co e - smcgov.org...by 1970 oak (510 in as april broadway, land, ca 946) 763‐2061 sociation wit 9,...
TRANSCRIPT
![Page 1: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/1.jpg)
![Page 2: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/2.jpg)
By
1970Oak(510
In as
April
0 Broadway,kland, CA 9460) 763‐2061
ssociation wit
l 9, 2015
E
, Suite 740 612
th Dyett & Bh
CO
EvaluaA
atia, Nelson N
ONNEC
ation AlternBui
Nygaard, and
CT THE
of Tranativeldout
Dr
S
d Flint Strateg
E COA
anspoes to ADefic
raft R
PreSan Mat
gies
ASTSID
ortatioAddreciencie
eport
epared fteo Coun
DE
on sses
t 2
fornty
![Page 3: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/3.jpg)
EvaluationAddress B
CONNECT
INTRODU
SUMMAR
MIDCOHALF M
IDENTIFIC
ALTERNRoadBicycTransParki
ALTERNRoadBicycTransParki
ALTERNRoadBicycTransParki
EVALUAT
ALTERNRoadBicycTransParki
ALTERNRoadBicycTransParki
ALTERNRoadBicycTransParki
CONCLUS
Hybri
n of TransporBuildout Defic
T THE COASTS
UCTION .........
RY OF DEFICIE
AST ..............MOON BAY AN
CATION OF AL
NATIVE 1 – LOway and Intecle and Pedestsit Improvemng ImprovemNATIVE 2 – Mway and Intecle and Pedestsit Improvemng ImprovemNATIVE 3 – HIway and Intecle and Pedestsit Improvemng Improvem
ION OF ALTE
NATIVE 1 – LOway and Intecle and Pedestsit Improvemng ImprovemNATIVE 2 – Mway and Intecle and Pedestsit Improvemng ImprovemNATIVE 3 – HIway and Intecle and Pedestsit Improvemng Improvem
SION .............
id Alternative
rtation Alternciencies
SIDE .............
....................
ENCIES IDENT
.....................ND SR 92 EAST
LTERNATIVES
OW COST/LOWersection Imptrian Facility ents .............
ments.............EDIUM COST/ersection Imptrian Facility ents .............
ments.............GH COST/HIGersection Imptrian Facility ents .............
ments.............
RNATIVES ....
OW COST/LOWersection Imptrian Facility ents .............
ments.............EDIUM COST/ersection Imptrian Facility ents .............
ments.............GH COST/HIGersection Imptrian Facility ents .............
ments.............
....................
e with Sugges
natives to
Table....................
....................
TIFIED FOR BU
.....................T OF HALF MO
S ...................
W IMPACT IMrovements ...Improvemen........................................../MEDIUM IMrovements ...Improvemen..........................................GH IMPACT IMrovements ...Improvemen..........................................
....................
W IMPACT IMrovements ...Improvemen........................................../MEDIUM IMrovements ...Improvemen..........................................GH IMPACT IMrovements ...Improvemen..........................................
....................
sted Improvem
i
Ex
of Conten....................
....................
UILDOUT CON
......................OON BAY ......
....................
MPROVEMENT......................ts ..............................................................
MPACT IMPRO......................ts ..............................................................MPROVEMEN......................ts ..............................................................
....................
MPROVEMENT......................ts ..............................................................
MPACT IMPRO......................ts ..............................................................MPROVEMEN......................ts ..............................................................
....................
ments ...........
xperts Connectin
nts ....................
....................
NDITIONS ....
.....................
.....................
....................
TS .....................................................................................................OVEMENTS ........................................................................................TS ....................................................................................................
....................
TS .....................................................................................................OVEMENTS ........................................................................................TS ....................................................................................................
....................
.....................
ng Communities
....................
....................
....................
.....................
.....................
....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
....................
.....................
April 9,
....................
....................
....................
......................
......................
....................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
....................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
....................
......................
, 2015
....... I
...... 3
...... 4
....... 4
....... 5
...... 6
....... 6
....... 6
....... 7
....... 8
....... 8
..... 10
..... 10
..... 11
..... 12
..... 12
..... 13
..... 13
..... 14
..... 15
..... 15
.... 16
..... 17
..... 17
..... 21
..... 22
..... 23
..... 24
..... 25
..... 28
..... 30
..... 31
..... 33
..... 33
..... 39
..... 41
..... 42
.... 44
..... 44
![Page 4: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/4.jpg)
EvaluationAddress B
FIGURE 1 ‐
TABLE 1 ‐ PTABLE 2 ‐ ATABLE 3 ‐ CTABLE 4 ‐ ATABLE 5 ‐ CTABLE 6 ‐ ATABLE 7 ‐ CTABLE 8 ‐ ATABLE 9 ‐ CTABLE 10 ‐TABLE 11 ‐TABLE 12 ‐TABLE 13 ‐TABLE 14 ‐TABLE 15 ‐TABLE 16 ‐TABLE 17 ‐TABLE 18 ‐TABLE 19 ‐TABLE 20 ‐TABLE 21 ‐TABLE 22 ‐TABLE 23 ‐TABLE 24 ‐TABLE 25 ‐TABLE 26 ‐TABLE 27 ‐TABLE 28 ‐ APPENDICAPPENDIX APPENDIX APPENDIX APPENDIX P:\P\14\1407Alternatives D
n of TransporBuildout Defic
‐ EXISTING AND
PEDESTRIAN, BALTERNATIVE 1COST ESTIMATALTERNATIVE 1COST ESTIMATALTERNATIVE 1COST ESTIMATALTERNATIVE 1COST ESTIMAT‐ ALTERNATIVE‐ COST ESTIMA‐ ALTERNATIVE‐ COST ESTIMA‐ ALTERNATIVE‐ ALTERNATIVE‐ COST ESTIMA‐ ALTERNATIVE‐ ALTERNATIVE‐ COST ESTIMA‐ ALTERNATIVE‐ COST ESTIMA‐ ALTERNATIVE‐ ALTERNATIVE‐ COST ESTIMA‐ COST OF HYB‐ COST OF HYB‐ COST OF HYB‐ COST OF HYB
ES A ‐ COST ESTIMB ‐ FEASIBILITYC ‐ EVALUATIOD ‐ PROPOSED
75‐000 San MateoDraft Report v12.d
rtation Alternciencies
D FUTURE COA
BICYCLE, TRANS1 BUILDOUT COTES FOR ALTERN1 BICYCLE ANDTES FOR ALTERN1 TRANSIT EVATES FOR ALTERN1 PARKING EVATES FOR ALTERNE 2 BUILDOUT CATES FOR ALTERE 2 BICYCLE ANATES FOR ALTERE 2 TRANSIT EVE 2 PARKING EVATES FOR ALTERE 3 BUILDOUT CE 3 BUILDOUT CATES FOR ALTERE 3 BICYCLE ANATES FOR ALTERE 3 TRANSIT EVE 3 PARKING EVATES FOR ALTERRID ALTERNATRID ALTERNATRID ALTERNATRID ALTERNAT
MATE CALCULAY AND DESIGNON METRIC SCOD ROUNDABOU
Midcoast CTMP\0docx
natives to
List ASTAL TRAIL AN
ListSIT, AND PARKONDITIONS PENATIVE 1 ROAD PEDESTRIAN NATIVE 1 BICYCALUATION SCONATIVE 1 TRANALUATION SCONATIVE 1 PARKCONDITIONS PRNATIVE 2 ROAD PEDESTRIANRNATIVE 2 BICYVALUATION SCOVALUATION SCRNATIVE 2 PARCONDITIONS PCONDITIONS PRNATIVE 3 ROAD PEDESTRIANRNATIVE 3 BICYVALUATION SCOVALUATION SCRNATIVE 3 PARTIVE ROADWAYTIVE BICYCLE ATIVE TRANSIT IMTIVE PARKING I
ATIONS CONSIDERATIORES UT PAVING FOO
07 Deliverables\07
ii
Ex
of FiguresND PARALLEL T
t of TablesKING EVALUATIAK HOUR INTEDWAY AND INTEVALUATION SCLE AND PEDERES ................NSIT IMPROVEORES ...............KING IMPROVEPEAK HOUR INTADWAY AND INN EVALUATIONYCLE AND PEDORES ..............CORES .............RKING IMPROVPEAK HOUR ROPEAK HOUR INTADWAY AND INN EVALUATIONYCLE AND PEDORES ..............CORES .............RKING IMPROVY AND INTERSEND PEDESTRIAMPROVEMENTMPROVEMENT
ONS
OTPRINT
7 Alternatives Eval
xperts Connectin
s TRAIL FACILITIE
s ION METRICS .ERSECTION LEVTERSECTION IMSCORES ...........ESTRIAN IMPRO.......................MENTS ..................................EMENTS ..........TERSECTION LENTERSECTION N SCORES .........DESTRIAN IMPR..............................................VEMENTS ........OADWAY SEGMTERSECTION LENTERSECTION N SCORES .........DESTRIAN IMPR..............................................VEMENTS ........ECTION IMPROAN IMPROVEMTS ....................TS ...................
luation Report\Re
ng Communities
ES ....................
........................VEL OF SERVICMPROVEMENT........................OVEMENTS .....................................................................................................EVEL OF SERVICIMPROVEMEN........................ROVEMENTS ...........................................................................MENT LEVEL OFEVEL OF SERVICIMPROVEMEN........................ROVEMENTS ...........................................................................OVEMENTS ......ENTS ..............................................................
vised Final Report
April 9,
.......................
.......................E.....................TS..............................................................................................................................................................CE...................NTS ....................................................................................................................................F SERVICE ........CE...................NTS ................................................................................................................................................................................................................................
t\Evaluation of
, 2015
........ 9
...... 17
...... 18
...... 20
...... 21
...... 22
...... 22
...... 23
...... 23
...... 24
...... 25
...... 27
...... 28
...... 30
...... 31
...... 32
...... 32
...... 34
...... 35
...... 38
...... 40
...... 40
...... 41
...... 43
...... 43
...... 47
...... 49
...... 50
...... 51
![Page 5: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/5.jpg)
INTRODUCTION In 2012, the California Coastal Commission certified a package of amendments known as the Midcoast Update to San Mateo County’s Local Coastal Program (LCP). Policy 2.53 of the Updated LCP requires San Mateo County to prepare a Comprehensive Transportation Management Plan (CTMP). Connect the Coastside is the project that will produce the CTMP. The CTMP requirement of the Local Coastal Program responds to the impact that growth in the region has had on roadway capacity, which is viewed by many as insufficient to support the current and future needs of the community and visitors.
This report presents several alternatives that were developed to address some or all of the deficiencies identified in the Buildout Analysis and Traffic Projections Report and evaluate the improvements identified in each alternative based on how well they address the identified deficiencies, as well as their feasibility and cost‐effectiveness. In the initial stages of Connect the Coastside, over 110 specific ideas to mitigate the potential impacts of future growth in the Midcoast and Half Moon Bay study area were generated by the Technical Advisory Committee (TAC), the Midcoast and Half Moon Bay community, and prior studies for improving multi‐modal transportation (e.g. vehicle, bicycle, pedestrian, transit).
A series of three alternatives have been identified based on the expected cost associated with the projects and the potential environmental and political impact of the potential projects. This memorandum presents a Low Cost/Low Potential Impact alternative, a Medium Cost/Medium Potential Impact alternative and a High Cost/High Potential Impact alternative. Each of the three alternatives is designed to be multi‐modal with potential projects to address needs for pedestrians, bicyclists, transit users and automobile users.
The end result of this study will be a Comprehensive Transportation Management Plan with a preferred alternative to be adopted and implemented by the Board of Supervisors for the Midcoast communities of San Mateo County. The CTMP will also serve as an advisory plan for the City of Half Moon Bay.
![Page 6: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/6.jpg)
EvaluAddre
The BtranspidenticompcurreThe dTraffi
MIUndecommvehiclfrom the LCwill ntraffic
The lacircuitHighwspeeduncon
Translack a
TherespeciaMontwere parkin
1 CounDepar2 Half
ation of Traness Buildout D
Buildout Anaportation issuified for the paring existingnt Local Coasdeficiencies idc Projections
DCOASr Buildout comunities will rles trying to eresidential neCP. Additionaot meet the c the roadway
ayout of neigtous routes bway 1 is limitds, and unimntrolled locat
it service opemenities and
e is generally al events deara State Beaobserved to ng locations a
nty of San Matrtment. f Moon Bay Cir
sportation AlDeficiencies
S
alysis and Traues and deficMidcoast, Hag conditions stal Program1 dentified for Report and s
ST onditions, theresult in the enter Highwaeighborhoodsally, under Buroadway segy is designed
hborhoods inbetween nearted by infreqmproved pedions to help p
erates at lowd shelter for u
sufficient pamand for paach lots northbe at or abovare not alway
teo Local Coas
rculation Elem
ternatives to
SUMMIDENT
affic Projecticiencies on thalf Moon Bayto the policie(LCP) and theeach area aummarized s
e projected inmajority of uy 1. The majos, will operatuildout condgment LOS stato handle.
n many of therby destinatioquent crossindestrian facilipedestrians a
w frequencies users waiting
arking supply arking can exh of Montarave capacity dys easily ident
stal Program Po
ment, 2013, City
4
MARY TIFIED
ions Reporthe Midcoast y and State es and level e Half Moon are documeneparately bel
ncrease in traunsignalized iority of unsige worse thanitions, the enandard as de
e Midcoast coons. Additionang opportuniities. There nd cyclists sa
and limited for buses.
during the wxceed the ava and the Fitzuring some ptified or signe
olicies, 2013, C
y of Half Moon
Experts Conn
OF DED FOR
COprovided a and in Half MRoute (SR) 9of service (LOBay General nted in the Tlow.
affic along Higintersections gnalized intersn the intersecntirety of Higefined in the
ommunities inally, beach acities, heavy tare no stopafely cross Hig
coverage. Ad
weekdays; hovailable capazgerald Marinpeak periods. ed.
