co e - smcgov.org...by 1970 oak (510 in as april broadway, land, ca 946) 763‐2061 sociation wit 9,...

53

Upload: others

Post on 17-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui
Page 2: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 

  By 

1970Oak(510

   

  In as

April

 0 Broadway,kland, CA 9460) 763‐2061 

ssociation wit

l 9, 2015 

E

 , Suite 740 612 

th Dyett & Bh

CO

EvaluaA

atia, Nelson N

ONNEC

ation AlternBui

Nygaard, and

CT THE

of Tranativeldout 

Dr

S

d Flint Strateg

E COA

anspoes to ADefic

raft R

PreSan Mat

gies 

ASTSID

ortatioAddreciencie

eport

epared fteo Coun

DE 

on sses 

t 2

fornty

Page 3: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluationAddress B

CONNECT

INTRODU

SUMMAR

MIDCOHALF M

IDENTIFIC

ALTERNRoadBicycTransParki

ALTERNRoadBicycTransParki

ALTERNRoadBicycTransParki

EVALUAT

ALTERNRoadBicycTransParki

ALTERNRoadBicycTransParki

ALTERNRoadBicycTransParki

CONCLUS

Hybri

n of TransporBuildout Defic

T THE COASTS

UCTION .........

RY OF DEFICIE

AST ..............MOON BAY AN

CATION OF AL

NATIVE 1 – LOway and Intecle and Pedestsit Improvemng ImprovemNATIVE 2 – Mway and Intecle and Pedestsit Improvemng ImprovemNATIVE 3 – HIway and Intecle and Pedestsit Improvemng Improvem

ION OF ALTE

NATIVE 1 – LOway and Intecle and Pedestsit Improvemng ImprovemNATIVE 2 – Mway and Intecle and Pedestsit Improvemng ImprovemNATIVE 3 – HIway and Intecle and Pedestsit Improvemng Improvem

SION .............

id Alternative

rtation Alternciencies 

SIDE .............

....................

ENCIES IDENT

.....................ND SR 92 EAST

LTERNATIVES

OW COST/LOWersection Imptrian Facility ents .............

ments.............EDIUM COST/ersection Imptrian Facility ents .............

ments.............GH COST/HIGersection Imptrian Facility ents .............

ments.............

RNATIVES ....

OW COST/LOWersection Imptrian Facility ents .............

ments.............EDIUM COST/ersection Imptrian Facility ents .............

ments.............GH COST/HIGersection Imptrian Facility ents .............

ments.............

....................

e with Sugges 

natives to 

Table....................

....................

TIFIED FOR BU

.....................T OF HALF MO

S ...................

W IMPACT IMrovements ...Improvemen........................................../MEDIUM IMrovements ...Improvemen..........................................GH IMPACT IMrovements ...Improvemen..........................................

....................

W IMPACT IMrovements ...Improvemen........................................../MEDIUM IMrovements ...Improvemen..........................................GH IMPACT IMrovements ...Improvemen..........................................

....................

sted Improvem

i

Ex

 of Conten....................

....................

UILDOUT CON

......................OON BAY ......

....................

MPROVEMENT......................ts ..............................................................

MPACT IMPRO......................ts ..............................................................MPROVEMEN......................ts ..............................................................

....................

MPROVEMENT......................ts ..............................................................

MPACT IMPRO......................ts ..............................................................MPROVEMEN......................ts ..............................................................

....................

ments ...........

xperts Connectin

nts ....................

....................

NDITIONS ....

.....................

.....................

....................

TS .....................................................................................................OVEMENTS ........................................................................................TS ....................................................................................................

....................

TS .....................................................................................................OVEMENTS ........................................................................................TS ....................................................................................................

....................

.....................

ng Communities 

....................

....................

....................

.....................

.....................

....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

....................

.....................

April 9,

....................

....................

....................

......................

......................

....................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

....................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

....................

......................

, 2015 

....... I 

...... 3 

...... 4 

....... 4 

....... 5 

...... 6 

....... 6 

....... 6 

....... 7 

....... 8 

....... 8 

..... 10 

..... 10 

..... 11 

..... 12 

..... 12 

..... 13 

..... 13 

..... 14 

..... 15 

..... 15 

.... 16 

..... 17 

..... 17 

..... 21 

..... 22 

..... 23 

..... 24 

..... 25 

..... 28 

..... 30 

..... 31 

..... 33 

..... 33 

..... 39 

..... 41 

..... 42 

.... 44 

..... 44 

Page 4: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluationAddress B

FIGURE 1 ‐ 

TABLE 1 ‐ PTABLE 2 ‐ ATABLE 3 ‐ CTABLE 4 ‐ ATABLE 5 ‐ CTABLE 6 ‐ ATABLE 7 ‐ CTABLE 8 ‐ ATABLE 9 ‐ CTABLE 10 ‐TABLE 11 ‐TABLE 12 ‐TABLE 13 ‐TABLE 14 ‐TABLE 15 ‐TABLE 16 ‐TABLE 17 ‐TABLE 18 ‐TABLE 19 ‐TABLE 20 ‐TABLE 21 ‐TABLE 22 ‐TABLE 23 ‐TABLE 24 ‐TABLE 25 ‐TABLE 26 ‐TABLE 27 ‐TABLE 28 ‐ APPENDICAPPENDIX APPENDIX APPENDIX APPENDIX  P:\P\14\1407Alternatives D

 

 

n of TransporBuildout Defic

‐ EXISTING AND

PEDESTRIAN, BALTERNATIVE 1COST ESTIMATALTERNATIVE 1COST ESTIMATALTERNATIVE 1COST ESTIMATALTERNATIVE 1COST ESTIMAT‐ ALTERNATIVE‐ COST ESTIMA‐ ALTERNATIVE‐ COST ESTIMA‐ ALTERNATIVE‐ ALTERNATIVE‐ COST ESTIMA‐ ALTERNATIVE‐ ALTERNATIVE‐ COST ESTIMA‐ ALTERNATIVE‐ COST ESTIMA‐ ALTERNATIVE‐ ALTERNATIVE‐ COST ESTIMA‐ COST OF HYB‐ COST OF HYB‐ COST OF HYB‐ COST OF HYB

ES A ‐ COST ESTIMB ‐ FEASIBILITYC ‐ EVALUATIOD ‐ PROPOSED

75‐000 San MateoDraft Report v12.d

rtation Alternciencies 

D FUTURE COA

BICYCLE, TRANS1 BUILDOUT COTES FOR ALTERN1 BICYCLE ANDTES FOR ALTERN1 TRANSIT EVATES FOR ALTERN1 PARKING EVATES FOR ALTERNE 2 BUILDOUT CATES FOR ALTERE 2 BICYCLE ANATES FOR ALTERE 2 TRANSIT EVE 2 PARKING EVATES FOR ALTERE 3 BUILDOUT CE 3 BUILDOUT CATES FOR ALTERE 3 BICYCLE ANATES FOR ALTERE 3 TRANSIT EVE 3 PARKING EVATES FOR ALTERRID ALTERNATRID ALTERNATRID ALTERNATRID ALTERNAT

MATE CALCULAY AND DESIGNON METRIC SCOD ROUNDABOU

Midcoast CTMP\0docx 

natives to 

List ASTAL TRAIL AN

ListSIT, AND PARKONDITIONS PENATIVE 1 ROAD PEDESTRIAN NATIVE 1 BICYCALUATION SCONATIVE 1 TRANALUATION SCONATIVE 1 PARKCONDITIONS PRNATIVE 2 ROAD PEDESTRIANRNATIVE 2 BICYVALUATION SCOVALUATION SCRNATIVE 2 PARCONDITIONS PCONDITIONS PRNATIVE 3 ROAD PEDESTRIANRNATIVE 3 BICYVALUATION SCOVALUATION SCRNATIVE 3 PARTIVE ROADWAYTIVE BICYCLE ATIVE TRANSIT IMTIVE PARKING I

ATIONS  CONSIDERATIORES UT PAVING FOO

07 Deliverables\07

ii

Ex

of FiguresND PARALLEL T

t of TablesKING EVALUATIAK HOUR INTEDWAY AND INTEVALUATION SCLE AND PEDERES ................NSIT IMPROVEORES ...............KING IMPROVEPEAK HOUR INTADWAY AND INN EVALUATIONYCLE AND PEDORES ..............CORES .............RKING IMPROVPEAK HOUR ROPEAK HOUR INTADWAY AND INN EVALUATIONYCLE AND PEDORES ..............CORES .............RKING IMPROVY AND INTERSEND PEDESTRIAMPROVEMENTMPROVEMENT

ONS 

OTPRINT 

7 Alternatives Eval

xperts Connectin

s TRAIL FACILITIE

s ION METRICS .ERSECTION LEVTERSECTION IMSCORES ...........ESTRIAN IMPRO.......................MENTS ..................................EMENTS ..........TERSECTION LENTERSECTION N SCORES .........DESTRIAN IMPR..............................................VEMENTS ........OADWAY SEGMTERSECTION LENTERSECTION N SCORES .........DESTRIAN IMPR..............................................VEMENTS ........ECTION IMPROAN IMPROVEMTS ....................TS ...................

luation Report\Re

ng Communities 

ES ....................

........................VEL OF SERVICMPROVEMENT........................OVEMENTS .....................................................................................................EVEL OF SERVICIMPROVEMEN........................ROVEMENTS ...........................................................................MENT LEVEL OFEVEL OF SERVICIMPROVEMEN........................ROVEMENTS ...........................................................................OVEMENTS ......ENTS ..............................................................

vised Final Report

April 9,

.......................

.......................E.....................TS..............................................................................................................................................................CE...................NTS ....................................................................................................................................F SERVICE ........CE...................NTS ................................................................................................................................................................................................................................

t\Evaluation of 

, 2015 

........ 9 

...... 17 

...... 18 

...... 20 

...... 21 

...... 22 

...... 22 

...... 23 

...... 23 

...... 24 

...... 25 

...... 27 

...... 28 

...... 30 

...... 31 

...... 32 

...... 32 

...... 34 

...... 35 

...... 38 

...... 40 

...... 40 

...... 41 

...... 43 

...... 43 

...... 47 

...... 49 

...... 50 

...... 51 

Page 5: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

INTRODUCTION In 2012,  the California Coastal Commission  certified a package of amendments known as  the Midcoast  Update  to  San  Mateo  County’s  Local  Coastal  Program  (LCP).    Policy  2.53  of  the Updated  LCP  requires  San  Mateo  County  to  prepare  a  Comprehensive  Transportation Management Plan  (CTMP).   Connect  the Coastside  is  the project  that will produce  the CTMP. The CTMP requirement of the Local Coastal Program responds to the impact that growth in the region has had on  roadway  capacity, which  is  viewed by many  as  insufficient  to  support  the current and future needs of the community and visitors.   

This  report  presents  several  alternatives  that were  developed  to  address  some  or  all  of  the deficiencies  identified  in  the Buildout Analysis and Traffic Projections Report and evaluate  the improvements  identified  in  each  alternative  based  on  how well  they  address  the  identified deficiencies, as well as  their  feasibility and cost‐effectiveness.    In  the  initial stages of Connect the Coastside, over 110 specific ideas to mitigate the potential impacts of future growth in the Midcoast and Half Moon Bay study area were generated by the Technical Advisory Committee (TAC), the Midcoast and Half Moon Bay community, and prior studies for improving multi‐modal transportation (e.g. vehicle, bicycle, pedestrian, transit).  

A series of three alternatives have been  identified based on the expected cost associated with the projects and the potential environmental and political impact of the potential projects.  This memorandum presents a Low Cost/Low Potential  Impact alternative, a Medium Cost/Medium Potential  Impact  alternative  and  a High  Cost/High  Potential  Impact  alternative.    Each  of  the three alternatives  is designed  to be multi‐modal with potential projects  to address needs  for pedestrians, bicyclists, transit users and automobile users. 

The end result of this study will be a Comprehensive Transportation Management Plan with a preferred  alternative  to  be  adopted  and  implemented  by  the  Board  of  Supervisors  for  the Midcoast communities of San Mateo County. The CTMP will also serve as an advisory plan for the City of Half Moon Bay. 

Page 6: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

The  BtranspidenticompcurreThe  dTraffi

MIUndecommvehiclfrom the LCwill ntraffic

The lacircuitHighwspeeduncon

Translack a

TherespeciaMontwere parkin

1 CounDepar2 Half

ation of Traness Buildout D

Buildout  Anaportation  issuified  for  the paring existingnt Local Coasdeficiencies  idc Projections 

DCOASr Buildout comunities will rles trying to eresidential neCP. Additionaot meet the c the roadway

ayout of neigtous routes bway  1  is  limitds,  and  unimntrolled locat

it service opemenities and

e  is generally al  events  deara State Beaobserved to ng locations a

nty of San Matrtment. f Moon Bay Cir

sportation AlDeficiencies 

S

alysis  and  Traues and deficMidcoast, Hag conditions stal Program1 dentified  for Report and s

ST onditions, theresult  in the enter Highwaeighborhoodsally, under Buroadway segy is designed 

hborhoods inbetween nearted  by  infreqmproved  pedions to help p

erates at  lowd shelter for u

sufficient pamand  for  paach lots northbe at or abovare not alway

teo Local Coas

rculation Elem

ternatives to

SUMMIDENT

affic  Projecticiencies on  thalf Moon Bayto  the policie(LCP) and theeach  area  aummarized s

e projected  inmajority of uy 1. The majos, will operatuildout condgment LOS stato handle. 

n many of therby destinatioquent  crossindestrian  facilipedestrians a

w frequencies users waiting 

arking supply arking  can  exh of Montarave capacity dys easily ident

stal Program Po

ment, 2013, City

4

MARY TIFIED

ions  Reporthe Midcoast y  and  State es and  level e Half Moon are  documeneparately bel

ncrease  in traunsignalized  iority of unsige worse thanitions,  the enandard as de

e Midcoast coons. Additionang  opportuniities.  There nd cyclists sa

and  limited for buses. 

during the wxceed  the  ava and the Fitzuring some ptified or signe

olicies, 2013, C

y of Half Moon

Experts Conn

OF DED FOR

COprovided  a and  in Half MRoute  (SR) 9of service  (LOBay General nted  in  the  Tlow. 

affic along Higintersections gnalized intersn the intersecntirety of Higefined  in the 

ommunities inally, beach acities,  heavy  tare  no  stopafely cross Hig

coverage. Ad

weekdays; hovailable  capazgerald Marinpeak periods. ed. 

