Page 1: CNCRP / BSPP Outline of Retrofitting

CNCRP / BSPP

Outline of Retrofitting

Page 2: CNCRP / BSPP Outline of Retrofitting

1

Contents

1 . The purpose of the Work ...................................................................................................... 2

2 . The retrofitting Procedure for Existing buildings. ................................................................... 5

2-1 Assessment ....................................................................................................................... 6

2-1-1 Basic Assessment ........................................................................................................... 6

2-1-2 Simplified evaluation. ..................................................................................................... 8

2-1-3 Advance Simplified evaluation. ........................................................................................ 8

2-1-4 Detail Assessment ........................................................................................................ 9

2-1-5 Retrofitting Design ....................................................................................................... 11

2-1-6 Construction ................................................................................................................ 12

3 . New Construction of buildings ........................................................................................... 14

3-1 New Construction manual ................................................................................................ 14

4 . Plan ................................................................................................................................. 15

4-1 Important buildings .......................................................................................................... 15

4-2 Future Plan (If possible) ................................................................................................... 16

4-3 Training ....................................................................................................................... 17

Page 3: CNCRP / BSPP Outline of Retrofitting

2

1. The purpose of the Work

“Earthquakes don’t kill people, buildings do.” It is the famous saying. Unfortunately, this

situation applies for the buildings in Bangladesh. The buildings should supply the sense of the

security. However, Rena plaza disaster had been occurred in April in 2013. This accident was

not caused by Earthquake, it was happened by not obeying rules of Bangladesh.

After Rana Plaza, CNCRP, BSPP has been supported the safety building for Public buildings

and Garment factory. Through the experience of the project, we can say 65% of the buildings,

some of retrofitting is needed for the target of BNBC, because BNBC becomes effective in 2008.

Page 4: CNCRP / BSPP Outline of Retrofitting

3

Earthquake Hazard & Risk Assessment was carried by CDMP, which means Bangladesh

government had been started the preparation. And the Hazards in Dhaka are estimated as

following;

“Do you think it is correct that we don't do anything, although we expect the huge damage if

the earthquakes occur?” We say again the buildings should supply the sense of the security.

Kathmandu earthquake in April 2015

CNCRP, “Project for Capacity Development on Natural Disaster-Resistant Techniques of

Construction and Retrofitting for Public Buildings in the People’s Republic of Bangladesh” was

commenced in 2010 to establish the technique in Bangladesh that the buildings should supply

the sense of the security.

<Hazards in Dhaka>

Building collapses: 72.000 buildings 22% of Dhaka buildings

Building damages : 158,000 buildings 49% of Dhaka buildings

Estimated dead peoples: 88,000 1.3% of Dhaka buildings

Financial loss:

12.7 Billion US dollars, 1.0 Trillion Taka 13.4% per GDP of Bangladesh 2009

<Assessment & Design>

Page 5: CNCRP / BSPP Outline of Retrofitting

4

<Retrofitting Constriction works>

Page 6: CNCRP / BSPP Outline of Retrofitting

5

2. The retrofitting Procedure for Existing buildings.

Considering the existing buildings, the carry the retrofitting works are carried out the following flow.

1) Simple Inspection for model buildings 

BNBC  load investigation 

Selection buildings     

with Drawings, geographical distribution 

Unbearableto 

Own weight

Bearable to 

Own weight

First Level Inspection

Demolish & Reconstruction Or Reduce live load

Demolish & Reconstruction Or Change occupancy 

All right, as it is 

Demolish &   Reconstruction Or Reduce  live  load Or RETROFIT Or as it is 

All right,as it is

Low earthquake 

proof 

Sufficient earthquake proof (BNBC) 

Sufficient earthquake proof (BNBC) 

Insufficient earthquake 

proof 

2) Detailed Inspection for model buildings

Low earthquake 

proof 

SecondLevel   Inspection

Simplified evaluation by Design drawings On site visual observation Weight (column size, concrete strength)

As‐built drawingsOn site observation) Core sampling & compression test)

Reinforcement Arrangement & StrengthOn site observation & Detailed Inspection calculation 

Demolish &   Reconstruction Or Reduce live load 

Setting Judgment Criteria 

< Basic Assessment > < Design > < Construction > < Detail Assessment >

Advanced simplified evaluation   On  site  observation  (rebar  arrangement, rebound tests)

Page 7: CNCRP / BSPP Outline of Retrofitting

6

2-1 Assessment

2-1-1 Basic Assessment

CNCRP established building inventory of Dhaka was prepared to know the conditions of

existing buildings in Dhaka. In this building inventory data, we can easily understand the

numbers of the building per construction ages, the building structures such as RC frame,

building stories. These data is the base data to perform the basic Assessment of the retrofitting

for the existing buildings.

Sample of inventory

Page 8: CNCRP / BSPP Outline of Retrofitting

7

Construction Year of Brick Masonry

Construction Year of RC Frame

Other Information

Items Data in Dhaka managed by PWD

Type Brick Masonry 1328, RC Frame 827

Usage Residential 1599, Non-Residential 495 and Un-known

Stories Medium Brick Masonry 2 stories, RC Frame 5 stories

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

80.00%

90.00%

100.00%

0

50

100

150

200

250

300

350

befo

re19

50

1951

-195

5

1956

-196

0

1961

-196

5

1966

-197

0

1971

-197

5

1976

-198

0

1981

-198

5

1986

-199

0

1991

-199

5

1996

-200

0

2001

-200

5

2006

-201

0

2010

-

Freq

uenc

y

Construction Year

Brick Masonry

Page 9: CNCRP / BSPP Outline of Retrofitting

8

2-1-2 Simplified evaluation.