County of San
n Bay.
necting Commun
EFICIER BUILONDITdetailed anaMoon Bay. D92 east of HaOS) standardPlan and CircTask 2 Buildo
ghway 1 withto experiencsections withction LOS stanghway 1 withLCP, based o
nhibits mobilccess for pedtraffic volump controls orghway 1.
dditionally, ex
owever duringcity. The Mane Reserve lo It was also n
Mateo, Plannin
Ap
nities
ENCIESLDOUTTIONSalysis of existDeficiencies walf Moon Bayds defined in culation Updaout Analysis
hin the Midcoce high delayhin the Midcondard definehin the Midcoon the volume
ity and resultestrians cross
mes, high vehr treatments
xisting bus st
g weekends artini Creek ot in Moss Benoted that pu
ng and Buildin
ril 9, 2015
S T S ting were y by the
ate2. and
oast y for oast, d in oast e of
ts in sing hicle s at
tops
and and each ublic
ng
![Page 7: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/7.jpg)
EvaluAddre
HAMOBasedof thedelay Circullanes betwebetwestandAll stumeet
A lackaccespedesopporTheresafely
Translack a
The mduring
ation of Traness Buildout D
ALF MOOON BAd on the incree unsignalizedand to operation Elemenwhich will oeen Mirada Reen Redondoard as defineudy intersectthe LOS stan
k of consistensibility withinstrian accessrtunities, heae are no stop y cross the hig
it service opemenities and
majority of bg peak period
sportation AlDeficiencies
OON BAAY ease in trafficd intersectionrate worse thnt. Highway 1perate withinRoad and Grao Beach Roaed in the LCP,ions along SRdards under
nt pedestriann and betwe along the Havy traffic vocontrols or trghways.
erates at lowd shelter for u
beach access ds.
ternatives to
AY AND
along Highwns within the han the inte1 within the n the roadwandview Boulead and Fairw, based on thR 92 and the projected Bu
n and bicycle een communHighway 1 aolumes, high reatments at
w frequencies users waiting
parking lots
5
D SR 92
way 1 under pCity of Half Mrsection LOS City of Half ay segment Levard, betweway Drive, we volume of ttwo‐lane porildout conditi
trails and crities within tnd SR 92 covehicle speeuncontrolled
and limited for buses.
were observ
Experts Conn
2 EAST
rojected BuilMoon Bay arestandard deMoon Bay haLOS standard.een Kelly Avenill not meet traffic the rortion of SR 92ions.
rossings resulthe City of Horridor is limds, and unimd locations to
coverage. Ad
ved to opera
necting Commun
OF HA
dout conditioe expected toefined in theas several se. However, twnue and Seym the roadwaadway is des2 east of Mai
lts in decreasHalf Moon Bmited by infrmproved pede help pedestr
dditionally, ex
ate at over 1
Ap
nities
ALF
ons, the majo experience h Half Moon ections with fwo‐lane sectimour Street, ay segment signed to hanin Street will
sed mobility ay. Additionarequent crossestrian facilitrians and cyc
xisting bus st
100% capacit
ril 9, 2015
ority high Bay four ions and LOS dle. not
and ally, sing ties. lists
tops
ty
![Page 8: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/8.jpg)
EvaluAddre
ImprocomprecendeficiimplecompfeasibRepor
Improcost, well aThe th
x
x
x
Alterncateg
x x x x
ALTIMAlternand wbe imthe exare bo
Roax
x
x
ation of Traness Buildout D
IDovements incpiled from TAt, relevant reencies. To adementation oplete list of pble and addrrt.
ovements areexpected imas the overalhree alternat
Alternative
Alternative
Alternative
natives are ories:
Roadway aBicycle andTransit andParking
TERNAPROVEnative 1 mainwithout signifmproved with xpansion of tolded.
adway aAddition o
Signage toMidcoast a
Stop signs
sportation AlDeficiencies
DENTIFcluded in eacAC and commeports, as welddress the neover the nextotential imprressed deficie
e grouped intpact to existl effect on reives describe
e 1 – Low Cos
e 2 – Medium
e 3 – High Co
defined by
and intersectid Pedestrian d
ATIVE 1EMENTnly focuses onicant cost or signage and he multi‐mod
nd Interof left‐turn ba
o restrict turnand Half Moo
added to uns
ternatives to
FICATIch alternativemunity‐suggel as improvemeeds for the t 30 years torovements wencies identi
to three alteting infrastrucesidents of thd in this secti
st/Low Impac
m Cost/Mediu
st/High Impa
proposed i
ions/access pfacilities
1 – LOWTS n improvemeenvironmentstriping chandal “Parallel T
rsection ay and accele
ing movemenon Bay
signed interse
6
ION Oe are selecteested improvments suggesBuildout pro
o respond towas analyzed fied in the B
ernatives for cture, envirohe Midcoast ion are as foll
ct
um Impact
ct
mprovement
points
W COST
ents that can tal impact. Thnges as well aTrail”. Project
Improveration lane a
nts to consoli
ections along
Experts Conn
OF ALTed from a listvements, prosted by the Dojections, theo planned groto determineBuildout Ana
evaluation. onment and sCommunitieslows:
ts and mod
T/LOW
be made withese projects as improvemets currently b
vementsat Gray Whal
date traffic a
g Highway 1
necting Commun
TERNAt of potentiaoposed projeKS team to ade projects areowth in the e which impralysis and Tr
Each alternatsurrounding cs and City of
difications to
W IMPA
thin the existaddress deficents already being planne
e Cove parkin
t key intersec
Ap
nities
ATIVESal improvemects identifiedddress identife considered study area. rovements wraffic Projecti
tive is basedcommunitiesHalf Moon B
o the follow
ACT
ting right of wciencies that planned suchd and evalua
ng lot
ctions within
ril 9, 2015
S ents d in fied for The
were ions
d on s, as Bay.
wing
way can h as ated
![Page 9: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/9.jpg)
EvaluAddre
x
Bicyx
x
x
x
ation of Traness Buildout D
Defined cua consisten
o Ha
o El
o M
o M
ycle andStriped crolocations a
o Gro Mo 2n
o 7th
o Mo Vio Cao Cyo HMo Noo Suo Mo Mo Keo Teo Quo Pilo SR
Sidewalks pedestrian
o AloHa
o Alo
Sharrows oHalf Moon
Traffic signo Peo Cr
sportation AlDeficiencies
urb and pavednt cross sectio
alf Moon Bay
Granada Seg
oss Beach Seg
ontara Segme
d Pedestossing with beas seen in Figuray Whale Coontara State d Street h Street oss Beach Ligrginia Street alifornia Streeypress AvenuMB Airport orth Capistranurfer’s Beach edio Avenue irada Road ehoe Avenue errace Avenueuarry Road (alarcitos CreekR 35 (along SR
in the followns: ong Highway alf Moon Bay ong Coronado
on Main Streen Bay
nal updates thedestrian couosswalk signa
ternatives to
d shoulder foon for vehicle
Segment ‐ Te
ment ‐ Capist
gment ‐ Califo
ent ‐ 7th Stre
rian Faceacons to aleure 1: ove Beach
ghthouse (16t
et e
no Road Parking area,
e/Grand Boullong SR 92) k Road (alongR 92)
ing locations
1 in Montara
o Street and A
et in Montara
hroughout Hant‐down indial crossing ad
7
r the followine and pedestr
errace Avenu
trano Road to
ornia Avenue
eet and 9th St
cility Imprt traffic at th
th Street)
, north of Cor
evard
g SR 92)
to provide a
a, Moss Beach
Avenue Alham
a, Carlos Stree
alf Moon Bay cators on all sdjustments to
Experts Conn
ng segments arian safety:
e to Seymour
o Coronado S
e to Cypress A
treet
provemehe following h
ronado Street
more continu
h, Miramar, a
mbra in El Gr
et in Moss Be
including: signalized croo accommoda
necting Commun
along Highwa
r Street
treet
Avenue
ents high demand
t
uous walking
and develope
anada
each, and Ma
osswalks ate slower wa
Ap
nities
ay 1 to provid
and bus stop
path for
ed areas of
in Street in
alking speeds
ril 9, 2015
de
p
![Page 10: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/10.jpg)
EvaluAddre
Trax
x
Parx
x
x
3 To b
ation of Traness Buildout D
o Bico Pe
nsit ImpImprovempassenger stops consstudy area
o 11Su
o 12Str
o 13Al
o 33SR
o 8 b
More freqarea:
o Inco Inc
rking ImpFormalizedHighway 1
Paving and
Improved
e evaluated by
sportation AlDeficiencies
cycle signal dedestrian refu
provemeents to bus stseating, pedesist only of a sa:
1 bus stops in unshine Valley
2 bus stops in reet. Airport
3 bus stops in hambra/Plaza
3 bus stops in R‐92 serving S
bus stops eas
uent weeken
crease weekecrease weeke
provemed parallel par1.
d striping at t
wayfinding si
y the Green Val
ternatives to
etection deviuge spaces on
ents tops includinestrian lightinsign to denot
Montara aloy Road servin
Moss Beach Street, and P
El Granada aa Alhambra, a
Half Moon BSamtrans Rou
st of Half Moo
d service for
end frequencyend frequency
ents king for Mont
the upper Gra
ignage
lley Trail and C
8
ice n wide road cr
g overhead sng, and electre the location
ng Highway 1g Samtrans R
along Highwarospect Way
along Airport and Highway
Bay along highte 17 and Ro
on Bay along
the existing S
y on Route 17y on Route 29
tara State Be
ay Whale Cov
Congestion Ma
Experts Conn
rossings
helters, bike ronic bus arrin. The followi
1, Main StreeRoute 17
ay 1, Sunshinserving Samt
Street, Capist1 serving Sam
hway 1, Mainute 294
SR‐92 serving
SamTrans fixe
7 from 120 m94 from 120 m
each, with a p
ve parking lo
anagement Pro
necting Commun
racks, trash rval signs. Curing bus stops
t, 6th/Harte S
ne Valley Roadtrans Route 1
trano Road, Amtrans Route
Street. Kelly
g Samtrans Ro
ed routes serv
minutes to 60 minutes to 60
hysical separ
ot3
ojects
Ap
nities
receptacles, rrently bus s serve the
Street, and
d, Etheldore 17
Ave e 17
Street, and
oute 294
ving the stud
minutes 0 minutes.
ration from
ril 9, 2015
y
![Page 11: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/11.jpg)
EvaluAddre
Figure
ation of Traness Buildout D
e 1 ‐ Existing an
sportation AlDeficiencies
nd Future Coas
ternatives to
stal Trail and P
9
Parallel Trail Fa
Experts Conn
acilities
necting Commun
Ap
nities
ril 9, 2015
![Page 12: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/12.jpg)
EvaluAddre
ALTIMAlternthis sstandaccesturns improenviroand Cdemaadditihigh r
Roax
x
x
x
x
x
ation of Traness Buildout D
TERNAPACT Inative 2 inclusection. Alterard under Bus to Highwayoff of and
ovements reonmental impCapistrano Roand‐focused ional parkingrecreational d
adway aAll Alterna
Signalizatio
o Hi
o Hi
o Hi
o HianBa
o HiincCit
Restrictingmeasures:
o Ad
o ReVe
Addition oStreet)
Addition o
Consolidat
sportation AlDeficiencies
ATIVE 2IMPROudes all straternative 2 aduildout by redy 1. This is doon to High
equire a mopact. Alternatoad, which aimprovementg in high demdemand.
nd Interative 1 roadw
on of the follo
ghway 1 and
ghway 1 and
ghway 1 and
ghway 1 andnalysis as an inay)
ghway 1 andcluded in Builty of Half Mo
g access to Hig
ddition of a m
estricting acceermont Avenu
of a median w
of left‐turn ba
tion of access
ternatives to
2 – MEDOVEMEegies introdudresses interducing the nune through thway 1 or boderate amotive 2 also core currently ts to transitmand location
rsection ay improvem
owing interse
California Av
Cypress Aven
Kehoe Avenu
Main Street ntersection p
Grand Bouleldout analysison Bay)
ghway 1 from
median betwe
ess to Highwaue east of Hig
with northbou
ay and accele
s to Highway
10
DIUM CNTS ced in Alternrsection LOSumber of locahe addition oy blocking aount of caponsiders suppbeing evaluat service (e.gns for observ
Improvments
ections meeti
venue in Moss
nue in Moss B
ue in Half Mo
(S) in Half Mplanned to be
evard/Terraces as an interse
m residential n
een 7th Street
ay 1 betweenghway 1 in Mo
und left‐turn
eration lane a
1 at the follow
Experts Conn
COST/M
native 1, in ad at intersectations where of raised medaccess to Higpital investmplementary biated as part og. shuttles aved overflow
vements
ing signal war
s Beach
Beach
oon Bay
Moon Bay (Alr signalized by
e Avenue in Hection planne
neighborhoo
t and 9th Stre
St. Etheldoreoss Beach
bay at the Li
at 8th Street in
wing location
necting Commun
MEDIU
ddition to thtions that do traffic can hians physicalghway 1 coment with ike lanes alonof Plan Princand park‐andw during wee
rrants:
eady includey the City of H
Half Moon Baed to be signa
ds through th
eet in Montar
e/Vallemar St
ighthouse in
n Montara
ns:
Ap
nities
UM
ose describedo not meet ave unrestricly restricting mpletely. Thsome potenng Airport Strceton, as weld‐ride lots) ekend periods
d in Buildout Half Moon
ay (Already alized by the
he following
ra
treet and
Montara (16
ril 9, 2015
d in the cted left
hese ntial reet ll as and s of
6th
![Page 13: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/13.jpg)
EvaluAddre
x
Bicyx
x
x
ation of Traness Buildout D
o Nu
o ReCr
o Grpla
An expansinclude the
o HaAv
o El Co
o M
o M
ycle andAll Alterna
“Parallel Tthe entire communitcomposedproposed Plan (CBPPproposed
o PrbeFrabebo
o PrbealoanM
Class II bikPrinceton
sportation AlDeficiencies
urseryman’s E
ealign Frenchmeek Road and
rand Avenue anned improv
ion of the dee following se
alf Moon Bayvenue to Fren
Granada Segoral Reef Aven
oss Beach Seg
ontara Segme
d Pedestative 1 bicycle
rail” adjacentstudy area, wies and locale of Class I, ClaNorth Coast BP), connectinglocation of th
oposed Paraletween 2nd Stancais Avenuetween the exorder of Half M
oposed Coastetween the Deong Cypress And the paving oon Bay.
ke lane along
ternatives to
Exchange driv
man’s Creek d Venice Boul
and Terrace vement by th
fined curb anegments alon
y Segment –nchman's Cree
gment ‐ Coronue
gment ‐ Cypr
ent ‐ between
rian Face and pedestr
t to Highway will provide pees along Highass II and ClasBikeway in thg Daly City, Pahe Parallel Tra
lel trail alignmreet in Montae in Half Mooxisting bicycleMoon Bay.
tal trail alignmevil’s Slide TrAvenue betweof an existing
Capistrano R
11
veways betwe
Road to conslevard
Avenue (Alrehe City of Half
nd paved shoung Highway 1:
– Seymour Stek Road
onado Street
ess Avenue to
n 1st Street a
cility Imprian facility im
1 and Coastaedestrians anway 1. As envss III bike facie County’s Coacifica, and Hail and Coasta
ment would bara and the eon Bay and a e facilities at W
ment would bail and 2nd Steen Highway g 1.69 mile di
Road which is
Experts Conn
een Mirada R
solidate inter
eady includedf Moon Bay)
ulder include:
treet to Redo
to Medio Av
o Etheldore S
and 7th Street
provememprovements
al Trail adjacend cyclists witvisioned, thisilities. These fomprehensivHalf Moon Bayal Trail.
be a 6.23 mileexisting bicycl1.58 mile segWavecrest Ro
be a 1.82 milereet in Monta1 and Airporirt path along
s currently be
necting Commun
Road and You
rsections at Fr
d in Buildout a
d in Alternati
ondo Beach
venue & Cap
Street
t
ents
nt to the coath a direct cos facility woulfacilities will ve Bicycle andy. Figure 17 s
e segment aloe facilities at gment along Hoad and the s
e segment aloara, a 0.25 mrt Street in Mg the coast in
eing evaluate
Ap
nities
ng Avenue
renchman’s
analysis as a
ive 1 to
Road & Terr
pistrano Road
stline along nnection to d be be part of thed Pedestrian hows the
ong Highway Ruisseau Highway 1 southern
ong Highwayile segment oss Beach, south Half
ed for Plan
ril 9, 2015
race
d to
e
1
1
![Page 14: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/14.jpg)
EvaluAddre
x
Trax
x
x
x
Parx
x
ation of Traness Buildout D
Class II bikPrinceton
nsit ImpAll Alterna
Shuttle buspecial eve
o Ju
o Spwe
o Op
o Prthon
o Fre
The establlots as weepotential ra location
o Pilo Cho Ca
School busthe Techniprovide adbe needed
rking ImpAll Alterna
Additionalfollowing l
o Paav
sportation AlDeficiencies
ke lane along
provemeative 1 transit
s service on sents with the
ne – October
pecial event weekends of se
perational ho
ovides conneree locationsn the event).
equency of 3
lishment of aekend park‐ariders who dofor people tollar Point Harhurch of Jesusalvary Chapel
s service for Cical Advisory dequate servid.
