    PROJECT REPORT

    ON

    COMPARISON AND ANALYSIS OF

    PRODUCTIVITY OF STRUCTURAL

    SHOP OF ENGINEERING WORKSHOP

    MANMAD, SABARMATHI, LALAGUDA

    AND ARAKKONAM

    by

    BALIJA ASHOKCE/ Workshop/ AJJ

    Southern RailwayAssisted by

    K. Rajendran/ AWM/ EWS/ AJJM. Govindaraju/ SSE/ EWS/ AJJ

    G. Ravichandran/ SE/ EWS/ AJJ

  • 7/28/2019 Coating Inspection Reports

    2/43

    II

    Note

    No.151/920608.05.09

    Sub : Allotment of project : (course no. 9206)

    The following topics are allotted for Project :

    SN Names of Trainees(S/Sh)

    Topic GuidingFaculty

    1 Balija Ashok,

    CE/W/SR

    Comparison and Analysis of

    Productivity of structural shop of

    engineering workshop

    Manmad,Sabarmathi,Lalaguda andArakkonam

    SPB2

    2 Praveen Kumar

    Mishra,

    CE/Wks/BB

    Motivation and related issues of the

    Civil Engineering Cadre (Group A,B

    and Supervisors)-Survey and Study

    SPB2

    3 D R Shyam Sundar,

    CTE/ECOR

    Study of liner bite of rails under

    different conditions with field datacollection analysis on SER,ECOR

    SPT2

    4 Subhodh KumarJindal,

    CE/Cont/Central

    Efficiency of training of Group C and Dstaff on Indian railways with special

    emphasis on NWR and suggestions forimprovement

    SPW

    5 Anil kumar pandey,

    CE/TMC/NWR

    Mechanisation of Track Maintenance

    on Indian Railways 2012 CaseStudy for improvements

    DN

    6 Ravi Mohan Sharma,CTE/TMC/NWR

    Working conditions of track machinefield staff(A study on NCR and NR) and

    suggestions for improvements

    PTM

    7 Gopal Khairwar,

    CE/TM/Hubli/SWR

    Site constraints in construction of

    limited height subway including

    comparing methods of construction

    SPB1

    8 Rajesh Arora,

    CPDE/WCR/JBP

    Study and uses of accidents on

    Unmanned level crossings in WCR andremedial measures

    SPT1

    9 Anurag Kumar

    Sachan,

    CE/G/WR

    Engineering and operational aspects

    involved in the work of remodeling of

    ADI yard and its impact A case study

    SPP

    10 Vijay Kitke,

    CGE/SCR

    Study of liner bite of rails under

    different conditions with field data

    collection analysis on CR and SCR

    SPT2

  • 7/28/2019 Coating Inspection Reports

    3/43

    1

    ARAKKONAM ENGINEERING WORKSHOP

    Work shop location : Arakkonam (Rural)Southern Railway

    Work shop Established on : 1905 Main Products : Riveted type girders

    Welded type girders,

    PPF Shelters and FOBSteel Channel Sleepers

    Dip lorry, Push Trolley, Motor Trolley, Glued

    Joint, LB Gate,

    Points & Crossings Assemblies, SEJ

    Number of Staffs : 1082 Age Profile of the Staff : 55 Years (avg) Total Tonnage during the

    Year 08-09 : 4338.715 MT/Year

    Equated Unit : 5028.527 / YearSTRUCTURAL SHOP

    No of Staff : 104 Outturn for the Year 08-09 : 634.25 MT/Year Equated Unit : 634.25 /Year Future proposal : To be increased to 1200 MT/Year

    after augmentation of infrastructure

  • 7/28/2019 Coating Inspection Reports

    4/43

    2

    OUT TURN FOR THE YEAR 2008-09

    Sl No Name of the ShopAchieved During the Year

    2008-09 (MT)

    1 Machine Shop 7.86

    2 Foundry 406.81

    3 Fitter 332.72

    4 Signal Fitter 387.28

    5 Structural

    Girders 634.54

    Light Structural 298.13

    6 Glued Joint 215.65

    7 Tinker 6.82

    8 Millwright 44.24

    9 Pts & Xings 1356.51

    10 Blacksmith 656.30

    TOTAL 4346.58

  • 7/28/2019 Coating Inspection Reports

    5/43

    3

    7.86

    4

    332

    38

    298.

