coal and mineral development in alberta 2014 year in review · 4 coal and mineral development in...

20
Coal and Mineral Development in Alberta 2014 Year in Review Coal mining and projects Metallic and industrial mineral activity Land-use planning Industrial mineral and coal production and royalty Subsurface reservoir storage

Upload: others

Post on 20-Mar-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

Coal and Mineral Development in Alberta2014 Year in Review

Coal mining and projectsMetallic and industrial mineral activityLand-use planningIndustrial mineral and coal production and royalty Subsurface reservoir storage

Page 2: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

2 Coal and Mineral Development in Alberta

Alberta EnergyResource Revenue and Operations DivisionCoal and Mineral Development BranchNorth Petroleum Plaza9945-108 St NWEdmonton, AB T5K 2G6

Phone: 780-427-7707Fax: 780-422-5447Email: [email protected]: www.energy.alberta.ca/OurBusiness/minerals.asp www.energy.alberta.ca/OurBusiness/coal.asp

All Alberta Acts and Regulations are available online:www.qp.alberta.ca/Laws_Online.cfm

Permit and Leasing Toolkitswww.energy.alberta.ca/minerals/547.asp

Coal and Mineral Development in Alberta Year in ReviewJanuary 2015

ISBN 978-1-4601-2110-8(Print)ISBN 978-1-4601-2111-5 (Online)

ISSN 2291-1545(Print)ISSN 2291-1553 (Online)

“Coal and Mineral Development in Alberta Year in Review” is published annually by Alberta Energy

ContentsIntroduction 3Metallic and industrial minerals 3

2014 metallic and industrial mineral exploration highlights 42014 industrial mineral quarry activities 10

Coal 102014 coal exploration highlights 102014 coal mine activities 12In Situ Coal Gasification (ISCG) 14

CMD Updates 14Activities 14Mineral Assessment Reports 15Interactive maps 15

Legislation 15Subsurface Reservoir Lease 15

New publications 16Alberta Geological Survey 16

Land-use planning 16Alberta Land Stewardship Act (ALSA) 16Land-Use Framework (LUF) 16Lower Athabasca Regional Plan (LARP) 18South Saskatchewan Regional Plan (SSRP) 18North Saskatchewan Regional Plan (NSRP) 19Other Regional Plans 19

Energy and Mines Ministers’ Conference 19About Alberta’s regulatory system 20

Cover photosLeft: Cardinal River coal mine, courtesy Alberta

Geological SurveyCentre: dragline at Genesee coal mine, courtesy Alberta

Geological SurveyRight: Grassy Mountain coal project, courtesy Riversdale

Resources.

The information contained within this report has been collected from publicly available government information, company websites, press releases, and reports filed on Sedar (www.sedar.com). All figures quoted are current as of the time of publication. Please consult the company websites for specific information regarding any projects outlined in this report. Any other references are noted within the document. The authors make no warranty of any kind with respect to the content and accept no liability, either incidental, consequential, financial or otherwise, arising from the use of this document.

Scan the QR code to go to the Alberta Energy website, where you can download a pdf of the 2014 (and previous years') Year in Review.

CMD Year in Review-04 (2014)

Page 3: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

32014 Year in Review

Figure 1. A bar graph with the total area of metallic and industrial minerals permits and permit applications from 2010 through 2014 (the report period is October 1 through September 31). Numbers at the base of the bars indicate the number of individual permits or applications.

Metallic and Industrial Minerals Permits

1305 1550 1121 986 81960 405 43 12 530

1,0002,0003,0004,0005,0006,0007,0008,0009,000

10,000

2010 2011 2012 2013 2014

Are

a ('0

00 h

a)

093 Metallic and Industrial Minerals PermitA93 Metallic and Industrial Minerals Permit Application

Figure 2. A bar graph with the total area of metallic and industrial minerals leases and lease applications from 2010 through 2014 (the report period is October 1 through September 31). Numbers at the base of the bars indicate the number of individual leases or applications.

Metallic and Industrial Minerals Leases

273 308 301 315 32639 34 15 2 80

50

100

150

200

250

300

350

2010 2011 2012 2013 2014

Are

a ('0

00 h

a)

094 Metallic and Industrial Minerals LeaseA94 Metallic and Industrial Minerals Lease Application

IntroductionWhile overall activity decreased in Alberta in 2014, there was significant work completed on a number of metallic and industrial mineral, and coal projects. Companies with available capital are continuing to develop projects in preparation for better market conditions.

Exploration activities continue to target a variety of metallic and industrial minerals; however, the interest in silica sand as a source for frac sand has increased significantly. With the identification of potential sources within both surface and subsurface deposits, companies have been looking to capitalize on the growing need for frac sand in Alberta and northeast British Columbia.

There was progress on the development of new coal mine projects as well as an expansion of an existing coal mine. Most coal-related activity relates to bituminous coal in the foothills and front ranges in the Eastern Slopes.

The development and implementation of Alberta’s Land-use Framework continued through 2014. This includes widespread involvement from a variety of government departments, stakeholders, and industry. Currently, the Lower Athabasca Regional Plan is being implemented, the South Saskatchewan Regional Plan is approved, and the North Saskatchewan Regional Plan is in development.

Metallic and industrial mineralsIn 2014 the mineral exploration industry faced another year of challenges due to low metal prices and lack of capital. Mineral exploration in Alberta continued to be limited; however, work advanced on an iron project in the Peace River area and land acquisition and exploration for uranium in northeastern Alberta increased. The area held under metallic and industrial mineral permits fell for a third straight year, continuing the five year trend (Figure 1). The area under metallic and industrial mineral lease increased slightly from the previous year (Figure 2). The number of active metallic and industrial mineral licences increased again in 2014, continuing the five-year trend (Figure 3).

Page 4: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

4 Coal and Mineral Development in Alberta

Figure 3. A bar graph with the total number of active metallic and industrial minerals licences from 2010 through 2014 (the report period is October 1 through September 31).

Metallic and Industrial Minerals Licences

0200400600800

1,0001,2001,4001,6001,800

2010 2011 2012 2013 2014

Num

ber

092 Metallic and Industrial Minerals Licence

Although the number and area of permits submitted for assessment is at a five-year low, the total expenditures accepted are up from 2013. Except for the large peak in 2012, 2014 had the highest expenditures filed and accepted in the past five years (Figure 4).

2014 metallic and industrial mineral exploration highlights

Polymetallic Shale

In late 2013, DNI Metals Inc (www.dnimetals.com) released a Preliminary Economic Assessment (PEA) for the Buckton polymetallic black shale project located approximately 120 kilometres north of Fort McMurray. The PEA outlines a conceptual mine plan that considers production of 450 tonnes of uranium yellowcake and 5,500 tonnes of rare earth oxides in addition to zinc, nickel, copper, cobalt and yttrium. In 2014, the company assessed the potential for adding a recovery circuit for scandium oxide.

Iron

Ironstone Resources Ltd (www.ironstoneresources.com) continued to advance its Clear Hills iron-vanadium project, located approximately 80 kilometres northwest of Peace River in northwest Alberta. Ironstone’s intent is to form the iron oxide ore into high-value, uniform metallic iron briquettes containing at least 90 percent iron for easy shipment. A vanadium pentoxide (V2O5) byproduct can also be recovered.

Ironstone completed two process metallurgical campaigns designed to test the iron reduction

process. The initial recovery was targeted at 80%. Reported results are positive with 90 percent or greater metallization after reduction. The metallized samples were then magnetically separated resulting in a Direct Reduced Iron (DRI) concentrate consisting of 90% iron (Fe), 0.12% phosphorous (P), and 0.3% carbon (C).