provemeative 1 parking
parking facilocations:
arking lot for vailable for ov
ternatives to
Airport Stree
ents improvemen
summer and ffollowing cha
r program
weekend servervice, or 8 da
urs from sun
ections from e in the study
0 minutes
a park‐and‐ridand‐ride locato not live witho meet and cabor, Princetos Christ of Lator Our Lady o
Cabrillo UnifieCommittee, tce. Also, a fac
ents g improveme
ities or parkin
Rancho Corraverflow beach
12
et which is cu
nts
fall weekendsaracteristics:
ice, outside oays total a yea
rise to sunset
either Hillsdaarea (the exa
de shuttle antions to improhin walking darpool: on tter Day Saintof the Pillar c
ed School Distthe school discility for stori
ents
ng improvem
al de Tierra ach parking
Experts Conn
urrently bein
s during peak
of peak summar
t
le or Haywardact communit
nd usage of tove access todistance of bu
ts, Moss Beacchurches in Ha
trict. Based ostrict would ning the vehicl
ents for recre
ccess east of
necting Commun
g evaluated f
k recreational
mer period; up
d Park Caltraties would be
he following o transit partius service and
ch alf Moon Bay
on feedback rneed a total oes and maint
eational user
highway, wh
Ap
nities
for Plan
l times and
p to 4
in Station to e dependent
existing parkcularly for thd to also prov
y
eceived fromof 10 buses totenance woul
s at the
ich could also
ril 9, 2015
king hose vide
m o d
o be
![Page 15: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/15.jpg)
EvaluAddre
ALTIMAlternensuiimproAlterncapacalternHighwerosioroundwhento proccasAlternfor pelanes Translarge a sign
Roax
x
ation of Traness Buildout D
TERNAPROVEnative 3 encong section. Aove roadwaynative 3 buildcity through nate route wiway 1 would on concerns,dabouts are p considering ovide additioional passingnative 3 also edestrian trafalong SR 92 it service woamount of canificant impac
adway aAll Alternareplacing p
Roundabo
o Hi
o Hi
o Hi
o Hi
o Hi
o Hi
o Hi
o Hi
o Hi
o M
o Hi
sportation AlDeficiencies
ATIVE 3EMENTompasses AltAs roadway se segment LOds on the impthe proposethin Half Moundergo a c, which wouproposed for signalization onal travel lag/climbing laintroduces pffic across Higto allow for
ould be improapital investmct to Midcoas
nd Interative 1 and Altproposed sign
uts at the fol
ghway 1 and
ghway 1 and
ghway 1 and
ghway 1 and
ghway 1 and
ghway 1 and
ghway 1 and
ghway 1 and
ghway 1 and
ain Street and
ghway 1 and
ternatives to
3 – HIGTS ternatives 1 egment LOS OS is to incrovements prd addition oon Bay throuomplete realuld also inclintersectionsof an interseanes along Sanes to redupedestrian ovghway 1 withsafe bicycle oved with pement, potentiat communitie
rsection ternative 2 ronalization of i
lowing inters
9th Street in M
Etheldore Str
Cypress Aven
Capistrano R
Coronado St
Mirada Road
Kehoe Avenu
Main Street
SR 92 in Half
d SR 92 in Ha
Higgins Cany
13
H COST
and 2, as wis defined byrease capacirovided in Altof travel laneugh the additlignment in Elude a larges acting as comction. While tSR 92, capacce bottlenecver/under croout interferincommuting
ermanent locally require aes and Half M
Improvoadway improntersections
ections:
Montara
reet (N) in Mo
nue in Moss B
Road (S) in El G
reet in El Gra
d in Miramar
ue in Half Mo
(N) in Half Mo
f Moon Bay
lf Moon Bay
yon Road/Ma
Experts Conn
T/HIGH
well as thosey capacity utiity or divert ternative 1 anes in the Midtion of a fronEl Granada, te addition ommunity gatethe existing tity can be imcks caused bossings at higng with traffibetween Sanal routes. Thcquisition of
Moon Bay.
vementsovements witwith roundab
oss Beach
Beach
Granada
nada
oon Bay
oon Bay
in Street (S) i
necting Commun
H IMPA
e strategies dlization, the traffic to and Alternativedcoast and btage road eato address seof parking ceways or as rterrain wouldmproved by by truck traffgh demand loc flow, as wen Mateo and hese improveright of way
th the exceptbouts
n Half Moon
Ap
nities
ACT
described in primary waysa parallel roue 2 by increasby proposingst of Highwaea level rise apacity. Sevrequired anald make it diffithe additionfic along SR ocations to alell as Class II BHalf Moon Bments requirand will resu
tion of
Bay
ril 9, 2015
the s to ute. sing g an y 1. and eral ysis cult n of 92. low Bike Bay. re a lt in
![Page 16: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/16.jpg)
EvaluAddre
x
x
x
x
x
x
x
Bicyx
x
ation of Traness Buildout D
o SR
Traffic calmMoss Beacdevices (ch
Increasing and St. EthMoss Beac
Highway 1
Constructiwith Frenc
Left turn la
o Beo Leo Ha
Passing/Cland Pilarciroadway s
An expansinclude the
o HaFre
o El
o M
o M
ycle andAll Alterna
Instead of demand an
o Gr
o M
o Su
o Ke
sportation AlDeficiencies
R 92 and SR 35
ming implemech. This couldhicanes and s
road capacitheldore Streech and Capist
1 realignment
on of a Frontchman’s Cree
anes at the fo
erta’s Farm mos Farm alf Moon Bay
imbing lanes tos Quarry Roegment as we
ion of the dee following se
alf Moon Bayenchman's Cr
Granada Seg
oss Beach Seg
ontara Segme
d Pedestative 1 and Alt
providing strnd bus stop lo
ray Whale Cov
ontara Sanita
urfer’s Beach
ehoe Avenue
ternatives to
5 east of Half
entation alon include basicspeed humps)
y to two lanet/Vallemar Strano Road (S
t in El Granad
tage Road alok Road
ollowing majo
Nursery
on the eastboad to allow ell as provide
fined curb anegments alon
y Segment ‐reek Road to
ment ‐ Medio
gment ‐ Carlo
ent ‐ between
rian Facternative 2 bi
riped crossingocations, pro
ve
ary District bu
Parking area,
14
f Moon Bay
ng Main Streec measures (s).
es in each diretreet in Moss) in El Granad
a to address s
ong east side o
or businesses
ound portioncars to pass te a passing lan
nd paved shoung Highway 1:
Redondo BeMirada Road
o Avenue to M
os Street to C
n 9th Street a
cility Impicycle and pe
gs with beacovide pedestri
uilding
, north of Cor
Experts Conn
et in Montaraspeed display
ection betwees Beach, and bda.
sea level rise
of Highway 1
along SR 92 i
n of SR‐92 betthe high volumne to go arou
ulder include:
each Road tod
Mirada Road
alifornia Ave
and 14th Stre
provemedestrian facil
ons to alert traian over/unde
ronado Street
necting Commun
and along Cay units) or spe
en 9th Street between Cyp
and erosion
connecting M
in Half Moon
tween the Lame of trucks und right‐turn
d in Alternati
o Miramonte
nue
eet
ents ity improvem
affic at the foer crossings:
t
Ap
nities
arlos Street ineed control
in Montara ress Avenue i
concerns
Main Street
Bay:
ndfill Road on this ning cars.
ives 1 and 2 t
es Point Road
ments
ollowing high
ril 9, 2015
n
in
to
d &
![Page 17: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/17.jpg)
EvaluAddre
x
Trax
x
x
Parx
x
x
ation of Traness Buildout D
Provide a Cto SR‐35.
nsit ImpAll Alterna
Provide anBeach, Mo
o Mo El
These routaccess to h
SamTrans morning a
o PeStaan
o Incan
o ExGr
rking ImpAll Alterna
Diagonal p
Diagonal p
sportation AlDeficiencies
Class II bicycle
provemeative 1 and Alt
n additional Sontara, and Paontara‐Moss Granada‐Mirtes would havhigh demand
service thatnd evening peak period exation with frend stops in Hacrease weekdnd San Mateoxpand the weeranada and Pr
provemeative 1 and Alt
parking for Mo
parking for El
ternatives to
e route along
ents ternative 2 tr
amTrans routacifica: Beach‐Devil’ramar‐North Hve local stopslocations as w
t provides ceak periods wxpress bus sequency of 3alf Moon Bay,day peak pero‐Hillsdale Calekday coverarinceton.
ents ternative 2 pa
oss Beach alo
Granada sepa
15
g State Route
ransit improve
te serving Ha
s Slide Trail roHalf Moon Bas, reducing acwell as conne
onnections twith limited sservice betwe0 minutes du, El Granada, riod frequenctrain Station age of Route 2
arking improv
ong Carlos Str
arated from H
Experts Conn
92 from Mai
ements
alf Moon Bay,
oute ay (to SR 92)ccess distanceections to reg
to regional tstops in ordereen Half Mouring the moMontara, andcy on Route 2from 60 min294 to provid
vements
reet
Highway 1 re
necting Commun
n Street in Ha
, El Granada,
e for users, angional routes
transit providr to decrease oon Bay and rning and evd Pacifica 294 betweenutes to 30 mide connection
alignment
Ap
nities
alf Moon Bay
Princeton, M
nd allow
ders during the travel timDaly City BAening peak h
n Half Moon inutes. ns to El
ril 9, 2015
y
Moss
the me: ART hour
Bay
![Page 18: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/18.jpg)
EvaluAddre
EvaluimproReporfeasibmetri
BecauimprorepreproducurreAppen
ation of Traness Buildout D
ation of alovements to rt. In order tobility/design ccs will be use
x Ro
x Pe
use there aovement was sent a relativuced with furtnt absolute indix B.
sportation AlDeficiencies
EVAternatives waddress defio judge the coconcerns haved for each ty
oadway and In
o Roadw
o Interse
o Effect o
edestrian, Bicy
o Filling gconnec
o Improv
o Improv
o Improv
o Precedstudy
re no formagiven a scoreve improvemther study toimprovement
ternatives to
ALUATIwill primarilyciencies idenost effectivenve been evalupe of propos
ntersection Im
ay Segment L
ction LOS
on vehicle and
ycle, Transit,
gaps in existinctions
ved pedestria
ved access to
ved access to
ent for a proj
al, locally ee according t
ment to existio allow for a ct. Further ex
16
ION Oy determinentified in the ess of the prouated for eaed improvem
mprovements
LOS
d pedestrian
and Parking I
ng bicycle or p
n and bicycle
communities
the shoreline
ject that has a
stablished so the scoringng conditioncomparison oxplanation of
Experts Conn
OF ALTe the effecBuildout Anoposed improch alternativ
ment:
s
safety
Improvement
pedestrian ne
e safety
s, neighborho
e
already been
standards fog system gives. A baselineof relative impf these evalu
necting Commun
TERNActiveness of alysis and Trovements, cove. Additiona
ts
etworks or tra
oods or popul
n recommend
r non‐vehiclen in Table 1. e score for eaprovement inuation metric
Ap
nities
ATIVESthe propo
raffic Projectiost estimates lly the follow
ansit
lar destinatio
ed in a previo
e modes, e These scoresach area cann addition to cs is available
ril 9, 2015
S osed ions and wing
ns
ous
each s all n be this e in
![Page 19: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/19.jpg)
EvaluAddre
Table
M
Conne
Acces
Safety
Shore
Prece
Capita
Annu
ALTIMAlternand wbe imbeing
RoaAlternare ab
None deficiparkindefinepedes
ation of Traness Buildout D
e 1 - Pedest
etric
ectivity Meexicon
ss Mefaccom
y Bo
eline Bo
edent Bopre
al Cost Mepro
al Cost Meop
TERNAPROVEnative 1 mainwithout signifmproved with evaluated.
adway anative 1 incluble to be add
Abilityof the propencies, howeng lot, the aded curb and strian travel a
sportation AlDeficiencies
trian, Bicycl
easures the eisting bicyclennections.
easures the ecilities or mmunities or
nus priority f
nus priority f
nus for a pevious studie
easures the eoject.
easures the eerating and m
ATIVE 1EMENTnly focuses onicant cost or h signage and
nd Interdes very fewressed simply
y to Addrposed improever, the addddition of stopaved shoulalong Highwa
ternatives to
e, Transit, a
Descrip
extent to whe or pedest
extent to whiservice to r existing dest
for safety imp
for enhanced
roject recoms
extent of the e
xtent of the emaintenance
1 – LOWTS n improvemeenvironmentd striping cha
rsection roadway andy with signage
ress Defvements in dition of a lefop signs to uder along Hiy 1.
17
and Parking
ption
ich a projecttrian networ
ich a project currently
tinations.
provements.
public shorel
mmended in
estimated cap
estimated ancosts of a pro
W COST
ents that can tal impact. Thanges as we
Improvd intersectione and striping
ficienciesAlternative 1ft‐turn bay anunsigned integhway 1 will
Experts Conn
g Evaluation
t fills a gap irks or trans
provides newunderserve
line access.
one or mor
pital cost for
nual oject.
T/LOW
be made withese projects ll as improve
vementsn improvemeg.
s 1 address annd acceleratiersections alol all improve
necting Commun
n Metrics
Poin
n it
0(lowconn
w d 0
(low to h
0
0
re 0
a 0(high to
c
0(high to
c
W IMPA
thin the existaddress deficements alrea
ents as few of
ny of the roion lane at Gong Highwaye safety both
Ap
nities
nt Value
0 to 3 w to high nectivity)
0 to 3 high access)
0 or 1
0 or 1
0 or 1
0 to 3 o low capital cost)
0 to 3 low annual cost)
ACT
ting right of wciencies that ady planned
f the deficien
oadway capaGray Whale Cy 1 and havin for vehicle
ril 9, 2015
way can and
cies
acity Cove ng a and
![Page 20: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/20.jpg)
EvaluAddre
Usingshowturns left tu
Table
IntersNum
1 Stan2 ProjAlterndeficimeet
x x x x x x x x x x x
x x x x
ation of Traness Buildout D
g signs to restn in Table 2 there will beurns are conso
e 2 - Altern
section mber
LStan
2
3
5
6
7
8
dard is given ect LOS (Buildnative 1 doesencies. With the LOS stan
MidcoasHighway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1
Half MoHighway 1Highway 1Highway 1Highway 1
sportation AlDeficiencies
trict left‐turn for the affec the possibilitolidated.
