COAL TO ELECTRICITY
How Electricity is produced ?
Thermal Power Stations burn fuels and use theresultant heat to raise steam which drive the turbogenerator.The fuel may be `fossil'
Coal -lignite, bituminous coal, anthracite coal,
Oil or
Natural Gas or
it may be fissionable (Uranium).
Whichever fuel is used, the objective is same i.e., toconvert heat into mechanical energy in the turbine,which is coupled to a generator and to convert thatmechanical energy into electricity by rotating amagnet inside a set of windings of the generator.
-
8/8/2019 Coalto Elect
6/35
A 200 MW POWER PLANT CONSUMES ABOUT 2500TONNES OF COAL EVERY DAY.
ENERGY AVAILABLE IN 1 lb OF URANIUM = 1000TONS OF COAL.
Cv OF COAL = 4500 to 5000 kcal/kgCv OF LIGNITE = AROUND 2000 kcal/kg
Cv of fuel oil is 10,000 kcal/kg
-
8/8/2019 Coalto Elect
7/35
THE HEIGHT OF A BOILER HOUSE OF A 210 MW UNIT IS 64
METRES
AND HEIGHT OF CHIMNEY IS 220 METRES.
THE HEIGHT OF A BOILER HOUSE OF A 500 MW UNIT IS
ABOUT 89 METRES AND HEIGHT OF CHIMNEY IS 275
METRES.
IN A TOWER TYPE BOILER, EVEN FOR A 210 MW UNIT,
THE HEIGHT OF A BOILER HOUSE IS ABOUT 89 METRES.
A 210 MW POWER PLANT CONSUMES ABOUT 2500 TONSOF COAL EVERY DAY.
THE BOTTOM ASH PRODUCED IS ABOUT 175 TONS.
-
8/8/2019 Coalto Elect
8/35
THE ORDER IN WHICH DIFFERENT FECILITIES ARRANGED IN A T.P.S. :
COAL HANDLING PLANT
OIL HADLING PLANTWATER TREATMENT PLANT
ASH HANDLING PLANT
CHIMNEYS
I.D. FANS
ELECTRO STATIC PRECIPITATOR
F.D. FANS
MILLS
FURNACE
BUNKER BAYCONTROL ROOM
TURBINE FLOOR
GENERATING & UNIT TRANSFORMERS
SWITCH YARD
-
8/8/2019 Coalto Elect
9/35
In a coal-fired power station the basic raw
materials are Coal & Air.
The coal, brought to the station by trains
or by other means, travels from the coal
handing plant by conveyor belt and to thecoal bunkers, from where it is fed to the
pulverising mills which grind it as fine as
face powder.
-
8/8/2019 Coalto Elect
10/35
The finely powdered coal mixed with pre-heated,
air is then blown into the boiler by a fan called
Primary Air Fan where it burns, more like a gasthan like a solid in the conventional domestic or
industrial grate, with additional amount of air
called secondary air supplied by a Forced Draft
Fan.
As the coal has been ground finely, the resultant
ash is also a fine powder. Some of it binds
together to from lumps which fall into the ashpits at the bottom of the furnace.
-
8/8/2019 Coalto Elect
11/35
-
8/8/2019 Coalto Elect
12/35
Coal handling plant
-
8/8/2019 Coalto Elect
13/35
-
8/8/2019 Coalto Elect
14/35
The water quenched ash from the bottom of the
furnace is conveyed to pits for subsequent
disposal or sale. Most of ash, still in fine particle form is carried
out of the boiler to the precipitators as dust,
where it is trapped by electrodes charged with
high voltage electricity.
The dust is then conveyed by water to disposal
areas or to bunkers for sale while the cleaned
flue gasses pass on through I.D.Fan to be
discharged from the chimney.
-
8/8/2019 Coalto Elect
15/35
Ash Handling system
-
8/8/2019 Coalto Elect
16/35
Meanwhile the heat released from the coal has been
absorbed by the many kilometers of tubing which line theboiler walls.
Inside the tubes is the boiler feed water which istransformed by the heat into steam at high pressure andtemperature
The steam, super heated in Super Heater passes to theturbine where it is discharged through nozzles on theturbine blades.
