coastal fastwater booming quality/oil spil... · oil. 317 ft. anchors. anchors. oil spill...

56
APPLYING FASTER WATER BOOMING TECHNIQUES to COASTAL ENVIRONMENTS “BOOMING of BOLINAS LAGOON PRESERVE” Bolinas Sits on the Ground by the Sea, Sky Overhead. - R. Creeley

Upload: others

Post on 15-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

“BOOMING of BOLINAS LAGOON PRESERVE”

Bolinas Sits on the Groundby the Sea, Sky Overhead.- R. Creeley

Page 2: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

“BOOMING of BOLINAS LAGOON PRESERVE”Presented by

CARL J. OSKINS, DOWCAR Environmental Management, Inc.

DEE BRADLEYDOWCAR Environmental Management, Inc.

DALE STANFIELDDOWCAR Environmental Management, Inc.

JOHN BRADLEYH2O Environmental, Inc.

Page 3: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

REASONS for CONCERN OVER BOLINAS LAGOON

• 1971 COLLISION of the ARIZONA STANDARDand the OREGON STANDARD

(840,000 GALLONS SPILLED in SAN FRANCISCO BAY)

• 2007 M/V COSCO BUSAN INCIDENT

• RARE, THREATENED or ENDANGERED SPECIES

• ECOLOGICAL VALUES

• NARROW LAGOON MOUTH and FAST MOVING WATERSCREATES VULNERABILITY

• DIFFICULT to INTERPRET and IMPLEMENTArea Contingency Plan for BOLINAS LAGOON

Page 4: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

JANUARY 19, 1971 COLLISION of the ARIZONA STANDARD and the OREGON STANDARD

At 2:00 am in Dense Fog

840,000 GALLONS SPILLED

OIL CONTAINED USING BOOM, LOGS, HAY AND CABLEto CREATE a BARRIER

ACROSS the LAGOON MOUTH

INSTALLED by

LOCAL VOLUNTEERS

Barrier ofBoom and Hay

Bagged Hay on RopeReady to

Be Deployed

Page 5: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

M/V COSCO BUSAN INCIDENTAPPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

November 7, 200758,000 Gallons of Bunker Fuel in San Francisco Bay.

Struck the San Francisco - Oakland Bay BridgeIn Thick Fog.

Page 6: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

M/V COSCO BUSAN INCIDENT

BOLINAS LAGOON

BOLINASLAGOON

3 Million Cubic Yards of Waterare Exchanged Between Bolinas Lagoon and the

Pacific Ocean with Each Tide.

MOUTH OFLAGOON

SAN FRANCISCO

BAY

Cosco BusanSpill Site and

Path

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 7: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

BolinasLagoon

M/V COSCO BUSAN INCIDENT

OIL PATH

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Path Oil Traveled to Bolinas Lagoon

Page 8: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

M/V COSCO BUSAN INCIDENT

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Local CitizensWork to

Save TheirLagoon Using

BorrowedBoom

Page 9: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

M/V COSCO BUSAN INCIDENT

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

On Day 2, US Coast Guardpositions 2 Skimming Vessels2 – 3 miles offshore.

On Day 4, a Contractor Attempts to

Boom Bolinas Lagoon.

They Gave Up after theFifth Boom broke.

Page 10: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

RARE, THREATENED or ENDANGERED

3 Species of Amphibians23 of Birds

3 of Mammalsthat frequent Bolinas Lagoon

Brown Pelicans

Great Blue Heron

Water EgretsWillets

Black CrownedNight Heron

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Marbled Murrelet

Page 11: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

ECOLOGICAL VALUES

Breeding Ground for Shellfish, Finfish, Bottom Fish, and Marine Organisms

Pupping Ground for Harbor Seals

Nesting Area for Herons, Egrets and other Wading Birds

Stopover for Thousands of Migratory Birds on the Pacific Flyway

Recreational Resource

for Millions of Citizens

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Harbor Seals

Surfer

Page 12: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

NARROW LAGOON MOUTH, FAST MOVING WATERSEntrance to Bolinas Lagoon

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Pacific Ocean

Page 13: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Entrance to Bolinas Lagoon