The building design can be evaluated by Simplified evaluation whether they it has BNBC

function or not. This evaluation needs architectural drawing, structure drawing. In other

words, this evaluation is suitable for design checking based on BNBC.

Evaluation sheet Calculation Sheet

2-1-3 Advance Simplified evaluation.

Advance Simplified evaluation applies for site information such as rebar arrangement ,

estimated concrete strength by rebound test. This evaluation also estimates whether

they it has BNBC function or not. This evaluation needs not only architectural drawing,

structure drawing but also site information. In other words, this evaluation is suitable

for design and construction quality as simplified checking based on BNBC.

Page 10: CNCRP / BSPP Outline of Retrofitting

9

Advance simplified evaluation that is done in the site, comparing with design

documents

2-1-4 Detail Assessment

To know the actual conditions of the target buildings, we perform the

Detail Assessment of existing buildings.

“Is” is the index to show the vulnerability of buildings. If the “Is” is larger, the building

has an enough resistance of earthquake. In Japan, we apply this index as 0.6.

Considering the seismic situation between Japan and Bangladesh we apply it as 0.3 in

Bangladesh. It means the buildings strength of Bangladesh is almost half of the

Japanese ones. The above graph is sample of the survey in Dhaka, the situation of this

0

1

2

3

4

5

0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8

Sto

ry

Is

Bangladesh Japan

If the “Is” index is less than 0.3, we will do

the retrofitting works. After retrofitting

works the building has the “Is “index is at

least 0.3.

Page 11: CNCRP / BSPP Outline of Retrofitting

10

building has a half of Bangladesh standard, and a quarter of Japanese standard.

Regarding “Is”, it is decided with considering Bangladesh building such as doing

structural test and concrete test. So, this method is based on Bangladesh building.

Striatal test to know the building beaver in the BNBC load

Page 12: CNCRP / BSPP Outline of Retrofitting

11

2-1-5 Retrofitting Design

To get enough strength as a building, we shall make a design drawing of retrofitting

based on the seismic assessment.

Sample of retrofitting

In Design stage, the construction cost is also estimated m Retrofitting. Through the

experience of CNCRP, retrofitting cost is 30-40% comparing of new construction building.

Anyhow, it is important to know the building situation that you work usually, we

recommend to do at least the building assessment as soon as possible.

Page 13: CNCRP / BSPP Outline of Retrofitting

12

2-1-6 Construction

To get enough strength as a building, we shall perform the

construction works based on the retrofitting design. To

keep quality of construction. CNCRP, BSPP developed the

quality control method for Bangladesh

Daily Report

Inspection

Page 14: CNCRP / BSPP Outline of Retrofitting

13

Safety Drills Site Instruction

Foundation work Column Jacketing

Column Jacketing Bracing

Bracing Bracing

Page 15: CNCRP / BSPP Outline of Retrofitting

14

3. New Construction of buildings

3-1New Construction manual

We shall take a license to work for society. The buildings also need the license..

Unfortunately, Rana Plaza collapsed in April 2013. And a huge persons were killed by the

collapse. The survey after the collapse, Rana Plaza, experts said, “ The building did not obey the

BNBC (Bangladesh National Building Code)." We strongly recommend we should obey BNBC

when we construct the buildings. The retrofitting works will be performed to 5-10 buildings per

year even if we have enough budgets. However, in Bangladesh, the more than 3,000 buildings

are constructed per one year (Rajuk). To make strengthen city against national disaster , we

must obey BNBC when we construct new buildings.

<Manuals on Seismic Design of New Construction>

Manual for Seismic Retrofitting Evaluation of Existing Reinforced Concrete Buildings

Manual for Seismic Retrofit Design of Existing Reinforced Concrete Buildings

Manual for Retrofit Construction and Supervision of Reinforced Concrete Buildings

Guidelines for Quality Control of Design and Construction of Reinforced Concrete Buildings

Manual For Seismic Design of Reinforced Concrete Buildings

Manual for Vulnerability Assessment and Damage Prediction of Reinforced Concrete Buildings

Page 16: CNCRP / BSPP Outline of Retrofitting

15

4. Plan

4-1 Important buildings

Even in the disasters, the fire-department must

have the normal functions. In CNCRP, we did the

retrofit work for one of the fire stations as a pilot

project.

Page 17: CNCRP / BSPP Outline of Retrofitting

16

4-2 Save Children

4-2 Future Plan (If possible)

Regarding to Public building, a new construction cost

depends on the conditions. Then we can't estimate exact

price without the detail design.

However, considering PWD’s experience, the general

cost is approximately TK 2000 per square feet. It is

rough estimation. On the other hand, the cost of

retrofitting price is ongoing to estimate. In our few

experience, the cost is 30-40% of the new construction building.

Shall we consider the following issue.

the average of floor area of

RCC buildings

77,700 sft.

62,160,000 Taka

the roughly estimate

retrofitting cost

Per One RCC

Per One RCC

One trillion Taka

CDMP Earthquake

16,000 buildings

If we have one trillion Taka we can retrofit 16,000 building

Page 18: CNCRP / BSPP Outline of Retrofitting

17

4-3 Training

The dissemination of the technology regarding to retrofitting works, is

important to make a resistant city against the natural disasters in

Bangladesh. More than 60 engineers of Bangladesh learn the

retrofitting technology in CNCRP project every year.

<Training Material & Conditions Training >

< Certificate Awarding Ceremony >

Page 19: CNCRP / BSPP Outline of Retrofitting

18

Md. Ahsan Habib, Project Manager of CNCRP Mr. Shakhawat Hossain, Deputy Project Manager of BSPP E-mail [email protected], [email protected]