The company is conducting further mineral processing tests and is working on a Preliminary Economic Assessment.

Ironstone’s Clear Hills project is an oolitic ironstone deposit hosted in the Cretaceous Bad Heart formation.

Figure 4. A graph of mineral assessment report statistics for 2010 through 2014. The number of permits and area are those reported in submitted reports. The accepted expenditures are those accepted by Alberta Energy; the total amount claimed is not reported, but is higher than the accepted expenditure value. Accepted values for 2014 are preliminary because not all report reviews were completed at the time of publication. Numbers at the base of each bar are the number of reports received.

Assessment Report Expenditures

Year Reports Permits Area (ha)Accepted

expenditures ($)Payment

in lieu2010 23 261 1,690,880 $5,772,404 $02011 19 112 642,758 $1,953,248 $39,7122012 21 343 2,392,416 $15,510,795 $02013 24 193 1,101,370 $5,746,824 $02014 15 81 391,064 $6,463,459 $0

23 19 21 24 150

50

100

150

200

250

300

350

400

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

2010 2011 2012 2013 2014

Per

mits

Exp

endi

ture

s (x

$100

0)A

rea

(x10

00 h

a)

Accepted expenditures ($)Area (ha)Permits

Page 5: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

52014 Year in Review

Uranium

Uranium exploration activity increased in Alberta in 2014. The Athabasca Basin, which straddles the Alberta-Saskatchewan border, produces about 15 percent of the world’s uranium for energy. Most of the significant uranium discoveries to date and all the operating uranium mines are located on the Saskatchewan side of the basin. In 1988 high grade uranium was found in northeast Alberta in the Dragon Lake area, on the far west side of the Athabasca Basin. The Alberta Geological Survey reports that one intersection in the Dragon Lake area along the Maybelle River shear zone has 21% U3O8 over five metres and another intersection of up to 54.5% U3O8. The potential exists for additional uranium discoveries in the Alberta side of the Athabasca Basin.

Declan Resources Inc (www.declanresources.com) continued work on their Firebag River property located about 100 kilometres northeast of Fort McMurray. In April 2014, Declan announced that it purchased 100 percent interest in five uranium properties in northeastern Alberta: Archer Lake, Jackfish Creek, Maurice Creek, Maybelle North and Richardson River.

A 1004 line kilometre airborne electromagnetic (EM) geophysical survey over the Maybelle North and Richardson River properties identified four electromagnetic trends for follow-up. The company plans to conduct ground geophysical programs in early 2015, followed by exploration drilling. In November 2014, Declan announced it has completed a 1,326.5 line kilometre high-resolution magnetic and radiometric survey of its Maurice Creek property.

The Maurice Creek property encompasses 27,500 hectares immediately northwest of Cameco Corporation’s Northwest Athabasca Project which is host to the Maurice Bay uranium deposit.

In August 2014, Declan announced it acquired an option to purchase additional uranium properties within the Athabasca Basin, including two in Alberta.

In 2013 Brazil Resources Inc (www.brazilresources.com) acquired the Rea uranium property through a corporation transaction. The Rea project is controlled 75% by Brazil Resources and 25% by Areva Resources Canada Inc and is located 185 kilometres northeast of Fort McMurray, Alberta in the western portion of the Athabasca Basin. The Rea property surrounds the high-grade Maybelle (Dragon Lake) uranium occurrence.

In September 2014, Brazil Resources announced the findings from an independent report that describes the historical uranium exploration work on the property and presents a recommended six hole, 2,600 metre drill program exploration program focused on the North Zone and the West Zone.

In March, 2014 Fission 3.0 Corporation (www.fission3corp.com) released a Technical Report on their North Shore uranium property

Panarc Resources (www.panarc-resources.com) holds the West Basin Uranium property in northeast Alberta. Previous exploration work by Esso Minerals in the 1970s included lake-bottom sediment and lake water sampling, reflection seismic and gravity surveying. Panarc is recommending a program of detailed gravity and electromagnetic surveys followed by target-specific seismic reflections surveys to identify potential drill targets on the property.

In late 2013 Vulcan Minerals Inc (www.vulcanminerals.ca) acquired 10 metallic and industrial mineral permits approximately 50 kilometres east of Fort McMurray. The exploration target is Athabasca Basin style uranium deposits. In February 2014, the company released an evaluation report on the uranium potential of the property including recommendations for a two phase exploration program.

Diamonds

The Buffalo Head Hills group of kimberlites in Alberta is the third largest district of diamond-bearing kimberlites in Canada, yet it remains underexplored. The Buffalo Head Hills Joint Venture consortium (Canterra Minerals Corporation, Shore Gold Inc, and Encana Corporation) holds the largest ground position in the area. To date, a total of 26 diamond-bearing kimberlites have been discovered on the property. The diamonds are generally of high quality. Given the renewed interest in diamond exploration this year, there may be increased interest in exploration for diamonds in Alberta.

Grizzly Discoveries Inc (www.grizzlydiscoveries.com) announced in June 2014 that they acquired additional metallic and industrial mineral permits for their Alberta Diamond project, which is located in the Buffalo Head Hills area of north-central Alberta. The Alberta Diamond project now covers 92,025 hectares (227,399 acres) of the Buffalo Head Hills kimberlite field. Grizzly plans to conduct new detailed ground geophysical surveys and acquire

Page 6: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

6 Coal and Mineral Development in Alberta

new LIDAR and orthophoto data to aid in identifying new kimberlites, followed by bulk sampling of previously discovered kimberlites and drilling of new high priority targets. To date, Grizzly’s Alberta Diamond Project hosts at least seven kimberlites, of which three contain microdiamonds.

Potash

There was a decreased level of exploration in 2014 for potash in Alberta. Grizzly Discoveries Inc announced they had a third party evaluating their Alberta Potash project located along the Alberta-Saskatchewan border. Drilling by Grizzly in 2011 on the Alberta Potash project property intersected up to 31.1% K2O.

Silica sand

Companies completed a number of exploration projects to test the extent and quality of silica sand in Alberta in 2014. Sand with high silica (SiO2) content can supply many industrial applications, including the glass industry, as filler in paint, plastics and rubber, and in foundry operations.

A particular type of high purity silica sand is in demand for use in hydraulic fracturing (fracking), where frac sand and a viscous gel and other chemicals are injected down a well under pressure. The pressure fractures the oil-bearing formation and the sand particles prop open fractures to increase oil and natural gas flow to the well head. A single well may use many tonnes of frac sand to extend the life of the reservoir.

DNI Metals added additional metallic and industrial mineral permits to its polymetallic project located approximately 120 kilometres north of Fort McMurray to claim exposures of sandstone with frac sand potential. Twenty two samples were collected from trenches and exposures of the Pelican sandstone formation and examined to see if they meet frac sand specifications.

Declan Resources evaluated the frac sand potential on their Firebag River property, in addition to pursuing uranium exploration. Initial laboratory results on frac sand samples from the property show high silica content, quality sphericity and roundness values, and a high percentage of sand falling within the preferred 20/40 and 40/70 mesh sizes. In addition, the company examined cuttings and drill core from oil sands drilling, stored at the Alberta Energy Regulator core storage facility in

Calgary, to document the continuity of high-grade frac sand at or near surface.