County of San

n Bay.

necting Commun

EFICIER BUILONDITdetailed  anaMoon Bay. D92 east of HaOS) standardPlan and CircTask  2  Buildo

ghway 1 withto experiencsections withction LOS stanghway 1 withLCP, based o

nhibits mobilccess for pedtraffic  volump  controls  orghway 1. 

dditionally, ex

owever duringcity.  The Mane Reserve lo It was also n

Mateo, Plannin

Ap

nities 

ENCIESLDOUTTIONSalysis  of  existDeficiencies walf Moon Bayds defined  in culation Updaout  Analysis 

hin the Midcoce high delayhin the Midcondard definehin  the Midcoon the volume

ity and resultestrians cross

mes,  high  vehr  treatments

xisting bus st

g weekends artini  Creek ot in Moss Benoted that pu

ng and Buildin

ril 9, 2015 

S T S ting were y by the 

ate2.  and 

oast y for oast, d in oast e of 

ts in sing hicle s  at 

tops 

and and each ublic 

ng

Page 7: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

HAMOBasedof thedelay Circullanes betwebetwestandAll stumeet 

A  lackaccespedesopporTheresafely

Translack a

The mduring

 

 

 

 

 

 

 

 

 

 

 

ation of Traness Buildout D

ALF MOOON BAd on the incree unsignalizedand  to  operation Elemenwhich will oeen Mirada Reen  Redondoard as defineudy intersectthe LOS stan

k of consistensibility withinstrian  accessrtunities, heae are no stop y cross the hig

it service opemenities and

majority  of  bg peak period

sportation AlDeficiencies 

OON BAAY ease in trafficd intersectionrate worse  thnt. Highway 1perate withinRoad and Grao  Beach  Roaed in the LCP,ions along SRdards under 

nt pedestriann  and  betwe  along  the  Havy  traffic  vocontrols or trghways. 

erates at  lowd shelter for u

beach  access ds. 

ternatives to

AY AND

 along Highwns within the han  the  inte1 within  the n the roadwandview Boulead  and  Fairw, based on thR 92 and the projected Bu

n and bicycle een  communHighway  1  aolumes, high reatments at 

w frequencies users waiting 

parking  lots 

5

D SR 92

way 1 under pCity of Half Mrsection  LOS City of Half ay segment Levard, betweway  Drive,  we volume of ttwo‐lane porildout conditi

trails and crities within  tnd  SR  92  covehicle  speeuncontrolled

and  limited for buses. 

were  observ

Experts Conn

2 EAST 

rojected BuilMoon Bay arestandard  deMoon Bay haLOS standard.een Kelly Avenill  not  meet traffic the rortion of SR 92ions. 

rossings resulthe  City  of  Horridor  is  limds,  and unimd locations to

coverage. Ad

ved  to  opera

 

necting Commun

OF HA

dout conditioe expected toefined  in  theas several se. However, twnue and Seym  the  roadwaadway is des2 east of Mai

lts  in decreasHalf Moon  Bmited  by  infrmproved pede help pedestr

dditionally, ex

ate  at  over  1

Ap

nities 

ALF 

ons, the majo experience h Half Moon ections with  fwo‐lane sectimour Street, ay  segment signed to hanin Street will 

sed mobility ay.  Additionarequent  crossestrian  facilitrians and cyc

xisting bus st

100%  capacit

ril 9, 2015 

ority high Bay four ions and LOS dle. not 

and ally, sing ties. lists 

tops 

ty 

Page 8: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

ImprocomprecendeficiimplecompfeasibRepor

Improcost, well aThe th

x

x

x

Alterncateg

x x x x

ALTIMAlternand wbe imthe exare bo

Roax

x

x

ation of Traness Buildout D

IDovements  incpiled  from  TAt, relevant reencies. To adementation  oplete  list of pble  and  addrrt.  

ovements  areexpected  imas  the overalhree alternat

Alternative

Alternative

Alternative

natives  are ories: 

Roadway aBicycle andTransit andParking 

TERNAPROVEnative 1 mainwithout signifmproved with xpansion of tolded. 

adway aAddition o

Signage toMidcoast a

Stop signs 

sportation AlDeficiencies 

DENTIFcluded  in  eacAC  and  commeports, as welddress  the neover  the  nextotential  imprressed  deficie

e  grouped  intpact  to existl effect on reives describe

e 1 – Low Cos

e 2 – Medium

e 3 – High Co

defined  by 

and intersectid Pedestrian d  

ATIVE 1EMENTnly focuses onicant cost or signage and he multi‐mod

nd Interof left‐turn ba

o restrict turnand Half Moo

added to uns

ternatives to

FICATIch  alternativemunity‐suggel as improvemeeds  for  the t  30  years  torovements wencies  identi

to  three  alteting  infrastrucesidents of  thd in this secti

st/Low Impac

m Cost/Mediu

st/High Impa

proposed  i

ions/access pfacilities 

1 – LOWTS n  improvemeenvironmentstriping chandal “Parallel T

rsection ay and accele

ing movemenon Bay 

signed interse

6

ION Oe  are  selecteested  improvments suggesBuildout pro

o  respond  towas analyzed fied  in  the  B

ernatives  for cture, envirohe Midcoast ion are as foll

ct 

um Impact 

ct 

mprovement

points 

W COST

ents that can tal impact. Thnges as well aTrail”.  Project

Improveration lane a

nts to consoli

ections along

Experts Conn

OF ALTed  from  a  listvements,  prosted by the Dojections,  theo  planned  groto determineBuildout  Ana

evaluation. onment and  sCommunitieslows: 

ts  and  mod

T/LOW

be made withese projects as improvemets currently b

vementsat Gray Whal

date traffic a

g Highway 1 

necting Commun

TERNAt  of  potentiaoposed  projeKS team to ade projects areowth  in  the e which  impralysis  and  Tr

Each  alternatsurrounding  cs and City of 

difications  to

W IMPA

thin the existaddress deficents already being planne

e Cove parkin

t key intersec

Ap

nities 

ATIVESal  improvemects  identifiedddress identife  considered study  area. rovements wraffic  Projecti

tive  is  basedcommunitiesHalf Moon B

o  the  follow

ACT 

ting right of wciencies that planned suchd and evalua

ng lot 

ctions within 

ril 9, 2015 

S ents d  in fied for The 

were ions 

d  on s, as Bay. 

wing 

way can h as ated 

Page 9: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

x

Bicyx

x

x

x

ation of Traness Buildout D

Defined cua consisten

o Ha

o El 

o M

o M

ycle andStriped crolocations a

o Gro Mo 2n

o 7th

o Mo Vio Cao Cyo HMo Noo Suo Mo Mo Keo Teo Quo Pilo SR

Sidewalks pedestrian

o AloHa

o Alo

Sharrows oHalf Moon

Traffic signo Peo Cr

sportation AlDeficiencies 

urb and pavednt cross sectio

alf Moon Bay 

Granada Seg

oss Beach Seg

ontara Segme

d Pedestossing with beas seen in Figuray Whale Coontara State d Street h Street oss Beach Ligrginia Street alifornia Streeypress AvenuMB Airport orth Capistranurfer’s Beach edio Avenue irada Road ehoe Avenue errace Avenueuarry Road (alarcitos CreekR 35 (along SR

in the followns: ong Highway alf Moon Bay ong Coronado

on Main Streen Bay 

nal updates thedestrian couosswalk signa

ternatives to

d shoulder foon for vehicle

Segment ‐ Te

ment ‐ Capist

gment ‐ Califo

ent ‐ 7th Stre

rian Faceacons to aleure 1: ove Beach 

ghthouse (16t

et e 

no Road Parking area,

e/Grand Boullong SR 92) k Road (alongR 92) 

ing locations 

1 in Montara

o Street and A

et in Montara

hroughout Hant‐down indial crossing ad

7

r the followine and pedestr

errace Avenu

trano Road to

ornia Avenue

eet and 9th St

cility Imprt traffic at th

th Street) 

, north of Cor

evard 

g SR 92) 

to provide a 

a, Moss Beach

Avenue Alham

a, Carlos Stree

alf Moon Bay cators on all sdjustments to

Experts Conn

ng segments arian safety: 

e to Seymour

o Coronado S

e to Cypress A

treet 

provemehe following h

ronado Street

more continu

h,  Miramar, a

mbra in El Gr

et in Moss Be

 including: signalized croo accommoda

necting Commun

along Highwa

r Street 

treet 

Avenue 

ents high demand 

uous walking 

and develope

anada 

each, and Ma

osswalks ate slower wa

Ap

nities 

ay 1 to provid

 and bus stop

path for 

ed areas of 

in Street in 

alking speeds

ril 9, 2015 

de 

Page 10: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

Trax

x

Parx

x

x

3 To b

ation of Traness Buildout D

o Bico Pe

nsit ImpImprovempassenger stops consstudy area

o 11Su

o 12Str

o 13Al

o 33SR

o 8 b

More freqarea: 

o Inco Inc

rking ImpFormalizedHighway 1

Paving and

Improved 

e evaluated by

sportation AlDeficiencies 

cycle signal dedestrian refu

provemeents to bus stseating, pedesist only of a sa: 

1 bus stops in unshine Valley

2 bus stops in reet. Airport 

3 bus stops in hambra/Plaza

3 bus stops in R‐92 serving S

bus stops eas

uent weeken

crease weekecrease weeke

provemed parallel par1. 

d striping at t

wayfinding si

y the Green Val

ternatives to

etection deviuge spaces on

ents tops includinestrian lightinsign to denot

Montara aloy Road servin

Moss Beach Street, and P

El Granada aa Alhambra, a

Half Moon BSamtrans Rou

st of Half Moo

d service for 

end frequencyend frequency

ents king for Mont

the upper Gra

ignage 

lley Trail and C

8

ice n wide road cr

g overhead sng, and electre the location

ng Highway 1g Samtrans R

along Highwarospect Way 

along Airport and Highway 

Bay along highte 17 and Ro

on Bay along 

the existing S

y on Route 17y on Route 29

tara State Be

ay Whale Cov

Congestion Ma

Experts Conn

rossings 

helters, bike ronic bus arrin. The followi

1, Main StreeRoute 17 

ay 1, Sunshinserving Samt

Street, Capist1 serving Sam

hway 1, Mainute 294 

SR‐92 serving

SamTrans fixe

7 from 120 m94 from 120 m

each, with a p

ve parking lo

anagement Pro

necting Commun

racks, trash rval signs. Curing bus stops

t, 6th/Harte S

ne Valley Roadtrans Route 1

trano Road, Amtrans Route

 Street. Kelly 

g Samtrans Ro

ed routes serv

minutes to 60 minutes to 60

hysical separ

ot3 

ojects

Ap

nities 

receptacles, rrently bus s serve the 

Street, and 

d, Etheldore 17 

Ave e 17 

Street, and 

oute 294 

ving the stud

minutes 0 minutes. 

ration from 

ril 9, 2015 

Page 11: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

Figure

ation of Traness Buildout D

e 1 ‐ Existing an

sportation AlDeficiencies 

nd Future Coas

ternatives to

stal Trail and P

 

9

Parallel Trail Fa

Experts Conn

acilities 

necting Commun

Ap

nities 

ril 9, 2015 

Page 12: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

ALTIMAlternthis  sstandaccesturns improenviroand Cdemaadditihigh r

Roax

x

x

x

x

x

ation of Traness Buildout D

TERNAPACT Inative 2  inclusection.  Alterard under Bus to Highwayoff  of  and 

ovements  reonmental impCapistrano Roand‐focused ional  parkingrecreational d

adway aAll Alterna

Signalizatio

o Hi

o Hi

o Hi

o HianBa

o HiincCit

Restrictingmeasures:

o Ad

o ReVe

Addition oStreet) 

Addition o

Consolidat

sportation AlDeficiencies 

ATIVE 2IMPROudes all straternative  2  aduildout by redy 1. This is doon  to  High

equire  a  mopact. Alternatoad, which aimprovementg  in  high  demdemand. 

nd Interative 1 roadw

on of the follo

ghway 1 and 

ghway 1 and 

ghway 1 and 

ghway 1 andnalysis as an inay) 

ghway 1 andcluded in Builty of Half Mo

g access to Hig 

ddition of a m

estricting acceermont Avenu

of a median w

of left‐turn ba

tion of access

ternatives to

2 – MEDOVEMEegies  introdudresses  interducing the nune through thway  1  or  boderate  amotive 2 also core  currently ts  to  transitmand  location

rsection ay improvem

owing interse

California Av

Cypress Aven

Kehoe Avenu

 Main Street ntersection p

 Grand Bouleldout analysison Bay) 

ghway 1 from

median betwe

ess to Highwaue east of Hig

with northbou

ay and accele

s to Highway 

10

DIUM CNTS  ced  in Alternrsection  LOSumber of locahe addition oy  blocking  aount  of  caponsiders suppbeing evaluat  service  (e.gns  for  observ

Improvments 

ections meeti

venue in Moss

nue in Moss B

ue in Half Mo

(S) in Half Mplanned to be 

evard/Terraces as an interse

m residential n

een 7th Street

ay 1 betweenghway 1 in Mo

und left‐turn

eration lane a

1 at the follow

Experts Conn

COST/M

native 1,  in ad  at  intersectations where of raised medaccess  to  Higpital  investmplementary biated as part og.  shuttles  aved  overflow

vements

ing signal war

s Beach 

Beach 

oon Bay 

Moon Bay (Alr signalized by

e Avenue in Hection planne

neighborhoo

t and 9th Stre

 St. Etheldoreoss Beach 

 bay at the Li

at 8th Street in

wing location

necting Commun

MEDIU

ddition to thtions  that  do traffic can hians physicalghway  1  coment  with ike lanes alonof Plan Princand  park‐andw  during wee

rrants: 

eady includey the City of H

Half Moon Baed to be signa

ds through th

eet in Montar

e/Vallemar St

ighthouse in 

n Montara 

ns: 

Ap

nities 

UM 

ose describedo  not  meet ave unrestricly restricting mpletely.  Thsome  potenng Airport Strceton, as weld‐ride  lots) ekend  periods

d in Buildout Half Moon 

ay (Already alized by the 

he following 

ra 

treet and 

Montara (16

ril 9, 2015 

d  in the cted left 

hese ntial reet ll as and s  of 

6th 

Page 13: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

x

Bicyx

x

x

ation of Traness Buildout D

o Nu

o ReCr

o Grpla

An expansinclude the

o HaAv

o El Co

o M

o M

ycle andAll Alterna

“Parallel Tthe entire communitcomposedproposed Plan (CBPPproposed 

o PrbeFrabebo

o PrbealoanM

Class II bikPrinceton 

sportation AlDeficiencies 

urseryman’s E

ealign Frenchmeek Road and

rand Avenue anned improv

ion of the dee following se

alf Moon  Bayvenue to Fren

Granada  Segoral Reef Aven

oss Beach Seg

ontara Segme

d Pedestative 1 bicycle

rail” adjacentstudy area, wies and locale of Class I, ClaNorth Coast BP), connectinglocation of th

oposed Paraletween 2nd Stancais Avenuetween the exorder of Half M

oposed Coastetween the Deong Cypress And the paving oon Bay. 

ke lane along 

ternatives to

Exchange driv

man’s Creek d Venice Boul

and Terrace vement by th

fined curb anegments alon

y  Segment  –nchman's Cree

gment  ‐ Coronue 

gment ‐ Cypr

ent ‐ between

rian Face and pedestr

t to Highway will provide pees along Highass II and ClasBikeway in thg Daly City, Pahe Parallel Tra

lel trail alignmreet in Montae in Half Mooxisting bicycleMoon Bay. 

tal trail alignmevil’s Slide TrAvenue betweof an existing

Capistrano R

11

veways betwe

Road  to conslevard 

Avenue (Alrehe City of Half

nd paved shoung Highway 1:

–  Seymour  Stek Road 

onado  Street 

ess Avenue to

n 1st Street a

cility Imprian facility im

1 and Coastaedestrians anway 1. As envss III bike facie County’s Coacifica, and Hail and Coasta

ment would bara and the eon Bay and a e facilities at W

ment would bail and 2nd Steen Highway g 1.69 mile di

Road which is

Experts Conn

een Mirada R

solidate inter

eady includedf Moon Bay)

ulder include: 

treet  to  Redo

to Medio Av

o Etheldore S

and 7th Street

provememprovements

al Trail adjacend cyclists witvisioned, thisilities. These fomprehensivHalf Moon Bayal Trail. 

be a 6.23 mileexisting bicycl1.58 mile segWavecrest Ro

be a 1.82 milereet in Monta1 and Airporirt path along

s currently be

necting Commun

Road and You

rsections at Fr

d in Buildout a

d in Alternati

ondo  Beach 

venue & Cap

Street 

ents   

nt to the coath a direct cos facility woulfacilities will ve Bicycle andy. Figure 17 s

e segment aloe facilities at gment along Hoad and the s

e segment aloara, a 0.25 mrt Street in Mg the coast in 

eing evaluate

Ap

nities 

ng Avenue 

renchman’s 

analysis as a 

ive 1 to 

Road &  Terr

pistrano Road

stline along nnection to d be be part of thed Pedestrian hows the 

ong Highway Ruisseau Highway 1 southern 

ong Highwayile segment oss Beach, south Half 

ed for Plan 

ril 9, 2015 

race 

d  to 

Page 14: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

x

Trax

x

x

x

Parx

x

ation of Traness Buildout D

Class II bikPrinceton 

nsit ImpAll Alterna

Shuttle buspecial eve

o Ju

o Spwe

o Op

o Prthon

o Fre

The establlots as weepotential ra location 

o Pilo Cho Ca

School busthe Techniprovide adbe needed

rking ImpAll Alterna

Additionalfollowing l

o Paav

sportation AlDeficiencies 

ke lane along 

provemeative 1 transit

s service on sents with the 

ne – October

pecial event weekends of se

perational ho

ovides conneree locationsn the event). 

equency of 3

lishment of aekend park‐ariders who dofor people tollar Point Harhurch of Jesusalvary Chapel 

s service for Cical Advisory dequate servid. 

provemeative 1 parking

 parking facilocations: 

arking lot for vailable for ov

ternatives to

Airport Stree

ents  improvemen

summer and ffollowing cha

r program 

weekend servervice, or 8 da

urs from sun

ections from e in the study 

0 minutes 

a park‐and‐ridand‐ride locato not live witho meet and cabor, Princetos Christ of Lator Our Lady o