Just as the energy of the wind turns the sails of the wind-mill, so the energy of steam, striking the blades, makes
the turbine rotate. Coupled to the end of the turbine is the rotor of the
generator a large cylindrical magnet so that when theturbine rotates the rotor turns with it.
-
8/8/2019 Coalto Elect
17/35
-
8/8/2019 Coalto Elect
18/35
The rotor is housed inside the stator havingheavy coils of copper bars in which electricity isproduced through the movement of the magnetic
field created by the rotor.
The electricity passes from the stator windings tothe step-up transformer which increases its
voltage so that it can be transmitted efficientlyover the power line of the grid.
The steam that has given up its heat energy ischanged back into water in a condenser so that
it is ready for re-use. The condenser containsmany kilometers of tubing through which coldwater is constantly pumped.
-
8/8/2019 Coalto Elect
19/35
The steam passing around the tubes loosesheat and is rapidly changed back to water. But
the two lots of water (i.e., boiler feed waterandcooling water) must never mix.
The cooling water is drawn from the river/sea,
but the boiler feed water must be absolutelypure, far purer than the water that we drink, if itis not to damage the boiler tubes. The chemistryat a power station is largely the chemistry ofwater.
a condenser, which by rapidly changing thesteam back into water creates a vacuum.
-
8/8/2019 Coalto Elect
20/35
To condense the large quantities of steam, huge
and continuous volume of cooling water is
essential. In most of the power stations thesame water is to be used over and over again.
So the heat which the water extracts from the
steam in the condenser is removed by pumping
the water out to the cooling towers. The cooling towers are simple concrete shells
acting as huge chimneys creating a draught
(natural/mechanically assisted by fans) of air.
The water is sprayed out at top of the towers
and as it falls into the pond beneath, the upward
draught of air-cools it.
-
8/8/2019 Coalto Elect
21/35
The cold water in thepond is then recirculatedby pumps to thecondensers. Inevitably,however, some of thewater is drawn upwardsas a vapour by thedraught and it is thiswater which forms thefamiliar white cloudswhich emerge from the
towers seen sometimes.
Cooling Water System
-
8/8/2019 Coalto Elect
22/35
-
8/8/2019 Coalto Elect
23/35
CONSIDERATIONS IN THE LOCATION OF THERMAL POWER STATIONS
The preparation of feasibility report for a thermal station requires studyunder two headings, viz. Area Selection and Site Selection.
a) Supply of raw materials, which in the case of thermal power stations arecoal and water, are of extreme importance.
b) Transport facilities to haul the raw materials, viz. Coal in this case andthe capital equipment
c) Transmission of power produced to the load centers.
d) A labour force of size and quality required but this will not be of overriding consideration. In our country the migration of labour from one place toanother does not pose very difficult problems.
e) Means of disposal for any trade effluents or byproducts. In case ofthermal stations both the flue gases and the ash are effluents and themeans for their disposals are to be thought of.
-
8/8/2019 Coalto Elect
24/35
Climatic conditions:
The climatic conditions also play a part in area selection;as in the case of thermal power stations these affect not
only the capital cost of structures and machines etc. Butalso the economics of generation during normal running.
Station Layout
The station layout is the arrangement of all the plantequipment, engineering systems and buildings which arenormally accommodated within the site boundary. This isdivided in to two areas.
First, the main station buildings which contain the major
plant items and systems such as boiler and turbinegenerator & second the auxiliary supporting systems andservices such as and handling plant, oil handling plant,ash handling plant, cooling water pumps etc. Which arelocated around the site outside the main buildings.
-
8/8/2019 Coalto Elect
25/35
The lay out of turbo-generator and the auxiliariesplus the coal crushing equipment for the boilerare generally located in an integrated building so
as to achieve the following objectives: Proper flow of process fluids steam, condensate,
air, coal and oil
Economy of space
Ease of installation/operation/maintenance Avoidance of interference
Clear passages and easy access to various floorsand equipment
Proper safety precautions Streamline locations for good appearance
-
8/8/2019 Coalto Elect
26/35
General Arrangement:
Normally the concept in India is to have turbo generator and itsauxiliaries located in one big hall called turbo generator hall orT.G.bay.
