordinated with school moving

entrance/exit.- Designed

£120,000

The Strood 01/02/15 15/04/14 LCOL142023 Review of options £2,000

Salcott 01/02/15 15/04/14 LCOL142031To reduce the size of the sign and brief report into the

possible options we have for consolidating the signage £500

Mason Close, Colchester 01/02/15 15/04/14 LCOL142032 Two accesses with dropped kerbs and tactile paving £3,000

Spring Lane and Bakers Lane 01/02/15 15/04/14 LCOL142034Full Safety Review of route and costed remedial

highway works£10,000

Mersea Road 362 to 392 01/02/15 15/04/14 LCOL142035

Add 4 No Bell bollards, some kerbing works, construct

concrete running strip (1m wide x 100m long), make

good the verge and erect post and rail fence (55m

long) to protect verge

£22,000

Moorside, Colchester 01/02/15 15/04/14 LCOL142036 Provide drop kerbing and tactile paving £1,500

B1022 - Maldon road Tiptree 01/02/15 15/04/14 LCOL142037 footway Design £5,000

2014/15 Budget Capital Schemes

\\CHESFS08\Highways\TransPlan\Programme Management\Local Highway Panels\East LHP\Scheme Update reports\Colchester updates\2014\LHP Colchester June V1

Page 16: Colchester Local Highway Panel Meeting Agenda · Colchester Local Highway Panel Meeting Agenda . Date: Wednesday 18. th. ... Reduce the carriageway width on the south-west bound approach

Design

Reference

Number

Task Name Finish CMA approved Cost Code Works Description Allocated Budget

Mill Road ColchesterTo be

programmed15/04/14 LCOL142011

Formalisation and upgrading of pedestrian refuge.

Safety Assessment recommended to ascertain possible

further measures

£6,500

B1022 Colchester Zoo Access, Stanway 01/02/15 15/04/14 LCOL142039

improve the signage on the approach to the junction.

The LHP would also like the right turn and redirection

investigated

£7,375

London Road in Stanway 01/08/14 15/04/14 LCOL142040 SID on or near lighting column 40. Design complete £8,500

Stanway Garage Zebra Crossing, London Road, Stanway 01/10/14 15/04/14 LCOL142041 Add Pedestrian Crossing signs. Design Complete £3,700

Butt Road (coming up either Beaconsfield or Salisbury Aves.) 01/02/15 15/04/14 LCOL142060 Zebra Crossing £35,000

Hawthorn Avenue, Colchester 01/02/15 15/04/14 LCOL142043replace the existing pedestrian island with a Zebra

Crossing £35,000

Boxted Road, op Whitebeam CloseTo be

programmed15/04/14 LCOL145003 2 flags and poles £1,000

Chapel rd. Stanway To be

programmed15/04/14 LCOL145004 New Bus shelter required £5,000

Fiveways stanway Blackberry Rd Colchester To be

programmed15/04/14 LCOL145005 New Bus shelter required £5,000

Barrington Road 01/02/15 15/04/14 LCOL146001 Add carriageway lines and markings £2,000

Eastern Boundary pathway by Braiswick Golf Course. Footpath 37

Colchester and Footpath 36 Myland

To be

programmed15/04/14 LCOL148001 Hard surface public footpath £5,000

Ransom Road, Tiptree WORKS 01/02/15 15/04/14 LCOL142045

to make the southern end of Ransom Road (from the

access to No. 42 Ransom Road to Church Road) one

way in a westerly direction. Design previously

approved

£30,000

Junction of the Earls Colne Road with Chappel Road, Great Tey 01/02/15 15/04/14 LCOL142046

Signs and lines works, a full kerbed footway - to the

nearside of the spur to give pedestrians a traffic free

area to walk on Design previously approved

£18,000

Severalls Lane near the Honorius drive bus stop 01/02/15 15/04/14 LCOL142047Pedestrian Refuge & Footway Works - Design

previously approved£5,000

Church Lane Lexden 01/09/14 15/04/14 LCOL142048

Undertake footway improvement works (raise kerbs,

lower crossfall, make good subbase and surface)

Design previously approved

£21,500

Bus Stop: 1500IM2006, St Margaret's Cross, Address: School Road,

Langham.

