coach rehabilitation workshop, wc railway, bhopal filemayank prajapati - je amit vishwakarma - sse...

41
Coach No. :SE018112 Type : WGACCN Built Year : 2001 Make : RCF Form No. F/BR/ICF/002 Valid From: 02/04/2015 Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of Corrosion Repair Rotary Side Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per% Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100% Aux. Head stock 4 100% Sole Bar 15 47% Draft Gear Bracket 2 100% Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 0 0% Bottom Wall Part 15 47% Body panel/patch 100% Door Top/Roof Patch 0% Window Module 0% Window Sill 0 0% Window Bar 0 0% Seat piller/lav. Partition 100% UIC end construction 100% End Drooping: Rotery End - EAST : -10, WEST : -4 Other End - EAST : 3, WEST : 10 Start Date : 24-Apr-2017, Completion Date : 29-Apr-2017, Net Repair Days : 6, Total Man Hours : 14440 MAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Upload: others

Post on 01-Sep-2019

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE018112 Type : WGACCN Built Year : 2001 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 15 47% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 0 0%Bottom Wall Part 15 47% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 0 0% Window Bar 0 0%Seat piller/lav. Partition 100% UIC end construction 100%

End Drooping: Rotery End - EAST : -10, WEST : -4 Other End - EAST : 3, WEST : 10Start Date : 24-Apr-2017, Completion Date : 29-Apr-2017, Net Repair Days : 6, Total Man Hours : 14440

MAYANK PRAJAPATI - JE AMIT VISHWAKARMA -SSE

ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 2: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE018221 Type : WGSCN Built Year : 2001 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 14 84% Draft Gear Bracket 2 100%Trough floor 7 100% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 14 84% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 40 100% Window Bar 112 63%Seat piller/lav. Partition 100% UIC end construction 100%

End Drooping: Rotery End - EAST : 0, WEST : -6 Other End - EAST : 6, WEST : 5Start Date : 21-Apr-2017, Completion Date : 29-Apr-2017, Net Repair Days : 8, Total Man Hours : 1376

U S BAJPAI - SSE P N VISHWKARMA - SSE MANOJ AGARAWAL - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 3: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE018318 Type : WGSCN Built Year : 2001 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 11 69% Draft Gear Bracket 2 100%Trough floor 7 100% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 11 69% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 14 35% Window Bar 30 17%Seat piller/lav. Partition 100% UIC end construction 100%

End Drooping: Rotery End - EAST : 5, WEST : -3 Other End - EAST : 0, WEST : 5Start Date : 25-Apr-2017, Completion Date : 04-May-2017, Net Repair Days : 9, Total Man Hours : 2088

R PILLAI - SSE A K D SHARMA - SSE MANOJ AGARAWAL - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 4: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE028107 Type : WGACCN Built Year : 2002 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 10 31% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 10 31% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 0 0% Window Bar 0 0%Seat piller/lav. Partition 100% UIC end construction 100%

End Drooping: Rotery End - EAST : 4, WEST : 2 Other End - EAST : 4, WEST : -4Start Date : 13-Apr-2017, Completion Date : 21-Apr-2017, Net Repair Days : 8, Total Man Hours : 1460

K K TRIPATHI - SSE H R KANNOJE - SSE MANOJ AGARAWAL - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 5: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE028209 Type : WGSCN Built Year : 2017 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 14 84% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 14 84% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 40 100% Window Bar 110 62%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 5, WEST : 3 Other End - EAST : 3, WEST : -3Start Date : 19-May-2017, Completion Date : 31-May-2017, Net Repair Days : 11, Total Man Hours : 2412

K K TRIPATHI - SSE H R KANNOJE - SSE MANOJ AGARAWAL - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 6: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE028269 Type : WGSCN Built Year : 2002 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 3 43% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 40 100% Window Bar 110 62%Seat piller/lav. Partition 100% UIC end construction 100%

End Drooping: Rotery End - EAST : 3, WEST : 2 Other End - EAST : -2, WEST : -4Start Date : 24-Apr-2017, Completion Date : 01-May-2017, Net Repair Days : 7, Total Man Hours : 2744

MAYANK PRAJAPATI - JE AMIT VISHWAKARMA -SSE

ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 7: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE028403 Type : GS Built Year : 2002 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 6.5 41% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 6.5 41% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 80 45% Window Bar 32 80%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 3, WEST : 3 Other End - EAST : 6, WEST : 6Start Date : 11-Oct-2017, Completion Date : 18-Oct-2017, Net Repair Days : 7, Total Man Hours : 1524

H R KANNOJE - SSE K K TRIPATHI - SSE T K PANJA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 8: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE028440 Type : GS Built Year : 2002 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 6 38% Draft Gear Bracket 2 100%Trough floor 0 0% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 6 38% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 28 70% Window Bar 78 42%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 5, WEST : 0 Other End - EAST : 5, WEST : 0Start Date : 30-Aug-2017, Completion Date : 11-Sep-2017, Net Repair Days : 11, Total Man Hours : 1296