Adjacent to this bay is an electrical bay comprising of control room,electrical switchgear and other minor auxiliaries.
The next bay generally consists of coal bunkers and coal mills.Sometimes coal bunkers and electrical bay overlap as is in the caseof Badarpur 3X100 MW layout.
Sometimes the mill bay is taken on the other side of the boiler forvarious reasons.
It may be pointed out here that station layout is not an exact sciencebut combination of art and science where the personal liking and
considerations weigh even more than the purely economicalconsideration.
A proper balance has to be struck between these two to have anacceptable lay out.
Proper lay out goes a long way in providing necessary comforts to
the operation and maintenance staff.
-
8/8/2019 Coalto Elect
27/35
Turbine Lay Out:
Once the basic concept of general arrangement is
agreed to and the decision between transverse andlongitudinal is taken the more detailed studies arerequired to finalize turbine lay out.
This consists of proper location of the following major
equipment 1) turbo generator ii) condensate pumps iii)circulating water pumps iv) LP heaters v) HP heaters vi)boiler feed pumps vii) oil coolers viii) stator water coolingsystem and various local control panels.
-
8/8/2019 Coalto Elect
28/35
Turbine operating floor should be in line with themain control room as far as possible so as to
have easy and direct access between the two.This floor should have as little obstruction on thefloor as possible.
Openings are left in the floor for approaching
equipment that is located underneath.
Generally this takes in to consideration thelength of HP heater shell which may have to be
removed for periodic maintenance. Anothermajor decision in TG bay is to have thebasement floor or not.
-
8/8/2019 Coalto Elect
29/35
Location of Deaerator:
Deaerator location has certain basic process
requirements with respect to the boiler feedpump.
Each boiler feed pump is designed to operateunder a particular net positive suction head and
this has to be provided by increasing thedearator level to particular height.
Moreover relative location of dearator withrespect of the boiler feed pump should be
chosen so as to have minimum BFP suction line.Provision has to be made in its foundation totake care of these requirements.
-
8/8/2019 Coalto Elect
30/35
Mill Bay
Coal from the coal yard is crushed to 25mm size
and conveyed through a conveyor gallery to the
transfer points. From the transfer point another
pair of conveyor belts carry the coal to the
bunkers.
Conventionally the milling in station with 210
MW units are housed in the space available
between the boiler and the power house in a line
and ducting have been conveniently done withsix mills.
-
8/8/2019 Coalto Elect
31/35
Piping layout
Besides equipment lay out station lay out engineer hasto keep in view the pipe routing not only for high-
pressure piping but also for low-pressure piping. Pipesare supported on brackets located in trenches as well asthe tunnels so as to have minimum interference betweenthem and the adjoining equipment.
Electrical Cables:
Provision has to be made in the station lay out for layingup electrical cables. For this generally two cablesgalleries are provided in electrical bay. In the bay,generally cables are taken in small cable trenches andwith pipes near the motors. In boiler area, they are beingtaken in cable tunnels and trenches. Cables may be laidover head also in addition to laying them in trenches.
-
8/8/2019 Coalto Elect
32/35
Ventilation:
For proper ventilating in the whole building windows areprovided but they are not sufficient and hence are
supplemented by having exhaust fans either on the sidesor in the roof. Space has to be provided for theventilation equipment in the main building as far aspossible.
Layout Aids:
The lay out engineer has to work in close co-operationwith the engineers of electrical as well as civil designside. Sometimes he may have to change his lay out ifthere are certain civil engineering constraints and alsocertain electrical requirements. Generally templates areused to see the various alternative locations ofequipment and these alternatives are studied withrespect to their positive and negative points.
-
8/8/2019 Coalto Elect
33/35
General Considerations:
In any plant lay out care has to be taken to
provide the basic necessities such as toilets andwash rooms, drinking water, rest rooms,engineers cabin, small stores, passages andstairs.
Generally lift is provided on two ends of the mainbuilding with a provision for an additional goodslift somewhere in between. This leads to easytransfer to heavy equipment from one floor toanother. With the higher capacity units andadditional lift for reaching the top of the boiler isalso provided.
-