Athabasca Minerals Inc (www.athabascaminerals.com) is developing its Firebag frac sand deposit to supply frac sand to oil and gas customers in Western Canada. The project is located 95 kilometres north of Fort McMurray. The company proposes to develop a 32 hectare parcel as the first development of the overall 202 hectare Firebag silica sand project. The second phase of the project includes planning the development of a larger 169 hectare parcel.

A National Instrument (NI) 43-101 Technical Report was released in September 2014; it outlines an Inferred mineral resource of 45 million tonnes of silica sand on the first phase of the project. A Preliminary Economic Assessment is underway.

Athabasca received approval from Alberta Environment and Sustainable Resource Development for phase one of the project. This approval grants the right to work and remove surface materials. Approval is pending for additional permits. Anticipated initial production is scheduled for 2016.

Rainmaker Resources Ltd (www.rainmakerminingcorp.com) entered into an option agreement to acquire the Peace River frac sand property from Zimtu Capital Corporation (www.zimtu.com) and 877384 Alberta Ltd. The property is located adjacent to the Peace River frac sand quarry owned and operated by Canadian Silica Industries (www.laprairiegroup.com/companies/canadian-silica-industries). Rainmaker carried out mapping and sampling of sandstone outcrops on the property this past summer, but decided not to continue with their option.

Victory Mountain Ventures Ltd entered into an option agreement in 2014 to earn an interest in the Ells frac sand property located 95 kilometre from Fort McMurray in northeast Alberta. The company compiled stratigraphic information to construct a 3-D model of the property.

In October 2014 CanAm Coal Corp (www.canamcoal.com) signed a Letter of Intent to acquire a 100 per cent interest in a frac sand property located in Alberta.

Industrial Minerals

Athabasca Minerals completed detailed core logging and sampling from drilling completed in

Page 7: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

72014 Year in Review

2013 and 2014 on its Richardson project located 130 kilometres north of Fort McMurray. High quality dolomite and granite are being evaluated for their use in concrete, asphalt and road base applications.

In 2014 Athabasca Minerals entered into a joint venture agreement with Wood Buffalo Metis Corporation to explore for, develop, and market potential sources of aggregate, including granite, dolomite, limestone, and silica sand.

Salt

Athabasca Minerals acquired three additional metallic and industrial mineral permits in 2014 to increase its holdings covering the Lotsberg salt formation near Boyle, Alberta.

Further north, on its Dover project, Athabasca acquired an additional metallic and industrial mineral permit adjacent to their existing leases that cover a salt formation; the company is evaluating the formation for its chemical and storage cavern potential. The Dover project is located about 150 kilometres north of Fort McMurray.

Heavy minerals

Titanium Corporation (www.titaniumcorporation.com) continued work on their process for extracting heavy minerals and residual bitumen from oil sands tailings. The company completed a heavy minerals bulk sample program designed to facilitate recovery of commercial volumes of zircon and titanium concentrate. In addition, the company commissioned a report on the marketability of the zircon and titanium products.

For additional information about metallic and industrial permits and leases that did not report active exploration in 2014, go to Alberta Energy’s online interactive map: www.energy.alberta.ca/OurBusiness/1072.asp.

Figure 5. The total quarriable mineral production and royalty collected for the last five years, including 2014. The report period is from October 1 to September 31.

Quarriable Mineral Production

$0

$100

$200

$300

$400

$500

$600

$700

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

2010 2011 2012 2013 2014

Roy

alty

pai

d (x

$100

0)

Pro

duct

ion

(x10

00 to

nnes

)

ProductionRoyalty

Year Production Royalty2010 12,078,733 $551,4392011 10,423,433 $471,4042012 11,399,983 $537,6212013 9,794,655 $445,4962014 10,583,127 $500,671

Figure 6. The total salt production and royalty collected for the last five years, including 2014 The report period is from October 1 to September 31.

Salt Production

$0

$25

$50

$75

$100

$125

$150

0

50

100

150

200

250

300

350

2010 2011 2012 2013 2014R

oyal

ty p

aid

(x$1

000)

Pro

duct

ion

(x10

00 to

nnes

)

ProductionRoyalty

Year Production Royalty2010 257,935 $116,0712011 239,061 $107,5772012 246,968 $111,1362013 222,631 $100,1842014 203,659 $91,647

Page 8: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

8 Coal and Mineral Development in Alberta

Figure 7. A map of Alberta showing metallic and industrial mineral tenure activity as of January 2015. An interactive, real-time version of this map is available at www.energy.alberta.ca/OurBusiness/1072.asp

5

WOOD BUFFALO

JASPER

BANFF

WATERTONLAKES

ELK ISLAND

²³

2

²³

16

²³

1

²³

16

²³

2

²³

2

²³

3

²³

28

²³

63

Fort McMurray

Red Deer

MedicineHat

Lloydminster

Lethbridge

GrandePrairie

EDMONTON

Cold Lake

CALGARY

SOURCE INFORMATION:Mineral Agreements: Alberta EnergyIndian Reserves: Natural Resources CanadaBase Map Data provided by the Government of Alberta under the Alberta Open Government Licence.

DISCLAIMER:This product or the data represented within may not be revised,copied, distributed, republished, uploaded, posted, or transmittedin any way without prior consent of Alberta Energy, the Governmentof Alberta. The information as depicted is subject to change; thereforethe Government of Alberta assumes no responsibility for discrepanciesat time of use.

Published Date: January 2015Author: Resource Mapping & Analysis (st)

Metallic &Industrial Minerals

Agreement Activity

Permit

Lease

Permit Application

Indian Reserve

Métis Settlement

National Park

Municipality

Hydrography

Primary Highway

´0 10050

Kilometres

Transverse Mercator Projection (10TM) North American Datum 1983 (NAD83)

G:\Custom\2015\Projects\CMD\CMD_Annual_Report\Metallics_Activity\mxd\20150120_Metallic_Activity.mxd

1 Clear Hills2 Buckton polymetallic3 Firebag River/ Maybelle North/

Richardson River 4 Rea5 North Shore6 Alberta Diamond7 Firebag8 Peace River Silica9 Parson Creek

1

2 3

5

6

7

8

4

9

Page 9: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

92014 Year in Review

2014 industrial mineral quarry activitiesProduction and royalty

The production of quarriable minerals (including limestone, dolomitic siltstone, sandstone, and silica sand) compares to the average over the last five years; salt production is slightly down from 2013, which continues the five-year trend (Figure 5 and 6). The most significant quarriable mineral production during this five year period is limestone. Salt production, from the Devonian Elk Point Group, is from in situ leach operations (rather than traditional mining methods).

Table 1 lists all operating industrial mineral quarries in Alberta.

Mine/Quarry Commodity Location Operator

Calling Lake* Salt North of Athabasca Calcium Inc.

Clearwater Limestone Rocky Mountain House Burnco Rock Products Ltd.

Cougar Ridge Limestone Rocky Mountain House Prairie Creek Quarries Ltd.

Exshaw Limestone Exshaw Lafarge Canada Ltd.

Fish Creek Limestone Nordegg Graymont Western Canada Inc.

Fort Hills Limestone North of Fort McMurray Hammerstone Corporation

Fort McMurray West Limestone Fort McMurray Suncor Energy Inc.

Gap Limestone Exshaw Graymont Western Canada Inc.

McLeod Limestone Cadomin Lehigh Hanson Materials Ltd.

Mitsue* Salt Slave Lake Tiger Calcium Services Inc.

Muskeg Limestone North of Ft McMurray Hammerstone Corporation

Peace River Silica Silica Sand Peace River Contractors Leasing Corp.

Riverview* Salt Riverview The Canadian Salt Company Ltd.