To be

programmed15/04/14 LCOL145006

Formalise the location of the stop add raised/dropped

kerbs as required - Design previously approved£5,000

Bus Stop: 1500IM2007, Perry Lane, Address: Perry Lane, Langham.To be

programmed15/04/14 LCOL145007

Formalise the location of the stop add raised/dropped

kerbs as required - Design previously approved£5,000

Bus Stop 1500IM20Y2, Chapel Road, Address: Chapel Road, LanghamTo be

programmed15/04/14 LCOL145008

Formalise the location of the stop add raised/dropped

kerbs as required - Design previously approved£5,000

Bus Stop :1500IM2005, The Shepherd and Dog. Address: Moor Road,

Langham

To be

programmed15/04/14 LCOL145009

Formalise the location of the stop add raised/dropped

kerbs as required - Design previously approved£5,000

Bus Stop 1500IM20100, Community Centre, Address: School Road, LanghamTo be

programmed15/04/14 LCOL145010

Formalise the location of the stop add raised/dropped

kerbs as required - Design previously approved£5,000

Layer Road To be

programmed15/04/14 LCOL145011

clearway marking and no waiting plate - Design

previously approved£1,500

Ash WayTo be

programmed15/04/14 LCOL145012

23m clearway marking no waiting plate - Design

previously approved£1,500

Revenue Circular Road South, Colchester 07/11/12 02/10/12 Speed Survey £250.00

Revenue Fordham 07/11/12 04/12/12 Speed Survey £2,000.00

Revenue London Road, Stanway Colchester 03/06/13 01/03/13 Speed Survey £200.00

Revenue Maldon Road_ Colchester 21/01/14 08/04/13 LCOL002013 Remove dropped kerb £2,000.00

Revenue Brinkley Grove Road 05/06/13 15/05/13 LCOL001014 Speed Survey £800.00

Revenue Butt Road 21/11/13 04/09/13 LCOL132014 PV2 survey for crossing £890.00

Revenue Halstead Road, Colchester 21/11/13 04/09/13 LCOL132019PV2 survey for crossing/20mph required before

scheme is validated£890.00

Revenue Roach Vale, Colchester 21/11/13 04/09/13 LCOL132022 Speed survey for looking into 20mph speed limit £210.00

Revenue Wivenhoe Road, Alresford 21/11/13 04/09/13 LCOL132023 Speed survey for lower speed limit consideration £210.00

Revenue centre of Dedham village 21/11/13 04/09/13 LCOL132024Speed survey for looking at 20mph limit in the centre

of village£210.00

Revenue Monkwick - Maypole 21/11/13 04/09/13 LCOL132025 Speed survey for 20 mph zones consideration £210.00

Revenue Birch glen -Maypole 21/11/13 04/09/13 LCOL132026 Speed survey for 20 mph zones consideration £210.00

Revenue The willows - Maypole 21/11/13 04/09/13 LCOL132027 Speed survey for 20 mph zones consideration £210.00

Revenue Severalls Lane near the Honorius drive bus stop 21/11/13 04/09/13 LCOL132028PV2 survey for crossing required before scheme is

validated£890.00

Revenue Grove Road Tiptree 21/11/13 04/09/13 LCOL132029 Speed survey for 20 mph speed limit consideration £210.00

Revenue Mill Road Colchester 21/11/13 04/09/13 LCOL132030PV2 survey for crossing required before scheme is

validated£890.00

Revenue School Road Copford 21/11/13 04/09/13 LCOL132031PV2 survey for crossing required before scheme is

validated£890.00

Revenue London Road Copford 21/11/13 04/09/13 LCOL132032PV2 survey for crossing required before scheme is

validated£890.00

Revenue A1124 from Foxes Corner to Ford Street 21/11/13 04/09/13 LCOL132033 Speed survey £210.00

RevenueSt Christopher Rd and near Anthony Close, Colchester, both junctions with

St John’s Rd21/11/13 04/09/13 LCOL132034

PV2 surveys for crossing required before scheme is

validated£890.00

Revenue B1022 - Maldon road Tiptree 21/11/13 04/09/13 LCOL132044PV2 surveys for crossing required before scheme is

validated£890.00

Revenue Layer Road 21/11/13 04/09/13 LCOL132060 Speed survey due to speeding concerns £210.00

Revenue Circular Road North 21/11/13 04/09/13 LCOL132061 PV2 survey for crossing £890.00

Revenue Shoebridge’s Hill, Dedham 28/01/14 16/12/13 LCOL132069R Speed survey for VAS consideration £210.00

Revenue Ardleigh Road, Dedham 28/01/14 16/12/13 LCOL132070R Speed survey due to perceived speeding £210.00

Revenue Dale Close, Stanway 04/02/14 16/12/13 LCOL132067R Speed survey for 20 mph consideration £210.00

Revenue Halstead Road, Aldham 04/02/14 16/12/13 LCOL132068RSpeed survey to see if the new limit is being adhered

to£210.00

Revenue Maldon Road/Butts Road ladder roads 10/02/14 16/12/13 LCOL132071R Six speed surveys for 20 mph consideration £1,260.00