Cabrillo UnifieCommittee, tce. Also, a fac

ents g improveme

ities or parkin

Rancho Corraverflow beach

12

et which is cu

nts 

fall weekendsaracteristics:

ice, outside oays total a yea

rise to sunset

either Hillsdaarea (the exa

de shuttle antions to improhin walking darpool: on tter Day Saintof the Pillar c

ed School Distthe school discility for stori

ents 

ng improvem

al de Tierra ach parking 

Experts Conn

urrently bein

s during peak

of peak summar 

le or Haywardact communit

nd usage of tove access todistance of bu

ts, Moss Beacchurches in Ha

trict. Based ostrict would ning the vehicl

ents for recre

ccess east of 

necting Commun

g evaluated f

k recreational

mer period; up

d Park Caltraties would be

he  following o transit partius service and

ch alf Moon Bay

on feedback rneed a total oes and maint

eational user

highway, wh

Ap

nities 

for Plan 

l times and 

p to 4 

in Station to e dependent 

existing parkcularly for thd to also prov

eceived fromof 10 buses totenance woul

s at the 

ich could also

ril 9, 2015 

king hose vide 

m o d 

o be 

Page 15: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

ALTIMAlternensuiimproAlterncapacalternHighwerosioroundwhento  proccasAlternfor pelanes Translarge a sign

Roax

x

ation of Traness Buildout D

TERNAPROVEnative  3  encong section. Aove  roadwaynative 3 buildcity  through nate route wiway 1 would on  concerns,dabouts are p considering ovide  additioional  passingnative 3 also edestrian trafalong SR 92 it  service woamount of canificant impac

adway aAll Alternareplacing p

Roundabo

o Hi

o Hi

o Hi

o Hi

o Hi

o Hi

o Hi

o Hi

o Hi

o M

o Hi

sportation AlDeficiencies 

ATIVE 3EMENTompasses  AltAs roadway se  segment  LOds on the impthe  proposethin Half Moundergo a  c,  which  wouproposed for signalization onal  travel  lag/climbing  laintroduces pffic across Higto allow  for 

ould be  improapital investmct to Midcoas

nd Interative 1 and Altproposed sign

uts at the fol

ghway 1 and 

ghway 1 and 

ghway 1 and 

ghway 1 and 

ghway 1 and 

ghway 1 and 

ghway 1 and 

ghway 1 and 

ghway 1 and 

ain Street and

ghway 1 and 

ternatives to

3 – HIGTS  ternatives  1 egment LOS OS  is  to  incrovements prd  addition  oon Bay throuomplete  realuld  also  inclintersectionsof an interseanes  along  Sanes  to  redupedestrian ovghway 1 withsafe bicycle oved with pement, potentiat communitie

rsection ternative 2 ronalization of i

lowing inters

9th Street in M

Etheldore Str

Cypress Aven

Capistrano R

Coronado St

Mirada Road

Kehoe Avenu

Main Street 

SR 92 in Half

d SR 92 in Ha

Higgins Cany

13

H COST

and  2,  as  wis defined byrease  capacirovided in Altof  travel  laneugh the additlignment  in Elude  a  larges acting as comction. While tSR  92,  capacce  bottlenecver/under croout interferincommuting 

ermanent  locally require aes and Half M

Improvoadway improntersections 

ections: 

Montara 

reet (N) in Mo

nue in Moss B

Road (S) in El G

reet in El Gra

d in Miramar

ue in Half Mo

(N) in Half Mo

f Moon Bay 

lf Moon Bay

yon Road/Ma

Experts Conn

T/HIGH

well  as  thosey capacity utiity  or  divert ternative 1 anes  in  the Midtion of a fronEl Granada,  te  addition  ommunity gatethe existing tity  can  be  imcks  caused  bossings at higng with traffibetween Sanal  routes. Thcquisition of 

Moon Bay. 

vementsovements witwith roundab

oss Beach 

Beach 

Granada 

nada 

oon Bay 

oon Bay 

in Street (S) i

necting Commun

H IMPA

e  strategies  dlization, the   traffic  to  and Alternativedcoast  and  btage road eato address  seof  parking  ceways or as rterrain wouldmproved  by by  truck  traffgh demand  loc flow, as wen Mateo and hese  improveright of way 

th the exceptbouts 

n Half Moon 

Ap

nities 

ACT 

described  in primary waysa  parallel  roue 2 by increasby  proposingst of Highwaea  level  rise apacity.  Sevrequired anald make it diffithe  additionfic  along  SR ocations to alell as Class II BHalf Moon Bments  requirand will resu

tion of 

Bay 

ril 9, 2015 

the s to ute. sing g  an y 1. and eral ysis cult n  of 92. low Bike Bay. re a lt in 

Page 16: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

x

x

x

x

x

x

x

Bicyx

x

ation of Traness Buildout D

o SR

Traffic calmMoss Beacdevices (ch

Increasing and St. EthMoss Beac

Highway 1

Constructiwith Frenc

Left turn la

o Beo Leo Ha

Passing/Cland Pilarciroadway s

An expansinclude the

o HaFre

o El 

o M

o M

ycle andAll Alterna

Instead of demand an

o Gr

o M

o Su

o Ke

sportation AlDeficiencies 

R 92 and SR 35

ming implemech. This couldhicanes and s

road capacitheldore Streech and Capist

1 realignment

on of a Frontchman’s Cree

anes at the fo

erta’s Farm mos Farm alf Moon Bay 

imbing lanes tos Quarry Roegment as we

ion of the dee following se

alf Moon  Bayenchman's Cr

Granada Seg

oss Beach Seg

ontara Segme

d Pedestative 1 and Alt

providing strnd bus stop lo

ray Whale Cov

ontara Sanita

urfer’s Beach 

ehoe Avenue 

ternatives to

5 east of Half

entation alon include basicspeed humps)

y to two lanet/Vallemar Strano Road (S

t in El Granad

tage Road alok Road 

ollowing majo

Nursery 

on the eastboad to allow ell as provide

fined curb anegments alon

y  Segment  ‐reek Road to 

ment ‐ Medio

gment ‐ Carlo

ent ‐ between

rian Facternative 2 bi

riped crossingocations, pro

ve 

ary District bu

Parking area,

14

f Moon Bay 

ng Main Streec measures (s). 

es in each diretreet in Moss) in El Granad

a to address s

ong east side o

or businesses 

ound portioncars to pass te a passing lan

nd paved shoung Highway 1:

Redondo  BeMirada Road

o Avenue to M

os Street to C

n 9th Street a

cility Impicycle and pe

gs with beacovide pedestri

uilding 

, north of Cor

Experts Conn

et in Montaraspeed display

ection betwees Beach, and bda. 

sea level rise 

of Highway 1

along SR 92 i

n of SR‐92 betthe high volumne to go arou

ulder include: 

each  Road  tod 

Mirada Road

alifornia Ave

and 14th Stre

provemedestrian facil

ons to alert traian over/unde

ronado Street

necting Commun

 and along Cay units) or spe

en 9th Street between Cyp

and erosion 

 connecting M

in Half Moon

tween the Lame of trucks und right‐turn

d in Alternati

o Miramonte

nue 

eet 

ents  ity improvem

affic at the foer crossings: 

Ap

nities 

arlos Street ineed control 

in Montara ress Avenue i

concerns 

Main Street 

 Bay: 

ndfill Road on this ning cars.  

ives 1 and 2 t

es  Point  Road

ments 

ollowing high 

ril 9, 2015 

in 

to 

d  & 

Page 17: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

x

Trax

x

x

Parx

x

x

ation of Traness Buildout D

Provide a Cto SR‐35. 

nsit ImpAll Alterna

Provide anBeach, Mo

o Mo El 

These routaccess to h

SamTrans morning a

o PeStaan

o Incan

o ExGr

rking ImpAll Alterna

Diagonal p

Diagonal p

sportation AlDeficiencies 

Class II bicycle

provemeative 1 and Alt

n additional Sontara, and Paontara‐Moss Granada‐Mirtes would havhigh demand 

service  thatnd evening peak  period  exation with frend stops in Hacrease weekdnd San Mateoxpand the weeranada and Pr

provemeative 1 and Alt

parking for Mo

parking for El 

ternatives to

e route along

ents ternative 2 tr

amTrans routacifica: Beach‐Devil’ramar‐North Hve local stopslocations as w

t  provides  ceak periods wxpress  bus  sequency of 3alf Moon Bay,day peak pero‐Hillsdale Calekday coverarinceton. 

ents ternative 2 pa

oss Beach alo

Granada sepa

15

g State Route 

ransit improve

te serving Ha

s Slide Trail roHalf Moon Bas, reducing acwell as conne

onnections  twith limited sservice  betwe0 minutes du, El Granada, riod  frequenctrain Station age of Route 2

arking improv

ong Carlos Str

arated from H

Experts Conn

92 from Mai

ements 

alf Moon Bay,

oute ay (to SR 92)ccess distanceections to reg

to  regional  tstops in ordereen  Half Mouring the moMontara, andcy on Route 2from 60 min294 to provid

vements  

reet 

Highway 1 re

necting Commun

n Street in Ha

, El Granada, 

e for users, angional routes  

transit  providr to decrease oon  Bay  and rning and evd Pacifica 294 betweenutes to 30 mide connection

alignment 

Ap

nities 

alf Moon Bay

Princeton, M

nd allow 

ders  during the travel timDaly  City  BAening peak h

n Half Moon inutes. ns to El 

ril 9, 2015 

Moss 

the me: ART hour 

Bay 

Page 18: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

EvaluimproReporfeasibmetri

BecauimprorepreproducurreAppen

ation of Traness Buildout D

ation  of  alovements  to rt. In order tobility/design  ccs will be use

x Ro

x Pe

use  there  aovement was sent a  relativuced with furtnt  absolute  indix B.  

sportation AlDeficiencies 

EVAternatives  waddress defio judge the coconcerns haved for each ty

oadway and In

o Roadw

o Interse

o Effect o

edestrian, Bicy

o Filling gconnec

o Improv

o Improv

o Improv

o Precedstudy  

re  no  formagiven a scoreve  improvemther study toimprovement

ternatives to

ALUATIwill  primarilyciencies  idenost effectivenve been  evalupe of propos

ntersection Im

ay Segment L

ction LOS 

on vehicle and

ycle, Transit, 

gaps in existinctions 

ved pedestria

ved access to 

ved access to 

ent for a proj

al,  locally  ee according t

ment  to existio allow for a ct.  Further  ex

16

ION Oy  determinentified  in  the ess of the prouated  for eaed improvem

mprovements

LOS 

d pedestrian 

and Parking I

ng bicycle or p

n and bicycle

communities

the shoreline

ject that has a

stablished  so the scoringng  conditioncomparison oxplanation  of

Experts Conn

OF ALTe  the  effecBuildout Anoposed improch  alternativ

ment: 

safety 

Improvement

pedestrian ne

e safety 

s, neighborho

already been

standards  fog system gives. A baselineof relative impf  these  evalu

necting Commun

TERNActiveness  of alysis and  Trovements, cove. Additiona

ts 

etworks or tra

oods or popul

n recommend

r  non‐vehiclen in Table 1. e  score  for eaprovement inuation metric

Ap

nities 

ATIVESthe  propo

raffic Projectiost estimates lly  the  follow

ansit 

lar destinatio

ed in a previo

e  modes,  e These scoresach area  cann addition to cs  is  available

ril 9, 2015 

S osed ions and wing 

ns 

ous 

each s all n be this e  in 

Page 19: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

Table

M

Conne

Acces

Safety

Shore

Prece

Capita

Annu

 

ALTIMAlternand wbe  imbeing

RoaAlternare ab

None deficiparkindefinepedes

ation of Traness Buildout D

e 1 - Pedest

etric 

ectivity Meexicon

ss Mefaccom

y  Bo

eline  Bo

edent  Bopre

al Cost  Mepro

al Cost  Meop

TERNAPROVEnative 1 mainwithout signifmproved with evaluated. 

adway anative 1 incluble to be add

Abilityof  the  propencies, howeng  lot,  the  aded  curb  and strian travel a

sportation AlDeficiencies 

trian, Bicycl

easures  the eisting  bicyclennections. 

easures the ecilities  or mmunities or

nus priority f

nus priority f

nus  for  a  pevious studie

easures the eoject. 

easures the eerating and m

ATIVE 1EMENTnly focuses onicant cost or h  signage  and

nd Interdes very fewressed simply

y to Addrposed  improever,  the addddition of  stopaved  shoulalong Highwa

ternatives to

e, Transit, a

Descrip

extent  to whe  or  pedest

extent to whiservice  to r existing dest

for safety imp

for enhanced

roject  recoms 

extent of the e

xtent of the emaintenance 

1 – LOWTS n  improvemeenvironmentd  striping  cha

rsection  roadway andy with signage

ress Defvements  in dition of a  lefop  signs  to uder  along Hiy 1. 

17

and Parking

ption 

ich a projecttrian  networ

ich a project currently 

tinations. 

provements.

public shorel

mmended  in 

estimated cap

estimated ancosts of a pro

W COST

ents that can tal impact. Thanges  as we

Improvd intersectione and striping

ficienciesAlternative  1ft‐turn bay anunsigned  integhway  1 will

Experts Conn

g Evaluation

t  fills a gap  irks  or  trans

provides newunderserve

line access. 

one  or  mor

pital cost for 

nual oject. 

T/LOW

be made withese projects ll  as  improve

vementsn improvemeg.  

s 1  address  annd acceleratiersections  alol  all  improve

necting Commun

n Metrics

Poin

n it 

0(lowconn

w d  0

(low to h

0

0

re 0

a  0(high to

c

0(high to

c

W IMPA

thin the existaddress deficements  alrea

ents as few of

ny  of  the  roion  lane at Gong Highwaye  safety both

Ap

nities 

nt Value 

0 to 3 w to high nectivity) 

0 to 3 high access)

0 or 1 

0 or 1 

0 or 1 

0 to 3 o low capital cost) 

0 to 3  low annual cost) 

ACT 

ting right of wciencies that ady  planned 

f the deficien

oadway  capaGray Whale Cy 1  and havin  for  vehicle 

ril 9, 2015 

way can and 

cies 

acity Cove ng  a and 

Page 20: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

Usingshowturns left tu

Table

IntersNum

1 Stan2 ProjAlterndeficimeet 

x x x x x x x x x x x

x x x x

ation of Traness Buildout D

g signs to restn  in Table 2 there will beurns are conso

e 2 - Altern

section mber 

LStan

dard is given ect LOS (Buildnative 1 doesencies. With the LOS stan

MidcoasHighway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1

Half MoHighway 1Highway 1Highway 1Highway 1

sportation AlDeficiencies 

trict left‐turn for  the affec the possibilitolidated.  

ative 1 Buil

LOS ndard1 

D  Hwy

D  Hwy

D  Hwy

D  Hwy

D  Hwy

D  Hwy

for an individdout No Projes not addressthe improvedard during t

st 1 and 2nd Stre1 and Vallema1 and Californ1 and Virginia 1 and Vermon1 and Cypress 1 and St. Ethe1 and Coral Re1 and Magella1 and Medio A1 and Mirama

oon Bay 1 and Mirada 1 and Rooseve1 and Young A1 and Ruisseau

ternatives to

movements cted  locationty of violation

dout Condi

Street Na

y 1 / 7th St 

y 1 / 8th St 

y 1 / Vallema

y 1 / Californi

y 1 / Virginia A

y 1 / Vermont

dual approachect  LOS) s any of the rments includthe listed pea

eet (AM, PM, ar Street (PM,ia Avenue (AAvenue (AM

nt Avenue (AMAvenue (AMldore Street (eef Avenue (Aan Avenue (AMAvenue (AM, r Drive (AM, 

Road (AM, PMelt BoulevardAvenue (AM, u Francais Av

18

at the followns; however,ns to avoid in

tions Peak

mes 

r St 

ia Ave 

Ave 

t Ave (WB) 

h (stop contro

remaining stued in Alternaak hours: 

Midday) , Midday) M, PM, Midd, PM, MiddayM, PM, Midda, PM, Midday(AM, PM) AM, PM, MiddM, PM, MiddaPM, Midday)PM, Midday)

M, Midday)  (AM, PM, MPM, Midday)venue (Midda

Experts Conn

wing key locatwithout  any 

ncreased dela

Hour Inters

Control Type 

TWSC 

TWSC 

TWSC 

TWSC 

TWSC 

TWSC 

olled)  

udy  intersectiative 1, the fo

day) y) ay) y) 

day) ay) )  

idday) 

y) 

necting Commun

tions will imp physical  impays at the inte

section Lev

AM Peak Hour LOS2 

F (F) 

C (F) 

F (D) 

F (F) 

E (F) 

F (F) 

ion LOS or roollowing inte

Ap

nities 

prove the LOSpediment  to ersections wh

el of Service

PM Peak Hour 

MPH

LOS2  L

F (F)  F

C (F)  B

F (F)  F

F (F)  F

F (F)  F

F (F)  F

oadway segmrsections do 

ril 9, 2015 

S as left 

here 

e

idday Peak Hour LOS2 

F (F) 