Rundle Stone Dolomitic Siltstone Canmore Kamenka Quarries Ltd.

Seebe Shale Kananaskis Lafarge Canada Ltd.

Sprayfalls Sandstone Exshaw Thunderstone Quarries Ltd.

Steepbank Limestone North of Fort McMurray Hammerstone Corporation

Summit Lake Limestone Coleman Graymont Western Canada Inc.

Sunnynook* Salt Drumheller Jarodon Resources Ltd.

Vicory Sandstone Coleman Pat Dwyer Construction Inc

Yamnuska Sandstone Kananaskis Lafarge Canada Ltd.

Industrial Mineral Quarries

Table 1. A table of the active industrial mineral quarries in Alberta; there are no metallic mines. *Salt is produced through in situ leaching from the Elk Point group.

Limestone

The Natural Resources Conservation Board (NRCB; https://nrp.nrcb.ca) released decision NR 2014-01 in February 2014. This decision concluded that the Parsons Creek Aggregate quarry project is in the public interest. The quarry is operated by Parsons Creek Aggregates (www.parsonscreekresources.com), which is a joint venture between Graymont Western Canada (www.graymont.com) and Inland Cement (www.lehighhansoncanada.com). It is located between Highway 63 and the Athabasca River just north of Fort McMurray (Figure 7). The company plans to quarry 58 Mt of limestone over a 40 year period.

Page 10: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

10 Coal and Mineral Development in Alberta

Figure 8. A bar graph with the total area of coal leases and lease applications from 2010 through 2014 (the report period is October 1 through September 31). Numbers at the base of the bars indicate the number of individual leases or applications.

Coal Leases

1167 1231 1205 1216 1233294 332 554 561 5970

100

200

300

400

500

600

700

800

2010 2011 2012 2013 2014

Are

a ('0

00 h

a)

013 Coal LeaseA13 Coal Lease Application

Coal The total area and number of coal leases in the province remained relatively constant from 2013 to 2014 (Figure 8). The area under coal lease application increased (Figure 8). Whereas interest in 2012 and 2013 was focused on acquiring new coal rights, 2014 saw companies explore and document coal resources on properties acquired in previous years. See Figure 9 for a map of Alberta’s coal fields, coal ranks, mines, and projects.

2014 coal exploration highlightsIn September 2013, Altitude Resources Ltd (www.altituderesources.ca) reported a NI 43-101 resource estimate on the Elan property comprising a 62.14 million tonne indicated resource and an 84.72 million tonne inferred resource. The resource calculation is based on historical exploration, including 82 rotary drill holes, 127 core holes, 19 adits, and 21 coal bed methane wells.

This past summer, Altitude completed an exploration program consisting of seven drill holes (four core and three rotary holes) and seven trenches. Exploration was focused on specific coal quality analysis (historical analysis indicates a rank of mid-volatile bituminous). Once analytical results are completed in 2015, Altitude plans to issue an updated NI 43-101 resource estimate.

In November, Altitude Resources, Elan Coal Ltd (www.elancoal.com), and Kuro Coal Ltd (www.atrumcoal.com) announced a joint venture agreement for the Elan property. Under the

agreement, Kuro Coal becomes the project operator and can earn up to 70 per cent interest in the property by meeting defined agreement milestones, including drilling, pre-feasibility and feasibility studies. Altitude Resources and Elan Coal would retain 12.5 per cent and 17.5 per cent interest, respectively, if they meet the terms of the agreement with Altitude.

The Elan property is located approximately 15 kilometres north of the Municipality of Crowsnest Pass. It is made up of 27 coal lease applications covering an area of 23,000 hectares.

Altitude Resources also continued work on their Palisades property located north of the town of Hinton. Following a drill program in fall 2013, Altitude Resources announced a NI 43-101 coal resource estimate in February. They report a 10.1 million tonne Measured and Indicated resource and a 4.9 million tonne Inferred resource of low-volatile bituminous coal.

Riversdale Resources (www.rivresources.com) continued work on the Grassy Mountain project in the Crowsnest Pass. In November 2014 the company released an Environmental Impact Assessment Proposed Terms of Reference for the project. The purpose of the report is to identify information required by government regulators for an Environmental Impact Assessment (EIA). This is preparation for the development of a full EIA as a major step toward project approval.

In addition, the company is preparing a feasibility study for the project. Current estimates are for the mine to produce two to four million tonnes of metallurgical coal per year over a 28 year life. If development proceeds as planned, Riversdale anticipates mining operations would begin in 2018.

Operated by the wholly owned-subsidiary Benga Mining, the Grassy Mountain coal mine project sits on both Crown and privately-held coal rights. It is located within the Crowsnest Pass in southwest Alberta. The proposed mine and coal processing plant is located seven kilometres north of the community of Blairmore.

2014 coal mine activitiesProduction and Royalty. Bituminous coal production has remained constant over the last four years. Because of lower net revenues reported by producers, royalty payable has decreased over the same period (Figure 10). The total subbituminous coal production also remained about the same

Page 11: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

112014 Year in Review

Figure 9. A map of Alberta showing coal tenure activity (dark brown), and coal mines and projects, as of January 2015. Coal fields (light brown) and approximate coal rank distribution (coloured bands) are also shown. An interactive, real-time version of the coal tenure on this map is available at www.energy.alberta.ca/OurBusiness/1072.asp.

Ç

Ç

Ç

Ç

Ç

ÇÇÇÇ

«Ç

«Ç

«Ç

«ÇÇÇ

ÇÇ

«Ç

«Ç

«Ç

WOOD BUFFALO

JASPER

BANFF

WATERTONLAKES

ELK ISLAND

CALGARY

EDMONTON

Red Deer

Lethbridge

MedicineHat

Cold Lake

Fort McMurray

GrandePrairie

Lloydminster

LOWER PEACE

UPPER PEACE

RED DEER

LOWERATHABASCA

UPPERATHABASCA

SOUTHSASKATCHEWAN

NORTHSASKATCHEWAN

DoddsGenesee

Cheviot

Highvale

Sheerness

Blackstone

Paintearth/Vesta

Summit Coal

Coal Valley

Grande Cache

Vista

GrassyMountain

BurtonsvilleIsland

Palisades

Elan

B

R

I

T

I

S

H

C

O

L

U

MB

I

A

SA

SK

AT

CH

EW

AN

²³

2

²³

16

²³

1

²³

16

²³

2

²³

2

²³

3

²³

28

²³

63

SOURCE INFORMATION:Mineral Agreements: Alberta EnergyAlberta Coal Data: Alberta Energy RegulatorBritish Columbia Coal Data: BC Ministry of Energy & MinesIndian Reserves: Natural Resources CanadaBase Map Data provided by the Government of Alberta under the Alberta Open Government Licence.

DISCLAIMER:This product or the data represented within may not be revised, copied, distributed, republished, uploaded, posted, or transmitted in any way without prior consent of Alberta Energy, the Government of Alberta. The information asdepicted is subject to change; therefore the Government of Alberta assumes no responsibility for discrepanciesat time of use.