    215.65

    6.82

    44.24

    0.00

    200.00

    400.00

    Machine Shop

    Foundry

    Fitter

    Signal Fitter

    Girders

    Light Structural

    Glued Joint

    Tinker

    Millwright

    Pts & Xings

    Blacksmith

    Production-Shopwise

  • 7/28/2019 Coating Inspection Reports

    6/43

    4

    OUT TURN OF STRUCTURAL SHOP FOR THE YEAR 2008-09

    Sl No Name of the Shop

    Achieved During

    the Year 2008-09(MT)

    1 Structural shop

    a) Girders 634.54

    b) Light Structural 298.13

    TOTAL 932.67

  • 7/28/2019 Coating Inspection Reports

    7/43

    5

    FLOW LINE PROCESS OF ARAKKONAM ENGINEERING WORKSHOP

    `

    Stud Drawin s

    Tem latin

    Tack Weldin

    Cuttin & Drillin

    Initial Assembl

    Final Weldin - SAW

    Markin

    Riveting

    Final Assembly

    Inspection

    Des atch

  • 7/28/2019 Coating Inspection Reports

    8/43

    6

    PRODUCTIVITY OF ENGINEERING WORKSHOPS / ARAKKONAM FOR THE YEAR 2008-09

    No.of staffOut turn for

    year 2008-09Sl.

    No.Description

    Sup. Tech. Total MT EQ.U

    (A) (B) ( C ) (D) (E) (H) (I)

    I DIRECT STAFF :

    1 Foundry shop 5 136 141 406.8 285.2

    2 Fitter shop 3 46 49 332.7 495.6

    3 Signal Fitter shop 2 46 48 387.3 529.2

    4 Structural shop 5 82 87 932.4 1054.9

    5 Glued Joint Section 2 34 36 215.7 208.3

    6 Tinker shop 1 22 23 6.8 68.7

    7 Millwright shop 7 96 103 44.2 141.8

    8 Points & Xings shop 5 78 83 1356.5 1202.8

    9 Blacksmithy shop 5 117 122 656.3 1042.0

    a Total :- 35 657 692 4338.7 5028.5

    II INDIRECT STAFF :

    1 Welding shop 3 72 75

    2 Paint shop 1 27 28

    3 P.C.O. Staff 28 9 37

    4 Night Shift 1 0 1

    5 Tool Room 1 0 1

    b Total Indirect Staff :- 34 108 142

    c Staff diverted to FBW 0 37 37

    d TOTAL STAFF ( a+b-c) 69 728 797

    e

    Staff for productivity calculation duly

    deducting absenteeism, m/c breakdown &

    power failure (in Hours)

    7322

    f Total Eq.Units achieved during the Year 5028.5

  • 7/28/2019 Coating Inspection Reports

    9/43

    7

    g Total no. of days in the Year 365

    h Actual no. of working days in the Year 292

    DescriptionAverage upto

    the Year

    Productivity of EWS/AJJ in Equated

    Units/man/month0.9

    PRODUCTIVITY OF STRUCTURAL SHOP

    e

    Staff for productivity calculation duly

    deducting absenteeism,m/c breakdown &

    power failure

    1180

    f Total Eq.Units achieved during the Year 1054.893

    g Total no. of days in the Year 365

    h Actual no. of working days in the Year 292

    Description Average upto the Year

    Productivity of Structural shop in Equated

    Units/man/month1.1

  • 7/28/2019 Coating Inspection Reports

    10/43

    8

    ACTIVITIES OF GIRDER FABRICATION IN ARAKKONAM

    SAW ON OPEN WEB GIRDER COMPONENT (VERTICAL)