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Pacific Ocean

Page 14: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

DOWCAR INVOLVEMENT at BOLINAS LAGOON

MULTIPLE BOOM DEPLOYMENT FAILURES in ATTEMPTS to BOOM BOLINAS LAGOON DURING the COSCO BUSAN INCIDENT

US COAST GUARD Recommended DOWCAR for FAST WATER BOOMING EXPERTISE

DOWCAR Contacted BY MARIN COUNTYin DECEMBER, 2007

SITE VISIT Arranged to BOLINAS LAGOON in APRIL, 2008

THREE DAY TRAINING and EXERCISE Conducted in JULY, 2008

Page 15: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

UPON AGREEMENT WITH:

MARIN COUNTY OPEN SPACES

CALIFORNIA FISH & GAME - OFFICE of SPILL PREVENTION,

DOWCAR ENVIRONMENTAL MANAGEMENT, Inc.Hired to Conduct 3 Day Oil Spill Response Course to

TEST LOCAL ACP for BOLINAS LAGOON

UsingFAST WATER BOOMING TECHNIQUES.

Page 16: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

FAST WATER BOOMING TECHNIQUES

BANK to BANK ROPE ANCHOR SYSTEM

SHORTER, SMALLER BOOM

20° - 25° BOOM DEPLOYMENT ANGLE into WATER CURRENT

OVERLAPPING SEGMENTS

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

APPLICATION of TECHNIQUES for FAST WATER ENVIRONMENTS (Such as Rivers)

to aCOASTAL ENVIRONMENT

Page 17: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Cascade Diversionary Boom DeploymentTruckee River - Truckee, CA

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 18: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Cascade Diversionary Boom DeploymentAmerican River - Sacramento, CA

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 19: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Cascade Diversionary Boom DeploymentMissouri River - Great Falls, Montana

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 20: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Cascade Diversionary Boom DeploymentColorado River - Laughlin, Nevada

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 21: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Cascade Diversionary Boom Deployment with Shoreline ProtectionGreen River - La Barge, WY

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 22: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Fast River Boom Deployment

Current

“C” Pull Line

Team “B”Team “A”

Far Shore

FerrySystemBoom #1

Anchor Stakes

Diagonal Release Line

Static Line

Near Shore

Team “C”

Buoy

Step 1.

“C” Hall Line

Bank to Bank Rope Anchor System

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 23: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Step 2.

Current

“C” Pull Line

“B”“A”

Far Shore

Ferry System

Boom #1

Anchor Stakes

Diagonal Release Line

Static Line

Near Shore

“C”

Buoy

Fast River Boom Deployment

Bank to Bank Rope Anchor System

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 24: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Step 3.

Fast River Boom Deployment

Current“C” Pull Line

FerrySystem

Boom #1

Static Line

Near Shore

Anchor Stakes“C”

“ B ”“A”

Far Shore

Bank to Bank Rope Anchor System

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 25: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Step 4.Fast River Boom Deployment

Current“C” Pull Line

FerrySystem

Boom #1

Static Line

Near Shore

Anchor Stakes“C”

“B-1”“A” “B-2”“B-3”

Boom #2Boom #3

Boom #4

Far Shore

Bank to Bank Rope Anchor System

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 26: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Step 5.

Fast River Boom Deployment

Current“C” Pull Line

FerrySystemBoom#1

Static Line

Near Shore

Anchor Stakes“C”

“B-1”“A” “B-2”“B-3”

Boom #2

Boom #3Boom #4

Far Shore

Bank to Bank Rope Anchor System

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 27: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Step 6.

Fast River Boom Deployment

Current“C” Pull Line

FerrySystem

Boom#1

Static Line

Near Shore

Anchor Stakes“C”

“B-1”“A” “B-2”“B-3”

Boom #2

Boom #3

Far Shore

Bank to Bank Rope Anchor System

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 28: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Step 7.

Fast River Boom Deployment

Current

FerrySystem

Static Line

Near Shore

Anchor Stakes“C”

“B-1”“A” “B-2”“B-3”

Far Shore

Bank to Bank Rope Anchor System

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 29: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

NARROW ENTRANCE to BOLINAS LAGOON is SIMILAR to FAST RIVERS

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 30: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Cascade Boom Deployment, Containment & Recovery Strategies - Bolinas LagoonHigh Tide Aerial Photos with Boom Deployment Overlay

Bolinas Lagoon Open Space Preserve

Bolinas

N

Seadrift

Stin

son

Bea

ch

Site 1.Cascade Boom

Deployment System

Not to Scale

Wharf RdWharf Rd

PacificOceanPacificOcean

STRATEGY for BOOMING ENTRY to BOLINAS LAGOON

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 31: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

AnchorsAnchors

Incoming Tide Flow

Seadrift

Stinson Beach

BolinasBolinas

Not to Scale

N

Anchors

Incoming Tide Flow

Anchors

Anchors

Oil

Anchors

Anchors

SecondaryBoom Deployment

Primary CascadeBoom Deployment

AnchorsAnchors

Oleophilic Drum Skimmer

Shoreline Protection Boom Deployment

Oil

317

ft.

