cnrad test it localization beacons
DESCRIPTION
CNRAD TEST IT Localization beacons. Alberto García Molero 12/02/2013 RadWG meeting. DUT: Localization beacon DGB102. TETRA Project: IT is investigating a solution to gelocate people in underground areas where no GPS is available - PowerPoint PPT PresentationTRANSCRIPT
CNRAD TESTIT Localization beacons
Alberto García Molero12/02/2013 RadWG meeting
DUT: Localization beacon DGB102• TETRA Project: IT is investigating a solution to gelocate people in underground
areas where no GPS is available• Indoor Localization Solution tested: SYSOCO beacons (model DGB102)
12/02/2013 RadWG meeting: IT Lcalization beacons (1/7)
Overview of ILS principles
12/02/2013 RadWG meeting: IT Lcalization beacons (2/7)
CNRAD Test: Schema of the installation
12/02/2013 RadWG meeting: IT Lcalization beacons (3/7)
TSG 46 (area 463)
CNRAD Test: Positioning of the beacons
12/02/2013 RadWG meeting: IT Lcalization beacons (4/7)
TSG 46 (area 463)
15 beacons in TSG 46 (area 463)
5 beacons in TSG 45 (offline)
CNRAD Test: Monitoring of the beacons
12/02/2013 RadWG meeting: IT Lcalization beacons (5/7)
CNRAD Test: Observed failuresTests started on 21/09/2012• On 26/09/2012 beacon nº 7 changed spontaneously to ID number 39• On 27/09/2012 signal from beacon nº 12 became unstable • On 4/10/2012 beacon nº2 disappeared• On 9/12/2012 a beacon with ID 2066 appeared (beacon nº2 / beacon in TSG 45?)• On 13-14/12/2012 beacons nº1, 6, 7, 8, 9, 10, 11, 13 and 14 disappeared• On 24/10/2012 beacons nº 566 and 42 appeared. The attenuation parameter of
both beacons changed of value• During week 46 beacon nº11 changed spontaneously to ID number 523• On 12/12/2012 beacon nº 20 changed spontaneously to ID number 23
Test finished on 17/12/2012- Total dose registered in TSG 46 (area 463): 40 Gy (20 years of LHC running)- Total dose registered in TSG 45 (area 453, off-line): 154 Gy
12/02/2013 RadWG meeting: IT Lcalization beacons (6/7)
CNRAD Test: Conclusions
Is beacon hardware reliable? - Only two beacons are truly dead: nº5 and nº13- 7 beacons (1, 2, 5, 11, 13, 19 and 20) worked after replacing their batteries by new ones
Conclusion: beacon hardware is reliable. But replacement of all beacons after 5 years should be planned to keep the system reliable!
Is beacon software reliable?- The main impact of ionizing radiation on - Other parameters may also change of value
Conclusion: beacon sofware is not reliable. SYSOCO is already working in the “hardening” of the software
12/02/2013 RadWG meeting: IT Lcalization beacons (7/7)