B (F) 

F (E) 

F (F) 

F (F) 

F (F) 

ment not 

Page 21: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

x x x x x x x x x x x

xxx

With the LO

HighwF. WhLOS Eand M

The fothe CM

x x x x x x x x

x  Additfollow

ation of Traness Buildout D

Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Main Stree

SR‐92 x SR 92 andx SR 92 andx SR 92 and

the  improveOS standard d

Midcoasway 1 betweehile the remaE standard givMiramar Drive

Half Moollowing roadMP: 

Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1

SR‐92 SR 92 from

ionally, severwing roadway

sportation AlDeficiencies 

1 and Frenchm1 and Venice B1 and Spindrif1 and Kehoe A1 and Grandvi1 and Bellevie1 and Main St1 and Kelly Av1 and Filbert S1 and Seymouet and Lewis F

d Muddy Roadd Skyline Bould SR 35 (PM, M

ments  includduring the list

st en Coronado ainder of the ven in the CMe does not me

oon Bay dways segme

1 between Mi1 between Ro1 from Young 1 from Ruissea1 from Venice1 between Fro1 from Spindri1 from Kehoe 

m Skyline Bou

ral roadway sy segments do

ternatives to

man’s Creek RBoulevard (AMft Way (AM, PAvenue (AM, ew Boulevardw Boulevard reet (north) (venue (MiddaStreet (AM, Pur Street (AM,Foster Drive (

d/Ox Mountaevard (AM, PMidday) 

ed  in Alternated peak hou

Street and Mroadway seg

MP, Highway eet the LCP LO

nts within th

ramar Drive aosevelt BouleAvenue to Ruau Francais A Boulevard toontage Road tift Way to KeAvenue to Gr

levard to SR 3

segments fallo not meet th

19

Road (AM, PMM, PM, MiddPM, Midday)PM, Midday)d (AM, PM, M(AM) (PM, Midday)y) M, Midday), PM, Midday(PM) 

in Landfill RoPM, Midday)

ative 1, the  frs: 

Miramar Drive gments within1 along the eOS D standar

e Study Area

and Roosevelevard and Youuisseau FrancAvenue to Veno Frontage Roto Spindrift Whoe Avenue (randview Bou

35 (PM, Midd

 below the sthe LCP LOS D 

Experts Conn

M, Midday) ay) 

 Midday) 

y) 

oad (PM, Midd

following road

 operates ben the Study Aentire Midcoad during the 

a operate belo

lt Boulevard (ung Avenue (cais Avenue (Mnice Boulevaroad (Midday)Way (PM, Mid(Midday) ulevard (AM, 

day) 

tricter standastandard dur

necting Commun

day) 

dway segmen

low the CMPArea operateast region belisted peak ho

ow the LOS s

(Midday) (PM, Midday)Midday) rd (PM, Midda dday) 

PM, Midday)

ard provided ring the listed

Ap

nities 

nts do not m

 standard at  better thanetween 1st Strours. 

tandard give

ay) 

by the LCP. d peak hours:

ril 9, 2015 

meet 

LOS the reet 

n in 

The 

Page 22: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

x x x

x x x

Cost standmobilcosts 

Table

#  Im

1  Gr

2  Tu

3  SR

4  SR

  1 Draf

Thereroadw

The fo

x

x

A full 

ation of Traness Buildout D

Highway 1Highway 1Highway 1

SR‐92 SR 92 fromSR 92 fromSR 92 betw

Cost Esestimates  foard  unit  costlization,  consis included in

e 3 - Cost E

mprovement 

ray Whale Co

urn Restrictio

R‐1 Side‐Stree

R‐1 Paved Sho

ft PPS for Con

Feasibe  are  no  feaway and inter

ollowing desig

Adequate Whale parpotential f

Given  the expensive 

listing of imp

sportation AlDeficiencies 

1 between Mi1 between Ke1 between Re

m Main Streetm Skyline Bouween SR 35 an

stimatesor  the  Alternts  and  are  lisstruction  engn Appendix A

Estimates fo

ove Turn and A

n Signage 

et Stop Signs 

oulder and Cu

ngestion Man

bility andsibility  concesection impro

gn considerat

vehicle storarking  lot shoufor queue spil

topography to provide pa

provements w

ternatives to

ramar Drive ally Avenue andondo Beach

t to Skyline Bolevard to SR 3nd I‐280 (AM

s ative  1  propsted  in  Tablegineering,  pe. 

r Alternativ

Acceleration 

urb 

agement and

d Designerns  that  weovements. 

tions were id

age  length  fould be  includellback. 

of  the  landaved shoulde

with feasibility

20

and Grandviend Seymour Sh Road and Fa

oulevard (AM35 (AM, PM, , PM) 

posed  improve  3.  Cost  estrmits,  design

ve 1 Roadwa

Lanes1 

d Safety Impro

n Concerere  identified

entified: 

or  the proposed for the ex

  adjacent  toers and curb.

y and design c

Experts Conn

ew Boulevard Street (AM, PMairway Drive (

M, PM) Midday) 

vements  haveimates  includn,  and  contin

ay and Inter

T

ovements, 20

rns d  for  any  of 

sed  southbouxpected dema

o  Highway  1,

consideration

necting Commun

 (AM, PM, MM) (AM, PM) 

e  been  calcude  contract  ingency.  A  fu

rsection Im

Co

 $      

 $      

 $      

 $    2

Total:  $    3

014 

the  Alternat

und  left‐turn and  in order 

,  some  locat

ns is included

Ap

nities 

idday) 

ulated  baseditems  as welll  breakdown

mprovement

ost Estimate

  960,000  

    40,000  

    18,000  

2,302,000  

3,320,000  

tive  1  propo

bay at  the Gto minimize 

tions may  pr

d in Appendix

ril 9, 2015 

  on l  as n  of 

ts

osed 

Gray the 

rove 

x B. 

Page 23: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

Bicy

The plisting

Table

3  T

4 C

Cost standmobilcosts 

ation of Traness Buildout D

ycle and

Abilityproposed  impg of scores is 

e 4 - Altern

Project 

Pedestrian Crossings 

Sidewalks 

Traffic signal updates 

Community Street 

Sharrows 

Cost Esestimates  foard  unit  costlization,  consis included in

sportation AlDeficiencies 

d Pedest

y to Addrprovements wprovided in A

ative 1 Bicy

Connectivi(0 to 3) 

stimatesor  the  Alternts  and  are  lisstruction  engn Appendix A

ternatives to

rian Fac

ress Defwere  given  thAppendix B. 

ycle and Ped

ty  Access(0 to 3)

s ative  1  propsted  in  Tablegineering,  pe. 

21

cility Imp

ficiencieshe  following 

destrian Eva

 ) 

Safety(0 or 1)

posed  improve  3.  Cost  estrmits,  design

Experts Conn

proveme

s scores  for  t

aluation Sco

Shoreline(0 or 1)

vements  haveimates  includn,  and  contin

necting Commun

ents  

he  evaluation

ores

e  Preceden(0 or 1)

e  been  calcude  contract  ingency.  A  fu

Ap

nities 

n metrics. A 

nt  

ImpactSubtota

ulated  baseditems  as welll  breakdown

ril 9, 2015 

full 

 al 

  on l  as n  of 

Page 24: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

Table

2A 

4A 

4B 

  

Thereand p

The fo

x

x

A full 

Tra

The plisting

Table

ation of Traness Buildout D

e 5 - Cost E

Improvemen

Striped Pede

SR‐1 Sidewa

Traffic Signa

Sharrows on

Sharrows on

Feasibe are no feasipedestrian im

ollowing desig

The beachlocation th

The  Parallengineerincould requ

listing of imp

nsit Imp

Abilityproposed  impg of scores is 

e 6 - Altern

Project 

Bus Stop Amenities 

Increased Weekend Samtrans service 

sportation AlDeficiencies 

Estimates fo

nt 

estrian Crossi

lk (Phase A) 

al Updates 

n Main Street

n Carlos Stree

bility Conbility concernprovements. 

gn considerat

h  access  croshat would acc

el  Trail woung  cost.  Addiuire mitigatio

provements w

proveme

y to Addrprovements wprovided in A

ative 1 Tran

Connectivi(0 to 3) 

ternatives to

r Alternativ

ng with Beac

 

et 

ncerns ns that were i

tions were id

sswalk  at  thecommodate t

ld  be  expectitionally  it mn.  

with feasibility

ents  

ress Defwere  given  thAppendix B. 

nsit Evaluat

ty  Access(0 to 3)

22

ve 1 Bicycle

cons 

identified for

entified: 

 Gray Whalehe southboun

ted  to  have  amay  encumbe

y and design c

ficiencieshe  following 

tion Scores

 ) 

Safety(0 or 1)

Experts Conn

e and Pedest

r any of the A

e Cove parkinnd storage la

an  uneven  per  significant 

consideration

s scores  for  t

Shoreline(0 or 1)

necting Commun

trian Impro

C

 $    

 $    

 $    

 $    

 $    

Total:   $    

Alternative 1 p

ng  lot  shouldne. 

profile  and menvironment

ns is included

he  evaluation

e  Preceden(0 or 1)

Ap

nities 

ovements

Cost Estimate

2,550,000  

1,475,000  

1,624,000  

      44,000  

      43,000  

5,736,000  

proposed bicy

d be  placed  a

may  carry  a  htal  impacts  t

d in Appendix

n metrics. A 

nt  

ImpactSubtota

ril 9, 2015 

ycle 

at  a 

high that 

x B. 

full 

 al 

Page 25: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

Cost standmobilcosts opera

 

Table

TherepropoA demdema

A full 

Par

The plisting

Table

ation of Traness Buildout D

Cost Esestimates  foard  unit  costlization,  consis  included  iating costs of 

e 7 - Cost E

Improvemen

Bus Stop Am

Increased W

Feasibe  are  no  feaosed transit immand study wand to warran

listing of imp

rking Imp

Abilityproposed  impg of scores is 

e 8 - Altern

Project 

Montara State Beach Parking 

Gray Whale Cove 

Parking Lot 

Improved Wayfinding 

sportation AlDeficiencies 

stimatesor  the  Alternts  and  are  lisstruction  engn Appendix Aweekend Sam

Estimates fo

nt 

menities 

Weekend Sa

bility Consibility  or  demprovementswould need tnt improveme

provements w

proveme

y to Addrprovements wprovided in A

ative 1 Park

Connectivi(0 to 3) 

ternatives to

s ative  1  propsted  in  Tablegineering,  peA. Cost estimmTrans Route

r Alternativ

mtrans serv

ncerns esign  concerns. There are 7o be performent. 

with feasibility

ents  

ress Defwere  given  thAppendix C. 

king Evaluat

ty  Access(0 to 3)

23

posed  improve  7.  Cost  estrmits,  design

mates  for  incre 17 and 294.

ve 1 Transit

ice 

ns  that  were77 active busmed  in order 

y and design c

ficiencieshe  following 

tion Scores

 ) 

Safety(0 or 1)

Experts Conn

vements  haveimates  includn,  and  continreased  transi 

t Improvem

e  identified  fs stops locateto  identify w

consideration

s scores  for  t

Shoreline(0 or 1)

necting Commun

e  been  calcude  contract  ingency.  A  fut service  is b

ments

C

 $   

 $    

for  any  of  thed throughoutwhich bus sto

ns is included

he  evaluation

e  Preceden(0 or 1)

Ap

nities 

ulated  baseditems  as welll  breakdownbased on curr

Cost Estimate

156,000 /stop

525,000  

he  Alternativt the study aops have eno

d in Appendix

n metrics. A 

nt  

ImpactSubtota

ril 9, 2015 

  on l  as n  of rent 

ve  1 rea. ugh 

x A. 

full 

 al 

Page 26: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

Cost standmobilcosts 

Table

  

Thereimpro

The fo

x

A full 

ALTIMAlternBuildoHighwof  anconsidbeingservicTheseenviro

ation of Traness Buildout D

Project 

Signs 

Cost Esestimates  foard  unit  costlization,  consis included in

e 9 - Cost E

Improvemen

Montara Sta

Gray Whale 

Wayfinding 

Feasibe are no feasibovements. 

ollowing desig

The  proponorthboun

listing of imp

TERNAPACT Inative 2 addrout  by  reducway 1. This is nd  on  to  Higders supplem evaluated  ace  (e.g.  shutte  improvemonmental imp

sportation AlDeficiencies 

Connectivi(0 to 3) 

stimatesor  the  Alternts  and  are  lisstruction  engn Appendix A

Estimates fo

nt 

ate Beach Par

Cove Parking

Signage 

bility Conbility concern

gn considerat

osed  parking nd traffic. 

provements w

ATIVE 2IMPROresses  intersecing  the  numdone throug

ghway  1  or  bmentary bike ls part of Platles  and  parkents  requirepact. 

ternatives to

ty  Access(0 to 3)

s ative  1  propsted  in  Tablegineering,  pe. 

r Alternativ

rking Lot Impr

g Lot Improve

ncerns ns that were i

tions were id

lot  for Mon

with feasibility

2 – MEDOVEMEection  LOS atmber  of  locagh the additioby  blocking anes along Aan Princeton, k‐and‐ride  lote  a  modera

24

 ) 

Safety(0 or 1)

posed  improve  9.  Cost  estrmits,  design

ve 1 Parking

rovements 

ements 

dentified for 

entified: 

ntara  State  B

y and design c

DIUM CNTS t  intersectiontions  where on of raised maccess  to  Hi

Airport Street as well as dts)  and  additate  amount

Experts Conn

Shoreline(0 or 1)

vements  haveimates  includn,  and  contin

g Improvem

any of the Al

Beach  should

consideration

COST/M

ns  that do notraffic  can 

medians physighway  1  coand Capistrademand‐focustional  parkint  of  capital

necting Commun

e  Preceden(0 or 1)

e  been  calcude  contract  ingency.  A  fu

ments

C

 $    

 $    

 $    

Total:   $    

lternative 1 p

d  include  a  l

ns is included

MEDIU

ot meet  the have  unrestically restrictmpletely.  Altano Road, whsed  improvemg  in  high  de  investment

Ap

nities 

nt  

ImpactSubtota

ulated  baseditems  as welll  breakdown

Cost Estimate

    557,000  

1,052,000  

    303,000  

1,912,000  

proposed park

eft‐turn  bay 

d in Appendix

UM 

LCP  standardricted  accessting left turnsternative  2  aich are currements  to  traemand  locatiot  and  mini

ril 9, 2015 

 al 

  on l  as n  of 

king 

for 

x B. 

d at s  to s off also ntly nsit ons. mal 

Page 27: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

Roa

In addmediaVirginenter 1/Cyp

Theseshowconsoand atraffic

Alterndefici

TableServi

IntersNum

21 Stan2 ProjWith stand

x

ation of Traness Buildout D

adway a

Abilitydition  to  theans  to  restricnia Avenue  inHighway 1 a

press Avenue 

e  proposed  imn  in Table 10olidates  traffia  resulting  LOc results in a w

native 2 doesencies.  

e 10 - Alterice

section mber 

LStan

27 

dard is given ect LOS (Buildthe improvemard during th

MidcoasHighway 1

sportation AlDeficiencies 

nd Inter

y to Addr proposed  imct  turning mon Moss Beachat  the high vin Moss Beac

mprovement0 for the affec  at VallemaOS  F becauseworsening of 

s not address

native 2 Bu

LOS ndard1 

D  Hwy

D  Hwy

D  Hwy

D  Hwy

D  Hwy

D  Hwy

D  SR 1

E  Hwy

for an individdout No Projements includehe listed peak

st 1 and 2nd Stre

ternatives to

rsection 

ress Defmprovementsovements  at h.  Signalizatioolume  intersch and Highw

s will  result ected  locationar  and Vermoe of  the high LOS at Highw

s any of the r

ildout Cond

Street Na

y 1 / 7th St 

y 1 / 8th St 

y 1 / Vallema

y 1 / Californi

y 1 / Virginia A

y 1 / Vermont

1 / Cypress A

y 1 / Kehoe A

dual approachect LOS) ed in Alternatk hours: 

eet (AM, PM, 

25

Improv

ficienciess  in Alternati8th  Street  inon will  improsections of Hiway 1/Kehoe A

in  the  followns. While theont,  the eastvolumes alo

way 1/Vallem

remaining stu

ditions Peak

ames 

r St 

ia Ave 

Ave 

t Ave (WB) 

Avenue 

Ave 

h (stop contro

tive 2, the fol

Midday) 