Published Date: January 2015Author: Resource Mapping & Analysis <st>

Ç Coal Mine

«Ç Advanced Coal Project

Export/Domestic Boundary

Land Use Framework Boundaries

Coal Leases/Applications

Coal Fields & Deposits

Bituminous Coals

Subbituminous Coals

Lignites

Indian Reserve

Métis Settlement

National Park

Municipality

Hydrography

Primary Highway

´0 10050

Kilometres

Transverse Mercator Projection (10TM) North American Datum 1983 (NAD83)

Export Bituminous & Domestic

Subbituminous Coals

G:\Custom\2015\Projects\CMD\CMD_Annual_Report\Coal_Activity\mxd\20150120_ExportBitumen_DomesticSubBitCoals.mxd

Alberta coal mines and projects

Ram

Page 12: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

12 Coal and Mineral Development in Alberta

Figure 10. The total bituminous coal production and royalty collected for the last five years, including 2014. The report period is from October 1 to September 31.

Bituminous Coal Production

Year Production Royalty2010 7,808,400 $20,628,2212011 6,898,123 $12,325,9692012 6,805,148 $8,892,6262013 6,653,820 $5,775,6402014 6,915,435 $5,826,830

$0

$5,000

$10,000

$15,000

$20,000

$25,000

01,0002,0003,0004,0005,0006,0007,0008,0009,000

10,000

2010 2011 2012 2013 2014

Roy

alty

pai

d (x

$100

0)

Pro

duct

ion

(x10

00 to

nnes

)

ProductionRoyalty

Subbituminous Coal Production

Figure 11. The total subbituminous coal production and royalty collected for the last five years, including 2014. The percentages are the portion of the production from Crown coal rights. Alberta Energy does not collect royalty on freehold coal production. The report period is from October 1 to September 31.

Year Production Crown % Royalty2010 23,583,193 43% $5,604,6372011 24,938,975 59% $8,124,1112012 22,483,777 60% $7,463,2582013 22,288,559 59% $7,209,3492014 24,230,326 70% $9,314,753

43% 59% 60% 59% 70%$0$1,000$2,000$3,000$4,000$5,000$6,000$7,000$8,000$9,000$10,000

0

5,000

10,000

15,000

20,000

25,000

30,000

2010 2011 2012 2013 2014R

oyal

ty p

aid

(x$1

000)

Pro

duct

ion

(x10

00 to

nnes

)

ProductionRoyalty

in 2014 as the previous four years (Figure 11). The proportion of production from Crown-owned coal is higher over the last four years, which has resulted in an elevated amount of royalty collected by the Crown relative to 2010. In 2014, there was a marked increase from a 10 per cent increase in production from Crown rights.

Table 2 lists all operating coal mines in Alberta.

Grande Cache Coal Mine

In October 2014, Up Energy Development Group (www.upenergy.com) purchased Grande Cache Coal Corporation (www.gccoal.com) for a total of $2. After purchasing the company in 2011 for $1 billion, Winsway Coking Coal Holdings Ltd (www.winsway.com) and Marubeni Corporation (www.marubeni.com) announced they would each sell interest in Grande Cache for $1. Winsway will retain 17 per cent interest and both companies retain an option to re-purchase interest at a later date.

Up Energy is a Chinese coking coal producer based in Xinjiang province in northwest China.

At the beginning of January 2015, Grande Cache announced it would be ceasing coal production from surface operations in February. The company will focus on production from the mine’s underground operations.

Vista Project

In February 2014 the Alberta Energy Regulator (AER) granted project approval for the Vista mine project to Coalspur Mines Limited (www.coalspur.com). The approval includes several conditions that the operator must meet for the project, including for the coal processing plant, mine plan, end-pit lake, geotechnical investigations, fines management, surface water quality, wetland, wildlife management, and noise mitigation. Subsequently, Coalspur received four additional approvals in August and October:

Page 13: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

132014 Year in Review

Table 2. A table of the active coal mines in Alberta.

Mine Coal rank Location Owner/Operator Main use

Burtonsville Subbituminous Burtonsville Keephills Aggregate Company Inc.

Small-scale sales

Cheviot (Cardinal River)

Bituminous Hinton Teck Coal Ltd. Export: metallurgical

Coal Valley Bituminous Hinton Westmoreland Coal Co. Export: thermal

Dodds Subbituminous Ryley Dodd’s Coal Mining Company Ltd.

Small-scale sales

Genesee Subbituminous Warburg Capital Power LP / Westmoreland Coal Co.

Electricity: Genesee generating stations

Grande Cache Bituminous Grande Cache Grand Cache Coal Corp Export: metallurgical

Highvale Subbituminous Wabamun Transalta Corp / SunHills Mining LP

Electricity: Keephills and Sundance generating stations

Paintearth/Vesta Subbituminous Forestburg Westmoreland Coal Co. Electricity: Battle River generating stations

Sheerness Subbituminous Hanna Westmoreland Coal Co. Electricity: Sheerness generating stations

Coal Mines

• An Environmental Protection and Enhancement Act (EPEA) approval for construction, operation, and reclamation.

• A Water Act approval for activities pursuant to constructing, operating, maintaining, and reclaiming Vista.

• A licence under the Water Act to operate works and to divert a limited amount of ground water and surface water annually.

• A Mineral Surface Lease under the Public Lands Act.

Coalspur released an updated NI 43-101 technical report for Vista and nearby Vista South in July. This report was completed by Snowden Mining Industry Consultants Inc and is available from the Coalspur website or Sedar (www.sedar.com).

The main hurdle facing Coalspur currently is securing the funding to proceed with construction of the mine. Low coal prices are making it especially difficult. This has caused Coalspur to delay the start of construction, which was previously set at July 2014.

Coal Valley mine expansion

The Westmoreland Coal Company (www.westmoreland.com) is continuing with the expansion of the Coal Valley mine. The expansion is into the Robb Trend, which is a northwest-southeast trending coal seam to the east of the existing mine operations. The project is located near the hamlet of Robb in the Coal Branch of the Rocky Mountain Foothills. The mine will continue to utilize existing coal processing facilities for production from new mining operations.

In October 2014, the Federal Minister of Environment referred the Robb Trend coal mine expansion project to a joint federal-provincial environmental assessment review panel. This joint review panel will be in cooperation with the Alberta Energy Regulator, who is responsible for the regulation of coal mining in Alberta.

With the announcement, the Federal Minister of Environment set timelines for the joint review:

• Pre-panel phase: 150 days from the referral to a panel to establish the panel.

Page 14: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

14 Coal and Mineral Development in Alberta

• Panel phase: 430 days from the establishment of the panel for the panel to submit their final report.

• Post-panel phase: 150 days from the date of submission of the panel’s report the Federal Minister of Environment must make a decision on the project.

The timelines do not include the time for Westmoreland to gather information for the review.

To support participation in the public review, the Canadian Environmental Assessment Agency announced in December that they will allocate $627,436 to 11 applicants. The applicants include 10 First Nations groups and a local association from the hamlet of Robb.

In Situ Coal Gasification (ISCG) There was no significant work done in 2014 with respect to developing in situ coal gasification. The most advanced project in the province, Swan Hills Synfuels’ pilot project, has been on hold since late in 2011.

CMD Updates

ActivitiesRoundup and PDAC. Representatives from the Coal and Mineral Development (CMD) branch of Alberta Energy hosted booths at the Mineral Exploration Roundup (Roundup) in Vancouver and the Prospectors and Developers’ Association of Canada (PDAC) convention in Toronto, in 2014. These conferences provide Alberta Energy an opportunity to disseminate information about Alberta, its resources, mineral rights, and other related topics. They also provide an opportunity for those interested in Alberta to make a direct connection.

Coal Association of Canada Conference. CMD hosted an information booth focussing on Alberta’s coal tenure and royalty regimes as well as investment opportunities at the annual Coal Association of Canada’s Annual Conference and Tradeshow held in Vancouver during mid-September.