ative 1 Buil
LOS ndard1
D Hwy
D Hwy
D Hwy
D Hwy
D Hwy
D Hwy
for an individdout No Projes not addressthe improvedard during t
st 1 and 2nd Stre1 and Vallema1 and Californ1 and Virginia 1 and Vermon1 and Cypress 1 and St. Ethe1 and Coral Re1 and Magella1 and Medio A1 and Mirama
oon Bay 1 and Mirada 1 and Rooseve1 and Young A1 and Ruisseau
ternatives to
movements cted locationty of violation
dout Condi
Street Na
y 1 / 7th St
y 1 / 8th St
y 1 / Vallema
y 1 / Californi
y 1 / Virginia A
y 1 / Vermont
dual approachect LOS) s any of the rments includthe listed pea
eet (AM, PM, ar Street (PM,ia Avenue (AAvenue (AM
nt Avenue (AMAvenue (AMldore Street (eef Avenue (Aan Avenue (AMAvenue (AM, r Drive (AM,
Road (AM, PMelt BoulevardAvenue (AM, u Francais Av
18
at the followns; however,ns to avoid in
tions Peak
mes
r St
ia Ave
Ave
t Ave (WB)
h (stop contro
remaining stued in Alternaak hours:
Midday) , Midday) M, PM, Midd, PM, MiddayM, PM, Midda, PM, Midday(AM, PM) AM, PM, MiddM, PM, MiddaPM, Midday)PM, Midday)
M, Midday) (AM, PM, MPM, Midday)venue (Midda
Experts Conn
wing key locatwithout any
ncreased dela
Hour Inters
Control Type
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
olled)
udy intersectiative 1, the fo
day) y) ay) y)
day) ay) )
idday)
y)
necting Commun
tions will imp physical impays at the inte
section Lev
AM Peak Hour LOS2
F (F)
C (F)
F (D)
F (F)
E (F)
F (F)
ion LOS or roollowing inte
Ap
nities
prove the LOSpediment to ersections wh
el of Service
PM Peak Hour
MPH
LOS2 L
F (F) F
C (F) B
F (F) F
F (F) F
F (F) F
F (F) F
oadway segmrsections do
ril 9, 2015
S as left
here
e
idday Peak Hour LOS2
F (F)
B (F)
F (E)
F (F)
F (F)
F (F)
ment not
![Page 21: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/21.jpg)
EvaluAddre
x x x x x x x x x x x
xxx
With the LO
HighwF. WhLOS Eand M
The fothe CM
x x x x x x x x
x Additfollow
ation of Traness Buildout D
Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Main Stree
SR‐92 x SR 92 andx SR 92 andx SR 92 and
the improveOS standard d
Midcoasway 1 betweehile the remaE standard givMiramar Drive
Half Moollowing roadMP:
Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1
SR‐92 SR 92 from
ionally, severwing roadway
sportation AlDeficiencies
1 and Frenchm1 and Venice B1 and Spindrif1 and Kehoe A1 and Grandvi1 and Bellevie1 and Main St1 and Kelly Av1 and Filbert S1 and Seymouet and Lewis F
d Muddy Roadd Skyline Bould SR 35 (PM, M
ments includduring the list
st en Coronado ainder of the ven in the CMe does not me
oon Bay dways segme
1 between Mi1 between Ro1 from Young 1 from Ruissea1 from Venice1 between Fro1 from Spindri1 from Kehoe
m Skyline Bou
ral roadway sy segments do
ternatives to
man’s Creek RBoulevard (AMft Way (AM, PAvenue (AM, ew Boulevardw Boulevard reet (north) (venue (MiddaStreet (AM, Pur Street (AM,Foster Drive (
d/Ox Mountaevard (AM, PMidday)
ed in Alternated peak hou
Street and Mroadway seg
MP, Highway eet the LCP LO
nts within th
ramar Drive aosevelt BouleAvenue to Ruau Francais A Boulevard toontage Road tift Way to KeAvenue to Gr
levard to SR 3
segments fallo not meet th
19
Road (AM, PMM, PM, MiddPM, Midday)PM, Midday)d (AM, PM, M(AM) (PM, Midday)y) M, Midday), PM, Midday(PM)
in Landfill RoPM, Midday)
ative 1, the frs:
Miramar Drive gments within1 along the eOS D standar
e Study Area
and Roosevelevard and Youuisseau FrancAvenue to Veno Frontage Roto Spindrift Whoe Avenue (randview Bou
35 (PM, Midd
below the sthe LCP LOS D
Experts Conn
M, Midday) ay)
Midday)
)
y)
oad (PM, Midd
following road
operates ben the Study Aentire Midcoad during the
a operate belo
lt Boulevard (ung Avenue (cais Avenue (Mnice Boulevaroad (Midday)Way (PM, Mid(Midday) ulevard (AM,
day)
tricter standastandard dur
necting Commun
day)
dway segmen
low the CMPArea operateast region belisted peak ho
ow the LOS s
(Midday) (PM, Midday)Midday) rd (PM, Midda dday)
PM, Midday)
ard provided ring the listed
Ap
nities
nts do not m
standard at better thanetween 1st Strours.
tandard give
)
ay)
)
by the LCP. d peak hours:
ril 9, 2015
meet
LOS the reet
n in
The
![Page 22: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/22.jpg)
EvaluAddre
x x x
x x x
Cost standmobilcosts
Table
# Im
1 Gr
2 Tu
3 SR
4 SR
1 Draf
Thereroadw
The fo
x
x
A full
ation of Traness Buildout D
Highway 1Highway 1Highway 1
SR‐92 SR 92 fromSR 92 fromSR 92 betw
Cost Esestimates foard unit costlization, consis included in
e 3 - Cost E
mprovement
ray Whale Co
urn Restrictio
R‐1 Side‐Stree
R‐1 Paved Sho
ft PPS for Con
Feasibe are no feaway and inter
ollowing desig
Adequate Whale parpotential f
Given the expensive
listing of imp
sportation AlDeficiencies
1 between Mi1 between Ke1 between Re
m Main Streetm Skyline Bouween SR 35 an
stimatesor the Alternts and are lisstruction engn Appendix A
Estimates fo
ove Turn and A
n Signage
et Stop Signs
oulder and Cu
ngestion Man
bility andsibility concesection impro
gn considerat
vehicle storarking lot shoufor queue spil
topography to provide pa
provements w
ternatives to
ramar Drive ally Avenue andondo Beach
t to Skyline Bolevard to SR 3nd I‐280 (AM
s ative 1 propsted in Tablegineering, pe.
r Alternativ
Acceleration
urb
agement and
d Designerns that weovements.
tions were id
age length fould be includellback.
of the landaved shoulde
with feasibility
20
and Grandviend Seymour Sh Road and Fa
oulevard (AM35 (AM, PM, , PM)
posed improve 3. Cost estrmits, design
ve 1 Roadwa
Lanes1
d Safety Impro
n Concerere identified
entified:
or the proposed for the ex
adjacent toers and curb.
y and design c
Experts Conn
ew Boulevard Street (AM, PMairway Drive (
M, PM) Midday)
vements haveimates includn, and contin
ay and Inter
T
ovements, 20
rns d for any of
sed southbouxpected dema
o Highway 1,
consideration
necting Commun
(AM, PM, MM) (AM, PM)
e been calcude contract ingency. A fu
rsection Im
Co
$
$
$
$ 2
Total: $ 3
014
the Alternat
und left‐turn and in order
, some locat
ns is included
Ap
nities
idday)
ulated baseditems as welll breakdown
mprovement
ost Estimate
960,000
40,000
18,000
2,302,000
3,320,000
tive 1 propo
bay at the Gto minimize
tions may pr
d in Appendix
ril 9, 2015
on l as n of
ts
osed
Gray the
rove
x B.
![Page 23: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/23.jpg)
EvaluAddre
Bicy
The plisting
Table
#
1
2
3 T
4 C
Cost standmobilcosts
ation of Traness Buildout D
ycle and
Abilityproposed impg of scores is
e 4 - Altern
Project
Pedestrian Crossings
Sidewalks
Traffic signal updates
Community Street
Sharrows
Cost Esestimates foard unit costlization, consis included in
sportation AlDeficiencies
d Pedest
y to Addrprovements wprovided in A
ative 1 Bicy
Connectivi(0 to 3)
1
1
1
1
stimatesor the Alternts and are lisstruction engn Appendix A
ternatives to
rian Fac
ress Defwere given thAppendix B.
ycle and Ped
ty Access(0 to 3)
1
1
0
2
s ative 1 propsted in Tablegineering, pe.
21
cility Imp
ficiencieshe following
destrian Eva
)
Safety(0 or 1)
1
1
1
1
posed improve 3. Cost estrmits, design
Experts Conn
proveme
s scores for t
aluation Sco
Shoreline(0 or 1)
1
0
0
0
vements haveimates includn, and contin
necting Commun
ents
he evaluation
ores
e Preceden(0 or 1)
1
1
0
1
e been calcude contract ingency. A fu
Ap
nities
n metrics. A
nt
ImpactSubtota
5
4
2
5
ulated baseditems as welll breakdown
ril 9, 2015
full
al
on l as n of
![Page 24: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/24.jpg)
EvaluAddre
Table
#
1
2A
3
4A
4B
Thereand p
The fo
x
x
A full
Tra
The plisting
Table
#
5
6
ation of Traness Buildout D
e 5 - Cost E
Improvemen
Striped Pede
SR‐1 Sidewa
Traffic Signa
Sharrows on
Sharrows on
Feasibe are no feasipedestrian im
ollowing desig
The beachlocation th
The Parallengineerincould requ
listing of imp
nsit Imp
Abilityproposed impg of scores is
e 6 - Altern
Project
Bus Stop Amenities
Increased Weekend Samtrans service
sportation AlDeficiencies
Estimates fo
nt
estrian Crossi
lk (Phase A)
al Updates
n Main Street
n Carlos Stree
bility Conbility concernprovements.
gn considerat
h access croshat would acc
el Trail woung cost. Addiuire mitigatio
provements w
proveme
y to Addrprovements wprovided in A
ative 1 Tran
Connectivi(0 to 3)
0
2
ternatives to
r Alternativ
ng with Beac
et
ncerns ns that were i
tions were id
sswalk at thecommodate t
ld be expectitionally it mn.
with feasibility
ents
ress Defwere given thAppendix B.
nsit Evaluat
ty Access(0 to 3)
0
2
22
ve 1 Bicycle
cons
identified for
entified:
Gray Whalehe southboun
ted to have amay encumbe
y and design c
ficiencieshe following
tion Scores
)
Safety(0 or 1)
1
0
Experts Conn
e and Pedest
r any of the A
e Cove parkinnd storage la
an uneven per significant
consideration
s scores for t
Shoreline(0 or 1)
0
0
necting Commun
trian Impro
C
$
$
$
$
$
Total: $
Alternative 1 p
ng lot shouldne.
profile and menvironment
ns is included
he evaluation
e Preceden(0 or 1)
0
0
Ap
nities
ovements
Cost Estimate
2,550,000
1,475,000
1,624,000
44,000
43,000
5,736,000
proposed bicy
d be placed a
may carry a htal impacts t
d in Appendix
n metrics. A
nt
ImpactSubtota
1
4
ril 9, 2015
e
ycle
at a
high that
x B.
full
al
![Page 25: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/25.jpg)
EvaluAddre
Cost standmobilcosts opera
Table
#
1
2
TherepropoA demdema
A full
Par
The plisting
Table
#
7
8
9
ation of Traness Buildout D
Cost Esestimates foard unit costlization, consis included iating costs of
e 7 - Cost E
Improvemen
Bus Stop Am
Increased W
Feasibe are no feaosed transit immand study wand to warran
listing of imp
rking Imp
Abilityproposed impg of scores is
e 8 - Altern
Project
Montara State Beach Parking
Gray Whale Cove
Parking Lot
Improved Wayfinding
sportation AlDeficiencies
stimatesor the Alternts and are lisstruction engn Appendix Aweekend Sam
Estimates fo
nt
menities
Weekend Sa
bility Consibility or demprovementswould need tnt improveme
provements w
proveme
y to Addrprovements wprovided in A
ative 1 Park
Connectivi(0 to 3)
1
1
1
ternatives to
s ative 1 propsted in Tablegineering, peA. Cost estimmTrans Route
r Alternativ
mtrans serv
ncerns esign concerns. There are 7o be performent.
with feasibility
ents
ress Defwere given thAppendix C.
king Evaluat
ty Access(0 to 3)
1
1
1
23
posed improve 7. Cost estrmits, design
mates for incre 17 and 294.
ve 1 Transit
ice
ns that were77 active busmed in order
y and design c
ficiencieshe following
tion Scores
)
Safety(0 or 1)
0
0
0
Experts Conn
vements haveimates includn, and continreased transi
t Improvem
e identified fs stops locateto identify w
consideration
s scores for t
Shoreline(0 or 1)
1
1
1
necting Commun
e been calcude contract ingency. A fut service is b
ments
C
$
$
for any of thed throughoutwhich bus sto
ns is included
he evaluation
e Preceden(0 or 1)
1
1
0
Ap
nities
ulated baseditems as welll breakdownbased on curr
Cost Estimate
156,000 /stop
525,000
he Alternativt the study aops have eno
d in Appendix
n metrics. A
nt
ImpactSubtota
4
4
3
ril 9, 2015
on l as n of rent
e
p
ve 1 rea. ugh
x A.
full
al
![Page 26: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/26.jpg)
EvaluAddre
#
Cost standmobilcosts
Table
#
1
2
3
Thereimpro
The fo
x
A full
ALTIMAlternBuildoHighwof anconsidbeingservicTheseenviro
ation of Traness Buildout D
Project
Signs
Cost Esestimates foard unit costlization, consis included in
e 9 - Cost E
Improvemen
Montara Sta
Gray Whale
Wayfinding
Feasibe are no feasibovements.
ollowing desig
The proponorthboun
listing of imp
TERNAPACT Inative 2 addrout by reducway 1. This is nd on to Higders supplem evaluated ace (e.g. shutte improvemonmental imp
sportation AlDeficiencies
Connectivi(0 to 3)
stimatesor the Alternts and are lisstruction engn Appendix A
Estimates fo
nt
ate Beach Par
Cove Parking
Signage
bility Conbility concern
gn considerat
osed parking nd traffic.
provements w
ATIVE 2IMPROresses intersecing the numdone throug
ghway 1 or bmentary bike ls part of Platles and parkents requirepact.
ternatives to
ty Access(0 to 3)
s ative 1 propsted in Tablegineering, pe.
r Alternativ
rking Lot Impr
g Lot Improve
ncerns ns that were i
tions were id
lot for Mon
with feasibility
2 – MEDOVEMEection LOS atmber of locagh the additioby blocking anes along Aan Princeton, k‐and‐ride lote a modera
24
)
Safety(0 or 1)
posed improve 9. Cost estrmits, design
ve 1 Parking
rovements
ements
dentified for
entified:
ntara State B
y and design c
DIUM CNTS t intersectiontions where on of raised maccess to Hi
Airport Street as well as dts) and additate amount
Experts Conn
Shoreline(0 or 1)
vements haveimates includn, and contin
g Improvem
any of the Al
Beach should
consideration
COST/M
ns that do notraffic can
medians physighway 1 coand Capistrademand‐focustional parkint of capital
necting Commun
e Preceden(0 or 1)
e been calcude contract ingency. A fu
ments
C
$
$
$
Total: $
lternative 1 p
d include a l
ns is included
MEDIU
ot meet the have unrestically restrictmpletely. Altano Road, whsed improvemg in high de investment
Ap
nities
nt
ImpactSubtota
ulated baseditems as welll breakdown
Cost Estimate
557,000
1,052,000
303,000
1,912,000
proposed park
eft‐turn bay
d in Appendix
UM
LCP standardricted accessting left turnsternative 2 aich are currements to traemand locatiot and mini
ril 9, 2015
al
on l as n of
e
king
for
x B.
d at s to s off also ntly nsit ons. mal
![Page 27: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/27.jpg)
EvaluAddre
Roa
In addmediaVirginenter 1/Cyp
Theseshowconsoand atraffic
Alterndefici
TableServi
IntersNum
21 Stan2 ProjWith stand
x
ation of Traness Buildout D
adway a
Abilitydition to theans to restricnia Avenue inHighway 1 a
press Avenue
e proposed imn in Table 10olidates traffia resulting LOc results in a w
native 2 doesencies.
e 10 - Alterice
section mber
LStan
2
3
5
6
7
8
9
27
dard is given ect LOS (Buildthe improvemard during th
MidcoasHighway 1
sportation AlDeficiencies
nd Inter
y to Addr proposed imct turning mon Moss Beachat the high vin Moss Beac
mprovement0 for the affec at VallemaOS F becauseworsening of
s not address
native 2 Bu
LOS ndard1
D Hwy
D Hwy
D Hwy
D Hwy
D Hwy
D Hwy
D SR 1
E Hwy
for an individdout No Projements includehe listed peak
st 1 and 2nd Stre
ternatives to
rsection
ress Defmprovementsovements at h. Signalizatioolume intersch and Highw
s will result ected locationar and Vermoe of the high LOS at Highw
s any of the r
ildout Cond
Street Na
y 1 / 7th St
y 1 / 8th St
y 1 / Vallema
y 1 / Californi
y 1 / Virginia A
y 1 / Vermont
1 / Cypress A
y 1 / Kehoe A
dual approachect LOS) ed in Alternatk hours:
eet (AM, PM,
25
Improv
ficienciess in Alternati8th Street inon will improsections of Hiway 1/Kehoe A
in the followns. While theont, the eastvolumes alo
way 1/Vallem
remaining stu
ditions Peak
ames
r St
ia Ave
Ave
t Ave (WB)
Avenue
Ave
h (stop contro
tive 2, the fol
Midday)
Experts Conn
vements
s ve 1, Alternan Montara aove the abilitighway 1/CalAvenue in Ha
wing changese restricted wbound trafficong Highway ar Street
udy intersecti
k Hour Inte
Control Type
TWSC
TWSC
TWSC
Signal
TWSC
TWSC
Signal
Signal
olled)
llowing inters
necting Commun
ative 22 will nd at Califorty for minor lifornia Avenlf Moon Bay.