S K SHARMA - SSE PANKAJ KU SINGH - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 9: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE028454 Type : GS Built Year : 2002 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 7 100% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 12%Window Module 0% Window Sill 40 100% Window Bar 108 59%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -8, WEST : 0 Other End - EAST : -7, WEST : -5Start Date : 15-Apr-2017, Completion Date : 25-Apr-2017, Net Repair Days : 9, Total Man Hours : 2380

A K D SHARMA - SSE R PILLAI - SSE MANOJ AGARAWAL - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 10: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE028628 Type : WGSCZJ Built Year : 2002 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 7 100% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 100% Window Sill 0 0% Window Bar 0 0%Seat piller/lav. Partition 100% UIC end construction 100%

End Drooping: Rotery End - EAST : 0, WEST : 0 Other End - EAST : -5, WEST : 0Start Date : 27-Mar-2017, Completion Date : 08-Apr-2017, Net Repair Days : 12, Total Man Hours : 2596

R PILLAI - SSE A K D SHARMA - SSE MANOJ AGARAWAL - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 11: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE028708 Type : SLRD Built Year : 2002 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 7 100% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 10 53% Window Bar 28 33%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 0, WEST : -5 Other End - EAST : -10, WEST : -10Start Date : 06-Oct-2017, Completion Date : 15-Oct-2017, Net Repair Days : 9, Total Man Hours : 2488

MAYANK PRAJAPATI - JE R KU KHARE - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 12: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE028714 Type : SLRD Built Year : 2002 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 1 14% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 32 38% Window Bar 9 47%Seat piller/lav. Partition 0% UIC end construction 0%

End Drooping: Rotery End - EAST : 0, WEST : 4 Other End - EAST : -10, WEST : -10Start Date : 07-Jun-2017, Completion Date : 16-Jun-2017, Net Repair Days : 9, Total Man Hours : 2224

P S RATHORE - JE NISHANK VERMA - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 13: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE038151 Type : WGSCZACJ Built Year : 2016 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 8 47% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 8 47% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 2% Window Sill 0 0% Window Bar 0 0%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -2, WEST : 8 Other End - EAST : 5, WEST : 0Start Date : 11-May-2017, Completion Date : 20-May-2017, Net Repair Days : 9, Total Man Hours : 1920

PANKAJ KU SINGH - JE S K SHARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 14: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE038211 Type : WGSCN Built Year : 2003 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 12 38% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 12 38% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 6 15% Window Bar 52 29%Seat piller/lav. Partition 100% UIC end construction 100%

End Drooping: Rotery End - EAST : -3, WEST : -80 Other End - EAST : 6, WEST : 5Start Date : 24-Mar-2017, Completion Date : 03-Apr-2017, Net Repair Days : 9, Total Man Hours : 2076

NISHANK VERMA - JE P S RATHORE - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 15: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE038235 Type : WGSCN Built Year : 2017 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 12 75% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 12 75% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 80 43%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -5, WEST : 6 Other End - EAST : 6, WEST : 5Start Date : 14-Oct-2017, Completion Date : 25-Oct-2017, Net Repair Days : 10, Total Man Hours : 1764

R PILLAI - SSE OM PRAKASH SAHU - JE T K PANJA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 16: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE038702 Type : SLRD Built Year : 2003 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 0 0% Sole Bar 32 100% Draft Gear Bracket 0 0%Trough floor 0 0% Centre plate 0 0% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 14 74% Window Bar 38 45%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -10, WEST : -5 Other End - EAST : -5, WEST : -4Start Date : 10-Apr-2017, Completion Date : 20-Apr-2017, Net Repair Days : 10, Total Man Hours : 1784

MAYANK PRAJAPATI - JE AMIT VISHWAKARMA -SSE

ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 17: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE048407 Type : GS Built Year : 2004 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 6.5 41% Draft Gear Bracket 2 100%Trough floor 0 0% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 6.5 41% Body panel/patch 0% Door Top/Roof Patch 100%Window Module 0% Window Sill 7 18% Window Bar 74 42%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -4, WEST : 0 Other End - EAST : -2, WEST : 0Start Date : 30-Aug-2017, Completion Date : 07-Sep-2017, Net Repair Days : 8, Total Man Hours : 1228

P N VISHWKARMA - SSE U S BAJPAI - SSE MANOJ AGARAWAL - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 18: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE048408 Type : GS Built Year : 2004 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 7.5 47% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 7.5 47% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 2 5% Window Bar 76 43%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 4, WEST : 2 Other End - EAST : 2, WEST : -5Start Date : 18-Sep-2017, Completion Date : 26-Sep-2017, Net Repair Days : 8, Total Man Hours : 1435