    DP TEST ON OPEN WEB GIRDER COMPONENT (VERTICAL)

  • 7/28/2019 Coating Inspection Reports

    11/43

    9

    SURFACE DEFECT IDENDIFIED BY DP TEST

    OPEN WEB GIRDER ASSEMBLY

  • 7/28/2019 Coating Inspection Reports

    12/43

    10

    METALIZED DECK STEEL GIRDER

    ASSEMBLY OF S HALLO W TYPE GIRDER

  • 7/28/2019 Coating Inspection Reports

    13/43

    11

    LAYOUT OF STRUCTURAL SHOP

  • 7/28/2019 Coating Inspection Reports

    14/43

    12

    LALLAGUDA ENGINEERING WORKSHOP

    Work shop location : Lallaguda(Urban)secunderabad

    South Central Railway

    Workshop Established : 1964 Main Products : Rivetted type girder

    Welded type girders up to 30m Span

    Fish belly type Rivetted GirderGlued joints 52Kg& 60 Kg (G3 L)FOB, Steel Channel Sleepers

    Rail dolleys, Diplorry, Motor Trolley.

    Number of Staffs : 220 Age Profile of the Staff : 40-45 Years Total Tonnage During the

    Year 08-09 : 2436.18 MT/ Year

    Equated Unit : 1403.6 /YearSTRUCTURAL SHOP

    No of Staff : 117 Outturn for the Year 2008-09 : 200.20 MT/Year Equated Unit : 232.23/Year Future Proposal : To be increased to 360 MT/Year after

    augmentation of infrastructures

  • 7/28/2019 Coating Inspection Reports

    15/43

    13

    OUT TURN FOR THE YEAR 2008-09

    Sl No Name of the ShopAchieved

    During the Year

    2008-09

    1 Structural

    a)Riveted Girder in MT 129.10

    b) Welded girder in MT 71.10

    2 Others (P.Way items) in MT 97.04

    3 Glued Joint in MT (6291 Nos) 2138.94

    Total Tonnage in MT 2436.18

    OUT TURN 2008-09 - LALLAGUDA

    0.00

    500.00

    1000.00

    1500.00

    2000.00

    2500.00

    a)Riveted

    Girder in MT

    b) Welded

    girder in MT

    Others (P.Way

    items) in MT

    Glued Joint in

    MT (6291Nos)

    Production - Shop wise

    AchievedMT

  • 7/28/2019 Coating Inspection Reports

    16/43

    14

    OUT TURN OF STRUCTURAL SHOP FOR THE YEAR 2008-09

    Sl No Name of the ShopAchieved

    During the Year2008-09

    1 Structural

    a)Riveted Girder in MT 129.1

    b) Welded girder in MT 77.1

    Total (in MT) 200.2

  • 7/28/2019 Coating Inspection Reports

    17/43

    15

    FLOW LINE PROCESS OF LALLAGUDA ENGINEERING WORK SHOP

    `

    Receipt of work orders

    Studying of drawings

    Placing of indents & procurement through stores

    Templating

    Inspection of materials

    RDSO/CONSIGNEE inspection

    Fabrication

    Despatch of finished products

  • 7/28/2019 Coating Inspection Reports

    18/43

    16

    PRODUCTIVITY OF ENGINEERING WORKSHOPS / LALLAGUDA FOR THE YEAR 2008-09

    No.of staffOut turn for year

    2008-09Sl.