s to the intewestbound acc still experie1. Additiona
ion LOS or ro
rsection Le
AM Peak Hour LOS2
F (F)
C (F)
F (D)
A (F)
E (F)
F (F)
B (F)
E (F)
sections do n
Ap
nities
include physrnia Avenue street trafficue and Highw
ersection LOSccess diverts ences high delly, the diver
oadway segm
vel of
PM Peak Hour
M
LOS2
F (F)
C (F)
F (F)
A (F)
F (F)
F (F)
C (F)
D (F)
not meet the
ril 9, 2015
sical and c to way
S as and elay rted
ment
Midday Peak Hour LOS2
F (F)
B (F)
F (E)
B (F)
F (F)
F (F)
B (F)
B (F)
LOS
![Page 28: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/28.jpg)
EvaluAddre
x x x x x x x x
x x x x x x x x x x x x x x x
xxx
With the LO
HighwF. WhLOS Eand M
The fothe CM
ation of Traness Buildout D
Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1
Half MoHighway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Main Stree
SR‐92 x SR 92 andx SR 92 andx SR 92 and
the improveOS standard d
Midcoasway 1 betweehile the remaE standard givMiramar Drive
Half Moollowing roadMP:
sportation AlDeficiencies
1 and Vallema1 and Virginia 1 and Vermon1 and St. Ethe1 and Coral Re1 and Magella1 and Medio A1 and Mirama
oon Bay 1 and Mirada 1 and Rooseve1 and Young A1 and Ruisseau1 and Frenchm1 and Venice B1 and Spindrif1 and Kehoe A1 and Grandvi1 and Bellevie1 and Main St1 and Kelly Av1 and Filbert S1 and Seymouet and Lewis F
d Muddy Roadd Skyline Bould SR 35 (PM, M
ments includduring the list
st en Coronado ainder of the ven in the CMe does not me
oon Bay dways segme
ternatives to
ar Street (AM,Avenue (AM
nt Avenue (AMldore Street (eef Avenue (Aan Avenue (AMAvenue (AM, r Drive (AM,
Road (AM, PMelt BoulevardAvenue (AM, u Francais Avman’s Creek RBoulevard (AMft Way (AM, PAvenue (AM)ew Boulevardw Boulevard reet (north) (venue (MiddaStreet (AM, Pur Street (AM,Foster Drive (
d/Ox Mountaevard (AM, PMidday)
ed in Alternated peak hou
Street and Mroadway seg
MP, Highway eet the LCP LO
nts within th
26
, PM, Midday, PM, MiddayM, PM, Midda(AM, PM) AM, PM, MiddM, PM, MiddaPM, Midday)PM, Midday)
M, Midday) (AM, PM, MPM, Midday)venue (MiddaRoad (AM, PMM, PM, MiddPM, Midday)
d (AM, PM, M(AM) (PM, Midday)y) M, Midday), PM, Midday(PM)
in Landfill RoPM, Midday)
ative 1, the frs:
Miramar Drive gments within1 along the eOS D standar
e Study Area
Experts Conn
y) y) ay)
day) ay) )
idday)
y) M, Midday) ay)
Midday)
)
y)
oad (PM, Midd
following road
operates ben the Study Aentire Midcoad during the
a operate belo
necting Commun
day)
dway segmen
low the CMPArea operateast region belisted peak ho
ow the LOS s
Ap
nities
nts do not m
standard at better thanetween 1st Strours.
tandard give
ril 9, 2015
meet
LOS the reet
n in
![Page 29: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/29.jpg)
EvaluAddre
x x x x x x x x
x Additfollow
x x x
x x x
Cost eunit cconstin App
TableImpr
#
4B
5
6
7
8
ation of Traness Buildout D
Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1
SR‐92 SR 92 from
ionally, severwing roadway
Highway 1Highway 1Highway 1
SR‐92 SR 92 fromSR 92 fromSR 92 betw
Cost Esestimates forcosts and are ruction enginpendix A.
e 11 - Cost rovements
Improveme
Carried over
Hwy 1 Paved
California Av
Cypress Ave
Kehoe Aven
Main Street
sportation AlDeficiencies
1 between Mi1 between Ro1 from Young 1 from Ruissea1 from Venice1 between Fro1 from Spindri1 from Kehoe
m Skyline Bou
ral roadway sy segments do
1 between Mi1 between Ke1 between Re
m Main Streetm Skyline Bouween SR 35 an
stimatesr Alternative 2listed in Tablneering, desig
Estimates fo
nt
r1 Alternative
d Shoulder an
venue Signal
nue Signal
ue Signal
(S) Signal
ternatives to
ramar Drive aosevelt BouleAvenue to Ruau Francais A Boulevard toontage Road tift Way to KeAvenue to Gr
levard to SR 3
segments fallo not meet th
ramar Drive ally Avenue andondo Beach
t to Skyline Bolevard to SR 3nd I‐280 (AM
s 2 proposed imle 11. Cost esgn, permits, a
for Alternat
1 options
nd Curb (Phas
27
and Roosevelevard and Youuisseau FrancAvenue to Veno Frontage Roto Spindrift Whoe Avenue (randview Bou
35 (PM, Midd
below the sthe LCP LOS D
and Grandviend Seymour Sh Road and Fa
oulevard (AM35 (AM, PM, , PM)
mprovementsstimates incluand contingen
tive 2 Roadw
se B)
Experts Conn
lt Boulevard (ung Avenue (cais Avenue (Mnice Boulevaroad (Midday)Way (PM, Mid(Midday) ulevard (AM,
day)
tricter standastandard dur
ew Boulevard Street (AM, PMairway Drive (
M, PM) Midday)
s have been cude contract ncy. A full br
way and Inte
necting Commun
(Midday) (PM, Midday)Midday) rd (PM, Midda dday)
PM, Midday)
ard provided ring the listed
(AM, PM, MM) (AM, PM)
calculated baitems as wellreakdown of
ersection
Ap
nities
)
ay)
)
by the LCP. d peak hours:
idday)
ased on stand as mobilizatcosts is inclu
Cost Est
$ 2,76
$ 2,84
$ 76
$ 64
$ 64
$ 53
ril 9, 2015
The
dard ion, ded
imate
0,000
1,000
67,000
40,000
40,000
30,000
![Page 30: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/30.jpg)
EvaluAddre
9
10
11
12A
12B
13
14
1 Doerestric2 TheBouledrivew
Thereroadw
The fo
x
x
A full
Bicy
The plisting
Table
#
10
ation of Traness Buildout D
Hwy 1 Medi
Hwy 1 Acces
Montara Lig
Nurserymen
Nurserymen
Frenchman'
Terrace Ave
es not includction projectse minimal alevard while thway directly s
Feasibe are no feaway and inter
ollowing desig
All design
SignalizatioconsideratAdditionalopportunit
listing of imp
ycle and
Abilityproposed impg of scores is
e 12 - Alter
Project
Parallel Trail
sportation AlDeficiencies
an and Left T
ss Restriction
ghthouse Med
n's Exchange A
n's Exchange A
s Creek Road
nue/Grand B
de Turn Restrs ternative inche expandedsouth of Youn
bility Consibility concesection impro
gn considerat
consideration
on of the Higtions becausely, striping eties.
provements w
d Pedest
y to Addrprovements wprovided in A
native 2 Bic
Connectiv(0 to 3)
3
ternatives to
Turn Bay in M
s in Moss Bea
dian and Left
Access Consol
Access Consol
Realignment
oulevard Acc
riction Signag
cludes a fro alternative wng Avenue an
ncerns erns that weovements.
tions were id
ns noted for A
ghway 1/Calife of the Wienhancements
with feasibility
rian Fac
ress Defwere given thAppendix B.
cycle and Pe
vity Access(0 to 3
3
28
ontara
ach
Turn Bay
lidation (Mini
lidation (Expa
t and Access C
ess Consolida
To
To
ge as it has
ntage road would contind north to M
ere identified
entified:
Alternative 1
fornia Avenunke Way leg s may be nec
y and design c
cility Imp
ficiencieshe following
edestrian Ev
s )
Safety(0 or 1)
1
Experts Conn
imal Alternat
anded Alterna
Consolidation
ation and Sign
tal (assuming
otal (assuming
been replac
between Yonue the frontirada Road.
d for any of
e intersectiothat makes
cessary to cre
consideration
proveme
s scores for t
valuation Sc
Shoreline(0 or 1)
1
necting Commun
tive)2
ative)
n
nalization
g Project 12A
g Project 12B
ced with med
oung Avenuetage road sou
the Alternat
n may requirit a five leggeate safe ped
ns is included
ents
he evaluation
cores
e Precede(0 or 1
1
Ap
nities
$ 22
$ 26
$ 17
$ 1,521
$ 2,851
$ 1,18
$ 1,27
A): $ 12,81
B): $ 14,14
dian and acc
e and Rooseuth to cover
tive 2 propo
re careful desged intersectdestrian cross
d in Appendix
n metrics. A
ent 1)
ImpacSubtota
9
ril 9, 2015
25,000
68,000
70,000
1,000
1,000
2,000
0,000
4,000
44,000
cess
velt the
osed
sign ion. sing
x B.
full
t al
![Page 31: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/31.jpg)
EvaluAddre
#
11
12
Cost eunit cconstin App
ation of Traness Buildout D
Project
Coastal Trail
Class II Bike Lanes on Airport
Street and Capistrano
Road
Cost Esestimates forcosts and are ruction enginpendix A.
sportation AlDeficiencies
Connectiv(0 to 3)
2
2
stimatesr Alternative 2listed in Tablneering, desig
ternatives to
vity Access(0 to 3
2
1
s 2 proposed imle 13. Cost esgn, permits, a
29
s )
Safety(0 or 1)
1
1
mprovementsstimates incluand contingen
Experts Conn
Shoreline(0 or 1)
1
0
s have been cude contract ncy. A full br
necting Commun
e Precede(0 or 1
1
1
calculated baitems as wellreakdown of
Ap
nities
ent 1)
ImpacSubtota
7
5
ased on stand as mobilizatcosts is inclu
ril 9, 2015
t al
dard ion, ded
![Page 32: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/32.jpg)
EvaluAddre
Table
#
2B
5
6
7
9
10
11
1Cost estabdollar
Thereand p
The fo
x
x
A full
Tra
The plisting
ation of Traness Buildout D
e 13 - Cost
Improveme
Carried over
Hwy 1 Sidew
Coronado St
Parallel Trai
Coastal Trail
Main Street
Capistrano R
Airport Stree
estimates folished in the rs
Feasibe are no feasipedestrian im
ollowing desig
All design
Lane widthand Airpor
listing of imp
nsit Imp
Abilityproposed impg of scores is
sportation AlDeficiencies
Estimates fo
nt
r Alternative 1
walk (Phase B
treet and Ave
l adjacent to
l throughout
Class III Bike
Road Bicycle F
et Class II Bik
r these projec2002 Mid‐Co
bility Conbility concernprovements.
gn considerat
consideration
h should be nrt Street in or
provements w
proveme
y to Addrprovements wprovided in A
ternatives to
for Alternat
1 options
)
e Alhambra Si
Highway 1 fo
the entire stu
Route
Facilities
e Lanes
cts are basedast Recreatio
ncerns ns that were i
tions were id
ns noted for A
narrowed alonrder to enhan
with feasibility
ents
ress Defwere given thAppendix C.
30
tive 2 Bicycl
dewalk
or the entire s
udy area1
To
on per mile Conal Needs As
identified for
entified:
Alternative 1
ng the proponce the traffic
y and design c
ficiencieshe following
Experts Conn
le and Pede
study area1
otal (assuming
Class 1 pavedssessment (pg
r any of the A
osed Class II bc calming effe
consideration
s scores for t
necting Commun
estrian Impr
g Project 12B
d bike trail cog 62), and adj
Alternative 2 p
bike lanes on ect.
ns is included
he evaluation
Ap
nities
rovements
Cost Est
$ 5,736
$ 1,80
$ 74
$ 11,03
$ 5,25
$ 8
$ 86
$ 4,23
B): $ 29,768
st estimates justed for 201
proposed bicy
Capistrano R
d in Appendix
n metrics. A
ril 9, 2015
imate
6,000
6,000
49,000
7,000
1,000
85,000
66,000
8,000
8,000
14
ycle
oad
x B.
full
![Page 33: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/33.jpg)
EvaluAddre
Table
#
13 S
14
15 S
Cost eand aprivatpark‐anegot
Therepropo
A full
Par
The plisting
ation of Traness Buildout D
e 14 - Alter
Project
Special EventShuttle Service
Park‐and‐Ride Lots
School Buses
Cost Esestimates forre not includte company and‐ride lotstiation of cost
Feasibe are no feaosed transit im
listing of imp
rking Imp
Abilityproposed impg of scores is
sportation AlDeficiencies
native 2 Tra
Connectiv(0 to 3)
3
2
2
stimatesr shuttle and ed in this docas well as ons have a mint with private
bility Consibility or demprovements
provements w
proveme
y to Addrprovements wprovided in A
ternatives to
ansit Evalua
vity Access(0 to 3
2
2
2
s school bus secument as thengoing operanimal cost ese lot owners.
ncerns esign concerns.
with feasibility
ents
ress Defwere given thAppendix C.
31
ation Scores
s )
Safety(0 or 1)
0
0
0
ervice are coey would reqation, maintestimate as th
ns that were
y and design c
ficiencieshe following
Experts Conn
s
Shoreline(0 or 1)
1
0
0
nsidered outuire acquisitienance, and hey involve t
e identified f
consideration
s scores for t
necting Commun
e Precede(0 or 1)
0
0
0
t of the scopeon or lease ostorage coststhe use of e
for any of th
ns is included
he evaluation
Ap
nities
nt )
ImpactSubtota
6
4
4
e for this prof vehicles fros. The propoexisting lots
he Alternativ
d in Appendix
n metrics. A
ril 9, 2015
t al
ject m a osed and
ve 2
x B.
full
![Page 34: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/34.jpg)
EvaluAddre
Table
#
17
Cost eunit cconstin App
Table
#
4
Thereimpro
The fo
x
x
A full
ation of Traness Buildout D
e 15 - Alter
Project
Parking lot for Rancho Corral de Tierra
Cost Esestimates forcosts and are ruction enginpendix A.
e 16 - Cost
Improveme
Carried over
Rancho Corr
Feasibe are no feasibovements.
ollowing desig
All design
The designshould haFlashing Bpresence o
listing of imp
sportation AlDeficiencies
native 2 Par
Connectiv(0 to 3)
1
stimatesr Alternative 2listed in Tablneering, desig
Estimates fo
nt
r Alternative 1
ral de Tierra P
bility Conbility concern
gn considerat
consideration
nated crosswve high visibeacon shouldof pedestrian
provements w
ternatives to
rking Evalua
vity Access(0 to 3
1
s 2 proposed imle 16. Cost esgn, permits, a
for Alternat
1 options
Parking Lot
ncerns ns that were i
tions were id
ns noted for A
walk for the bility for Highd be consides and bicyclis
with feasibility
32
ation Score
s )
Safety(0 or 1)
0
mprovementsstimates incluand contingen
tive 2 Parkin
dentified for
entified:
Alternative 1
proposed Rahway 1 traffred as an effsts.
y and design c
Experts Conn
es
Shoreline(0 or 1)
1
s have been cude contract ncy. A full br
ng Improve
any of the Al
ncho Corral fic. The instafective meas
consideration
necting Commun
e Precedet
(0 or 1)
1
calculated baitems as wellreakdown of
ments
Tota
lternative 2 p
de Tierra acllation of Reure to alert
ns is included
Ap
nities
en
)
ImpactSubtota
4
ased on stand as mobilizatcosts is inclu
Cost Est
$ 1,912
$ 2,34
al: $ 4,258
proposed park
ccess parkingectangular Ramotorists of
d in Appendix
ril 9, 2015
t al
dard ion, ded
imate
2,000
6,000
8,000
king
g lot apid the
x B.
