coal mountain phase 2 project - teck resources · 2015-11-06 · coal mountain phase 2 project site...
TRANSCRIPT
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!
Natural Gas Buildings
Coal
Leac
hR
oad
HWY
3
Heig
htOfLand
Wheeler Creek Road
No Unauthorized AccessNo Hunting
No Shooting
Le ach
Creek
Wheeler Creek
Marten Creek
Littl
e
Wheeler Creek
Marten Creek
Carbon C
reek
Hei ght
Of L
and
1600
18001800
1 800
1 600
20 00
1 400
1200
22 00
2000
1800
1400
1800
2
200
1800
1800
1800
2000
18 0 0
1400
2
00 0
160
0
200 0
1600
1800
2000
1600
1600
2000
1600
180 0
20 00
180016 0 0
16 0 0
18
00
1800
2000
180 0
650000
650000
655000
655000
660000
660000
5490
000
5490
000
5495
000
5495
000
Coal Mountain Phase II Operations
2km
LegendGate
Road Open
Road Closed
Coal Mountain Phase 2 ProjectCoal Mountain Phase 2 Project
Pow
erlin
ePo
wer
line
Cor
bin
Hig
hway
Cor
bin
Hig
hway
CP
Rai
lway
CP
Rai
lway
No Entry, No Hunting, No Shooting Safety Boundary in 2014
Teck respectfully asks backcountry users to observe the No Entry, No Hunting, No Shooting boundary on the Coal Mountain Phase 2 project site near Marten Ridge and Wheeler Ridge off Corbin Road.
Heavy machinery will be operating in this area throughout the rest of 2014 as Teck carries out active exploration drilling in the area.
This safety boundary has been created in consultation with local backcountry users to allow access to as much of Teck’s private land as possible, while ensuring that our workers and members of the public are safe during active mine exploration work.
• Expect to see work vehicles on access roads in this area
• Slow down around work sites
• Always know where you are in relation to the no entry boundary
• Be aware of workers near the perimeter of the active work site
For more information or to report an incident please call 250.433.7348.
For the provincial government’s Hunting and Trapping Regulations Synopsis for Region 4—Kootenay, please visit www.env.gov.bc.ca
Coal Mountain Phase 2 Project