Experts Conn

vements

s ve 1, Alternan Montara  aove  the  abilitighway 1/CalAvenue in Ha

wing  changese restricted wbound  trafficong Highway ar Street 

udy  intersecti

k Hour Inte

Control Type 

TWSC 

TWSC 

TWSC 

Signal 

TWSC 

TWSC 

Signal 

Signal 

olled)  

llowing inters

necting Commun

ative 22 will nd  at  Califorty  for minor lifornia Avenlf Moon Bay. 

s  to  the  intewestbound acc  still experie1. Additiona

ion LOS or ro

rsection Le

AM Peak Hour LOS2 

F (F) 

C (F) 

F (D) 

A (F) 

E (F) 

F (F) 

B (F) 

E (F) 

sections do n

Ap

nities 

include physrnia Avenue street  trafficue and Highw 

ersection  LOSccess diverts ences high delly,  the diver

oadway segm

vel of

PM Peak Hour 

M

LOS2 

F (F) 

C (F) 

F (F) 

A (F) 

F (F) 

F (F) 

C (F) 

D (F) 

not meet the 

ril 9, 2015 

sical and c  to way 

S  as and elay rted 

ment 

Midday Peak Hour LOS2 

F (F) 

B (F) 

F (E) 

B (F) 

F (F) 

F (F) 

B (F) 

B (F) 

LOS 

Page 28: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

x x x x x x x x

x x x x x x x x x x x x x x x

xxx

With the LO

HighwF. WhLOS Eand M

The fothe CM

ation of Traness Buildout D

Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1

Half MoHighway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Main Stree

SR‐92 x SR 92 andx SR 92 andx SR 92 and

the  improveOS standard d

Midcoasway 1 betweehile the remaE standard givMiramar Drive

Half Moollowing roadMP: 

sportation AlDeficiencies 

1 and Vallema1 and Virginia 1 and Vermon1 and St. Ethe1 and Coral Re1 and Magella1 and Medio A1 and Mirama

oon Bay 1 and Mirada 1 and Rooseve1 and Young A1 and Ruisseau1 and Frenchm1 and Venice B1 and Spindrif1 and Kehoe A1 and Grandvi1 and Bellevie1 and Main St1 and Kelly Av1 and Filbert S1 and Seymouet and Lewis F

d Muddy Roadd Skyline Bould SR 35 (PM, M

ments  includduring the list

st en Coronado ainder of the ven in the CMe does not me

oon Bay dways segme

ternatives to

ar Street (AM,Avenue (AM

nt Avenue (AMldore Street (eef Avenue (Aan Avenue (AMAvenue (AM, r Drive (AM, 

Road (AM, PMelt BoulevardAvenue (AM, u Francais Avman’s Creek RBoulevard (AMft Way (AM, PAvenue (AM)ew Boulevardw Boulevard reet (north) (venue (MiddaStreet (AM, Pur Street (AM,Foster Drive (

d/Ox Mountaevard (AM, PMidday) 

ed  in Alternated peak hou

Street and Mroadway seg

MP, Highway eet the LCP LO

nts within th

26

, PM, Midday, PM, MiddayM, PM, Midda(AM, PM) AM, PM, MiddM, PM, MiddaPM, Midday)PM, Midday)

M, Midday)  (AM, PM, MPM, Midday)venue (MiddaRoad (AM, PMM, PM, MiddPM, Midday)

d (AM, PM, M(AM) (PM, Midday)y) M, Midday), PM, Midday(PM) 

in Landfill RoPM, Midday)

ative 1, the  frs: 

Miramar Drive gments within1 along the eOS D standar

e Study Area

Experts Conn

y) y) ay) 

day) ay) )  

idday) 

y) M, Midday) ay) 

Midday) 

y) 

oad (PM, Midd

following road

 operates ben the Study Aentire Midcoad during the 

a operate belo

necting Commun

day) 

dway segmen

low the CMPArea operateast region belisted peak ho

ow the LOS s

Ap

nities 

nts do not m

 standard at  better thanetween 1st Strours. 

tandard give

ril 9, 2015 

meet 

LOS the reet 

n in 

Page 29: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

x x x x x x x x

x  Additfollow

x x x

x x x

Cost eunit cconstin App

TableImpr

 

4B 

ation of Traness Buildout D

Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1

SR‐92 SR 92 from

ionally, severwing roadway

Highway 1Highway 1Highway 1

SR‐92 SR 92 fromSR 92 fromSR 92 betw

Cost Esestimates forcosts and are ruction enginpendix A. 

e 11 - Cost rovements

Improveme

Carried over

Hwy 1 Paved

California Av

Cypress Ave

Kehoe Aven

Main Street 

sportation AlDeficiencies 

1 between Mi1 between Ro1 from Young 1 from Ruissea1 from Venice1 between Fro1 from Spindri1 from Kehoe 

m Skyline Bou

ral roadway sy segments do

1 between Mi1 between Ke1 between Re

m Main Streetm Skyline Bouween SR 35 an

stimatesr Alternative 2listed in Tablneering, desig

Estimates fo

nt 

r1 Alternative 

d Shoulder an

venue Signal 

nue Signal 

ue Signal 

(S) Signal 

ternatives to

ramar Drive aosevelt BouleAvenue to Ruau Francais A Boulevard toontage Road tift Way to KeAvenue to Gr

levard to SR 3

segments fallo not meet th

ramar Drive ally Avenue andondo Beach

t to Skyline Bolevard to SR 3nd I‐280 (AM

s 2 proposed imle 11. Cost esgn, permits, a

for Alternat

1 options 

nd Curb (Phas

27

and Roosevelevard and Youuisseau FrancAvenue to Veno Frontage Roto Spindrift Whoe Avenue (randview Bou

35 (PM, Midd

 below the sthe LCP LOS D 

and Grandviend Seymour Sh Road and Fa

oulevard (AM35 (AM, PM, , PM) 

mprovementsstimates incluand contingen

tive 2 Roadw

se B) 

Experts Conn

lt Boulevard (ung Avenue (cais Avenue (Mnice Boulevaroad (Midday)Way (PM, Mid(Midday) ulevard (AM, 

day) 

tricter standastandard dur

ew Boulevard Street (AM, PMairway Drive (

M, PM) Midday) 

s have been cude contract ncy. A full br

way and Inte

necting Commun

(Midday) (PM, Midday)Midday) rd (PM, Midda dday) 

PM, Midday)

ard provided ring the listed

 (AM, PM, MM) (AM, PM) 

calculated baitems as wellreakdown of 

ersection

Ap

nities 

ay) 

by the LCP. d peak hours:

idday) 

ased on stand as mobilizatcosts is inclu

Cost Est

 $    2,76

 $    2,84

 $        76

 $        64

 $        64

 $        53

ril 9, 2015 

The 

dard ion, ded 

imate 

0,000  

1,000  

67,000 

40,000 

40,000 

30,000 

Page 30: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

10 

11 

12A 

12B 

13 

14 

  

  1  Doerestric2  TheBouledrivew

Thereroadw

The fo

x

x

A full 

Bicy

The plisting

Table

10 

ation of Traness Buildout D

Hwy 1 Medi

Hwy 1 Acces

Montara Lig

Nurserymen

Nurserymen

Frenchman'

Terrace Ave

es  not  includction projectse  minimal  alevard while  thway directly s

Feasibe  are  no  feaway and inter

ollowing desig

All design 

SignalizatioconsideratAdditionalopportunit

listing of imp

ycle and

Abilityproposed  impg of scores is 

e 12 - Alter

Project 

Parallel Trail 

sportation AlDeficiencies 

an and Left T

ss Restriction

ghthouse Med

n's Exchange A

n's Exchange A

s Creek Road

nue/Grand B

de  Turn  Restrs ternative  inche expandedsouth of Youn

bility Consibility  concesection impro

gn considerat

consideration

on of the Higtions becausely, striping eties. 

provements w

d Pedest

y to Addrprovements wprovided in A

native 2 Bic

Connectiv(0 to 3) 

ternatives to

Turn Bay in M

s in Moss Bea

dian and Left 

Access Consol

Access Consol

 Realignment

oulevard Acc

riction  Signag

cludes  a  fro alternative wng Avenue an

ncerns erns  that  weovements. 

tions were id

ns noted for A

ghway 1/Calife of  the Wienhancements

with feasibility

rian Fac

ress Defwere  given  thAppendix B. 

cycle and Pe

vity  Access(0 to 3

28

ontara 

ach 

Turn Bay 

lidation (Mini

lidation (Expa

t and Access C

ess Consolida

To

To

ge  as  it  has 

ntage  road would contind north to M

ere  identified

entified: 

Alternative 1

fornia Avenunke Way  leg s may be nec

y and design c

cility Imp

ficiencieshe  following 

edestrian Ev

s ) 

Safety(0 or 1)

Experts Conn

imal Alternat

anded Alterna

Consolidation

ation and Sign

tal (assuming

otal (assuming

been  replac

between  Yonue  the  frontirada Road.

d  for  any  of 

e  intersectiothat makes 

cessary to cre

consideration

proveme

s scores  for  t

valuation Sc

Shoreline(0 or 1)

necting Commun

tive)2 

ative) 

nalization 

g Project 12A

g Project 12B

ced  with med

oung  Avenuetage  road sou

the  Alternat

n may requirit a  five  leggeate safe ped

ns is included

ents  

he  evaluation

cores

e  Precede(0 or 1

Ap

nities 

 $        22

 $        26

 $        17

 $   1,521

 $   2,851

 $    1,18

 $    1,27

A):   $  12,81

B):   $  14,14

dian  and  acc

e  and  Rooseuth  to cover 

tive  2  propo

re careful desged  intersectdestrian cross

d in Appendix

n metrics. A 

ent 1) 

ImpacSubtota

ril 9, 2015 

25,000 

68,000 

70,000 

1,000  

1,000  

2,000  

0,000  

4,000 

44,000 

cess 

velt the 

osed 

sign ion. sing 

x B. 

full 

t al 

Page 31: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

11 

12 

Cost eunit cconstin App

ation of Traness Buildout D

Project 

Coastal Trail 

Class II Bike Lanes on Airport 

Street and Capistrano 

Road 

Cost Esestimates forcosts and are ruction enginpendix A. 

sportation AlDeficiencies 

Connectiv(0 to 3) 

stimatesr Alternative 2listed in Tablneering, desig

ternatives to

vity  Access(0 to 3

s 2 proposed imle 13. Cost esgn, permits, a

29

s ) 

Safety(0 or 1)

mprovementsstimates incluand contingen

Experts Conn

Shoreline(0 or 1)

s have been cude contract ncy. A full br

necting Commun

e  Precede(0 or 1

calculated baitems as wellreakdown of 

Ap

nities 

ent 1) 

ImpacSubtota

ased on stand as mobilizatcosts is inclu

ril 9, 2015 

t al 

dard ion, ded 

Page 32: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

Table

 

2B 

10 

11 

  1Cost estabdollar

Thereand p

The fo

x

x

A full 

Tra

The plisting

ation of Traness Buildout D

e 13 - Cost

Improveme

Carried over

Hwy 1 Sidew

Coronado St

Parallel Trai

Coastal Trail

Main Street 

Capistrano R

Airport Stree

estimates folished in the rs 

Feasibe are no feasipedestrian im

ollowing desig

All design 

Lane widthand Airpor

listing of imp

nsit Imp

Abilityproposed  impg of scores is 

sportation AlDeficiencies 

Estimates fo

nt 

r Alternative 1

walk (Phase B

treet and Ave

l adjacent to 

l throughout 

Class III Bike 

Road Bicycle F

et Class II Bik

r these projec2002 Mid‐Co

bility Conbility concernprovements. 

gn considerat

consideration

h should be nrt Street in or

provements w

proveme

y to Addrprovements wprovided in A

ternatives to

for Alternat

1 options 

e Alhambra Si

Highway 1 fo

the entire stu

Route 

Facilities 

e Lanes 

cts are basedast Recreatio

ncerns ns that were i

tions were id

ns noted for A

narrowed alonrder to enhan

with feasibility

ents  

ress Defwere  given  thAppendix C. 

30

tive 2 Bicycl

dewalk 

or the entire s

udy area1 

To

 on per mile Conal Needs As

identified for

entified: 

Alternative 1

ng the proponce the traffic

y and design c

ficiencieshe  following 

Experts Conn

le and Pede

study area1 

otal (assuming

Class 1 pavedssessment (pg

r any of the A

osed Class II bc calming effe

consideration

s scores  for  t

necting Commun

estrian Impr

g Project 12B

d bike trail cog 62), and adj

Alternative 2 p

bike lanes on ect. 

ns is included

he  evaluation

Ap

nities 

rovements

Cost Est

$    5,736

 $    1,80

 $        74

 $  11,03

 $    5,25

 $          8

 $        86

 $    4,23

B):  $  29,768

st estimates justed for 201

proposed bicy

Capistrano R

d in Appendix

n metrics. A 

ril 9, 2015 

imate 

6,000  

6,000  

49,000 

7,000 

1,000  

85,000 

66,000 

8,000  

8,000  

14 

ycle 

oad 

x B. 

full 

Page 33: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

Table

13 S

14 

15  S

Cost eand aprivatpark‐anegot

Therepropo

A full 

Par

The plisting

ation of Traness Buildout D

e 14 - Alter

Project 

Special EventShuttle Service 

Park‐and‐Ride Lots 

School Buses 

Cost Esestimates forre not includte  company and‐ride  lotstiation of cost

Feasibe  are  no  feaosed transit im

listing of imp

rking Imp

Abilityproposed  impg of scores is 

sportation AlDeficiencies 

native 2 Tra

Connectiv(0 to 3) 

 3 

stimatesr shuttle and ed in this docas well  as  ons  have  a mint with private

bility Consibility  or  demprovements

provements w

proveme

y to Addrprovements wprovided in A

ternatives to

ansit Evalua

vity  Access(0 to 3

s school bus secument as thengoing  operanimal  cost  ese lot owners.

ncerns esign  concerns. 

with feasibility

ents  

ress Defwere  given  thAppendix C. 

31

ation Scores

s ) 

Safety(0 or 1)

ervice are coey would reqation, maintestimate  as  th

ns  that  were

y and design c

ficiencieshe  following 

Experts Conn

s

Shoreline(0 or 1)

nsidered outuire acquisitienance,  and hey  involve  t

e  identified  f

consideration

s scores  for  t

necting Commun

e  Precede(0 or 1)

t of the scopeon or lease ostorage  coststhe  use  of  e

for  any  of  th

ns is included

he  evaluation

Ap

nities 

nt ) 

ImpactSubtota

e for this prof vehicles fros.  The  propoexisting  lots 

he  Alternativ

d in Appendix

n metrics. A 

ril 9, 2015 

t al 

ject m a osed and 

ve  2 

x B. 

full 

Page 34: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

Table

17 

Cost eunit cconstin App

Table

 

  

Thereimpro

The fo

x

x

A full 

ation of Traness Buildout D

e 15 - Alter

Project 

Parking lot for Rancho Corral de Tierra 

Cost Esestimates forcosts and are ruction enginpendix A. 

e 16 - Cost

Improveme

Carried over

Rancho Corr

Feasibe are no feasibovements. 

ollowing desig

All design 

The  designshould  haFlashing Bpresence o

listing of imp

sportation AlDeficiencies 

native 2 Par

Connectiv(0 to 3) 

stimatesr Alternative 2listed in Tablneering, desig

Estimates fo

nt 

r Alternative 1

ral de Tierra P

bility Conbility concern

gn considerat

consideration

nated  crosswve  high  visibeacon  shouldof pedestrian

provements w

ternatives to

rking Evalua

vity  Access(0 to 3

s 2 proposed imle 16. Cost esgn, permits, a

for Alternat

1 options 

Parking Lot 

ncerns ns that were i

tions were id

ns noted for A

walk  for  the bility  for  Highd be consides and bicyclis

with feasibility

 

32

ation Score

s ) 

Safety(0 or 1)

mprovementsstimates incluand contingen

tive 2 Parkin

dentified for 

entified: 

Alternative 1

proposed  Rahway  1  traffred as an effsts. 

y and design c

Experts Conn

es

Shoreline(0 or 1)

s have been cude contract ncy. A full br

ng Improve

any of the Al

ncho  Corral fic.  The  instafective meas

consideration

necting Commun

e  Precedet 

(0 or 1)

calculated baitems as wellreakdown of 

ments

Tota

lternative 2 p

de  Tierra  acllation  of  Reure  to alert 

ns is included

Ap

nities 

en

ImpactSubtota

ased on stand as mobilizatcosts is inclu

Cost Est

$    1,912

 $    2,34

al:  $    4,258

proposed park

ccess  parkingectangular  Ramotorists of 

d in Appendix

ril 9, 2015 

t al 

dard ion, ded 

imate 

2,000  

6,000  

8,000 

king 

g  lot apid the 

x B. 

Page 35: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

ALTIMAlterncapacpropoHighwrise acoast,travellanes pedesHighwsafe improoperaimpac

Roa

IncreaEtheldCapistsegmesegmehighestill o

ation of Traness Buildout D

TERNAPROVEnative 3 buildcity  through osing an alterway 1. Highwnd erosion co, south of Higl lanes along to  reduce  bstrian over/uway 1 withoutbicycle  commoved with perating investmct to Midcoas

adway a

Abilityasing the roadore Street/Vtrano  Road  (ents from LOents it is not r density areperate worse

sportation AlDeficiencies 

ATIVE 3EMENTds on the impthe  proposenate route way 1 would uoncerns, whicghway 1. WhSR 92, capacbottlenecks  cnder  crossingt interfering wmuting  betwrmanent locaent, potentiast communitie

nd Inter

y to Addrd capacity toVallemar Stre(S)  in  El GranS E to LOS A/suggested toeas with highe than the sta

ternatives to

3 – HIGTS rovements pred  addition  owithin Half Moundergo a comch would alsoile the existinity can be imaused  by  trugs at high dewith traffic floween  San  Mal routes. Thesally require aces and Half M

rsection 

ress Defo two lanes inet in Moss Benada  results /B under Buildo add additionher occurrencndard. 

33

H COST

rovided in Altof  travel  lanoon Bay throumplete realigo include a lang terrain womproved by thuck  traffic  aloemand  locatioow as well as ateo  and  Hase improvemecquisition of rMoon Bay. 

Improv

ficienciesn each directieach and betin  an  improdout conditional capacity aces of pedest

Experts Conn

T/HIGH

ternative 1 annes  in  portiough the additgnment  in El rge addition ould make it dhe addition ofong  SR  92.  Aons  to allow Class II Bike 

alf  Moon  Bayents require right of way a

vements

s ion between tween Cypresvement  to  Rons as shown as it may encotrian  crossing

necting Commun

H IMPA

nd Alternativeons  of  the  Mion of a frontGranada to aof parking cadifficult to prf occasional pAlternative  3 for pedestrilanes along Sy.  Transit  sea large amouand will resu

9th Street in ss Avenue in Road  Segmenin Table 17. ourage fastergs. The unaff

Ap

nities 

ACT 

e 2 by increasMidcoast  andtage road easaddress sea  leapacity along rovide additiopassing/climbalso  introduan  traffic acrR 92 to allowervice  would unt of capital lt in a signific

Montara andMoss Beach nt  LOS  for  thOutside of thr speeds throfected  segme

ril 9, 2015 

sing   by st of evel the onal bing uces ross w for 

be and cant 

d St. and hose hese ugh ents 

Page 36: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

TableServi

SegmNum

1

1 Proj

The a18 forof  lanaerialAppe

The foround

x x x

Additof a ro

x x

This inhoursdiffer

ation of Traness Buildout D

e 17 - Alterice

ment mber 

4 Hwy

Hwy

8 Hwy

Hwy

9 Hwy

Hwy

10 Hwy

Hwy

ect LOS (Build

ddition of rour the affectednes  for  the m  view  showinndix C. 

ollowing thredabout over t

Highway 1Highway 1SR‐92 & SR

ionally, the fooundabout ov

Highway 1Main Stree

nconsistency s being more ently to acco

sportation AlDeficiencies 

rnative 3 Bu

y 1 from 9th S

y 1 from Carlo

y 1 from Cypr

y 1 from St. E

y 1 from St. E

y 1 from Capi

y 1 from Capi

y 1 from Cora

dout No Proje

undabouts atd locations. Thmajor approacng  the minim

ee locations sthe no‐projec

1 & Coronado1 & Kehoe AveR‐35 

ollowing locatver the no‐pr

1 & Main Street & SR‐92 

of improvemthan the capaunt for peak 

ternatives to

uildout Cond

Location 

St to Carlos S

os St to 9th S

ress Ave to St

Etheldore St to

Etheldore St to

istrano Rd N t

istrano Rd N t

al Reef Ave to

ect LOS) 

t the followinhe number ofch and  the amum  paving 

how consistet alternative:

 Street enue 

tions show mroject alterna

et 

ment is due toacity of the rohour volume

34

ditions Peak

t. Etheldore S

o Cypress Ave

o Capistrano 

to St. Etheldo

to Coral Reef 

o Capistrano R

g locations ref roundaboutmount of  tradiameter  is  s

ent improvem 

mixed improvetive: 

 an increase ooundabout. Ws, the capacit

Experts Conn

k Hour Roa

AM PeHouLOS

A (E

A (E

St  A (E

e  A (E

Rd N A (E

ore St A (E

Ave  A (E

Rd N  A (E

esults in the Lt lanes was anaffic expectedshown  for  ea

ment of LOS w

ement of LOS

of traffic turnWhile traffic sty of a rounda

necting Commun

adway Segm

eak ur 

PM PeHour

S1  LOS1

E)  A (E)

E)  A (E)

E)  A (E)

E)  A (E)

E)  B (E)

E)  A (E)

E)  B (E)

E)  A (E)

LOS changes dnalyzed basedd  to use  the ach  proposed

with the impl

S with the imp

ning during cesignals can beabout cannot

Ap

nities 

ment Level o

eak r 

MiddPeak H

1  LOS

)  B (E

)  A (E

)  B (E

)  A (E

)  A (E

)  A (E

)  A (E

)  A (E

detailed in Tad on the numroundabout.d  roundabou

lementation o

plementation

ertain peak e timed t be adjusted.

ril 9, 2015 

of

ay Hour 1 

able mber . An t  in 

of a 

Page 37: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

TableServi

IntersNum

N

1

1

1

2

3

3

4

3

41 Not 2 Proj

With stand

x x x x x x x x x

ation of Traness Buildout D

e 18 - Alterice

section mber  Sta

N/A 

11 

14 

19 

27 

32 

33 

42 

38 

48 

a study interect LOS (Build

the improvemard during th

MidcoasHighway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1

sportation AlDeficiencies 

native 3 Bu

LOS andard1 

Ro

D  Sin

D  Sin

D  Sin

D  Do

D  Do

E  Sin

E  Do

E  Do

E  Do

F  Do

E  Do

D  Do

section dout No Proje

ments includehe listed peak

st 1 and 2nd Stre1 and Vallema1 and Californ1 and Virginia 1 and Vermon1 and Cypress 1 and Capistra1 and St. Ethe1 and Coral Re

ternatives to

ildout Cond

undaboutLanes 

ngle  H

ngle  H

ngle  H

ouble  H

ouble  H

ngle  H

ouble  H

ouble  H

ouble  H

ouble  M

ouble  HR

ouble  S

ect LOS) 

ed in Alternatk hours: 

eet (AM, PM, ar Street (PM,ia Avenue (AAvenue (AM

nt Avenue (AMAvenue (AM

ano Road (S) (ldore Street (eef Avenue (A

35

ditions Peak

Street

Hwy 1 / 9th St

Hwy 1 / Valle

Hwy 1 / Cypre

Hwy 1 / Capis

Hwy 1 / Coro

Hwy 1 / Mira

Hwy 1 / Keho

Hwy 1 / Main

Hwy 1 / SR 92

Main Street /

Hwy 1 / HiggiRoad/Main St

SR 92 / SR 35

tive 3, the fol

Midday) , Midday) M, PM, Midd, PM, MiddayM, PM, Midda, PM, Midday(PM) (AM, PM) AM, PM, Midd

Experts Conn

k Hour Inte

t Names 

treet1 

emar (N) 

ess Avenue 

strano Road (

nado Street

da Road  

oe Avenue 

n Street (N) 

/ SR 92 

ins Canyon treet (S) 

 

llowing inters

day) y) ay) y) 

day) 

necting Commun

rsection Le

AM Peak Hour LOS2 

N/A 

D (D) 

F (F) 

(S) C (C) 

D (D) 

F (F) 

C (F) 

F (D) 

F (C) 

B (D) 

A (A) 

C (D) 

sections do n

Ap

nities 

vel of

PM Peak Hour 

M

LOS2 

N/A 

F (F) 

F (F) 

D (C) 

C (C) 

F (F) 

B (F) 

E (F) 

F (D) 

D (C) 

B (A) 

E (F) 

not meet the 

ril 9, 2015 

Midday Peak Hour LOS2 

N/A 

F (E) 

F (F) 

E (D) 

C (E) 

F (F) 

C (F) 

F (F) 

F (F) 

D (F) 

C (A) 

F (F) 

LOS 

Page 38: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

x x x

x x x x x x x x x x x x x x x

xxx

With the LO

HighwF. WhLOS Eand Mthe se

x x

The fothe CM

x x

ation of Traness Buildout D

Highway 1Highway 1Highway 1

Half MoHighway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1Main Stree

SR‐92 x SR 92 andx SR 92 andx SR 92 and

the  improveOS standard d

Midcoasway 1 betweehile the remaE standard givMiramar Driveegments prop

Highway 1Highway 1

Half Moollowing roadMP: 

Highway 1Highway 1

sportation AlDeficiencies 

1 and Magella1 and Medio A1 and Mirama

oon Bay 1 and Mirada 1 and Rooseve1 and Young A1 and Ruisseau1 and Frenchm1 and Venice B1 and Spindrif1 and Grandvi1 and Bellevie1 and Main St1 and SR‐92 (A1 and Kelly Av1 and Filbert S1 and Seymouet and Lewis F

d Muddy Roadd Skyline Bould SR 35 (PM, M

ments  includduring the list

st en Coronado ainder of the ven in the CMe does not mposed to be w

1 between 9th 1 between Cyp

oon Bay dways segme

1 between Mi1 between Ro

ternatives to

an Avenue (AMAvenue (AM, r Drive (AM, 

Road (AM, PMelt BoulevardAvenue (AM, u Francais Avman’s Creek RBoulevard (AMft Way (AM, Pew Boulevardw Boulevard reet (N) (AM,AM, PM, Middvenue (MiddaStreet (AM, Pur Street (AM,Foster Drive (

d/Ox Mountaevard (AM, PMidday) 

ed  in Alternated peak hou

Street and Mroadway seg

MP, Highway eet the LCP Lwidened: 

Street and Cpress Ave and

nts within th

ramar Drive aosevelt Boule

36

M, PM, MiddaPM, Midday)PM, Midday)

M, Midday)  (AM, PM, MPM, Midday)venue (MiddaRoad (AM, PMM, PM, MiddPM, Midday)d (AM, PM, M(AM) , PM, Middayday) y) M, Midday), PM, Midday(PM) 

in Landfill RoPM, Midday)

ative 1, the  frs: 

Miramar Drive gments within1 along the eLOS D standa

arlos Streetd Coral Reef R

e Study Area

and Roosevelevard and You

Experts Conn

ay) )  

idday) 

y) M, Midday) ay) 

Midday) 

y) 

y) 

oad (PM, Midd

following road

 operates ben the Study Aentire Midcoard during the

Road 

a operate belo

lt Boulevard (ung Avenue (

necting Commun

day) 

dway segmen

low the CMPArea operateast region bee listed peak 

ow the LOS s

(Midday) (PM, Midday)

Ap

nities 

nts do not m

 standard at  better than etween 1st Strhours expect

tandard give

ril 9, 2015 

meet 

LOS the reet t for 

n in 

Page 39: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

x x x x x x

x  Additfollow

x x x

x x

Cost eunit cconstin App

ation of Traness Buildout D

Highway 1Highway 1Highway 1Highway 1Highway 1Highway 1

SR‐92 SR 92 from

ionally, severwing roadway

Highway 1Highway 1Highway 1

SR‐92 SR 92 fromSR 92 from

Cost Esestimates forcosts and are ruction enginpendix A. 

sportation AlDeficiencies 

1 from Young 1 from Ruissea1 from Venice1 between Fro1 from Spindri1 from Kehoe 

m Skyline Bou

ral roadway sy segments do

1 between Mi1 between Ke1 between Re

m Main Streetm Skyline Bou

stimatesr Alternative 3listed in Tablneering, desig

ternatives to

Avenue to Ruau Francais A Boulevard toontage Road tift Way to KeAvenue to Gr

levard to SR 3

segments fallo not meet th

ramar Drive ally Avenue andondo Beach

t to Skyline Bolevard to SR 3

s 3 proposed imle 19. Cost esgns, permits,

37

uisseau FrancAvenue to Veno Frontage Roto Spindrift Whoe Avenue (randview Bou

35 (PM, Midd

 below the sthe LCP LOS D 

and Grandviend Seymour Sh Road and Fa

oulevard (AM35 (AM, PM, 

mprovementsstimates incluand continge

Experts Conn

cais Avenue (Mnice Boulevaroad (Midday)Way (PM, Mid(Midday) ulevard (AM, 

day) 

tricter standastandard dur

ew Boulevard Street (AM, PMairway Drive (

M, PM) Midday) 

s have been cude contract ency. A full br

necting Commun

Midday) rd (PM, Midda dday) 

PM, Midday)

ard provided ring the listed

 (AM, PM, MM) (AM, PM) 

calculated baitems as wellreakdown of 

Ap

nities 

ay) 

by the LCP. d peak hours:

idday) 

ased on stand as mobilizatcosts is inclu

ril 9, 2015 

The 

dard ion, ded 

Page 40: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

TableImpr

#  I

  C

  C

4B  H

15  9

16  E

17  C

18  C

19  C

20  M

21  K

22  M

23  H

24  S

25  H

26  S

27  M

28  C

29  H

30  H

31  S

32  S

33  H

  

  1 Doe2 Costincludgreatl3Cost 

ation of Traness Buildout D

e 19 - Cost rovements

Improvement

Carried over1 

Carried over1 

Hwy 1 Paved 

9th Street Ro

Etheldore Str

Cypress Aven

Capistrano Ro

Coronado Str

Mirada Road 

Kehoe Avenu

Main Street (

Hwy 1/SR‐92 

SR‐92/Main S

Higgins Canyo

SR‐92/SR‐35 R

Main Street T

Carlos Street 

Highway 1 Re

Hwy 1 East Si

SR‐92 Left Tu

SR‐92 Passing

Hwy 1 Widen

s not include t estimates ade  right‐of‐wly underestimestimates do

sportation AlDeficiencies 

estimates fo

Alternative 1

Alternative 1

Shoulder and

undabout 

eet Roundab

ue Roundabo

oad Roundab

eet Roundab

Roundabout 

e Roundabou

N) Roundabo

Roundabout 

Street Rounda

on Road Roun

Roundabout 

Traffic Calmin

Traffic Calmin

ealignment (C

de Frontage R

rn Lanes 

g/Climbing La

ing to 4 Lane

signalizationre not  includ

way  acquisitiomate the cost o not include 

ternatives to

or Alternat

1 and 2 option

1 and 2 option

d Curb (Phase

out 

out 

out 

out 

ut 

out 

about 

ndabout 

ng 

Center Alignm

Road in Half M

nes 

 projects as tded for the fron,  and  any 

any right‐of‐w

38

ive 3 Roadw

ns with Projec

ns with Projec

e C) 

ment) 

Moon Bay2 

Total (assu

Total (assu

hey have beerontage road cost  estimat

way acquisitio

Experts Conn

way and Inte

ct 12A 

ct 12B 

uming Project

uming Projec

en replaced bas a  large pae  based  on 

on 

necting Commun

ersection

C

 $    

 $  1

 $    

 $    

 $    

 $    

 $    

 $    

 $    

 $    

 $    

 $    

 $    

 $    

 $    

 $    

 $    

 $  1

 $    

 $    

 $  1

t 12A):   $  5

t 12B):   $  5

by roundabouart of this promaterials  an

Ap

nities 

Cost Estimate

8,967,000  

10,297,000  

2,441,000  

1,171,000  

1,492,000  

1,205,000  

1,446,000  

1,154,000  

1,234,000  

1,240,000  

1,630,000  

1,630,000  

1,630,000  

1,313,000  

1,177,000  

    522,000  

    306,000  

14,474,000  

infeasible 

    418,000  

1,519,000  

12,614,000  

57,583,000  

58,913,000  

ts oject cost wond  design  wo

ril 9, 2015 

e3

ould ould 

Page 41: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

Thereand  iHighwimprooften of‐wathey stime opera

The  crequirdeemdiscusaligneprevio

The fo

x

x

x

x

x

A full An aeAppe

Bicy

The plisting

ation of Traness Buildout D

Feasibe are no designtersection  iway 1 within ovements maresult in som

ay acquisitionslow traffic aland  congestate. 

creation  of  a red  right‐of‐w

med  to be polssed  in  the  ped  with  Goldously been ru

ollowing desig

All design 

While the intersectio(approximwith caref

The  instalrequire  inpresented guidance f

The Highwbecause of

Any left‐tuminimize t

listing of imperial view of tndix D. 

ycle and

Abilityproposed  impg of scores is 

sportation AlDeficiencies 

bility Congn feasibility improvementthe  study ary carry with tme resistance n  issues. Roulong previoustion  during  p

frontage  roway  acquisitlitically  infeaspast  includinden  Gate  Aveuled out based

gn considerat

consideration

installation oon, the  intersately  130  feeul design con

lation  of  a tegration  wiin  the  High

for how the ro

way 1/Main Sf the close pr

urn pockets fotheir impact o

provements wthe proposed

d Pedest

y to Addrprovements wprovided in A

ternatives to

ncerns concerns thats.    There  area as  it  is nothem some obased on condabouts alssly non‐controperiods  of  h

ad  parallel  toion,  includinsible. Other ag  the  Foothienue  and  exd on upcomin

tions were id

ns noted for A

of a roundabsection’s closeet)  presents siderations.

roundabout th  the  Ethelhway  1  Safeoundabout sh

treet (S)  inteoximity to th

or businesseson traffic ope

with feasibilit roundabout 

rian Fac

ress Defwere  given  thAppendix C. 

 

39

at were identre  no  legal ot classified apposition froncerns over iso  sometimesolled locationhigh  demand

o Highway  1g  the  removalternative pill  Boulevard xisting  north‐ng projects an

entified: 

Alternative 1 

out  is technice proximity ttraffic  opera

at  the  Highwldore  Street/ty  and  Mobhould be desi

ersection will e Higgins Can

s along SR‐92ration along S

y and design location with

cility Imp

ficiencieshe  following 

Experts Conn

ified for any restrictions  tas a  rural areom local residnduced demas  carry with  tns, potentiallyor  simply  u

1 would  also val  of  severaparallel  routesalignment  a

‐south  connend environme

and Alternat

cally feasibleto the Main Sational  challe

way  1/Etheld/Carlos  Streebility  Improveigned. 

require an  innyon Road/M

2 should haveSR‐92. 

consideratioh required pa

proveme

s scores  for  t

necting Commun

of the Alternto  increasingea. Some of ents. Capacitand as well athem  resistay resulting in unfamiliarity 

result  in  a  lal  existing  hos with Highwand  a  paralleections,  howeental impacts

ive 2 

 at the HighwStreet/9th Strenges  that  ca

dore  Street et  intersectioement  Study

nnovative rouMain Street int

e adequate st

ons is includedaving footprin

ents  

he  evaluation

Ap

nities 

native 3 roadwg  capacity  althe high  impty improvemes resulting rignce due  to hincreased trawith  how  t

large  amountouses.  This  wway 1 have bel  route  partiever  these  hs. 

way 1/9th Strreet  intersectan  be  addres

intersection on.  The  concy  provides  go

undabout destersection. 

torage length

d in Appendints is include

n metrics. A 

ril 9, 2015 

way ong pact ents ght‐how avel they 

t  of was een ially have 

reet tion ssed 

will cept ood 

sign 

s to 

x B. d in 

full 

Page 42: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

Table

 

18 

19 

Cost eunit cconstin App

Table

#  I

  C

2C  S

13  G

14  M

15  S

16  K

17  S

  

Thereand ppedeswhile 1 wit

ation of Traness Buildout D

e 20 - Alter

Project 

 

Pedestrian over/under crossings 

Class II Bicycle 

Route along SR 92 

Cost Esestimates forcosts and are ruction enginpendix A. 

e 21 - Cost

Improvement

Carried over A

SR‐1 Sidewalk

Gray Whale C

Montara Sani

Surfer's Beach

Kehoe Avenu

SR‐92 Bike La

Feasibe are no feasipedestrian  imstrian under‐cpedestrian ohout  causing

sportation AlDeficiencies 

native 3 Bic

Connectiv(0 to 3) 

 

stimatesr Alternative 3listed in Tablneering, desig

Estimates fo

Alternative 1 

k (Phase C) 

Cove Pedestri

itary District P

h Pedestrian 

e Overcrossin

nes 

bility Conbility concern

mprovements crossings mayover‐crossingsg  any  conflict

ternatives to

cycle and Pe

vity  Access(0 to 3

 

s 3 proposed imle 21. Cost esgns, permits, 

for Alternat

and 2 options

an Overcross

Pedestrian Ov

Overcrossing

ng 

ncerns ns that were iother  than  ty be affecteds may providets  or  speed 

40

edestrian Ev

s ) 

Safety(0 or 1)

 

mprovementsstimates incluand continge

tive 3 Bicycl

sing 

vercrossing 

identified forthose noted  by the watere a way for preduction  to

Experts Conn

valuation Sc

Shoreline(0 or 1)

 

s have been cude contract ency. A full br

le and Pede

r any of the Afor Alternatir table for locedestrians ano  highway  1 

necting Commun

cores

e  Precede(0 or 1

 

calculated baitems as wellreakdown of 

estrian Impr

C

$  2

 $    

 $    

 $    

 $    

 $    

 $  2

Total:  $   7

Alternative 3 pve 2; howevcations close nd bicyclists ttraffic,  the  r

Ap

nities 

ent 1) 

ImpacSubtot

 

ased on stand as mobilizatcosts is inclu

rovements

Cost Estimate

9,768,000  

1,564,000  

4,486,000  

5,849,000  

7,221,000  

6,408,000  

20,959,000  

76,255,000  

proposed bicyer  the designto the coast to cross Highwrequired  vert

ril 9, 2015 

ct tal 

dard ion, ded 

ycle n of and way tical 

Page 43: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

clearaneede

A full 

Tra

The plisting

Table

20 

21 

Cost SamT

#  I

  C

21  I

   T

   

 

Therepropo

A full 

ation of Traness Buildout D

ance and  ramed for the str

listing of imp

nsit Imp

Abilityproposed  impg of scores is 

e 22 - Alter

Project 

New SamTrans service 

Transit to BART and San Mateo 

Cost Esestimates  forans Route 17

Improvement

Carried over A

Increased Sa

Total: 

Feasibe  are  no  feaosed transit im

listing of imp

sportation AlDeficiencies 

mp  for handicucture. 

provements w

proveme

y to Addrprovements wprovided in A

native 3 Tra

Connectiv(0 to 3) 

stimatesr  increased  t7 and 294 ser

Alternative 1 

amTrans serv

bility Consibility  or  demprovements

provements w

ternatives to

cap accessibi

with feasibility

ents  

ress Defwere  given  thAppendix C. 

ansit Evalua

vity  Access(0 to 3

s transit  servicrvice. 

and 2 options

vice to regio

ncerns esign  concerns. 

with feasibility

41

ility  can pote

y and design c

ficiencieshe  following 

ation Scores

s ) 

Safety(0 or 1)

ce  are  based 

onal transit p

ns  that  were

y and design c

Experts Conn

entially  result

consideration

s scores  for  t

s

Shoreline(0 or 1)

  on  current 

providers 

e  identified  f

consideration

necting Commun

t  in a  large  f

ns is included

he  evaluation

e  Precede(0 or 1)

operating  co

C

$  1

 $    

$   1

 

for  any  of  th

ns is included

Ap

nities 

footprint of  l

d in Appendix

n metrics. A 

nt ) 

ImpactSubtota

osts  of week

Cost Estimate

2,537,000  

2,124,000  

14,661,000  

he  Alternativ

d in Appendix

ril 9, 2015 

and 

x B. 

full 

t al 

kday 

ve  3 

x B. 

Page 44: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

Par

The plisting

ation of Traness Buildout D

rking Imp

Abilityproposed  impg of scores is 

sportation AlDeficiencies 

proveme

y to Addrprovements wprovided in A

ternatives to

ents  

ress Defwere  given  thAppendix C. 

42

ficiencieshe  following 

Experts Conn

s scores  for  t

necting Commun

he  evaluation

Ap

nities 

n metrics. A 

ril 9, 2015 

full 

Page 45: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

Table

21 

22 

Cost eunit cconstin App

Table

#  I

   C

5  C

6  E

  

Therepropo

A full 

ation of Traness Buildout D

e 23 - Alter

Project 

Carlos Street Parking 

El Granada recreational parking 

Cost Esestimates forcosts and are ruction enginpendix A. 

e 24 - Cost

Improvement

Carried over A

Carlos Street 

El Granada Di

Feasibe  are  no  feaosed parking 

listing of imp

sportation AlDeficiencies 

native 3 Par

Connectiv(0 to 3) 

1

stimatesr Alternative 3listed in Tablneering, desig

estimates fo

Alternative 1 

On‐Street Pa

iagonal Parkin

bility Consibility  or  deimprovement

provements w

ternatives to

rking Evalua

vity  Access(0 to 3

2

s 3 proposed imle 24. Cost esgns, permits, 

or Alternat

and 2 option

rking 

ng 

ncerns esign  concernts other than

with feasibility

43

ation Score

s ) 

Safety(0 or 1)

1

mprovementsstimates incluand continge

ive 3 Parkin

ns  that  were those noted 

y and design c

Experts Conn

es

Shoreline(0 or 1)

1

s have been cude contract ency. A full br

ng Improvem

e  identified  ffor Alternativ

consideration

necting Commun

e  Precede(0 or 1

1

calculated baitems as wellreakdown of 

ments

C

 $    

 $    

 $    

Total:   $    

for  any  of  thve 2. 

ns is included

Ap

nities 

ent 1) 

ImpacSubtot

6

6

ased on stand as mobilizatcosts is inclu

Cost Estimate

4,258,000  

      34,000  

      54,000  

4,346,000  

he  Alternativ

d in Appendix

ril 9, 2015 

ct tal 

dard ion, ded 

ve  3 

x B. 

Page 46: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

The  falterndeficiimpacoveraaltern

x

x

x

The im

x

x

Whilefor agaltern

Hyb

The fo

x

x

ation of Traness Buildout D

following  threnatives were encies  in  thect  to  existingall effect on  rnatives descri

Alternative

Alternative

Alternative

mprovements

Roadway a

o M

o M

o Im

Pedestrian

o Fil

o Im

o Im

o Im

o Su

e the determiggregation annative which i

brid Alte

Roadwollowing proje

Addition oimprove ciin a cost‐e

Addition ocirculation

sportation AlDeficiencies 

ee  alternativdesigned  to e  Buildout  cog  infrastructuresidents of  tbed in this se

e 1 – Low Cos

e 2 – Medium

e 3 – High Co

s for each alte

and Intersect

eeting roadw

eeting interse

mproving  veh

n, Bicycle, Tra

ling gaps in e

mproving pede

mproving acce

mproving acce

upport for a p

nation of altend evaluationincludes sugg

ernative 

way and ects are sugg

of a left‐turn birculation andffective way 

of a median wn in Montara a

ternatives to

es were  devassess whatondition.    Thure,  the  envithe Midcoastection are as f

st/Low Impac

m Cost/Mediu

st/High Impa

ernative were

ion Improvem

way segment L

ection LOS sta

icle and pede

nsit, and Park

existing bicycl

estrian and bi

ess to commu

ess to the sho

roject in a pr

ernatives basn of  improvegested improv

with Su

d Intersecested to impr

bay and an acd prevent turn(Alt 1) 

with northbouand provide a

44

veloped  fromt  level  of  imphe  three  alteronment  andt Communitiefollows: 

ct 

um Impact 

ct 

e evaluated b

ments 

LOS standard

andards 

estrian safety

king Improve

e or pedestri

icycle safety

nities, neighb

reline 

evious study 

ed on cost anments,  the uvements from

uggested

ction Imrove safety o

cceleration laning vehicles 

nd left‐turn ba crossing ref

Experts Conn

COm  a  list  of  prprovement wernatives  wed  the  surroues and City o

based on the f

 

ements 

an networks 

borhoods or p

 

nd impact proultimate  resum all three alt

d Improv

mprovemr circulation i

ne at Gray Wfrom restrict

bay at 16th Strfuge for pede

necting Commun

ONCLUoposed  imprwould  be  neeere  based  onnding  commof Half Moon

following crit

or transit con

popular desti

ovides a clearult of  this  stuernatives. 

vements

ments in a cost‐effe

Whale Cove pating flow alon

reet will imprstrians (Alt 2

Ap

nities 

USIONrovements.   eded  to  addrn  cost;  expecunities;  and n Bay. The  th

teria: 

nnections 

nations 

r methodologudy  is a hybr

ctive way: arking lot will ng Highway 1 

rove ) 

ril 9, 2015 

N The ress cted the 

hree 

gy id 

Page 47: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

x

x

x

x

x

The fo

x

ation of Traness Buildout D

The use ofintersectiointersectioHighway 1The propowithout an

The implemspeed humcost‐effect3) 

Stop signs paved shocross sectibicycle act

o M

o M

o El 

o Ha(A

Consolidatof vehicle 

o Nu

o Grpla

Left‐turn laeffective sThe main ilocations. 

o Beo Leo Ha

ollowing proje

Signalizationo improv

o Hi

sportation AlDeficiencies 

f signage to reons within theon LOS deficie1 and potentiased constructny added ben

mentation of mps along Mative way to sl

added to unsulder for the on for vehicletivity along Hi

ontara Segme

oss Beach Seg

Granada Seg

alf Moon Bay Alt 1, 2) 

tion of accessconflicts alon

urseryman’s E

rand Avenue anned improv

anes at majorolution to adimpediment wThe following

erta’s Farm mos Farm alf Moon Bay 

ects are sugg

on of the folloement with i

ghway 1 and 

ternatives to

estrict turninge Midcoast arency, but it wally improve stion of mediaefit. (Alt 1) 

traffic calminain Street in Mow traffic and

signed intersefollowing sege and pedestrighway 1: 

ent – 1st Stre

gment – Carlo

ment – Coral

Segment – F

s to Highway ng Highway 1 

Exchange driv

and Terrace Avement by th

r businesses adress a circulwould be acqg locations ar

Nursery 

ested to impr

owing intersemplementati

California Av

45

g movementsrea and Half Mill reduce thesafety for pedans and block

ng improvemMontara and ad improve saf

ections alonggments alongrian safety ba

eet and 14th S

os Street to E

Reef Avenue

renchman's C

1 at the followand improve

veways betwe

Avenue (Alreahe City of Half

along SR 92 inlation issue couisition of thre suggested (

rove intersec

ections will adon of a round

venue in Moss

Experts Conn

s and to consMoon Bay wile number of vdestrians in Mking access is 

ents such as along Carlos Sfety for bicyc

g Highway 1 ag Highway 1 wased on areas

Street (Alt 1, 

Etheldore Stre

e to Medio Ro

Creek Road to

wing locatione circulation (A

een Mirada R

ady included f Moon Bay)

n Half Moon ommonly idee required rig(Alt 3): 

ction and road

ddress the LOdabout (Alt 2

s Beach (LOS 

necting Commun

olidate trafficll not addressvehicle conflicMontara and Ma more expen

speed displayStreet in Mosclists and ped

nd a defined will provide a s of highest p

2, 3) 

eet (S) (Alt 1,

oad (Alt 1, 2) 

o Redondo Be

ns will reduceAlt 2): 

Road and You

in Buildout a

Bay would beentified by theght‐of‐way at

dway deficien

OS deficiencie): 

F to LOS B) 

Ap

nities 

c at key s any cts along Moss Beach. nsive solution

y units and ss Beach is a estrians. (Alt 

curb and consistent edestrian and

 2, 3) 

each Road  

e the number 

ng Avenue 

nalysis as a 

e a cost‐e communityt the desired 

ncies: 

es and show 

ril 9, 2015 

Page 48: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

x

x

x

Manyimproand Scondithrouare coimprosuggerelaxecomm

4 From

ation of Traness Buildout D

o Hi

o HianBa

o HiincCit

Roundabo

o Hi

o Hi

o SRAM

The remaiintersectio

Increasing and St. EthMoss Beacdeficiency cost and o

The additioLandfill Roon this roacost estimearthwork

y of the intersovements. ThR 92 and fairtions.  This regh the use ofonsidered undovements andested that theed to take intmunity.  Altern

m Buildout Ana

sportation AlDeficiencies 

ghway 1 and 

ghway 1 and nalysis as an inay) (LOS E to L

ghway 1 and cluded in Builty of Half Mo

uts at the fol

ghway 1 and 

ghway 1 and 

R 92 and SR 35M and PM pe

nder of the roon. 

road capacitheldore Streech and Capist(LOS E to LOSbtaining pub

on of passingoad and Pilarcadway segmeate does not k which may b

section and rois was the resly strict LOS sesults in LOS df signalizationdesirable fromd signalizatione intersectiono account thenatively, land

alysis and Traf

ternatives to

Cypress Aven

Main Street ntersection pLOS A)4 

Grand Bouleldout analysison Bay) (LOS 

lowing inters

Coronado St

Kehoe Avenu

5 east of Halfak improve fr

oundabouts a

y to two lanet/Vallemar Strano Road (SS A/B), howevlic support. (A

g/climbing lancitos Quarry Rnt and providhowever inclbe identified w

oadway LOS dsult of very hstandards thadeficiencies inn or roundabom a multimodn would furth and roadwaye current defid‐use alternat

ffic Projections

46

nue in Moss B

(S) in Half Moplanned to be 

vard/Terraces as an interseF to LOS B)4

ections addre

reet in El Gra

ue in Half Mo

f Moon Bay (Mrom LOS F to 

analyzed resu

es in each diretreet in Moss) in El Granadver the largesAlt 3) 

nes on the easRoad will allowde a passing llude any rightwith a full des

deficiencies aigh forecastet in many casn locations thouts or in locadal or politicaher address thy level of serviciencies and tives that wou

s Report

Experts Conn

Beach (LOS F 

oon Bay (Alre signalized by

e Avenue in Hection planne

ess LOS defic

nada (LOS E t

oon Bay (LOS 

Midday peak LOS E) 

ulted in a wor

ection betwees Beach, and bda will addresst impedimen

stbound portw cars to pasane to go arot‐of‐way acqusign. (Alt 3)

re not addresd buildout voses are not mhat either couations where al standpoint.he LOS deficievice standardthe multimould significant

necting Commun

to LOS C) 

eady includedy the City of H

alf Moon Bayed to be signa

iencies (Alt 3

to LOS D) 

F to LOS C) 

remains LOS 

rsening of LOS

en 9th Street between Cypss the roadwant to this will 

tion of SR‐92 s the high voound right‐turuisition or an

ssed with theolumes along met under curruld not be mitcapacity imp. While large‐encies, it is inds for the Midodal needs of tly reduce the

Ap

nities 

 in Buildout Half Moon 

y (Already alized by the 

): 

F, however 

S for the 

in Montara ress Avenue iay segment be the large 

between the lume of truckrning cars. Thy large scale 

e proposed Highway 1 rent tigated provements ‐scale capacitstead dcoast area bethe e Buildout 

ril 9, 2015 

in 

ks he 

Page 49: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

land upropo

Table

4

4

4

 

The foprovid

ation of Traness Buildout D

use could parosed hybrid a

e 25 - Cost

Improve

1  Gray Wh

2  Turn Res

3  SR‐1 Sid

4A  SR‐1 Pav

4B  SR‐1 Pav

4C  SR‐1 Pav

5  Californ

6  Cypress 

8  Main Str

11  Montara

12  Nursery

14  Terrace 

19  Coronad

21  Kehoe A

26  SR‐92/S

27  Main Str

28  Carlos St

31  SR‐92 Le

32  SR‐92 Pa

33  SR‐1 Wid

Bicycleollowing bicycding a safer a

sportation AlDeficiencies 

tially addresslternative roa

of Hybrid A

ement 

hale Cove Tur

striction Signa

e‐Street Stop

ved Shoulder 

ved Shoulder 

ved Shoulder 

ia Avenue Sig

Avenue Signa

reet (S) Signa

a Lighthouse 

men's Exchan

Avenue/Gran

do Street Rou

Avenue Round

R‐35 Rounda

reet Traffic Ca

treet Traffic C

eft Turn Lanes

assing/Climbi

dening to 4 La

e and Pecle and pedesnd more con

ternatives to

s the forecastadway and in

Alternative R

rn and Accele

age 

p Signs 

and Curb (Ph

and Curb (Ph

and Curb (Ph

gnal 

al 

Median and L

nge Access Co

nd Boulevard 

ndabout 

dabout 

bout 

alming 

Calming 

ng Lanes 

anes 

H

edestrianstrian improvnected enviro

47

ted deficiencitersection im

Roadway an

eration Lanes

hase A) 

hase B) 

hase C) 

Left Turn Bay

onsolidation (

Access Conso

Hybrid Roadw

n Facilityvements wereonment to th

Experts Conn

es. A summamprovements 

nd Intersect

(Expanded Al

olidation and

way and Inter

y Improe found to behe Midcoast a

necting Commun

ry of the costis included in

tion Improv

ternative) 

d Signalization

rsection Tota

vementse cost‐effectivarea and Half 

Ap

nities 

t of the n Table 25. 

vements

Cost Estim

 $        440

 $          40

 $          18

 $    2,302

 $    2,841

 $        820

 $        767

 $        640

 $        530

 $        170

 $    2,851

n   $    1,270

 $    1,154

 $    1,240

 $    1,177

 $        522

 $        306

 $        418

 $    1,519

 $  12,614

al   $  31,639

s ve solutions toMoon Bay. 

ril 9, 2015 

mate 

0,000 

0,000 

8,000 

,000  

,000  

0,000 

7,000 

0,000 

0,000 

0,000 

,000  

,000  

,000  

,000  

,000  

2,000 

6,000 

8,000 

,000  

4,000  

9,000  

Page 50: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

x

x

x

x

The foenviroare su

x

x

ation of Traness Buildout D

The “Paral(including pedestrianSharrows oHalf Moonbicycles awA Class II bHighway 1Striped croconnectivilocations (

o Gro Mo 2n

o 7th

o Mo Vio Cao Cyo HMo Noo Suo Mo Mo Keo Teo Quo Pilo SR

ollowing impronment to thuggested if th

A Class II bbetween Snecessary who wouldTraffic signin the dow

o Peo Cr

sportation AlDeficiencies 

lel Trail” adjaAirport Streens and recreaton Main Streen Bay provide way from the bike lane alon1 (Alt 2) ossing with bety, access, an(Alt 1): ray Whale Covontara State d Street h Street oss Beach Ligrginia Street alifornia Streeypress AvenueMB Airport orth Capistranurfer’s Beach edio Avenue irada Road ehoe Avenue errace Avenueuarry Road (alarcitos CreekR 35 (along SR

rovements we Midcoast ahe funding is abicycle lane alSan Mateo anto perform ad use the rounal updates thwntown areasedestrian couosswalk signa

ternatives to

acent to Highwet) provides a tional bicycleet in Montaraa safe and coheavier traff

ng Capistrano 

eacons were nd safety. The

ve Beach 

ghthouse (16t

et e 

no Road Parking area,

e/Grand Boullong SR 92) k Road (alongR 92) 

ere identifiedrea and Half available. long SR‐92 wod Half Moon  demand studte would makhroughout Ha. Potential imnt‐down indial crossing ad

48

way 1 and Cosafe and cos

es away from a, Carlos Streeost‐effective afic on HighwaRoad would 

found to be ve following loc

h Street) 

, north of Cor

evard 

g SR 92) 

d solutions toMoon Bay, bu

ould greatly iBay, howevedy to determke it worth thalf Moon Bay mprovements cators on all sdjustments to

Experts Conn

oastal Trail adt‐effective altthe heavier tet in Moss Bealternative roy 1 (Alt 1).  improve bicy

very cost‐effecations were 

ronado Street

o providing a sut they carrie

mprove conner the large coine if the pothe cost (Alt 3) would improinclude (Alt 1signalized croo accommoda

necting Commun

djacent to theternative routraffic on Higheach, and Maoute for comm

ycle connecti

ective at impridentified as 

safer and moed a larger pr

nectivity for bost would matential volume). ove safety for1): osswalks ate slower wa

Ap

nities 

e coastline ute for hway 1 (Alt 2in Street in muting 

vity along 

roving  high priority

re connectedice tag. They 

bicyclists ake it e of bicyclists

r pedestrians 

alking speeds

ril 9, 2015 

 

Page 51: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

x

x

Thougof ovecheapaltern

Table

Pro

Hybri

Hybri

ation of Traness Buildout D

o Bico Pe

A Class II bbicyclists, of bicyclistSidewalks pedestrian

o AloHa

o Alo

gh they minimer‐ or under‐cper solution onative roadwa

e 26 - Cost

oject # 

d Bicycle and

1  Str

3  Sh

4  Sh

6  Pa

7  Co

10  Ma

11  Ca

  

d Bicycle and

2A  SR

2B  SR

2C  SR

5  Co

9  Tra

12  Air

17  SR

sportation AlDeficiencies 

cycle signal dedestrian refubike lane alonhowever givets would helpin the followns (Alt 1, 2, 3)ong Highway alf Moon Bay ong Coronado

mize the confcrossings as wof striped peday and interse

of Hybrid A

d Pedestrian 

riped Pedestr

arrows on Ma

arrows on Ca

rallel Trail adj

astal Trail thr

ain Street Cla

pistrano Road

d Pedestrian 

‐1 Sidewalk (

‐1 Sidewalk (

‐1 Sidewalk (

ronado Stree

affic Signal Up

rport Street C

‐92 Bike Lane

ternatives to

etection deviuge spaces onng Airport Streen the cost, a p determine ting locations ): 1 in Montara

o Street and A

lict and impawell as the lardestrian crossection improv

Alternative B

Facility Recom

rian Crossing w

ain Street 

arlos Street 

jacent to Hig

roughout the

ss III Bike Rou

d Bicycle Faci

Hybrid B

Facility Recom

Phase A) 

Phase B) 

Phase C) 

et and Ave Alh

pdates 

Class II Bike La

es 

49

ice n wide road creet would prodemand studhe need for awould provid

a, Moss Beach

Avenue Alham

ct with vehicrge footprint ings. A summvements is in

Bicycle and

Project Nam

mmended Im

with Beacons

hway 1 for th

entire study 

ute 

ilities 

Bicycle and Pe

mmended Im

hambra Sidew

anes 

Experts Conn

rossings ovide anothedy to determian additional de a more con

h,  Miramar, a

mbra in El Gr

le along Highis prohibitive

mary of the cocluded in Tab

Pedestrian

me 

mprovements

he entire stud

area 

edestrian Rec

mprovements

walk 

necting Commun

r alternate roine if the potbicycle routentinuous walk

and develope

anada 

way 1, the vee as comparedost of the proble 26. 

Improvem

dy area 

commended 

s with Additio

Ap

nities 

oute for ential volumee (Alt 2) king path for 

ed areas of 

ery high cost d to the muchposed hybrid

ments

 $    

 $     

 $     

 $  1

 $    

 $     

 $     

Total:   $  1

onal Funding

 $    

 $    

 $    

 $     

 $    

 $    4

 $  2

ril 9, 2015 

h d 

Cost 

2,550,000  

     44,000  

     43,000  

1,037,000  

5,251,000  

     85,000  

   866,000  

9,876,000  

1,475,000  

1,806,000  

1,564,000  

   749,000  

1,624,000  

4,238,000  

0,959,000  

Page 52: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

 

The  mSamTcompvariet

Transx x

x

Transx

x

Givenimprowhichthis hinclud

A sumimproservic

Table 

Hybri

 

Hybri

ation of Traness Buildout D

  

Transimajority  of  trans or privaprehensive recty of services 

it services thaShuttle buMore freqarea. (Alt 2The establ

it services thaSamTrans morning afrequency School busvehicles an

n the high cosovements shoh transit stopsybrid alternaded as being i

mmary of the ovements is ince for Cabrillo

27 ‐ Cost of Hy

Improvemen

d Transit Fac

Increased W

d Transit Rec

Bus Stop Am

sportation AlDeficiencies 

Hybr

it Improvthe  transit  imate bus  compcommendatiolisted here. 

at were evalus service on suent weeken2) ishment of a 

at were evaluservice that pnd evening pof Samtrans s service for Cnd maintenan

t but necessitould be baseds have the higtive, a conserimproved. 

cost of the prncluded in Tao Unified Scho

ybrid Alternati

nt 

cility Recomm

Weekend Sa

commended 

menities 

ternatives to

rid Bicycle an

vementsmprovementspanies  as weon will requir

uated to havesummer and fd service for 

park‐and‐rid

uated to haveprovides conneak periods wRoute 294 anCabrillo Unifience. (Alt 2) 

ty of improved on a travel dghest demandrvative estima

roposed hybrble 27. This cool District. 

ive Transit Imp

mended Impro

mtrans serv

Hybr

Improvemen

50

d Pedestrian

s s  will  depenell  as  requiredre a demand s

e the highest cfall weekendsthe existing S

e shuttle and

e less cost effenections to rewith limited snd 17. (Alt 3)ed School Dist

ements to busdemand studyd or highest pate of about 

rid alternativecost estimate 

provements 

ovements 

ice 

rid Parking Re

nts with Addit

Experts Conn

n with Additio

nd  on  discussd  acquisitionstudy to dete

cost effectives during specSamTrans fixe

d usage of exi

ectiveness weegional transistops though 

trict including

s stops, the sy with public potential for fhalf the stops

e roadway an does not inc

ecommended

tional Fundin

necting Commun

onal Funding 

sions  and  nen  and ongoinermine need a

eness were: cial events. (Aed routes serv

sting parking 

ere: it providers dincreased we

g a facility for

pecific locatioinvolvement future demans (40 stops) h

nd intersectiolude the cost

C

 $    

d Total   $    

ng 

 $    

Ap

nities 

Total:   $  5

egotiations  wg  costs. A mand want for 

Alt 1) ving the stud

 lots. (Alt 2)

uring the eekday 

r storing the 

ons chosen foto determinend. (Alt 1) Forhave been 

on t of school bu

Cost Estimate

    525,000  

    525,000  

6,240,000  

ril 9, 2015 

2,291,000  

with more the 

or e r 

us 

Page 53: CO E - smcgov.org...By 1970 Oak (510 In as April Broadway, land, CA 946) 763‐2061 sociation wit 9, 2015 E Suite 740 12 h Dyett & Bh CO valua A atia, Nelson N NNEC tion ltern Bui

 EvaluAddre

21 

  

The laspillovMidco

x

x

x

The fomake

x x

Table 

Pro

Hybri

Hybri

 

 

ation of Traness Buildout D

Increased S

Parkinack of capacitver of demanoast and Half 

FormalizedHighway 1Diagonal pare both pneed, thatMoss BeacImproved 

ollowing  loca their approv

Paving andParking lotHighway 1

28 ‐ Cost of Hy

oject # 

d Parking Re

1  Mo

3  Wa

5  Ca

6  El G

  

d Parking Re

2  Up

4  Ra

  

sportation AlDeficiencies 

SamTrans se

H

ng Improty for the largnd into commMoon Bay. T

d parallel par1. (Alt 2) parking for Mopart of larger it they be consch and El Granwayfinding si

ations would val dependent

d striping at tt for Rancho C1 (Alt 2) 

ybrid Alternati

commended 

ontara State B

ayfinding 

rlos Street On

Granada Diag

commended 

pper Gray Wh

ncho Corral d

ternatives to

rvice to regi

Hybrid Trans

ovementge amount of unity parkingThe following 

king for Mont

oss Beach aloimprovementstructed indenada. (Alt 3)ignage (Alt 1)

also benefit t on available

he upper GraCorral de Tier

ive Parking Im

Improvemen

Beach Parking

n‐Street Park

gonal Parking

Improvemen

hale Cove Park

de Tierra Park

H

51

onal transit 

it with Addit

ts weekend recg. There is a nproposed im

tara State Be

ong Carlos Strts, however itpendent of th

from  increase funding: 

ay Whale Coverra access and

mprovements 

Project Nam

nts 

g Lot Improve

ing 

 

Hybri

nts with Addi

king Lot Impr

king Lot 

ybrid Parking

Experts Conn

providers 

ional Funding

creational parneed for additprovements 

each, with a p

reet and diagot is suggestedhe approval o

ed parking; h

e parking lotd beach overf

me 

ements 

id Parking Re

itional Fundin

rovements 

g with Additi

necting Commun

 $    

g Total  $     

rking demandtional parkingpresent low c

hysical separ

onal parking d that given tof the larger p

however the 

(Alt 1) flow located 

ecommended

ng 

onal Funding

Ap

nities 

2,124,000  

8,889,000  

d results in a g in the cost solutions

ration from 

for El Granadhe parking projects in 

higher cost m

east of 

 $     

 $     

 $     

 $     

d Total   $    

 $    

 $    

g Total   $    4

ril 9, 2015 

s. 

da 

may 

Cost 

   557,000  

   303,000  

     34,000  

     54,000  

   948,000  

1,052,000  

2,346,000  

4,346,000