![Page 35: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/35.jpg)
EvaluAddre
ALTIMAlterncapacpropoHighwrise acoast,travellanes pedesHighwsafe improoperaimpac
Roa
IncreaEtheldCapistsegmesegmehighestill o
ation of Traness Buildout D
TERNAPROVEnative 3 buildcity through osing an alterway 1. Highwnd erosion co, south of Higl lanes along to reduce bstrian over/uway 1 withoutbicycle commoved with perating investmct to Midcoas
adway a
Abilityasing the roadore Street/Vtrano Road (ents from LOents it is not r density areperate worse
sportation AlDeficiencies
ATIVE 3EMENTds on the impthe proposenate route way 1 would uoncerns, whicghway 1. WhSR 92, capacbottlenecks cnder crossingt interfering wmuting betwrmanent locaent, potentiast communitie
nd Inter
y to Addrd capacity toVallemar Stre(S) in El GranS E to LOS A/suggested toeas with highe than the sta
ternatives to
3 – HIGTS rovements pred addition owithin Half Moundergo a comch would alsoile the existinity can be imaused by trugs at high dewith traffic floween San Mal routes. Thesally require aces and Half M
rsection
ress Defo two lanes inet in Moss Benada results /B under Buildo add additionher occurrencndard.
33
H COST
rovided in Altof travel lanoon Bay throumplete realigo include a lang terrain womproved by thuck traffic aloemand locatioow as well as ateo and Hase improvemecquisition of rMoon Bay.
Improv
ficienciesn each directieach and betin an improdout conditional capacity aces of pedest
Experts Conn
T/HIGH
ternative 1 annes in portiough the additgnment in El rge addition ould make it dhe addition ofong SR 92. Aons to allow Class II Bike
alf Moon Bayents require right of way a
vements
s ion between tween Cypresvement to Rons as shown as it may encotrian crossing
necting Commun
H IMPA
nd Alternativeons of the Mion of a frontGranada to aof parking cadifficult to prf occasional pAlternative 3 for pedestrilanes along Sy. Transit sea large amouand will resu
9th Street in ss Avenue in Road Segmenin Table 17. ourage fastergs. The unaff
Ap
nities
ACT
e 2 by increasMidcoast andtage road easaddress sea leapacity along rovide additiopassing/climbalso introduan traffic acrR 92 to allowervice would unt of capital lt in a signific
Montara andMoss Beach nt LOS for thOutside of thr speeds throfected segme
ril 9, 2015
sing by st of evel the onal bing uces ross w for
be and cant
d St. and hose hese ugh ents
![Page 36: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/36.jpg)
EvaluAddre
TableServi
SegmNum
1
1 Proj
The a18 forof lanaerialAppe
The foround
x x x
Additof a ro
x x
This inhoursdiffer
ation of Traness Buildout D
e 17 - Alterice
ment mber
4 Hwy
Hwy
8 Hwy
Hwy
9 Hwy
Hwy
10 Hwy
Hwy
ect LOS (Build
ddition of rour the affectednes for the m view showinndix C.
ollowing thredabout over t
Highway 1Highway 1SR‐92 & SR
ionally, the fooundabout ov
Highway 1Main Stree
nconsistency s being more ently to acco
sportation AlDeficiencies
rnative 3 Bu
y 1 from 9th S
y 1 from Carlo
y 1 from Cypr
y 1 from St. E
y 1 from St. E
y 1 from Capi
y 1 from Capi
y 1 from Cora
dout No Proje
undabouts atd locations. Thmajor approacng the minim
ee locations sthe no‐projec
1 & Coronado1 & Kehoe AveR‐35
ollowing locatver the no‐pr
1 & Main Street & SR‐92
of improvemthan the capaunt for peak
ternatives to
uildout Cond
Location
St to Carlos S
os St to 9th S
ress Ave to St
Etheldore St to
Etheldore St to
istrano Rd N t
istrano Rd N t
al Reef Ave to
ect LOS)
t the followinhe number ofch and the amum paving
how consistet alternative:
Street enue
tions show mroject alterna
et
ment is due toacity of the rohour volume
34
ditions Peak
t
t
t. Etheldore S
o Cypress Ave
o Capistrano
to St. Etheldo
to Coral Reef
o Capistrano R
g locations ref roundaboutmount of tradiameter is s
ent improvem
mixed improvetive:
an increase ooundabout. Ws, the capacit
Experts Conn
k Hour Roa
AM PeHouLOS
A (E
A (E
St A (E
e A (E
Rd N A (E
ore St A (E
Ave A (E
Rd N A (E
esults in the Lt lanes was anaffic expectedshown for ea
ment of LOS w
ement of LOS
of traffic turnWhile traffic sty of a rounda
necting Commun
adway Segm
eak ur
PM PeHour
S1 LOS1
E) A (E)
E) A (E)
E) A (E)
E) A (E)
E) B (E)
E) A (E)
E) B (E)
E) A (E)
LOS changes dnalyzed basedd to use the ach proposed
with the impl
S with the imp
ning during cesignals can beabout cannot
Ap
nities
ment Level o
eak r
MiddPeak H
1 LOS
) B (E
) A (E
) B (E
) A (E
) A (E
) A (E
) A (E
) A (E
detailed in Tad on the numroundabout.d roundabou
lementation o
plementation
ertain peak e timed t be adjusted.
ril 9, 2015
of
ay Hour 1
)
)
)
)
)
)
)
)
able mber . An t in
of a
n
.
![Page 37: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/37.jpg)
EvaluAddre
TableServi
IntersNum
N
1
1
1
2
3
3
4
3
41 Not 2 Proj
With stand
x x x x x x x x x
ation of Traness Buildout D
e 18 - Alterice
section mber Sta
N/A
5
9
11
14
19
27
32
33
42
38
48
a study interect LOS (Build
the improvemard during th
MidcoasHighway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1
sportation AlDeficiencies
native 3 Bu
LOS andard1
Ro
D Sin
D Sin
D Sin
D Do
D Do
E Sin
E Do
E Do
E Do
F Do
E Do
D Do
section dout No Proje
ments includehe listed peak
st 1 and 2nd Stre1 and Vallema1 and Californ1 and Virginia 1 and Vermon1 and Cypress 1 and Capistra1 and St. Ethe1 and Coral Re
ternatives to
ildout Cond
undaboutLanes
ngle H
ngle H
ngle H
ouble H
ouble H
ngle H
ouble H
ouble H
ouble H
ouble M
ouble HR
ouble S
ect LOS)
ed in Alternatk hours:
eet (AM, PM, ar Street (PM,ia Avenue (AAvenue (AM
nt Avenue (AMAvenue (AM
ano Road (S) (ldore Street (eef Avenue (A
35
ditions Peak
Street
Hwy 1 / 9th St
Hwy 1 / Valle
Hwy 1 / Cypre
Hwy 1 / Capis
Hwy 1 / Coro
Hwy 1 / Mira
Hwy 1 / Keho
Hwy 1 / Main
Hwy 1 / SR 92
Main Street /
Hwy 1 / HiggiRoad/Main St
SR 92 / SR 35
tive 3, the fol
Midday) , Midday) M, PM, Midd, PM, MiddayM, PM, Midda, PM, Midday(PM) (AM, PM) AM, PM, Midd
Experts Conn
k Hour Inte
t Names
treet1
emar (N)
ess Avenue
strano Road (
nado Street
da Road
oe Avenue
n Street (N)
2
/ SR 92
ins Canyon treet (S)
llowing inters
day) y) ay) y)
day)
necting Commun
rsection Le
AM Peak Hour LOS2
N/A
D (D)
F (F)
(S) C (C)
D (D)
F (F)
C (F)
F (D)
F (C)
B (D)
A (A)
C (D)
sections do n
Ap
nities
vel of
PM Peak Hour
M
LOS2
N/A
F (F)
F (F)
D (C)
C (C)
F (F)
B (F)
E (F)
F (D)
D (C)
B (A)
E (F)
not meet the
ril 9, 2015
Midday Peak Hour LOS2
N/A
F (E)
F (F)
E (D)
C (E)
F (F)
C (F)
F (F)
F (F)
D (F)
C (A)
F (F)
LOS
![Page 38: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/38.jpg)
EvaluAddre
x x x
x x x x x x x x x x x x x x x
xxx
With the LO
HighwF. WhLOS Eand Mthe se
x x
The fothe CM
x x
ation of Traness Buildout D
Highway 1Highway 1Highway 1
Half MoHighway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Main Stree
SR‐92 x SR 92 andx SR 92 andx SR 92 and
the improveOS standard d
Midcoasway 1 betweehile the remaE standard givMiramar Driveegments prop
Highway 1Highway 1
Half Moollowing roadMP:
Highway 1Highway 1
sportation AlDeficiencies
1 and Magella1 and Medio A1 and Mirama
oon Bay 1 and Mirada 1 and Rooseve1 and Young A1 and Ruisseau1 and Frenchm1 and Venice B1 and Spindrif1 and Grandvi1 and Bellevie1 and Main St1 and SR‐92 (A1 and Kelly Av1 and Filbert S1 and Seymouet and Lewis F
d Muddy Roadd Skyline Bould SR 35 (PM, M
ments includduring the list
st en Coronado ainder of the ven in the CMe does not mposed to be w
1 between 9th 1 between Cyp
oon Bay dways segme
1 between Mi1 between Ro
ternatives to
an Avenue (AMAvenue (AM, r Drive (AM,
Road (AM, PMelt BoulevardAvenue (AM, u Francais Avman’s Creek RBoulevard (AMft Way (AM, Pew Boulevardw Boulevard reet (N) (AM,AM, PM, Middvenue (MiddaStreet (AM, Pur Street (AM,Foster Drive (
d/Ox Mountaevard (AM, PMidday)
ed in Alternated peak hou
Street and Mroadway seg
MP, Highway eet the LCP Lwidened:
Street and Cpress Ave and
nts within th
ramar Drive aosevelt Boule
36
M, PM, MiddaPM, Midday)PM, Midday)
M, Midday) (AM, PM, MPM, Midday)venue (MiddaRoad (AM, PMM, PM, MiddPM, Midday)d (AM, PM, M(AM) , PM, Middayday) y) M, Midday), PM, Midday(PM)
in Landfill RoPM, Midday)
ative 1, the frs:
Miramar Drive gments within1 along the eLOS D standa
arlos Streetd Coral Reef R
e Study Area
and Roosevelevard and You
Experts Conn
ay) )
idday)
y) M, Midday) ay)
Midday)
y)
y)
oad (PM, Midd
following road
operates ben the Study Aentire Midcoard during the
Road
a operate belo
lt Boulevard (ung Avenue (
necting Commun
day)
dway segmen
low the CMPArea operateast region bee listed peak
ow the LOS s
(Midday) (PM, Midday)
Ap
nities
nts do not m
standard at better than etween 1st Strhours expect
tandard give
)
ril 9, 2015
meet
LOS the reet t for
n in
![Page 39: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/39.jpg)
EvaluAddre
x x x x x x
x Additfollow
x x x
x x
Cost eunit cconstin App
ation of Traness Buildout D
Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1
SR‐92 SR 92 from
ionally, severwing roadway
Highway 1Highway 1Highway 1
SR‐92 SR 92 fromSR 92 from
Cost Esestimates forcosts and are ruction enginpendix A.
sportation AlDeficiencies
1 from Young 1 from Ruissea1 from Venice1 between Fro1 from Spindri1 from Kehoe
m Skyline Bou
ral roadway sy segments do
1 between Mi1 between Ke1 between Re
m Main Streetm Skyline Bou
stimatesr Alternative 3listed in Tablneering, desig
ternatives to
Avenue to Ruau Francais A Boulevard toontage Road tift Way to KeAvenue to Gr
levard to SR 3
segments fallo not meet th
ramar Drive ally Avenue andondo Beach
t to Skyline Bolevard to SR 3
s 3 proposed imle 19. Cost esgns, permits,
37
uisseau FrancAvenue to Veno Frontage Roto Spindrift Whoe Avenue (randview Bou
35 (PM, Midd
below the sthe LCP LOS D
and Grandviend Seymour Sh Road and Fa
oulevard (AM35 (AM, PM,
mprovementsstimates incluand continge
Experts Conn
cais Avenue (Mnice Boulevaroad (Midday)Way (PM, Mid(Midday) ulevard (AM,
day)
tricter standastandard dur
ew Boulevard Street (AM, PMairway Drive (
M, PM) Midday)
s have been cude contract ency. A full br
necting Commun
Midday) rd (PM, Midda dday)
PM, Midday)
ard provided ring the listed
(AM, PM, MM) (AM, PM)
calculated baitems as wellreakdown of
Ap
nities
ay)
)
by the LCP. d peak hours:
idday)
ased on stand as mobilizatcosts is inclu
ril 9, 2015
The
dard ion, ded
![Page 40: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/40.jpg)
EvaluAddre
TableImpr
# I
C
C
4B H
15 9
16 E
17 C
18 C
19 C
20 M
21 K
22 M
23 H
24 S
25 H
26 S
27 M
28 C
29 H
30 H
31 S
32 S
33 H
1 Doe2 Costincludgreatl3Cost
ation of Traness Buildout D
e 19 - Cost rovements
Improvement
Carried over1
Carried over1
Hwy 1 Paved
9th Street Ro
Etheldore Str
Cypress Aven
Capistrano Ro
Coronado Str
Mirada Road
Kehoe Avenu
Main Street (
Hwy 1/SR‐92
SR‐92/Main S
Higgins Canyo
SR‐92/SR‐35 R
Main Street T
Carlos Street
Highway 1 Re
Hwy 1 East Si
SR‐92 Left Tu
SR‐92 Passing
Hwy 1 Widen
s not include t estimates ade right‐of‐wly underestimestimates do
sportation AlDeficiencies
estimates fo
t
Alternative 1
Alternative 1
Shoulder and
undabout
eet Roundab
ue Roundabo
oad Roundab
eet Roundab
Roundabout
e Roundabou
N) Roundabo
Roundabout
Street Rounda
on Road Roun
Roundabout
Traffic Calmin
Traffic Calmin
ealignment (C
de Frontage R
rn Lanes
g/Climbing La
ing to 4 Lane
signalizationre not includ
way acquisitiomate the cost o not include
ternatives to
or Alternat
1 and 2 option
1 and 2 option
d Curb (Phase
out
out
out
out
ut
out
about
ndabout
g
ng
Center Alignm
Road in Half M
nes
s
projects as tded for the fron, and any
any right‐of‐w
38
ive 3 Roadw
ns with Projec
ns with Projec
e C)
ment)
Moon Bay2
Total (assu
Total (assu
hey have beerontage road cost estimat
way acquisitio
Experts Conn
way and Inte
ct 12A
ct 12B
uming Project
uming Projec
en replaced bas a large pae based on
on
necting Commun
ersection
C
$
$ 1
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$ 1
$
$
$ 1
t 12A): $ 5
t 12B): $ 5
by roundabouart of this promaterials an
Ap
nities
Cost Estimate
8,967,000
10,297,000
2,441,000
1,171,000
1,492,000
1,205,000
1,446,000
1,154,000
1,234,000
1,240,000
1,630,000
1,630,000
1,630,000
1,313,000
1,177,000
522,000
306,000
14,474,000
infeasible
418,000
1,519,000
12,614,000
57,583,000
58,913,000
ts oject cost wond design wo
ril 9, 2015
e3
ould ould
![Page 41: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/41.jpg)
EvaluAddre
Thereand iHighwimprooften of‐wathey stime opera
The crequirdeemdiscusaligneprevio
The fo
x
x
x
x
x
A full An aeAppe
Bicy
The plisting
ation of Traness Buildout D
Feasibe are no designtersection iway 1 within ovements maresult in som
ay acquisitionslow traffic aland congestate.
creation of a red right‐of‐w
med to be polssed in the ped with Goldously been ru
ollowing desig
All design
While the intersectio(approximwith caref
The instalrequire inpresented guidance f
The Highwbecause of
Any left‐tuminimize t
listing of imperial view of tndix D.
ycle and
Abilityproposed impg of scores is
sportation AlDeficiencies
bility Congn feasibility improvementthe study ary carry with tme resistance n issues. Roulong previoustion during p
frontage roway acquisitlitically infeaspast includinden Gate Aveuled out based
gn considerat
consideration
installation oon, the intersately 130 feeul design con
lation of a tegration wiin the High
for how the ro
way 1/Main Sf the close pr
urn pockets fotheir impact o
provements wthe proposed
d Pedest
y to Addrprovements wprovided in A
ternatives to
ncerns concerns thats. There area as it is nothem some obased on condabouts alssly non‐controperiods of h
ad parallel toion, includinsible. Other ag the Foothienue and exd on upcomin
tions were id
ns noted for A
of a roundabsection’s closeet) presents siderations.
roundabout th the Ethelhway 1 Safeoundabout sh
treet (S) inteoximity to th
or businesseson traffic ope
with feasibilit roundabout
rian Fac
ress Defwere given thAppendix C.