Anchors

Anchors

Oil Spill Containment Boom4”x 6” (10”) w/Top Tension

@ 50 – 100 ft. Sections

PacificOcean

Anchors

Bolinas Lagoon Open Space Preserve

Cascade Boom Deployment, Containment & Recovery StrategiesBolinas Lagoon Open Space Preserve - Incoming Response Strategies

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 32: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Anchors

Incoming Tide Flow

Seadrift

Stin

son

Beac

h

BolinasBolinas

Bolinas Lagoon Open Space Preserve - Geographical Response Plan for Oil Spills©July, 2008 - (Boom Deployment, Containment & Recovery Sites and Strategies)Prepared By DOWCAR

Environmental Management, Inc.

Not to Scale

N

Anchors

Incoming Tide Flow

Anchors

Anchors

Oil Spill Containment Boom4”x 6” (10”) w/Top Tension

@ 50 – 100 ft. Sections

AnchorsAnchors

317

ft.

Anchors

Oil

Anchors

Primary CascadeBoom Deployment

SecondaryBoom Deployment

Shoreline Protection Boom Deployment

PacificOcean

Anchors

AnchorsAnchors

Anchors

Oleophilic Drum Skimmer

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Cascade Boom Deployment, Containment & Recovery StrategiesBolinas Lagoon Open Space Preserve - Outgoing Response Strategies

Bolinas Lagoon Open Space Preserve

Page 33: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Boom Laid Out Along the ShorePreparing to Deploy Cascade System - 1st Exercise

Pacific Ocean

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 34: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Team “C” on Far Shore Locates Anchor PointsPacific Ocean is Behind Them – 1st Exercise

Pacific Ocean

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Boom DeploymentAngle & Anchor Point

Page 35: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Two (2) Booms Deployed 1st Exercise

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Boom DeploymentAngle & Anchor Point

Page 36: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Four (4) Booms Deployed - 1st Exercise

Pacific Ocean

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Boom DeploymentAngle & Anchor Point

Page 37: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

INCREASED BOOM DEPLOYMENT ANGLE for 2nd EXERCISE BECAUSE

• NOT EXPECTING INCREASED CURRENT SPEED BECAUSE of TIDAL CURRENT

• PROBLEMS in ANCHORING on/or NEAR SEAWALLDURING 1st EXERCISE

• SAFETY CONCERNS of MOVING PERSONNEL with ANCHORINGLINES and ANCILLARY EQUIPMENT

THRU HIGH and FAST TIDAL WATERS ENROUTE to ANCHOR SITES

• SUCCESS of DEPLOYING OIL SPILL CONTAINMENT BOOMSin FAST WATER CASCADE SYSTEM

DURING 1st EXERCISE

Page 38: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Boom 1 Deployed Onshore for High TideBoom 2 Deployed Toward Point on Opposite Shore - 2nd Exercise

BOOM 1

BOOM 2

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 39: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Four Booms DeployedBoom 1 Onshore due to Low Tide in Anticipation of Incoming High Tide

Pacific Ocean

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Anchor Point for all Booms - 3rd Day

2nd DayAnchor Points

Page 40: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Four Booms Deployed - Containment of Rice Hulls Beginning

Anchor Point for all Booms - 3rd Day

Anchor Point for -2rd Day

Page 41: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Cascade System is Catching Rice Hulls - 2nd Exercise

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Anchor Point for all Booms

Page 42: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Cascade System for Fast Water Environments is Effective in a Coastal Water Environment

Pacific Ocean

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Anchor Point for all Booms - 3rd Day

Page 43: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Five Booms Deployed

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Anchor Point for all Booms - 2nd Exercise

Anchor Point for -1st Exercise

Page 44: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Boom Deployment, Containment & Recovery StrategiesBolinas Lagoon Open Space Preserve - High Tide

Kent Island

1

1

Seadrift

Bolinas

Site 2.Cascade Boom

Deployment System

Site 2.Cascade Boom

Deployment System

Stinson Beach

N

Seadrift RdSeadrift Rd

Dipsea RdDipsea Rd

Dipsea Rd

Dipsea Rd

Not to Scale

PacificOcean

6.