    No.Description

    Sup. Tech. Total MT EQ.U

    1 Structural shop 5 111 116 200.2 232.23

    2 Glued Joint Section 2 87 89 2138.94 1171.37

    3 Mechanical Shop 1 11 12 97.0 Nil

    Total :- 8 209 217 2436.18 1403.6

    Total Eq. Units achieved during the Year 1403.6 /Yr

    Total Tonnage achieved during the Year 2436.18/ Yr

  • 7/28/2019 Coating Inspection Reports

    19/43

    17

    ACTIVITIES OF GIRDER FABRICATION IN LALLAGUDA

    JIG FOR SAW

    COMPONENTS FOR STEEL GIRDERS

  • 7/28/2019 Coating Inspection Reports

    20/43

    18

    I SECTION FOR FISHBELLY GIRDER

    JIG FOR I FORMING

  • 7/28/2019 Coating Inspection Reports

    21/43

    19

    DRILLING OF S TEEL PLATE GIRDERS

  • 7/28/2019 Coating Inspection Reports

    22/43

    20

    LAYOUT OF STRUCTURAL SHOP

  • 7/28/2019 Coating Inspection Reports

    23/43

    21

    MANMAD ENGINEERING WORKSHOP

    Work shop location : Manmad(Urban),Central Railway.

    Work Established : 1906 Products : Open web Girder

    Welded type girder,Truss, Glued jointsJoggled Fish plate

    Number of Staffs : 878 Age Profile of the Staff : 45-55 Years Total Tonnage During the

    Year 08-09 : 7129.36 MT

    Equated Unit : 12063.35/YearSTRUCTURAL SHOP

    No of Staff : 494 Outturn for the Year 2008-09 : 2803.82 MT Equated Unit : 3424.4 MT Future Proposal : To be increased to 3600 MT/Year

    after augmentation of infrastructures

  • 7/28/2019 Coating Inspection Reports

    24/43

    22

    OUT TURN FOR THE YEAR 2008-09

    Sl No Name of the Shop

    AchievedDuring the

    Year 2008-09(MT)

    1 Structural Girders 2803.82

    2 Light Structural 389.74

    3 Others* 3935.80

    TOTAL 7129.36

    * Others inclusive of Glued joint, BS, BNR, M.Shop, Misc Works of EUR & Channel Sleeper

    OUT TURN 2008-09 - MANMAD

    0.00

    500.00

    1000.00

    1500.00

    2000.00

    2500.00

    3000.00

    3500.00

    4000.00

    4500.00

    Structural Girders Light Structural Others*

    Production - Shop wise

    AchievedMT

  • 7/28/2019 Coating Inspection Reports

    25/43

    23

    OUT TURN OF STRUCTURAL SHOP FOR THE YEAR 2008-09

    Sl No Name of the ShopAchieved Duringthe Year 2008-09

    (MT)

    1 Structural Girders 2803.82

    2 Light Structural 389.74

    TOTAL 3193.56

  • 7/28/2019 Coating Inspection Reports

    26/43

    24

    FLOW LINE PROCESS OF MANMAD ENGINEERING WORK SHOP

    `

    Templating

    Cutting

    Initial assembly

    Tack assembly

    Initial assembl

    Riveting

    Jig

    Final assembly

  • 7/28/2019 Coating Inspection Reports

    27/43

    25

    PRODUCTIVITY OF ENGINEERING WORKSHOPS / MANMAD FOR THE YEAR2008-09

    No.of staffOut turn for year

    2008-09Sl.

    No.Description

    Sup. Tech. Total MT EQ.U

    1 Structural shop 37 457 494 3193.56 4051.55

    2 Others 41 343 384 3935.80 8011.80

    Total :- 78 800 878 7129.36 12063.35

    Total Eq.Units achieved during the Year 12063.35

    Total Tonnage achieved during the Year (in MT) 7129.36

  • 7/28/2019 Coating Inspection Reports

    28/43

    26

    ACTIVITIES OF GIRDER FABRICATION IN MANMAD

    PICTORIAL REPRESENTATION OF PLATE STRAIGHTENING MACHINE

    DYE PENETRANT TEST OF FILLET WELD

  • 7/28/2019 Coating Inspection Reports

    29/43

    27

    DRILLING OF COMPONENTS USING FERRULES

    HIGH S PEED DUAL NOZZLE PUG CUTTING MACHINE

  • 7/28/2019 Coating Inspection Reports

    30/43

    28

    PICTORIAL VIEW OF STOCK YARD

    INSPECTION OF FERRULES

  • 7/28/2019 Coating Inspection Reports

    31/43

    29

    LAYOUT OF STRUCTURAL SHOP

  • 7/28/2019 Coating Inspection Reports

    32/43

    30

    SABARMATHI ENGINEERING WORKSHOP

    Work shop location : Sabarmathi(Urban),Near Ahamedabad

    Western Railway.