39
at were identre no legal ot classified apposition froncerns over iso sometimesolled locationhigh demand
o Highway 1g the removalternative pill Boulevard xisting north‐ng projects an
entified:
Alternative 1
out is technice proximity ttraffic opera
at the Highwldore Street/ty and Mobhould be desi
ersection will e Higgins Can
s along SR‐92ration along S
y and design location with
cility Imp
ficiencieshe following
Experts Conn
ified for any restrictions tas a rural areom local residnduced demas carry with tns, potentiallyor simply u
1 would also val of severaparallel routesalignment a
‐south connend environme
and Alternat
cally feasibleto the Main Sational challe
way 1/Etheld/Carlos Streebility Improveigned.
require an innyon Road/M
2 should haveSR‐92.
consideratioh required pa
proveme
s scores for t
necting Commun
of the Alternto increasingea. Some of ents. Capacitand as well athem resistay resulting in unfamiliarity
result in a lal existing hos with Highwand a paralleections, howeental impacts
ive 2
at the HighwStreet/9th Strenges that ca
dore Street et intersectioement Study
nnovative rouMain Street int
e adequate st
ons is includedaving footprin
ents
he evaluation
Ap
nities
native 3 roadwg capacity althe high impty improvemes resulting rignce due to hincreased trawith how t
large amountouses. This wway 1 have bel route partiever these hs.
way 1/9th Strreet intersectan be addres
intersection on. The concy provides go
undabout destersection.
torage length
d in Appendints is include
n metrics. A
ril 9, 2015
way ong pact ents ght‐how avel they
t of was een ially have
reet tion ssed
will cept ood
sign
s to
x B. d in
full
![Page 42: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/42.jpg)
EvaluAddre
Table
#
18
19
Cost eunit cconstin App
Table
# I
C
2C S
13 G
14 M
15 S
16 K
17 S
Thereand ppedeswhile 1 wit
ation of Traness Buildout D
e 20 - Alter
Project
Pedestrian over/under crossings
Class II Bicycle
Route along SR 92
Cost Esestimates forcosts and are ruction enginpendix A.
e 21 - Cost
Improvement
Carried over A
SR‐1 Sidewalk
Gray Whale C
Montara Sani
Surfer's Beach
Kehoe Avenu
SR‐92 Bike La
Feasibe are no feasipedestrian imstrian under‐cpedestrian ohout causing
sportation AlDeficiencies
native 3 Bic
Connectiv(0 to 3)
2
3
stimatesr Alternative 3listed in Tablneering, desig
Estimates fo
t
Alternative 1
k (Phase C)
Cove Pedestri
itary District P
h Pedestrian
e Overcrossin
nes
bility Conbility concern
mprovements crossings mayover‐crossingsg any conflict
ternatives to
cycle and Pe
vity Access(0 to 3
1
3
s 3 proposed imle 21. Cost esgns, permits,
for Alternat
and 2 options
an Overcross
Pedestrian Ov
Overcrossing
ng
ncerns ns that were iother than ty be affecteds may providets or speed
40
edestrian Ev
s )
Safety(0 or 1)
1
1
mprovementsstimates incluand continge
tive 3 Bicycl
s
sing
vercrossing
g
identified forthose noted by the watere a way for preduction to
Experts Conn
valuation Sc
Shoreline(0 or 1)
1
0
s have been cude contract ency. A full br
le and Pede
r any of the Afor Alternatir table for locedestrians ano highway 1
necting Commun
cores
e Precede(0 or 1
0
1
calculated baitems as wellreakdown of
estrian Impr
C
$ 2
$
$
$
$
$
$ 2
Total: $ 7
Alternative 3 pve 2; howevcations close nd bicyclists ttraffic, the r
Ap
nities
ent 1)
ImpacSubtot
5
8
ased on stand as mobilizatcosts is inclu
rovements
Cost Estimate
9,768,000
1,564,000
4,486,000
5,849,000
7,221,000
6,408,000
20,959,000
76,255,000
proposed bicyer the designto the coast to cross Highwrequired vert
ril 9, 2015
ct tal
dard ion, ded
e
ycle n of and way tical
![Page 43: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/43.jpg)
EvaluAddre
clearaneede
A full
Tra
The plisting
Table
#
20
21
Cost SamT
# I
C
21 I
T
Therepropo
A full
ation of Traness Buildout D
ance and ramed for the str
listing of imp
nsit Imp
Abilityproposed impg of scores is
e 22 - Alter
Project
New SamTrans service
Transit to BART and San Mateo
Cost Esestimates forans Route 17
Improvement
Carried over A
Increased Sa
Total:
Feasibe are no feaosed transit im
listing of imp
sportation AlDeficiencies
mp for handicucture.
provements w
proveme
y to Addrprovements wprovided in A
native 3 Tra
Connectiv(0 to 3)
3
3
stimatesr increased t7 and 294 ser
t
Alternative 1
amTrans serv
bility Consibility or demprovements
provements w
ternatives to
cap accessibi
with feasibility
ents
ress Defwere given thAppendix C.
ansit Evalua
vity Access(0 to 3
3
3
s transit servicrvice.
and 2 options
vice to regio
ncerns esign concerns.
with feasibility
41
ility can pote
y and design c
ficiencieshe following
ation Scores
s )
Safety(0 or 1)
0
0
ce are based
s
onal transit p
ns that were
y and design c
Experts Conn
entially result
consideration
s scores for t
s
Shoreline(0 or 1)
0
0
on current
providers
e identified f
consideration
necting Commun
t in a large f
ns is included
he evaluation
e Precede(0 or 1)
0
0
operating co
C
$ 1
$
$ 1
for any of th
ns is included
Ap
nities
footprint of l
d in Appendix
n metrics. A
nt )
ImpactSubtota
6
6
osts of week
Cost Estimate
2,537,000
2,124,000
14,661,000
he Alternativ
d in Appendix
ril 9, 2015
and
x B.
full
t al
kday
e
ve 3
x B.
![Page 44: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/44.jpg)
EvaluAddre
Par
The plisting
ation of Traness Buildout D
rking Imp
Abilityproposed impg of scores is
sportation AlDeficiencies
proveme
y to Addrprovements wprovided in A
ternatives to
ents
ress Defwere given thAppendix C.
42
ficiencieshe following
Experts Conn
s scores for t
necting Commun
he evaluation
Ap
nities
n metrics. A
ril 9, 2015
full
![Page 45: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/45.jpg)
EvaluAddre
Table
#
21
22
Cost eunit cconstin App
Table
# I
C
5 C
6 E
Therepropo
A full
ation of Traness Buildout D
e 23 - Alter
Project
Carlos Street Parking
El Granada recreational parking
Cost Esestimates forcosts and are ruction enginpendix A.
e 24 - Cost
Improvement
Carried over A
Carlos Street
El Granada Di
Feasibe are no feaosed parking
listing of imp
sportation AlDeficiencies
native 3 Par
Connectiv(0 to 3)
1
1
stimatesr Alternative 3listed in Tablneering, desig
estimates fo
t
Alternative 1
On‐Street Pa
iagonal Parkin
bility Consibility or deimprovement
provements w
ternatives to
rking Evalua
vity Access(0 to 3
2
2
s 3 proposed imle 24. Cost esgns, permits,
or Alternat
and 2 option
rking
ng
ncerns esign concernts other than
with feasibility
43
ation Score
s )
Safety(0 or 1)
1
1
mprovementsstimates incluand continge
ive 3 Parkin
s
ns that were those noted
y and design c
Experts Conn
es
Shoreline(0 or 1)
1
1
s have been cude contract ency. A full br
ng Improvem
e identified ffor Alternativ
consideration
necting Commun
e Precede(0 or 1
1
1
calculated baitems as wellreakdown of
ments
C
$
$
$
Total: $
for any of thve 2.
ns is included
Ap
nities
ent 1)
ImpacSubtot
6
6
ased on stand as mobilizatcosts is inclu
Cost Estimate
4,258,000
34,000
54,000
4,346,000
he Alternativ
d in Appendix
ril 9, 2015
ct tal
dard ion, ded
e
ve 3
x B.
![Page 46: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/46.jpg)
EvaluAddre
The falterndeficiimpacoveraaltern
x
x
x
The im
x
x
Whilefor agaltern
Hyb
The fo
x
x
ation of Traness Buildout D
following threnatives were encies in thect to existingall effect on rnatives descri
Alternative
Alternative
Alternative
mprovements
Roadway a
o M
o M
o Im
Pedestrian
o Fil
o Im
o Im
o Im
o Su
e the determiggregation annative which i
brid Alte
Roadwollowing proje
Addition oimprove ciin a cost‐e
Addition ocirculation
sportation AlDeficiencies
ee alternativdesigned to e Buildout cog infrastructuresidents of tbed in this se
e 1 – Low Cos
e 2 – Medium
e 3 – High Co
s for each alte
and Intersect
eeting roadw
eeting interse
mproving veh
n, Bicycle, Tra
ling gaps in e
mproving pede
mproving acce
mproving acce
upport for a p
nation of altend evaluationincludes sugg
ernative
way and ects are sugg
of a left‐turn birculation andffective way
of a median wn in Montara a
ternatives to
es were devassess whatondition. Thure, the envithe Midcoastection are as f
st/Low Impac
m Cost/Mediu
st/High Impa
ernative were
ion Improvem
way segment L
ection LOS sta
icle and pede
nsit, and Park
existing bicycl
estrian and bi
ess to commu
ess to the sho
roject in a pr
ernatives basn of improvegested improv
with Su
d Intersecested to impr
bay and an acd prevent turn(Alt 1)
with northbouand provide a
44
veloped fromt level of imphe three alteronment andt Communitiefollows:
ct
um Impact
ct
e evaluated b
ments
LOS standard
andards
estrian safety
king Improve
e or pedestri
icycle safety
nities, neighb
reline
evious study
ed on cost anments, the uvements from
uggested
ction Imrove safety o
cceleration laning vehicles
nd left‐turn ba crossing ref
Experts Conn
COm a list of prprovement wernatives wed the surroues and City o
based on the f
s
ements
an networks
borhoods or p
nd impact proultimate resum all three alt
d Improv
mprovemr circulation i
ne at Gray Wfrom restrict
bay at 16th Strfuge for pede
necting Commun
ONCLUoposed imprwould be neeere based onnding commof Half Moon
following crit
or transit con
popular desti
ovides a clearult of this stuernatives.
vements
ments in a cost‐effe
Whale Cove pating flow alon
reet will imprstrians (Alt 2
Ap
nities
USIONrovements. eded to addrn cost; expecunities; and n Bay. The th
teria:
nnections
nations
r methodologudy is a hybr
s
ctive way: arking lot will ng Highway 1
rove )
ril 9, 2015
N The ress cted the
hree
gy id
![Page 47: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/47.jpg)
EvaluAddre
x
x
x
x
x
The fo
x
ation of Traness Buildout D
The use ofintersectiointersectioHighway 1The propowithout an
The implemspeed humcost‐effect3)
Stop signs paved shocross sectibicycle act
o M
o M
o El
o Ha(A
Consolidatof vehicle
o Nu
o Grpla
Left‐turn laeffective sThe main ilocations.
o Beo Leo Ha
ollowing proje
Signalizationo improv
o Hi
sportation AlDeficiencies
f signage to reons within theon LOS deficie1 and potentiased constructny added ben
mentation of mps along Mative way to sl
added to unsulder for the on for vehicletivity along Hi
ontara Segme
oss Beach Seg
Granada Seg
alf Moon Bay Alt 1, 2)
tion of accessconflicts alon
urseryman’s E
rand Avenue anned improv
anes at majorolution to adimpediment wThe following
erta’s Farm mos Farm alf Moon Bay
ects are sugg
on of the folloement with i
ghway 1 and
ternatives to
estrict turninge Midcoast arency, but it wally improve stion of mediaefit. (Alt 1)
traffic calminain Street in Mow traffic and
signed intersefollowing sege and pedestrighway 1:
ent – 1st Stre
gment – Carlo
ment – Coral
Segment – F
s to Highway ng Highway 1
Exchange driv
and Terrace Avement by th
r businesses adress a circulwould be acqg locations ar
Nursery
ested to impr
owing intersemplementati
California Av
45
g movementsrea and Half Mill reduce thesafety for pedans and block
ng improvemMontara and ad improve saf
ections alonggments alongrian safety ba
eet and 14th S
os Street to E
Reef Avenue
renchman's C
1 at the followand improve
veways betwe
Avenue (Alreahe City of Half
along SR 92 inlation issue couisition of thre suggested (
rove intersec
ections will adon of a round
venue in Moss
Experts Conn
s and to consMoon Bay wile number of vdestrians in Mking access is
ents such as along Carlos Sfety for bicyc
g Highway 1 ag Highway 1 wased on areas
Street (Alt 1,
Etheldore Stre
e to Medio Ro
Creek Road to
wing locatione circulation (A
een Mirada R
ady included f Moon Bay)
n Half Moon ommonly idee required rig(Alt 3):
ction and road
ddress the LOdabout (Alt 2
s Beach (LOS
necting Commun
olidate trafficll not addressvehicle conflicMontara and Ma more expen
speed displayStreet in Mosclists and ped
nd a defined will provide a s of highest p
2, 3)
eet (S) (Alt 1,
oad (Alt 1, 2)
o Redondo Be
ns will reduceAlt 2):
Road and You
in Buildout a
Bay would beentified by theght‐of‐way at
dway deficien
OS deficiencie):
F to LOS B)
Ap
nities
c at key s any cts along Moss Beach. nsive solution
y units and ss Beach is a estrians. (Alt
curb and consistent edestrian and
2, 3)
each Road
e the number
ng Avenue
nalysis as a
e a cost‐e communityt the desired
ncies:
es and show
ril 9, 2015
n
d
.