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Bolinas Lagoon Open Space Preserve

Page 45: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Bol

inas

Bol

inas

Anchors

Anchors

Anchors

AnchorsAnchorsAnchors

Anchors

AnchorsAnchors

AnchorsAnchors

SeadriftSeadrift

Stinson Beach

Kent IslandKent Island

Chevron Boom Deployment, Containment & Recovery StrategiesIncoming Tide - Photo with Boom Deployment Overlay

Chevron Boom Deployment, Containment & Recovery StrategiesIncoming Tide - Photo with Boom Deployment Overlay

AnchorsAnchorsAnchorsAnchors

AnchorsAnchorsAnchorsAnchors

Site 2. Primary CascadeBoom Deployment

N

Site 2. Secondary

Boom Deployment

AnchorsSite 2.

Shoreline ProtectionBoom Deployment

Oil

Incoming Tide Flow

Inco

min

g T

ide

Flow

Not to Scale

7.

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Bolinas Lagoon Open Space Preserve

Pacific Ocean

Page 46: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Boom in 100’ Lengths is Zig-Zagged on the Boat Ramp in Seadrift

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 47: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Team Setting Up Anchor to Receive Boom

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 48: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Jet Ski Ferries Line Attached to Boom to Anchor Team on Sand Bar Small Island

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 49: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Team on Sandbar Island Pulls Line and Boom is Being Deployed

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 50: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Shoreline Containment & Protection Boom Being Deployed

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 51: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Team Waits to be Ferried back to Nearside Seadrift Boat Ramp as the Tide Comes in

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Page 52: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

Site 1a.& 1c.

Site 1a.& 1c.

Site 5.Site 5.

Site 3.Site 3.

Site 4.Site 4.

Pacific Ocean

Bolinas

1

1

1

Boom Deployment, Containment & Recovery StrategiesBolinas Lagoon Open Space Preserve - High Tide Aerial Photo

Boom Deployment, Containment & Recovery StrategiesBolinas Lagoon Open Space Preserve - High Tide Aerial Photo

KentIsland

Site 2.Site 2.

N

SeadriftStinson Beach

Site 1b.& 1c.

Site 1b.& 1c.

Not to Scale

Site 4

.

Site 4

.

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

Bolinas Lagoon

Open Space Preserve

Page 53: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

LESSONS LEARNED

• UNREALISTIC EXPECTATIONS byPARTICIPANTS and OBSERVERS

• OVERCROWDED CLASSROOM

• INTRUSIVE MEDIA

• TOO MANY REGULATORS

• MEDIA EXPOSURE TOO SOON –TECHNIQUE HAD NEVER BEEN TRIED

Page 54: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

OBSERVATIONS

• COMMUNITY DRIVEN

• LOCAL RESIDENTS INVOLVED in EXERCISES AND TRAINING

• GOVERNMENT AGENCIES ALSO INVOLVED

• CONCEPTS of CASCADE SYSTEM INCORPORATEDin RESPONSE STRATEGY

• FOLLOW-ON EXERCISES OCCURRING

Page 55: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

SUMMARY

• FAST WATER STRATEGIES are a PART ofBOLINAS LAGOON OIL SPILL RESPONSE

• SHORTER, SMALLER BOOM

• SMALLER ANGLES (LESS THAN 20°)

• OVERLAPPING SEGMENTS

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

• AGENCIES and LOCAL CITIZENS CONTINUEto WORK TOGETHER

Page 56: Coastal Fastwater Booming Quality/Oil Spil... · Oil. 317 ft. Anchors. Anchors. Oil Spill Containment Boom. 4”x 6” (10”) w/Top Tension @ 50 – 100 ft. Sections. Pacific. Ocean

APPLYING FASTER WATER BOOMING TECHNIQUESto COASTAL ENVIRONMENTS

APPLICATION of TECHNIQUES forFAST WATER ENVIRONMENTS

(SUCH AS RIVERS) to a

COASTAL ENVIRONMENTPROVIDES MORE OPTIONS for SUCCESS

at BOLINAS LAGOON.