P N VISHWKARMA - SSE U S BAJPAI - SSE MANOJ AGARAWAL - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 19: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE048409 Type : GS Built Year : 2004 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 13.5 84% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 13.5 84% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 21 53% Window Bar 70 39%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -3, WEST : -5 Other End - EAST : -5, WEST : -2Start Date : 19-Sep-2017, Completion Date : 29-Sep-2017, Net Repair Days : 10, Total Man Hours : 0

P N VISHWKARMA - SSE U S BAJPAI - SSE MANOJ AGARAWAL - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 20: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE058205 Type : WGSCN Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 16 100% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 16 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 118 64%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 3, WEST : 2 Other End - EAST : 1, WEST : -5Start Date : 29-Jul-2017, Completion Date : 11-Aug-2017, Net Repair Days : 12, Total Man Hours : 2300

P N VISHWKARMA - SSE U S BAJPAI - SSE MANOJ AGARAWAL - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 21: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE058207 Type : WGSCN Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 16 100% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 16 100% Body panel/patch 0% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 118 66%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 5, WEST : 0 Other End - EAST : 7, WEST : 8Start Date : 07-Aug-2017, Completion Date : 12-Aug-2017, Net Repair Days : 6, Total Man Hours : 1920

MAYANK PRAJAPATI - JE R KU KHARE - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 22: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE058212 Type : WGSCN Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 12 75% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 12 75% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 21 53% Window Bar 74 42%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -5, WEST : 2 Other End - EAST : 0, WEST : 0Start Date : 15-Jul-2017, Completion Date : 25-Jul-2017, Net Repair Days : 9, Total Man Hours : 1924

U S BAJPAI - SSE P N VISHWKARMA - SSE MANOJ AGARAWAL - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 23: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE058219 Type : WGSCN Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 11.5 72% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 11.5 72% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 14 35% Window Bar 74 40%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -6, WEST : -5 Other End - EAST : -6, WEST : -6Start Date : 23-Oct-2017, Completion Date : 31-Oct-2017, Net Repair Days : 8, Total Man Hours : 1808

OM PRAKASH SAHU - JE R PILLAI - SSE T K PANJA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 24: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE058264 Type : WGSCN Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 12 30% Window Bar 72 39%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 0, WEST : -4 Other End - EAST : 0, WEST : 4Start Date : 26-Sep-2017, Completion Date : 06-Oct-2017, Net Repair Days : 10, Total Man Hours : 1760

S K SHARMA - SSE PANKAJ KU SINGH - JE OM PRAKASH SINGH -SSE

A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 25: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE058268 Type : WGSCN Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 10 59% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 10 59% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 21 53% Window Bar 70 39%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -4, WEST : -4 Other End - EAST : 5, WEST : 4Start Date : 19-Aug-2017, Completion Date : 25-Aug-2017, Net Repair Days : 6, Total Man Hours : 1776

R PILLAI - SSE OM PRAKASH SAHU - JE OM PRAKASH SINGH -SSE

A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 26: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE058270 Type : WGSCN Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 80 43%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -2, WEST : -3 Other End - EAST : 4, WEST : 2Start Date : 13-Oct-2017, Completion Date : 26-Oct-2017, Net Repair Days : 12, Total Man Hours : 2304

NISHANK VERMA - JE P S RATHORE - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 27: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE058274 Type : WGSCN Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 16 100% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 16 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 28 70% Window Bar 70 38%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -8, WEST : -9 Other End - EAST : -10, WEST : -5Start Date : 05-Aug-2017, Completion Date : 14-Aug-2017, Net Repair Days : 8, Total Man Hours : 1864

NISHANK VERMA - JE P S RATHORE - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 28: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE058286 Type : WGSCN Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 16 100% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 16 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 14 35% Window Bar 74 42%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 10, WEST : 10 Other End - EAST : 0, WEST : 5Start Date : 26-Jul-2017, Completion Date : 02-Aug-2017, Net Repair Days : 7, Total Man Hours : 1768

PANKAJ KU SINGH - JE S K SHARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 29: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE058296 Type : WGSCN Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 13 81% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 13 81% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 102 57%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -3, WEST : 3 Other End - EAST : 5, WEST : 0Start Date : 19-Jul-2017, Completion Date : 27-Jul-2017, Net Repair Days : 8, Total Man Hours : 2040

R PILLAI - SSE A K D SHARMA - SSE MANOJ AGARAWAL - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 30: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE058299 Type : WGSCN Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 94 53%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -10, WEST : -5 Other End - EAST : 10, WEST : 3Start Date : 12-Jul-2017, Completion Date : 21-Jul-2017, Net Repair Days : 9, Total Man Hours : 2232