    Work Established : 1958 Products : Open web Girder

    Welded type Girder

    Fish Belly Girder

    Number of Staffs : 656 Age Profile of the Staff : 35-50 Year Total Tonnage for the

    Year 2008-09 : 6011.39 MT/Year

    Equated Unit : 4742.35 /YearSTRUCTURAL SHOP

    Number of Staffs : 376 Outturn for the Year 2008-09 : 1645.89 MT/Year Equated Unit : 2072.60 /Year Future Proposal : To be increased to 2250

    MT/Year after augmentation

    of infrastructures

  • 7/28/2019 Coating Inspection Reports

    33/43

    31

    OUT TURN FOR THE YEAR 2008-09

    Sl No Name of the ShopAchieved Duringthe Year 2008-09

    (MT)

    1 Structural

    Open web girder 1343.39

    Riveted Plate Girder 198.70

    Welded Plate Girder 103.80

    2 Glued Joint 3430.00

    3 Steel Channel Sleeper 897.00

    4 SEJ Set 38.50

    TOTAL 6011.39

    OUT TURN FOR THE YEAR 2008-09 - SABARMATHI

    1343.39

    198.70 103.80

    3430.00

    897.00

    38.500.00

    500.00

    1000.00

    1500.00

    2000.00

    2500.00

    3000.00

    3500.00

    4000.00

    Open web girder Riveted Plate Girder Welded Plate Girder Glued Joint Steel Channel Sleeper SEJ SetProduction - Shop wise

    Achieved MT

  • 7/28/2019 Coating Inspection Reports

    34/43

    32

    OUT TURN OF STRUCTURAL SHOP FOR THE YEAR 2008-09

    Sl No Name of the ShopAchieved

    During the Year2008-09 (MT)

    1 Structural

    a) open web girder 1343.39

    b) Riveted Plate Girder 198.70

    c) Welded Plate Girder 103.80

    TOTAL 1645.89

  • 7/28/2019 Coating Inspection Reports

    35/43

    33

    FLOW LINE PROCESS OF SABARMATI ENGINEERING WORK S HOP

    `

    Templating

    Cutting

    Initial assembly

    Fitting

    Drilling

    Final assembly

    Riveting

  • 7/28/2019 Coating Inspection Reports

    36/43

    34

    PRODUCTIVITY OF ENGINEERING WORKSHOPS / SABARMATI FOR THEYEAR 2008-09

    No.of staffOut turn for year

    2008-09Sl.

    No.Description

    Sup. Tech. Total MT EQ.U1 Structural shop 21 355 376 1645.89 2072.60

    2 Others 25 255 280 4365.50 2669.75

    Total :- 46 610 656 6011.39 4742.35

    Total Eq.Units achieved during the Year 4742.35

    Total Tonnage achieved during the Year(in MT)