China Mining Conference and Investment Forums. Alberta Energy participated for the second time as a full participant with a Canadian delegation

to the annual China Mining Conference and Exhibition (www.china-mining.org/en/index.aspx) in Tianjin, China, and Canada Mineral Investment forums in Beijing and Shanghai, China, and Tokyo, Japan.

The trip was successful solidifying new connections and continued to build on established relationships in Asia. Alberta also helped arrange mineral investment forums where companies working in Alberta met investors based in China and Japan. Support for the trip was provided by the Alberta offices in Beijing and Tokyo. Although the economic downturn meant fewer companies were able to join the trip than in previous years, there was very good reception for those that were there.

Other jurisdictions that were part of the Canadian delegation were British Columbia, Yukon, Saskatchewan, Quebec, Newfoundland and Labrador, and the federal government.

Mineral Assessment ReportsAll assessment reports submitted to Alberta Energy are subject to a confidentiality period of one year. The most recent reports will not be available on the website until after this period.

Non-confidential mineral assessment reports housed by Alberta Energy are available on the Alberta Energy website: www.energy.alberta.ca/minerals/3441.asp. Reports dating back to 1949 have been scanned and are available for viewing and printing in PDF format at no charge.

Mineral assessment reports are required by Alberta Energy for a permittee to maintain a Metallic and Industrial Minerals Permit. Every two years, a permittee must supply a report that documents the exploration work they did during the previous two-year period and that they expended the required amount of money doing so. Assessment reports are the record of the exploration work that is done by permit holders.

Interactive maps There are online interactive maps available on the Alberta Energy website to show up-to-date tenure information for ammonite shell, coal, and metallic and industrial minerals. The data is updated nightly. The maps are a very important tool for those interested in applying for mineral rights.

Data from the ammonite shell, coal, and metallic

Page 15: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

152014 Year in Review

and industrial minerals maps are available for download. The maps are located on the Alberta Energy website: www.energy.alberta.ca/OurBusiness/1072.asp. There is an easy to use tutorial available, accessed by selecting the help button when in the map.

Legislation

Subsurface Reservoir LeaseOn September 3, 2014, Cabinet approved (OC 364/2014) amendments to the Metallic and Industrial Minerals Tenure Regulation (AR 145/2005) to create a new lease type: Subsurface Reservoir Lease (SRL). These new leases will be used to issue storage rights in subsurface salt caverns.

Previously, the right to store a substance in subsurface salt caverns was granted as a Special Mineral Lease. The authority to do this is through section 9(b) of the Mines and Minerals Act, which allows the Minister to enter into an agreement that vary from the Act or any regulations with the approval of the Lieutenant Governor in Council (i.e. Cabinet).

The SRL grants the exclusive right to store a specified substance (e.g. natural gas, petroleum liquids, crude oil, and petroleum waste) in a subsurface reservoir, as well as to create a cavern in salt for the purpose of storage. Because the rights are now granted through regulation, Cabinet approval is no longer required. All other administrative processes will remain the same. During 2015 additional information will be released regarding the new leases. In the meantime, applications for a Subsurface Reservoir Lease should be submitted as a letter that states the location, formation, and substance to be stored.

Annual rental for a Subsurface Reservoir Lease is $12.50 per hectare. Each lease will be limited to one section and a $625 application is due for each application.

New publications

Alberta Geological SurveyThe Alberta Geological Survey (AGS) released new bedrock geology maps for Alberta and the Alberta

Rocky Mountains. Maps and all other publications are available for free from their website: www.ags.gov.ab.ca.

Energy Briefing Note: The Ultimate Potential for Unconventional Petroleum from the Montney Formation of British Columbia and Alberta. National Energy Board; British Columbia Oil and Gas Commission; Alberta Energy Regulator; and British Columbia Ministry of Natural Gas Development, AER/AGS Information Series 144, 2013.

Hydrogeological Field Notes by Dr. Jósef Tóth: 1964-1969, Central and Southern Alberta. Tóth, J., AER/AGS Information Series 143, 2014.

Outcrops of the Lower Waterways Formation (Firebag and Calumet Members) on the Clearwater, Athabasca and Firebag Rivers, Alberta (NTS 74D, E). Schneider, C.L., Grobe, M., Hein, F.J., Leighton, L.R., and Forcino, F.L., AER/AGS Open File Report 2014-08, 2014.

Compilation of Boreholes Drilled or Logged by the Alberta Geological Survey. Waters, E.J. and Andriashek, L.D., AER/AGS Open File Report 2014-06, 2014.

Regional Correlation of the Beaverhill Lake Group in the Subsurface of Alberta, Townships 29 to 113 and Ranges 1W4 to 13W6. Hauck, T.E., AER/AGS Open File Report 2014-05, 2014.

Geological Characterization of the Lower Clearwater Shale in the Athabasca Oil Sands Area, Townships 87-99, Ranges 1-13, West of the Fourth Meridian. Haug, K., Greene, P., and Mei, S., AER/AGS Open File Report 2014-04, 2014.

Subsurface Stratigraphic Picks for the Milk River ‘Shoulder’, Alberta Plains: Including Tops for the Milk River Formation and Alderson Member of the Lea Park Formation. Glombick, P.M. and Mumpy, A.J., AER/AGS Open File Report 2013-17, 2014.

A Review of the Potential Correlation between Low-Magnitude Earthquakes and Oil and Gas Industry Activity in Alberta. Haug, K., Dongas, J.M., and Warren, J.E., AER/AGS Open File Report 2013-16, 2014.

Regional Cross-Sections of Devonian Stratigraphy in Northeastern Alberta (NTS 74D, E). Schneider, C.L. and Grobe, M., AER/AGS Open File Report 2013-05, 2013.

Thin Section Analysis of Core Samples from the Duvernay and Muskwa Formations and

Page 16: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

16 Coal and Mineral Development in Alberta

For more information regarding the LARP, SSRP, or other land-use plans, contact:

Land-use Framework Regional Planning780-427-7707

Land-use planning questions?

the Majeau Lake Member in Alberta. Anderson, S.D.A., Bladek, J., and Rokosh, C.D., AER/AGS Open File Report 2013-06, 2013.

Land-use planning

Alberta Land Stewardship Act (ALSA)The ALSA was passed on June 4, 2009 and is the legislative mechanism to implement and support the development of regional plans under the Land-use Framework (LUF).

To clarify the intent of the legislation and to reinforce the Government of Alberta’s commitment to respecting the property rights of Albertans, the ALSA was amended on May 10, 2011.

Land-Use Framework (LUF)A key strategy of the LUF is the development of seven regional land use plans (see Figure 12). Along with environmental monitoring and regulatory enhancement, regional planning is a cornerstone of the world-leading resource system that the Government of Alberta is building in Alberta. This more integrated and coordinated resource system will deliver the best economic, environmental and social benefits for Albertans today and improve competitiveness and certainty for industry for years to come.

Lower Athabasca Regional Plan (LARP)The LARP, the first regional plan developed under the LUF, was publicly released on August 22, 2012 and the regulatory components of the plan took effect on September 1, 2012. The LARP is a forward-looking, 50-year blueprint that provides the strategic direction needed to enhance environmental management in the Lower Athabasca Region which hosts the Athabasca Oil Sands Area, the main economic driver for the region and the province.

The LARP ensures future opportunities for oil sands, petroleum and natural gas, electricity and metallic and industrial mineral development. The establishment of six new conservation areas by the LARP brings the total conserved area in the region to two million hectares or approximately 22% of the land base. Nine new recreation areas established by the LARP help address social needs, giving Albertans access to various recreational sites to enjoy year round.

