cma-3 support to standardisation 7 th cma plenary meeting palais beaumont, pau, france, 14 th may 08...

17
CMA-3 CMA-3 Support to Standardisation Support to Standardisation 7 7 th th CMA Plenary Meeting CMA Plenary Meeting Palais Beaumont, Pau, France, 14 Palais Beaumont, Pau, France, 14 th th May 08 May 08 Ulrich Borchers, Peter Lepom, Ulrich Borchers, Peter Lepom, Bernd Gawlik Bernd Gawlik

Upload: jacob-bradford

Post on 21-Jan-2016

223 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik

CMA-3 CMA-3

Support to StandardisationSupport to Standardisation

77thth CMA Plenary Meeting CMA Plenary Meeting

Palais Beaumont, Pau, France, 14Palais Beaumont, Pau, France, 14thth May 08 May 08

Ulrich Borchers, Peter Lepom, Ulrich Borchers, Peter Lepom, Bernd Gawlik Bernd Gawlik

Page 2: CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik

2

Agenda

Introduction

State of the Play of the Mandate to CEN TC 230 State of agreement at COM level Proposed projects Adoption at CEN level

Further steps (Roadmap 2008-2011)

Page 3: CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik

3

CMA 2007 – 2009 – Tasks and Deliverables

CMA-1Exchange of best practices

STRATEGIC CO-ORDINATION GROUP

PLENARY CMA(GW, SW/MW)

CMA-2QA_QC

CMA-3Standardisation

(CEN TC/230)

• Sharing best practices• Identification of gaps and needs• Analytical methods, sampling• Practical exercises• Sediment and biota

• Follow-up of COM decision• Discussion of common strategy (EAQC-WISE)

• Identification of standards• Follow-up of CEN work• Links with RTD

WG C or WG E(joint meetings)

WG E

Page 4: CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik

4

CMA-3 Core Activities

Identification and evaluation of standardisation needs and appropriate actions related to them Discussion on standardisation needs

related to WFD chemical monitoring Establishment of lists of

Existing standards fit for purpose Standards that need to be revised Standards that need to be developed

Proposal of a) Existing standards for adoption b) Development of new standards mandated to CEN

Page 5: CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik

5

Agenda

Introduction

State of the Play of the Mandate to CEN TC 230 State of agreement at COM level Proposed projects Adoption at CEN level

Further steps (Roadmap 2008-2011)

Page 6: CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik

6

Edition of the Mandate to CEN

The mandate was edited on 7th April 2008 under the number M/424 Development or improvement of standards in

support of the WFD

Page 7: CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik

7

Proposed projects for the mandate

5 chemical parameters/groups 1) Organochlorine pesticides:

(incl. alachlor, endosulfan, hexachlorobenzene, hexachlorocyclohexane isomers, pentachlorobenzene, DDT and metabolites, aldrin, dieldrin, endrin, and isodrin)

Matrix: whole water samples

Samples containing up to 0.5 g/L of suspended solids.

Technique: GC-MS

Type of work: Co-normative research

Page 8: CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik

8

Proposed projects for the mandate

5 chemical parameters/groups 2) Pentabromodiphenylethers: procedure for the analysis of congeners

representative for the technical pentabromodiphenylether formulation (incl. BDE28, BDE47, BDE99, BDE100, BDE153, and BDE154)

Matrix: whole water samples

Samples containing up to 0.5 g/L of suspended solids.

Technique: GC-MS or GC-ECNI-MS

Type of work: Pre-normative research

Page 9: CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik

9

Proposed projects for the mandate

5 chemical parameters/groups 3) Tributyltin compounds

Matrix: whole water samples Samples containing up to 0.5 g/L of suspended

solids. Technique: GC-MS or GC-AED Type of work: Pre-normative research

Page 10: CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik

10

Proposed projects for the mandate

5 chemical parameters/groups 4) Chloroalkanes The various options for the analysis of SCCPs including

several clean-up and detection techniques as well as calibration protocols

should be thoroughly compared and evaluated. A proposal should be made on how to proceed to come to a

standardised method for the analysis of SCCPs in whole water samples

The option to develop an operationally defined parameteras a surrogate for SCCP should be considered.