Revenue B1025/Mersea road 12/02/14 16/12/13 LCOL132072R Speed survey for VAS consideration £210.00

Revenue Westlands, Prettygate, Colchester 05/02/14 16/12/13 LCOL132073R Two speed surveys for 20 mph consideration £420.00

Revenue Van Dyck and Gainsborough Rd 28/01/14 16/12/13 LCOL132075R Two speed surveys for 20 mph consideration £420.00

Revenue Bowes Road and Broome Grove, Wivenhoe 05/02/14 16/12/13 LCOL132075R Two speed surveys for 20 mph consideration £420.00

Revenue Walnut Tree Way Estate 10/02/14 16/12/13 LCOL132078R Five speed surveys for 20 mph consideration £1,050.00

Revenue Grove Road, Tiptree 29/01/14 16/12/13 LCOL132080R

Speed survey with a view to future traffic calming

measures (or reduction of speed limit) being

introduced

£210.00

Revenue West Bergholt: Roads around Heathlands Primary School 29/01/14 16/12/13 LCOL132081R

Three Speed Survey in regard to introduction of

20mph scheme, Roads around West Bergholt Primary

School

£630.00

Revenue Dyers Road 10/02/14 16/12/13 LCOL132086R Speed survey for VAS scheme £210.00

Revenue Church Road, Tiptree (at Asda) 29/01/14 16/12/13 LCOL132057R PV2 for Zebra crossing consideration £890.00

Revenue Greenfield Drive, Great Tey 26/03/14 16/12/13 LCOL132082R Two speed surveys for VAS consideration £420.00

Revenue B1026 - Layer Road N/A 16/12/13 LCOL132079R Speed survey due to perceived speeding and accidents £210.00

Revenue Elmstead road N/A 15/04/14 LCOL142016 speed survey for traffic calming consideration £210

Revenue Chapel Road and Winstree Road, Stanway 28/11/14 15/04/14 LCOL142057Weight limit restrictions of 7.5t except for access,

survey£2,500.00

Revenue Riverside Estate 24/06/14 15/04/14 LCOL142050 four speed surveys for consideration of 20 mph £840

Revenue Abberton Road, Fingringhoe 24/06/14 15/04/14 LCOL142051 speed survey for speed reduction £210

Revenue Elmstead Road, Wivenhoe 02/07/14 15/04/14 LCOL142052 speed survey for consideration of traffic calming £210

Revenue Hazelton Rd, Colchester 24/06/14 15/04/14 LCOL142053Speed survey due to yellow lines being installed which

is believed to have increased traffic speed£210

Revenue Blackheath Colchester 24/06/14 15/04/14 LCOL142054 speed survey for VAS consideration £210

Revenue Monkwick Estate 24/06/14 15/04/14 LCOL142003 two speed surveys for consideration of 20mph £420

Revenue The Willows Estate 24/06/14 15/04/14 LCOL142004 speed survey to consider traffic calming £210

Revenue Birch Glen Estate 24/06/14 15/04/14 LCOL142005 speed survey to consider traffic calming £210

Revenue Scythe Way and Regency Green, off King Harold Rd in Prettygate, Colchester 24/06/14 15/04/14 LCOL142006 two speed surveys for consideration of 20 mph £420

RevenueVilla Road, Winstree Road, Blackberry Road, Peartree Road, Tollgate Drive,

Peace Road, New farm Road, Wheatfield Road15/08/14 15/04/14 LCOL142009 Request for consideration of 20 mph £1,680

Revenue Mill Road, Mile End 24/06/14 15/04/14 LCOL142010 speed survey for traffic calming consideration £210

Revenue Wood Lane/A1124, Eight Ash Green, Fordham Heath 06/06/14 15/04/14 LCOL142012 PV2 for pedestrian Crossing consideration £890

Revenue Circular Road North 30/08/14 15/04/14 LCOL142055PV2 for pedestrian Crossing consideration

(July/august)£890

Revenue Spring Lane and the Residential estate roads on either side 30/08/14 15/04/14 LCOL142014 three speed surveys to ascertain current speeds £630

Revenue Vine Drive, Wivenhoe FEASIBILITY 02/02/15 15/04/14 LCOL142056

The proposal is to widen the Colchester Road end of

the layby to reduce any obstruction caused by vehicles

parking at this end. feasibility study

£3,000.00

Revenue Colchester District N/A 15/04/14 LCOL144004 Strategic review of Colchester Cycling schemes £13,000