Implementation of the LARP began with the establishment of the Urban Development Sub-Region (UDSR) boundaries through an Order in Council and implementation of new conservation areas and new provincial recreation areas (PRAs) designated by the LARP. This required the cancellation of oil sands agreements within the UDSR, oil sands and metallic and industrial mineral (MIM) agreements in conservation areas, and MIM agreements within PRAs. The Government has been working with affected companies throughout the process of cancellation and compensation. As of the end of 2014, all oil sands agreements within the new conservation areas have been cancelled and compensated.

Environmental management frameworks for air and surface water quality were developed as part of the LARP and those for groundwater, an updated surface water quantity management framework for the Lower Athabasca River, and a Biodiversity Management Framework are being developed based on commitments made in the LARP.

South Saskatchewan Regional Plan (SSRP)The final SSRP came into force on September 1, 2014. Direction in the SSRP supports Alberta’s Integrated Resource Management System (IRMS) by establishing clear regional outcomes, providing clear direction to land use decision-makers, and the use of monitoring to support achievement of the outcomes.

Economically, the SSRP seeks to provide certainty for industry by ensuring clear rules for access to, and development of, natural resources are in place and also ensures opportunities for the responsible development of the region’s renewable energy industry in the region are maintained. The SSRP also identifies strategies to provide for more tourism opportunities, forest management, and maintaining a sustainable agriculture industry in the region.

Environmentally, to protect critical watersheds, habitats and native grasslands, the SSRP creates eight new or expanded conservation areas, including a new 54,588 hectare Castle Wildland

Page 17: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

172014 Year in Review

Lake Athabasca

Lake Claire

Lesser Slave Lake

Bistcho Lake

ColdLake

UtikumaLake

Lac la Biche

CallingLake

SullivanLake

GordonLake

Winefred Lake

BeaverhillLake

MamawiLake

GullLake

PigeonLake

Buffalo Lake

PeerlessLake

Baril Lake

North WabascaLake

RichardsonLake

South WabascaLake

GrahamLake

Sla

ve R

i v

e r

P e a c e R i v e r

W a p i t i R i v e r

A t h

ab

a s c a R i v e r

Mc l e o d

Ri v

e r

N o r t h S a s k a t c h e w a n R i v e r

R e d De

e r R i v e r

B o w R i v e r

O l d m a n R i v e r

N o r t h S a s k a t c h e w a n R i v e r

A t h a b a s c a R i v e r

So

uth Sas

katchewan R i v er

Pe

a c e R i v e r

S m o k y R i v e r

Calgary

Edmonton

Lethbridge

Medicine Hat

Red Deer

Leduc

Cold Lake

Fort McMurray

St. Albert

Airdrie

GrandePrairie

FortSaskatchewan

Lloydminster

Lacombe

W O O D B U F F A L O

N A T I O N A L

P A R K

J A S P E R

N A T I O N A L

P A R K

B A N F F

N A T I O N A L

P A R K

WATERTON LAKESNATIONAL PARK

ELK ISLANDNATIONAL PARK

Paddle Prairie

GiftLakePeavine

Kikino

FishingLake

EastPrairie

BuffaloLake

Elizabeth

²³

58

²³

35

²³

63

²³

2

³²1

²³

43

²³

5

²³

3

²³

28

²³

4

²³

3

²³

2

³²1

³²16

³²16

²³

2

²³

35

²³

58

²³

43

3

54

6

2

7

1

7

98

5

8

4

9

6

51

71

83

99

91

83

31

79

87

91

27

39

39

28

27

50

59

67

99

95

19

67

95

63

71

51

55

11

19

75

52

11

15

92

23

87

55

80

31

35

75

15

24

32

88

84

48

3635

68

60

12

91

67

63

72

40

37

59

47

16

71

56

13

83

43

48

99

49

17

79

96

92

68

79

20

29

33

60

72

76

96

56

52

32

20

55

76

92

60

36

16

64

18

84

42

25

69

40

88

28

61

81

68

57

95

64

69

75

37

72

77

70

93

14

21

66

33

56

85

21

82

10

30

97

53

85

41

52

93

80

89

53

41

61

57

38

73

47

61

58

73

87

62

85

44

69

65

73

10

29

38

81

26

17

93

94

18

89

70

76

58

43

86

34

22

77

49

65

62

90

26

97

80

42

30

82

96

54

58

88

78

62

90

54

53

74

70

98

34

89

94

45

86

74

66

94

74

66

77

98

78

81

86

78

97

50

46

54

98

90

44

82

12

45

1314

46

126

103

111

119

115

123

119

115

119

111

123

103

100

104

111

112

107

120

108

122

100

116

112

104

120

124

120

107

116

112

108

105

103

113

101101

113

117

109

105

100

121

125

109

113

117

102104

106

114114

102

118

122

110

114

118

101

110

105

102

106

107

106

108109110

BR

IT

IS

H

CO

LU

MB

IA

SA

SK

AT

CH

EW

AN

125124

121

1

84

51

9 8 7 6 5 234 2345

9

6789

8 7 6

2347 568

5

879 964

42

23559 38 67

34 2

11 10

12 11

22 21 20 19 18

10

17

13

13 10

22

12 1116

14

23

27

15 14

26

21

1925

13

22 1521

12 11

23

22

10

13

1617

12 1024

18

111723

20

2625 24 1319 1826 21 20 10201819 1516 1117 1416 131215 14 2512 11 10

24

2312

27 27

Cold LakeAir Weapons Range

C.F.B.Suffield

C.F.B. Wainwright

C.F.B. Cold Lake

C.F.B.Edmonton

I.R.148

I.R.145

I.R.146

I.R.201

I.R.147

I.R.125

I.R.215

I.R.209

I.R.203I.R.137

I.R.149

I.R.122

I.R.154

I.R.162

I.R.166

I.R.142,143, 144

I.R.128

I.R.226

I.R.236

I.R.123

I.R.155

I.R.133A

I.R.133

I.R.150

I.R.138

I.R.134

I.R.150A

I.R.207

I.R.173

I.R.120

I.R.228

I.R.234

I.R.121

I.R.135

I.R.139

I.R.232

I.R.138B

I.R.149B

I.R.174B

I.R.202

I.R.194

I.R.210

I.R.211

I.R.176

I.R.164

Limit 147B

I.R.166B

I.R.235

I.R.174A

I.R.144A

I.R.217

I.R.173A

I.R.166C

I.R.134A

I.R.150E

I.R.164A

I.R.212

Limit 148A

I.R.155A

No.230

I.R.138A

I.R.201G

I.R.151A

I.R.227

I.R.150H

I.R.131

I.R.167

I.R.163

I.R.216

I.R.142B

I.R.133C

I.R.152C

I.R.155B

I.R.222

I.R.152B

I.R.213

I.R.154A

I.R.151K

I.R.175

No.150D

I.R.237

I.R.194B

I.R.221

I.R.150G

I.R.133B

I.R.214

I.R.194A

I.R.163B

I.R.174

I.R.233

I.R.154B

I.R.225

I.R.201F

I.R.224

I.R.150F

I.R.176A

I.R.223

I.R.173B

I.R.173C

I.R.149A

I.R.201A

I.R.218

I.R.201CI.R.201B

I.R.167A

Settlement 187

I.R.134B

I.R.178

I.R.203A

I.R.137A

!

!

!

I.R.135A

!

!

I.R.183

!

!

No.231!

!

No.150C

No.150BNo.229! !