S K SHARMA - SSE PANKAJ KU SINGH - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 31: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE058401 Type : GS Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 14 88% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 14 88% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 7 18% Window Bar 68 37%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -10, WEST : -10 Other End - EAST : 8, WEST : 5Start Date : 17-Jul-2017, Completion Date : 22-Jul-2017, Net Repair Days : 6, Total Man Hours : 1708

MAYANK PRAJAPATI - JE AMIT VISHWAKARMA -SSE

ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 32: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE058403 Type : GS Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 10.5 66% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 10.5 66% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 12 30% Window Bar 74 42%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -10, WEST : -8 Other End - EAST : 3, WEST : 4Start Date : 05-Sep-2017, Completion Date : 08-Sep-2017, Net Repair Days : 4, Total Man Hours : 1696

MAYANK PRAJAPATI - JE R KU KHARE - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 33: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE058409 Type : GS Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 14 35% Window Bar 54 29%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 0, WEST : 0 Other End - EAST : 0, WEST : 0Start Date : 19-Apr-2017, Completion Date : 28-Apr-2017, Net Repair Days : 9, Total Man Hours : 1984

S K SHARMA - SSE PANKAJ KU SINGH - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 34: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE058704 Type : SLRD Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 0 0% Sole Bar 32 100% Draft Gear Bracket 0 0%Trough floor 0 0% Centre plate 0 0% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 10 53% Window Bar 20 24%Seat piller/lav. Partition 0% UIC end construction 0%

End Drooping: Rotery End - EAST : 0, WEST : 2 Other End - EAST : 5, WEST : 6Start Date : 23-Jun-2017, Completion Date : 30-Jun-2017, Net Repair Days : 7, Total Man Hours : 1960

MAYANK PRAJAPATI - JE AMIT VISHWAKARMA -SSE

ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 35: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE058706 Type : SLRD Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 13 81% Draft Gear Bracket 2 100%Trough floor 1 14% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 13 81% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 7 18% Window Bar 26 31%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 6, WEST : 0 Other End - EAST : 0, WEST : -7Start Date : 31-Aug-2017, Completion Date : 13-Sep-2017, Net Repair Days : 12, Total Man Hours : 1968

P N VISHWKARMA - SSE U S BAJPAI - SSE MANOJ AGARAWAL - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 36: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE078226 Type : WGSCN Built Year : 2007 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 38 95% Window Bar 78 42%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -8, WEST : -8 Other End - EAST : -8, WEST : 2Start Date : 05-Oct-2017, Completion Date : 16-Oct-2017, Net Repair Days : 10, Total Man Hours : 2228

P N VISHWKARMA - SSE U S BAJPAI - SSE T K PANJA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 37: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE078247 Type : WGSCN Built Year : 2007 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 16 100% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 16 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 70 39%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 4, WEST : 5 Other End - EAST : -3, WEST : -4Start Date : 17-Aug-2017, Completion Date : 28-Aug-2017, Net Repair Days : 10, Total Man Hours : 2376

U S BAJPAI - SSE P N VISHWKARMA - SSE OM PRAKASH SINGH -SSE

A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 38: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE078262 Type : WGSCN Built Year : 2007 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 16 100% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 16 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 86 47%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 0, WEST : -5 Other End - EAST : -5, WEST : -2Start Date : 09-Aug-2017, Completion Date : 18-Aug-2017, Net Repair Days : 9, Total Man Hours : 2104

NISHANK VERMA - JE P S RATHORE - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 39: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE078266 Type : WGSCN Built Year : 2007 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 108 59%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -5, WEST : -3 Other End - EAST : -9, WEST : -7Start Date : 21-Sep-2017, Completion Date : 04-Oct-2017, Net Repair Days : 12, Total Man Hours : 1864

MAYANK PRAJAPATI - JE R KU KHARE - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 40: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE078268 Type : WGSCN Built Year : 2007 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 16 100% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 16 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 70 38%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -12, WEST : -5 Other End - EAST : 7, WEST : 2Start Date : 07-Sep-2017, Completion Date : 21-Sep-2017, Net Repair Days : 13, Total Man Hours : 2517

H R KANNOJE - SSE K K TRIPATHI - SSE MANOJ AGARAWAL - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 41: Coach Rehabilitation Workshop, WC Railway, Bhopal fileMAYANK PRAJAPATI - JE AMIT VISHWAKARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge. Coach No. :SE018221

Coach No. :SE078709 Type : SLRD Built Year : 2007 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 16 100% Draft Gear Bracket 2 100%Trough floor 5 71% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 16 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 14 74% Window Bar 30 36%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -4, WEST : 8 Other End - EAST : -5, WEST : -2Start Date : 10-Aug-2017, Completion Date : 21-Aug-2017, Net Repair Days : 10, Total Man Hours : 2360

P S RATHORE - JE NISHANK VERMA - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge