  • 8/7/2019 CO 2 Presentation-Mar'11

    1/21

    LARSEN & TOUBRO LIMITED

    COKE OVEN 2

    BHUSHAN STEEL, Angul

  • 8/7/2019 CO 2 Presentation-Mar'11

    2/21

    LARSEN & TOUBRO LIMITED

    Major Highlights

    11868 CUM Concreting in March2011.

    3 Nos EOT Erection Completed.

    Roof Sheeting Completed.

    CO Gas Under-jet Piping work Started.

  • 8/7/2019 CO 2 Presentation-Mar'11

    3/21

    Area Description UOM ScopeDrg. Rel. by

    BSLFront Avl. Completed

    Battery no 1 CUM 103645 103645 98235 98235

    Battery no 2 CUM 154037 154037 72114 72114

    By-Product CUM 80000 80000 63148 63148

    TOTAL CUM 337682 337682 233497 233497

    Presently WMM Work stopped due to non availability of workable front

  • 8/7/2019 CO 2 Presentation-Mar'11

    4/21

    Area Description ScopeDrg. Rel. by

    BSLFront avl.

    Seq. FrontAvl

    Completed ason 4

    thApr11

    Battery no 1 61194 51912 50488 45570 37127

    By-Product 29150 13853 12601 9684 8147

    Service Areas 1500 - - - -

    Battery no 2 34698 8947 2630 2630 1811

    AL 126542 74712 65719 57884 47085

  • 8/7/2019 CO 2 Presentation-Mar'11

    5/21

    Area Scope Sch. Rel. Act. Rel. Balance Sch. Date

    Quenching Tower 1462 1462 1462

    Coal Tower 9728 9728 4492 5236 Sep10

    End Platform-

    Battery 14219 4219 3925 294

    Quenching track rail

    foundation5306 5306 5306

    Coke wharf &

    De-dusting6167 6167 4462 1705 Sep10

    OtherArea 34312 34312 32265 2047 Sep10

    Total 61194 61194 51912 9282

  • 8/7/2019 CO 2 Presentation-Mar'11

    6/21

    Area Scope Sch. Rel. Act.Rel.

    Bal. Sch.Date

    Pipe Network 1700 1700 890 810 Mar11

    Primary cooler ( 3 No.+2

    Nos. Future)680 680 641 39

    Combi Scrubber 901 901 901 Released

    Electrostatic Detarrer 638 638 197 441

    De-acidification andAmmonia Stripping Plant

    475 475 375 100

    Exhauster building 1315 1315 1191 124

    Main control room 638 638 638 Nov'10

  • 8/7/2019 CO 2 Presentation-Mar'11

    7/21

    Area Scope Sch. Rel.

    Act. Rel. Balance Sch. Date

    Maintenance ware

    house utility2189 2189 2189 Nov'10

    Sulphur recovery 638 638 638 Nov'10

    Sulphur Solidification &Storage

    2423 2423 2423 Feb'11

    Coal water storage 149 149 149 Nov'10

    Electrical Receiving

    Station

    5787 5787 5787

    Settling basin 2277 2277 2277 Feb'11

    Others 9340 9340 1594 7746

    Total 29150 29150 13853 15297

  • 8/7/2019 CO 2 Presentation-Mar'11

    8/21

    Area

    DescriptionUOM Scope

    Drawing

    Released

    Front

    Avl.

    Fab.

    Comp

    Erec.

    Comp

    Temp Shed for

    Oven

    MT 1150 782 779 761 661

    Vessels MT 746 549 Nil Nil Nil

    Pipe Rack

    Structure

    MT 1300 1057 Nil Nil Nil

    Total MT 3196 2388 779 761 661

  • 8/7/2019 CO 2 Presentation-Mar'11

    9/21

    Area

    DescriptionUOM Scope

    Drg.

    Rel.

    Front

    Avl.

    Fab.

    Comp

    Erec.

    Comp

    Battery Proper MT 77 40 35 32 Nil

    Wet Quenching MT 59 Nil Nil Nil Nil

    By Product

    AreaMT 2980 1728 Nil Nil Nil

    Total MT 3116 1768 35 32 Nil

    Area demarcation is required on rake piping layout drawing

    so that civil, strl and piping can go simultaneously.

  • 8/7/2019 CO 2 Presentation-Mar'11

    10/21

    Major Scope Of Work-Equipment

    Slo

    e cription OM Scope rg. Rel. FrontAvl.

    Comp

    A Technological Structure & Equipment

    1 Coal Tower MT 116 il il il

    2 COB Proper MT 5989 il il il

    3 PEC System MT 900 il il il

    4 Wet Quenching MT 1010 il il il

    5 By Product Plant MT 2143 il il il

    6 Pipe & Valves MT 98 il il il

    7 HVAC System MT 225 il il il

  • 8/7/2019 CO 2 Presentation-Mar'11

    11/21

    Major Scope Of Work

    SlNo

    Description UOM Scope Drg.Rel.

    FrontAvl.

    Comp

    B Stainless Steel structures

    1 COB Proper MT 0.37 Nil Nil Nil

    2 Wet Quenching MT 13 Nil Nil Nil

    C Oven Machines

    1 COB Proper MT 6618 Nil Nil Nil

    D Other Area

    1 EOT MT 235 235 235 235

    2 Sheeting for TOPR SQ M 13980 13980 13980 9800

  • 8/7/2019 CO 2 Presentation-Mar'11

    12/21

    Drawing release schedule.

    Drawing control index & Scope.

    Balance Civil drawings of Bi-Product Area.

    GFC Drawings For Mixed gas , CO Gas Piping.

    Civil foundation Drg for pipe rack inside battery limit . Inline with structural fabrication and piping fabrication.

    Lay out Drawing & G A Drawing for mechanical.

  • 8/7/2019 CO 2 Presentation-Mar'11

    13/21

    Overall S Cur ve to be prepared along with

    Engineering, supply and site service .

    Schedule of Supply ordering and deliveries .

    4 nos Scrubber fabrication issue not cleared,

    which is supplied by BU or fabricated at site .P O Released for 27 no's Item

  • 8/7/2019 CO 2 Presentation-Mar'11

    14/21

    Material Related:-

    BOPAREA- PIPING

    Valve & Nozzle's for COG under jet Piping .

    Valve & Nozzle's for CO gas, Mixed gas & De graphitizing air.

    BPPA

    REA

    :- Primary Gas Cooler with all internal parts.

    Primary gas cooler Pumps.

  • 8/7/2019 CO 2 Presentation-Mar'11

    15/21

  • 8/7/2019 CO 2 Presentation-Mar'11

    16/21

    BI PRODUCT - MA

    IN ECR RA

    FT CONCRETING

  • 8/7/2019 CO 2 Presentation-Mar'11

    17/21

    SETTLING TANK RAFT

    BATTERY #1 DECK SLAB UPTO

    5th SEGMENT COMPLETED

  • 8/7/2019 CO 2 Presentation-Mar'11

    18/21

    BATTERY #1 TEMPORARY SHED

    BATTERY #1 TEMPORARY SHED-

    EOT ERECTION COMPLETED

  • 8/7/2019 CO 2 Presentation-Mar'11

    19/21

    COG UNDERJET PIPING

    ERECTION UNDER PROGRESS

  • 8/7/2019 CO 2 Presentation-Mar'11

    20/21

    CHIMNEY- 140M high

    COMBI SCRUBBER

  • 8/7/2019 CO 2 Presentation-Mar'11

    21/21

    Thank You