!!

!

! I.R.166AI.R.166D

!

I.R.176B

!

!

!

!

I.R.219

I.R.220

!

!

I.R.201EI.R.201D

!

!

!

I.R.163A

!

!

I.R.196G

I.R.196F

I.R.196E

I.R.196DI.R.196C

I.R.196B

I.R.196AI.R.196

Blue QuillsFirst Nation

I.R.174C

Upper Peace

South Saskatchewan

North Saskatchewan

Lower Athabasca

Upper Athabasca

Lower Peace

Red Deer

G:\access\basemaps\LUF\LUF

SOURCE INFORMATION:Land-use Framework: Government of AlbertaParks & Protected Areas: Alberta Tourism, Parks & RecreationIndian Reserves: Natural Resources CanadaBase Map Data Provided by Spatial Data Warehouse Ltd.

DISCLAIMER:This product or the data represented within may not be revised,copied, distributed, republished, uploaded, posted, or transmittedin any way without prior consent of the Alberta Energy, Governmentof Alberta. The information as depicted is subject to change; thereforethe Government of Alberta assumes no responsibility for discrepanciesat time of use.

Published Date: October 2012Author: Integrated Resources & Environmental Policy (eu)

Alberta's Land-use Framework

Land-use FrameworkRegional Boundary

Parks & Protected Areas

National Park

Military Reserve

Indian Reserve

Métis Settlement

Municipality

Hydrography

Primary Highway

0 50 10025

KilometresTransverse Mercator Projection (10TM)North American Datum 1983 (NAD83)

´

Figure 12. A map of Alberta, showing the boundaries of the regional planning areas associated with Alberta's Land-use Framework.

Page 18: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

18 Coal and Mineral Development in Alberta

Provincial Park and the 34,356 hectare Pekisko Heritage Rangeland. The SSRP also establishes environmental management frameworks for ensuring air and water quality as well as a commitment to develop a biodiversity management framework.

Socially, the SSRP has identified two new and six expanded Provincial Parks to help meet growing demand for recreational opportunities and to provide a dedicated land base to support recreation and tourism development. Twelve new primitive public land recreation areas in the eastern slopes for camping and trail access are also created by the SSRP.

Implementation of the SSRP is underway. A key element of establishing the new conservation areas in the region is initiating the process of cancelling and compensating portions of coal and MIM agreements falling within the new conservation areas. It should be noted that these are historical coal and MIM agreements that existed prior to A Policy for Resource Management of the Eastern Slopes, released in 1977 and revised in 1984, and should have been cancelled and compensated at that time to be consistent with the management intent of Prime Protection Zones established under the Policy. The SSRP and the establishment of legally designated conservation areas ensure that this administrative oversight is addressed.

The SSRP has also directed the Government of Alberta to review the coal categories as laid out in the 1976 A Coal Development Policy for Alberta along with the Integrated Resource Plans in the region. The review of the coal categories will only be for the South Saskatchewan Region at this time. The intent is for the SSRP and associated tools developed under the SSRP to supersede the coal categories within the region and provide clear direction about where exploration and development of all mineral resources, including coal, can and cannot occur in the planning region.

North Saskatchewan Regional Plan (NSRP)The Regional Advisory Council (RAC) for the NSRP concluded its series of eight meetings in various locations in the region in November 2014. The RAC was guided by a Cabinet approved Terms of Reference for the region which specified areas for the RAC to provide advice to the Government of Alberta. The RAC Advice for the NSRP is anticipated to be presented to the Government of Alberta by the end of 2014.

The Government of Alberta intends to publicly release the RAC Advice document in early 2015.

Other Regional PlansPre-planning work for the Upper Peace, Lower Peace, Upper Athabasca and Red Deer Regional Plans is underway.

Energy and Mines Ministers’ ConferenceThe 2014 Energy and Mines Ministers’ Conference was held August 24 to 26 in Sudbury, Ontario. The Mines session of the conference included a round table on the state of the junior mining sector in Canada. The purpose of the round table was threefold: 1) for Ministers to receive industry’s perspective on the state of the junior mining sector; 2) to discuss Canada’s long-term competitiveness in the mining sector; and 3) for Ministers to task provincial, territorial, and federal officials to develop a framework exploring the competitiveness of the sector.

Mines Ministers also approved two deliverables:

• The release of a compendium of good mining practices. This report’s objective is to promote government, industry, and community initiatives that have yielded positive results and have improved community readiness and engagement for mining-related activities. This report included three case studies from Alberta: Coalspur Mine Limited’s Community Readiness Program; the Luscar and Gregg River mines’ land management plan; and Genesee coal mine reclamation.

• An update that was given on an Environmental Verification Program (EVP) pilot study, as part of the Green Mining Initiative. The pilot is investigating a process to certify mining-related technologies under Environment Canada’s EVP program. The technology being tested is an on-demand ventilation system for underground mines.

These publications and others can be viewed on Natural Resources Canada website (https://www.nrcan.gc.ca/publications/11102)

Page 19: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

192014 Year in Review

About Alberta’s regulatory systemThe Crown owns 81% of the mineral rights in Alberta. The other 19% are Freehold mineral rights and are owned by individuals, companies or the federal government on behalf of First Nations. The Coal and Mineral Development Branch is responsible the administration of the Crown’s mineral rights for metallic and industrial minerals and coal.

Agreement Rights granted Term Application fee

Annual rental Work requirements

Metallic and Industrial Minerals Permit

The exclusive right to ex-plore for MIM in the subsur-face and remove samples for exploration purposes.

14 years, divided into 7 2-year work terms; not-renewable

$625 N/A Term 1 Term 2-3 Term 4-7

$5/ha $10/ha $15/ha

Coal Lease The exclusive right to win, work, and recover coal.

15 years; renewable

$625 $3.50/ha N/A

Metallic and Industrial Minerals Lease

The exclusive right to win, work, and recover metallic and industrial minerals.

15 years; renewable

$625 $3.50/ha N/A

Metallic and Industrial Minerals Licence

The non-exlusive right to win, work, and recover me-tallic and industrial minerals through placer mining (i.e. a sluice box).

5 year; not-renewable

$50 N/A N/A

Secondary Mineral Lease

The right to win, work, and recover metallic and industrial minerals through a secondary recovery operation.

5 years; renewable

$625 $3.50/ha N/A

Special Mineral Lease*/ Subsurface Reservoir Lease

The exclusive right to create caverns and store material in underground salt formations.

15 years; renewable

$625 $12.50/ha N/A

Ammonite Shell Agreement

The exclusive right to recover ammonite shell. Must be held in conjunction with an exemption from the Historical Resources Act.

15 year, 5 year renewal

$625 $3.50/ha N/A

Table 3. A table outlining the various coal, and metallic and industrial minerals agreements, along with the detail of each type of agreement. *Special Mineral Leases are one-off agreements between a lessee and the Crown; the details listed in this table are not exclusive, they are the most common.

The mineral rights for coal, and metallic and industrial minerals are managed using a variety of agreements, depending on the specific substance and/or activity a client wishes to pursue (see Table 3). Each agreement type is defined and governed through the Alberta’s Mines and Minerals Act, the Metallic and Industrial Minerals Tenure Regulation, and the Ammonite Shell Regulation. Fees and rentals are set out in the Mines and Minerals Administration Regulation

Page 20: Coal and Mineral Development in Alberta 2014 Year in Review · 4 Coal and Mineral Development in Alberta Figure 3. A bar graph with the total number of active metallic and industrial

www.energy.alberta.ca