![Page 48: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/48.jpg)
EvaluAddre
x
x
x
Manyimproand Scondithrouare coimprosuggerelaxecomm
4 From
ation of Traness Buildout D
o Hi
o HianBa
o HiincCit
Roundabo
o Hi
o Hi
o SRAM
The remaiintersectio
Increasing and St. EthMoss Beacdeficiency cost and o
The additioLandfill Roon this roacost estimearthwork
y of the intersovements. ThR 92 and fairtions. This regh the use ofonsidered undovements andested that theed to take intmunity. Altern
m Buildout Ana
sportation AlDeficiencies
ghway 1 and
ghway 1 and nalysis as an inay) (LOS E to L
ghway 1 and cluded in Builty of Half Mo
uts at the fol
ghway 1 and
ghway 1 and
R 92 and SR 35M and PM pe
nder of the roon.
road capacitheldore Streech and Capist(LOS E to LOSbtaining pub
on of passingoad and Pilarcadway segmeate does not k which may b
section and rois was the resly strict LOS sesults in LOS df signalizationdesirable fromd signalizatione intersectiono account thenatively, land
alysis and Traf
ternatives to
Cypress Aven
Main Street ntersection pLOS A)4
Grand Bouleldout analysison Bay) (LOS
lowing inters
Coronado St
Kehoe Avenu
5 east of Halfak improve fr
oundabouts a
y to two lanet/Vallemar Strano Road (SS A/B), howevlic support. (A
g/climbing lancitos Quarry Rnt and providhowever inclbe identified w
oadway LOS dsult of very hstandards thadeficiencies inn or roundabom a multimodn would furth and roadwaye current defid‐use alternat
ffic Projections
46
nue in Moss B
(S) in Half Moplanned to be
vard/Terraces as an interseF to LOS B)4
ections addre
reet in El Gra
ue in Half Mo
f Moon Bay (Mrom LOS F to
analyzed resu
es in each diretreet in Moss) in El Granadver the largesAlt 3)
nes on the easRoad will allowde a passing llude any rightwith a full des
deficiencies aigh forecastet in many casn locations thouts or in locadal or politicaher address thy level of serviciencies and tives that wou
s Report
Experts Conn
Beach (LOS F
oon Bay (Alre signalized by
e Avenue in Hection planne
ess LOS defic
nada (LOS E t
oon Bay (LOS
Midday peak LOS E)
ulted in a wor
ection betwees Beach, and bda will addresst impedimen
stbound portw cars to pasane to go arot‐of‐way acqusign. (Alt 3)
re not addresd buildout voses are not mhat either couations where al standpoint.he LOS deficievice standardthe multimould significant
necting Commun
to LOS C)
eady includedy the City of H
alf Moon Bayed to be signa
iencies (Alt 3
to LOS D)
F to LOS C)
remains LOS
rsening of LOS
en 9th Street between Cypss the roadwant to this will
tion of SR‐92 s the high voound right‐turuisition or an
ssed with theolumes along met under curruld not be mitcapacity imp. While large‐encies, it is inds for the Midodal needs of tly reduce the
Ap
nities
in Buildout Half Moon
y (Already alized by the
):
F, however
S for the
in Montara ress Avenue iay segment be the large
between the lume of truckrning cars. Thy large scale
e proposed Highway 1 rent tigated provements ‐scale capacitstead dcoast area bethe e Buildout
ril 9, 2015
in
ks he
y
e
![Page 49: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/49.jpg)
EvaluAddre
land upropo
Table
#
4
4
4
The foprovid
ation of Traness Buildout D
use could parosed hybrid a
e 25 - Cost
Improve
1 Gray Wh
2 Turn Res
3 SR‐1 Sid
4A SR‐1 Pav
4B SR‐1 Pav
4C SR‐1 Pav
5 Californ
6 Cypress
8 Main Str
11 Montara
12 Nursery
14 Terrace
19 Coronad
21 Kehoe A
26 SR‐92/S
27 Main Str
28 Carlos St
31 SR‐92 Le
32 SR‐92 Pa
33 SR‐1 Wid
Bicycleollowing bicycding a safer a
sportation AlDeficiencies
tially addresslternative roa
of Hybrid A
ement
hale Cove Tur
striction Signa
e‐Street Stop
ved Shoulder
ved Shoulder
ved Shoulder
ia Avenue Sig
Avenue Signa
reet (S) Signa
a Lighthouse
men's Exchan
Avenue/Gran
do Street Rou
Avenue Round
R‐35 Rounda
reet Traffic Ca
treet Traffic C
eft Turn Lanes
assing/Climbi
dening to 4 La
e and Pecle and pedesnd more con
ternatives to
s the forecastadway and in
Alternative R
rn and Accele
age
p Signs
and Curb (Ph
and Curb (Ph
and Curb (Ph
gnal
al
l
Median and L
nge Access Co
nd Boulevard
ndabout
dabout
bout
alming
Calming
s
ng Lanes
anes
H
edestrianstrian improvnected enviro
47
ted deficiencitersection im
Roadway an
eration Lanes
hase A)
hase B)
hase C)
Left Turn Bay
onsolidation (
Access Conso
Hybrid Roadw
n Facilityvements wereonment to th
Experts Conn
es. A summamprovements
nd Intersect
y
(Expanded Al
olidation and
way and Inter
y Improe found to behe Midcoast a
necting Commun
ry of the costis included in
tion Improv
ternative)
d Signalization
rsection Tota
vementse cost‐effectivarea and Half
Ap
nities
t of the n Table 25.
vements
Cost Estim
$ 440
$ 40
$ 18
$ 2,302
$ 2,841
$ 820
$ 767
$ 640
$ 530
$ 170
$ 2,851
n $ 1,270
$ 1,154
$ 1,240
$ 1,177
$ 522
$ 306
$ 418
$ 1,519
$ 12,614
al $ 31,639
s ve solutions toMoon Bay.
ril 9, 2015
mate
0,000
0,000
8,000
,000
,000
0,000
7,000
0,000
0,000
0,000
,000
,000
,000
,000
,000
2,000
6,000
8,000
,000
4,000
9,000
o
![Page 50: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/50.jpg)
EvaluAddre
x
x
x
x
The foenviroare su
x
x
ation of Traness Buildout D
The “Paral(including pedestrianSharrows oHalf Moonbicycles awA Class II bHighway 1Striped croconnectivilocations (
o Gro Mo 2n
o 7th
o Mo Vio Cao Cyo HMo Noo Suo Mo Mo Keo Teo Quo Pilo SR
ollowing impronment to thuggested if th
A Class II bbetween Snecessary who wouldTraffic signin the dow
o Peo Cr
sportation AlDeficiencies
lel Trail” adjaAirport Streens and recreaton Main Streen Bay provide way from the bike lane alon1 (Alt 2) ossing with bety, access, an(Alt 1): ray Whale Covontara State d Street h Street oss Beach Ligrginia Street alifornia Streeypress AvenueMB Airport orth Capistranurfer’s Beach edio Avenue irada Road ehoe Avenue errace Avenueuarry Road (alarcitos CreekR 35 (along SR
rovements we Midcoast ahe funding is abicycle lane alSan Mateo anto perform ad use the rounal updates thwntown areasedestrian couosswalk signa
ternatives to
acent to Highwet) provides a tional bicycleet in Montaraa safe and coheavier traff
ng Capistrano
eacons were nd safety. The
ve Beach
ghthouse (16t
et e
no Road Parking area,
e/Grand Boullong SR 92) k Road (alongR 92)
ere identifiedrea and Half available. long SR‐92 wod Half Moon demand studte would makhroughout Ha. Potential imnt‐down indial crossing ad
48
way 1 and Cosafe and cos
es away from a, Carlos Streeost‐effective afic on HighwaRoad would
found to be ve following loc
h Street)
, north of Cor
evard
g SR 92)
d solutions toMoon Bay, bu
ould greatly iBay, howevedy to determke it worth thalf Moon Bay mprovements cators on all sdjustments to
Experts Conn
oastal Trail adt‐effective altthe heavier tet in Moss Bealternative roy 1 (Alt 1). improve bicy
very cost‐effecations were
ronado Street
o providing a sut they carrie
mprove conner the large coine if the pothe cost (Alt 3) would improinclude (Alt 1signalized croo accommoda
necting Commun
djacent to theternative routraffic on Higheach, and Maoute for comm
ycle connecti
ective at impridentified as
t
safer and moed a larger pr
nectivity for bost would matential volume). ove safety for1): osswalks ate slower wa
Ap
nities
e coastline ute for hway 1 (Alt 2in Street in muting
vity along
roving high priority
re connectedice tag. They
bicyclists ake it e of bicyclists
r pedestrians
alking speeds
ril 9, 2015
)
d
s
![Page 51: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/51.jpg)
EvaluAddre
x
x
Thougof ovecheapaltern
Table
Pro
Hybri
Hybri
ation of Traness Buildout D
o Bico Pe
A Class II bbicyclists, of bicyclistSidewalks pedestrian
o AloHa
o Alo
gh they minimer‐ or under‐cper solution onative roadwa
e 26 - Cost
oject #
d Bicycle and
1 Str
3 Sh
4 Sh
6 Pa
7 Co
10 Ma
11 Ca
d Bicycle and
2A SR
2B SR
2C SR
5 Co
9 Tra
12 Air
17 SR
sportation AlDeficiencies
cycle signal dedestrian refubike lane alonhowever givets would helpin the followns (Alt 1, 2, 3)ong Highway alf Moon Bay ong Coronado
mize the confcrossings as wof striped peday and interse
of Hybrid A
d Pedestrian
riped Pedestr
arrows on Ma
arrows on Ca
rallel Trail adj
astal Trail thr
ain Street Cla
pistrano Road
d Pedestrian
‐1 Sidewalk (
‐1 Sidewalk (
‐1 Sidewalk (
ronado Stree
affic Signal Up
rport Street C
‐92 Bike Lane
ternatives to
etection deviuge spaces onng Airport Streen the cost, a p determine ting locations ): 1 in Montara
o Street and A
lict and impawell as the lardestrian crossection improv
Alternative B
Facility Recom
rian Crossing w
ain Street
arlos Street
jacent to Hig
roughout the
ss III Bike Rou
d Bicycle Faci
Hybrid B
Facility Recom
Phase A)
Phase B)
Phase C)
et and Ave Alh
pdates
Class II Bike La
es
49
ice n wide road creet would prodemand studhe need for awould provid
a, Moss Beach
Avenue Alham
ct with vehicrge footprint ings. A summvements is in
Bicycle and
Project Nam
mmended Im
with Beacons
hway 1 for th
entire study
ute
ilities
Bicycle and Pe
mmended Im
hambra Sidew
anes
Experts Conn
rossings ovide anothedy to determian additional de a more con
h, Miramar, a
mbra in El Gr
le along Highis prohibitive
mary of the cocluded in Tab
Pedestrian
me
mprovements
s
he entire stud
area
edestrian Rec
mprovements
walk
necting Commun
r alternate roine if the potbicycle routentinuous walk
and develope
anada
way 1, the vee as comparedost of the proble 26.
Improvem
s
dy area
commended
s with Additio
Ap
nities
oute for ential volumee (Alt 2) king path for
ed areas of
ery high cost d to the muchposed hybrid
ments
$
$
$
$ 1
$
$
$
Total: $ 1
onal Funding
$
$
$
$
$
$ 4
$ 2
ril 9, 2015
e
h d
Cost
2,550,000
44,000
43,000
1,037,000
5,251,000
85,000
866,000
9,876,000
1,475,000
1,806,000
1,564,000
749,000
1,624,000
4,238,000
0,959,000
![Page 52: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/52.jpg)
EvaluAddre
The mSamTcompvariet
Transx x
x
Transx
x
Givenimprowhichthis hinclud
A sumimproservic
Table
#
Hybri
2
Hybri
1
ation of Traness Buildout D
Transimajority of trans or privaprehensive recty of services
it services thaShuttle buMore freqarea. (Alt 2The establ
it services thaSamTrans morning afrequency School busvehicles an
n the high cosovements shoh transit stopsybrid alternaded as being i
mmary of the ovements is ince for Cabrillo
27 ‐ Cost of Hy
Improvemen
d Transit Fac
Increased W
d Transit Rec
Bus Stop Am
sportation AlDeficiencies
Hybr
it Improvthe transit imate bus compcommendatiolisted here.
at were evalus service on suent weeken2) ishment of a
at were evaluservice that pnd evening pof Samtrans s service for Cnd maintenan
t but necessitould be baseds have the higtive, a conserimproved.
cost of the prncluded in Tao Unified Scho
ybrid Alternati
nt
cility Recomm
Weekend Sa
commended
menities
ternatives to
rid Bicycle an
vementsmprovementspanies as weon will requir
uated to havesummer and fd service for
park‐and‐rid
uated to haveprovides conneak periods wRoute 294 anCabrillo Unifience. (Alt 2)
ty of improved on a travel dghest demandrvative estima
roposed hybrble 27. This cool District.
ive Transit Imp
mended Impro
mtrans serv
Hybr
Improvemen
50
d Pedestrian
s s will depenell as requiredre a demand s
e the highest cfall weekendsthe existing S
e shuttle and
e less cost effenections to rewith limited snd 17. (Alt 3)ed School Dist
ements to busdemand studyd or highest pate of about
rid alternativecost estimate
provements
ovements
ice
rid Parking Re
nts with Addit
Experts Conn
n with Additio
nd on discussd acquisitionstudy to dete
cost effectives during specSamTrans fixe
d usage of exi
ectiveness weegional transistops though
trict including
s stops, the sy with public potential for fhalf the stops
e roadway an does not inc
ecommended
tional Fundin
necting Commun
onal Funding
sions and nen and ongoinermine need a
eness were: cial events. (Aed routes serv
sting parking
ere: it providers dincreased we
g a facility for
pecific locatioinvolvement future demans (40 stops) h
nd intersectiolude the cost
C
$
d Total $
ng
$
Ap
nities
Total: $ 5
egotiations wg costs. A mand want for
Alt 1) ving the stud
lots. (Alt 2)
uring the eekday
r storing the
ons chosen foto determinend. (Alt 1) Forhave been
on t of school bu
Cost Estimate
525,000
525,000
6,240,000
ril 9, 2015
2,291,000
with more the
y
or e r
us
e
![Page 53: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui](https://reader036.vdocuments.site/reader036/viewer/2022071002/5fbf96d1a31d8c7f5812d152/html5/thumbnails/53.jpg)
EvaluAddre
21
The laspillovMidco
x
x
x
The fomake
x x
Table
Pro
Hybri
Hybri
ation of Traness Buildout D
Increased S
Parkinack of capacitver of demanoast and Half
FormalizedHighway 1Diagonal pare both pneed, thatMoss BeacImproved
ollowing loca their approv
Paving andParking lotHighway 1
28 ‐ Cost of Hy
oject #
d Parking Re
1 Mo
3 Wa
5 Ca
6 El G
d Parking Re
2 Up
4 Ra
sportation AlDeficiencies
SamTrans se
H
ng Improty for the largnd into commMoon Bay. T
d parallel par1. (Alt 2) parking for Mopart of larger it they be consch and El Granwayfinding si
ations would val dependent
d striping at tt for Rancho C1 (Alt 2)
ybrid Alternati
commended
ontara State B
ayfinding
rlos Street On
Granada Diag
commended
pper Gray Wh
ncho Corral d
ternatives to
rvice to regi
Hybrid Trans
ovementge amount of unity parkingThe following
king for Mont
oss Beach aloimprovementstructed indenada. (Alt 3)ignage (Alt 1)
also benefit t on available
he upper GraCorral de Tier
ive Parking Im
Improvemen
Beach Parking
n‐Street Park
gonal Parking
Improvemen
hale Cove Park
de Tierra Park
H
51
onal transit
it with Addit
ts weekend recg. There is a nproposed im
tara State Be
ong Carlos Strts, however itpendent of th
)
from increase funding:
ay Whale Coverra access and
mprovements
Project Nam
nts
g Lot Improve
ing
Hybri
nts with Addi
king Lot Impr
king Lot
ybrid Parking
Experts Conn
providers
ional Funding
creational parneed for additprovements
each, with a p
reet and diagot is suggestedhe approval o
ed parking; h
e parking lotd beach overf
me
ements
id Parking Re
itional Fundin
rovements
g with Additi
necting Commun
$
g Total $
rking demandtional parkingpresent low c
hysical separ
onal parking d that given tof the larger p
however the
(Alt 1) flow located
ecommended
ng
onal Funding
Ap
nities
2,124,000
8,889,000
d results in a g in the cost solutions
ration from
for El Granadhe parking projects in
higher cost m
east of
$
$
$
$
d Total $
$
$
g Total $ 4
ril 9, 2015
s.
da
may
Cost
557,000
303,000
34,000
54,000
948,000
1,052,000
2,346,000
4,346,000