    6011.39

  • 7/28/2019 Coating Inspection Reports

    37/43

    35

    ACTIVITIES OF GIRDER FABRICATION IN SABARMATHI

    PICTORIAL REPRESENTATION OF I SECTION FOR PLATE GIRDERS

    PICTORIAL REPRESENTATION OF OPEN WEB GIRDER

  • 7/28/2019 Coating Inspection Reports

    38/43

    36

    SUBMERGED ARC WELDING JIG FOR STEEL PLATE GIRDERS

    SUBMERGED ARC WELDING JIG FOR STEEL PLATE GIRDERS HAVINGBOTH SIDES TRACK FOR DOING FILLET WELD

  • 7/28/2019 Coating Inspection Reports

    39/43

    37

    PICTORIAL REPRESENTATION OF DRILLING OF COMPONENT ON BOTH

    TRACKS

    PICTORIAL REPRESENTATION OF FORMING I-SECTION FOR FISH BELLY

    GIRDER

  • 7/28/2019 Coating Inspection Reports

    40/43

    38

    LAYOUT OF STRUCTURAL SHOP

  • 7/28/2019 Coating Inspection Reports

    41/43

    39

    COMPARATIVE STATEMENT OF STRUCTURAL SHOP OF ALL

    WORKSHOPS 2008-09

    Description AJJ LGD MMR SBI

    Present Production of Structural

    shop in MT

    634.25 200.20 2803.82 1645.89

    Proposed Production of Structural

    shop in MT1200.00 360.00 3600.00 2250.00

    COMPARITIVE CHART OF WORKSHOPS

    634.25

    200.20

    2803.82

    1645.89

    1200.00

    360.00

    3600.00

    2250.00

    0.00

    500.00

    1000.00

    1500.00

    2000.00

    2500.00

    3000.00

    3500.00

    4000.00

    AJJ LGD MMR SBI

    WORKSHOP UNIT

    inMT

    Present Production Proposed Production

    TOTAL OUT TURN OF ALL WORKSHOPS FOR THE YEAR 2008-09SlNo

    Name ofthe Shop

    Achieved During the Year 2008-09 (MT)

    ARAKKONAM LALLAGUDA MANMAD SABARMATHI

    TOTAL 4346.58 2470.35 7129.36 1645.89

  • 7/28/2019 Coating Inspection Reports

    42/43

    40

    CONCLUSION

    Arakkonam : Flow line has to be improved, since one more covered shed is

    required. Welders and gas cutters have to be augmented. Augmentation of Speed Gas Cutting Equipment, Compressors,

    Plate Bend Removal Machine, Drilling Machines are essentialfor increasing production. Since Arakkonam workshop is having all type of other shops such

    as Mill Wright, Fitter shop, Crossing shop, Motor Trolley shop,glued shop, foundry, black smith shop along with structural shop.

    With available shed and machineries along with re-employment ofother shop staff, present production of 50 T / month will beincreased to 100 T/ month during Aug 2009 ( 1200 T / Year ).

    Lallaguda : Land constraint is affecting for further development of this shop. Flow line cannot be further improved due to non availability of

    land. How ever with available man power and machines, the present

    structural shop capacity of 220.2 MT/ Year can be increased to 360

    MT/ Year.

    Manmad : The flow line is excellent, since it has got three parallel long shed

    of 260 m length. Feeding of material is very good. It has got Speed Pug Gas Cutting Machine, Shear Cutting

    Machines, Plate Straightening Machines, Ferrules System ofDrilling, and more numbers of Drilling Machines along with 17

    numbers ofEOT Cranes. Their structural shop capacity can be increased from 2803.82 MT

    to 3600 MT/Year per year by suitable deployment of additional

    staff.

    Sabarmathi : The flow line is moderate since two bays are narrow. It has got more number of Drilling Machines, Good Fixtures &

    Jigs, Cutting Machines, and Plate Straightening Machines. Onemore additional shed may be erected along with second bay to

    increase the production. However final assembly yard requiresimprovement.

    It is proposed to increase the production of girders from 1645.89MT/Year to 2250 MT/ Year with in 3 years.

  • 7/28/2019 Coating Inspection Reports

    43/43

    RECOMMENDATIONS

    1.Works Manager and Asst. Works Managers should be trainedin Basic Principles of Design of Steel Structures inIRICEN/PUNE.

    2.Annual SEMINAR CUM WORKSHOP to be conducted inrotation on ALL-INDIA basis for AWM/ WM/ Dy CES for

    dissemination of knowledge and what is going in different shopsof Indian Railways.

    3.Supervisors and other critical staff such as welders, gas cuttersshould be given periodical training in reputed institutions other

    than railways also for absorbing latest technology in respective

    fields.

    $ $ $