coffee cart rewards management system risk assessment
TRANSCRIPT
8/10/2019 Coffee Cart Rewards Management System Risk Assessment
http://slidepdf.com/reader/full/coffee-cart-rewards-management-system-risk-assessment 1/5
Team 52
Coffee Cart Rewards Management System for AndroidRisk List
Version <1.2>
8/10/2019 Coffee Cart Rewards Management System Risk Assessment
http://slidepdf.com/reader/full/coffee-cart-rewards-management-system-risk-assessment 2/5
Coffee Cart Rewards Management System for Android Version: 1.2
Risk List Date: 06/Jul/14
RiskAssessment.pdf
Confidential Team 52, 2014 Page 2 of 5
Revision HistoryDate Version Description Author
25/Jun/14 1.0 Inception Phase Laura Pike
29/June/14 1.1 Revised after review with team Laura Pike
06/July/14 1.2 Revised for Elaboration Phase Laura Pike
8/10/2019 Coffee Cart Rewards Management System Risk Assessment
http://slidepdf.com/reader/full/coffee-cart-rewards-management-system-risk-assessment 3/5
Coffee Cart Rewards Management System for Android Version: 1.2
Risk List Date: 06/Jul/14
RiskAssessment.pdf
Confidential Team 52, 2014 Page 3 of 5
Table of Contents
1. Introduction 4
1.1 Purpose 4 1.2 Scope 4 1.3 Definitions, Acronyms, and Abbreviations 4 1.4 References 4 1.5 Overview 4
2. Risks 4
2.1 Risk Planning Table Error! Bookmark not defined.
8/10/2019 Coffee Cart Rewards Management System Risk Assessment
http://slidepdf.com/reader/full/coffee-cart-rewards-management-system-risk-assessment 4/5
Coffee Cart Rewards Management System for Android Version: 1.2
Risk List Date: 06/Jul/14
RiskAssessment.pdf
Confidential Team 52, 2014 Page 4 of 5
Risk List1. Introduction
1.1 Purpose
This document address es the risks identified during the development of the BeanTracker system. A
description of each risk can be found in the Risks s ection of the document.
1.2 Scope
The risks address ed in the document are for the first iteration of the BeanTracker, a coffee cart rewards
system.
1.3 Definitions, Acronyms, and Abbreviations
1.4 References
Vision Document, 6300Sum14Project2\Deliverable1\vision.pdf
Project Plan, 6300Sum14Project2\Deliverable1\ProjectPlan.pdf
Microsoft Word Templates for RUP
http://sce.uhcl.edu/helm/RationalUnifiedProcess/wordtmpl/index.htm#sdp
1.5 Overview
The Risks section, noted below, des cribes the identified risks of the system, their rank, impact risk
exposure, type/indicator, mitigation strategy,and contingency for each risk. The risk rank is an indicator of
the magnitude of the risk to the project; the smaller the number the lower the risk. Impact number is a
weight indicating impact on the project; the smaller the number the lower the risk. The exposure is
calculated by multiplying the rank with the impact. The type or indicator des cribes how the risk occurred or
is about to occur. The mitigation strategy describes what will be don e on the project to reduce the impact of
the risk. Finally, contingency describes what the course of action will be if the risk occurs , such as an
alternate solution or a reduction in functionality.
2. Risks
2.1 Risk Planning Table
Requirements Rank Impact Risk
Exposure
Type/Indicator Mitigation
Strategy
Contingency
RISK 1: New database
to hold customer
information, menu
items, purchase
history, and pre-
orders to be created
5 5 25 Technology Address
during
Elaboration
Phase
RISK 2: Customer can
have only 1 VIP card
4 4 16 Address
during
Elaboration
Phase
RISK 3: Customer
awarded 1 VIP point
per dollar spent
3 4 12 Trigered by a
purchase
request
Addressed
during
Elaboration
8/10/2019 Coffee Cart Rewards Management System Risk Assessment
http://slidepdf.com/reader/full/coffee-cart-rewards-management-system-risk-assessment 5/5
Coffee Cart Rewards Management System for Android Version: 1.2
Risk List Date: 06/Jul/14
RiskAssessment.pdf
Confidential Team 52, 2014 Page 5 of 5
phase – test
cases
RISK 4: Customer is
upgraded to GOLD
level if 500 points areearned in 30 days.
3 4 12 Trigered by a
purchase
request
Addressed
during
Elaborationphase – test
cases
RISK 5: Customer is
permanently
upgraded to GOLD
level if 5000 points
are earned.
2 3 6 Trigered by a
purchase
request
Addressed
during
Elaboration
phase – test
cases
RISK 6: Daily pre-
order slots can not
exceed 5 or 3 if the
item is a bestseller.
2 4 8 Trigered by a
purchase
request
Addressed
during
Elaboration
phase – test
cases
Risk 7: The software
system will run on
Android devices.
1 5 5 Addressed
during the
Inception
phase –
Vision
document
Risk 8: Implementing
a shared database
with web interface
5 0 0 Will be
implemented in
a future release
of BeanTracker
(codenameBeanTracker+)
RISK 9: Update SDK to
2.3
5 5 25 Technology Addressed
during the
Elaboration
phase
RISK 10: Ability to
communicate (or not
communicate with
team members)
5 5 25 Technology /
Logistics
Addressed
during the
Elaboration
phase
Backup email,
Piazza, GitHub
RISK 11: PC Hardware 5 5 25 Technology GitHub
repository,backups