Matrix: whole water samples Samples containing up to 0.5 g/L of suspended solids.

Technique: to be defined Type of work: Co-normative research

Page 11: CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik

11

Proposed projects for the mandate

5 chemical parameters/groups 5) Polycyclic Aromatic Hydrocarbons: analysis of PAHs (incl. anthracene, fluoranthene,

benzo(a)pyrene, benzo(k)fluoranthene, benzo(b)fluoran-thene, indeno(1,2,3-cd)pyrene and benzo(ghi)perylene

The ISO/CD 28540 might be an advantage point for further method development

Matrix: whole water samples samples containing up to 0.5 g/L of suspended

solids. Technique: GC-MS Type of work: Pre-normative research

Page 12: CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik

12

Proposed projects for the mandate

3 biological methods 1) Phytoplankton sampling (lake and marine) 2) Guidance on the estimation of

algal biovolume (lake) 3) Fish sampling

Page 13: CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik

13

Adoption of the Mandate at CEN level

After reception of the official letter from DG ENTR CEN CS has prepared the necessary enquiry on the adoption of the mandate to all CEN members In the respective questionnaire it was proposed to adopt the

mandate as set out in the M424 document In addition it is proposed that the work should start when the

financial requirements are settled For meeting the time schedule and for ensuring the

necessary resources

The deadline for this enquiry is 2008-06-06 In addition a formal resolution will be taken at the next

CEN TC 230 meeting in Hof (Bavaria) at 2008-05-29 this will underline that the mandate is highly welcomed and it

will endorse the formal adoption by CEN members

Page 14: CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik

14

Agenda

Introduction

State of the Play of the Mandate to CEN TC 230 State of agreement at COM level Proposed projects Adoption at CEN level

Further steps (Roadmap 2008-2011)

Page 15: CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik

15

Further steps (1)

Meeting of CEN TC 230 / WG 1 in Hof (Bavaria) on 2008-05-28: Resolution on the formal and complete re-

installation of the working group Election of a new Chairman for the WG 1 Technical discussion on the 5 chemical

methods/projects (approaches, problems, main tasks ….

Technical discussion on the possible structure of the work and on contributors

Advice will be sought from DIN (secretariat of CEN TC 230) on the management of the projects

Page 16: CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik

16

Agenda of the meeting of CEN TC 230 / WG 1

5) The Chemical Monitoring Activity under the CIS of the WFD (Mandate 2007 – 2009)

5.1) Report on the CMA-3 “Standardisation Needs” activity plan and on the outcome of recent meetings

6) The new EU QA/QC Directive on technical specifications for chemical analysis and monitoring of water status - What are the consequences for the application of CEN standards?

7) Mandate M424 addressed to CEN for the development or improvement of standards in support of the WFD (edited on 2008-04-07)

7.1) State of the play of the mandate – General discussion 7.2) The five chemical projects of the mandate – Technical discussion considering

the COM requirements on the methods Organochlorine pesticides ISO TC 147 SC2/ WG 53) Pentabromodiphenylethers Tributyltin compounds Chloroalkanes ISO TC 147 SC2/ AHG chloroalkanes) PAH ISO TC 147 SC2/ WG 19 PAH

7.3 Co-operation with existing ISO/TC 147 WGs 7.4 Next steps and actions needed

Page 17: CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik

17

Further steps (3)

Discussion with JRC (IES and IRMM) on the further steps Clarification of funding possibilities with DG ENTR!?

Date? Who?

Clarification of relevant funding guidelines(Terms and Conditions) with DG ENTR

Elaboration of a Technical Document with the detailed description of work (DOW) and on the administration of the work Borchers, Lepom, Gawlik with contributions from others Timeframe 3 month (but from which moment the clock starts to click?)

Submission of the proposal (technical document) date?

Kick-off of the projects ! date?